2. METRADO DE CARGAS
Wu2
Wu1
2.125 m 2.525 m
X RB
Wu1 TRAMO DESCANSO
Carga Muerta Carga Viva
P.P = 570.24 Kg/m S/C = 600.00 Kg/m
Acabados = 120.00 Kg/m
690.24 Kg/m 600.00 Kg/m
WD1 = 966.34 Kg/m WL1 = 1020.00 Kg/m Wu1 = 1986.34 Kg/m
4. DISEO EN ACERO
Para Momento Positivo: 4.87 T-m
Asumiendo varilla de acero: = 1/2
b= 120.00 cm As = 1.27 cm
d= 17.17 cm
a= 1.54 cm USAR = 7 1/2 @ 19
As (+) = 7.86 cm Ok!
As (+) = 7.86 cm
S= 19.00 cm
# Varillas = 7
As min = 3.71 cm
Para As de Temperatura:
As temp = 3.56 cm
As temp = 1.78 cm Dos capas
Asumiendo varilla de acero: = 3/8
S= 39.50 cm As = 0.71 cm
S max = 99.00 cm
S max = 45.00 cm USAR = 3/8 @ 39.5
S= 39.50 cm