Académique Documents
Professionnel Documents
Culture Documents
GABBIONS GABBIONS
BACKFILL,
MATERIAL IN - SITU TYPE
LEAN CONCRETE
A 0,35
Do.
0,35
FIBRE - OPTIC PIPELINE
SELECTED GRAVEL IN - SITU
MATERIAL, GRAIN SIZE < 50mm
CABLE (CONDUIT)
LEAN CONCRETE, CONDUIT FOR CABL
REFERENCE DRAWINGS
DRAWING No.: DRAWING TITLE:
4 4 2,5
BACKFILL
1st TRENCH 2nd TRENCH (EXCAVATED MATERIAL)
SELECTED GRAVEL IN-SITU MATERIAL GRAIN SIZE < 50 mm
ROCKSHIELD (AS APPROVED)
ORIGINAL ORIGINAL
AL LITH
ROCK BUND WADI BED WADI BED WATER TRANSMISSION SYSTEM
2,5 3,5
HEAVY BOULDERS OF IN-SITU TYPE
Do.
(SEPARATE TRENCH)
BACK FILL ILF CONSULTING ENGINEERS
(MATERIAL IN-SITU TYPE) BACK FILL CONSULTING
P H S
4 4 2,5 5
0m 2m 4m 6m 8m
SCALE 1:100 SCALE: DRAWING SHEET REV.
No.: