SECOND FLOOR TOILET-BATH AND BALCONY CONCRETE FLOOR SLABS -
When preparing the concrete for upper floor slabs of Tollet-Bath and balcony it shall be m
waterproof by adding __ (Specify brand) __ waterproofing compound to the mixture
“The proportion of the waterproofing compound to a given volume of conerete mixture shall be:
recommended by the product manufacturer.
STEEL REINFORCING BARS -
|All steel reinfarcing bars to be used in this construction shall consist of round deformed bars wi
lugs or projections on their sides to provide a greater bond between the concrete and the steel, All se
reinforcing bars to be used shall be __(Specify brand)
{All steet reinforcing bars shall be accurately placed and secured against displacement by ty
them together at each bar intersection with Gauge No, 16 galvanized iron wire,
‘The steel reinforcing bars indicated for footings, columns, slabs, bears,
concrete members shall all conform to the number, size and spacing as indicated in the drawings
schedule of steel reinforcements,
No metal reinforcement shall be installed In place unless itis free from rust, scale or oth
coatings, which will destroy or reduce the bond with concrete.
‘CONCRETE HOLLOW BLOCKS -
Concrete hollow blocks to be used in this project shall be _(Specify brand)
‘All exterior concrete hollow blocks to be used for first floor walls shall be at least 10mm thi
while concrete hollow blocks for interior walls unless otherwise indicated, shall be 100mm thick, F
Werior CHB walls where plumbing pipes and fittings shall be located, the thickness shall be at le
150mm.
Concrete hollow block to be used for walls above the first floor, shall be 100mm thick.
“The conerete hollow block walls shall be laid, and the cells filed with cement mortar consisting
+ part portland cement and 3 parts sand by volume, They shall be ceinforced with round deformed ba
40mm diameter, spaced not more than 0.80m on centers, bothways.
‘All exposed surfaces of concrete hollow block walls shail be finished with the specified mater
indicated on the elevation drawings.
“The mixture of cement plaster for concrete hollow block wall finishes indicated in the drawin
shall be 1 part cement, 1 part lime and 3 parts sand.
FLOOR FINISHES -
The materials to be used as floor finishes for the rooms of the building shall be as follows:
Entrance Porch _ (Specity)
Living Room ws (Specify)
Dining Room oon snes (SPECIFY)
Kitchen ... coeceunnnseveeserenssees (Specily)
Maid's Room ....... i (Specify)
Bedroom (First Floor) .... (Specify)
A37_ ESTIMATING BILL OF MATERIALS - Tagayun