TECHO PISO 30
+126.00
INS.1 INS.1
Color INS.1
P23
INS.1
Piso 30
VAC. 29 4000 3550
INS.2
P23 (4 DIAS) R: 13/03/15
Concreto - Columnas NIVEL DE VAC.
+94.00
P22 VAC. 28
Concreto - Vigas y Losa de Techo Piso 30 VAC. 28
NIVEL DE VAC.
4000 3550
INS.3 INS.3
P22 (4 DIAS)
(7 DIAS) P: 10/03/15
R: 09/03/15
+90.00
INS.1 INS.1
P19 VAC. 25
VAC. 25
NIVEL DE VAC.
+78.00
4000 4447 P19 (7 DIAS)
(7 DIAS)
P: 18/02/15
R: 18/02/15
7547
VAC. 24
VAC. 24
NIVEL DE VAC.
+74.00
4000 INS.2 INS.3
P18
INS.3
P18 (6 DIAS)
(6 DIAS)
P: 11/02/15
R: 11/02/15
P17
P16 VAC. 23
PLANEADO VAC. 23
NIVEL DE VAC.
4000 3550
P17 (7 DIAS)
(9 DIAS) P: 05/02/15
R: 05/02/15
+70.00
450
VAC. 22
VAC. 22 4000
NIVEL DE VAC.
+66.00
4450
P16 (6 DIAS)
(8 DIAS)
P: 27/01/15
R: 27/01/15
INS.1 INS.1
P15 VAC. 21
VAC. 21 4000
NIVEL DE VAC.
+62.00
P15 (7 DIAS)
(6 DIAS)
P: 21/01/15
R: 19/01/15
VAC. 17
VAC. 17
NIVEL DE VAC.
4000 3550
P11
P11 (5 DIAS)
(9 DIAS) P: 24/12/14
R: 23/12/14
+46.00
VAC. 16
VAC. 16
NIVEL DE VAC.
4000 3550
INS.2 INS.3
P10
INS.3
P10 (6 DIAS)
(9 DIAS)
P: 15/12/14
R: 18/12/14
+42.00
VAC. 13 P: 25/11/14
P7
VAC. 13 (7 DIAS)
3000 P7
Concreto - Columnas. Piso 29 100% NIVEL DE VAC.
+31.00
2550
VAC. 12 P: 18/11/14
Concreto - Vigas y Losa de Techo Piso 29 100% VAC. 12 4000
NIVEL DE VAC.
3550 (8 DIAS)
R: 18/11/14
+27.00
P6
P6 (9 DIAS)
VAC. 10 4000
INS.1
P5
INS.1
P5 VAC. 10 (10 DIAS)
P: 28/10/14
3550
+15.00
NIVEL DE VAC. P3
INICIO DE VACIADO +11.00
TRABAJO FINAL
VAC. 7
P: 13/06/15 P: 22/06/15 4000
VAC. 7
PLAN (P) V.S. REAL (R)
3550
(10 DIAS)
P31 R: 10/05/15 R: 25/05/15
NIVEL DE VAC.
+7.00
P2
P2
(16 DIAS)
VAC. 6
VAC. 6 4000
P: 28/05/15 (10 DIAS) P: 06/06/15 3550
VAC. 5 4000
P1
P1 VAC. 5
P: 22/05/15 (9 DIAS) P: 30/05/15 3550
VAC. 4
P: 16/05/15 (10 DIAS) P: 25/05/15
VAC. 4 4000
3050
S1 S1
P28 R: 06/05/15 (9 DIAS) R: 14/05/15
NIVEL DE VAC.
-5.00
VAC. 3 VAC. 3
NIVEL DE VAC. 2390 1940
S3
1280
-10.79
S3
P: 05/05/15 (11 DIAS) P: 13/05/15
P26 R: 20/04/15 (11 DIAS)
R: 30/04/15 VAC. 1 4000 VAC. 1
S4
3550
NIVEL DE VAC. S4
-14.79
KICKER 350
P: 27/04/15 (11 DIAS) P: 07/05/15
P25 R: 18/04/15 (7 DIAS)
R:24/04/15 1 2 3 4 5 6 7 8 9 10 11 1213
P: 21/04/15 (10 DIAS) P: 30/04/15
Comentarios Adicionales:
P24 R: 11/04/15 (8 DIAS) R:18/04/15 Color % Avance
P: 10/04/15 (14 DIAS) P: 23/04/15 Concreto Ejecutado. Piso 31 100% E1: Se encuentra concretado hasta el Piso 31.
P23 R:05/04/15 (10 DIAS) R:14/04/15 Real E2: Se encuentra concretado hasta el Piso 31.
Concreto Ejecutado. Piso 31B 100%
P: 04/04/15 (11 DIAS) P: 14/04/15
Pisos Liberado por Estructuras
P22 R:31/03/15 (8 DIAS) R:07/04/15 Concreto Planeado. Piso 31 100%
Real Piso Liberado
Plan Piso 31B Plan Piso Liberado
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 100%