OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
TABLE OF CONTENTS
ENGG CERT
SS
SS
SS
SM
SM
SM
1. INTRODUCTION 3
1.1 Purpose 3
1.2 Facilities Overview 3
2. INSTRUMENT NAMEPLATES 3
10-01506-0001 ISSUED FOR INTERNAL/CLIENT PMT REVIEW
2.1 Documentation 3
DESCRIPTION
21/11/13
16/12/13
31/01/14
DATE
REV. NO.
C
A
DISCIPLINE
ENGINEER
________________
DATE ___________
PROJECT
ENGINEER
________________
DATE ___________
CERTIFIED
________________
DATE ___________
CONSTRUCTION
AGENCY
________________
DATE ___________
OPERATIONS
________
DATE ___________
CONTROL NUMBER
DATE _____________
BY: ______________
VERIFICATION
EDSD
THIS INDICATES THAT REV. NO. ____________
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
1. INTRODUCTION
ENGG CERT
SS
SS
SS
1.1 Purpose
The purpose of this Specification together with Project documents is to
SM
SM
SM
production capacity of Khurais field from 1,200 MBCD to 1,500 MBCD. The
DESCRIPTION
The project will design and install a fifth Crude Train at KhCPF to produce
the additional AL crude oil. The additional gas from the new oil train will
require installation of a third Gas Train with molecular sieve dehydrators.
Additionally, the scope will include installation of combined cycle 140 MW
Cogeneration facilities, expansion of existing Seawater Injection Facilities
with two additional seawater pumps.
Off plot scope includes installation of 48, 145 km Seawater supply line
JO/EWO
from Ain Dar to KhCPF along with Ain Dar pumping station additional
Booster pump expansion. Also, Shedgum Gas Plant Slug Catcher
modification will be required to accommodate the full flow of Khurais Sour
Gas along with the Uthmaniyah Gas Plant Swing Flow. Additionally, two
21/11/13
16/12/13
31/01/14
DATE
new residential buildings will be required along with all plant major electric
and non-electric utility systems and security infrastructure expansion
REV. NO.
C
A
________________
Where nameplates are required for Instrument identification a Nameplate
DATE ___________ List shall be produced as per SA-2504 List of Nameplates for Local
Mounted Instruments. The nameplate List shall detail the text required to
CONSTRUCTION
AGENCY
be engraved for each nameplate.
________________
Separate drawings shall be prepared in accordance with Library Drawing
DATE ___________
DD-950025 to cover nameplates required for instruments as follows:
OPERATIONS
DATE _____________
BY: ______________
VERIFICATION
Annunciator.
THIS INDICATES THAT REV. NO. ____________
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SS
SS
SS
Every item of field instrumentation for which a tag number is allocated shall
be provided with an engraved nameplate. This nameplate will be in addition
SM
SM
SM
16/12/13
31/01/14
DATE
C
A
DATE ___________ The dimensions of 031B shall be 3 1/4 x 5 and the lettering shall be 1/4
CERTIFIED
with a maximum of 23 characters per line or 1/8 high with a maximum of
________________ 38 characters per line.
DATE ___________
See Nameplate 031B in Appendix A
CONSTRUCTION
AGENCY
Nameplates shall be fixed using stainless steel screws.
________________
DATE ___________
OPERATIONS
________
DATE ___________
CONTROL NUMBER
DATE _____________
BY: ______________
VERIFICATION
EDSD
THIS INDICATES THAT REV. NO. ____________
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
OF THIS DRAWING IS COVERED, FOR ALL A 21/11/13 10-01506-0001 ISSUED FOR INTERNAL/CLIENT PMT REVIEW SM SS
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
B 16/12/13 10-01506-0001 ISSUED FOR CLIENT E-RREVIEW SM SS
AGENCY
________
PROJECT
ENGINEER
ENGINEER
CERTIFIED
DISCIPLINE
BY DRAWING COMPLETION CERTIFICATE BY: ______________
OPERATIONS
CONSTRUCTION
DATE ___________
DATE ___________
DATE ___________
DATE ___________
DATE ___________
________________
________________
________________
________________
(DCC)NO. _______________________________ C 31/01/14 10-01506-0001 ISSUED FOR PROJECT PROPOSAL SM SS
DATE _____________
KHURAIS
Saudi Aramco 2616-ENG (10/2002)
PROJECT SPECIFICATION
DOC
DWG.TYPE
APPENDIX A - NAMEPLATE TYPES
SAUDI ARABIA
B37
PLANT .NO
J
INDEX
SAUDI ARABIAN OIL COMPANY
PP-965029
DOC CLASS
6
5
OF
SHT. NO.
C
REV. NO.
DSN:3283
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Saudi Aramco 2616-ENG (10/2002)
OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SS
SS
SS
PROJECT STANDARDS
SM
SM
SM
Number Description
Number Description
DESCRIPTION
Number Description
21/11/13
16/12/13
31/01/14
DATE
REV. NO.
C
A
DISCIPLINE
ENGINEER
________________
DATE ___________
PROJECT
ENGINEER
________________
DATE ___________
CERTIFIED
________________
DATE ___________
CONSTRUCTION
AGENCY
________________
DATE ___________
OPERATIONS
________
DATE ___________
CONTROL NUMBER
DATE _____________
BY: ______________
VERIFICATION
EDSD
THIS INDICATES THAT REV. NO. ____________
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.