Académique Documents
Professionnel Documents
Culture Documents
1. Introduction
2. Objectives
4. Execution Plan
5. Standard Plan
Introduction
The thirst for learning, upgrading technical skills and applying the concepts in real
life environment at a fast pace is what the industry demands from IT professionals
today. However busy work schedules, far-flung locations, and unavailability of
convenient time-slots pose as major barriers when it comes to applying the concepts
into realism. And hence the need to look out for alternative means of
implementation in the form of laddered approach.
The above truly pose as constraints especially for our students too! With their busy
schedules, it is indeed difficult for our students to keep up with the genuine and
constant need for integrated application which can be seen live especially so in the
field of IT education where technology can change on the spur of a moment. Well,
technology does come to our rescue at such times!!
Keeping the above in mind and in tune with our constant endeavour to use
Technology in our training model, we at Aptech have thought of revolutionizing the
way our students learn and implement the concepts using tools themselves by
providing a live and synchronous eProject learning environment!
eProject is a step by step learning environment that closely simulates the classroom
and Lab based learning environment into actual implementation. It is a project
implementation at your fingertips!! An electronic, live juncture on the machine that
allows you to
The students at the centre are expected to complete this eProject and send complete
documentation with source code within the time allotted to eprojects@aptech.ac.in
The Objective of this program is to give a sample project to work on real life
projects. These applications help you build a larger more robust application.
The objective is not to teach you the software s but to provide you with a real life
scenario and help you create basic applications using the tools.
You can revise the topics before you start with the project.
These programs should be done in the Lab sessions with assistance of the faculty if
required.
Task:
Create an informative and business site for an Air lines named Air-Arena . You also
need to create a logo for the company and put the logo on the site.
Navigations / Links:
1. Intro / Banner animation
2. Home Page
3. Search your flight
4. Purchase ticket
5. Special offers
6. Terms and conditions
7. Contacts
Navigation Details:
Note:
a) The page should be centrally aligned on the browser window at the time of
page display.
b) The Display size of the page should be compatible for both the monitor
resolution of 800X600 pixels and 1024X768 pixels in Internet Explorer (the
browser should not display the left / right scroll).
c) The website has to be user friendly, so that one can navigate from any page
to any destination page.
d) You should use appropriate file types to reduce the size of the entire project /
site.
e) You should use appropriate typography and color combination to enhance
readability and clarity of the page content.
f) All the navigation / link buttons should have smart name.
g) Don t use frameset to design the website, better use table.
h) All the pages should have navigations at the top or side and also at the
bottom.
i) You need to document the entire creation (from project planning to delivery
of the project) of the site.
j) If you are using background sound on the website then must use either a
volume controller or sound On / Off buttons on all the pages. Use proper
icon for the volume controller or On / Off button.
k) All the thumbnails (pictures) you will add on the site for display purpose
should have view option / button to zoom/ enlarge the picture.
1. CD s:
The entire project on one CD.
All the raw files used on the website and soft copy of the
documentation on another CD.
2. Hardbound Documentation of the project.
3. You need to follow all the under mentioned points are part of your
eprojects execution and will carry 10 marks in the final eProject Result.
d) Send us raw files in a CD / DVD. The CD with all the files (created
using different software) used during the project. The raw files
should be stored in different media folders named / tagged
properly.
Technology:
1. CorelDraw / Illustrator.
2. Photoshop.
3. Premiere
4. Sound Forge
5. Flash.
6. Dreamweaver.
Execution Plan:
Developing a full-fledged multimedia title involves a rich mix of skills ranging from
project management and interface design to sound preparation and programming.
Although multimedia tools make it possible for one person to perform every task,
few people have the combination of technical, artistic, and management skills
necessary to fill every role well. As a rule, multimedia titles are best developed
collaboratively by teams with a range of expertise.
Roles:
Writer/Content expert
The writer researches the content of the title, helps storyboard it, and then writes all
of the text. Sometimes a content expert works with the writer and visualizer to help
communicate the right information.
Editor/Proofreader
The editor reviews all of the written material onscreen for interest, clarity,
conciseness, and grammatical correctness. The editor also checks that the text works
well with the other media. A proofreader polishes the final work.
Illustrator/Animator
The illustrator creates the graphical parts of the title, such as the screen elements
and buttons. The illustrator also prepares the drawings. Scanned photographs, and
animations that are specified in the storyboard.
The final work will be done by the web designer. He will assemble all the media
together to get the final out put. He should use any web designing tools/software to
do the web designing.
Team Leader
The Leader verifies that every aspect of the title works correctly. An expert leader
looks at every word, screen, and media effect to ensure the quality. The leader also
runs the title on different hardware configuration for the testing purpose.
Duration:
As mentioned in the schedule.
Standard plans:
1. While development it must be noted that the application must be safe, stable and
should be capable in handling multiple users.
iii. At the end of the project after final delivery acceptance testing has
to be done with the client to figure out whether all the clients
expectations are fulfilled or not.
j. After Testing phase all documentation must be in place and the version is
released.
Note: Don t forget to take your data backup every day. This will save your project
work from the following:
a. Virus problem
b. System failure
c. File corrupt
Data Backup is an important event to be done on regular basis in a project
management
This document was created with Win2PDF available at http://www.daneprairie.com.
The unregistered version of Win2PDF is for evaluation or non-commercial use only.