SPE ascot RESERVOIR MANAGEMENT KEY PERFORMANCE INDICATORS 3

should tie revisited at least every three to four years to off pressures along with injection profile are needed to
determine present status and arrest any deviation from its monitor the flood front advance through the reservoir.
expected performance.
7. Economic Evaluation Plan
4. Drilling and Production Plan To appreciate the above plans and their economic values, it is
This plan defines the basic well design to drill and complete imperative that such plans collectively be subjected to
the discovers. appraisal and development wells properly and rigorous economic evaluation to determine the discounted
efficiently. The plan should be translated into programs that present cash flow value, its payout time and the rate of return
address all aspects of well drilling, completion. production and on the investment. However. the economic evaluation efforts
abandonment practices. Moreover. appropriate section for should be revisited when reservoir development studies are
detailed data acquisition should be included in line with data revisited to incorporate any refinement in predicted production
acquisition master plan. Also. detailed cost estimation for performance. various remedial actions and any addition of
drilling, completing and future abandonment of the wells capital and operation costs.
should be included. Thus will enable drilling and completion Economic evaluation always incorporates the impact of oil
professionals to properly monitor and cost control this phase and gas prices along with the equipment and senices. price.
of reservoir management process. cost escalation and operating cost that are reviewed
pcnothcally. Other economic factors such as taxes. royalty
S. Surface Facilities Plan and depreciation updates arc required to reflect current
This plan defines the total system of all moving and stationary impacts on economic evaluation.
equipment used to efficiently control and direct the oil and gas Cost control procedures should be addressed and stipulated
production from well head to custody transfer point. Also. in the economic evaluation plan. nevertheless. its practice m
water production and injection should be controlled and diligent fashion throughout the reservoir's productive duration
directed to appropriate disposal or injection points. should be stressed.
First the surface facilities should be properly identified so
that a preliminary feasibility study along with its cost Reservoir Management Key Performance Indicators
estimation can be made for the various possible different It is rare to find in the literature any documented examples of
alternatives. Secondly. provisions should be made for the mismanaged reservoirs. In fact when such conclusion becomes
surface facilities preliminary design and execution procedures a fact. responsible staff and management officers move rather
Thirdly. project execution will commence with detailed design swiftly to cover it up and attempt to stop the spread of the
along with a timetable for all activities inclusive of hand-over misdeeds. Nevertheless, there arc many resenoirs throughout
Then this is followed by procurement. the fabrication of all the World and in particular in our Asia Pacific region that can
required equipment and the construction of needed structures. be identified to be mismanaged reservoirs.
In addition to the above scheduling, installation. To evaluate the effectiveness of the reservoir management
conunissioning and hand-over, the plan should be designed process. a grading system has been devised to facilitate such
properly to meet the target dates. Surface facilities plan will determination. The Key Performance Indicators (KPIs) are
not be completed without making provisions to continue to listed below to correspond to the seven component of reservoir
monitor and cost control the actual expenditure in relation to management process.
previously prepared cost estimates. Any deviation and in I- Synergy Team Plan, (SFKPI)
particular cost over-run should be identified and reviewed for 2- Data Acquisition Plan. (DAKPI)
proper actions. Plans should include properly spaced Reservoir Development Plan. (RDKPI)
3-
inspection of all surface facilities to identify any deviations in 4- Drilling and Production Plan. (DPKPI)
performance and/or operational problems so that remedial 5- Surface Facilities Plan, (SFKPI)
actions be implemented. if required. to maintain the surface 6- Operation and monitoring Plan. (OMKPI)
facilities in operative conditions and in accordance with its 7- Economic Evaluation Plan. (EEKPI)
designed specifications. Recognizing that reservoir management process is an
integrated and multidisciplinary process. when any component
6. Operation and Monitoring Plan becomes ineffective or missing, then the whole system will
The purpose of this plan is to stipulate the operational and experience some kind of a breakdown. In other words the
monitoring procedures to ensure that the reservoir and above components of reservoir management process should be
production operations surveillance is carried out properly. evaluated and graded separately. Therefore, it is not
This plan should also define in details the data gathering and appropriate to average them in order to produce a single value
their frequency from the wells. reservoir, surface facilities and indicator. When weakness exists in one component. it can not
cost factors be substituted or strengthened by another component due to
Accurate production toil/garewaterl. bottom hole pressure the unique integrity of each component
and production-logging measurements arc of utmost On the other hand each of the above key performance
importance. The use of such data is needed to determine
average reservoir pressure. productivity, permeabil its and
formation damage extent. For water injection projects accurate
injection rate and pressure measurements. injectnity and fall