DUCTILE IRON PIPE PRESSURE TEST. TEST No.

_______

NAME OF PROJECT: C2010-09 IMPROVEMENT OF WATER SUPPY TO THE SOUTH EAST COAST

DATE ______________ WEATHER:_________________

From Ch____________ Elevation/m____________ Pipe____________mm

To Ch ____________ Elevation/m____________ Elev. Diff._______m Test length:_____m

New pipe and valve sections have been subjected to a hydrostatic pressure of _______bars

TIME STARTED: _______________ TIME FINISHED: _________________

SPECIFICATION:

Test is performed as per ISO 10802:1992.- Ductile iron pipelines- Hydraulic Testing after
installation
cl. 5.1.2.1 Falling pressure Test

ACCEPTANCE CRITERIA

As per Clause 6 of ISO 10802, ''The water loss shall not exceed 0.001litre/hour/km of pipeline/millimetre of nominal
size/bar of static pressure(average head applied to the test section)''

TEST OBSERVATION

Pressure Reading _______bar ch___________ Time___________

Pressure Reading _______bar ch___________ Time___________

CALCULATION:

(a) Allowable Leakage ( litres) = 0.001litre X ______hr X _______Km X______mm X _______bar

= _______litres.

(b) Actual Leakage (litres) = 3.14 x Radius( ) mmx Radius( )mm x Depth of Water Used( )mm

Actual Circular Reservoir Volume = ( ) Cubic mm x 1x10-6 = _______ Litre

Remarks:___________________________________________________________________________

Test passes if actual < allowable. Inspector ________________ Date ________

Test fails if actual > allowable. Inspector _________________ Date _________

Contractors Rept _________________