Vous êtes sur la page 1sur 5

1.

Creative Construction Conference 2015


Jun 21, 2015 - Jun 24, 2015 Krakow, Poland Dec 1, 2014
2. International Conference on Building Information Modelling (BIM) in Design,
Construction and Operation
Sep 9, 2015 - Sep 11, 2015 Bristol, UK TBD

3. III INTERNATIONAL CONGRESS ON CONSTRUCTION AND BUILDING RESEARCH


Dec 14, 2015 - Dec 16, 2015 Madrid, Spain Sep 15, 2015 (May 1, 2015)

4. International Conference on Sustainable Design, Engineering and Construction


May 10, 2015 - May 13, 2015 Chicago Oct 14, 2014

2.
3.Tor for Desin,and frims
4. strartfey for compelting the CC projects
5.EQUIP!!! Design

faryab projects
3. awarded contract
4. procurment plan
5. ToRs
6.deviaiton tracker
7.M&E reports
5. more missing compionets
7. Reviewing M&E format
9. comment son senior engi neering expert
10. reviwing DAARTT designs tor
- resposne to procurment plan
-repsonse to adi memoir
-reposnse to Tor

- stauts of CMORe trajing


11. safiullah application
12. soft copy of DAARTT
14. torakia and EsMP for kabul and sohail for estimation

15. cc project update table

16.preparing Tor for firms and conslutants

17. preparing tor for archticutre and strucutral design engineer

18. unit cost of already awrded contractsd

19. MIS -CMORE Report

18.
wafie.sarfaraz@gmail.com

lovelyhassanat

1. Review of semi annual repprt


2. prpearing plan for ISD
3. value of project site
4. TED and Hostel and Dpr prpearation
5. Estimation followup
6.Quanity followup

6. Estimation format for Missing componernts


7.UNICEFI
8.WORLD bank AID Memior
9. DAARTT Design and COnstruction manaul

review of designs:
1. DPR 15 june
2.Hostel 200incluidng dininig stair to be in the mioddile, toilets, kitchen,dining,
recreation 30 june
3. hostel 300:
same design and make it for 4 person 30 june
4. 16 classroom
make it site speciifc
the commetn provided by 10 cm to be incropeted for 16 as well
electrical, water supply works detail specilaly water tank
site plamn and checklist to be filled blindly 30 june

10 classroom 15 july

commetns on boundry walls 15 july

a meeting with O&M for fianlising the list, followup of O&M


2. 9:30 tommaroow Dr.ameer weera sajad rahimi sayed omar
3. tracking and database nevalution to be done ineach month
4. database to be crossed checked
5.internet to eb cut by tracking and database
6. engineer zubair followup election saleem ibrahimi
7. updates frfom engin eer aman amiri
8. database
1.daikunde
gpe

ongoing

mosessat

ba qemat project
zabi basheri

1. check progress of Teams


2.Email to DAARTT
2.M&E team and devitation tracker
3.update report
4.passport
5.operation b udget
6.nurun
7.scehdual for dubai mission
3.

1) Budget
2) working session on Database
3) presentation for PED
4) planeed projects for the 1993
5) DARRT
6) TED Furniture
7) nurnu
8) sajad attendance sheet
9) email to rishi
10) IRD meeting

firoz.consfiroz.consfiroz.consfiroz.consfiroz.consfrToday
1) meeting with maqool sahib about segragation of dublicated projects need to be
followed

11) GPE Meting on 29th of janauary

2) meting with zia ,enayat, and data base, M& E, and engineer sayed rasool (need to
be followed)

3) sending email to all for arranging the meeting for rajeev (need to be followed)

4) Reviewing the MIS Data base and tracking system (Need to be followed)

5) Going to Moec for in dian projects

6) meeting with eng habib and eng hameed for CMP (need to be followed)
7) sending email to server azizi
8) report fromat for local points

1) Data base and MIS Section


2) Tracking of the project
3) Meeting with zia, enayat and data base, and sayed omar, sayed rasool

for rajeev

1) updatation of the civil work component Equip and additional finacing

2) fareed walade shamardan 3rd class


3) NoL request for India email to dr weera

estimates
marekt price
devition tracker

1. name of the lots to be entered,zone, provinces


2.provincial costs to be updated
3.boufry wall lenght

summary of mission

1. drawing revison
hostel seat may reuce, how the oringal requiment will be accomodated, check with
the cleint for there consent
2. revison of the design types, electricity and water supply faiclites not to
include
3. Deviation tracker
IRD findings to be fixed. outstanding actions to be attended.
4. engineers top up allowances
5. 10 contratcs tracking 5 june sinc eintitiion till relese of theire payment from
MoF

6. Community contriubution in equip project


6. supervsion strucutres, how the

7. O&M
8. supervison chart for each project

1. time line
a. material price for 4 provinces to be sent today 3 quotations from each province
nme of vendor to be
b. estimaets to be proved
2. face to face discussion to DAARTT
3.4-6 weeks for article 25 to remobilize
4. ToR
5.delevrbels such as supervising compilitn the reports, semnding monthly reports
6. in 141 engineers how many of them are provinces and how many of htem are in
center and provinces
1. site superviosrs100
2. supervsiores superviosr 120 (Central engineers)
3. design engineers and managerss 140 (Central engineers)
4. 2nd june 10:30 am to 1 pm for VC about EMIS

1) jatenbda
2) Comments
3) Data base
4) saftety and enviorment
5) reporting format
6) MoU
7) Aziz aboiut MoE complex

Vous aimerez peut-être aussi