CHAPTER-1

MATERIALS
Note : The rates except fot Item 2, 3, 38 & 39 are exclusive of Contractor's profits 5% Contractor's Profit may be given while
- supply through some agency otherthen a direct supplier. The rates include Octori, Royalty and sales tax etc. and carta
Km. (5 miles).
Sl. Materials Rate
Unit
No.
1 2 3 4
1 Brick
a) Bricks (Ist class) per % 2.70
b) Bricks (Iind class or straight over burnt) per % 2.60
c) Bricks (III class per % c) Bricks (III clas
d) Bricks (sundried) per % d) Bricks (sundri

2 Ballast (1st class or over burnt Brick Ballast.


a) 5.00 cm gauge per cu. m. a) 5.00 cm gau
b) 4.00 cm. gauge per cu. m. 19.82
c) . 2.50 cm. gauge per cu. m. 21.23

3 Ballast (Hard stone graded)


a) 1.00 cm.to 1.3 cm. gauge per cu. m. 35.38
b) 2.00 cm. gauge. per cu. m. 37.88
c) 4.00 cm. gauge. per cu. m. 43.13
d) 5.00 cm: gauge. per cu. m.

4 Bolts and nuts, etc.


a) upto 6 mm. dia. per kg. a) upto 6 mm. di
b) above 6 mm. and upto 13 mm. dia, per kg. b) above 6 mm.
c) above 13 mm. and upto 25 mm. dia per kg. c) above 13 mm

5 Bottle nuts 13mm.to 22 mm.dia.15cm.long each Bottle nuts 13m


6 Beeswax per kg. Beeswax
7 Bamboos Bamboos
a) 2.5 cm. upto 4 cm. dia per % run.m. a) 2.5 cm. upto 4
b) above 4 cm. and upto 8 cm. dia per % run.m. b) above 4 cm. a
8 Bailies Sal Bailies Sal
a) 8 cm. (Mean) dia. per % run.m. a) 8 cm. (Mean)
b) 10 cm. per % run.m. b) 10 cm.
c) 12.5 cm. per % run.m. c) 12.5 cm.
d) 15.00 cm. per % run.m. d) 15.00 cm.
e) 20.00 cm. per % run.m. e) 20.00 cm.

9 Cement Portland (Ordinary) per 50 kg bag. 225.00


10 Cement (White) per 50 kg bag. 575.00
11 Coal Tar per liter Coal Tar
12 Cusstic soda per kg. Cusstic soda
13 Cinder per cu. m. Cinder
14 Cotton (string) per kg. Cotton (string)
15 a) Distemper (oil) in paste of best quality per 50 kg tin a) Distemper (o
b) Dry Distemper ordinary of best quality per 1.5 kg packet b) Dry Distempe
16 Glass ordinary Glass ordinary
a) 21 oz. per sq. m. a) 21 oz.
b) 18oz. per sq. m. b) 18oz.
c) 16 oz. per sq. m. c) 16 oz.

17 Insulating Materials
(a) Fibrs glass Resin.bonded slabs and rolls in standard slab and rolls sizes.)
i) Fibre-glass (density 24 kg/m2) of 25 mm.
per sq. m. i) Fibre-glass (d
thickness for ceiling
ii) - do 40 mm. per sq. m. ii) - do
iii)- do 50 mm. per sq. m. iii)- do
iv)- do 65 mm. per sq. m. iv)- do
v)- do 75 mm. per sq. m. v)- do
vi) Fibre-glass (density 32 kg/m2) of 25mm.
per sq. m. vi) Fibre-glass (
thickness for walls
vii)- do 40 mm. per sq. m. vii)- do
viii)-do 50 mm. per sq. m. viii)-do
ix)- do 65 mm. per sq. m. ix)- do
x)- do 75 mm. per sq. m. x)- do
(b) Thermocole insulation per cu. m. (b) Thermocole i
18 a) Lime white (unsulaked) per quin. 550.00
b) Lime kankar of besT quality per cu. m. 110.99
19 a) Lead white best qualiry (safeda) per kg. a) Lead white b
b) Lead red powder (sindoor) per kg. b) Lead red pow

20 a) M S Flat angles Tand like wise.. per quin. a) M S Flat angl


b) M.S. Rounds up to 12 mm dia per quin. b) M.S. Rounds
c) M.S. Romnds above 12 mm. dia per quin. c) M.S. Romnds
d) R. S. Joits per quin. d) R. S. Joits
e) G. I. Barbed wire per quin. e) G. I. Barbed w
f) Sheet Galvanized plain 20 B. W. G per quin. f) Sheet Galvan
g) Sheet Galvanized Corrugated 24 B. W. G.
per quin. g) Sheet Galvan
plain
h) Sheet black iron plain per quin. h) Sheet black i
i) upto 8 mm. dia. per quin. i) upto 8 mm. d
i) upto 8 mm. dia. per quin. i) upto 8 mm
ii) above 8 mm. and upto 14 mm per quin. ii) above 8 mm
iii) above 13 mm. and upto 50 mm per quin. iii) above 13 m
j) Galvanized iron wire gauge per sq. m. j) Galvanized iro
k) Expanded metal 2.00 cm. mesh 1.6/17
per sq. m. k) Expanded me
gauge Marble chips 3 mm. size.
21 Marble chips 3mm. size. Marble chips 3m
a) white per quin. a) white
b) Black per quin. b) Black
22 Marble dust per quin. Marble dust
23 Masonite sheet 3 mm. thick per sq. m. Masonite sheet 3
24 Nails (country) per kg. Nails (country)
25 Nails (wire) per kg. Nails (wire)
26 a) Oil (linseed double boiled) per liter a) Oil (linseed d
b) Oil (Turpentine) per liter b) Oil (Turpentin
27 Paints (of superior quality ) Paints (of superi
a) Paint (Anti corrosive Bituminous). per liter (in 20 lit. drum a) Paint (Anti cor
b) Paint Black Japan per liter (in 20 lit. drum b) Paint Black Ja
c) Superior ready mixed, paints for wood c) Superior read
per liter (in 20 lit. drum
or steel (All colours) or steel (All colou
d) Ordinary quality ready mixed paint per liter (in 20 lit. drum d) Ordinary qual
e) Paint Ready mixed (Enamel) for floors. per liter (in one lit. drum e) Paint Ready m
f) Dry colours for cement floors. f) Dry colours for
i) Dark green oxide per 20 kg bag. i) Dark green
ii) Deep black oxide per 20 kg bag. ii) Deep black
iii)Blue oxide per 20 kg bag. iii)Blue oxide
iv)Chocolate exide per 20 kg bag. iv)Chocolate e
g) i) Red oxide primer surfacer for steel per liter (in 20 lit. drum g) i) Red oxide p
ii) Red lead paint ready mixed for roofs. per liter (in 20 lit. drum ii) Red lead pa
h) Paint enamel (synthetic) per liter (in 20 lit. drum h) Paint enamel
i) Paint (aluminium) per liter (in 20 lit. drum i) Paint (alumini
j) i) Paint primer for wood per liter (in 20 lit. drum j) i) Paint primer
ii) Paint primer for metal per liter (in 20 lit. drum ii) Paint primer
k) Road marking paint (spirit base) per liter (in 20 lit. drum k) Road marking
l) i) Cement primer per liter (in 20 lit. drum l) i) Cement prim
ii) Water proof cement paint per kg. (in 50kg. drum ii) Water proof
m) Varnishes m) Varnishes
i) Clear synthetic. per liter (in 20 lit. drum i) Clear synthe
ii) Copal per liter (in 20 lit. drum ii) Copal
iii) Ordinary per liter (in 20 lit. drum iii) Ordinary
28 Water proofing compound per kg. Water proofing c
29 Polish (Mansion or wax) per kg. Polish (Mansion
30 a) Pipe (A.C. Rain water) 8 cm.internal dia. of
each a) Pipe (A.C. Ra
6' length each
b) do 10 cm dia each b) do
c) do 15 cm dia each c) do
each
31 a) Pipe (A. C. Bend and shoes) 8 cm. dia.
each a) Pipe (A. C. Be
Plain
b) do 10 cm. dia each b) do
c) do 15 cm. dia each c) do
each d) Pipe(A. C. Be
d) Pipe(A. C. Bend with access door)8 cm. dia
e) do 10 cm. dia each e) do
f) do 15 cm. dia each f) do

32 a) SheetsfAsbestos corrugated)grey 6 mm.


per sq. m. a) SheetsfAsbes
thick
b) do (Asbestos plain) grey do per sq. m. b) do (Asbestos
c) do(A. C. Ridges) per pair c) do(A. C. Ridge
d) (Gutters) each d) (Gutters)

33 a) Pipe Rain water (Cast iron) 5 cm. dia. per run. m. a) Pipe Rain wat
b) do 10 cm. dia per run. m. b) do
34 a) Pipe Rain water(C. I. Rose) 5 cm. dia. each a) Pipe Rain wat
b) do 10 cm. dia. each b) do
c) Pipe Rain water(C. I. Head) 5 cm. dia. each c) Pipe Rain wat
d) do do 10 cm. dia. each d) do do
e) Pipe Rain water (C. I. Shoes) 5 cm. dia. each e) Pipe Rain wat
f) do do 10 cm. dia. each f) do do
g) Pipe Rain water(C. I. Bend) 5 cm^ dia. each g) Pipe Rain wat
h) do do ' 10 cm. dia each h) do do

35 a) Rope (Moonj) per kg. a) Rope (Moonj)


b) do (Hemp) per kg. b) do (Hemp)
c) do (Cotton) per kg. c) do (Cotton)
d) do (G. I. Wire) 7 ply 2.5 cm. dia. per m. d) do (G. I. Wir

36 Rivets per 50 kg. Rivets


37 Sheet(celotex or equivalent) 13 mm. thick per sq. m. Sheet(celotex or

38 Sand (coarse) approved per cu. m. 19.11


39 Fine sand of fineness modulus 1.25 per cu. m. 12.74
40 Surkhi per cu. m. 9.91
41 a) Stone (Mirzapur) undressed per cu. m. a) Stone (Mirzap
b) Stone (Mirzapur) upto 5 cm. thick flag .. per sq. m. b) Stone (Mirzap
42 Whiting? per 50 kg. Whiting?
43 a) Washer (limpet) per doz. a) Washer (limpe
b) Washer (Bitumen) per doz. b) Washer (Bitum
c) Washer (G. 1.) per doz. c) Washer (G. 1.
44 Wood preservative per liter (in 20 lit. tin Wood preservati

45 a) Wood Chaukhat sections (CP Teak) per cu. m. a) Wood Chaukh


b) Wood Chaukhat sections (Shisham) per cu. m. b) Wood Chaukh
c) Wood Chaukhat sections (Indian sal) per cu. m. c) Wood Chaukh
d) Wood Chaukhat sections (Deodar) per cu. m. d) Wood Chaukh
e) Wood Chaukhat sections (Kail) per cu. m. e) Wood Chaukh
f) Wood Chaukhat sections (Country) per cu. m. f) Wood Chaukh
g) Wood Chaukhat sections (Chir) per cu. m. g) Wood Chaukh
46 a) Wood Planks (C.P.Teak) per cu. m. a) Wood Planks
b) Wood Planks (Shisham) per cu. m. b) Wood Planks
c) Wood Planks (Indian-sal) per cu. m. c) Wood Planks
d) Wood Planks (Deodar) per cu. m. d) Wood Planks
e) Wood Planks (Kail) per cu. m. e) Wood Planks
f) Wood Planks (Country) per cu. m. f) Wood Planks
g) Wood Planks (Chir wood) per cu. m. g) Wood Planks
CHAPTER-2
Labour
Sl. Materials Rate
Unit
No.
1 2 3 4
194 Mistri per day 170.00
195 Mason per day 160.00
196 Carpenter per day 160.00
197 Blacksmith per day 170.00
198 Hammer man per day 105.00
199 Fitter per day 110.00
200 Thateher per day 100.00
201 Painter per day 140.00
202 Plumber per day 150.00
203 Stone cutter per day 160.00
204 Mate per day 110.00
205 Beldar per day 100.00
206 Mazdoor (Coolie) per day 100.00
207 Bhishti per day 130.00
208 Well sinker per day Well sinker
209 Bullockcart with two Bullocks and Driver per day 400.00
Mote or charsa including two bullocks, one
210 per day Mote or charsa i
driver and one puller
211 Sawyer per pair per day Sawyer per pair
212 White washer per day 140.00
213 Beldar for bitumen or Tar work per day 105.00
214 Glazier per day 120.00
215 Rivetter per day 120.00
216 Cane-man per day 100.00
217 Brick Moulder per day 105.00

CHAPTER-3
Cartage
Sl. Description of Item of Work Analysis
No.
1 2 3
231 (a) Cartage of ballast, Kanker, coal grit or sand etc. including loading and unloading but excluding stacking on Pucca Road

Assume that 7 tonner truck will carry 4 cu. Metre of material.


1st km. As per statement 11.65 cost per cu. Metre 11.65
4.00
2nd & 3rd km. As per statement 2.23 cost per cu. Metre 2.23
4.00
4th & 5th km. As per statement 1.70 cost per cu. Metre 1.70
4.00
6th to 10th km. As per statement 1.24 cost per cu. Metre 1.24
4.00
11th & 20th km. As per statement 0.83 cost per cu. Metre 0.83
4.00
21th & 30th km. As per statement 0.67 cost per cu. Metre 0.67
4.00
Beyond 30th km. As per statement 0.65 cost per cu. Metre 0.65
4.00
(b) For Kachcha Roads :- Add 331/3% on the above rates as per U.P. Parivahan Ayukta(Tech) U.P. letter no. 7329 TR
1962.
(c) For Bricks 1000 Nos. Reduce the above rates by 15%

232 (a) As in item (231) above but for cement, Steel or other such material.

1st km. As per statement 11.65 cost per ton 11.65


7.00
Say
2nd & 3rd km. As per statement 2.23 cost per cu. Ton 2.23
7.00
Say
4th & 5th km. As per statement 1.70 cost per cu. Ton 1.70
7.00
Say
6th to 10th km. As per statement 1.24 cost per cu. Ton 1.24
7.00
Say
11th & 20th km. As per statement 0.83 cost per cu. Ton 0.83
7.00
Say
21th & 30th km. As per statement 0.67 cost per cu. Ton 0.67
7.00
Say
Beyond 30th km. As per statement 0.65 cost per cu. Ton 0.65
7.00
Say
(b) For Kachcha Roads : Add 33 1/3% on the above rates
233 (a) As in item 231 above but forTar,Bitumen.Asphalt,Mobile oil or other such material.
Note:- One truck will carry 22 Tar drums or 26Mexphalt drums. The average weight carted shall be 5 Tons per 7 Tonner
trip.
1st km. As per statement 11.65 cost per ton 11.65
5.00
Say
2nd & 3rd km. As per statement 2.23 cost per cu. Ton 2.23
5.00
Say
4th & 5th km. As per statement 1.70 cost per cu. Ton 1.70
5.00
Say
6th to 10th km. As per statement 1.24 cost per cu. Ton 1.24
5.00
Say
11th & 20th km. As per statement 0.83 cost per cu. Ton 0.83
5.00
Say
21th & 30th km. As per statement 0.67 cost per cu. Ton 0.67
5.00
Say
Beyond 30th km. As per statement 0.65 cost per cu. Ton 0.65
5.00
Say

(b) For Kachcha Roads Add 33 1/3% on the above rates.

234 Cartage of Ballast, kankar, coal, grit or sand


etc. by head load upto 90 metres (3 Coolie 1/4 for loading and 1/2 for carriage i. e. 3/4
chains only including loading and unloading ccolie at Rs. 2.50 per day T&P L. S.
but excluding stacking.

Contractor's profit 10%


Total : 2.16 cft. per chain Say Rs. 2.20 or Rs. 0.75 per
cu.metre per 30 metre

235 Loading and unloading of material like Ballast, Loading :-Four Beldars will take one hour in loading 100
kankar. coal or grit. etc. excluding their cft. of material. Beldars 4/8 nos, at Rs.3.25 per day
stacking Unloading :- 4 Beldars will take one hour in unloading
Beldar 4/8 on at Rs. 3.25 per day
Total
Contractor's profit 10%
Total
Rs. 127 per cu. metre. Say Rs. 1.25 per cu. Metre
(b) For brick 1000 nos. Reduce the above rate by 15 percent

236 (a) Unloading of cement. Tar, or Bitumen


drums, lighter ;teel sections and other such Five Beldars will suffice for this job for one day per
materials from wagons and stac king the same Wagon, Beldars 5 nos. at Rs. 3.25 per day
on platform.
Contractors profit 10%
Total
Rs. 18.00 per wagon.
(Taking wagon capacity 22 tons) Rate per ton

(b) As in item 236 above but for heavy


articles like joists etc. machineries and Eight Beldar will suffice for this job at Rs. 3.25 per day
unwieldy structures.
Contractor's profit 10%
Total
(Taking wagon capacity 22 tons) Rate per ton 28.60/22...Rs. 1.30 per ton

(C) As in item 236 above but for R. C. C.


Weight of 30 cm. dia. H. P. In a length of 8...51x8 Collar
Hume pipe 30 cm. to 46 cm. dia and 1.8 M.
weight average half 32/2
to 2.5 M. in length
Total

(including necessary collars for which nothing


extra will be paid).
Hence rate 424x080
2240

(d) As in item No. 236 (c) above but for Hume Weight o'r 77 cm. dia. hume pipe in a length of 2.5 m. =
pipes of 50 cm. to 95 cm.dia. 182x8=1,456 lbs
Collar weight average half 134/2=67
Total
Hence rate

237 (a) Stacking of bricks on edge in rows of two to


a height of ten bricks and in a length of 100
bricks after dressing l evelling as required Beldar 1/4 no. at Rs. 3.25 per day
where bricks are to be stacked
Contractor's profit at10%
Total
Say Rs.

(b) Stacking of coal, surkhi, sancf, lime stone,


grit, stone/brick ballast and boulders etc. to
the required sizes of stacks after necessary Dressing, levelling, ramming side berms including,
dressing of site where such materials are to be filling. Coolie 1 /5 no. at. Rs. 2.50 per day
stacked.
Stacking Beldar
Contractors profit @ 10 % including T & P.
Total
Say

(c) As in item 237 above but when the 3 Beldars will take one hour in stacking 1 Ton 3/8 no. at
materials are either cement/steel. Rs. 3.25 per day

Contractor's profit @ 10 %

238 (a) Loading of cement. Tar, Bitumen drums.


Lighter sections of steel and other such 4 Beldars will suffice Rs. 3.25 per day
materials into wagons.
Contractor's profit @ 10%
Total

(b) As in item 238 (a) above but for heavy 12 Beldars will suffice for this job at Rs. 3.25 per day
articles like joists ect. Machineries and
unwieldy structures.

Contractor's profit @ 10 %
Total
Rate per ton

239 (a) Cartage of heavy articles like joists etc.


machineries and unwieldy structure including One Buffalow thela with driver etc, will carry one ton
loading, unloading but excluding stacking. (0 and will take 4 hours for covering a distance of average
to 8 km. by thela) 8 km. no. at Rs. 25.00 per day

Contractor's profit 10%


Total
Average rate per km.
Reduce the rate of item

(b) As in item No. 239 (a) above but when the 239 (a) by 50 per cent for subsequent Kilo metre
distance exceeds 8 km. beyond 8 km.

(c) Cartage of R.C.C. Hume pipe 30 cm. to 46


cm.dia.and 1.8 M.to 2.5 M.in length (including
collars for which nothing extra will be paid) One truck will carry 16 hume pipes per trip.
including loading & unloading. Hence all rates as per schedule item No.
231 comes to

1st km. 11.65


16.00

2nd & 3rd km. 2.23


16.00

4th & 5th km. 1.70


16.00
6th to 10th km. 1.24
16.00

11th & 20th km. 0.83


16.00

21th & 30th km. 0.67


16.00

Beyond 30th km. 0.65


16.00
(d) As in item No. 239 (c) above but for R.C;C.
Hume pipes 50 cm. to 95 cm. dia &1.8M. to One truck will carry 5 hume pipe per 7 tonner truck per
2.5 M. in length. Carriage to be done by truck trip. As per statement.
or by thela.

1st km. 11.65


5.00

2nd & 3rd km. 2.23


5.00

4th & 5th km. 1.70


5.00

6th to 10th km. 1.24


5.00

11th & 20th km. 0.83


5.00

21th & 30th km. 0.67


5.00
CHAPTER-4
Earth Work and Excavation
Sl. Item of Work
Unit Qnty Rate
No.
1 2 3 4 5.00
251 Excavation in foundation in ordinary soil (Loam clay, or sand) including lift upto 1.5 metre (5 fts.) and lead upto 30 m. (
including filling, watering and ramming of excavated earth into the trenches or into the space between the building and th
foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-char
distance of 30 M. (100 fts) from the foundation trenches.
Mistri per day 1/8 no. 170.00
Beldars per day 6 no. 100.00
Coolie per day 7 no. 170.00
Blacksmith for sharpening Tools, etc per day 1/8 no. 170.00
T & P and Basket etc. L.S.
Contractor's profit @ 10%
Rate per 1000 Cuft Total
Rate per 100 Cum

252 As in item no. (251) above but excavation in soil mixed with moorum/shingle kankar requiring the use of special T & P suc
pickaxes, subbals etc.
Mistri per day 1/8 no. 170.00
Beldars per day 8 no. 100.00
Coolie per day 7 no. 100.00
Blacksmith for sharpening Tools, etc per day 1/6 no. 170.00
T & P and Basket etc. L.S.
Contractor's profit @ 10%
Rate per 1000 Cuft Total
Rate per 100 Cum

253 Earthwork in cutting or in embarkment In ordinary soil, excavation to be in the form of regular pits not exceeding metre (
depth and earthwork in embankment to be in 20 cm. (8") layers, including ramming & dressing the surface to required leve
slopes and also including 1.5 metre (5 ft) lifts and 30 m. (100") lead. The earth from cutting to be used in making embankm
be deposited as spoil banks within 30 metres (100 ft.) distance as directed by the Engineer-in-charge.

Mate per day 1/10 no. 110.00


Beldar per day 2 no. 100.00
Coolie per day 3 no. 100.00
Blacksmith per day 1/8 no. 170.00
Dressing Beldar per day 1/8 no. 100.00
T & P, L S.
Coolie per day 6 no. 100.00
Contractor's profit @ 10%
Rate per 1000 Cuft Total
Rate per 100 Cum

554 Add to items (251-253) for every additional 30 m. (100') lead or part of 30 m. (100 ft.) or for every additional 1.5 m. (5 ft.)
of 1.5 m. (5 ft).
Coolies per day 2 no. 100.00
T & P L.S.
Contractor's profit @ 10%
Rate per 1000 Cuft Total
Rate per 100 Cum
255 Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 km. (5 miles) from th
work and includhg watering, dressing etc. Rate to include cost of all materials. labour and T & P etc. required for proper
completion of the work.
Local sand per % cft. 1000 cft.
Beldar per day 3 no. 100.00
Coolie per day 5 no. 100.00
Bhisti per day 3/4 no. 130.00
T & P etc LS
Contractor's profit @ 10%
Rate per 1000 Cuft Total
Rate per 100 Cum

256 Same as in item i no. 251 above but excavation in Skeleton analysis based on hill soil mixed with gravel and boulder. S
rate s P.W.D.sl. no. 157
Mistri per day 1/8 no. 170.00
Beldar per day 10 no. 100.00
Coolie per day 7 no. 100.00
Blacksmith for sharpening Tools, etc. per day 1/4 no. 170.00
T & Pand Basket etc. L. S.
Contractor's profit @ 10%
Rate per 1000 Cuft Total
Rate per 100 Cum

257 As in item 251 above but excavation in black cotton soil in Bundelkhand area requiring use of special tools and plants suc
axes and sabbal etc.
For 1000 cft.
Mistri per day 1/8 no. 170.00
Beldar per day 8 no. 100.00
Coolie per day 6 no. 100.00
Blacksmith for sharpening Tools etc. per day 1/6 no. 170.00
T & P and Basket etc. L S.
Contractor's profit @ 10%
Rate per 1000 Cuft Total
Rate per 100 Cum
258 Extra rate for quantities of work executed under
(a) In or under water and or liquid mud. per %o cft.

(b) In or under foul position. per %o cft.

Note: The extra in rates is applicable in respect of each item but to limited quantities of work excavated in these difficult conditio

259 Clearing jungla including uprooting of rank vegetations grass,bush,wood trees and saplings of girth upto 30 cm. mea
height of 1 metre above ground level & removal of rubbish upto a distance of 50 metres out side the periphery of are
Analysis of rates on the basis of item 41 of CPWD analysis of 1S55 schedule).

Take 1000 cft.


Beldar per day 1 no. 100.00
Coolie per day 0.5 no. 100.00
T & P and Basket etc. L. S
Contractor's profit @ 10%
Rate per 1000 Cuft Total
Rate per 100 Cum
CHAPTER-5
Concrete
Sl. Item of Work
Unit Qnty Rate
No.
1 2 3 4 5.00
271 Concrete with 4 cm. (1.5") gauge brick ballast and kankar lime, in foundations and under floors, including supply of all
labour and T&P etc. required for proper completion of the work.
Materials -
Brick Ballast per % cft. 100 cft. 19.82
Kankar Lime per % cft. 33 cft. 110.99
Labour -
Mistri per day 1/8 no. 170.00
Mason per day 1/3 no. 160.00
Beldar per day 3 no. 100.00
Coolie per day 3 no. 100.00
Bhisiti per day 0.5 no. 130.00
Blacksmith per day 1/8 no. 170.00
T&P and Sundries L. S.
Total
1. Materials
2. Labour
Total
1.50 % water charges
Add contractor's profit @ 10% except on cost
of Brick Ballast i.e. on Rs.
Rate per 100 Cft Total
Rate per Cum

272 Concrete with 4 cm. (1.5") gauge brick ballast, white lime and surkhi in foundations and under floors in the proportions of
32, including supply of all materials. labour and T&P etc. required for proper completion of the work (unslacked lime
powder at site to be used).

Materials -
Brick Ballast per % cft. 100 cft. 19.82
White Lime per % cft. 15 cft. 550.00
Surkhi per % cft. 30 cft. 9.91
Labour -
Mistri per day 1/8 no. 170.00
Mason per day 1/3 no. 160.00
Beldar per day 3 no. 100.00
Coolie per day 3 no. 100.00
Bhisiti per day 0.5 no. 130.00
Blacksmith per day 1/8 no. 170.00
T&P and Sundries L. S.
Total
1. Materials
2. Labour
Total
1 .5% water charges
Add contractor's profit @ 10% except on cost
of Brick Ballast i.e. on Rs. 74.50
Rate per 100 Cft Total
Rate per Cum

273 Concrete with 4 cm. (1.5") gauge brick ballast, Fine local sand of 1.25 Fineness modulous and cement in proportion o
foundations and under floors, including supply of all materials, labour and T & P etc. required for proper completion of the

Materials -
Brick Ballast per % cft. 100 cft. 19.82
Fine Sand of 1.25 (F.M.) per % cft. 48 cft. 12.74
Cement per 50 kg.bag. 6.4 bag. 225.00
Total
Add 2.5% wastage on cement and sand i.e.on
Rs. 81.60
Total
Labour -
Mistri per day 1/8 no. 170.00
Mason per day 1/3 no. 160.00
Beldar per day 3 no. 100.00
Coolie per day 3 no. 100.00
Bhisiti per day 1 no. 130.00
Blacksmith per day 1/8 no. 170.00
T&P and Sundries etc, hire of C.C. Mixer,
Lubricants e.c. including wastage of materials
at 2.5% L.S.
Total
1- Materials
2.Labour
Total
1.5% water charges
Add contractor profit 10% on Rs. 36.00 except
on cost of cement brick ballast and sand.

Rate per 100 Cft Total


Rate per Cum

274 As in item (273) above but in the proportion of 10:5:1


Materials -
Brick Ballast per % cft. 100 cft. 19.82
Fine Sand of 1.25 (F.M.) per % cft. 50 cft. 12.74
Cement per 50 kg.bag. 8 bag. 225.00

Add 2.5% wastage on cement and sand.


Total
Labour:Same as in item 273
1. Materiasl
2. Labour including stacking
Total
1.5% water charge
Add Contractor's profit @ 10% on Rs. 36.00
except on cost of cement, sand and Brick
ballast.
Rate per 100 Cft Total
Rate per Cum
275 As in item (273) above, but in the proportion of 8:4:1.
Materials -
Brick Ballast per % cft. 100 cft. 19.82
Fine Sand of 1.25 (F.M.) per % cft. 50 cft. 12.74
Cement per 50 kg.bag. 9.3 bag. 225.00
Total
Add 2.5% wastage
Total
Labour:Same as in item 273
1. Materiasl
2. Labour including stacking
Total
1.5% water charge
Contractor's profit @ 10% on Rs. 36.00 except
on cost of cement, sand and brick ballast.

Rate per 100 Cft Total


Rate per Cum

276 As in item (271) above but for haunch filling. Rate as per item no. 271. 129.67 per%cft Extra labour for lift and pinning.

Beldar per day 1 no. 100.00


Coolie per day 4 no. 100.00
T & P and scaffolding etc. L.S.
Total
Rate as per item No. 271
Extra labour etc. for lift & pinning
Add 1.5% water charges on Rs. 538.40
10% contractor's profit on Rs. 538.40
Rate per 100 Cft Total
Rate per Cum
277 As in item (271) above but for roof terracing'with 2.5 cm. (1") gauge including raking a shallow drain on the edge if des
Engineer-in-charge.
Rate as in item 276
Add difference in cost of 4 cm. and 2.5 cm.
gauge.
Brick ballast per % cft. 100 cft. 21.23
Cost of Extra Kankar Lime 45-33-12 cft. per % cft. 12 cft. 110.99

1.5% water charges on tnis extra cost.


Bail and Gur L.S.
Contractor's profit @ 10% on A
Total

278 Concrete with 4cm. (1") gauge brick ballast, white lime and surkhi in the proportion of 100:18:36 in roof terracing, including
all materials, labour, and T&P etc. required for proper completion of the work (Unslacked lime brought to powder to be us

Materials -
Brick Ballast per % cft. 100 cft. 19.82
White Lime per % cft. 15 cft. 110.99
(unslacked lime brought to powder at site)
Bail, Gur etc. L.S.
Surkhi per % cft. 30 cft. 9.91
Total
Labour
Mistri per day 1/8 no. 170.00
Mason per day 1/3 no. 160.00
Beldar per day 4 no. 100.00
Coolie per day 6 no. 100.00
Bhisiti per day 0.5 no. 130.00
Blacksmith per day 1/8 no. 170.00
T&P and basker etc. L.S.
Total
1- Materials
2.Labour
Total
1.5% water charges
Total
Add contractor profit 10% on except on cost of
cement brick ballast and sand.
Rate per 100 Cuft Total
Rate per 100 Cum
279 Cement concrete with 4 cm. (1.5") gauge approved stone ballast, approved coarse sand and cement in the proportion o
including supply of all materials, labour and T&P etc. required for proper completion of the work.

Materials -
Stone ballast 1.5" gauge per % cft. 90 cft. 43.13
Coarse sand per % cft. 45 cft. 19.11
Cement per 50 kg.bag. 18.9 bag. 225.00
Total
Add 2 and 1/2 % wastage on coarse sand and cement
Total
Labour
Labour : Mistri per day 1/10 nos. 170.00
Mason per day 0.5 nos. 160.00
Beldar per day 4 nos. 100.00
Coolie per day 4 nos. 100.00
Bhisti per day 2 nos. 130.00
Blacksmith per day 1/10 nos. 170.00
T & P and sundries etc. hire of C.C. Mixer,
lubricant etc. L.S.
Total
1. Materials
2. Labour
Total
1.5% water charges
Contractor's profit @ 10% on Rs. 46.20 except
on cost of cement, sand and stone ballast

Rate per 100 Cft Total


Rate per Cum

280 As in item (279) above but in the proportion of 6 : 3 : 1.


Materials -
Stone ballast per % cft. 92 cft. 43.13
Coarse sand per % cft. 46.5 cft. 19.11
Cement per 50 kg.bag. 12.7 bag. 225.00
Add 2.5% wastage on coarse sand and
cement.
Total
Labour - Same as in item 279
1. Materials
2. Labour
Total
1.5% water charges
Contractor profit @ 10% on Rs. 46.20 Except
on cost of cement, coarse sand and stone
ballast.
Total

281 As in item No. (279) above but in the proportion of 8 : 4 : 1.


Materials -
Stone ballast per % cft. 94 cft. 43.13
Coarse sand per % cft. 48 cft. 19.11
Cement per 50 kg.bag. 9.8 bag. 225.00
Add 2.5% wastage on cement and coarse sand
Total
Labour - Same as in item No. 279
1. Materials
2. Labour
Total
1.5% water charges
Add Contractor's profit @ 10 % except on
cement, sand and stone ballast i.e. on Rs.
46.20
Total

282 Cast cement concrete door sills, chaukhats boundry posts, shelves and similar small work with cement, approved coarse
2 cm. (3/4") gauge approved stone ballast in the proportion of 1:2:4, excluding supply of reinforcement and its binding bu
its fixing and binding the same with 24 B.W.G.G.I. binding wire, and including the cost of binding wire, moulds an
materials, labour and T & P etc. required for proper completion of the work.

1. Cost of 1 : 2 : 4 C.C. as per item 279


2. Add difference in cost of 1and 1/2" gauge
per % cft. 90 cft. 37.88
and 3/4" gauge ballast.
3. Blacksmith for binding & fixing
per day 4 nos. 170.00
reinforcement
4. Cost of mould & extra cement and labour for
floating coat etc. L. S.
5. Binding wire and wastage of steel L. S.
Total
1.5% water charges on Rs. 99.00
Total
Contractor's profit @ 10 % on Rs. 73.48

except on cost af grit and the rate of S.I. (No. 279) Total

283 R.C.C. work with cement approved coarse sand and 2 cm. (3/4") gauge approved stone ballast in the proportion of 1:2:4
doors and windows excluding supply of reinforcement and its binding but including its fixing and binding the sam
B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and also including supply of all materials,
T & P etc. required for proper completion of the work. Binding wire cost being included in the item.

1. Same as in item No. 279 above,


2. Add difference in cost of 1 A" gauge and
per % cft. 90 cft. 37.88
3/4" gauge stone ballast.
3. Blacksmith for binding & fixing
per day 2 nos. 170.00
reinforcement
4. Cost of binding wire & extra cement &
labour for floating coat etc. L.S.
5. Cost of centering etc. with extra labour.
Total
1.5% water charges on Rs. 88.00
Total
Contractor's profit @ 10% on Rs. 62.32
except on rate of S. I. No. 279 and on ballast.
Total

284 As in item No. 283 above but for slabs. Rate as per S.I. 283
Add extra cost of centering and shuttering
Add 10% contractors profit on Rs. 0.80
Total

285 As in item (283) above but in the lighter beams, i.e. having spans above 6 m. (20')
Rate as in item 283 above
Add for ordinary brick or bailie supports L.S.
10% Contractor's profit on Rs. 1.30
Total

286 As in item (283) above but in heavier beams, i.e. having spans above 6 m. (20').
Rate as in item (283) above
Add for masonry or bailie supports and
stronger shuttering
10% Contractor's profit on Rs. 1.85
Total

287 As in item (283) above but in R. C. C. Raft foundation and footing with 4 cm. (1.5") gauge approved stone ballast.
Rate as in item No. 279 above
Blacksmith for binding and reinforcement. per day 0.5 nos. 170.00
Cost of binding wire, pumping out of water if
any L.S.
Contractor'profit @ 10% on Rs. 42.75
Total

288 As in item (283) above but in R.C.C. T beam and slab roofs and R. C. C. columns.
Rate as in item No. (283) above
Add for masonary or bailie supports and
stronger shuttering
Contractor's profit @ 10% on Rs. 1.40
Total

289 As in item no. (283) but on R. C. C. columns in 1 : 1and 1/2 : 3.


Rate as in item No. 288 above
Add difference in cost of materials to bo used.

Stone Ballast per % cft. 5 cft. 37.88


Coarse sand per % cft. 2.5 cft. 19.11
Cement per 50 kg.bag. 4.65 bag. 225.00

1.5% water charges on Rs. 36.57


Total

290 As in item (282 to 288) above but when shingles are used. Deduct from item 282 to
Stone
288 7% Ballast 2 cm. (3/4")
of materials will be less used. per % cft. 6.3 cft. 37.88
Coarse sand per % cft. 3.2 cft. 19.11
Cement per 50 kg.bag. 1.32 bag. 225.00

Difference in rate of shingle and stone grit.

Contractor's protit 10% on Rs. 38.00


Total

291 Deduct rate of concrete for using 5 cm. (2") gauge brick ballast in schedule item no.272 to 276, instead of 4 cm. (1.5") g
ballast.
Rate of 1.5" gauge brick ballast. per % cft. 100 cft. a) 5.00
Rate of 2" gauge brick ballast. per % cft. 100 cft.
Difference
Add for water charges 1.5%
Total
Rs. 5.07 per % cft. or Rs. 1.79 per cu. metre. Say Rs. 1.80 per cu. Metre

292 Deduct rato of concrete for using 5 cm. (2") gauge stone ballast in schedule item no. 279 to 281 instead of 4 cm. (1
gauge stone ballast.
Rate of 1and 1/2 gauge stone ballast. per % cft. 100 cft. 0.00
Rate of 2" gauge stone ballast. per % cft. 100 cft.
Difference
So difference for 90 cft. ballast to be used in
100 cft. of concrete =10x9/10=9.00
Add for Water charges 1.5 %
Total
CHAPTER - 6
BRICK WORK
Sl. Item of Work
Unit Qnty Rate
No.
1 2 3 4 5.00
301- First class brick work in kankar lime in foundation and plinth including supply of all materials, labour and T & P etc. re
proper completion of the work.
Materials : Bricks per %o 1300 2.70
Kankar lime per % cft. 30 cft. 110.99
Total

Labour : Mistri per day 1/6 no. 170.00


Mason per day 2 nos 160.00
Beldar per day 2 nos 100.00
Coolies per day 2 nos 100.00
Bhisti per day 1/2 nos 130.00
T & P etc., L.S.
Total
Materials
Labour
Add 1.5% water charges for curing

Contractor's profit @ 10%


Total

302- First class brick work in one white lime and two surkhi mortar in foundation and plinth including supply of all materials, lab
& P etc. required for proper completion of the work.
Materials : Bricks per % nos. 1300 2.70
Surkhi per % cft. 22 cft. 9.91
White lime per % cft. 11 cft. 550.00
Total
Labour : Same as in item No. 301 27.45
Materials
Labour
Total
Add 1.5% water charges
Contractor's profit @ 10%
Total

(a) First class brick work in one white lime and three surkhi mortar in foundation and plinth including supply of all materials,
T & P etc. required for proper completion of the work.
Materials : Bricks per % nos. 1300 nos. 2.70
Surkhi per % cft. 24 cft. 9.91
White (lime brought to powder at site from
per % cft. 8 cft. 550.00
unslacked lime)
Total
Labour : Same as in item No. 301 27.45
Materials
Labour
Total
Add for water charges 1.5%
Contractor's profit @ 10%
Total
303- First class brick work in 1 : 6 cement and fine sand of 1.25 F.M. mortar in foundation and plinth including supply of all
labour and T & P etc. required for proper completion of the work.
Materials : Bricks per % nos. 1300 nos. 2.70
Fine sand of 1.25 F.M. per % cft. 27 cft. 12.74
Cement per 50 kg bag. 3.75 bag. 225.00
Total
Labour : Same as in item No. 301 27.45
Materials
Labour
Total
Add 1.5%% water charges
Total
10% Contractor's profit on Rs. 107.73
Total

304- As in item (303) above but in 1 : 5 cement and fine sand of 1.25 F.M. mortar.
Materials : Bricks per % nos. 1300 nos. 2.70
Fine sand of 1.25 F.M. per % cft. 27 cft. 12.74
Cement per 50 kg bag. 4.5 bags. 225.00
Total
Labour : Same as in item No. 303 27.45
Materials
Labour
Total
Add for water charges 1.5%
Total
Contractor's profit @ 10% on Rs. 107.85
(excluding cost of cement and sand) Total

305- As in item 303 above but in 1 : 4 cement and fine sand of 1.25 F.M. mortar.
Materials : Bricks per % nos. 1300 nos. 2.70
Fine sand of 1.25 F.M. per % cft. 27 cft. 12.74
Cement per 50 kg bag. 51/4 bags. 225.00
Total
Labour : Same as in item No. 303 27.45
Materials
Labour
Total
Add 1.5% water charges
Total
Contractor's profit @ 10% on Rs. 107.97
(excluding cost of cement and sand) Total

306- As in item 303 above but in 1 : 3 cement and fine sand of 1.25 F.M. mortar.
Materials : Bricks per % nos. 1300 nos. 2.70
Fine sand of 1.25 F.M. per % cft. 27 cft. 12.74
Cement per 50 kg bag. 7.5 bags. 8.9 cft. 225.00
Total
Labour : Same as in item No. 303 27.45
Materials
Labour
Total
Add 1.5% water charges
Total
Contractor's profit @ 10% on Rs. 108.33
(except on cost of cement and sand) Total

307- As in item 303 above but in 1 : 3 cement and coarse sand mortar.
Materials : Bricks per % nos. 1300 nos. 2.70
Coarse sand per % cft. 27 cft. 19.11
Cement per 50 kg bag. 7.5 bags. 225.00
Total
Labour : Same as in item No. 303 27.45
Materials
Labour
Total
Add 1.5% water charges
Total
Contractor's profit @ 10% on Rs. 108.73
(excluding cost of cement and sand) Total

308- First class brick work in mud mortar in foundation and plinth including supply of all materials, labour and T & P etc. re
proper completion
Materials : Bricks of the work. per % nos. 1300 nos. 2.70
Earth per % cft. 30 cft.
Total
Labour : Same as in item No. 303 27.45
Materials
Labour
Total
Contractor's profit @ 10%
Total

309- As in item (301) to (304) above but in the super-structure including necessary cutting and moulding of bricks as require
including honey comb brick, work thickness of wall not to be less than 1 brick thick. Add for extra labour to above items.

Extra labour required :


1. Mason per day 1 no. 160.00
2. Coolie per day 1 no. 100.00
3. Scaffolding etc. L.S.
Total

Add 1.5% water charges


Total
Contractor's profit @ 10%
Total

310- As in item (309) above but for wall of one brick thick. Add for extra labour.
Mason per day 1 no. 160.00
Coolie per day 1 no. 100.00
Total

Add 1.5% water charges


Total
Contractor's profit @ 10%
Total

310- As in item (309) above but for wall of half brick(4") thick. Add for extra labour.
(a)
Extra labour over item no. 310.
Mason per day 0.5 no. 160.00
Coolie per day 0.5 no. 100.00
Total

Add 1.5% water charges


Total
Contractor's profit @ 10%
Total
Rate of item no. 310
Total

310- As in item (309) above but wall up to 3" thick. Add for extra labour.
(b)
Extra labour over item no. 310 (a).
Mason per day 0.5 no. 160.00
Coolie per day 1 no. 100.00
Total

Add 1.5% water charges


Total
Contractor's profit @ 10%
Total
Rate of item no. 310 (a)
Total

311- For second class brick work deduct from items (301) to (310) (310)
Difference in cost of bricks. per % nos. 1300 nos.
Water charges 1.5%
Total
Contractor's profit @ 10%
Total

312- For third class brick work in mud mortar deduct from item (301) to (310).
Difference in cost of bricks. per % nos. 1200 nos.
Deduct cost of 1300-1200=100 1st class
per % nos.
bricks.
Less workmanship required L.S.
Total
Add contractor's profit @ 10%
Total

313- Sundried Brick work in mud mortar in foundation and plinth, including supply of all materials, labour and T & P etc. re
proper completion of the work.
Materials : Bricks including wastage per % nos. 1300 nos.
Earth per % cft. 30 cft.
Total
Labour : Mistri per day 1/6 no. 170.00
Mason per day 2 nos. 160.00
Beldar per day 2 nos. 100.00
Coolie per day 2 nos. 100.00
Bhisti per day 1/4 no. 130.00
T & P etc.
Total
Material
Labour
Total
Contractor's profit @ 10%
Total
314- First class brick work in arches including shuttering and centering add to items (301 - 307). Extra labour, centering and
required.
Mason per day 2 nos. 160.00
Beldar per day 1 nos. 100.00
Coolie per day 2 nos. 100.00
Centering and Shuttering etc. L.S.
Total
Add 1.5% water charges
Total
Contractor's profit @ 10%
Total

315- As in item 314 above but in jack arches, including shuttering & centering add to item 301-307. Extra labour, centering and
required.
Mason per day 2 nos. 160.00
Beldar per day 1 nos. 100.00
Coolie per day 2.5 nos. 100.00
Centering and Shuttering etc. L.S.
Total
Add 1.5% water charges
Total
Contractor's profit @ 10%
Total

316- As in item 314 above but in well steining with ordinary bricks, add to item 301-307. Extra cost of labour, centering and
etc.
Mason per day 2.5 nos. 160.00
Beldar per day 1 nos. 100.00
Coolie per day 3 nos. 100.00
Centering and Shuttering etc.
Total
Add 2.5% water charges
Total
Contractor's profit @ 10%
Total

317- As in item 316 above but in well steining but with specially moulded bricks. Add to item 316. Extra labour required for wo
and handling.
Mason per day 0.5 nos. 160.00
Beldar per day 2 nos. 100.00
Total
Add 1.5% water charges
Total
Contractor's profit @ 10%
Total

318- 11.5cm. (4") thick string or drip course with 6 cm. (2.1/4") projection of first class brick in kankar lime including 12mm
lime plastering with simple moulding and cutting drip notch as required and including supply of all materials, labour and
required for proper completion of the work.

Bricks required for projected portion, 100rft.


3/16x3/8x100x1300/100=91 nos.
Wastage at the rate of 10% = 9nos. Bricks
total : 100 bricks.
Bricks per % nos. 100 nos. 2.70
Kankar lime masonary3/16x3/8x100x30/100 = 2.10 cft.
For plaster 100x3/4=75 cft. 5cft. = 3.75 cft.
Total = 5.85 cft.
Kankar lime per % cft. 5.85 cft. 110.99

Labour : Mistri per day 1/50 nos. 170.00


Mason per day 3.5 nos. 160.00
Coolie per day 2 nos. 100.00
Bhisti per day 1/12 no. 130.00
T & P scaffolding etc. per day
Total

Add 1.5% water charges


Total
Contractor's profit @ 10%
Total

319- As in item (318) above but both masonary and laster in 1:6 cement and fine sand of 1.25 F.M. Labour as per item no. 318

Bricks same as in item no. 318 above 2.70


Cement plaster per 50 kg.bag. 0.77 bag.
(75sft.@83cft.per%sft. = 0.62 cft.
Masonary (7cft. @ 4.2cft. Per%cft. = 0.29 cft.
Total = 0.91 cft.
Fine sand of 1.25 F.M. per % cft. 5 cft. 12.74
Total

Add 1.5% water charges


Contractor's profit @ 10% on Rs. 40.23-6.75=
33.48
(except cost of cement and sand) Total

320- As in item (318) above but in 23cm. (9") cornice in three courses with 6 cm. (21/4") projection in each course in kanka
12mm. thick lime, plaster or pointing take length of 100 rft.
Brick work in 1st course=1/4x3/16x100 = 4.70 cft.
2nd course = 2x4.7 = 9.40 cft.
3rd course = 3x4.7 = 14.10 cft.
Total = 28.20 cft.
Plaster = 100x(221/4") 1/12 = 187.50 sft.
Bricks = 28.2x1300/100+10% = 402.00 say 400 nos.
Kankar lime
In masonary 28.2x30/100 = 8.46 cft.
In plaster 187-5x5/100 = 9.37 cft.
Total = 17.83 cft. say 18.00 cft.
Bricks per % nos. 400 nos. 2.70
Kankar lime per % cft. 18 cft. 110.99
Labour : Mistri per day 1/20 nos. 170.00
Mason per day 6.5 nos. 160.00
Coolie per day 4 nos. 100.00
Bhisti per day 1/8 no. 130.00
T & P scaffolding etc.
Total

Add 1.5% water charges


Total
Contractor's profit @ 10%
Total
321- As in item 320 above but both masonary and plaster and pointing in 1.6 cement and local sand mortar.
Materials Bricks per % nos. 400 nos. 2.70
Local sand of 1.25 F.M. including
wastage per % cft. 25 cft.
Cement per 50 kg.bag. 2.32 bag. 225.00
Cement : In Brick work in 1.6 cement an local
sand 28.2/100x4.2=1.186 cft.
In plaster 187.5cft.=8/5/100x0.83=1.554/
2.740 cft. = 2.32 bag.
Labour as per item 320 above
Total

Add 1.5% water charges


Contractor's profit @ 10% on Rs. 76.55
(except on cement and sand) Total

322- Extra cutting of bricks for moulding as required for cornice, etc, including rubbed finish not exceeding 11.5 cm. (4.5") w
only take 100 rft.)
Wastage of bricks @ 10% per % nos. 7 nos.
Mason for cutting bricks per day 4 nos. 160.00
Labour for rubbing & carriage (coolie) per day 3 nos. 100.00
T & P etc. L.S.
Total

Contractor's profit @ 10%


Total

323- Making opening through walls in lime or cement mortar for doors and windows or enlarging existing opening or cutting
work for under pinning including necessary supports staging etc. cleaning site and stacking the dismantled materials at th
directed by the Engineer-in-charge within a distance of 60 metres (200ft.). Assuming size of opening 5ft. wide and 7 feet
1 1/8 ft. thick = 40cft. Labour for making holes for pins, fixing pins for proper safety of super structure and removing the
completion of the job pins na holes.

Beldar per day 1 nos. 100.00


Coolie per day 1 nos. 100.00
Hire of pins and struts L.S. per day
Total
Cutting opening, cleaning of bricks and stacking them within 2 chain as directed by the Engineer-in-charge.
Beldar per day 1.5 nos. 100.00
Coolie per day 2 nos. 100.00
Mistri per day 1/12 nos. 170.00
T&P etc. L.S.
Total
Contractor's profit @ 10%
Total

324- Laying reinforced brick work in sunshades with first class brick laid in cement and approved coarse sand mortar 1:3
supply of reinforcement and its bending but including its fixing in position and binding the same with 24 B.W.G.I. Bindin
including all centering and shuttering etc. and curing and also including cost of binding wire, supply of all materials labou
etc. required for proper completion of the work.

Rate for R.B. slab as per item no. 535


Deduct for less cost of centering materials
10% on Rs. 12.92 (from item 535)
Less 1.5% water charges
Less Contractor's profit @ 10%
Total

325- As in item (324) but in lintels


As in item 324 above
Deduct : less labour required due less cost of
centering and staging including 10%
contractor's profit
Total

326- Encasing rolled steel sections as in beams and columns in 1:3 brick work in cement and approved coarse sand with 10
thick cement plaster in 1:3 cement and approved coarse sand including supply and fixing of wire netting of required ga
necessary including supply of all material, labour and T&P etc. required for proper completion of the work.

Details of cost for a single l section 8'x3"x6"


Brick work in 1:3 1x8x1/6x5/12=1.1 cft.
Ditto per % cft. 1.1 cft.
Wire gauge including wastage : 8x1.5=12 sft.

Ditto per % sft. 12 sft.


Cost of binding and placing wire gauge
Blacksmith per day 1/4 nos. 170.00
Beldar per day 1/4 nos. 100.00
Total
Cement plaster in 1:3 (cement and approved
coarse sand).
8x1 1/4=10sft. per % sft. 10 sft.
Total
Labour as per item 320 above
Total

1.5% water charges on Rs. 14.48


Contractor's profit @ 10% on Rs. 14.48
Total

327- Add to all items of brick work in superstructure extra for brick work in circular pillar.
Details of cost per % cft.
Extra Bricks per %o 4 no.
Labour for cutting and dressing bricks etc.
Mason per day 4 nos. 160.00
Coolie per day 1 nos. 100.00
Total
1.5% water charges
Contractor's profit @ 10%
Total
CHAPTER - 7
DAMP COARSING
Sl. Item of Work
Unit Qnty Rate
No.
1 2 3 4 5.00
360- 2cm. (3/4") thick damp proof coarse with cement and approved coarse sand 1:2 with and including water proofing m
ordered by the Engineer-in-charge in the proportion as specified by the manufacturers, including supply of all materials,
T&P etc. required for proper completion of the work and including proper curing and shuttering as necessary.

Materials : Coarse sand per % cft. 6.25 cft. 19.11


Cement per 50 kg.bag. 2.6 bag. 225.00
Water proofing compound as specified by the
per kg. 3.4 kg.
manufactures
Total
Labour : Mistri per day 1/20 no. 170.00
Mason per day 1/4 nos 160.00
Beldar per day 1/4 nos 100.00
Coolies per day 1/4 nos 100.00
Bhisti per day 1/8 nos 130.00
Sundries L.S.
Total
1.5% water charges

Contractor's profit @ 10% on Rs. 16.62


Total

361- As in item (360) above but 2.5 cm. (1") thick and of cement concrete consisting of one part cement 1.5 parts approved co
and 3 parts approved 13mm. (1.5") graded stone grit and including water proofing materials as ordered by the Engineer-in
the proportion as specified by the manufacturers.

Materials : Stone ballast per % cft. 7.5 cft. 37.88


Cement per 50 kg.bag. 2.3 bag. 225.00
Water proofing compound as specified by the
per kg. 2.3 kg.
manufactures
Total
Labour : Mistri per day 1/16 no. 170.00
Mason per day 1.5 nos 160.00
Beldar per day 1.5 nos 100.00
Bhisti per day 1/8 nos 130.00
Sundries L.S.
Total
1.5% water charges

Contractor's profit @ 10% on Rs. 25.66


except on cost of cement, sand and ballast. Total
CHAPTER - 8
STONE WORK
Sl. Item of Work
Unit Qnty Rate
No.
1 2 3 4 5.00
370- Supply and fixing of Mirzapur or other approved stone fine dressed, as in door sills chaukhats etc. laid in mortar consisting
cement and 6 part approved fine sand of 1.25 F.M. including supply of all materials, labour and T&P etc. required
completion of the work.
Cost of 2" thick stone at site including carriage
per % cft. 1 cft.

Dressing Charges :
Stone mason per day 1/10 no. 160.00
Blacksmith per day 1/36 no. 170.00
Beldar per day 1/48 no. 100.00
Coolie per day 1/48 no. 100.00
Fixing Charges :
Stone mason per day 1/48 no. 160.00
Beldar per day 1/32 nos 100.00
Blacksmith per day 1/336 nos 170.00
Bhisti per day 1/96 nos 130.00
Scaffolding materials and water charge L.S.
Total
Contractor's profit @ 10%
Total

371- Supply and fixing of Mirzapur or other approved stone slabs 4cm. (1.5") thick with plain moulding on one edge and fine d
all exposed surfaces as in steps and shelves laid in cement mortar consisting of one part cement and 6 parts approved fi
1.25 F.M. including supply of all materials, labour and T&P etc. required for proper completion of the work. Take st
12.5x12" each.

Stone per % sft. 106 sft. 43.13


Cement per 50 kg.bag. 2 bag. 225.00
Fine sand of 1.25 F.M. per % cft. 15 cft. 12.74
Coolie per day 12 no. 100.00
Bhisti per day 1/ 4 nos 130.00
Blacksmith and Mason per day 1 no. 170.00
Beldar per day 1.5 nos 100.00
Sundries, scaffolding and water charge L.S.
Total
Contractor's profit @ 10% on Rs. 141.51
Total

372- Supply and fixing of Mirzapur or other approved stone chajjas 4cm. (1.5") thick with but joint and with exposed surfaces fin
set in cement mortar consisting of one part cement and 6 parts approved fine sand of 1.25 F.M. including supply of all
labour and T&P etc. required for proper completion of the work.
Details of cost of 22.5 sft. Taking 100rft. And 2
1/4 ft. projection and 6" bearing.
Area 10x2.75 = 27.50 sft.
Wastage at 10% = 2.75 sft.
Total = 30.25 sft. say 30.00 sft.
Stone per % sft. 30.25 sft.
Mortar for pointing 1:2 with one part of cement
and 2 parts of stone dust.
Cement per 50 kg.bag. 4/45 bag. 225.00
Stone dust per % cft. 2/ 9 cft.
Pigment L.S.
Stone mason per day 1/ 8 no. 160.00
Beldar per day 3/ 4 no. 100.00
Bhisti per day 1/ 8 no. 130.00
Dresser per day 1 no
Scaffolding Sundries and mortar L.S.
Total
Contractor's profit @ 10% on Rs. 36.26
Total

373- Supply and fixing of Mirzapur or other approved stone rushades upto 4cm. (1.5") thick over doors and windows inc
brackets of same stone 5cm. (2") thick with plain moulding in edges of brackets all exposed surfaces to be fine dressed
to project upto 0.6m. (2ft.) and set well into walls to a depth of 15cm. (6") (minimum) with cement mortar consisting o
cement and 6 parts approved fine sand of 1.25 F.M. including supply of all materials, labour and T&P etc. required
completion of the work. Stone chisel 1.5" thick over all width 2"-6"=2.5ft.

Total area 5'-3"x2'-6" = 13.12 sft.


Brackets(chisel dressed)Length1'-6"+9"=2.5ft. sft.
Area 2x1x2.5 = 5.00 sft.
Wastage at 10% = 1.81 sft.
Total = 19.93 sft. say 20 sft.
Stone per % sft. 20 sft.
Stone mason :
Ornamental per day 1/ 2 no. 170.00
Beldar per day 1/ 2 no. 100.00
Bhisti per day 1/ 8 no. 130.00
Dressing Stone :
Dresser per day 1 no 160.00
Contractor's profit @ 10%
Total

374- Supply and fixing of pierced tracery panels of Mirzapur or other approved stone 5cm. to 6cm. (2" to 2.5") thick fixed
mortar consisting for 1 part cement and 3 part approved corase sand including supply of all materials, labour and T&P et
for proper completion of the work.
Cost of 2" thick stone at site including carriage

Stone per % sft. 1 sft.


Wastage 10%
Dressing Charges :
Stone mason per day 1/ 2 no. 160.00
Blacksmith L.S.
Beldar per day 1/ 2 no. 100.00
Coolie per day 1/12 no. 100.00
Fixing Charges :
Stone mason for plain work per day 1/12 no. 160.00
Beldar per day 1/ 8 no. 100.00
Blacksmith per day
4/56
no. 170.00
x1/6
Bhisti 4/16
per day x1/6
no. 130.00
Scaffolding materials and mortar etc.L.S.
Contractor's profit @ 10% on Rs. 7.30
Total
CHAPTER - 9
WOOD WORK
Sl. Item of Work
Unit Qnty Rate
No.
1 2 3 4 5.00
401 C.P. Teak wood wrought tramed and fixed including simple mouldings, straight works as in Chaukhats, including su
materials, labour and T&P etc. required for proper completion of the work.
Take a size of opening as 4'47' section of
Chaukhat 4"x3".
Wood 1x18x1/3x1/4 = 1.500 cft.
Wastage 5% = 0.075 cft.
Total = 1.575 cft. say 1.6 cft.
Wood per % cft. 1.6 cft. a) Wood Ch
Carpenter Mistri per day 1/16 no. 170.00
Carpenter per day 1/ 2 no. 160.00
Beldar per day 1/ 4 no. 100.00
Sundries L.S.
Contractor's profit @ 10% on Rs. 61.69
Total

402- As in item 401 above but with shisham wood.


Same as in item 401 above
Deduct difference in cost of wood
(35-24.05)=10.95 per % cft. 1.6 cft.
Contractor's profit @ 10% on Rs. 17.52
Total

403- As in item 401 above but in indian sal wood.


Same as in item 401
Deduct difference in cost of wood
(35-17.55) = 17.45 per % cft. 1.6 cft.
Contractor's profit @ 10% on Rs. 27.92
Total

404- As in item 401 above but with Deodar wood.


Same as in item 401 above
Deduct difference in cost of wood
(35-24.90) = 10.10 per % cft. 1.6 cft.
Contractor's profit @ 10% on Rs. 16.16
Total

405- As in item 401 above but with Kail wood.


Same as in item 401 above
Deduct difference in cost of wood
(35-14.15) = 20.85 per % cft. 1.6 cft.
Contractor's profit @ 10% on Rs. 33.36
Total

406- As in item 401 above but with country wood.


Same as in item 401 above
Deduct difference in cost of wood
(35-9.92) = 25.08 per % cft. 1.6 cft.
Contractor's profit @ 10% on Rs. 40.12
Total

407- As in item (401-406) but for curved work, add to the above item 25% above per cu.m.
408- Wood work worught framed and fixed plain work as in roof trusses, pulins, ceiling joists, etc. including supply of all materi
and T&P etc. required for proper completion of the work. Deduct from the item (401-406).
Less labour required
Carpenter per day 1/ 4 no. 160.00
Beldar per day 1/ 2 no. 100.00
Contractor's profit @ 10% on Rs. 3.24
Total

409- Supply & fixing of 4.5cm. (1 3/4") thick C.P Teak wood part panelled & part glazed door and window shutters including s
fixing of wooden cleats and stops and including fixing and adjustment of hinses, bolts, locks, handles, springs, and/or o
but excluding their supply and including painting with two coats of Black Japan on all iron fittings if necessary & including
glass panes with putty & brad. Glass to be 0.64 kg (21oz.) fittings with necessary screws to be supplied departmentally.

Take a door size 4"x7", size of shutter


3.2/3x6.3/4"= 24.75 sft.
Wood required including 10% wastage per % cft. 3.25 cft.
Glass panes 12"x8" each 16 no.
Putty and brad L.S.
Mistri per day 1/ 8 no. 170.00
Carpenter per day 4 no. 160.00
Beldar per day 1 no. 100.00
Glazier per day 1/ 5 no. 120.00
Sundries such as glue black Japan etc.
Contractor's profit @ 10% on Rs. 171.01
Total

410- Additional cost for fixing glass panes with C.P. Teak wood beading and felt as directed by Engineer-in- charge instead o
brad including cost of all materials, labour and T&P etc. required for proper completion of the work.

Take 10nos. Glass panes C.P. Teak wood


5x1/3x1/32 = 0.05 cft.
Wastage 10% = 0.005 cft.
Total = 0.055 cft. say 0.06 cft.
Wood per % cft. 0.06 cft. a) Wood Ch
Screws per gross 10 doz.
Carpenter per day 1/ 4 no. 160.00
Beldar per day 1/ 8 no. 100.00
Contractor's profit @ 10% on Rs. 6.87
Total

411- As in item no. 409 above but fully panneled.


Wood 24.75x7/48 = 3.61 cft.
Wastage 10% = 0.36 cft.
Total = 3.97 cft. say 4.00 cft.
C.P. Teak Wood per % cft. 4 cft. a) Wood Pl
Labour as above in item no 409 including 10%
contractor's profit

Contractor's profit @ 10% on cost of C.P. Teak


Wood only.
Total

412- As in item no. 409 above but fully glazed.


C.P. Teak wood including wastage per % cft. 3 cft. a) Wood Pl
Glass panes 12"x8" each 28 no.
Brad and Putty L.S.
Labour as in item no. 409
Deduct Carpenter per day 1 no. 160.00
Contractor's profit @ 10% on Rs. 162.19
Total

413- As in item no. 409 above but 4cm. (1.5") thick.


Rate as in item no. 409 above
Deduct difference in quantity of wood per % cft. 0.01 cft.
Contractor's profit @ 10% on difference in
quantity of wood
Total

414- As in item no. 411 above but 4cm. (1.5 ") thick.
Rate as in item no. 411 above
Deduct difference due to less wood required
as in item 413 including
Contractor's profit @ 10%
Total

415- As in item no. 412 above but 4cm. (1.5") thick.


Rate as in item no. 412 above
Deduct difference due to less wood required
as in item 413 including
Contractor's profit @ 10%
Total
416- As in item no. 409 above but 2.5cm. (1") thick.
Rate as in item no. 409 above
Deduct difference in quantity of wood per % cft. 0.02 cft.
Contractor's profit @ 10% on Rs. 0.78
Total

417- As in item no. 411 above but 2.5cm. (1") thick.


Rate as in item no. 411 above
Deduct difference due to less wood required
as in item 416 including
Contractor's profit @ 10%
Total

418- As in item no. 412 above but 2.5cm. (1") thick.


Rate as in item no. 412 above
Deduct difference due to less wood required
as in item 416 including
Contractor's profit @ 10%
Total

419- Same as in item no. 409 above but of Shisham Wood.


Rate as in item no. 409
Deduct difference in cost of wood=3.25/
per % cft. 0.13 cft.
24.75=0.13 cft. at Rs. 39.05-26.90=12.15
Contractor's profit @ 10%
Total

420- Same as in item no. 411 above but of Shisham Wood.


Rate as in item no. 411
Deduct difference in cost of wood 4/24.75 =
161 cft.
Contractor's profit @ 10%
Total

421- As in item no. 412 above but of Shisham Wood.


Rate as in item no. 412
Deduct difference in cost of wood 3/24.75 =
121 cft.
Contractor's profit @ 10%
Total

422- As in item no. 419 above but of Shisham Wood.


Rate as in item no. 419
Deduct difference in quantity of wood per % cft. 0.01 cft.
Contractor's profit @ 10%
Total

423- As in item no. 420 above but 4cm. (1.5") thick.


Rate as in item no. 420
Deduct difference due to less wood required
as in item 422 including
Contractor's profit @ 10%
Total

424- As in item no. 421 above but 4cm. (1.5") thick.


Rate as in item no. 421
Deduct difference due to less wood required
as in item 422 including
Contractor's profit @ 10%
Total

425- Same as in item no. 409 above but of Indian Sal Wood.
Rate as in item no. 409
Deduct difference in cost of wood at Rs.
per % cft. 0.13 cft.
(39.05-20.10) = 18.95
Contractor's profit @ 10%
Total

426- As in item no. 411 above but of Indian Sal Wood.


Rate as in item no. 411
Deduct difference in cost of wood per % cft. 0.161 cft.
Contractor's profit @ 10%
Total

427- As in item no. 412 above but of Indian Sal Wood.


Rate as in item no. 412
Deduct difference in cost of wood per % cft. 0.121 cft.
Contractor's profit @ 10%
Total

428- As in item no. 425 above but 4cm. (1.5") thick.


Rate as in item no. 425
Deduct difference in quantity of wood per % cft. 0.01 cft.
Contractor's profit @ 10%
Total

429- As in item no. 426 above but 4cm. (1.5") thick.


Rate as in item no. 426
Deduct difference due to less wood required
as in item 428 including
Contractor's profit @ 10%
Total

430- As in item no. 427 above but 4cm. (1.3") thick.


Rate as in item no. 427
Deduct difference due to less wood required
as in item 428 including
Contractor's profit @ 10%
Total

431- As in item no. 409 but of Deodar wood.


Details of 24.75 sft. of door shutter :
Deodar wood per % cft. 3.25 cft. d) Wood Pl
Glass panes each 16 no.
Putty and brads L.s
Mistri per day 1/ 8 no. 170.00
Carpenter per day 3 no. 160.00
Beldar per day 1 no. 100.00
Glazier per day 1/ 4 no. 120.00
Sundries L.S.
Contractor's profit @ 10% on Rs. 128.01
Total

432- Same as in item no. 411 above but of Deodar wood.


Wood 24.75x7/48 = 3.61 cft.
Wastage 10% = 0.36 cft.
Total = 3.97 cft. say 4.00 cft.
Deodar wood per % cft. 4 cft.
Labour as in item no. 431
Contractor's profit @ 10% on Rs. 188.13
Total

433- Deodar wood including wastage per % cft. 3 cft.


Glass panes 12"x8" each 28 no.
Brad and Putty L.s
Labour : Same as in item no. 431
Deduct Carpenter per day 1 no. 160.00
Contractor's profit @ 10% on Rs. 121.94
Total

434- As in item no. 431 but of 4cm. (1.5") thick.


Rate as in item no. 431
Deduct difference in quantity of wood per % cft. 0.01 cft.
Contractor's profit @ 10%
Total

435- As in item no. 432 above but 4cm. (1.5") thick.


Rate as in item no. 432
Deduct difference due to less wood required
as in item 434 including
Contractor's profit @ 10%
Total

436- As in item no. 433 above but 4cm. (1.5") thick.


Rate as in item no. 433
Deduct difference due to less wood required
as in item 434 including
Contractor's profit @ 10%
Total

437- As in item no. 431 above but 2.5cm. (1") thick.


Rate as in item no. 431
Deduct difference in quantity of wood per % cft. 0.02 cft.
Contractor's profit @ 10%
Total

438- As in item no. 432 above but 2.5cm. (1") thick.


Rate as in item no. 432
Deduct difference due to less wood required
as in item 437 including
Contractor's profit @ 10%
Total

439- As in item no. 433 above but 2.5cm. (1") thick.


Rate as in item no. 433
Deduct difference due to less wood required
as in item 437 including
Contractor's profit @ 10%
Total

440- Same as in item no. 409 above but of Kail wood or Chir Wood.
Rate as in item no. 431
Deduct difference in cost of wood 3.25/ 24.75
per % cft. 0.13 cft.
=13cft. @ Rs. (28.05-16) = 12.05
Contractor's profit @ 10%
Total

441- As in item no. 411 above but of Kail wood or Chir Wood.
Rate as in item no. 432
Deduct difference in quantity of wood per % cft. 0.161 cft.
Contractor's profit @ 10%
Total

442- As in item no. 412 above but of Kail wood or Chir Wood.
Rate as in item no. 433
Deduct difference in quantity of wood per % cft. 0.121 cft.
Contractor's profit @ 10%
Total

443- As in item no. 440 above but of 4cm. (1.5") thick.


Rate as in item no. 440
Deduct difference in quantity of wood per % cft. 0.01 cft.
Contractor's profit @ 10%
Total

444- As in item no. 441 above but 4cm. (1.5") thick.


Rate as in item no. 441
Deduct difference due to less wood required
as in item 443 including
Contractor's profit @ 10%
Total

445- As in item no. 442 above but 4cm. (1.5") thick.


Rate as in item no. 442
Deduct difference due to less wood required
as in item 443 including
Contractor's profit @ 10%
Total

446- As in item no. 440 above but 2.5cm. (1") thick.


Rate as in item no. 440
Deduct difference in quantity of wood per % cft. 0.02 cft.
Contractor's profit @ 10%
Total

447- As in item no. 441 above but 2.5cm. (1") thick.


Rate as in item no. 441
Deduct difference due to less wood required
as in item 446 including
Contractor's profit @ 10%
Total

448- As in item no. 442 above but 2.5cm. (1") thick.


Rate as in item no. 442
Deduct difference due to less wood required
as in item 446 including
Contractor's profit @ 10%
Total

449- Supply & fixing of 20 B.W.G. black iron sheet panelled door and window shutters in 4cm. (1.5") thick Indian Sal W
including supply and fixing of wooden cleats and stops and including fixing and adjustment of hinses, bolts, locks, handle
and/or other fitting but excluding their supply and including painting with tow coats of Black Japan on all iron fittings if
Fitting with necessary screws to be supplied departmentally.

Details of 24.75 sft. Sal wood per % cft. 2.5 cft.


20 B.W.G.Black panel 12sft.@1.6lbpersft.= 19.20 lb
Wastage 10% = 1.92 lb
Total = 21.12 lb say 21 lb
Rs 160.00 per quintal per kg. 9.5 kg. Total
Mistri (Carpenter) per day 1/ 8 no. 170.00
Carpenter per day 3 no. 160.00
Beldar per day 1 no. 100.00
Contractor's profit @ 10% on Rs. 89.01
Total

450- Supply & fixing of 4cm. (1.5") thick C.P. Teal Wood door and window shutters with panels of heavy quality galvanized
gauge 2.5 mm. or 2 mm. or 1.5 mm. (1/10 or 1/12 or 1/6 inch.) mesh or any other size with necessary beading, including s
fixing of wooden cleats and stops and including fixing and adjustment of hinses, bolts, locks, handles, springs, and/or o
but excluding their supply and including two coats of Black Japan on all iron fittings if necessary. (Fitting with necessary
be supplied departmentally).

Details of door shutter of size 3'-6'x6'-9' Area =


23.62 sft.
Styles 4x6 3/4x5/12x1/8 = 1.40 cft. 1.40 cft.
Rails, tops and middle rail 6x1 3/4x6/12x 1/8 =
0.50 cft.
0.50 cft.
Bottom Rail 2x1 2/3x2/3x1/8 = 0.30 cft.
Beading 4x5 1/8x1/24x1/24
12x1 1/3x1/24x1/24 = 0.06 cft.
Total = 2.26 cft.
Wastage 10% = 0.23 cft.
Total = 2.49 cft. say 2.50 cft.
C.P. Teak wood per cft. 2.5 cft. a) Wood Pl
Wire gauge6x1 3/4x1 1/3x1.1=15.4say 16sft. per cft. 0.1 cft.
Total
Labour same as ing item 431
Contractor's profit @ 10% on Rs. 139.56
Total

451- As in item no. 450 above but in Shisham Wood.


Rate as in item no. 450
Deduct difference in cost of wood
2.5/23.62=0.105cft. @ Rs. 39.05-26.90=12.15 per % cft. 0.1 cft.

Contractor's profit @ 10%


Total
452- As in item no. 450 above but in Indian Sal Wood.
Rate as in item no. 450
Deduct difference in cost of wood 0.1 cft. @
per % cft. 0.1 cft.
Rs. 39.05-20.10=18.95
Contractor's profit @ 10%
Total

453- As in item no. 450 above but in Deodar Wood.


Rate as in item no. 450
Deduct difference in cost of wood 0.1 cft. @
per % cft. 0.1 cft.
Rs. 39.05-28.05=11.00
Contractor's profit @ 10%
Total

454- As in item no. 450 above but in Kail wood or Chir Wood.
Rate as in item no. 450
Deduct difference in cost of wood 0.1 cft. @
per % cft. 0.1 cft.
Rs. 39.05-16.00=23.05
Contractor's profit @ 10%
Total

455- Supplying & fixing galvanized mosquitos proof heavy quality iron wire gauge or expended metal of heavy quality over win
including supply and fixing of C.P. Teak wood battens 8cm.x1cm. (3"x3/8") and including supply of necessary screws, all
labour and T&P etc. required for proper completion of the work.

Taking a size 3'x4' = 12 sft.


Wooden Battens 14x1/4x1/24x2.5'x1/6x1/24 = 0.15 cft.
Wastage 10% = 0.02 cft.
Total = 0.17 cft.
C.P. Teak per % cft. 0.17 cft. a) Wood Pl
Wire gauge per % sft. 14 sft.
Carpenter per day 1/ 4 no. 160.00
Beldar per day 1/ 4 no. 100.00
Sundries
Contractor's profit @ 10% on Rs. 25.57
Total

456- As in item no. 455 above but with in Shisham Wood battens.
Rate as in item no. 455
Deduct difference in cost of inferior quality of
wood used 0.017/12= 0.014 cft. @ Rs. 39.05- per % cft. 0.014 cft.
26.90=12.15
Contractor's profit @ 10%
Total

457- As in item no. 455 but Indian Sal Wood battens.


Rate as in item no. 455
Deduct difference in cost of inferior quality of
wood used 0.014 cft. @ Rs. 39.05- per % cft. 0.014 cft.
20.10=18.95
Contractor's profit @ 10%
Total

458- As in item no. 455 but with Deodar Wood battens.


Rate as in item no. 455
Deduct difference in cost of inferior quality of
wood used 0.014 cft. @ Rs. 39.05- per % cft. 0.014 cft.
28.05=11.00
Contractor's profit @ 10%
Total
459- As in item 409 but braced and battened 4cm. (1.5") thick of shisham wood including supply of necessary screws.

Size of door 3.5x6.5 = 19.5 sft.


Battens 8x5/12x6.5x1/8 = 2.60 cft.
2x3x1/4x18 = 0.20 cft.
Braces 4x3.5x1/4x1/8 = 0.44 cft.
Total = 3.24 cft.
Wastage 10% = 0.32 cft.
Total = 3.56 cft.
So cost of wood per sft.=3.56x26.90/19.5 Rs.
4.91 per sft.
Wood per % cft. 3.56 cft.
Screws 2.5" long per gross 4 doz.
Mistri per day 1/ 8 no. 170.00
Carpenter per day 1 no. 160.00
Beldar per day 0.5 no. 100.00
Sundries L.S.
Contractor's profit @ 10% on Rs. 110.44
Total

460- As in item no. 459 above but of Indian Sal Wood.


Rate as in item no. 459
Deduct difference in cost of inferior quality of
wood used 3.56/19.5=0.18cft. @ Rs. 26.90- per % cft. 0.18 cft.
20.10 = 6.80
Contractor's profit @ 10%
Total

461- As in item no. 459 above but of Country Wood.


Rate as in item no. 459
Deduct difference in cost of inferior quality of
wood used 0.18cft. @ Rs. 26.90-11.90 = 15.00 per % cft. 0.18 cft.

Contractor's profit @ 10%


Total

462- As in item no. 459 above but of Deodar Wood.


Rate as in item no. 459
Deduct difference in cost of inferior quality of
wood used 0.18cft. @ Rs. 26.90-28.05=1.15 per % cft. 0.18 cft.

Contractor's profit @ 10%


Total

463- As in item no. 459 above but of Kail Wood or Chir Wood.
Rate as in item no. 459
Deduct difference in cost of inferior quality of
wood used 0.18cft. @ Rs. 26.90-16.00= 10.90 per % cft. 0.18 cft.

Contractor's profit @ 10%


Total

464- As in item no. 461 above but of 2.5 cm. (1") thick.
Rate as in item no. 461
Deduct difference in quality of wood used
3.56-2.4/19.5=0.061cft. @ Rs. 26.90-11-90= per % cft. 0.06 cft.
15.00
Contractor's profit @ 10%
Total
465- Supply & fixing of 4cm. (1.5") thick C.P. Teak Wood door and window shutters with 1cm. (3/8) thick ply wood rae pres
panels and fixing C.P. Teak wood cleats and stops and including fixing and adjustment of hinses, bolts, locks, handle
and/or other fitting but excluding their supply and including two coats of Black Japan on all iron fittings if necessary. F
necessary screws to be supplied departmentally.

C.P. Teak wood per % cft. 2.5 cft. a) Wood Pl


1cm. (3/8) thick ply wood panels per % sft. 14 sft.
Mistri (Carpenter) per day 1/ 8 no. 170.00
Carpenter per day 3 no. 160.00
Beldar per day 1 no. 100.00
Sundries L.S.
Contractor's profit @ 10% on Rs. 133.84
Total

466- As in item no. 465 above but Shisham Wood.


Rate as in item no. 465
Deduct difference in cost of inferior quality of
wood used 2.5/23.62=0.10cft. @ Rs. 39.05- per % cft. 0.10 cft.
26.90= 12.15
Contractor's profit @ 10%
Total

467- As in item no. 465 above but Indian Sal Wood.


Rate as in item no. 465
Deduct difference in cost of inferior quality of
wood used 0.10cft. @ Rs. 39.05-22.10= 18.95 per % cft. 0.10 cft.

Contractor's profit @ 10%


Total

468- Sawing wood excluding carriage (Teak wood and Shisham or Sal wood etc.).
Sawyers per day 1 pair Sawyer per
Sundries L.S.
Contractor's profit @ 10% on Rs. 11.75
Total

469- As in item above but softer wood (like Kail, Chir or Country wood of Deodar).
Sawyers per day 3/ 4 no. Sawyer per
Sundries L.S.
Contractor's profit @ 10% on Rs. 8.50
Total

470- As in item 411 above but of commerical quality (Kanju) Sitapur ply or other approved ply wood flush shuters 3cm. (11/4") t

Company Rate at Sitapur


Cartage Charge L.S.
Labour for fixing : Carpenter per day 1/24 no. 160.00
Beldar per day 1/42 no. 100.00
Contractor's profit @ 10% on Rs. 4.73
Total

471 to Approximate cost of fittings with screws for door and windows etc.
474-
These rates are provided in the schedule of
rates for Estimating purpose. Fittings are to be
supplied departmentally.
471- Rs. 7.50 per sq. metre.
472- Rs. 10.75 per sq. metre.
473- Rs. 32.00 per sq. metre.
474- Rs. 37.60 per sq. metre.

475- As in item 409 to 488 above but when 0.55 kg. ( 18oz) of glass is used instead of 0.65 kg. (21oz) Deduct from items (4
Glass panes.
Rs. 0.62-0.47 = 0.15 each 16 no.
Contractor's profit @ 10%
Total

476- As in item 470 above but for 4cm. (1.5") thick


Add : Extra to item 470
Difference in company rate 4.38-4.08 = 0.30
per sft.
Contractor's profit @ 10%
Total

477- As in item 470 but of C.P. Teak decorative type ( one side only) and commerical lipping approved ply wood flush shu
(1.5.") thick
Company Rate at Sitapur
Cartage Charge L.S.
Labour for fixing : Carpenter per day 1/20 no. 160.00
Beldar per day 1/20 no. 100.00
Contractor's profit @ 10% on Rs. 6.65
Total

478- As in item 477 but both sides decorating (C.P. Teak) Add extra to item 477.
Difference in company rate 7.37-5.87=150 per
sft.
Contractor's profit @ 10%
Total

479- As in item 478 but with Teak lipping single leaf door.
Add extra charges as per company rate
Contractor's profit @ 10%
Total

480- As in item 478 but with Teak lipping double leaf.


Extra charges as per company rate
Contractor's profit @ 10%
Total

481- Providing and fixing 12mm (0.5") thick and 100m. (4") wide pelmet with 25mm. (1") diameter wooden curtain rod and br
covered with same wood planks 12mm. (0.5") thick including fixing with 25x3m. (1"x1/8") M.S. Flat 10cm. (4") long and
complete with painting polishing or oiling as required.

Take a plemet of 5 1/4 rft. with 4 1/4 front and


6" on each side.
Materials wood required 0.5" thick planking
Front 1x4 1/4'x1/3'x1/24' = 0.060 cft.
side 2x0.5'x1/3.5.x1/24' = 0.014 cft.
Top 1x4 1/4'x0.5'x1/24' = 0.090 cft.
Rod. 1x4.3'x1/12'x1/12'x22/7'x1/4' = 0.022 cft.
Add wastage 10% = 0.020 cft.
Total = 0.206 cft. say 0.20 cft.
(a) Teak wood cost of plank per % cft. 0.20 cft.
Cost of flats 4"x1"x1/8" L.S.
Cost of wooden plugs including cutting brick
each 2 no.
work and fixing with cement mortar
Total
Labour : Carpenter per day 1/ 8 no. 160.00
Mason per day 1/10 no. 160.00
Beldar per day 1/ 8 no. 100.00
Total
Materials
Labour
Painting and polishing or oiling L.S.
Contractor's profit @ 10% on Rs. 12.88
Total

(b) Shisham wood rate as per item no. 481 (a) per % rft. 5.25 rft. b) Wood P
Deduct difference in cost of 0.20 cft. Of wood
per % cft. 0.20 cft.
@ Rs. 39.05-26.10= 12.15 per cft.
Deduct Contractor's profit @ 10% on Rs. 2.43

Total

(c) Deodar wood rate as per item no. 481 (a) per % rft. 5.25 rft. d) Wood Pl
Deduct difference in cost of 0.20 cft. Of wood
per % cft. 0.20 cft.
@ Rs. 39.05-28.05=11.00 per cft.
Deduct Contractor's profit @ 10% on Rs. 2.20

Total

(d) Kail wood rate as per item no. 481 (a) per % rft. 5.25 rft. e) Wood Pl
Deduct difference in cost of 0.20 cft. Of wood
per % cft. 0.20 cft.
@ Rs. 39.05-16.00=23.05 per cft.
Deduct Contractor's profit @ 10% on Rs. 4.61

Total

482- Same as in Sl. no. 481 but 150m. (6") wide pelmets] Take a pelment of 51/4 rft. with 4/1/4' front and 6" on each side woo
0.5" thick planking.
Front 1x4 1/14'x0.5'x1/24' = 0.09 cft.
side 2x0.5'x0.5"x1/24' = 0.02 cft.
Top 1x4 1/4'x0.5'x1/24' = 0.09 cft.
Rod. 1x4 1/4'x1/12'x1/12'x22/7'x1/4' = 0.02 cft.
Add wastage 10% = 0.02 0.02 cft.
Total = 0.24 cft.
(a) Teak wood cost of plank per % cft. 0.24 cft. a) Wood Pl
Cost of flats 4"x1"x1/8" L.S.
Cost of wooden plugs including cutting brick
each 2 no.
work and fixing with cement mortar
Total
Labour : Carpenter per day 1/ 6 no. 160.00
Mason per day 1/10 no. 160.00
Beldar per day 1/ 6 no. 100.00
Painting & varnishing of oiling etc. L.S.
Total
Materials
Labour
Contractor's profit @ 10% on Rs. 14.82
Total

(b) Shisham wood rate as per item no. 482 (a) per % rft. 5.25 rft.
Deduct difference in cost of 0.24 cft. @ Rs.
per % cft. 0.24 cft.
39.05-26.10= 12.15 per cft.
Deduct Contractor's profit @ 10% on Rs. 2.92

Total
(c) Deodar wood rate as per item no. 482 (a) per % rft. 5.25 rft.
Deduct difference in cost of 0.24 cft. @ Rs.
per % cft. 0.24 cft.
39.05-28.05=11.00 per cft.
Deduct Contractor's profit @ 10% on Rs. 2.64

Total

(d) Kail wood rate as per item no. 482 (a)


Deduct difference in cost of 0.24 cft. @ Rs.
per % cft. 0.24 cft.
39.05-16.00=23.05 per cft.
Deduct Contractor's profit @ 10% on Rs. 5.53

Total

483- Extra for providing curtain rods of Aluminium with brackets instead of wooden curtain rod, in pelmets in Sl. No. 481 and 48

(a) 12mm. dia.rod (18 gauge)


Cost or aluminium rod per rft. or pelmet per % rft. 1 rft.
Deduct average cost of wooden rod per rft. of
per % rft. 1 rft.
pelmet
So extra cost
Contractor's profit @ 10%
Total

(b) 19mm. dia.rod (18 gauge)


Cost or aluminium rod per rft. or pelmet per % rft. 1 rft.
Deduct average cost of wooden rod per rft. of
per % rft. 1 rft.
pelmet
So extra cost
Contractor's profit @ 10%
Total

(c) 25mm. dia.rod (16 gauge)


Cost or aluminium rod per rft. or pelmet per % rft. 1 rft.
Deduct average cost of wooden rod per rft. of
per % rft. 1 rft.
pelmet
So extra cost
Contractor's profit @ 10%
Total

484- Extra for providing in pelmets, aluminium curtain rails of heavy quality 6x9x15mm. With rollers, stop ends and brackets
wooden curtain rods and bracket.
Cost of rails. Rollers etc per rft. of pelmet per % rft. 1 rft.
Deduct average cost of wooden rod and
per % rft. 1 rft.
Brackets per rft. of pelmet
So extra cost per rft. of pelmets
Contractor's profit @ 10%
Total

485- Providing and fixing 25mm (1") diametre curtain rod with brackets, plugs etc. wherever required including painting, p
oiling as required. Taking rod of 4.5" length.
(a) Teak wood cost of wood per % cft. 0.022 cft.
Cost of wooden plugs, brackets including
cutting brick work & fixing with cement mortar each 2 no.

Painting etc. L.S.


Contractor's profit @ 10% on Rs. 2.61
Total
(b) Shisham wood cost of wood per % cft. 0.022 cft.
Cost of wooden plugs, brackets including
cutting brick work & fixing with cement mortar each 2 no.

Painting etc. L.S.


Contractor's profit @ 10% on Rs. 2.34
Total

486- Providing and fixing curtain rods of aluminium with brackets and wooden plugs etc. wherever necessary complete. Take 4

(a) 12mm. dia.rod (18 gauge)


Cost or aluminium rod per % rft. 4.5' rft.
Cost of wooden plugs, brackets including
each 2 no.
cutting of brick & fixing with cement
Contractor's profit @ 10% on Rs. 4.69
Total

(b) 19mm. dia.


Cost or aluminium rod per % rft. 4.5' rft.
Cost of wooden plugs, brackets including
each 2 no.
cutting of brick & fixing with cement
Contractor's profit @ 10% on Rs. 5.75
Total

(c) 25mm. dia.


Cost or aluminium rod per % rft. 4.5' rft.
Cost of wooden plugs, brackets including
each 2 no.
cutting of brick & fixing with cement
Contractor's profit @ 10% on Rs. 6.81
Total
CHAPTER - 10
MILD STEEL & IRON WORK
Sl. Item of Work
Unit Qnty Rate
No.
1 2 3 4 5.00
501- Rolled steel joists fixed in position excluding cost of joists which will be supplied free at site but including all labour in ha
hoisting and including hire etc. of necessary T&P.
(a) Light section, i.e. not exceeding 300kg. (6cwt.) in weight and upto 7.5 metre (24ft.) in height.
Rate per cwt. Peshraj (Beldar) per day 1/20 no. 100.00
Mason per day 1/10 no. 160.00
Beldar per day 1/ 2 no. 100.00
Coolie per day 1 no. 100.00
Ropes T&P L.S.
Contractor's profit @ 10% on Rs. 5.18
Total

(b) Same as above but heavy section, i.e. exceeding 300kg. (6cwt.) in weight and upto 7.5 metre (24ft.) in height.

Rate per cwt. Peshraj (Beldar) per day 1/20 no. 100.00
Mason per day 1/10 no. 160.00
Beldar per day 1/ 2 no. 100.00
Coolie per day 1.5 no. 100.00
Hire of pulley & tackle
Ropes T&P L.S.
Contractor's profit @ 10% on Rs. 7.88
Total

(c) Add to item 501(a) and 501(b) for heights beyond 7.5 metre (24ft.).
Extra Beldar per day 1/ 2 no. 100.00
Coolie per day 1/ 2 no. 100.00
Extra for Rope etc.
Contractor's profit @ 10% on Rs. 3.07
Total

502- Mild steel or iron work of small sizes and sections such as holding down bolts, hold fasts, tie, rods, gratings etc. (when no
in an over all rates) wrought to required form, including supply of steel, bolts nuts and wastage etc. and their fixing re
proper completion of the work.
Rate per cwt. Blacksmith per day 1 no. 170.00
Hammer man per day 1 no. 105.00
Coolie per day 1 no. 100.00
Coal T&P L.S.
Contractor's profit @ 10% on Rs. 12.75
Cost of steel per cwt. 1 cwt.
Wastage 2.5% on steel
Total

503- Mild steel or iron work in heavy sizes such as trusses ; built up gates, door frames, record racks, roof work, gates etc.
required form including drilling holes, rivetting or welding where necessary and also including supply of steel, bolts nut
their fixing required for proper completion of the work.
Rate per cwt. Blacksmith per day 1 no. 170.00
Hammer man per day 1 no. 105.00
Rivetter per day 1/ 4 no. 120.00
Coolie per day 1 no. 100.00
Coal and other sundries L.S.
Hoisting & welding L.S.
Contractor's profit @ 10% on Rs. 19.75
Cost of steel per cwt. 1 cwt.
Wastage 2.5% on steel
Total

504- Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in and over all rate
to required shape as necessary including bending for proper completion of the work and including supply of all steel and
over lapping & hooks.
Rate per cwt. Blacksmith per day 1 no. 170.00
Coolie per day 1.5 no. 100.00
T&P L.S.
Contractor's profit @ 10% on Rs. 9.55
Cost of steel per cwt. 1 cwt.
Wastage 5% on the steel
Total

505- Cutting rolled steel joints below 22.5cm. X 10cm. (9"x4").


Labour for cutting joist 9" deep.
Blacksmith per day 1/ 4 no. 170.00
Coolie per day 1/ 4 no. 100.00
T&P L.S.
Contractor's profit @ 10% on Rs. 2.30
Total

506- Cutting rolled steel joints above 22.5cm. X 10cm. (9"x4").


Labour for cutting joist 15" deep=38.10 cm..
Blacksmith per day 1/ 2 no. 170.00
Coolie per day 1/ 2 no. 100.00
T&P L.S.
Contractor's profit @ 10% on Rs. 4.56
Total

507- Cutting plates & angles : Take an angle 4'x4'x1/2'. Area 3.75 sq. inch. = 24.20 sq.cu.m.
Blacksmith per day 1/ 8 no. 170.00
Helper (Beldar) per day 1/ 8 no. 100.00
Contractor's profit @ 10% on Rs. 1.10
Total

508- Cutting rounds. Take 10 cutting of 5/8" dia.


Sectional area 0.307x10=3.07 sq. inch. = 19.8
sq.m.
Blacksmith per day 1/20 no. 170.00
Helper (Beldar) per day 1/20 no. 100.00
T&P L.S.etc.
Contractor's profit @ 10% on Rs. 0.47
Total

509- Boring holes in mild steel or iron not exceeding 10mm. (3/8") dia & thickness of plate not exceeding 6mm. (1/4"). Labo
holes.
Blacksmith per day 3.5 no. 170.00
Coolie per day 3 no. 100.00
Beldar per day 1 no. 100.00
T&P L.S.
Contractor's profit @ 10% on Rs. 30.75
Total

510- As in item 509 above but holes exceeding 10mm. (3/8") dia but not exceeding 20mm. (3/4") dia. and thickness excee
(3/8") but not exceeding 13mm. (1/2") dia.Labour for 100 holes.
Blacksmith per day 6 no. 170.00
Coolie for helping and handing per day 6 no. 100.00
Contractor's profit @ 10% on Rs. 48.00
Total
511- Providing and fixing 10cm. (4") dia C.l. down pipe complete with rose, heads, bends with eye hole, shoes and gratings e
walls with suitable clamps as directed by the Engineer-in-charge.
Assuming 30ft. Height C.l. pipes in 6 length.
Piece per rft. 5 pieces (6')
Rose each 1 no.
Head each 1 no.
Shoe (splash proof) each 1 no.
Bend with eye hole each 1 no.
Bolts L.S.
Clamps L.S.
Labour Mason per day 1/ 2 no. 160.00
Beldar per day 1 no. 100.00
Mortar etc. L.S.
Contractor's profit @ 10% on Rs. 145.00
Total

512- Mild steel or iron work in purlins and rafters including drilling holes and fixing in required for proper completion of the work.

Take a 10' length of purlin at 10' apart, angle


3"x3"x1/2" should do-
Blacksmith per day 1/ 3 no. 170.00
Hammer man per day 1/ 3 no. 105.00
Drilling holes L.S.
Contractor's profit @ 10% on Rs. 7.16
Total
Rate per cwt. 7.88x112/9.35x10=9.46
Cost of steel per cwt. 1 cwt.
Wastage 2.5% on the steel
Total

513- Providing barbed iron wire fencing including fixing it to post after stretchins it, including labour and T&P etc. required
completion of the work, but excluding supply of posts and wire.
Take 100 ft. length of fencing six lins.
Blacksmith per day 1/ 2 no. 170.00
Helper (Beldar) per day 3/ 4 no. 100.00
Coolie per day 1/ 2 no. 100.00
Contractor's profit @ 10% on Rs. 6.44
Total

514- Welding by Cass plant including supply of all materials, labour etc. complete.
Take welding per day. Rent of welding.
Machine per day 1 day
Welder's pay per day 1 day
Beldar for cutting & help per day 2 no. 100.00
Carbide stone L.S.
Oxygen Gass L.S.
Welding Road L.S.
Sundries L.S.
Contractor's profit @ 10% on Rs. 35.00
Total

515- Same as in item no. 514 but by Electric plant. In case of electric welding, per rent and cost of machine will be more and
be also some what more. The extra cost is estimated at 20%. So rate per rft. = Rs. 2.88 per rft. Say 2.30 per rft. or Rs
metre.

516- Add extra to item no. 514 when the welding is required to be done at roof height 10% extra is estimated to account for l
and shuttering etc.
517- Providing and fixing 1 mm thick M.S. sheet garage door with from of 40x40x6mm. (1.5"x1.5"x1/4") angle iron, 3.15 mm.
M.S. gusset plates at the junctions and corners including supply and fixing of necessary fittings, lock rail or 15" length of o
and including pintels, hooks at the top and applying a priming coat of red lead paint on all sides complete.

(a) Using M.S. angle 40x40x6mm (1.5"x1.5"x1/4") for diagonal braces.


Details of cost of a double leaf door size
5.76 sqm.
2.4mx2.4m= 5.76 sq. metre.
1- Materials M.S. Sheet 1mm. Thick, 5.76 45.216 sqm.
sq.m.@ 7.85 kg. Per sq.m. =
Wastage 10% = 4.522
Total = 49.738 kg.=
2- Gusset plates, Area of one gusset plate (They
are 08 no.)
0.3x04 = 0.12 sq.m. 0.1200 sqm.
1/2x0.26(0.04+0.03) = 0440sq.m. 0.0440 sqm.
8x0.0562 = 0.4496 sq.m. 0.4496 sqm.
2x4x32 = 0.1414 sp.m. 0.1414 sqm.
@ 24.73 kg. per sq.m. = 14.62 kg. 14.62 kg.
Wastage 10% = 1.46 kg. 1.46 kg.
Total = 16.08 = 0.161 Q
3- Angle iron 40x40x6mm.@ 3.5kg.Per m.
Sides 4x2.4 = 9.60 m.
Top and bottom 4x1.2 = 4.80 m.
Diagonals 2x2.5 = 5.00 m.
2x2.45 = 4.9 m. 4.90 m.
Wastage 10% on 24.3 = 2.43
Total = 26.73 m.
@ 3.5 kg. Per metre = 93.56 kg. 93.56 kg. 936q
4- Pintels including bolts and nuts for them and
each 4 no.
fixing in position
Hooks each 2 no.
Locking arrangement & handles etc. L.s.
Cement concrete L.S.
Rivets L.S.
Priming coat M.S. sheet both side-11.52
Angle iron 16x24.3 = 3.89 sq.m.
Labour Fitter each 2 no.
Blacksmith each 7 no.
Mason each 1/8 no.
Beldar each 2 no.
Mazdoor each 3 no.
Sundries L.S.
Contractor's profit @ 10% on Rs. 355.00
Total

517- Using M.S. flat 40x6 mm (1.5"x1/4") for diagonal bracings and central cross piece. .
(b)
Details of cost of a double leaf door size
2.4mx2.4m= 5.76 sq. metre.
1- Materials M.S. Sheet 1mm. Thick as in item
no. 517 (a).
2- Gusset plates, vide item (2) in 517(a) = 0.5910 m2
At mid height 4x0.0623 = 0.2112 m2
Wastage 10% on 8022m2 = 0.0800 m2
Total = 0.8822 m2
@ 24.73 kg. per m. = 21.82 kg.
3- Angle iron 40x40x6mm.@ 3.5kg.Per m.
Sides 4x2.4 = 9.6 m.
Top and bottom 4x1.2 = 4.8 m.
Wastage 10% on 14.40m. = 1.44 m.
Total = 15.84 m.
@ 3.5 kg. Per metre = 55.44 kg.
4- Flats 30x6 mm. @ 1.4 kg. /m. 4x2.45=9.80 9.80 m.
2x1.20 = 2.40 2.40 m.
Wastage 10% on 12.20m. = 1.22 1.22 m.
Total = 13.42 m.
@ 1.4 kg. Per metre13.42x1.4=18.788 kg. 18.788 kg.= 0.188 Q
5- Pintels including bolts and nuts for them and
each 4 no.
fixing in position
Hooks each 2 no.
Locking arrangement & handles. L.s.
Cement concrete L.S.
Rivets L.S.
Applying puming cost M.S. sheet 1 = 11.52
Angle iron 0.16x4.40 = 2.30
Flats 0.072x1.22 = 0.88
Total = 14.70
Labour Same as in item 517(a)
Sundries L.S.
Contractor's profit @ 10% on Rs. 324.08
Total

518- Providing and fixing in position collapsible steel shutters with vertical channels 20x10x2mm (3/4"x3/8"x1/12) & braced w
diagonals 20x5mm (3/4"x3/16") size with top & bottom rails fo Tiron 40x40x6mm. (1.5"x1.5"x1/4") with 38 mm. dia. steel p
bolts, nuts locking arrangement, stoppers, handles, complete including applying a priming coat of approved red lead paint

(Skelton analysis based on item no. 4 of 1962 CPWD analysis of rates).


Details of cost of a gate of 2.4mx1.5m = 3.6
sq. metre.
Materials M.S. channels 18nos. on both sides.
20x10x2mm. @ 0.56 kg./m.
2x18x24 = 86.40 m.
Wastage 10% = 8.64 m.
Total = 95.04 m.
@ 0.56kg. per m. = 53.22 kg.= 0.53 Q
M.S.T. 40x40x6m. for Bottom = 1.570 m.
Top = 1.725 m.
Total = 3.30 m.
@ 3.5 kg. per m. = 11.55 m.
Wastage 10% = 1.155 m.
Total = 12.705 kg.= 0.13 Q
20x5mm. Flat iron diagonal 4 nos.
68.275 m.
x32x0.5334m. =
@ 0.8 kg. Per metre = 54.62 kg.
Wastage 10% = 5.46 kg.
Total = 60.08 kg.= 0.60 Q
Cost of rivets,fixing hooks and washers L.S.
Cost of locking arrangment & handles L.S.
Pullyes 38mm. dia.metre each 10 no.
Priming coat channel 26x076x2.4 = 6.57
6.57 sqm.
sq.m.M.S. sheet both side-11.52
Top 0.16x0.33 = 0.53 sq.m. 0.53 sqm.
Flats 0.05x0.68 = 3.40 3.40 sqm.
Total = 10.50 sqm.
Labour Fitter each 3 no. 110.00
Blacksmith each 12 no. 170.00
Mason each 1 no. 160.00
Beldar each 4 no. 100.00
Mazdoor each 4 no. 100.00
Sundries L.S.
Contractor's profit @ 10% on Rs. 284.95
Total

519- Providing and fixing 1m. thick M.S. sheet sliding shutters with frame and daigonal braces of 40x40x6mm. (1.5"x1.5"x1
iron, 3.15mm. (1/8") gusset plates at the junctions & corners, hooks at top, 25mm. (1") dia. pullyes at bottom 40
(1.5"x1.5"x1/4") angles & T iron guides at top & bottom respectively including locking arrangement with handles etc. com
applying one priming coat of approved lead paint.

(Skelton analysis based on item no. 5 of 1962 CPWD analysis of rates).


Details of cost for one double leaf door. Size
2.4x2.4m. = 5.76 sq.m.
Materials (1) M.S. sheet 1mm. Thick same as
in item 517(a)
2- Gusset plates,same as in item 517(a) (2)
3- Angle iron 40x40x6mm.@ 3.5kg.Per m.
Sides 4x2.4 = 9.60 m.
Top and bottom 4x1.2 = 4.80 m.
Diagonals 2x2.5 = 5.00 m.
2x2.45 = 4.90 m.
Top and Bottom guides 2x4.8 = 9.60 m.
Top guides support 7x0.3 = 2.10 m.
Total = 36.00 m.
So wt. = 36x3.5= 126.00 kg.
Channels 25x25x6mm. @ 3.05 kg./m. Bottom = 2.4x3.05= 7.32 kg.
Channels 40x40x6mm. @ 5.56kg./m. Bottom = 0.5x5.56= 2.78 kg.
Wastage 10% on 136.10 kg. = 13.61 kg.
Total = 149.71 kg.
Say 1.50 qnt.
4- Pulley guide blocks including drilling holes L.S.

5- 15mm. dia pulleys each 8 no.


6- Handles and locking arrangement L.s.
7- Bolts and rivets L.s.
8- Cement concrete L.s.
9- Printing coat
M.S. Sheet 2x5.76 = 11.52 sqm.
Angle iron 0.16x36 = 5.76 sqm.
Channel 0.15x0.24 = 0.36 sqm.
0.24x0.05 = 0.12 sqm.
Total = 17.76 sqm.
17.76 sq.m. say 18sq.m. per sq. m. 18 sq.m.
Labour Fitter each 2 no. 110.00
Blacksmith each 7 no. 170.00
Beldar each 2 no. 100.00
Mazdoor each 2 no. 100.00
Mason each 1/8 no. 160.00
Sundries
Contractor's profit @ 10% on Rs. 376.23
Total

520- Supplying and fixing rolling shutters of approved make of 80x125mm.(3"x3.5") guage cold rolled M.S. laths inter locked th
their entire length and jointed together at the end by end locks and mounted on specially designed pipe shaft with brac
guides and arrangements for inside and outside locking with push and pull operations complete but excluding the cost o
and spring.

(Skelton analysis based on item no. 7 of 1962 CPWD analysis of rates).


Details of cost 3x2.5 metre door =7.5 sq.m.
Cost of rolling shutters including top cover etc.
complete sq.m.
(Market rate Rs. 8.00 per sq.m. ft. or 86.00 per
sq.m. )
Deduct for the cost of top cover
Deduct for the cost of coiled springs L.S.
Total
Labour Fitter each 2 1/4 no. 110.00
Beldar each 2 6/4 no. 100.00
Mason each 1/4 no. 160.00
Contractor's profit @ 10% on Rs. 558.93
Total

521- Providing and fixing 27.5 cm. Long wire spring grade no. 2 for rolling shutters.
(Skelton analysis based on item no. 8 of 1962 CPWD analysis of rates).
Details of cost for 1 no. 27.5 cm. long wire
each 1 no.
spring grad no. 2
Sundries
Contractor's profit @ 10% on Rs. 46.00
Total

522- Providing and fixing top cover for rolling shutters.


(Skelton analysis based on item no. 9 of 1962 CPWD analysis of rates).
Details of cost for 1 shutter 2.5 metre width top
each 1 no.
cover
Sundries L.S.
Contractor's profit @ 10% on Rs. 61.00
Total

523- Providing and fixing ball bearing for rolling shutters.


(Skelton analysis based on item no. 10 of 1962 CPWD analysis of rates).
Details of cost for 1 no.l each 1 no.
Sundries
Contractor's profit @ 10%
Total

524- Extra add to Sl. No. 520 for providing mechanical devise, chain & cranks operation for operating rolling shutters

(Skelton analysis based on item no. 11 of 1962 CPWD analysis of rates).


(a) Shutters exceeding 11.2 m2 (120 sq.ft.) in
area and up to 16.80 m2 (180sq.ft.) in area
average area 14 sq. m.
Mechnical devise chain, crank etc. (Market
rate)
Contractor's profit @ 10%
Total
(b) Area exceeding 16.8 sq. m. (180sq.f.) Taking
details of cost for 20m2 area.
Mechnical devise chain, crank etc.L.S.
Contractor's profit @ 10%
Total
CHAPTER - 11
ROOF WORK
Sl. Item of Work
Unit Qnty Rate
No.
1 2 3 4 5.00
531- Supply and fixing single Allahabe tiling with and including supply of hips, ridges and eaves and includings laying them fo
& setting in white lime & Surkhi Mortar in ratio of 1.2 or pure kankar lime and also including supplying and laying of S
battens and white washing two coats bottom surface or tiles.
Assuming length of 100ft. And stop of 12ft. On either side.
Roof area 2x12x100sft. = 2400 sq.ft.
Length of ridge = 100 ft.
Length of valley = 14 ft.
Flat tiles = 2420
10% Wastage = 240
Total = 2660
Flat tiles %o no. 2660 no.
Half round %o no. 2660 no.
Flate ridge = 100+10=110 no.
Hips = 14+4=18 no.
Scanding(Indian sal)Batterns 24x100x1/12x1/8= 25.00 ft.
Batterns 2x100x1/6x1/8 = 4.30
Hip Battens 2x14x1/6x1/8 = 0.50
Wastage at 10% on 29.8 = 2.98
Total = 32.78
Hip Battens per % cft. 32.78 cft.
Nails at 5/2.2 kg. Per% sft. On 2400sft. per kg. 54.05 kg.
Total
Cealtar two coats 24x100x5/12 = 1000 sft.
2x100x7/12 = 117 sft.
2x14x7/12 = 17 sft.
Total = 1134 sft.
Coaltar two coats, Coalter (sl. No. 652 & 653)
per % sft. 1200 sft.

White washing two coats (sl.no. 672) per % sft. 2000 sft.
Lime mortar at 4 cft. % sft. = 96 cft. per % cft. 100 cft.
Carriage of materials L.S.
Mason Mistri per day 2 no. 170.00
Mason for laying per day 24 no. 160.00
Beldar per day 24 no. 100.00
Coolie per day 48 no. 100.00
Carpenter per day 8 no. 160.00
Sundries
Bhisti per day 1 no. 130.00
Contractor's profit @ 10% on Rs. 252.91
Total

532- As in item (531) above but for double Allahabad tiling roof. As above.
Add 2.3 cost of extra materials and labour.
Total

533- Supply and fixing large contry tile roofing on and including bambod frames containing not less than 4 (40) Bamboos per s
%s.ft.) and Chatai supplied and fixed position including supply of all materials, labour and T&P etc. required for proper com
the work and including two coats of coaltarring of bamboo frame and chatai.

Flat rules including wastage Rate per % sft. %o no. 110 no.
Segmental %o no. 110 no.
Bamboos each 40 no.
Channel per % sft. 120 sft.
B.N. Hemp per kg. 5 kg.
Nail L.s.
Layers for laying the tiles per day 2 no.
Coolie per day 2 no. 100.00
Contractor's profit @ 10% on Rs. 88.00
Coaltarring as per item no. 653 & 652 per % sft. 100 sft.
Total

534- As in item no 533 above but small size country titles.


Rate per % sft. %o no. 500 no.
Segmental %o no. 500 no.
Bamboos each 20 no.
Nail L.s.
Bans etc.
Thacher per day 1 no. 100.00
Tile layer per day 2 no.
Coolie per day 2 no. 100.00
Contractor's profit @ 10% on Rs. 62.60
Coaltarring as per item no. 653 & 652 per % sft. 100 sft.
Total

535- Laying rainforced brick slab with and including supply of first class bricks laid in cement mortar consisting of one part
three parts approved coarse sand excluding supply of reinforcement and its bending but including its fixing in position a
the same with 24 B.W.G.I. binding wire & including centering and shuttering and necessary & also including cost of bin
supply of all materials, labour & T&P etc. required for proper completion of the work.

Taking a roof ares = 12'x8'=96 sft.


Height of roof slab = 12'
Cubical contents 96x3/8 = 36 cft.
Bricks first claff. 36x1200/100 per %o no. 432 no.
Cement per 50 kg. bag 3.6 bad
Coarse sand per % cft. 12 cft.
Mason mistri per day 1/6 no. 170.00
Mason per day 3/4 no. 160.00
Beldar per day 3/4 no. 100.00
Coolie per day 1 no. 100.00
Bhisti per day 1/4 no. 130.00
Total
Centering Ballies 5no. 12ft. Length & 4" dia
60rft.
Ballies 4" dia. 15no. of 12ft. each 180rft.
Total
Planking 96 sft. X 1/8" thick
Cost of centering Ballies 4" dia %rft. per % rft. 240 rft.
Planks of country wood per % cft. 12 cft.
The materials can be used 25 times -
285.60/25
Nail etc. L.s.
Total
Erection and dismantling Carpenter per day 1/2 no. 160.00
Beldar per day 1 no. 100.00
Coolie per day 1 no. 100.00
Fixing reinforcement in position Blacksmith per day 1/4 no. 170.00
Coolie per day 1/4 no. 100.00
Total
1.5% water charges
Contractor's profit @ 10% on Rs. 63.14
(excluding cost of cement & sand)
Total
536- Supply & fixing Galvanised corrugated iron roofing 24 BWG in position including supply of all materials, labour and T&P e
for the proper completion of the work and including wastage.
Considering a roof area 61x32 1/2 = 1982.50 sft.
2x27x8x8/3 = 0.613 tons
2x27x9x8/3 = 0.692 tons
Wastage at 10% on 1.305 = 0.065 tons
Total = 1.370 tons
Carriage to site L.s.
1"x1/4" G.I. Bolts per doz 50 doz.
6"x1/4" J. Hooks per doz 40 doz.
Limper Washer per doz 90 doz.
Bitumen Washer per doz 90 doz.
Carpenter per day 12 no. 160.00
Beldar per day 12 no. 100.00
Sundries L.S.
Contractor's profit @ 10% on Rs.3368.80
Total

537- Supply & fixing 22 B.W.G. Ridges, valleys and gutters for iron roofing fixed with jor U bolts 10mm. (3/8") dia. with G.I. L
bitumen washers complete including supply of all materials, labour and T&P ect required for the proper completion of the
including wastage.

Take a length of 56 rft. G.I. Plain sheet


4 nos. 8'x3' per cwt. 1.1 cwt.
Cartage
Bolts 1"'x1/4" per doz 6.5 doz.
Limper Washer per doz 6.5 doz.
Bitumen Washer per doz 6.5 doz.
Blacksmith per day 3 no. 170.00
Beldar per day 3 no. 100.00
Contractor's profit @ 10% on Rs.169.39
Total

538- Supplying and laving complete 4cm. (1.5") thick insulation layer of sand & clay over jackarch. Reinforced brick or reinforc
concrete roof.
Rate per 100 sft.1.5" earth with 505 sand
per % cft. 14.5 cft.
100x1/8=12.5+2 for wastage=14.5cft.
Labour for palverizing and laying in even
course of 1.5" and ramming
Mason per day 1/4 no. 160.00
Beldar per day 1/4 no. 100.00
Contractor's profit @ 10% on Rs.5.07
Total

539- Making contraction joints in terraced roof lip type including supply of necessary qnty. of filler, brick tile, all materials , lab
etc. required for proper completion of the work. Take a length of 100 rft. Brick tiles for 109 rft. Length.

Tiles - 133.0
Wastage 10% = 13.3 Total : 146.3 nos. per % 150 no.
Maxphalt 30/40 per lbs 37 lds
Tarmastic per lbs 40 lds
Fuel and other T&P
Mortar regarding making Gola etc.
Making groove and gola on either side with
surface neatly and floated
Mason per day 1/2 no. 160.00
Beldar per day 1/2 no. 100.00
For filling joint. Mason per day 1 no. 160.00
Coolie per day 1 no. 100.00
Contractor's profit @ 10% on Rs. 73.67
Total

540- As in item 539 above but of parapet type. Take a length of 100 rft.
Brick tiles including 10% wastage 100x8/3
=2.93 nos. %
Brick 1x100x3/4x1.1 = 147
1x100x2x4x1.1 = 880
1x100x4/3x3x1.1 = 440
Total = 1467 say 1470 nos.
Maxphalt 30/40 per lbs 67 lds
Tarmastic per lbs 80 lds
Fuel, Tools and plants
Kankar lime per % cft. 30 cft.
Throating and Champhering Mason per day 2 no. 160.00
Coolie per day 1 no. 100.00
Making joint & applying premix and tarmastic

Mason per day 1.5 no. 160.00


Beldar per day 1.5 no. 100.00
Parapet making mason per day 4 no. 160.00
Beldar per day 2 no. 100.00
Plastering with cement mortarr 1.5, 100"x2.5"
per % sft. 250 sft.
(Sl. No. 585)
Contractor's profit @ 10% on Rs.301.82
Total

541- As in item 536 above but with 6mm. Thick grey corrugated asbestos sheet .
Take a roof area of 61x32.5 = 1982.50 sft.
2x19nos.x8x3 = 1051.30
2x19x9"x3-5" = 1182.80
Wastage at 10% on Rs. 2234.10 = 223.41
Total = 2457.51 Say 2458 sft.
Cost of sheet per % sft. 2458 sft.
Carriage to site
Hook bolts per doz. 34 doz.
G.I. Washer per doz. 34 doz.
Bitumen washer per doz. 34 doz.
Sundries L.S.
Mistri per day 2 no. 170.00
Carpenter per day 10 no. 160.00
Beldar per day 8 no. 100.00
Contractor's profit @ 10% on Rs.2672.24
Total

542- As in item 537 above but with ridges, valleys and gutters of asdestos sheets.
Take a length of 100 rft. 3"x6" long per pair 33 pairs
Carriage end scaffolding L.S.
Total
Ridges shall be fixed with the same hooks and
bolts as already provided.
Mistri Carpenter per day 1 no. 170.00
Carpenter per day 1 no. 160.00
Beldar per day 1.5 no. 100.00
Contractor's profit @ 10% on Rs.388.37
Total

543- Spreading over leaky roofs with bitumen paint @ 10lbs. Per % sft. or 1lbs. sq.m. including sweeping, cleaning the roof wit
heating of the paint upto the required temperature, pouring it on th surface, spreading of necessary quantity of approv
sand @ 1cft. per 100 sft. and including supply of all materials, labour and T&P etc. required for proper completion of the w
Materials, Bitumen 10lbs. per lds 10 lds
Coarse sand 1cft. per % cft. 1 cft.
Labour Beldar per day 0.5 no. 100.00
T&P L.S.
Contractor's profit @ 10% on Rs.6.67
Total

544- Supplying and laying one layer of tarfelt or any other equivelent approved materials at the junction of wall and roof or at
as per direction of the Engineer-in-charge including necessary overlap, giving a coat of approved mastic paint below the
including supply of all materials, labour and T&P etc. required for proper completion of the work.

Rate % sft. Tarfelt per % sft. 100 sft.


One coat of approved Mastic Paint per lds 25 lds
Labour Mistri each 1/4 cft.
Beldar for hot work per day 0.5 no. 100.00
Beldar per day 1.5 no. 100.00
Sundries
Contractor's profit @ 10% on Rs.62.61
Total

545- Supplying and laying one layer of tarfelt of other equivelent approved materials over roofs as per direction of the Engineer
including necessary overlap, giving a coat of approved mastic paint on the bottom and top of tarfelt, spreading of necessa
of approved coarse sand or small size bajri and including supply of all materials, labour and T&P etc. required for proper c
of the work.
Material 100sft. Tarfelt 110sft. per % sft. 110 sft.
Two coat of approved Mastic Paint per lds 50 lds
Labour Mistri each 1/4 cft.
Beldar for hot work per day 1 no. 100.00
Beldar per day 2 no. 100.00
Sundries L.S.
Contractor's profit @ 10% on Rs. 76.87
Total

546- Making expansion joints with 24 gauge 6" wide aluminium sheet in walls with necessary cutting shaping of bricks i
covering joints, by means of 3/8" thick ply wood 5" wide and match painted as per direction of the Engineer-in-charge
supply of all materials, labour and T&P etc. required for proper completion of the work.

Rater per rft. Aluminium Plate 6/12 sft. per % sft. 0.5 sft. .
Labour for cutting, shaping and fixing or plate
in position L.S.
3/8" thick ply wood with gutkas and screws
etc. L.s.
Contractor's profit @ 10% on Rs. 1.85
Total

547- Making expansion joints with 24 gauge 5" wide aluminium sheet & 8" wide tarfelt fixed with termastic in roof or floors
approved bitumen as per direction of the Engineer-in-charge including supply of all materials, labour and T&P etc. re
proper completion of the work.
Rater per rft. Aluminium Plate 5/12 sft. per % sft. 5/12 sft.
Labour for cutting, shaping and fitting plate
L.S.
Providing Tarmastic and filling joints with
maxphalt 30/40 L.S.
Contractor's profit @ 10% on Rs. 1.72
Total
CHAPTER - 12
CEILING
Sl. Item of Work
Unit Qnty Rate
No.
1 2 3 4 5.00
551- Supply and fixing of 2.5 cm. (1") thick Deodar wood planks, ceiling including supply of beading 2.5 cm.x4 cm. (1"x1.5")
wood over joints, but excludings cost of ceiling joint if & when necessary but including cost of all materials, labour &
required for proper completion of the work. Cost of 300 sft. ceiling i.e. for a room 20"x15".

Planks 1" thick 300x1/12 = 25.00 cft.


Add for rebates 20% = 5.00 cft.
Beading 400x1/12x1/8 = 4.20 cft.
Add for overlap at 10% = 0.42 cft.
Add for wastage 5% on 34.62 = 1.73 cft.
Total = 36.35 cft.
Materials. Deodar planks per % cft. 36.35 cft.
Screws 1.5" long per gross 8 gross
Carriage of materials L.S.
Labour Mistri per day 2 no. 170.00
Carpenter per day 2 no. 160.00
Beldar per day 4 no. 100.00
Scaffolding L.S.
Sundries L.Sl
Contractor's profit @ 10%on Rs. 1108.00
Total

552- As in item no. 551 above but of C.P. Teak wood. Rate as per item no. 551.
Add extra cost of Teak wood @ Rs. 39.05-
28.05 = 11.00 per cft.
Contractor's profit @ 10%
Total

553- As in item no. 551 above but of Kail or Chir wood. Rate as per item no. 551.
Deduct difference of cost of Deopar and Kail
or Chir Wood i.e. @ Rs. 28.05-16.00 = 12.05 per % cft. 36.35 cft.
per cft.
Contractor's profit @ 10%
Total

554- Supply and fixing A.C. plain sheets ceiling including beadings 2.5cm.x4cm. (1"x1.5") of Deodar wood, screws. bo
materials, labour & T&P etc. complete excluding cost of ceiling joints if any required for proper completion of the work. Ta
of 20"x15"=300sft.
A.C. Sheets = 300sft.
Wastage 5% = 15sft.
Take 5sq.ft. panel for beading 5x20+4x15 = 160
Wood required 160x1/8x1/12 = 1.67
Add wastage 10% = 0.17
Total = 1.84 Say 2.00 cft.
A.C. sheets per % sft. 315 sft.
Deodar wood per % cft. 2 cft.
Screws 1.5" per gross 3 gross
Carriage of materials L.S.
Labour Carpenter per day 2 no. 160.00
Beldar per day 2 no. 100.00
Scaffolding L.S.
Sundries L.S.
Contractor's profit @ 10%on Rs. 395.88
Total
555- As in item no. 554 above but with C.P. Teak beading.
Rate with Deodar wood (as in item 554)
Add difference in rate of Deodar and Teak
per % cft. 36.35 cft.
wood (per sft.) 2x11/300 = 0.07
Carriage L.s.
Contractor's profit @ 10% on Rs. 0.09
Total

556- As in item 554 above but of 6" thick masonite or celotax with Deodar beading 20x15 = 300 sft.
Masonite or celotax 1/4" thick per % sft. 315 sft.
Deodar wood required for panels of 2.5 sft.
300x1/12x1/8 = 3.12
Wastage 10% =0.31
Materials, Deodar wood per % cft. 3.5 cft.
Screws per gross 3 gross
Labour etc. same as in item 554
Contractor's profit @ 10%on Rs. 664.75
Total

557- As in item 556 above but with C.P. Teak wood beading. Rate as per item 556
Add difference in cost C.P. Teak wood and
Deodar wood 39.05-28.05 = Rs. 11.00 per cft. per % cft. 3.5 cft.

Contractor's profit @ 10%


Total

558- Supply and fixing 10mm. (3/8") thick plaster of paris (Gypsum) anhyadrous ceiling including providing Kail or Chir wood fra
consisting of 2"x5" battens at 2'-6" apart cross battens of 1.5" x2" at 1'-3" apart & wooden strips 1"x1/4" with 3/8' gap i
with rabbit wire mest reinforcement fixed to wooden frame and applying one coat of solignum paint or other appro
preservative to wooden frame including cost of all materials labour and tools and plants etc. required for proper comple
work.

(Skelton analysis based on CPWD analysis of rates 1955 Sl. No. 41).
Details of cost for % sft. for a room 10'x10'
Materials 5'x2"x5"x11" = 3.82 cft.
9x1.5"x2"x10' = 1.88 cft.
Strips 88x1"x1/4"x10' = 1.53 cft.
Wastage 5% on 7.23 = 0.36 cft.
Total = 7.59 cft. say 7.6 cft.
Labour Carpenter per day 3 no. 160.00
Beldar per day 3 no. 100.00
Cutting holes in walls for supporting main
battens and also repairing afterwards l.s.
Solignum painting or wood preservative
applying
5x2x2"x11" = 18 sft.
5x2x5"x11" = 46 sft.
9x2x1.5x10" = 23 sft.
9x2x2"x10" = 30 sft.
88x2.5"x10" = 183 sft.
Total = 300 sft. 300 sft.
Hesian cloth for mixing in plaster 100/9 yds. per yds. 100/9
Plaster of paris for 100 sft. of area per mds 5 mds.
Cost of rabbit wire mest per % sft. 100 sft.
Labour for manufacturing required size of tiles

Mason each 3 no.


Coolie each 3 no.
For fixing in the roof Carpenter each 1 no.
Beldar each 1 no.
Iron screws 1" size gross 1 5/6 gross
Sundries moulds for tiles and Scaffolding L.S.

1.5% water charges on Rs. 371.29


Contractor's profit @ 10%on Rs. 360.27
(except item no. 4)
Total

559- Same as in item 558 but plaster of paris to be 12mm. Thick (").
Cost per Sl. No. 558 per % sft. 100 sft.
Add extra cost of plaster of paris per md. 1.25 md.
1.5% water charges on extra cost
Add 10% over this extra cost of Contractor's
profit
Total
CHAPTER - 13
PLASTER AND POINTING
Sl. Item of Work
Unit Qnty Rate
No.
1 2 3 4 5.00
571- Struck pointing with kankar lime on brick work including supply of all materials, labour and T&P ect. Required for proper c
of the work.
(a) Raking and washing surface Mason per day 1/4 no. 160.00
Coolie per day 1/4 no. 100.00
Bhisti per day 1/10 no. 130.00
(b) Labour for pointing Mason per day 1.5 no. 160.00
Coolie per day 1.5 no. 100.00
Bhisti per day 1/4 no. 130.00
Materials K. lime per % cft. 2 cft.
Scaffolding L.S.
Add 1.5% water charges
Contractor's profit @ 10% on Rs. 18.83
Total

572- As in item no. 571 above but for flush pointing.


Raking and washing surface same as in item
571.
Labour for flush pointing Mason per day 1.3 no. 160.00
Coolie per day 1 no. 100.00
Bhisti per day 1/4 no. 130.00
Materials Kankar lime per % cft. 1.5 cft.
Scaffolding L.S.
1.5% water charges on Rs. 15.38
Contractor's profit @ 10% on Rs. 15.61
Total

573- Rubbing with kankar lime or with white lime and surkhi on brick work including supply of all materials, labour T&P etc. re
proper completion of the work.
Labour Mason per day 1/2 no. 160.00
Coolie per day 1/2 no. 100.00
Bhisti per day 1/4 no. 130.00
Scaffolding L.S.
Materials Kankar lime per % cft. 3.5 cft.
Add 1.5% water charges on Rs. 8.78
Contractor's profit @ 10% on Rs. 8.91
Total

574- As in item (571) above but with cement mortar consisting of one part cement & two parts of fine sand of 1.25 F.M.

Raking and washing surface Mason per day 1/4 no. 160.00
Coolie per day 1/4 no. 100.00
Bhisti per day 1/10 no. 130.00
Labour for pointing Mason per day 1.5 no. 160.00
Coolie per day 1.5 no. 100.00
Bhisti per day 1/4 no. 130.00
Materials Cement per 50 kg. bag 0.43 bag
Fine sand of 1.25 F.M. per % cft. 1 cft.
Finishing by Iron Trowal L.S.
Add 1.5% water charges on 22.06
Contractor's profit @ 10% on Rs. 17.58
Total

575- As in item no. 574 above but for flush pointing deduct form item 574..
Labour Mason per day 1/3 no. 160.00
Coolie per day 1/3 no. 100.00
Add 1.5% water charges on Rs. 2.83
Contractor's profit @ 10% on Rs. 2.87
Total

576- As in item no. 574 and 575 above but in flush deduct form item 574 and 575.
Labour Mason per day 1/3 no. 160.00
Coolie per day 1/3 no. 100.00
Bhisti per day 1/10 no. 130.00
Add 1.5% water charges on Rs. 3.25
Contractor's profit @ 10% on Rs. 3.30
Total

577- Raised pointing with cement and Fine sand of 1.25 F.M. mortar on brick work in proportion of 1:2, including supply of all
labour and T&P etc. required for proper completion of the work.
Raking and washing surface Mason per day 1/4 no. 160.00
Coolie per day 1/4 no. 100.00
Bhisti per day 1/10 no. 130.00
Labour for pointing Mason per day 1.33 no. 160.00
Coolie per day 1.33 no. 100.00
Bhisti per day 1/3 no. 130.00
Scaffolding L.S.
Mortar including wastage : Cement per 50 kg. bag 1 bag
Fine sand of 1.25 F.M. per % cft. 1.3 cft.
Add 1.5% water charges on Rs. 26.67
Contractor's profit @ 10% on Rs. 16.19
(except on cost of cement & sand)
Total

578- Struck cement pointing 1:2 with colouring materials to match the brick work colour including supply of all materials, labou
etc. required for proper completion of the work.
Raking and washing surface Mason per day 1/4 no. 160.00
Coolie per day 1/4 no. 100.00
Bhisti per day 1/10 no. 130.00
Labour for pointing including mixing : Mason per day 1.5 no.
Coolie per day 1.5 no. 100.00
Bhisti per day 1/4 no. 130.00
Materials Cement per 50 kg. bag 425 bag
Fine sand of 1.25 F.M. per % cft. 1 cft.
Scaffolding L.S.
Finishing by Iron Trowal L.S.
Colouring materials for 100sft. L.S.
Add 1.5% water charges on Rs. 22.9
Contractor's profit @ 10% on Rs. 18.58
(except on cost of cement & sand)
Total

579- 12mm. Thick plaster with kankar lime over brick work minimum thickness not to be less than 3/8" (10mm.) thick including
all materials, labour and T&P etc. required for proper completion of the work.
Raking and washing surface. Same in above
item 578.
Labour for Plastering : Mason per day 3/4 no. 160.00
Coolie per day 3/4 no. 100.00
Bhisti per day 1/4 no. 130.00
Scaffolding L.S.
Materials : Kankar lime per % cft. 5 cft.
Add 1.5% water charges on Rs. 14.73
Contractor's profit @ 10% on Rs. 14.96
Total

580- As in item 579 above but with cement mortar in proportion of 1:2 cement & fine sand of 1.25 F.M.
Raking and washing surface. Same in above
item 579.
Labour for Plastering. Same as in item no.
579.
Materials Cement per 50 kg. bag 2.5 cft.
Fine sand of 1.25 F.M. per % cft. 5 cft.
Add 1.5% water charges on Rs. 34.24
Contractor's profit @ 10% on Rs. 10.99
(except on cost of cement & sand)
Total

581- As in item 579 above but with cement mortar consisting one part cement and two parts of approved coarse sand.

Labour for raking, washing and plastering.


Same in above item 579.
Materials Cement per 50 kg. bag 2.5 cft.
Coarse Sand per % cft. 5 cft.
Extra labour required L.S.
Add 1.5% water charges on Rs. 40.74
Contractor's profit @ 10% on Rs. 12.59
(except on cost of cement & sand)
Total

582- As in item 589 above but with cement and fine sand of 1.25 F.M. mortar in 1:3.
Labour for raking, washing and plastering.
Same in above item 580.
Materials Cement per 50 kg. bag 1.67 cft.
Fine sand of 1.25 F.M. per % cft. 5 cft.
Add 1.5% water charges on Rs. 26.89
Contractor's profit @ 10% on Rs. 10.88
(except on cost of cement & sand)
Total

583- As in item 579 above but with cement and approved coarse sand in 1:3..
Labour for raking, washing and plastering.
Same in above item 581.
Materials Cement per 50 kg. bag 1.42 bag
Coarse Sand per % cft. 5 cft.
Add 1.5% water charges on Rs. 21.41
Contractor's profit @ 10% on Rs. 12.48
(except on cost of cement & sand)
Total

584- As in item 579 above but with cement and fine sand of 1.25 F.M. mortar in 1:4.
Labour for raking, washing surface as above.

Labour for plastering as above.


Materials Cement per 50 kg. bag 1.25 cft.
Fine sand of 1.25 F.M. per % cft. 5 cft.
Add 1.5% water charges on Rs. 23.11
Contractor's profit @ 10% on Rs. 10.83
(except on cost of cement & sand)
Total

585- As in item 579 above but with cement and fine sand of 1.25 F.M. mortar in 1:5.
Labour for raking, washing surface as above.
Labour for plastering as above.
Materials Cement per 50 kg. bag 0.85 cft.
Fine sand of 1.25 F.M. per % cft. 5 cft.
Add 1.5% water charges on Rs. 20.90
Contractor's profit @ 10% on Rs. 10.79
(except on cost of cement & sand)
Total

586- As in item 579 above but with cement and fine sand of 1.25 F.M. mortar in 1:6.
Labour for raking, washing as above.
Labour for plastering as above.
Materials Cement per 50 kg. bag 0.7 cft.
Fine sand of 1.25 F.M. per % cft. 5 cft.
Add 1.5% water charges on Rs. 19.33
Contractor's profit @ 10% on Rs. 10.76
(except on cost of cement & sand)
Total

586- (a) As in schedule item 579 above but with cement, white lime, coarse sand and local sand in proportion of 1:1:2:5 com
%sft.).
Labour for raking, washing surface as above.
Same as in item no. 586.
Materials Cement per 50 kg. bag 0.7 cft.
White lime per % cft. 0.8 cft.
Coarse sand per % cft. 0.8 cft.
Local sand per % cft. 0.4 cft.
Add 1.5% water charges on Rs. 21.83
Contractor's profit@10%on Rs.12.57 (except
on cement,coarse sand & local sand)
Total

586- (b) As in item 579 above but with cement, white lime, coarse sand and local sand in proportion of 1:1:2:4.
Labour as in item no. 586(a).
Materials Cement per 50 kg. bag 0.7 cft.
White lime per % cft. 0.8 cft.
Coarse sand per % cft. 1.6 cft.
Local sand per % cft. 0.4 cft.
Add 1.5% water charges on Rs. 22.87
Contractor's profit @ 10% on Rs. 12.58
(except on cement, coarse sand & local sand)

Total

587- Add for extra labour to all items of plaster if done in ceiling.
Extra labour : Mason per day 1/4 no. 160.00
Extra of scaffolding
Wastage for mortar L.S.
1.5% water charges
Contractor's profit @ 10%
Total

588- As in item 579 above but with cement, white lime and fine of 1.25 F.M. mortar in proportion of 1:1:6.
Labour for raking, washing as above.
Labour for plastering as above
Materials Cement per 50 kg. bag 0.7 bag
Fine sand of 1.25 F.M. per % cft. 5 cft.
White lime per % cft. 0.7 cft.
Add 1.5% water charges on Rs. 20.87
Contractor's profit @ 10% on Rs. 12.33
(except on cost of cement & sand)
Total

589- Mud plastering over brick walls including supply of all materials, labour and T&P etc. rquired for proper completion of the w

Labour : Mason per day 0.5 no. 160.00


Beldar per day 0.5 no. 100.00
Coolie per day 0.5 no. 100.00
Bhisti per day 1/10 no. 130.00
Cost of mud and other sundries L.S.
Contractor's profit @ 10% on Rs. 6.69
Total

590- 2cm. (3/4") thick stucco plaster resembling marble finish, 1st coat 10mm. (3/8") thick with 1:4 cement and approved co
intermediate coat 5mm. Thick with cement and marble dust 1:1 and final coat 5mm. (3/16") thick with rich lime throughtl
passed through fine sieve and mixed and grinded with white marble dust or gypsum alongwith required quantity of matel
give desired tint in ratio 1:1:3 including supply of all materials, labour and T&P etc. rquired for proper completion of the wo

Materials Cement per 50 kg. bag 1 bag


Coarse sand per % cft. 4.5 cft.
Labour for raking, joints, washing and
polishing
Mason per day 1.3 no. 160.00
Coolie per day 1.3 no. 100.00
Bhisti per day 1/ 4 no. 130.00
Intermediate coat 1/4" thick 1:1 cement and
marble dust.
Cement per 50 kg. bag 0.8 bag
Marble per % cft. 1 cft.
Labour : Mason per day 3/4 no. 160.00
Coolie per day 3/4 no. 100.00
Final Coat : White lime per % cft. 1 cft.
Marble dust or gypsum per % cft. 1 cft.
Linseed (orcinary) per gall. 0.5 gall.
Chali per kg. 2 kg.
Muslin per yard 2 yds
Labour for rendering final coat including
rubbing and polishing.
Mason per day 2 no. 160.00
Coolie per day 2 no. 100.00
Bhisti per day 1/ 4 no. 130.00
Beldar special for polishing per day 5 no. 100.00
Cost of rubbing stones L.S.
Add 1.5% water charges on Rs. 112.37
Contractor's profit @ 10% on Rs. 89.30
(except on cost of cement & sand)
Total

591- 2cm. (34/") thick plaster finished with marble chips on walls, pillars and steps etc. rubbed & polished to granolithic finish,
to be 15mm. (9/16") thick with one part of cement and 2 parts approved coarse sand & top coat 5mm. (3/16") thick with o
ordinary cement & 2 marble chips of required colour including supply of all materials, labour and T&P etc. rquired
completion of the work.

Same as in item 592 below.


Deduct Difference in cost of whit cement
including water charges and contractor's profit
and in ordinary cement=(0.8x27.00+ 11.5%-
0.8x10.50 or 24.11-8.40
Add 1.5% water charges on Rs. 15.71
Total
592- Same as in item 591 above but with top 5 cm. (3/16") thick coat of white cement and marble chips. Labour and materials
Base coarse 0.5" thick with 1:2 cement and coarse sand.
Labour and materials same as in foregoing
item no. 581.
White Cement per bag. 0.8 bag
Marble chips per % cft. 2.5 cft.
Sundries including carborandum and polishing
L.S.
Labour : Mason per day 1.3 no. 160.00
Coolie per day 1.5 no. 100.00
Bhisti per day 0.5 no. 130.00
Beldar for rubbing and polishing per day 9 no. 100.00
Add 1.5% water charges on Rs. 139.21
Contractor's profit @ 10% on Rs. 112.55
(except on cost of cement)
Total

593- Same as in item 591 above but with 5mm. (3/16") thick top coat coloured as desired by the Engineer-in- charge.

Same as in item 590.


Colour including contractor's profit @ 10% per kg. 4 kg.
Total

594- 2cm. (3/4") thick pebble dash plaster with base coat 1.5cm. (9/16") thick in one cement & 4 approved coarse sand. The fi
be with cement & washed fine gravel or pabbedashed on to the green plaster and pressed with large trowel, rubbing
labour and T&P etc. required for proper completion of the work.

Cost of 100 sft. Base coat with 1:4 cement and


coarse sane 1.5 cm. (9/16").
Materials Cement per 50 kg. bag 1.13 bag
Coarse sand per % cft. 5.5 cft.
Labour same as in item no. 592
Final Coat : Cement per 50 kg. bag 0.8 bag
Pebble and fine gravels per % cft. 2.5 cft.
Brush L.S.
Labour : Mason per day 1/2 no. 160.00
Coolie per day 1 no. 100.00
Bhisti per day 1/ 4 no. 130.00
Scaffolding L.S.
Add 1.5% water charges on Rs. 50.15
Contractor's profit @ 10% on Rs. 23.49
(except on cost of cement & coarse sand)
Total

595- Rough cost finish to plaster of different mortar. Add extra to plaster items.
Extra materials for rough cost finish.
Cement per 50 kg. bag 0.8 bag
Labour : Mason per day 0.5 no. 160.00
Coolie per day 0.5 no. 100.00
Bhisti per day 1/ 8 no. 130.00
Sundries such as Muslin pad to raise grains
L.s.
Add 1.5% water charges on Rs. 13.43
Contractor's profit @ 10% on Rs. 5.23 (except
on cost of cement)
Total

596- Add extra labour and materials for plaster over rough face of one brick walls.
Extra cost of cement or lime L.S.
Mason per day 1/ 8 no. 160.00
Coolie per day 1/ 8 no. 100.00
Add 1.5% water charges on Rs. 2.21
Contractor's profit @ 10% on Rs. 1.09 (except
on cost of cement)
Total

597- 2cm. (3/4") thick cement plaster in dedo or skirting in 1:2 consisting of one part yf cement and 2 parts of approved coarse
in panels, finished with 3mm. (1/8") floating coat of neat cement or cement and marble dust in ratio of 5:1 including su
materials, labour and T&P etc. required for proper completion of the work.

Cement per 50 kg. bag 2 bag


Coarse sand per % cft. 6 cft.
Raking and washing surface : Mason per day 1/ 4 no. 160.00
Coolie per day 1/4 no. 100.00
Bhisti per day 1/10 no. 130.00
Finishing coat cement per 50 kg. bag 0.25 bag
Mason per day 1 no. 160.00
Coolie per day 1 no. 100.00
Bhisti per day 3/ 8 no. 130.00
Add 1.5% water charges on Rs. 44.07
Contractor's profit @ 10% on Rs. 13.30
(except on cost of cement & sand)
Total

598- Engraving lines in the plaster of outer face well vertically and horizontally to display the surface as stone facing as direc
Engineer-in-charge including labour & T&P etc. required for proper completion of the work. Add for extra labour to a
plaster.
Mason per day 2/ 3 no. 160.00
Coolie per day 1/ 8 no. 100.00
Add 1.5% water charges on Rs. 4.00
Contractor's profit @ 10%
Total

599- Providing and fixing water proofing materials in cement mortar for plastering or in concrete work in the proportion recomm
the Manufacturer.
Cost of water proofing materials per kg. 1 kg.
Extra labour for mixing L.S.
1.5% water charges
Contractor's profit @ 10%
Total
CHAPTER - 14
FLOORING
Sl. Item of Work
Unit Qnty Rate
No.
1 2 3 4 5.00
600- 2.5 cm. (1") thick 1:2:4 plain cement concrete floor with cement, approved coarse sand and 2cm. (3/4") graded approved
in panels finished with 3 mm. (1/8") flooring coat of neat cement or cement and marble dust in 5:1 as specified over & i
cm. (3") thick base concrete consisting of cement, local sand and brick ballast 4 cm. (1.5") gauge in the proportion of
removing any over lapping mortar at the joints of panels if any and giving them a uniform finish including supply of all
labour and T & P etc. required for proper completion of the work.

Stone grit 2 cm. gauge per % cft. 7.5 cft.


Coarse sand per % cft. 3.7 cft.
Cement including wastage per 50 kg. bag 2.4 cft. or 2.03 bag
Mistri per day 1/8 no. 170.00
Mason per day 1 no. 160.00
Beldar per day 0.5 no. 100.00
Coolie per day 0.5 no. 100.00
Bhisti per day 1/4 no. 130.00
Sundries and phanties etc. L.S.
Add 1.5% water charges on Rs. 51.86
Contractor's profit @ 10% on Rs. 13.02 except
on cement, sand and ballast.
Add brick ballast 3" base concrete in 1:4:8 as
per
item no. 275 per % cft. 25 cft.
Total

601- (a) As in item no 601 above but without base


concrete.
Rate of 1" C.C. floor with 3" base concrete as
per
Sl. No. 601. per % cft. 100 sft.
Deduct cost of 3" base concrete 1:4:8 cement
local sand and 1.5" brick ballast as per Sl. No. per % cft. 25 cft.
275
Total

602- As in item no. 601 above but with the base concrete consisting of brick ballast, white lime and surkhi in ratio of 100.16:32

Same as in item 601 for 1" C.C. floor


Add 3" base concrete in lime and surkhi (272)
per % cft. 25 cft.
Total

603- As in item no. 601 above but with base concrete consisting of brick ballast & kankar lime.
As in item no. 601 for 1" C.C. floor
Add brick ballast 3" base concrete in kankar
per % cft. 25 cft.
lime (271)
Total

604- As in item no. 601 but floor shall be 5 cm. (2") thick instead of 2.5 cm. (1") thick and proportion of concrete 1:1.5:3 instead

Cement per 50 kg. bag 475 bag


Stone grit 2 cm. per % cft. 15 cft.
Coarse sand per % cft. 7.5 cft.
Mistri per day 1/8 no. 170.00
Mason per day 1.5 no. 160.00
Beldar per day 3/4 no. 100.00
Coolie per day 3/4 no. 100.00
Bhisti per day 1/3 no. 130.00
Sundries and phanties etc. L.S.
Add 1.5% water charges on Rs. 105.77
Contractor's profit @ 10% on Rs. 20.05 except
on cost of cement and ballast
Add brick ballast 7.5cm. Base concrete in
per % 25 cft.
1:4:8(275) per% 25 cft.
Total

604- As in item no. 604 above but without base concrete.


(a)
Rate 2" C.C. floor with 3" base concrete as per

Sl. No. 604 per % sft. 100 sft.


Deduct cost of 3" base concrete 1:4:8 cement,
local sand and 1.5" brick ballast as per Sl. per % cft. 25 cft.
no.275

Total

605- As in item no. 601 above but floors shall be 4 cm. (1.5") thick instead of 2.5 cm. (1") thick and without base concrete.

Cement per 50 kg. bag 2.75 bag


Coarse sand per % cft. 6.5 cft.
Stone Ballast 3/4" per % cft. 13 cft.
Mistri per day 1/8 no. 170.00
Mason per day 1.3 no. 160.00
Beldar per day 1 no. 100.00
Coolie per day 3/4 no. 100.00
Bhisti per day 1/4 no. 130.00
Sundries and phanties etc. L.S.
Add 1.5% water charges on Rs. 77.23
Contractor's profit @ 10% on Rs. 17.65 except
on cost of cement and ballast
Total

606- Add in item 601 to 603 and 605 when floors are polished including supply of extra cement, chapra batti, carborndum ston
materials, labour and T & P etc. required for proper completion of the work. Marble dust shall be added in the floating coa
5:1 (Marble dust and cement) if necessary but no extra amount will be paid for it. This includes final finish with frenc
pollish or other approved polish.

Extra cement or cement & marble dust mortar


per 50 kg. bag 0.5 bag

Polishing and rubbing materials L.S.


Labour for polishing and cutting : Beldar per day 8 nos. 100.00
1.5% water charges on Rs. 34.25
Contractor's profit @ 10% on Rs. 29.51 except
on cost of cement
Total

607- Add to item no. 601 to 603 and 605 when coloured polished floors are laid.
Polishing as in item no. 606
Cost of colour (Deep Bluish) per kg. 4 kg.
Contractor's profit @ 10% on Rs. 15.00
Deduct 4 kg. cement 10.50x4/50=0.84
Total
608- Stone floors 4 cm. (1.5") thick of Mirzapur or othere approved stone flags, set in kankar lime over and including 1 cm
concrete consisting 4 cm. (1.5") gauge brick ballast & kankar lime stone flags to be of standard size with and including bo
as specified or as directed by Engineer-in-charge. Stone should be fine dressed on upper surface and all edges, jo
exceed 3 mm. (1/8") Rate to include cost of stone dressed as specified, all other materials, labour & T&P etc. required
completion of the work. Rater per 100 sft. lime concrete bas 3" thick.

As per item no. 271 per % cft. 25 cft.


1" thick stone of standard size with top
surface finally dressed including 15% wastage per % sft. 115 sft.

Lime mortar (Kankar lime) for bedding per % cft. 6 cft.


Carriage of stone L.S.
Cement slurry for joints L.S.
Mestri per day 1/8 no. 170.00
Mason per day 4 no. 160.00
Beldar per day 4 no. 100.00
Bhisti per day 1/8 no. 130.00
Add 1.5% for water charges on Rs. 215.93
Contractor's profit @ 10% on Rs. 181.87
(except on cost of base concrete & cement
slurry).
Total

609- As in item no. 608 above but with stone flags laid in 1:4 cement and fine sand of 1.25 F.M. mortar with base concrete co
on part of cement and four parts of local sand and 8 parts brick of ballast. As in item no. 608.

Deduct for line concrete base


Lime mortar for setting including 10%
contractor's profit
Total
Add 3" base with cement concrete 1:4:8 Sl.
per % cft. 25 cft.
No. 275
Cement per 50 kg. bag 1 bag
Fine sand of 1.25 F.M. per % cft. 4 cft.
Total

610- As in item no. 608 above but stone flags laid in white lime and surkhi 1:2 and base concrete consisting of brick ballast, in
lime and 2 surkhi mortar. As in item no. 609.
Deduct for cement concrete base per % cft. 25 cft.
Add 3" base concrete in one white lime and
per % cft. 25 cft.
two surkhi mortar (272)
Total

611- As in item no. (608, 609 and 610) above but upper surface and edges chiesel dressed and joints upto 6 mm. (1/4") thic
from items (608, 609 and 610).
Same as in item 608 above
Deduct lime concrete 3" base
Stone flags of standard size chiesel dressed
including
10% wastage per % cft. 110 cft.
Cost of lime mortar per % cft. 6 cft.
Mason per day 4 no. 160.00
Cement slurry for joints L.S.
Beldar per day 4 no. 100.00
Bhisti per day 1/8 no. 130.00
Sundries L.S.
Contractor's profit @ 10% on Rs.135.49
except on lime concrete & cement slurry cost
of cement and ballast
So net deduction to be made 237.37-
per % sft.
198.96=Rs. 38.38
Total

612- First class brick on edge floor laid in cement mortar consisting one part of cement & six parts of fine sand of 1.25 F.M.
with cement mortar 1:2 over and including 8 cm. (3") brick ballast base concrete with kankar lime including supply of all
labour & T&P etc. required for proper completion of the work.

Rate per sft.-3" base concrete in kankar


Lime as per item no. 271 per % cft. 25 cft.
1st class bricks per 30 no. 530 no.
Cement per 50 kg. bag 1.25 bag
Fine sand of 1.25 F.M. per % cft. 8.5 cft.
Cement pointing 1:2 cement and local sand
per % sft. 100 sft.
mortar (item 574-576)
Mestri per day 1/10 no. 170.00
Mason per day 1 no. 160.00
Beldar per day 1 no. 100.00
Coolie per day 1 no. 100.00
Bhisti per day 1/4 no. 130.00
Add 1.5% water charges on Rs. 113.87
Contractor's profit @ 10% on Rs. 46.97 except
on cost of cement, sand, base concrete and
pointing.
Total

613- As in item no. 612 above but with 8 cm. (3") base concrete consisting of brick ballast white lime and surkhi in ratio of 100
in item no. 612.
Deduct cost of 3" base concrete in kankar lime
per % cft. 25 cft.
as per item 271
Add cost of 3" base concrete in birck ballast,
white lime and surkhi in ratio of 100:16:32 as per % cft. 25 cft.
per item 273
Total

614- As in item no. 612 above but with 8 cm. (3") base concrete consisting of one part of cement four parts of fine sand of 1.2
eight parts of brick ballast. As in item no. 612.
Deduct cost of 3" base concrete in kankar lime
per % cft. 25 cft.
as per item 271
Add cost of 3" base concrete in 1:4:8 cement,
fine sand of 1.25 F.M. and birck ballast. per % cft. 25 cft.

Total

615- First class brick on edge floor laid dry joints sand filled including preparation of base to proper slope and its ramming and
supply of all materials, labour and T & P etc. required for proper completion of the work.

Preparation of base, dressing, ramming and


sprinking water.
Beldar per day 0.5 no. 100.00
Coolie per day 0.5 no. 100.00
Bricks per % o no. 530 no.
Sand per % cft. 10 cft.
Mason per day 1 no. 160.00
Beldar per day 1 no. 100.00
Contractor's profit @ 10% on Rs. 46.92
Total

616- As in item no. 612 above but bricks , laid flat.


Rate for 100 sft. :- 3' base concrete in kankar.

Lime as per item no. 271 per % cft. 25 cft.


1st class bricks per % no. 350 no.
Cement per 50 kg. bag 0.9 bag
Fine sand of 1.25 F.M. per % cft. 7 cft.
Cement pointing 1:2 cement and fine sand of
per % sft. 100 sft.
1.25 F.M. mortar
Mistri per day 1/10 no. 170.00
Mason per day 3/4 no. 160.00
Beldar per day 0.5 no. 100.00
Coolie per day 1 no. 100.00
Bhisti per day 1/4 no. 130.00
Add 1.5% water charges on Rs. 95.67
Contractor's profit @ 10% on Rs. 31.18
(except on base concrete, pointing cement
and sand.
Total

617- As in item no. 613 above but bricks laid flat.


As in item no. 616
Deduct cost of 3" base concrete kankar lime
per % cft. 25 cft.

Add cost of 3" base concrete in brick ballast,


white lime and surkhi in ratio of 100:16:32 per % cft. 25 cft.
(item no. 272)
Total

618- As in item no. 614 above but bricks laid flat.


As in item no. 616
Deduct cost of 3" base concrete in kankar lime
per % cft. 25 cft.

Add cost of 3" base concrete in 1:4:8 cement,


fine sand of 1.25 F.M. and brick ballast. per % cft. 25 cft.

Total

619- As in item no. 615 above but bricks , laid flat.


Rate for 100 sft. :- 3' base concrete in kankar.

Bricks per % o no. 350 no.


Sand per % cft. 8 cft.
Mason per day 1 no. 160.00
Beldar per day 1 no. 100.00
Contractor's profit @ 10% on Rs. 32.65
Total

620- Granolithic marble flooring 2.5 cm. (1") thick consisting of one part cement, two parts of approved coarse sand and 4 par
(3/4") graded approved stone chips including 6 mm. (1/4") thick surface coat with ordinary cement black, white or grey
marble chips passing 3 mm. (1/8") but retained on 1.5 mm. (1/6") mesh screen in proportion of 1:2 as specified or d
Engineer-in-charge and polished by hand or machine and finally finished with french manson polish or other appro
including 8 cm. (3") kankar lime concrete base, including supply of all materials, labour and T & P etc. required
completion of the work.

Base : Lime concrete base 3" thick as per item


per % cft. 25 cft.
271
3/4"C.C. Stone chips 3/4" granite per % cft. 7 cft.
Coarse sand per % cft. 4 cft.
Cement per 50 kg. bag 1.75 bag
1/4" Granolithic chips : Marble chips per quintal 1.4 quintal
Cement per 50 kg. bag 1 bag
Sundries for rubbing and polishing L.S.
Mistri per day 1/8 no. 170.00
Mason per day 2 no. 160.00
Beldar per day 2 no. 100.00
Bhisti per day 1/4 no. 130.00
Beldar for cutting & polishing per day 15 no. 100.00
Sundries L.S. like phanties etc.
Add 1.5% water charges on Rs. 185.62
Contractor's profit @ 10% on Rs. 109.29
(except on base concrete, cement, sand and
ballast)
Total

621- As in item no. 620 above but when white cement is used in top 5 mm. (1/4") layer instead of ordinary cement.
Rate per % sft. as per item no. 620
Deduct :- Cost of grey cement per 50 kg. bag 1 bag
Add cost of white cement from market per 50 kg. bag 1 bag
Add Contractor's profit @ 10% on Rs. 27.00
Total

622- As in item no. 620 above but when coloured floors are to be made.
Rate per sft. as per item no. 620
Add cost of colour (Deep bluish) per kg. 4 kg.
Add Contractor's profit @ 10% on Rs. 15.00
Add 1.5% water charges on Rs. 15.00
Deduct Cost of 4 kg. cement per 50 kg. bag 4 kg.
Total

623- As in item no. (620 to 622) above but base concrete consisting of one part of cement 4 parts of local sand and 8 pa
ballast.
Add extra :- Difference in kankar lime,
concrete and 1:4:8 base concrete per sft.
58.16-32.42/100
Total

624- As in item no. (620 to 622) above but base concrete consisting of brick ballast, white lime and surkhi in ratio of 100:16:32.

Add extra:-Difference in kankar lime and one


white lime and two surkhi mortar base
concrete per sft.=37.99-32.42/100
Total

625- Granolithic marble dado 2 cm. (3/4") thick consisting of 15 mm. (9/16") thick layer of one part cement, 2 part of approv
sand including 5 mm. (3/16") thick surface coat with ordinary cement, black or white or grey or mixed marble chips pass
(1/8") but retained on 1.5 mm. (1/16") mesh screen in proportion of 1:2 as specified or directed by Engineer-in-charge & p
hand or machine and finally finished with french mansion polish or other approved polish including supply of all materi
and T&P etc. required for proper completion of the work.

Base 12 mm. thick cement plaster 1:2 as base coat with cement and coarse.
sand (as per item 581) per % sft. 100 sft.
3/8" thick rubbed to 1/4" marble chips per quintal 1.4 quintal
Cement per 50 kg. bag 1 bag
Sundries L.S.
1/4" Granolithic chips : Marble chips per quintal 1.4 quintal
Cement per 50 kg. bag 1 bag
Sundries for rubbing and polishing L.S.
Mason Mistri per day 1/6 no. 170.00
Mason per day 3/4 no. 160.00
Beldar per day 3/4 no. 100.00
Bhisti per day 1/4 no. 130.00
Beldar for cutting & polishing per day 15 no. 100.00
Add 1.5% water charges on Rs. 142.34
Contractor's profit @ 10% on Rs. 91.36
(except on cost of cement and plaster)
Total

626- As in item no. 625 above but when white cement is used in top 5mm. (3/16") thick layer instead of ordinary cement.

Rate per % sft. as per item no. 625


Deduct cost of grey cement per 50 kg.bag 1 bag
Add cost of white cement from market per 50 kg.bag 1 bag
Add Contractor's profit @ 10% on Rs. 27.00
Total

627- As in item no. 625 above but when coloured dados are to be made.
Rate per % sft. as per item no. 625
Add cost of colour (Deep bluish) per kg. 4 kg.
Add Contractor's profit @ 10% on Rs. 15.00
Add 1.5% water charges on Rs. 15.00
Deduct Cost of 4 kg. cement per 50 kg. bag 4 kg.
Total

628- Supply & fixing 6 mm. (1/4") China white glazed in flooring or dado laid with 1:3 cement and approved coarse and mort
with white cement slurry jointing & polishing complete including supply of all materials, labour and T&P etc. required
completion of the work.
Take an area of 12sq. Yards- 108 sq.ft
Tiles required per doz. 36 doz.
Cement per 50 kg. bag 3.2 bag
Coarse sand per % cft. 12 cft.
White cement per bag 1 bag
Marble dust per cft. 4 cft.
Tile layers per day 4 no.
Women coolie per day 2 no. 100.00
Sundries L.S.
Add 1.5% water charges on Rs. 782.81
Contractor's profit @ 10% on Rs. 747.24
(except on cost of grey cement and sand)
Total

629- As in item no. 628 above but when NITCO or equivalent quaintity of tiles with mosaic work in light shades are used in
dados. Take as area of 12sq. yards= 108sq.ft.
Tiles required 110sft. at 2.50 per sft.
Total mortar required 5cft. Cement per 50 kg. bag 1 bag
Coarse sand per % cft. 4 cft.
Add 1.5% water charges on Rs. 290.70
Contractor's profit @ 10% on Rs. 279.35
Total

630- Providing & fixing aluminium strips of 16" gauge in joints of floors & skirtings at the time of laying floors, flash with
including labour and T&P etc. complete
(a) of 2.5cm. (1") depth. Details of cost of 144rft. of Skeletion analysis as per S.l. aluminium stirps 16" gauge 1" depth wt. -
no. 20, 1962 CPWD analysis Materials, Aluminium sheet cut into streps=10.88lbs.
Wastage 5% = 00.54lbs. Total = 11.37 lbs. or 5.16kg.
Cost of strips (Market rate) per kg. 5.16 kg.
Carriage of Strips L.S. per kg.
Labour for fixing and finishing Mason per day 1 no. 160.00
Beldar per day 1 no. 100.00
Sundries L.S.
Add 1.5% water charges on Rs. 58.45
Contractor's profit @ 10% on Rs. 59.32
Total

(b) of 1/4 cm. (1.5%) depth. Take 144rft. 16' gauge 1.5' depth aluminium strip, weight = 16.25 lbs. Materials. Aluminium she
strips=16.25 lbs.
Wastage 5% = 0.81lbs. Total = 17.06 lbs. or 7.75kg.
Cost of strips per kg. 7.75 kg.
Cartage of Strips L.S.
Labour for fixing and finishing same as in (a)
above
1.5% water charges on Rs. 82.43
Contractor's profit @ 10% on Rs. 88.66
Total

(c) of 5cm. (2") depth. Take 144rft. 16' gauge 2' depth aluminium strips weight = 21.67 lbs. Materials. Aluminium she
strips=21.67 lbs.
Wastage 5% = 1.08lbs. Total = 22.75 lbs. or 10.34 kg.
Cost of strips per kg. 10.34 kg.
Cartage of Strips L.S.
Labour for fixing and finishing same as in (a)
per day 1 no. 100.00
above
1.5% water charges on Rs. 106.39
Contractor's profit @ 10% on Rs. 107.98
Total

631 Providing & fixing glass strips of 3.15mm. (1/8") thickness in joints of floors & skirtings at the time of laying floors, flash
level, including labour and T&P etc. complete
(a) of 2.5cm. (1") depth. Details of cost of 144rft. or glass strips 1/8" thick.
Cost of strips (Market rate) per rft. 144 rft.
Carriage of Strips L.S.
Labour for fixing and finishing same as in 630
(a) above
Add 1.5% water charges on Rs. 22.27
Contractor's profit @ 10% on Rs. 22.60
Total

(b) of 4 cm. (1.5%) depth. Details of cost of 144rft. of glass strips 3.5mm. (1/8") thick.
Cost of strips (Market rate) per rft. 144 rft.
Carriage of Strips L.S.
Labour for fixing and finishing same as in 630
(a) above
Add 1.5% water charges on Rs. 28.03
Contractor's profit @ 10% on Rs. 28.45
Total

(c) of 5cm. (2") depth. Details of cost of 144rft. of glass strips 1/8" thick.
Cost of strips (Market rate) per rft. 144 rft.
Carriage of Strips L.S.
Labour for fixing and finishing same as in 630
(a) above
Add 1.5% water charges on Rs. 32.35
Contractor's profit @ 10% on Rs. 32.83
Total

632- Extra for making cheques of approved pattern on Skeleton analysis based on S.l.no. cement concrete, floor, steps, la
including 12 of 1962CPWD analysis of rates labour and T&P etc. complete. Take 100sft.Area.
Labour : Mason per day 1/3 no. 160.00
Beldar per day 1/3 no. 100.00
Chequered plates L.S.
Add Contractor's profit @ 10% on Rs. 3.68
Total

633- Providing & fixing aluminum angle shape, nosings (Skeleton analysis taken from 30x12x2.2mm., (1.5"x0.5"1/10" approx)
25x3 mm. an extra item sanctioned in C.(1"x1/8") flat iron hold fasts 180 mm. (7") long placed at PWD kanpur office). 15
apart and screwed with 1"x1/8" screwes and nuts, including supply of all materials, labour and T&P complete. Take 10
materials. Aluminium nosings = 100ft.

Wastage 5%=5ft. Total 1.5ft.


Cost of nosings (Market rate) per rft. 105 rft.
M.S. flats 1"x1/8"x7" long 200no.=117rft. @
per kg. 11.13 kg.
0.21 lbs./rft. = 24.57lbs=11.13kg.
Screws and nuts 1"x1/6" per gross 200 no.
Carriage L.S.
Labour : Mason per day 6 no. 160.00
Hammer man per day 6 no. 105.00
Add Contractor's profit @ 10% on Rs.157.30
Total
CHAPTER - 15
PAINTING AND DISTEMPERING
Sl. Item of Work
Unit Qnty Rate
No.
1 2 3 4 5.00
641- Painting or varnishing on iron works in small areas or new wood work with one coat or ready mixed priming painting & o
approved superior quality ready mixed paint of clear synthetic varnish including supply of all materials, labour and T&P et
for proper completion of work. Paint to be used should conform to the I.S.I. no. 103-1950. Details of cost for an area
(Priming coat on wood work).
Primer per gal. 1 gal.
Painter per day 1.5 no. 140.00
Coolie per day 1.5 no. 100.00
Brushes, T&P and other Sundries L.S.
Add Contractor's profit @ 10% on Rs. 41.25
Total

Details of cost for 650sft. Painting one coat over priming coat.
Paint per litre 4 litre Paints (of
Painter per day 1.8 no. 140.00
Coolie per day 1.8 no. 100.00
Sundries, brushes etc. L.S.
Add Contractor's profit @ 10% on Rs. 65.24
Total

642- Same as in item 641 above but for every coat after 1st coat. Details of cost for 650 sft. area.
c) Superior read
Superior paint ready mixed per litre 3.5 litre
or steel (All col
Painter per day 1.5 no. 140.00
Coolie per day 1.5 no. 100.00
Sundries, brushes etc. L.S.
Add Contractor's profit @ 10% on Rs. 56.00
Total

643- As in item 642 above but for every coat on previously painted old wood or steel work.
Take cost of 650 sft. Paint per litre 4.5 litre Paints (of
Painter per day 2.1667 no. 140.00
Coolie per day 2.1667 no. 100.00
Sundries, brushes etc. L.S.
Add Contractor's profit @ 10% on Rs. 73.99
Total

644- Painting roofs or other iron work in large area with one coat of ready mixed paint priming one coat of approved pa
ANTISOL or equivalent) including supply of all materials, labour & T&P etc. required for proper completion of the work. P
used should confirm I.S.I. no. 103-1950. Cost for area of 650 sft. priming coat.
Paint per gal. 1 gal. Paints (of
Painter per day 1 no. 140.00
Coolie per day 1 no. 100.00
Brushes T&P scaffolding and sundries etc.
L.S.
Contractor's profit @ 10% on Rs. 38.25
Total
Painting coat for 1050 sft. Paint per litre 4 litre Paints (of
Painter per day 3 no. 140.00
Coolie per day 3 no. 100.00
Sundries scaffolding etc.
Contractor's profit @ 10% on Rs. 67.50
Total

645- As in item no. 644 above but every cost after the first coat.
For 1050 sft. Paint per litre 3.5 litre Paints (of
Painter per day 2.3 no. 140.00
Coolie per day 2.3 no. 100.00
Sundries scaffolding etc.
Contractor's profit @ 10% on Rs. 55.85
Total

646- Same as in item no. 615 above but for every coat on previously painted old surface.
Paint per litre 4.5 litre Paints (of
Painter per day 3.5 no. 140.00
Coolie per day 3.5 no. 100.00
Sundries scaffolding etc.
Contractor's profit @ 10% on Rs. 77.38
Total

647- Painting or varnishing with superial or other approved high grade enamel or superior synthetic clear varnish complete one
previously painted surface, including supply of all materials, labour nad T&P etc. required for proper completion of the wor
or varnish to be used should confirm to I.S.I. no. 105/106/133-1950.
Cost for an area of 400 sft. Enamel per litre 2.25 litre h) Paint e
Painter per day 1.33 no. 140.00
Coolie per day 1.33 no. 100.00
Sundries L.S.
Contractor's profit @ 10% on Rs. 45.37
Total

648- As in item no. 647 above but for every subsequent coat on previously treated surface.
Cost for an area of 400 sft. Enamel per litre 1.06 litre h) Paint e
Painter per day 1 no. 140.00
Coolie per day 1 no. 100.00
Contractor's profit @ 10% on Rs. 30.60
Total

649- One priming coat & one coat oil distemper on new work including supply of all materials, labour and T&P etc. Required
completion of the work.
Painting coat, whiting per kg. 1 kg.
Painter per day 1/8 no. 140.00
Coolie per day 1/8 no. 100.00
Contractor's profit @ 10% on Rs. 1.36
Distempering oil distemper in paste per kg. 1.5 kg.
Sundries L.S.
Painter per day 3/8 no. 140.00
Coolie per day 3/8 no. 100.00
Sundries, brushes etc.
Contractor's profit @ 10% on Rs. 1.36
Contractor's profit @ 10% on Rs. 13.26
Total

650- As in item no. 649 above but for every coat after the first coat.
Oil Distemper in paste per kg. 0.75 kg.
Sundries and putty etc. L.S.
Painter per day 1/5 no. 140.00
Coolie per day 1/5 no. 100.00
Sundries, brushes etc.
Contractor's profit @ 10% on Rs. 6.79
Total

651- As in item no. 650 above but for every coat on previously old distempered surface.
Oil Distemper in paste per kg. 0.75 kg.
Sundries and putty etc. L.S.
Painter per day 1/4 no. 140.00
Coolie per day 1/4 no. 100.00
Sundries, brushes etc.
Contractor's profit @ 10% on Rs. 7.51
Total

652- One cost hot coaltar on new surface including supply of all materials, labour and T&P etc. required for proper comple
work.
Coaltar per litre 0.91 litre
Beldar per day 1/3 no. 100.00
Sundries L.S.
Contractor's profit @ 10% on Rs. 2.33
Total

653- As in item no. 652 above but every coat after first coat or on previously treated surface.
Coaltar per litre 0.75 litre
Beldar per day 1/5 no. 100.00
Sundries L.S.
Contractor's profit @ 10% on Rs. 1.64
Total

654- One coat solignum or other approved preservative on new wood work, including supply of all materials, labour and
required for proper completion of the work.
Wood preservative per litre 0.75 litre
Painter per day 1/5 no. 140.00
Coolie per day 1/5 no. 100.00
Sundries L.S.
Contractor's profit @ 10% on Rs. 5.03
Total

655- As in item no. 654 above but for every coat after first coat on previously treated surface.
Wood preservative per litre 0.45 litre
Painter per day 1/5 no. 140.00
Coolie per day 1/5 no. 100.00
Sundries L.S.
Contractor's profit @ 10% on Rs. 2.58
Total

656- Oiling wood work with double boiled linseed oil including supply of all materials, labour & T&P etc. required for proper com
the work. Details for and area of 700 sft.
Linseed Oil per litre 3.75 litre
Painter per day 3/4 no. 140.00
Coolie per day 3/4 no. 100.00
Sundries
Contractor's profit @ 10% on Rs. 27.53
Total

657- Removing paint or varnish with paint remover orr caustic soda, including supply of all matrials, labour and T&P etc. re
proper completion of the work.
Caustic Soda per kg. 3.80 kg.
Coolie per day 1/3 no. 100.00
Beldar per day 1/3 no. 100.00
Sundries
Contractor's profit @ 10% on Rs. 3.28
Total

658- Wax polishing new wood work with approved ready made wax polish or approved french polish after, rubbing down with s
including supply of all materials, labour and T&P etc. required for proper completion of the work.

Manson (Wax) polish per kg. 0.50 kg.


Painter per day 0.50 no. 140.00
Coolie per day 0.50 no. 100.00
Sundries L.S.
Contractor's profit @ 10% on Rs. 11.25
Total

659- As in item no. 658 aboe but repolishing wood work already wax or french polished with approved realy made wax
approved french polish including supply of all materials, labour and T&P etc. required for proper completion of the work.

Manson (Wax) polish or French Polish per kg. 0.30 kg.


Painter per day 0.30 no. 140.00
Coolie per day 0.30 no. 100.00
Sundries L.S.
Contractor's profit @ 10% on Rs. 5.70
Total

660- Finishing walls with water proof cement paint of approved make and quality on new work with two coats to give an ev
including supply of all materials, labour & T&P etc. required for proper completion of the work. (Skeleton analysis base
CPWD analysis of rates item no. 97(a).
Details of cost for 100 sft. Snowcem powder per kg. 3.40 kg.
Labour :Painter per day 3/10 no. 140.00
Coolie per day 3/10 no. 100.00
Bhisti per day 3/8 no. 130.00
Scaffoliding and Sundries etc. L.S.
Add 1.5% water charges on Rs.14.90
Contractor's profit @ 10% on Rs. 15.11
Total

661- Same as in item no. 660 but for each coat of water proof cement paint after the first two coats to give an even shade.
analysis based on 1962 CPWD analysis of rates item no. 97(a).
Take 100sq.ft. of area
Snowcem powder per kg. 1.70 kg.
Labour :Painter per day 3/40 no. 140.00
Coolie per day 3/40 no. 100.00
Bhisti per day 1/8 no. 130.00
Scaffoliding and Sundries etc. L.S.
Add 1.5% water charges on Rs.6.54
Contractor's profit @ 10% on Rs. 6.64
Total

Note- Rate approved by S.E., 6th Circle vide letter no. 2817CB/131CB-6/67, dated 15.1.1968 for two coats and three coats are
and 24.00 per % sq.ft. respectively.

662- Finishing walls with one coat of water proof cement paint of approved quality on previouslly old treated surface with this pa
and even shade including supply of all materials, labour and T&P etc. required for the proper completion of the work.
analysis based on item no. 98 of 1962 PWD analysis of rates) Cost per %sft.
Materials : Snowcem powder per kg. 2 kg.
Labour :Painter per day 1/ 5 no. 140.00
Coolie per day 1/ 5 no. 100.00
Bhisti per day 1/8 no. 130.00
Sundries L.S.
Add 1.5% water charges on Rs.8.56
Contractor's profit @ 10% on Rs. 8.69
Total
CHAPTER - 16
WHITE AND COLOUR WASHING
Sl. Item of Work
Unit Qnty Rate
No.
1 2 3 4 5.00
671- White washing on coat, including supply of all materials, labour and T&P etc. required for proper completion of the work.

Materials : White lime per kg. 1 kg.


Carriage of lime L.S.
Labour : White washer per day 1/15 no. 140.00
Helper (Coolie) per day 1/15 no. 100.00
Sundries, gum, ladder etc. L.S.
Contractor's profit @ 10% on Rs. 0.71
Total

672- As in item no. 671 above but two coats.


White lime per kg. 2 kg.
Carriage of lime L.S.
White washer per day 1/10 no. 140.00
Helper (Coolie) per day 1/10 no. 100.00
Sundries, gum, ladder etc. L.S.
Contractor's profit @ 10% on Rs. 1.16
Total

673- As in item no. 671 above but 3 coats white washing 2 coats as per item 672.
Add difference in cost of one additional coat
(1.28-0.78)
Total

674- Colour washing one coat using approved colouring materials of buff, blue, grey or brown shade, including supply of all
labour and T&P etc. required for proper completion of the work.
Rate for white washing on coat 671
Add cost of 0.25 kg. colouring material per kg. 0.25 kg.
Add extra labour required L.S.
Contractor's profit @ 10% on Rs. 0.42
Total

675- As in item 674 above but 2 coats. Rate for white washing 2 coats 672.
Add cost of 0.5 kg. colouring material per kg. 0.50 kg.
Add extra labour required L.S.
Contractor's profit @ 10% on Rs. 0.85
Total

676- As in item 674 above but using approved colouring materials of pink, green or yellow shades.
Rate as per item (674).
Add extra cost of manufactured colour L.S.
Contractor's profit @ 10% on Rs. 0.18
Total

677- As in item 676 above but two coats.


Rate for colour washing 2 coats (675)
Add extra cost of 2 coats colouring materials
L.S.
Contractor's profit @ 10% on Rs. 0.32
Total

678- As in item 676 above but colour washing with copper or iron sulphate on coat.
Same as per colour washing on coat as per
item 676
Add extra cost of colour
Contractor's profit @ 10% on Rs. 0.16
Total

679- As in item 678 above but two coats.


Rate same as per colour washing two coats as
item 677
Add extra cost of colour
Contractor's profit @ 10% on Rs. 0.32
Total

680- Cement washing, including supply of all materials, labour and T&P etc.required for proper completion of the work.
Material : Cement per 50 kg. bag 3.6 kg.
Carriage of cement L.S.
Labour : White washer per day 1/12 no. 140.00
Helper (Coolie) per day 1/12 no. 100.00
Sundries, gum, ladder L.S.
Contractor's profit @ 10% on Rs. 1.44
Total

681- One priming coat and one coat of dry distemper on new work, including supply of all materials, labour and T&P etc. re
proper completion of the work.
Details of cost of 100 sft. Whiting per kg. 1.0 kg.
Vinegar L.S.
Labour : Painter per day 1/ 8 no. 140.00
Coolie per day 1/ 8 no. 100.00
Distempering Dry-distemper per kg. 3/ 4 kg.
Painter per day 1/ 5 no. 140.00
Coolie per day 1/ 5 no. 100.00
Sundries L.S.
Contractor's profit @ 10% on Rs. 6.33
Total

682- As in item 681 above but for each coat of distemper after the first coat.
Distemper per kg. 0.6 kg.
Painter per day 1/ 6 no. 140.00
Coolie per day 1/ 6 no. 100.00
Sundries L.S.
Contractor's profit @ 10% on Rs. 3.90
Total
CHAPTER - 17
DEMOLITION & DISMANTLING
Sl. Item of Work
Unit Qnty Rate
No.
1 2 3 4 5.00
691- Dismantling sundried brick work including stacking of dismantled materials as directed by the Engineer-in- charge within
of 60 metres (200 ft.)
Coolie per day 3/ 4 no. 100.00
Sundries L.S.
Contractor's profit @ 10%
Total

692- Dismantling brick work or stone work in lime or cement mortar and including stacking of materials as directed by the E
charge within a distance of 60 metres.
(200 ft.) Beldar per day 2 no. 100.00
Coolie per day 2 no. 100.00
Contractor's profit @ 10% on Rs. 11.50
Total

693- As in item 692 above but in mud mortar.


Beldar per day 1 no. 100.00
Coolie per day 1 no. 100.00
Contractor's profit @ 10% on Rs. 5.75
Total

694- Dismantling reinforced cement concrete or reinforced brick work, including stacking of dismantled materials as direc
Engineer-in-charge within a distance of 60 metres (200 ft.) .
Beldar per day 4 no. 100.00
Coolie per day 4 no. 100.00
Blacksmith per day 1/ 3 no. 170.00
Sundries L.S.
Contractor's profit @ 10% on Rs. 26.33
Total

695- Dismantling jack arched or wooden beam & bargas roofs, including beams & roof concrete & including stacking of d
materials as directed by the Engineer-in-charge within a distance of 60 metres (200 ft.)

Beldar per day 2 no. 100.00


Coolie per day 2 no. 100.00
Contractor's profit @ 10% on Rs. 11.50
Total

696- As in item 695 above but only roof concretes.


Beldar per day 1.50 no. 100.00
Coolie per day 1.50 no. 100.00
Contractor's profit @ 10% on Rs. 8.62
Total

697- Dismantling cement concrete or brick or granolithic floors, including base concrete & including stacking of dismantled m
directed by the Engineer-in-charge within a distance of 60 metres (200 ft.)
Beldar per day 3/ 4 no. 100.00
Coolie per day 3/ 4 no. 100.00
Contractor's profit @ 10% on Rs. 4.32
Total

698- As in item 697 above but floors to be stone flagged or tiled floor.
Beldar per day 1 no. 100.00
Coolie per day 1 no. 100.00
Contractor's profit @ 10% on Rs. 5.75
Total

699- Dismantling single tiled roof, any kind, including perlin and battens & including stacking of dismantled materials as direc
Engineer-in-charge within a distance of 60 metres (200 ft.)
Mistri per day 1/10 no. 170.00
Beldar per day 1 no. 100.00
Coolie per day 1 no. 100.00
Contractor's profit @ 10% on Rs. 6.40
Total

700- As in item 699 above but double tiled roof.


Mistri per day 1/10 no. 170.00
Beldar per day 2 no. 100.00
Coolie per day 1.50 no. 100.00
Contractor's profit @ 10% on Rs. 10.90
Total

701- Dismantling corrugated iron roof walls and patiotions including purlin battens and vertical supports and including s
materials as directed by the Engineer-in-charge within a distance of 60 metres (200 ft.)
Blacksmith per day 0.50 no. 170.00
Coolie per day 0.50 no. 100.00
Contractor's profit @ 10% on Rs. 4.00
Total

702- Dismantling of griders, trusses & other steel work including stacking of dismantled materials as directed by the Engineer
within a distance of 60 metres (200 ft.)
Blacksmith per day 0.50 no. 170.00
Beldar per day 1.50 no. 100.00
Sundries L.S.
Contractor's profit @ 10% on Rs. 8.78
Total

703- Dismantling doors & windows. Including chowkhats with hold fast and including stacking of materials as directed by the E
charge within a distance of 60 metres (200 ft.)
Mason per day 1/10 no. 160.00
Carpenter per day 0.50 no. 160.00
Coolie per day 1 no. 100.00
Contractor's profit @ 10% on Rs. 6.35
Total

704- Dismantling doors & windows leaves, including stacking of materials as directed by the Engineer-in-charge within a dista
metres (200 ft.)
Carpenter per day 1/ 3 no. 160.00
Beldar per day 1/ 3 no. 100.00
Sundries L.S.
Contractor's profit @ 10% on Rs. 3.65
Total

705- Dismantling doors & windows. Including chowkhats but excluding hold fast and including stacking of materials as direc
Engineer-in-charge within a distance of 60 metres (200 ft.)
Carpenter per day 1/ 3 no. 160.00
Mason per day 1/ 8 no. 160.00
Coolie per day 1 no. 100.00
Sundries L.S.
Contractor's profit @ 10% on Rs. 6.57
Total
706- Dismantling existing plaster including disposal of refuse as directed by the Engineer-in-charge within a distance of 60 m
ft.)
Coolie per day 1 no. 100.00
Bhisti per day 1/16 no. 130.00
Contractor's profit @ 10% on Rs. 2.77
Total

707- Racking out joints of brick work in cement or lime mortar to a depth of 1cm. (3/8") including disposal of refuse as direc
Engineer-in-charge within a distance of 60 metres (200 ft.)
Beldar per day 3/ 4 no. 100.00
Contractor's profit @ 10%
Total

708- Scarping old white or colour wash including disposal of refuse as directed by the Engineer-in-charge within a distance of
(200 ft.)
Coolie per day 1/ 3 no. 100.00
Contractor's profit @ 10%
Total
CHAPTER - 18
WELL WORK
Sl. Item of Work
Unit Qnty Rate
No.
1 2 3 4 5.00
711- R.C.C. work in 1:2:4 in well curbs with cement, approved coarse sand & 2cm. (3/4") gauge well graded grit, including
placing & fixing, of reinforcement in position, but excluding cost of reinforecement & its bending but including its binding t
shape & including supply of all materials, labour and T&P etc. required for proper completion of the work. Binding wire (2
wire) to be supplied by the contractor free of cost.
As in item 285
Cost of extra labour including contractor's
profit @ 10%
Total

712- Mild steel or iron work in cutting edge of well work, wrought to required shape & joined as necessary including supply o
its cutting, bending and welding etc. for proper completion of work as directed by Engineer-in-charge.

Blacksmith per day 1 no. 170.00


Hammer man per day 2 no. 105.00
Helper Beldar per day 2 no. 100.00
Sundries T&P cartage etc. L.S.
Contractor's profit @ 10% on Rs. 22.25
Cost of steel per cwt. 1 cwt.
Wastage 2%
Total

713- Mild steel or iron work in well steining, including supply of steel and its cutting, bending and welding etc. & including co
nuts required for proper completion of work as directed by Engineer-in-charge.
Blacksmith per day 1 no. 170.00
Helper Beldar per day 1 no. 100.00
Hammer man per day 1 no. 105.00
Bottle nuts each 2 no.
Sundries T&P cartage etc. L.S.
Contractor's profit @ 10%
Cost of steel per cwt. 1 cwt.
Wastage 5%
Total

714- Sinking of well of 2.5m(8') external diametre in ordinary soil below spring level, including supply, erection & working o
required, as well as loading & unloading of weight bailing & unloading of weight bailing & pumping out water with ma
otherwise as required 0m to 1.5m (0'-5').
Sinker per day 1/ 3 no. Well sinke
Skilled labour per day 1.50 no.
Coolie per day 4 no. 100.00
T&P and load etc. L.S.
Contractor's profit @ 10% on Rs. 19.75
Total

715- As in item 714 above but from 1.5m to 3.0m. (5'-10').


Sinker per day 1 no. Well sinke
Skilled labour per day 1.50 no.
Coolie per day 5 no. 100.00
T&P and load etc. L.S.
Contractor's profit @ 10% on Rs. 29.75
Total

716- As in item 714 above but from 3m to 5m. (10'-20').


Sinker per day 1 no. Well sinke
Skilled labour per day 2 no.
Coolie per day 7 no. 100.00
T&P and load etc. L.S.
Contractor's profit @ 10% on Rs. 39.50
Total

717- As in item 714 above but from 7m to 9m. (20'-30').


Sinker per day 2 no. Well sinke
Skilled labour per day 2 no.
Coolie per day 10 no. 100.00
T&P and load etc. L.S.
Contractor's profit @ 10% on Rs. 56.00
Total

718- As in item 714 above but from 9m to 12m. (30'-40').


Sinker per day 3 no. Well sinke
Skilled labour per day 2 no.
Coolie per day 10 no. 100.00
T&P and load L.S.
Contractor's profit @ 10% on Rs. 71.00
Total

719- As in item 714 above but from 12m to 15m. (40'-50').


Sinker per day 2 no. Well sinke
Mate with driver per day 1 no. 110.00
Skilled labour per day 4 no.
Driver per day 1 no. 400.00
T&P and load etc.
Contractor's profit @ 10% on Rs. 88.00
Total

719-(a) For the diametra (External) other than above the rates shall be calculated proportionatly to their areas.

(b) For soils other than the average soil as indicated above an increase as given below shall be allowed according to the na
soil and work.
Soft Clay 25% Hard clay 50% Kankar shingle 0.75
CHAPTER - 19
MISCELLANEOUS
Sl. Item of Work
Unit Qnty Rate
No.
1 2 3 4 5.00
725- Blocks of C.P. Teak 8cmx8cmx12cm (3"x3"x4.5") supplied & fixed in wall with & including cement and approved coarse sa
in the proportion of 1.3 and including making a hole for the same.
C.P. Teak Block 3"x3"x4.5" per cft. 3/128 cft.
Cement per 50 kg. bag 0.5 bag
Coarse sand per % cft. 0.03 cft.
Mason per day 1/25 no. 160.00
Beldar per day 1/25 no. 100.00
Contractor's profit @ 10% on Rs. 1.33
Total

726- Supply of approved brass cleats for clerestory window cords including their fixing to Teak wood plates 10cmx10cmx1cm (4
over blocks of C.P. Teak 8cmx8cmx12cm (3"x3"x4.5") supplied and fixed in wall with & including cement & approved co
mortar in proportion of 1:3 and screws etc. and including making a hole for the same.

Cost of 12 cleats Teak wood blocks each 12 nos.


Teak plates 4"x4"x3/8" per cft. 1/20 cft.
Brass cleats per doz. 1 doz.
Iron screws 2.5" per doz. 1 doz.
Brass screws1" per doz. 2 doz.
Carpenter per day 0.50 no. 160.00
Cement mortar and fixing. Same as in item
(725) 0.51x12
Contractor's profit @ 10% on Rs. 45.71
Total

727- As in item 726 but with approved oxidised iron cleats.


As in item 726
Deduct difference in cost of brass and iron
cleats L.S.
Total

728- Supply of cotton cord for clerestory window including fixing in position.
Rate for cotton cord per kg. 1 kg.
Fixing charges L.S.
Contractor's profit @ 10% on Rs. 7.75
Total

729- Supply and fixing of C.P. Teak wood doors and windows cleat 10cmx7.5cmx5cm(4"x3"x2") with 5cm. (2") brass hignes
fixing & supply of screws bings & including supply of all materials, labour & T&P etc. required for proper completion of the

Details of 12 cleats. Teak wood 12x0.5"x3"x2"


per cft. 1/ 6 cft.

Brass hinges 2" per doz. 1 doz.


Carpenter per day 1/ 3 no. 160.00
Brass screws 1" per doz. 4 doz.
Contractor's profit @ 10% on Rs. 29.99
Total

730- Supply and fixing of 10cm(4") internal dia. A.C. down pipes complete with rose head., bends and gratings & includings
necessary M.S. clamps 2.5cmx3mm(1"x1/8") fixed to walls, with & including supply of 15cm. (6") long 6mm(1/4") d
including supply of all materials, labour and T&P etc. required for proper completion of the work and also inclucing repair
pointing etc. if damaged during fixing of pipes. Details of 30' length.
Cost of 6' pipe each 5 nos.
Add for M.S. clamps each 5 nos.
Cement mortar L.S.
Fitter per day 1/ 4 no. 110.00
Mason per day 3/ 4 no. 160.00
Beldar per day 1 no. 100.00
Contractor's profit @ 10% on Rs. 83.37
Total

(b) Shoes, shoe each 1 no.


Holder label 1 no.
Contractor's profit @ 10% on Rs. 5.00
Total

(c) Head including rose each 1 no.


Carriage and fixing charges L.S.
Contractor's profit @ 10% on Rs. 6.18
Total

(d) Bends, Construction of Bends each 1 no.


Carriage and fixing charges L.S.
Contractor's profit @ 10% on Rs. 5.00
Grand total (a+b+c+d)
Total

731- Supply and fixing of C.P. Teak wood per rack (8cmx8cmx2.5cm)(3"x3"x1") over blocks of C.P. Teak 8Cmx8cmx12cm(3
with three brass pegs of approved design supplied and fixed in wall with & including cement & approved coarse sand mo
proportion of 1:3 and screws etc. & including making a hole for the same.

Teak wood 1x5/2x4/12x1/12 per cft. 0.07 cft.


Brass hole peg each 3 nos.
Brass screws 3/4" per doz. 6 nos.
Carpenter per day 1/12 no. 160.00
Beldar per day 1/12 no. 100.00
Teak wood block 3"23"24" (two) per cft. 3/64 cft.
Cement mortar and labour L.S.
Sundries L.S.
Contractor's profit @ 10% on Rs. 9.45
Total

732- Fire bricks laid in fire clay mortar including supply of fire bricks and fire clay, labour and T&P etc. required for proper com
the work .
Details of cost per % cft.
Fire clay bricks per % 1300 no.
Fire clay mortar per cwt. 14 cwt.
Sundries L.S.
Mason per day 4 no. 160.00
Beldar per day 2 no. 100.00
Bhisti per day 1/ 4 no. 130.00
Sundries T&P etc. L.S.
Contractor's profit @ 10% on Rs.1352.31
Total

733- Providing & fixing at site 4cm. (1.5") C.P. Teak wood panelled partition complete with teak wood frames 10cmx8cm(4"x3")
and side vertical at 1.5m (5') apart including supply of all brass screws, cleats, bolts, etc. all materials, labour and T&P et
for proper completion of the work. Details of cost for partitions of panels 6'-8' high and 5" wide 6x5=33.33 sft. materials.

Styles 1x4x6x1/4x1/8 = 0.83


Rails 1x4x5x1/4x1/8 = 0.63
Panels 3x3x2x1.5x5/96 = 1.41
Add wastage 10% on 2.87 = 0.29
Total = 3.16 3.16 cft.
Carriage L.S.
Carpanter per day 3.50 no. 160.00
Beldar per day 1.50 no. 100.00
Mistri per day 1/ 8 no. 170.00
Carpanter per day 1.75 no. 160.00
Screws etc. L.S.
Contractor's profit @ 10% on Rs.178.21
Total

Teak wood frames 4"x3" take a length of 15" (As per item of straight works in wood work).
2x15"4/12"x3/12" = 2.5
4x6x4/12x3/12 = 2.2
Wastage 10% on 4.7 = 0.5
As per item no. 401 = 5.2 per cft. 5.2 cft.
Add cost of bolts etc. L.S.
Total

734- Providing & fixing plain asbestos sheets partition with 5cmx1cm )2"x3/8") deodar or Shisham wood beading including
fixing complete with deodar or shisham frames 10cmx8cm(4"x3") top bottoms and sides verticals at 1.5m(5') apart &
supply of all screws, bolts, nuts and cleats etc. all materials, labour and T&P etc. required for proper completion of work.

Details of cost for 12'x7' = 84 sft.


Deodar wood 3x12x1/6x1/24 = 0.25
4x6x1/24 = 0.19
Wastage 5% on 0.44 = 0.02
Total = 0.46 sft. 0.46 cft.
Carriage L.S.
Plain asbestos sheets 1/4" thick = 84sft.
Wastage 5% per sft. 88.2 cft.
Carriage L.S.
Carpanter per day 1.33 no. 160.00
Mason per day 1 no. 160.00
Beldar per day 1.50 no. 100.00
Sundries screws L.S.
Contractor's profit @ 10% on Rs. 111.44
Total

Deodar wood frame as above (As per item of straight work and wood work).
As per item no. 404 per cft. 5.2 cft.
Add cost of bolts etc. L.S.
Total

735- As in item 734 above but with masonite board


partition as above
Add extra cost of masonite board including
contractor's prolit @ 10%
Total
CHAPTER - 20
ROAD WORK
Sl. Item of Work
Unit Qnty Rate
No.
1 2 3 4 5.00
751- Consolidation of kankar by hand rammers including opening out stacks, sorting kankar into three sizes repairing patch
road surface with kankar, picking up old surface, spreading kankar, making medhi to retain water and ramming and also
carriage of metal upto 30m (100'). Carriage of water 200m. (1 furlong) supply & maintenance of barrier, caution posts, lig
& including all T&P etc. required for proper completion of the work, kankar to be supplied to the contractor free at site.

Taking up a length of 220'x12'=2640sft. Kankar required 2640x3/8 = 990cft.


Beldar for cris cross lines and sweeping and
per day 2 nos. 100.00
taking out kankar dug
Preparing earth & making medhi mazdoor per day 1 no. 100.00
Opening out stack & sooting into sizes beldar
per day 2 nos. 100.00

Mazdoor per day 2 nos. 100.00


Carriage of kankar & spreading on surface,
per day 4 nos. 100.00
Mazdoor
Hand packing Beldar per day 6 nos. 100.00
Supply of water, Mazdoor per day 8 nos. 100.00
Consolidation Head Hammer man per day 1 nos. 105.00
Hammer man per day 11 nos. 105.00
Basi chot Beldar per day 2 nos. 100.00
Leak katai L.S.
T&P and night light L.S.
Contractor's profit @ 10% on Rs. 120.25
Total

752- As in item 751 above but for consolidation by R/R including hire and fuel of the roller.
As in item 751
Deduce for labour involved in consolidation (A)
Add for hire charges of roller per day 1 no.
Steam coal per day 1/ 4 nos.
Beldar per day 2 nos. 100.00
Contractor's profit @ 10% on Rs. 6.50 except
on roller & coal
Total

753- As in item 752 above but for 12cm. (4.5") thick coat of brick ballast.
As in item 752
Extra for labour for providing building materials.
Beldar per day 0.50 nos. 100.00
Contractor's profit @ 10% on Rs. 1.62
Total

754- As in item no. 752 above but 8cm. (3") thick coat of brick ballast.
As in item 753
Add difference in item 755/756
Total

755- As in item 752 above but for 12cm. (4.5") thick stone ballast.
As in item 752
Extra for labour for providing building materials in excess including.
10% contractor's profit Beldar per day 3/ 4 nos. 100.00
Add for extra coat to be used L.S.
Contractor's profit @ 10% on Rs. 2.94
Total
756- As in item 752 above but for 6cm (2.3") to 8cm. (3") thick, stone ballast. Consider a length of 220 rft. Materials
220x12x0.3=660 cft.
For ctis cross lines, sweeping and taking out
per day 2 nos. 100.00
kankar dug. Beldar
Preparing earth & making medhi mazdoor per day 1 no. 100.00
Opening out stack, carriage and spreading on
per day 3 nos. 100.00
raod surface : Beldar
Hand packing Beldars per day 8 nos. 100.00
Supply of water, Mazdoor per day 6 nos. 100.00
Consolidation Roller charges per day 1 day
Coal per ton 1/ 6 ton
Beldar per day 2 nos. 100.00
Binding Beldar per day 2 nos. 100.00
Leak katai L.S.
T&P night lanterns L.S.
Contractor's profit @ 10% except on coal and
roller i.e. on Rs. 77.25
Total

757- Water allowance to be allowed on item no. 751 to 756 between 15 Nov. to 31 May.
Beldar per day 3/ 4 no. 100.00
Contractor's profit @ 10% on Rs. 2.68
Total

758- Digging kankar including breaking, cleaning and royalty as well as the cost of boring to fined kankar strata excluding ca
proper stacking.
Royalty to villagers
Indication (digging) per day 1/ 8 no.
Beldar per day 4 nos. 100.00
Coolie per day 3 nos. 100.00
For hundred cft. Kankar 110 cft. of kankar as
the quary will have to be dug.
Total

759- Making mud tree guards 1 m (3'-4') internal diameter and 1m (3'-4') high above ground level.
Mason per day 3/ 4 no. 160.00
Coolie per day 3/ 4 no. 100.00
Sundries L.S.
Contractor's profit @ 10% on Rs. 6.50
Total

760- Dag-belling 15cm. (6") deep in one line aligned, with flags and jhandies as directed by th Engineer-in-charge.

Mate per day 1 no. 110.00


Beldar per day 9 nos. 100.00
Contractor's profit @ 10% on Rs. 32.75
Total

761- Painting white traffic lines 8cm. (3") wide in three coats with approved road marking paint (spirit base) as directed by the
on-charge, including all materials, labour and T&P etc. required for proper completion of the work. Take an area of 100 sft.

Paint (Road marking paint) per litre 4.5 litre


Painter per day 5 no. 140.00
Beldar per day 5 no. 100.00
Sundries L.S.
Contractor's profit @ 10%
Total
762- (a) Brick soling with straight overburnt bricks laid flat and dry including preparation of subgrade to prescribed cambre and
supply of bricks, filling joints with local earth spreading a blinding coat of 1cm. (3/8") depth of local earth of P.I. 5 to 7 or
the entire surface & including labour & T&P etc. required for proper completion of the work.

Bricks per %o 350 nos.


Rate of preparing subgrade and laying as per per day 5 no.
item no. 785 profit @ 10% on Rs. 19.25
Contractor's
Total
(b) As in item 762(a) but with bricks laid on edge.
Bricks per %o 550 nos.
Rate of preparing subgrade and laying as per per day 5 no.
item no. 786 profit @ 10% on Rs.30.25
Contractor's
Total

763- Bricks on edge pavement on patries with bricks laid dry, joints filled with local sand including preparation of base to pr
and its ramming, spreading a layer of 1cm. (3/8") depth of local sand over the subgrade and including supply of all materi
and T&P etc. required for proper completion of the work.

As item no. 762(b) above


Extra cost of labour and 10cft. Local sand,
including Contractor's profit @ 10% ( Rs.
3.00+1.00+0.40)
Total

764- Renewing patries 3metre (10') wide including dressing surface filling upto 8cm. (3") depth and making namunas at every 1
apart on either side of the road true to patri template with side slopes 1:2 etc. for taking the earth to be so dug that th
continuous side drain at road boundry. Take a length of 1 furlong.

Mate per day 1 no. 110.00


Diggers per day 10 no.
Dressers per day 2 no.
Coolie per day 12 no. 100.00
Baskets per no. 4 no.
String L.S.
Coal per ton 1/ 6 ton
Beldar per day 2 nos. 100.00
T&P L.S.
Contractor's profit @ 10% Rs. 78.25
Total

765- Bricks edging on both sides of the road of first class bricks 8cm. (3") wide and 12cm. (4.5") deep laid with mud morta
labour & supply of bricks finished to required template and in proper alignment and also including dressing & ram
excavated earth as directed by the Engineer-in-charge. Take a stip of 0.5 furlong 2x330=660 rft.

Bricks per %o 8/5 no.


Mason per day 1 no. 160.00
Beldar per day 1 no. 100.00
Coolie per day 2 no. 100.00
Dressing and throwing surplus materials includings stacking of road materials.
Coolie per day 2 no. 100.00
T&P Baskets and other sundries L.S.
Contractor's profit @ 10% Rs. 72.50
Total

766- Stacking of road metal to the required templete after screening at road side including dressing of side berms as requir
metal is to be stacked and including a lead upto 60 metres (200').
Screeing Coolie per day 1/ 5 no. 100.00
Dressing, levelling, side berms, including filling.
Coolie per day 1/ 5 no. 100.00
Stacking Beldar per day 1/ 2 no. 100.00
Sundries L.S.
Contractor's profit @ 10% Rs. 2.82
Total

767- Bitumen painting (labour only) over W.B. surface (1st coat) excluding supply of paint & grit including maintenance of s
and watering them during operation for proper completion of the work as directed by Engineer-in-charge and exclu
charges and its fuel but including the wages of fire-man & tar-boiler man.

Take a strip of 0.5 furlong area 330x12=3960 sft.


Cleaning grit : Mazdoor per day 1 no. 100.00
Cleaning sub-grade : Mazdoor per day 10 no. 100.00
Coolie per day 8 no. 100.00
Tar heating & spreading on road: Hot Belder per day 7 no.
Grit spreading Beldar per day 5 no. 100.00
Diversion watering : Beldar per day 2 no. 100.00
Misce. : Mate per day 1 no. 110.00
Work agent per day 1/ 2 no.
Tar boiler man & Fireman per day 1 no.
Sundries L.S.
Total

768- As in item 767 above but subsequent coat or painting over previously painted surface. The above labour will make an
double the area i.e. the same labour can do the painting of 1 furlong. Hence rate for % sft. 3 00/2 = Rs. 1.50 or Rs.0.16 pe

769- As in item 767 above but cold cmulsion in 2nd coat painting with bitumen covering on furlong.
(As per item no. 767).
Deduct labour for heating paint not required in
this operation as in item 767
Extra labour required for operation L.S.
Total

770- As in item 767 above but with tar in first coat painting with
bitumen furlong
Deduct less labour required for heating Tar-
per day 4 no. 100.00
beldar
Total

771- As in item 767 but with Tar in 2nd coat or other subsequent coats of painting over previously painted surface. The above
make an output double the area i.e. the same labour can do the painting of one furlong. Hence rate for % sft. = 1.30 or R
sq.m.

772- Scrapping old painted surface including disposal of all scraped material to a distance of 30m. (100') as desired by E
charge.
Beldar per day 1 no. 100.00
Contractor's profit @ 10%
Total

773- Laying C.C. Road slab 10cm. (4") thick consisting of 1:2:4 cement, coarse sand & approved 4cm. (1.5") gauge stone ba
prepared sub grade after its rectifications & bringing it to proper camber & including supply of all meterials, labour and
required for proper completion of work, finished to required templete as directed by Engineer-in-charge but excluding co
required for rectification of the subgrade. Take a slab length of 33rft. & 4' in depth. qnty. of work involved 33x1.2x1/3=132

Stone ballast 1.5" gauge per cft. 119 cft.


Coarse sand per % cft. 60 cft.
Cement bag per 50 kg. bag 25 no.
Empty bag each 15 no.
Tar and other side forms etc. L.S.
Laying of C.C. and putting forma and temping
per day 1/ 6 no. 170.00
etc. Mistri
Mason per day 2 no. 160.00
Mate per day 1 no. 110.00
Beldar per day 12 no. 100.00
Coolie per day 2 no. 100.00
Sub grade rectification etc. Mason per day 1/ 2 no. 160.00
Beldar per day 1 no. 100.00
Coolie per day 1 no. 100.00
Curing : Mate per day 1 no. 110.00
Coolie per day 8 no. 100.00
Diversion : Beldar per day 1 no. 100.00
Chowkidar per day 2 no.
Misce.: Supervision W/Agent per day 1/ 3 no.
Driver C.C. Mixer etc. per day 1/ 6 no.
Cleaner per day 1/ 6 no.
Beldar per day 3 no. 100.00
Coolie per day 3 no. 100.00
Water Charges 1.5% on Rs. 656.16
Contractor's profit @ 10% on 147.00
Total

774- As in item no 773 above but excluding supply of cement coarse sand & stone ballast (labour only)
As in item no. 773 including forms work
Contractor's profit @ 10%
Total

775- Blinding of water bound stone or kankar lime with local earth by spreading evently to an average depth of 1.5 cm (9/16") &
intersticks of the road metal. The trenches to be so dug for taking the earth that they form continuous side drain at road
Take a length of one furlong 1x660x12x1/24=330 Say 300cft.
Rate for earth work per cft. 300 cft.
Add 50% for small work
Total

776- Earth work in edging of the painted of C.C. miles in a width of 0.5m. (20") on either side according to patri template
dressing ramming etc. The trenches to be so dug for taking the earth that they form a continuous side drain at road bound

Take a length of one furlong : Earth work to be


done (average) say 380 cft.
Rate for earth work per cft. 380 cft.
Add 50% for small work
Total

777- Joint and other small cracks filling in C.C. miles after racking out the joints & removing the old Tar and other material wi
materials as directed by Engineer-in-charge (Labour only) Total Joints at every 33' joints to be filled would be 5280/33 = 16

Add 25% for other cracks = 40 nos Total : 200


nos. say 200 joints would be attended to Mate per day 3/ 4 no. 110.00

Beldar per day 6 no. 100.00


Coolie per day 1 no. 100.00
Contractor's profit @ 10% Rs. 24.62
Total

778- Consolidation of kankar in patch repair from 1st June to 14 Nov. by hand rammer including opening out stacks, picki
surface upto 8cm (3") in a rectangular form, making 5cm. (2") wide drain around the patch upto depth of 12cm. (4.5"
carriage of kankar and water, but exclucding supply of kankar & including stacking the unserviceable materials & basi-cho
& blinding the same as directed by the Engineer-in-charge. Take a patch of 5'x5' fresh metal to be used 5x5x1/4'=6.3 cft.
Mate per day 1/30 no. 110.00
Beldar per day 4/15 no. 100.00
Coolie per day 1/10 no. 100.00
Contractor's profit @ 10% Rs. 1.24
Total

779- As in item no 778 above but from 15 nov. to 31 may.


As in item no. 778
Add for water allwoance as in item 757
Total

780- Patch repair of painted miles with tar & bitumen (labour only) including heating of paint upto required temperature, pouri
surface spreading th necessary qnty of grit & ramming hard with hand roller or rammer & also including cleaning with bru
existing surface after sacrifying it to the W.B. surface in rectangular shape & spreading the dismantled material on the
directed by the Engineer-in- charge. As per CE's circular patch work is carried out upto a stage when 0.5 ton tar is used pe
mile (6/4 surface to be treated by 1.5 ton in year 3360/12=10,000 sft. Grit to be consumed 120x2.25-270 cft.

Hence consumption per mile per month = 270x12=22.50 cft. Say 25 cft.
Mate per day 1 no. 110.00
Beldar per day 4 no. 100.00
Coolie per day 4 no. 100.00

Total

781- Cleaning of existing painted surface & laying premix 2cm. (3/4") thick over a tack coat with graded approved grit & bitume
Only) including heating the paint to required temp. mixing either in mixer or in hand drum including cartage of material ma
of side patries & watering them during operation for proper completion of work as directed by the Engineer-in-charge. Tak
of 0.5 furlong 330x12=3960 sft.

Labour for cleaning : Mazdoor per day 6 no. 100.00


Coolie per day 6 no. 100.00
Tack coat heating & spreading:Beldar per day 4 no. 100.00
Premixing, screening grit : Beldar per day 1 no. 100.00
Heating the tar & mixing grit : Beldar per day 5 no. 100.00
Coolie per day 3 no. 100.00
Spreading the premix & making into camber
per day 15 no. 100.00
Beldar
Diversion & watering : Mazdoor per day 2 no. 100.00
Misc.: Mate per day 2 no. 110.00
W/Agent per day 1 no.
Tar, Bitumen and fireman per day 2 no. 105.00
Sundries cartage and other T&P etc.L.S.
Total

782- As in item 781 above but in patches labour required for the work when 25cft. of grit is concumed.
Mate per day 1 1/4 litre 110.00
Beldar (Hot) per day 4 no. 100.00
Coolie per day 4 no. 100.00
Sundries L.S.
Total

783- Cleaning the premix surface & laying seal coat with approved 6mm (1/4") graded grit & bitumen (labour only) including h
paint to required temperature including cartage of material & including maintenance of side patries & watering th
operation as directed by Engineer-in-charge. Take a length of 0.5 furlong. Area covered 330x12=3960 sft.

Labour for cleaning : Mazdoor per day 2 no. 100.00


Coolie per day 2 no. 100.00
Heating and spreading : Beldar per day 4 no. 100.00
Screening graded grit 1/4" : Beldar per day 1 no. 100.00
Spreading grit : Beldar per day 2 no. 100.00
Misc.: Mate per day 1 no. 110.00
Work Agent per day 1/ 4 no.
Tar, Boilerman and fireman per day 1 no.
Sundries cartage and other T&P etc.L.S.
Total

784- As in item 781 above but on water bound surface.


Take a length of 1/2 furlong area 330x12=3960 sft.
Labour for cleaning : Mazdoor per day 10 no. 100.00
Coolie per day 10 no. 100.00
Tack coat Heating and spreading:Beldar per day 6 no. 100.00
Premixing, Screening grit, Beldar per day 1 no. 100.00
Heating and Tar mixing grit : Beldar per day 5 no. 100.00
Coolie per day 3 no. 100.00
Spreading the premix & making into camber
per day 15 no. 100.00
Beldar
Diversion and watering : Beldar per day 2 no. 100.00
Misc.: Mate per day 3 no. 110.00
Work Agent per day 1 no.
Tar, Boilerman and fireman etc. per day 2 no.
Sundries cartage and T&P etc.L.S.
Total

785- Brick soling with straight over burnt bricks lade flat & dry (labour only) including preparation of sub grade to prescribed cam
joints with local earth spreading blinding coat, 1cm. (3/8") depth of local earth over the entire surface & including labour &
required for proper completion of the work. 100sft. preparation of sub grade.

Mazdoor per day 1 no. 100.00


Laying bricks : Mason per day 1/6 no. 160.00
Mazdoor per day 1/ 2 no. 100.00
Spreading earth : Mazdoor per day 1/ 2 no. 100.00
Contractor's profit @ 10% Rs. 6.00
Total

786- As in item 785 above but with brick laid on edge.


Same as in item 785
Add extra mason for laying per day 1/5 no. 160.00
Contractor's profit @ 10% Rs. 1.25
Total
CHAPTER - 21
ANNUAL REPAIRS
Sl. Item of Work
Unit Qnty Rate
No.
1 2 3 4 5.00
791- Maintenance of terraced roofs filling up cracks before rains with approved bituminous filler & stopping leaks during rains
supply of all materials, labour & T&P etc. required for proper completion of the work. Take an area of %o sft.

Cleaning : Coolie per day 1 no. 100.00


Bitumen filling and other minor repairs
Contractor's profit @ 10% Rs. 4.50
Total

792- Maintenance of Allahabad or Frizoni tiled roofs including replacing of broken tiles not exceeding 2% and adjusting misp
before rains and stopping leaks during rains including supply of all materials, labour and T&P etc. required for proper com
work. Take an area of 100sft.
Replacing broken tiles flat
2% of 105 nos. = 2.10
Flat round = 2.10
Total = 4.20 per %o 5 no.
Mason per day 1/20 no. 160.00
Coolie per day 1/20 no. 100.00
Mortar and other sundries L.S.
Contractor's profit @ 10% Rs. 1.66
Total

793- Maintenance of roofs of large size country tiles including replacing broken tiles not exceeding 5% and adjusting misp
before rains and stopping leaks during rains including supply of all materials, labour and T&P etc. required for proper com
the work. Take an area of 100 sft.
Replacing broken tiles flat
5% of 110 nos. = 5.50
Segmental = 5.50
Total = 11.00 per %o 11 no.
Mason per day 1/30 no. 160.00
Coolie per day 1/30 no. 100.00
Mortar and other sundries L.S.
Contractor's profit @ 10% Rs. 1.09
Total

794- As in item 793 above but for roofs of small size country tiles.
Same as in item 793
Add 25% above for small size
Total

795- Relaying large size country tiles roofs with old and new materials including taking down tiles and bamboo, framing,
framing with upto 5% new materials & relaying tiles with upto 25% new tiles including supply of new Bamboos tiles, al
labour and T&P etc. required for proper completion of the work. Take an area of 100sft.

Dismantling as per item no. 699


Materials:Flat tiles 25% of 110no. = 27 no.
Segmental 25% = 28 no.
Total = 55 per %o 55 no.
Bamboos 5% of 40nos. each 2 no.
Chatai 5% of 120 sft. per %o sft. 6 Sqft
Relaying: Thatcher per day 1.50 no. 100.00
Coolie per day 2 no. 100.00
Contractor's profit @ 10% Rs. 23.61
Total
796- Taking down and relaying single Allahabad or frizoni tiled roofs after repairs to raftes & batters including mortar, labour &
required for proper completion of the work (cost of any new wood work, iron work on new tiles required will be paid separa
Dismantling-50% of item (699) as wood work is not to be dismantled.
Relaying Mason per day 1/ 4 no. 160.00
Beldar per day 1/ 2 no. 100.00
Coolie per day 1 no. 100.00
Carpenter per day 1/ 8 no. 160.00
Sundries mortar nails etc.
Contractor's profit @ 10% Rs. 10.70
Total

797- As in item no. 796 above but for double tiled roof.
Dismantling-50% of item (700) as wood work is not to be dismantled.
Relaying per day 1 no.
Beldar per day 1 no. 100.00
Coolie per day 1 no. 100.00
Carpenter per day 1/ 4 no. 160.00
Sundries mortar nails etc.
Contractor's profit @ 10% Rs. 20.12
Total

798- Filling eaves and ridges of Allahabad tiled roof with cememnt mortar consisting of one part of cement and 6 parts of fin
1.25 F.M. including supply of all materials, labour and T&P etc. required for proper completion of the work.

Mason per day 1/40 no. 160.00


Coolie per day 1/40 no. 100.00
Carpenter per day 1/ 4 no. 160.00
Mortar Sundries L.S.
Contractor's profit @ 10% Rs. 0.37
Total

799- Filling eaves and ridges of country tiled roof with mud including mud, labour and T&P etc. required for proper comple
work.
Beldar per day 1/40 no. 100.00
Carpenter per day 1/ 4 no. 160.00
Mud mortar and Sundries L.S.
Contractor's profit @ 10% Rs. 0.11
Total

800- Repair to plaster or pointing in patches including removal of old plaster, racking out joints to 1cm(3/8") depth. Watering the
then replastering or repointing with the same mortar in proportion of mortar as the existing surface, including supply of all
labour and T&P etc. required for proper completion of the work.
Add to the respective item in chapter 13 for
plaster and pointing.
Add 25% more to the existing respective rate
being work in patches.

801- Repair to 2.5cm.(1") cement concrete flooring patches including digging upto 10cm (4") depth renewing 8cm. (3") base
consisting of the part cement, 4 parts approved fine sand of 1.25 F.M. and 8 parts of 1.5" gauge brick ballast as in
consisting of 1 part cement 2 parts approved coarse sand & 4 parts approved stone grit including supply of all materials,
T&P etc. required for proper completion of the work.

Add to item 601 in chapter 14 for flooring. Add


25% more to the rate of the item 25%.

802- Cleaning silt from road culvert upto 6 metre (20') span & in length of 18 metre (60') & throwing the earth silt to the place w
boundary including dressing leveling & ramming the same as directed by the Engineer-in-charge. Take a culvert of 10' sp
width & the depth of silt 1ft. average of each work 60x10x1=600cft.
Labour for %ocft. Mistri per day 1/ 8 no. 170.00
Beldar per day 8 no. 100.00
Coolie per day 10 no. 100.00
Dressing and Ramming L.S.
T&P and other Sundries L.S.
Contractor's profit @ 10% Rs. 54.81
Total

803- Cleaning of well and throwing the silt to the place as directed by Engineer-in-charge including dressing leveling and ra
same. Take a well of 3' internal dia.
Sinker per day 1/ 2 no. Well sinke
Beldar per day 1 no. 100.00
Coolie per day 2 no. 100.00
T&P and Sundries L.S.
Contractor's profit @ 10% Rs. 12.00
Total

804- Sweeping coimney and throwing the refuse etc. beyond a distance of 60metre (200ft.) as directed by Engineer-in-charge .

Coolie per day 1/ 3 no. 100.00


Sundries L.S.
Contractor's profit @ 10% Rs. 1.08
Total

805- Blinding panes of glass including supply of all materials, labour and T&P etc. required for proper completion of the wor
area of 100 sft.
Rate of ordinary paint 1 coat (Based as S.I.
per sft. 100 sft.
641)
Add 25% being smaller work
Total

806- Renewing panes of glass including supply of glass 64kg (21oz) with putty & brad including supply of all materials labour &
required for proper completion of the work.
21oz. Ground glass per sft. 1 sft.
Breakage 5%
Fixing L.S.
Contractor's profit @ 10% Rs. 1.22
Total

807- Cleaning doors and windows with ordinary oil and water including supply of all materials, labour and T&P etc. required
completion of work.
Beldar per day 1/ 4 no. 100.00
Mustared oil per day 1/ 8 sees
Sundries T&P L.S.
Contractor's profit @ 10% Rs. 1.41
Total

808- Taking down punkhas (Labour only)


Beldar per day 1/ 5 no. 100.00
Sundries T&P L.S.
Contractor's profit @ 10% Rs. 0.67
Total

809- Hanging punkha (Labour only)


Beldar per day 1/ 3 no. 100.00
Sundries T&P L.S.
Contractor's profit @ 10% Rs. 1.10
Total

810- Easing doors and windows


Carpenter per day 1/ 9 no. 160.00
Sundries T&P L.S.
Contractor's profit @ 10% Rs. 0.75
Total

811- Renewing door cleats including supply of all materials labour and T&P etc. required for proper completion of the work.

Iron Hings with Screws each 1 no.


Cleat with labour etc. L.S.
Contractor's profit @ 10% Rs. 0.57
Total

812- Fixing panes of glass with and including putty and brads and including supply of all materials, labour and T&P etc. re
proper completion of the work.
Glazer can fix 30 glasses of 1'x1'. Hence for 1sft.1/30 Glazer is required.
Glazer per day 1/30 no. 120.00
Sundries , putty and brad etc. L.S.
Contractor's profit @ 10% Rs. 0.28
Total

813- As in item no. 812 above but with wooden beading. Carpenter can fix 25 Glasses of 1'x1'. Hence for 1sft. 1/25 carpenter is

Carpenter per day 1/25 no. 160.00


Sundries, Beading and Screws L.S.
Contractor's profit @ 10% Rs. 0.62
Total

814- Cleaning panes of glass with sorit and or caustic soda including supply of all materials labour and T&P etc. required
completion of the work.
Glazer can clean 60 glasses of 1'x1'. Hence for 1sft.1/60 Glazer is required.
Glazer per day 1/60 no. 120.00
Spirit, Caustic soda etc.
Contractor's profit @ 10% Rs. 0.10
Total

815- Labour for fixing door bolts on hinges or tower bolts or hasp and stopels or handles etc. to doors and windows. Carpenter
such type or doors or windows fiting in a day. Hence for one fiting 1/24 carpenter is required.

Carpenter per day 1/24 no. 160.00


Contractor's profit @ 10%
Total

816- Opening and refixing 10cm (4") rain water down pipes after cleaning including supply of all materials, labour and T&P et
for proper completion of the work.
Take a length of 6 rft. Carpenter per day 1/ 8 no. 160.00
Coolie per day 1/ 8 no. 100.00
Sundries, nails etc. L.S.
Contractor's profit @ 10% Rs. 1.42
Total

817- Painting letters upto 25cm. (1") size including supply of all materials labour and T&P etc. required for proper completion o
One painter can write 250 letter in a day, hence cost per letter comes.
Brush, Paint, Sundries etc. per day 250 no. 140.00
Contractor's profit @ 10%
Total

818- As in item 817 above but size above 2.5 cm. (1") but upto 8cm. (3"), one painter can write 125 letters in a day hence cos
comes at Rs. 5.00 per day.
Brush, Paint, Sundries etc.
Contractor's profit @ 10%
Total

819- As in item 817 above but size above 8 cm. (3") but upto 15cm. (6"), one painter can write 100 letters in a day hence cos
comes at Rs. 5.00 per day.
Brush, Paint, Sundries etc.
Contractor's profit @ 10%
Total

820- Repainting letters upto 2.5cm. (1") size including supply of all materials labour and T&P etc. required for proper comple
work. One painter will re-write 500 letter in a day, hence cost per letter comes at Rs. 5.00 per day.

Brush, Paint, Sundries etc.


Contractor's profit @ 10%
Total

821- As in item 820 above but size above 2.5 cm. (1") but upto 8cm. (3"), one painter will re-write 250 letters in a day henc
letter comes at Rs. 5.00 per day.
Brush, Paint, Sundries etc.
Contractor's profit @ 10%
Total

822- As in item 820 above but size above 8 cm. (3") but upto 15cm. (6"), one painter will re-write 150 letters in a day hence cos
comes at Rs. 5.00 per day.
Brush, Paint, Sundries etc.
Contractor's profit @ 10%
Total

823- Varnishing or polishing furniture with high grade varnish or polish after sand papering, including supply of all materials l
T&P etc. required for proper completion of the work.
Take different type of furniture in working out the average rate.
Name of furniture
Table
Chair
Stool
Towel rack
Pillar (Bed)
Tea Table
Wash hand Basin
Total
Add 25 per% for smaller area
Total

824- Repainting road direction posts (including) lettering with super varnish or valspar or enamel paint, including supply of al
labour and T&P etc. required for proper completion of the work.
Post to be painted in alternate stips of 20 cm.
(9") with black and white paint.
Painting angle 3"x3"x3/8" in a height 9ft.
Area of paint 11/12x1x9
Direction plates 2x2x1/2x5/2
Total
Add 10% extra
say 15 sft. per % sft. 15 sft.
Re-painting letters up to 3" each 25 no.
Total
Contractor's profit @ 10%
Total
825- Repainting of road caution Boards or village name plates, including lettering with super varnish or valspar or enam
including supply of all materials labour and T&P etc. required for proper completion of the work.
Post to be painted in alternate stips of 20 cm.
(9") with black and white paint.
Painting angle 3"x3"x3/8" in a height 9ft.
11/12x1x9
Traingle portion 2x1/2x15/12x15/12
Ractangular Plate 2x1x2x15/12x18/12
Total
Add 10% extra
Total

826- As in item 825 above but when plates are enamelled


Area of paint would be
Add 10% extra
Total
Contractor's profit @ 10%
Total

827- Repainting and relettering of furlong stones of P.W.D. standard design with approved enamel paint of superior quality
supply of all materials labour and T&P etc. required for proper completion of the work.
Area of painting of a standard Furlong stone
5/3x1
Add 10%
Total
Say 2 sft. per % sft. 2 sft.
Relettering letters up to 6" each 1 no.
Total

828- Repainting and relettering of milestones of P.W.D. standard design with approved enamel paint of superior quality, includ
of all materials labour and T&P etc. required for proper completion of the work.
Repainting 2x1.3/4"x1/3"
1x2x31/3
Total
Relettering (average) each 50 no.
Total

829- Repainting and relettering number plates on ends of parapets of culverts in letters from 2.5cm. To 8cm. (1" to 3") with sup
or valspar, or enamel paint, including supply of all materials labour and T&P etc. required for proper completion of the wor
Area of painting 4x1.5x0.5 per % sft. 3 sft.
Relettering letters up to 3" each 12 no.
Total

830- As in item 827 above but for furlong stones of I.R.C., standard design as prescribed for national highway.
Painting (9"+4")2x1.3" = 2.7 per % sft. 3 sft.
Relettering (average) each 6 no.
Total

831- As in item 828 above but for large size miles stones of I.R.C., standard design as specified for every fifth mile stone
highway.
Repainting 2x4x3=24 per % sft. 28 sft.
0.5x4x2= 4
Relettering (average) each 60 no.
Contractor's profit @ 10%
Total
HAPTER-1

f Contractor's profits 5% Contractor's Profit may be given while taking the


. The rates include Octori, Royalty and sales tax etc. and cartage up to 8

c) Bricks (III class


d) Bricks (sundried)

a) 5.00 cm gauge

a) upto 6 mm. dia.


b) above 6 mm. and upto 13 mm. dia,
c) above 13 mm. and upto 25 mm. dia

Bottle nuts 13mm.to 22 mm.dia.15cm.long

a) 2.5 cm. upto 4 cm. dia


b) above 4 cm. and upto 8 cm. dia
Bailies Sal
a) 8 cm. (Mean) dia.
b) 10 cm.
c) 12.5 cm.
d) 15.00 cm.
e) 20.00 cm.

Cusstic soda

Cotton (string)
a) Distemper (oil) in paste of best quality
b) Dry Distemper ordinary of best quality
Glass ordinary

slab and rolls sizes.)


i) Fibre-glass (density 24 kg/m2) of 25 mm. thickness for ceiling
ii) - do 40 mm.
iii)- do 50 mm.
iv)- do 65 mm.
v)- do 75 mm.
vi) Fibre-glass (density 32 kg/m2) of 25mm. thickness for walls
vii)- do 40 mm.
viii)-do 50 mm.
ix)- do 65 mm.
x)- do 75 mm.
(b) Thermocole insulation

a) Lead white best qualiry (safeda)


b) Lead red powder (sindoor)

a) M S Flat angles Tand like wise..


b) M.S. Rounds up to 12 mm dia
c) M.S. Romnds above 12 mm. dia
d) R. S. Joits
e) G. I. Barbed wire
f) Sheet Galvanized plain 20 B. W. G
g) Sheet Galvanized Corrugated 24 B. W. G. plain
h) Sheet black iron plain
i) upto 8 mm. dia.
i) upto 8 mm. dia.
ii) above 8 mm. and upto 14 mm
iii) above 13 mm. and upto 50 mm
j) Galvanized iron wire gauge
k) Expanded metal 2.00 cm. mesh 1.6/17 gauge Marble chips 3 mm. size.
Marble chips 3mm. size.

Marble dust
Masonite sheet 3 mm. thick
Nails (country)
Nails (wire)
a) Oil (linseed double boiled)
b) Oil (Turpentine)
Paints (of superior quality )
a) Paint (Anti corrosive Bituminous).
b) Paint Black Japan
c) Superior ready mixed, paints for wood
or steel (All colours)
d) Ordinary quality ready mixed paint
e) Paint Ready mixed (Enamel) for floors.
f) Dry colours for cement floors.
i) Dark green oxide
ii) Deep black oxide
iii)Blue oxide
iv)Chocolate exide
g) i) Red oxide primer surfacer for steel
ii) Red lead paint ready mixed for roofs.
h) Paint enamel (synthetic)
i) Paint (aluminium)
j) i) Paint primer for wood
ii) Paint primer for metal
k) Road marking paint (spirit base)
l) i) Cement primer
ii) Water proof cement paint
m) Varnishes
i) Clear synthetic.

iii) Ordinary
Water proofing compound
Polish (Mansion or wax)
a) Pipe (A.C. Rain water) 8 cm.internal dia. of 6' length each
b) do 10 cm dia
c) do 15 cm dia

a) Pipe (A. C. Bend and shoes) 8 cm. dia. Plain


b) do 10 cm. dia
c) do 15 cm. dia
d) Pipe(A. C. Bend with access door)8 cm. dia
e) do 10 cm. dia
f) do 15 cm. dia

a) SheetsfAsbestos corrugated)grey 6 mm. thick


b) do (Asbestos plain) grey do
c) do(A. C. Ridges)
d) (Gutters)

a) Pipe Rain water (Cast iron) 5 cm. dia.


b) do 10 cm. dia
a) Pipe Rain water(C. I. Rose) 5 cm. dia.
b) do 10 cm. dia.
c) Pipe Rain water(C. I. Head) 5 cm. dia.
d) do do 10 cm. dia.
e) Pipe Rain water (C. I. Shoes) 5 cm. dia.
f) do do 10 cm. dia.
g) Pipe Rain water(C. I. Bend) 5 cm^ dia.
h) do do ' 10 cm. dia

a) Rope (Moonj)
b) do (Hemp)
c) do (Cotton)
d) do (G. I. Wire) 7 ply 2.5 cm. dia.

Sheet(celotex or equivalent) 13 mm. thick

a) Stone (Mirzapur) undressed


b) Stone (Mirzapur) upto 5 cm. thick flag ..
Whiting?
a) Washer (limpet)
b) Washer (Bitumen)
c) Washer (G. 1.)
Wood preservative

a) Wood Chaukhat sections (CP Teak)


b) Wood Chaukhat sections (Shisham)
c) Wood Chaukhat sections (Indian sal)
d) Wood Chaukhat sections (Deodar)
e) Wood Chaukhat sections (Kail)
f) Wood Chaukhat sections (Country)
g) Wood Chaukhat sections (Chir)
a) Wood Planks (C.P.Teak)
b) Wood Planks (Shisham)
c) Wood Planks (Indian-sal)
d) Wood Planks (Deodar)
e) Wood Planks (Kail)
f) Wood Planks (Country)
g) Wood Planks (Chir wood)
HAPTER-2

Rate

Well sinker

Mote or charsa including two bullocks, one driver and one puller

Sawyer per pair

HAPTER-3

Rate

4.00
ding loading and unloading but excluding stacking on Pucca Roads.

2.91

0.56

0.43

0.31
0.21

0.17

0.16

es as per U.P. Parivahan Ayukta(Tech) U.P. letter no. 7329 TR dt. Jan 27

duce the above rates by 15%

1.66

1.65
0.32

0.35
0.24

0.25
0.18

0.20
0.12

0.15
0.10

0.10
0.09

0.09

le oil or other such material.


drums. The average weight carted shall be 5 Tons per 7 Tonner Truck per

2.33

1.65
0.45

0.35
0.34

0.25
0.25

0.20
0.17

0.15
0.13

0.10
0.13
0.09
0.73

0.14

0.11
0.08

0.05

0.04

0.04

2.33

0.45

0.34

0.25

0.17

0.13
HAPTER-4
rk and Excavation
Cost
6.00
sand) including lift upto 1.5 metre (5 fts.) and lead upto 30 m. (100 fts) &
h into the trenches or into the space between the building and the sides of
d disposal of surplus earth as directed by the Engineer-in-charge upto a

21.25
600.00
1190.00
21.25
23.00
185.55
2041.05
72.10

ith moorum/shingle kankar requiring the use of special T & P such as

21.25
800.00
700.00
28.33
46.10
159.57
1755.25
62.00

cavation to be in the form of regular pits not exceeding metre (20") in


layers, including ramming & dressing the surface to required levels and
100") lead. The earth from cutting to be used in making embankment or to
tance as directed by the Engineer-in-charge.

11.00
200.00
300.00
21.25
12.50
12.30
600.00
115.71
1272.76
45.00

ead or part of 30 m. (100 ft.) or for every additional 1.5 m. (5 ft.) lift or part

200.00
6.10
163.96
1803.52
63.70
tity of sand from a distance not exceeding 8 km. (5 miles) from the site of
de cost of all materials. labour and T & P etc. required for proper

0.00
300.00
500.00
97.50
15.40
97.66
1074.26
37.90

eton analysis based on hill soil mixed with gravel and boulder. Schedule of

21.25
1000.00
700.00
42.50
15.40
177.92
1957.07
69.10

in Bundelkhand area requiring use of special tools and plants such as pick

21.25
800.00
600.00
28.33
15.40
146.50
1611.48
56.90

0.00

0.00

ut to limited quantities of work excavated in these difficult conditions.

s grass,bush,wood trees and saplings of girth upto 30 cm. measured at a


bish upto a distance of 50 metres out side the periphery of area cleared.
sis of 1S55 schedule).

100.00
50.00
15.40
16.54
181.94
6.40
HAPTER-5
Concrete
Cost
6.00
kar lime, in foundations and under floors, including supply of all materials,
work.

1982.00
3662.67

21.25
53.33
300.00
300.00
65.00
21.25
46.10
806.93
5644.67
806.93
6451.60
96.77

654.84
7203.21
2544.17

e and surkhi in foundations and under floors in the proportions of 100 : 16 :


c. required for proper completion of the work (unslacked lime brought to

1982.00
8250.00
297.30

21.25
53.33
300.00
300.00
65.00
21.25
46.10
806.93
10529.30
806.93
11336.23
170.04

1150.63
12656.90
4470.42

al sand of 1.25 Fineness modulous and cement in proportion of 12:6:1 in


rials, labour and T & P etc. required for proper completion of the work.
1982.00
611.52
1440.00
4033.52

100.838
4134.36

21.25
53.33
300.00
300.00
130.00
21.25

124.00
949.83
4134.36
949.83
5084.19
76.26

516.05
5676.50
2004.94

1982.00
637.00
1800.00
4419.00
110.48
4529.48
949.83
4529.48
949.83
5479.31
82.19

556.15
6117.66
2160.76

1982.00
637.00
2092.50
4711.50
117.79
4829.29
949.83
4829.29
949.83
5779.12
86.69
586.58
6452.40
2279.00

item no. 271. 129.67 per%cft Extra labour for lift and pinning.

100.00
400.00
38.40
538.40
7203.21
538.40
8.076
53.84
7803.52
2756.2
m. (1") gauge including raking a shallow drain on the edge if desired by the

2123.00
1331.88

nd surkhi in the proportion of 100:18:36 in roof terracing, including supply of


mpletion of the work (Unslacked lime brought to powder to be used).

1982.00
1664.85

269.20
297.30
4213.35

21.25
53.33
400.00
600.00
65.00
21.25
69.10
1229.93
4213.35
1229.93
5443.28
81.65
5524.93

552.49
6077.42
2146.50
ne ballast, approved coarse sand and cement in the proportion of 4 : 2 : 1
uired for proper completion of the work.

3881.70
859.95
4252.50
8994.15
127.81
9121.96

17.00
80.00
400.00
400.00
260.00
17.00

322.40
1496.40
9121.96
1496.40
10618.36
159.28

1077.76
11855.41
4187.30

3967.96
888.62
2857.50

1.

4054.22
917.28
2205.00
ts, shelves and similar small work with cement, approved coarse sand and
on of 1:2:4, excluding supply of reinforcement and its binding but including
ding wire, and including the cost of binding wire, moulds and all other
letion of the work.

3409.20

680.00

m. (3/4") gauge approved stone ballast in the proportion of 1:2:4 in lintels of


and its binding but including its fixing and binding the same with 24
ng and shuttering etc. and also including supply of all materials, labour and
ding wire cost being included in the item.

3409.20

340.00

283

ng spans above 6 m. (20')


spans above 6 m. (20').

d footing with 4 cm. (1.5") gauge approved stone ballast.

ofs and R. C. C. columns.

1/2 : 3.

189.40
47.78
1046.25

d. Deduct from item 282 to


238.64
61.15
297.00

ballast in schedule item no.272 to 276, instead of 4 cm. (1.5") gauge brick

#VALUE!
0.00

one ballast in schedule item no. 279 to 281 instead of 4 cm. (1 and 1/2f)

0.00
0.00
HAPTER - 6
RICK WORK
Cost
6.00
plinth including supply of all materials, labour and T & P etc. required for

3510.00
3329.70

28.33
320.00
200.00
200.00
65.00

ortar in foundation and plinth including supply of all materials, labour and T

3510.00
218.02
6050.00

mortar in foundation and plinth including supply of all materials, labour and

3510.00
237.84
4400.00
1.25 F.M. mortar in foundation and plinth including supply of all materials,
e work.
3510.00
343.98
843.75

of 1.25 F.M. mortar.


3510.00
343.98
1012.50

f 1.25 F.M. mortar.


3510.00
343.98
#VALUE!

f 1.25 F.M. mortar.


3510.00
343.98
1687.50

d mortar.
3510.00
515.97
1687.50

plinth including supply of all materials, labour and T & P etc. required for
3510.00
0.00

e including necessary cutting and moulding of bricks as required and also


be less than 1 brick thick. Add for extra labour to above items.

160.00
100.00

for extra labour.


160.00
100.00

. Add for extra labour.

80.00
50.00
ra labour.

80.00
100.00

310) (310)
0.00

(301) to (310).
0.00
0.00

linth, including supply of all materials, labour and T & P etc. required for

0.00
0.00

28.33
320.00
200.00
200.00
32.50
centering add to items (301 - 307). Extra labour, centering and shuttering

320.00
100.00
200.00

ring & centering add to item 301-307. Extra labour, centering and shuttering

320.00
100.00
250.00

bricks, add to item 301-307. Extra cost of labour, centering and shuttering

400.00
100.00
300.00

lly moulded bricks. Add to item 316. Extra labour required for workmanship

80.00
200.00

/4") projection of first class brick in kankar lime including 12mm (") thick
ch as required and including supply of all materials, labour and T & P etc.

270.00
649.29

3.40
560.00
200.00
10.83

:6 cement and fine sand of 1.25 F.M. Labour as per item no. 318 above.

0.00

63.70

e courses with 6 cm. (21/4") projection in each course in kankar lime with
t.

0.00

0.00
1080.00
1997.82
8.50
1040.00
400.00
16.25
pointing in 1.6 cement and local sand mortar.
1080.00

0.00
522.00

ice, etc, including rubbed finish not exceeding 11.5 cm. (4.5") with (labour

0.00
640.00
300.00

for doors and windows or enlarging existing opening or cutting out brick
ging etc. cleaning site and stacking the dismantled materials at the place as
0 metres (200ft.). Assuming size of opening 5ft. wide and 7 feet height and
ixing pins for proper safety of super structure and removing the came after

100.00
100.00

hin 2 chain as directed by the Engineer-in-charge.


150.00
200.00
14.17

ass brick laid in cement and approved coarse sand mortar 1:3 excluding
fixing in position and binding the same with 24 B.W.G.I. Binding wire and
d also including cost of binding wire, supply of all materials labour and T&P
s in 1:3 brick work in cement and approved coarse sand with 10mm. (3/8")
e sand including supply and fixing of wire netting of required gauge where
P etc. required for proper completion of the work.

0.00

0.00

42.50
25.00

0.00

rick work in circular pillar.

640.00
100.00
APTER - 7
P COARSING
Cost
6.00
approved coarse sand 1:2 with and including water proofing materials as
pecified by the manufacturers, including supply of all materials, labour and
ncluding proper curing and shuttering as necessary.

119.44
585.00
0.00

8.50
40.00
25.00
25.00
16.25

ent concrete consisting of one part cement 1.5 parts approved coarse sand
including water proofing materials as ordered by the Engineer-in-charge in

284.10
517.50
0.00

10.63
240.00
150.00
16.25
APTER - 8

Cost
6.00
e dressed, as in door sills chaukhats etc. laid in mortar consisting for 1 part
ncluding supply of all materials, labour and T&P etc. required for proper

0.00

16.00
4.72
2.08
2.08

3.33
3.13
0.51
1.35

abs 4cm. (1.5") thick with plain moulding on one edge and fine dressed on
ent mortar consisting of one part cement and 6 parts approved fine sand of
T&P etc. required for proper completion of the work. Take stone rough

4571.78
450.00
191.10
1200.00
32.50
170.00
150.00

ajjas 4cm. (1.5") thick with but joint and with exposed surfaces fine dressed
6 parts approved fine sand of 1.25 F.M. including supply of all materials,
work.

0.00
0.00

20.00
0.00

20.00
75.00
16.25
0.00
rushades upto 4cm. (1.5") thick over doors and windows including two
ng in edges of brackets all exposed surfaces to be fine dressed and stone
depth of 15cm. (6") (minimum) with cement mortar consisting of one part
ncluding supply of all materials, labour and T&P etc. required for proper
dth 2"-6"=2.5ft.

0.00

or other approved stone 5cm. to 6cm. (2" to 2.5") thick fixed in cement
corase sand including supply of all materials, labour and T&P etc. required

0.00

80.00

50.00
8.33

13.33
12.50
#VALUE!

#VALUE!
APTER - 9
OOD WORK
Cost
6.00
mple mouldings, straight works as in Chaukhats, including supply of all
etion of the work.

#VALUE!
10.63
80.00
25.00

0.00

0.00

0.00

0.00

0.00

e item 25% above per cu.m.


of trusses, pulins, ceiling joists, etc. including supply of all materials, labour
Deduct from the item (401-406).

40.00
50.00

part panelled & part glazed door and window shutters including supply and
nd adjustment of hinses, bolts, locks, handles, springs, and/or other fitting
o coats of Black Japan on all iron fittings if necessary & including fixing the
.) fittings with necessary screws to be supplied departmentally.

0.00
0.00

21.25
640.00
100.00
24.00

d beading and felt as directed by Engineer-in- charge instead of putty and


equired for proper completion of the work.

#VALUE!
0.00
40.00
12.50

#VALUE!

#VALUE!
0.00

160.00
0.00

0.00

0.00
0.00

0.00

0.00

0.00

0.00
#VALUE!
0.00

21.25
480.00
100.00
30.00

0.00

0.00
0.00

160.00

0.00

0.00
Wood.

0.00

0.00

0.00

0.00

0.00
d door and window shutters in 4cm. (1.5") thick Indian Sal Wood frame
nd including fixing and adjustment of hinses, bolts, locks, handles, springs,
ing painting with tow coats of Black Japan on all iron fittings if necessary.
ally.

0.00

#VALUE!
21.25
480.00
100.00

or and window shutters with panels of heavy quality galvanized iron wire
inch.) mesh or any other size with necessary beading, including supply and
nd adjustment of hinses, bolts, locks, handles, springs, and/or other fitting
ack Japan on all iron fittings if necessary. (Fitting with necessary screws to

#VALUE!
0.00

0.00
0.00

0.00

0.00

ality iron wire gauge or expended metal of heavy quality over windows and
m.x1cm. (3"x3/8") and including supply of necessary screws, all materials,
work.

#VALUE!
0.00
40.00
25.00

ens.

0.00

0.00

0.00
of shisham wood including supply of necessary screws.

0.00
0.00
21.25
160.00
50.00

0.00

0.00

0.00

0.00

0.00
or and window shutters with 1cm. (3/8) thick ply wood rae pressed wood
including fixing and adjustment of hinses, bolts, locks, handles, springs,
ding two coats of Black Japan on all iron fittings if necessary. Fitting with

#VALUE!
0.00
21.25
480.00
100.00

0.00

0.00

m or Sal wood etc.).


#VALUE!

ry wood of Deodar).
#VALUE!

tapur ply or other approved ply wood flush shuters 3cm. (11/4") thick.

6.67
2.38

dows etc.
of glass is used instead of 0.65 kg. (21oz) Deduct from items (409 to 448)

0.00

side only) and commerical lipping approved ply wood flush shutters 4cm.

8.00
5.00

extra to item 477.

ide pelmet with 25mm. (1") diameter wooden curtain rod and brackets top
uding fixing with 25x3m. (1"x1/8") M.S. Flat 10cm. (4") long and plugs etc.

0.00
0.00
20.00
16.00
12.50

#VALUE!
0.00

#VALUE!
0.00

#VALUE!
0.00

e a pelment of 51/4 rft. with 4/1/4' front and 6" on each side wood required

#VALUE!

0.00

26.67
16.00
16.67

0.00
0.00
0.00
0.00

0.00

s instead of wooden curtain rod, in pelmets in Sl. No. 481 and 482 above.

0.00
0.00

0.00
0.00

0.00
0.00

heavy quality 6x9x15mm. With rollers, stop ends and brackets instead of

0.00
0.00

th brackets, plugs etc. wherever required including painting, polishing or

0.00

0.00
0.00

0.00

ets and wooden plugs etc. wherever necessary complete. Take 4.5" length.

#VALUE!
0.00

#VALUE!
0.00

#VALUE!
0.00
APTER - 10
EEL & IRON WORK
Cost
6.00
s which will be supplied free at site but including all labour in handling and

and upto 7.5 metre (24ft.) in height.


5.00
16.00
50.00
100.00

(6cwt.) in weight and upto 7.5 metre (24ft.) in height.

5.00
16.00
50.00
150.00

tre (24ft.).
50.00
50.00

as holding down bolts, hold fasts, tie, rods, gratings etc. (when not included
supply of steel, bolts nuts and wastage etc. and their fixing required for

170.00
105.00
100.00

built up gates, door frames, record racks, roof work, gates etc. wrought to
g where necessary and also including supply of steel, bolts nuts etc. and

170.00
105.00
30.00
100.00
e or reinforced brick work (when not included in and over all rates) wrought
oper completion of the work and including supply of all steel and wastage &

170.00
150.00

0.00

42.50
25.00

85.00
50.00

.75 sq. inch. = 24.20 sq.cu.m.


21.25
12.50

8.50
5.00

(3/8") dia & thickness of plate not exceeding 6mm. (1/4"). Labour for 100

595.00
300.00
100.00

) dia but not exceeding 20mm. (3/4") dia. and thickness exceeding 6mm.
holes.
1020.00
600.00
ete with rose, heads, bends with eye hole, shoes and gratings etc. fixed to
-charge.

0.00
0.00
0.00
0.00

80.00
100.00

ing holes and fixing in required for proper completion of the work.

56.67
35.00

0.00

post after stretchins it, including labour and T&P etc. required for proper
d wire.

85.00
75.00
50.00

abour etc. complete.

0.00
0.00
200.00

electric welding, per rent and cost of machine will be more and output will
t 20%. So rate per rft. = Rs. 2.88 per rft. Say 2.30 per rft. or Rs. 7.50 per

o be done at roof height 10% extra is estimated to account for less output
with from of 40x40x6mm. (1.5"x1.5"x1/4") angle iron, 3.15 mm. (1/8") thick
supply and fixing of necessary fittings, lock rail or 15" length of oxised iron
ming coat of red lead paint on all sides complete.

nal braces.

0.00

#VALUE!

0.00
0.00

0.00
0.00
0.00
0.00
0.00

s and central cross piece. .

0.00
0.00

#VALUE!
0.00
0.00

with vertical channels 20x10x2mm (3/4"x3/8"x1/12) & braced with flat iron
ils fo Tiron 40x40x6mm. (1.5"x1.5"x1/4") with 38 mm. dia. steel pulleys with
plete including applying a priming coat of approved red lead paint.

alysis of rates).

330.00
2040.00
160.00
400.00
400.00
rs with frame and daigonal braces of 40x40x6mm. (1.5"x1.5"x1/4") angle
corners, hooks at top, 25mm. (1") dia. pullyes at bottom 40x40x6mm.
respectively including locking arrangement with handles etc. complete and

alysis of rates).

0.00

0.00

220.00
1190.00
200.00
200.00
20.00

f 80x125mm.(3"x3.5") guage cold rolled M.S. laths inter locked through out
d locks and mounted on specially designed pipe shaft with brackets, side
with push and pull operations complete but excluding the cost of top cover

alysis of rates).
247.50
350.00
40.00

2 for rolling shutters.


alysis of rates).
0.00

alysis of rates).
0.00

nalysis of rates).
0.00

chain & cranks operation for operating rolling shutters

nalysis of rates).
APTER - 11
OOF WORK
Cost
6.00
g supply of hips, ridges and eaves and includings laying them for roof work
r pure kankar lime and also including supplying and laying of Sal wooden
les.
e.

0.00
0.00

0.00
0.00

340.00
3840.00
2400.00
4800.00
1280.00

130.00

f. As above.

g bambod frames containing not less than 4 (40) Bamboos per sq. m. (Per
upply of all materials, labour and T&P etc. required for proper completion of
o frame and chatai.

0.00
0.00
0.00
0.00
0.00
0.00
200.00

0.00

0.00
0.00
0.00

100.00
0.00
200.00

of first class bricks laid in cement mortar consisting of one part cement &
einforcement and its bending but including its fixing in position and binding
tering and shuttering and necessary & also including cost of binding wire,
per completion of the work.

0.00
0.00
0.00
28.33
120.00
75.00
100.00
32.50

0.00
0.00

80.00
100.00
100.00
42.50
25.00
WG in position including supply of all materials, labour and T&P ect required
age.

0.00

0.00
0.00
0.00
0.00
1920.00
1200.00

or iron roofing fixed with jor U bolts 10mm. (3/8") dia. with G.I. Limper and
als, labour and T&P ect required for the proper completion of the work and

0.00

0.00
0.00
0.00
510.00
300.00

n layer of sand & clay over jackarch. Reinforced brick or reinforced cement

0.00

40.00
25.00

ng supply of necessary qnty. of filler, brick tile, all materials , labour & T&P
ngth of 100 rft. Brick tiles for 109 rft. Length.

0.00
0.00
0.00

80.00
50.00
160.00
100.00
of 100 rft.

0.00
0.00
0.00

0.00
320.00
100.00

240.00
150.00
640.00
200.00

d asbestos sheet .

0.00
0.00

0.00
0.00
0.00

340.00
1600.00
800.00

of asdestos sheets.
0.00

170.00
160.00
150.00

Per % sft. or 1lbs. sq.m. including sweeping, cleaning the roof with brushes,
ring it on th surface, spreading of necessary quantity of approved coarse
rials, labour and T&P etc. required for proper completion of the work.
0.00
0.00
50.00

uivelent approved materials at the junction of wall and roof or at any place
essary overlap, giving a coat of approved mastic paint below the tarfelt and
uired for proper completion of the work.

0.00
0.00
0.00
50.00
150.00

ent approved materials over roofs as per direction of the Engineer-in-charge


astic paint on the bottom and top of tarfelt, spreading of necessary quantity
g supply of all materials, labour and T&P etc. required for proper completion

0.00
0.00
0.00
100.00
200.00

nium sheet in walls with necessary cutting shaping of bricks if any, and
e and match painted as per direction of the Engineer-in-charge including
roper completion of the work.

0.00

um sheet & 8" wide tarfelt fixed with termastic in roof or floors joints with
harge including supply of all materials, labour and T&P etc. required for

0.00
APTER - 12
CEILING
Cost
6.00
nks, ceiling including supply of beading 2.5 cm.x4 cm. (1"x1.5") of Deodar
& when necessary but including cost of all materials, labour & T&P etc.
ft. ceiling i.e. for a room 20"x15".

0.00
0.00

340.00
320.00
400.00

per item no. 551.

s per item no. 551.

0.00

beadings 2.5cm.x4cm. (1"x1.5") of Deodar wood, screws. bolts and all


ceiling joints if any required for proper completion of the work. Take a room

0.00
0.00
0.00
0.00

320.00
200.00
0.00

with Deodar beading 20x15 = 300 sft.


0.00

0.00
0.00

Rate as per item 556

0.00

psum) anhyadrous ceiling including providing Kail or Chir wood frames base
of 1.5" x2" at 1'-3" apart & wooden strips 1"x1/4" with 3/8' gap in between
rame and applying one coat of solignum paint or other approved wood
ials labour and tools and plants etc. required for proper completion of the

5 Sl. No. 41).

0.00
480.00
300.00

0.00
#VALUE!
0.00
0.00

0.00
0.00
0.00
0.00
0.00
ck (").
0.00
0.00
APTER - 13
R AND POINTING
Cost
6.00
supply of all materials, labour and T&P ect. Required for proper completion

40.00
25.00
13.00
240.00
150.00
32.50

208.00
100.00
32.50

on brick work including supply of all materials, labour T&P etc. required for

80.00
50.00
32.50

of one part cement & two parts of fine sand of 1.25 F.M.

40.00
25.00
13.00
240.00
150.00
32.50

m item 574..
53.33
33.33

m item 574 and 575.


53.33
33.33
13.00

mortar on brick work in proportion of 1:2, including supply of all materials,


work.
40.00
25.00
13.00
212.80
133.00
43.33

0.00
0.00

atch the brick work colour including supply of all materials, labour and T&P

40.00
25.00
13.00
0.00
150.00
32.50
0.00
0.00

nimum thickness not to be less than 3/8" (10mm.) thick including supply of
mpletion of the work.

120.00
75.00
32.50

0.00
n of 1:2 cement & fine sand of 1.25 F.M.

0.00
0.00

one part cement and two parts of approved coarse sand.

0.00
0.00

25 F.M. mortar in 1:3.

0.00
0.00

se sand in 1:3..

0.00
0.00

25 F.M. mortar in 1:4.

0.00
0.00

25 F.M. mortar in 1:5.


0.00
0.00

25 F.M. mortar in 1:6.

0.00
0.00

te lime, coarse sand and local sand in proportion of 1:1:2:5 complete (per

0.00
0.00
0.00
0.00

rse sand and local sand in proportion of 1:1:2:4.

0.00
0.00
0.00
0.00

g.
40.00

e of 1.25 F.M. mortar in proportion of 1:1:6.

0.00
0.00
0.00
terials, labour and T&P etc. rquired for proper completion of the work.

80.00
50.00
50.00
13.00

h, 1st coat 10mm. (3/8") thick with 1:4 cement and approved coarse sand,
ust 1:1 and final coat 5mm. (3/16") thick with rich lime throughtly slaked &
white marble dust or gypsum alongwith required quantity of matelic oxide to
rials, labour and T&P etc. rquired for proper completion of the work.

0.00
0.00

208.00
130.00
32.50

0.00
0.00
120.00
75.00
0.00
0.00
0.00
0.00
0.00

320.00
200.00
32.50
500.00

alls, pillars and steps etc. rubbed & polished to granolithic finish, base coat
parts approved coarse sand & top coat 5mm. (3/16") thick with one part of
ncluding supply of all materials, labour and T&P etc. rquired for proper
ck coat of white cement and marble chips. Labour and materials per % sft.

0.00
0.00

208.00
150.00
65.00
900.00

op coat coloured as desired by the Engineer-in- charge.

0.00

m. (9/16") thick in one cement & 4 approved coarse sand. The final coat to
on to the green plaster and pressed with large trowel, rubbing materials,
work.

0.00
0.00

0.00
0.00

80.00
100.00
32.50

to plaster items.

0.00
80.00
50.00
16.25

e of one brick walls.


20.00
12.50

consisting of one part yf cement and 2 parts of approved coarse sand laid
t cement or cement and marble dust in ratio of 5:1 including supply of all
etion of the work.

0.00
0.00
40.00
25.00
13.00
0.00
160.00
100.00
48.75

y and horizontally to display the surface as stone facing as directed by the


d for proper completion of the work. Add for extra labour to all items of

106.67
12.50

mortar for plastering or in concrete work in the proportion recommended by

0.00
APTER - 14
LOORING
Cost
6.00
cement, approved coarse sand and 2cm. (3/4") graded approved stone laid
cement or cement and marble dust in 5:1 as specified over & including 8
al sand and brick ballast 4 cm. (1.5") gauge in the proportion of 1:4:8 and
s if any and giving them a uniform finish including supply of all materials,
e work.

0.00
0.00
0.00
21.25
160.00
50.00
50.00
32.50

0.00

0.00

0.00

sisting of brick ballast, white lime and surkhi in ratio of 100.16:32

0.00

ng of brick ballast & kankar lime.

ad of 2.5 cm. (1") thick and proportion of concrete 1:1.5:3 instead of 1:2:4

0.00
0.00
0.00
21.25
240.00
75.00
75.00
43.33

0.00

0.00

0.00

hick instead of 2.5 cm. (1") thick and without base concrete.

0.00
0.00
0.00
21.25
208.00
100.00
75.00
32.50

including supply of extra cement, chapra batti, carborndum stone, all other
pletion of the work. Marble dust shall be added in the floating coat in ratio of
a amount will be paid for it. This includes final finish with french mansion

0.00

800.00

hed floors are laid.

0.00
proved stone flags, set in kankar lime over and including 1 cm. (8") lime
nkar lime stone flags to be of standard size with and including border stone
ne should be fine dressed on upper surface and all edges, joints not to
sed as specified, all other materials, labour & T&P etc. required for proper
bas 3" thick.

0.00

0.00

0.00

21.25
640.00
400.00
16.25

cement and fine sand of 1.25 F.M. mortar with base concrete consisting of
s brick of ballast. As in item no. 608.

0.00
0.00
0.00

e and surkhi 1:2 and base concrete consisting of brick ballast, in one white

ace and edges chiesel dressed and joints upto 6 mm. (1/4") thick. Deduct

0.00
0.00
640.00

400.00
16.25
nsisting one part of cement & six parts of fine sand of 1.25 F.M. & pointed
ck ballast base concrete with kankar lime including supply of all materials,
ork.

0.00
0.00
0.00
0.00
0.00
7266650.00
160.00
100.00
100.00
32.50

te consisting of brick ballast white lime and surkhi in ratio of 100:16:32 . As

0.00

0.00

ete consisting of one part of cement four parts of fine sand of 1.25 F.M. and

0.00

0.00

ncluding preparation of base to proper slope and its ramming and including
proper completion of the work.

50.00
50.00

160.00
100.00
0.00
0.00
0.00
0.00
0.00
17.00
120.00
50.00
100.00
32.50

0.00

0.00

0.00

0.00

0.00
0.00
160.00
100.00

f one part cement, two parts of approved coarse sand and 4 parts of 2 cm.
4") thick surface coat with ordinary cement black, white or grey or mixed
mm. (1/6") mesh screen in proportion of 1:2 as specified or directed by
and finally finished with french manson polish or other approved polish
ding supply of all materials, labour and T & P etc. required for proper

0.00
0.00
0.00
0.00
0.00
0.00
21.25
320.00
200.00
32.50
1500.00

in top 5 mm. (1/4") layer instead of ordinary cement.

0.00
0.00

be made.

0.00

0.00

onsisting of one part of cement 4 parts of local sand and 8 part of brick

sisting of brick ballast, white lime and surkhi in ratio of 100:16:32.

15 mm. (9/16") thick layer of one part cement, 2 part of approved coarse
nary cement, black or white or grey or mixed marble chips passing 3 mm.
oportion of 1:2 as specified or directed by Engineer-in-charge & polished by
on polish or other approved polish including supply of all materials, labour

cement and coarse.


0.00
0.00
0.00
0.00
0.00
0.00

28.33
120.00
75.00
32.50
1500.00

in top 5mm. (3/16") thick layer instead of ordinary cement.

0.00
0.00

o be made.

0.00

0.00

ng or dado laid with 1:3 cement and approved coarse and mortar finished
ncluding supply of all materials, labour and T&P etc. required for proper

0.00
0.00
0.00
0.00
0.00
0.00
200.00

nt quaintity of tiles with mosaic work in light shades are used in floors and

0.00
0.00

nts of floors & skirtings at the time of laying floors, flash with floor level,

on analysis as per S.l. aluminium stirps 16" gauge 1" depth wt. - 10.88 lbs.
cut into streps=10.88lbs.

0.00

160.00
100.00
th aluminium strip, weight = 16.25 lbs. Materials. Aluminium sheet cut into

0.00

luminium strips weight = 21.67 lbs. Materials. Aluminium sheet cut into

0.00

100.00

ss in joints of floors & skirtings at the time of laying floors, flash with floor

ps 1/8" thick.
0.00

trips 3.5mm. (1/8") thick.


0.00

s 1/8" thick.
0.00

eton analysis based on S.l.no. cement concrete, floor, steps, landing etc.
T&P etc. complete. Take 100sft.Area.
53.33
33.33

eton analysis taken from 30x12x2.2mm., (1.5"x0.5"1/10" approx) fixed with


n hold fasts 180 mm. (7") long placed at PWD kanpur office). 150 mm. (6")
ding supply of all materials, labour and T&P complete. Take 100ft. lenght

0.00
0.00
0.00

960.00
630.00
APTER - 15
ND DISTEMPERING
Cost
6.00
ew wood work with one coat or ready mixed priming painting & one coat of
hetic varnish including supply of all materials, labour and T&P etc. required
conform to the I.S.I. no. 103-1950. Details of cost for an area of 650sf.

0.00
210.00
150.00

coat.
#VALUE!
252.00
180.00

oat. Details of cost for 650 sft. area.


#VALUE!
210.00
150.00

nted old wood or steel work.


#VALUE!
303.33
216.67

e coat of ready mixed paint priming one coat of approved paint (British
, labour & T&P etc. required for proper completion of the work. Paint to be
650 sft. priming coat.
#VALUE!
140.00
100.00

#VALUE!
420.00
300.00

t.
#VALUE!
322.00
230.00

viously painted old surface.


#VALUE!
490.00
350.00

gh grade enamel or superior synthetic clear varnish complete one coat over
als, labour nad T&P etc. required for proper completion of the work. Enamel
/133-1950.
#VALUE!
186.20
133.00

on previously treated surface.


#VALUE!
140.00
100.00

including supply of all materials, labour and T&P etc. Required for proper

0.00
17.50
12.50

0.00

52.50
37.50

coat.
0.00

28.00
20.00

old distempered surface.


0.00

35.00
25.00
of all materials, labour and T&P etc. required for proper completion of the

0.00
33.33

on previously treated surface.


0.00
20.00

new wood work, including supply of all materials, labour and T&P etc.

0.00
28.00
20.00

t on previously treated surface.


0.00
28.00
20.00

supply of all materials, labour & T&P etc. required for proper completion of

0.00
105.00
75.00

ic soda, including supply of all matrials, labour and T&P etc. required for

0.00
33.33
33.33

e wax polish or approved french polish after, rubbing down with sand paper
uired for proper completion of the work.

0.00
70.00
50.00
lready wax or french polished with approved realy made wax polish or
abour and T&P etc. required for proper completion of the work.

0.00
42.00
30.00

ed make and quality on new work with two coats to give an even shade,
ired for proper completion of the work. (Skeleton analysis based on 1962

0.00
42.00
30.00
48.75

of cement paint after the first two coats to give an even shade. (Skeleton
97(a).

0.00
10.50
7.50
16.25

/131CB-6/67, dated 15.1.1968 for two coats and three coats are Rs. 16.50

of approved quality on previouslly old treated surface with this paint to give
r and T&P etc. required for the proper completion of the work. (Skeleton
ates) Cost per %sft.
0.00
28.00
20.00
16.25
APTER - 16
COLOUR WASHING
Cost
6.00
abour and T&P etc. required for proper completion of the work.

0.00

9.33
6.67

0.00

14.00
10.00

ats as per item 672.

erials of buff, blue, grey or brown shade, including supply of all materials,
work.

0.00

2 coats 672.
0.00

rials of pink, green or yellow shades.

ron sulphate on coat.


and T&P etc.required for proper completion of the work.
0.00

11.67
8.33

w work, including supply of all materials, labour and T&P etc. required for

0.00

17.50
12.50
0.00
28.00
20.00

the first coat.


0.00
23.33
16.67
APTER - 17
ON & DISMANTLING
Cost
6.00
mantled materials as directed by the Engineer-in- charge within a distance

75.00

mortar and including stacking of materials as directed by the Engineer-in-

200.00
200.00

100.00
100.00

brick work, including stacking of dismantled materials as directed by the


.) .
400.00
400.00
56.67

ofs, including beams & roof concrete & including stacking of dismantled
distance of 60 metres (200 ft.)

200.00
200.00

150.00
150.00

s, including base concrete & including stacking of dismantled materials as


0 metres (200 ft.)
75.00
75.00

d floor.
100.00
100.00
nd battens & including stacking of dismantled materials as directed by the
.)
17.00
100.00
100.00

17.00
200.00
150.00

including purlin battens and vertical supports and including stacking of


distance of 60 metres (200 ft.)
85.00
50.00

ing stacking of dismantled materials as directed by the Engineer-in-charge

85.00
150.00

hold fast and including stacking of materials as directed by the Engineer-in-

16.00
80.00
100.00

of materials as directed by the Engineer-in-charge within a distance of 60

53.33
33.33

excluding hold fast and including stacking of materials as directed by the


.)
53.33
20.00
100.00
as directed by the Engineer-in-charge within a distance of 60 metres (200

100.00
8.13

ar to a depth of 1cm. (3/8") including disposal of refuse as directed by the


.)
75.00

efuse as directed by the Engineer-in-charge within a distance of 60 metres

33.33
APTER - 18
ELL WORK
Cost
6.00
ed coarse sand & 2cm. (3/4") gauge well graded grit, including shuttering,
ng cost of reinforecement & its bending but including its binding to required
P etc. required for proper completion of the work. Binding wire (24B.W.G.I.

ught to required shape & joined as necessary including supply of steel and
n of work as directed by Engineer-in-charge.

170.00
210.00
200.00

0.00

of steel and its cutting, bending and welding etc. & including cost of bottle
y Engineer-in-charge.
170.00
100.00
105.00

0.00

y soil below spring level, including supply, erection & working of all plants
ng & unloading of weight bailing & pumping out water with machinery or

#VALUE!
0.00
400.00

#VALUE!
0.00
500.00

#VALUE!
0.00
700.00

#VALUE!
0.00
1000.00

#VALUE!
0.00
1000.00

#VALUE!
110.00
0.00
400.00

all be calculated proportionatly to their areas.

an increase as given below shall be allowed according to the nature of the


APTER - 19
CELLANEOUS
Cost
6.00
d & fixed in wall with & including cement and approved coarse sand mortar
e same.
#VALUE!
0.00
0.00
6.40
4.00

rds including their fixing to Teak wood plates 10cmx10cmx1cm (4"x4"x3/8")


upplied and fixed in wall with & including cement & approved coarse sand
making a hole for the same.

0.00
0.00
0.00
0.00
0.00
80.00

ng in position.
0.00

ws cleat 10cmx7.5cmx5cm(4"x3"x2") with 5cm. (2") brass hignes including


materials, labour & T&P etc. required for proper completion of the work.

0.00
0.00
53.33
0.00

pes complete with rose head., bends and gratings & includings supply of
walls, with & including supply of 15cm. (6") long 6mm(1/4") dia, nails &
uired for proper completion of the work and also inclucing repair of plaster,
30' length.
0.00
0.00
27.50
120.00
100.00

0.00
0.00

0.00

0.00

mx2.5cm)(3"x3"x1") over blocks of C.P. Teak 8Cmx8cmx12cm(3"x3"x4.5")


ixed in wall with & including cement & approved coarse sand mortar in the
ole for the same.

0.00
0.00
0.00
13.33
8.33
0.00

bricks and fire clay, labour and T&P etc. required for proper completion of

0.00
0.00

640.00
200.00
32.50

elled partition complete with teak wood frames 10cmx8cm(4"x3") top botton
brass screws, cleats, bolts, etc. all materials, labour and T&P etc. required
tions of panels 6'-8' high and 5" wide 6x5=33.33 sft. materials.
0.00

560.00
150.00
21.25
280.00

of straight works in wood work).

0.00

cmx1cm )2"x3/8") deodar or Shisham wood beading including erection &


8cm(4"x3") top bottoms and sides verticals at 1.5m(5') apart & including
als, labour and T&P etc. required for proper completion of work.

0.00

0.00

212.80
160.00
150.00

rk and wood work).


0.00
APTER - 20
OAD WORK
Cost
6.00
ening out stacks, sorting kankar into three sizes repairing patch in existing
ing kankar, making medhi to retain water and ramming and also including
m. (1 furlong) supply & maintenance of barrier, caution posts, light at night
the work, kankar to be supplied to the contractor free at site.

2640x3/8 = 990cft.
200.00
100.00
200.00
200.00
400.00
600.00
800.00
105.00
1155.00
200.00

ng hire and fuel of the roller.

0.00
0.00
200.00

ck ballast.

50.00

ballast.

ast.

including.
75.00
thick, stone ballast. Consider a length of 220 rft. Materials required =

200.00
100.00
300.00
800.00
600.00
0.00
0.00
200.00
200.00

tween 15 Nov. to 31 May.


75.00

as well as the cost of boring to fined kankar strata excluding cartage and

0.00
400.00
300.00

1m (3'-4') high above ground level.


120.00
75.00

s and jhandies as directed by th Engineer-in-charge.

110.00
900.00

with approved road marking paint (spirit base) as directed by the Engineer-
quired for proper completion of the work. Take an area of 100 sft. lines.

0.00
700.00
500.00
d dry including preparation of subgrade to prescribed cambre and including
blinding coat of 1cm. (3/8") depth of local earth of P.I. 5 to 7 or sand over
for proper completion of the work.

0.00
0.00

0.00
0.00

, joints filled with local sand including preparation of base to proper slope
of local sand over the subgrade and including supply of all materials, labour

urface filling upto 8cm. (3") depth and making namunas at every 15cm. (50')
ith side slopes 1:2 etc. for taking the earth to be so dug that they form a
furlong.

110.00
0.00
0.00
1200.00
0.00

0.00
200.00

icks 8cm. (3") wide and 12cm. (4.5") deep laid with mud mortar including
e and in proper alignment and also including dressing & ramming the
ake a stip of 0.5 furlong 2x330=660 rft.

0.00
160.00
100.00
200.00
ing of road materials.
200.00

creening at road side including dressing of side berms as required, where


es (200').
20.00

20.00
50.00

oat) excluding supply of paint & grit including maintenance of side parties
etion of the work as directed by Engineer-in-charge and excluding roller
& tar-boiler man.

100.00
1000.00
800.00
0.00
500.00
200.00
110.00
0.00
0.00

over previously painted surface. The above labour will make an output of
of 1 furlong. Hence rate for % sft. 3 00/2 = Rs. 1.50 or Rs.0.16 per metre.

ng with bitumen covering on furlong.

400.00

ent coats of painting over previously painted surface. The above labour will
do the painting of one furlong. Hence rate for % sft. = 1.30 or Rs. 0.14 per

scraped material to a distance of 30m. (100') as desired by Engineer-in-

100.00

2:4 cement, coarse sand & approved 4cm. (1.5") gauge stone ballast, over
o proper camber & including supply of all meterials, labour and T&P etc.
ed templete as directed by Engineer-in-charge but excluding cost of metal
gth of 33rft. & 4' in depth. qnty. of work involved 33x1.2x1/3=132 cft.

0.00
0.00
0.00
0.00
28.33
320.00
110.00
1200.00
200.00
80.00
100.00
100.00
110.00
800.00
100.00
0.00
0.00
0.00
0.00
300.00
300.00

coarse sand & stone ballast (labour only)

arth by spreading evently to an average depth of 1.5 cm (9/16") & filling the
for taking the earth that they form continuous side drain at road boundary.
0cft.
0.00

width of 0.5m. (20") on either side according to patri template including


ng the earth that they form a continuous side drain at road boundary.

0.00

cking out the joints & removing the old Tar and other material with suitable
) Total Joints at every 33' joints to be filled would be 5280/33 = 160 nos.

82.50

600.00
100.00

o 14 Nov. by hand rammer including opening out stacks, picking out old
m. (2") wide drain around the patch upto depth of 12cm. (4.5") including
ankar & including stacking the unserviceable materials & basi-chot next day
e. Take a patch of 5'x5' fresh metal to be used 5x5x1/4'=6.3 cft.
3.67
26.67
10.00

only) including heating of paint upto required temperature, pouring it on th


ard with hand roller or rammer & also including cleaning with brush etc. the
rectangular shape & spreading the dismantled material on the patries as
patch work is carried out upto a stage when 0.5 ton tar is used per year per
=10,000 sft. Grit to be consumed 120x2.25-270 cft.

cft. Say 25 cft.


110.00
400.00
400.00

m. (3/4") thick over a tack coat with graded approved grit & bitumen (Labour
g either in mixer or in hand drum including cartage of material maintenance
er completion of work as directed by the Engineer-in-charge. Take a length

600.00
600.00
400.00
100.00
500.00
300.00
1500.00
200.00
220.00
0.00
210.00

he work when 25cft. of grit is concumed.


137.50
400.00
400.00

roved 6mm (1/4") graded grit & bitumen (labour only) including heating the
aterial & including maintenance of side patries & watering them during
th of 0.5 furlong. Area covered 330x12=3960 sft.

200.00
200.00
400.00
100.00
200.00
110.00
0.00
0.00

1000.00
1000.00
600.00
100.00
500.00
300.00
1500.00
200.00
330.00
0.00
0.00

(labour only) including preparation of sub grade to prescribed camber filling


) depth of local earth over the entire surface & including labour & T&P etc.
ration of sub grade.

100.00
26.67
50.00
50.00

32.00
APTER - 21
UAL REPAIRS
Cost
6.00
ains with approved bituminous filler & stopping leaks during rains including
per completion of the work. Take an area of %o sft.

100.00

g replacing of broken tiles not exceeding 2% and adjusting misplaced tiles


pply of all materials, labour and T&P etc. required for proper completion of

0.00
8.00
5.00

ng replacing broken tiles not exceeding 5% and adjusting misplaced tiles


pply of all materials, labour and T&P etc. required for proper completion of

0.00
5.33
3.33

les.

ew materials including taking down tiles and bamboo, framing, renewing


h upto 25% new tiles including supply of new Bamboos tiles, all materials
work. Take an area of 100sft.

0.00
0.00
0.00
150.00
200.00
d roofs after repairs to raftes & batters including mortar, labour & T&P etc.
ew wood work, iron work on new tiles required will be paid separately).
dismantled.
40.00
50.00
100.00
20.00

dismantled.
0.00
100.00
100.00
40.00

memnt mortar consisting of one part of cement and 6 parts of fine sand of
P etc. required for proper completion of the work.

4.00
2.50
40.00

including mud, labour and T&P etc. required for proper completion of the

2.50
40.00

l of old plaster, racking out joints to 1cm(3/8") depth. Watering the area and
roportion of mortar as the existing surface, including supply of all materials,
e work.

ncluding digging upto 10cm (4") depth renewing 8cm. (3") base concrete
and of 1.25 F.M. and 8 parts of 1.5" gauge brick ballast as in C.C. floor
d & 4 parts approved stone grit including supply of all materials, labour and

in length of 18 metre (60') & throwing the earth silt to the place within road
e as directed by the Engineer-in-charge. Take a culvert of 10' span & 60' in
x1=600cft.
21.25
800.00
1000.00

rected by Engineer-in-charge including dressing leveling and ramming the

#VALUE!
100.00
200.00

a distance of 60metre (200ft.) as directed by Engineer-in-charge .

33.33

, labour and T&P etc. required for proper completion of the work. Take an

0.00

(21oz) with putty & brad including supply of all materials labour & T&P etc.

0.00

r including supply of all materials, labour and T&P etc. required for proper

25.00
0.00

20.00

33.33
17.78

bour and T&P etc. required for proper completion of the work.

0.00

ds and including supply of all materials, labour and T&P etc. required for

azer is required.
4.00

enter can fix 25 Glasses of 1'x1'. Hence for 1sft. 1/25 carpenter is required.

6.40

including supply of all materials labour and T&P etc. required for proper

Glazer is required.
2.00

asp and stopels or handles etc. to doors and windows. Carpenter can fix 24
one fiting 1/24 carpenter is required.

6.67

fter cleaning including supply of all materials, labour and T&P etc. required

20.00
12.50

ll materials labour and T&P etc. required for proper completion of the work.
letter comes.
35000.00

o 8cm. (3"), one painter can write 125 letters in a day hence cost per letter
15cm. (6"), one painter can write 100 letters in a day hence cost per letter

of all materials labour and T&P etc. required for proper completion of the
cost per letter comes at Rs. 5.00 per day.

pto 8cm. (3"), one painter will re-write 250 letters in a day hence cost per

15cm. (6"), one painter will re-write 150 letters in a day hence cost per letter

or polish after sand papering, including supply of all materials labour and

rate.

super varnish or valspar or enamel paint, including supply of all materials


work.

0.00
0.00
ates, including lettering with super varnish or valspar or enamel painting
ired for proper completion of the work.

standard design with approved enamel paint of superior quality, including


oper completion of the work.

0.00
0.00

ard design with approved enamel paint of superior quality, including supply
ompletion of the work.

0.00

apets of culverts in letters from 2.5cm. To 8cm. (1" to 3") with super varnish
als labour and T&P etc. required for proper completion of the work.
0.00
0.00

ndard design as prescribed for national highway.


0.00
0.00

I.R.C., standard design as specified for every fifth mile stone of national

0.00

0.00