INTERNATIONAL TECHNO COMMERCIAL TENDER
FOR CIVIL AND ALLIED WORKS
PART II BILL OF QUANTITIES
DUE DATE FOR SUBMISSION: ON OR BEFORE 6th August, 2008 at 15.00 Hours
TO BE SUBMITTED TO:
The Chairman & Managing Director
TIDEL Park Coimbatore Ltd
(First Floor TIDEL Park)
4, Rajiv Gandhi Salai,
Taramani, Chennai - 600 113.
Telephone No.: +91 44 22540500/501
Tax No.: +91 44 22541744
M/s._________________________
Address_____________________
____________________________
JULY 2008
1 The Preamble to the Bills of Quantities and Bill of Quantities must be read with the Drawings, Conditions of
Contract and the Specification and the tenderer shall be deemed to have examined the Drawings,
Specifications, Conditions of Contract and to have acquainted himself with the Works to be done and the
way in which they are to be carried out. This preamble to the Bills of Quantities shall form part of the
Contract.
2 Notwithstanding that the work has been sectionalised every part of it shall be deemed to be supplementary
to and complementary of every other part and shall be read with it or into it so far as it may be practicable to
do so.
3 The description of an item shall be deemed to include all preambles, headings, sub-headings and
references to other documents. The detailed description of work and materials, given in the Specification
are not necessarily repeated in the Bill of Quantities.
4 The rates for all items shall be quoted and priced in Indian Rupees only. Prices inserted in this BOQ are full
including cost of the work described and of the obligations setforth in the tender document. Rates should be
quoted both in Figures & words in Columns specified. In case of discrepency between the rates quoted in
figures and in words, lower of the two shall be considered. While quoting the rates for the items covered
under bill of materials, the tenderers should carefully read the Preamble under the respective heads also
and quote the rate accordingly.
5 Tenderers are instructed to quote "rate only" for all QRO items without fail and not to enter any amount in
the amount column. The rates quoted under QRO items is negotiable during the evaluation of the tender
and the rationalised rate only will be considered if there is a need to operate QRO items during execution.
Any percentage of discount / rebate offered by the tenderer during negotition is applicable on all the quoted
rates of the tendered items including "QRO" Items.
6 Each individual item in the Bill of Quantities is to be priced or if any items are not priced it is to be indicated
under which item or items the value of the work has been included. If the tenderer omits to quote an item
the cost of the work of such item shall be held to be spread over and included in the prices given for other
items and the tenderer should compulsorily execute that item for full quantity given in the bill of quantities at
free of cost, if the tenderer gets the work. However the successful tenderer shall quote the rates for such
items and get approved by the Employer. In such case such items are not required to be executed full / part
quantity, the successful tenderer shall pay appropriate amount for the quantity at the accepted rate to the
Employer. Tenderer should not mark items as "included" when the rate is asked for. Exactly similar items
in indivitual sections/sub-Head shall be priced similarly.
7 The rate entered against each item in the Schedule of Quantities shall be binding through out the Contract
and shall not be changed on account of any discrepancies or inaccuracies in the estimated quantities or any
other cause. All prices quoted shall be firm for the entire duration of the contract except cement &
reinforcement steel. The Contractor shall when contracting satisfy himself that the quantities are reasonably
correct within the scope of work. If there is any discrepancy, he should at once notify the Employer, so that
the matter can be examined, and if necessary altered before tenders close.
8 For the sake of convenience the Bill of Quantities is sectionalised to cover one structure or a group of
structures.
9 Unit Rates will be used as basis of payment for schedules and variation orders.
C.R.Narayana Rao
Architects & Engineers 1 1. General
Tidel,Coimbatore Preamble to Bills of Quantities
10 Cost of all materials, labour, equipment required, tools & plants required, conveyance, infrastructure facilities
required including heavy excavation machinery with supporting transport facility either own or leased, shall
be included in the quoted rates elsewhere. Contractor shall provide Steel pipe double Scaffolding to carry
out their works during execution of the project in good and operational condition within the Quoted Rates.
11 Rates and prices shall be quoted considering as SEZ Project set against items are to be the full inclusive
value of the finished work shown on the Drawings and/or described in the specification or which can
reasonably be inferred therefrom and are to cover the cost of marking layout of buildings for excavation,
fixing permanent grid points, establishing bench mark, provision of plant, labour, supervisions, materials,
erection, insurance cover for Third Party Liability and workmen compensation and other applicable
insurance cover , maintenance, overheads and profits and every incidental and contingent cost and charges
whatsoever. (in accordance with general conditions of contract Part - 1 of tender documents) and every
kind of temporary work executed or used in connection therewith and all the Sub Contractor's obligations
under the sub contract and all matters and things necessary for the proper completion and maintenance of
the Works.
The Tender will be finalized based on the competitive rates quoted for the total value of work including
materials, labour, services, etc. However break up details of materials, labour, services and also
taxes/duties to be provided as per the format enclosed for reference. The Owner shall not pay more than
the amount eligible to the contractor for SEZ Project.The SEZ benefits with respect to the duties and taxes
should be extended to the Owner. More over the contractor should furnish the total quantities of materials to
be used for the project with respect to source viz. local/imported to be clearly specified in the document for
indicative purpose. The contractor shall place the order for the materials/equipments after getting prior
approval from Owner.
The rates quoted in the price bid shall be firm and shall not be subject to variations in costs of any
or all inputs, such as but not limited to, materials, labour, exchange variations, labour conditions,
fluctuations in freights (including sea/road/railway) or any conditions whatsoever. No claim in
respect of any taxes or duties or levies as existing or future shall be entertained by the Owner. It
is expressly provided that the materials as above shall not include cement and reinforcement steel
for which price adjustment will be considered by the OWNER as per the terms and conditions
below :
The price adjustment clause will be applicable for cement and reinforcement steel items only. The
bench mark price for cement and reinforcement steel are fixed as given below, which include cost
of materials, all expenses, freight, insurance, Transit Insurance, handling charges and delivery at
site but excluding Excise Duty, Cess on Excise Duty and TNVAT.
No price adjustment will be given if the increase/decrease in cost of cement / reinforcement steel
varies upto 3% from the bench mark price.
If the price variation is more than 3% over the bench mark price, the excess cost of
cement/reinforcement steel over the bench mark price will be paid by OWNER based on the
invoice to be produced by the contractor. If the price of cement/reinforcement steel is decreased
more than 3%, the difference in cost over bench mark price will be deducted from the contract bill.
The price variation with respect to cement and reinforcement steel will be adjusted only in the final
bill after completion of work.
The price adjustment shall not be applicable for the extended period of completion, if the delay is
attributable to the contractor. The price adjustment clause will not be applicable if the delay in achieving
milestones is attributable to the contractor.
12 Any change in the quoted rates due to any variation in price(ie. Increase / decrease In Price) except for
cement and reinforcement steel, shall not be considered and will be to the contractor's account.
C.R.Narayana Rao
Architects & Engineers 2 1. General
Tidel,Coimbatore Preamble to Bills of Quantities
13 The specification is intended to cover the supply of material including providing minor civil works such as
Establishing Permanent Grid points and permanent Bench mark on the neatly plastered brick pillar, and the
execution of all works necessary to complete the entire scope of work. Should there be any details of
construction or materials which have not been referred to in the Specification or in the Bill of Quantities and
Drawings, but the necessity for which may reasonably be implied or inferred therefrom or which are usual or
essential to the completion of all works in all trades, the same shall be deemed to be included in the rates
and prices named by the tenderer in the Bill of Quantities. If there is inconsistency between the Bill of
Quantities, Specification and Drawings and in case of conflict among different sections/heads, precedence
shall be given in the following order of descending priority.
14 Providing all the water required for the Construction work or by any means including testing the water
proofing works or by any means, by arranging the water from the approved source including obtaining an
acceptable quality water from outside by tanker for all purpose within the quoted rates.
15 Providing power required for the construction work or by any means with in the premises including making
his own arrangements to obtain temporary power connection and maintain at his own expense an efficient
service of electric light and power during the contract period. Any shortfall in quantum of electric power from
electric company's supply shall be made up by necessary captive generator at site including all charges
connected with installation, running and maintenance, necessary statutory approvals etc. within the quoted
rates.
16 Providing water and power required for testing and commissioning of various items specified in the Bill of
Quantities and Technical Specifications within the quoted rates.
17 Constructing and providing water proof water storage tank to the required capacity for storing the water for
construction purposes during the construction period including maintaining the water during this period.
Construction and location of the tank shall be in accordance with the approved drawing and at no extra cost.
The same shall be dismantled, removed, cleaned and disposed of at authorised area out of site premises at
no extra cost.
18 Constructing and providing temperory site office for Employer/Architect to the requirement specified in the
conditions of contract for use during the construction period including all amenities and Facilities like
Necessary electrical facility ,Local telephone, Photocopier Facility, Internet connection and Fax connection
within the quoted rates. Telephone charges and Power and any other charges, Maintainence of all Facilities
and Maintainence shall also borne by the contractor. At the time of successful handing over of the project to
the Employer or at any time earlier, as directed by the Employer, the entire site office structure shall be
dismantled and removing the accommodation including debris and restore the site at no extra cost.
19 Providing and forming all temporary roads / Pathways, cross overs, foot path, tracks, hard standings,
Temporary ramp to approach the excavated level etc. within the site and shall provide temporary foot path
outside the boundaries if required to protect the public entering into the construction area at no extra cost.
20 Providing and establishing required plants, machineries, equipments, scaffolding, staging, guard rails,
temporary stairs, temporary access to the various places of the premises during execution stage, including
maintenance of all the machineries, tools and plants, Heavy excavation machineries with supporting
transport facility etc., required consumables for such equipments till the completion of the work for proper
execution of work and providing well maintained temporary toilets for Labourers as required ( Minimum - 3
Nos at desired location by Employer/Architect) during execution till completion of the entire work within the
quoted rates.
21 Providing and maintaining Field Laboratory in a satisfactory manner till the completion of work to ensure site
control on quality of materials and the works and shall strictly comply with provision of indian/ International
Standards at no extra cost. All other regular tests including requisite materials shall be carried out as
directed either at approved laboratory or at site at no extra cost.
22 Providing drains and establishing means and disposal of storm water from the site during construction
period.
C.R.Narayana Rao
Architects & Engineers 3 1. General
Tidel,Coimbatore Preamble to Bills of Quantities
23 Providing barricade and enclosure around the premises of the site by using the aluminium sheets or GI
corrugated sheets duly painted neatly with required supporting arrangements with verticals, horizontals and
bracing including maintaining the barricade and enclosure till the entire completion of the work at no extra
cost. Barricades and hazardous areas adjacent to but not located in normal routes of travel shall be marked
by red flasher lanterns at nights. The same shall be dismantled, removed, cleaned and disposed of out of
site premises at no extra cost.
24 Providing all safety measures including barricade and enclosure around the excavated trench/area in the
site during excavation by using the R.C.C post at 3 m Intervals to a height of 1.5 m from the existing G.L
with suitable depth of foundation ( Minimum 0.60 M from Existing G.L ) and providing Polyster insulated
chain link fencing and fixing the chain link using M.S.Flat 30 x 6mm with bolting arrangements including
painting the post neatly. R.C.C post shall be placed on PCC 1:2:4 to a required depth to hold the post
including maintaining the barricade and enclosure till the entire completion of the work at no extra cost.
Barricades and hazardous areas adjacent to but not located in normal routes of travel shall be marked by
red flasher lanterns at nights. The same shall be dismantled and removed after the completion of work with
in the quoted rates.
25 Providing and establishing disposal of any water from the site due to rains and de-watering at the site during
excavation at no extra cost.The arrangement for suitable de-watering system shall be the responsibility of
the tenderer, so that the excavated area and site is kept sufficiently dry and fit for works during the contract
period. Arrangement for any additional means of de-watering as may be required depending on the
exigencies shall be the responsibility of the Contractor without any claim to extra. Similarly retention of the
excavated sides and stability of the slopes and prevention of land slides shall be the responsibility of the
Contractor within the quoted rates. All such precautionary and safety measures for earthwork excavation
and dewatering shall not hamper the construction schedule at any time within the quoted rates.
26 All rules and regulations of Labour Department, Contract Labour Laws, Provident Fund and ESI and
connected laws, and all other laws of the land are to be complied with by the tenderer within the quoted
rates.
27 Providing security arrangements to guard the site and premises at all times to maintain strict control on the
movement of material and labour till the completion of the work within the quoted rates.
28 Setting out the works at site shall be the entire responsibility of the Contractor for excavation including
maintaining the premises throughout the contract period, proper permanent grid line points and datum
bench mark within the quoted rates.
29 Maintain the site and surroundings in neat and orderly manner, free of accumulation of debris, haphazard
stacking of materials, unhygienic and unsafe environment, cleaning the site at all levels, removal of
unwanted materials on day-to-day basis during the contract period at no extra cost.
30 The estimated quantities given in the bill of quantities shall be regarded as approximate only and shall not
be deemed to gauge the extent or description of the works, or to limit the effect and meaning of any of the
provisions of the contract documents.
31 The quantities in the Bill of quantities approximately indicate the total extent of work but may vary to any
extent and may even be omitted thus altering the aggregate value of the contract. A Schedule of Probable
Quantities in respect of each trade of work is covered in Part II. Individual items in the Schedule of
Probable Quantities is liable to alteration without any pre-specified limit to extent of such variations by way of
omissions, deductions or additions at the discretion of the Architect/Owner's Engineer. Each Bid should
contain not only the rates but also the value of each item of work entered in the amount column and all the
items should be totaled in order to show the aggregate value of the entire Bid. The value of each item
worked out shall be rounded off to a nearest Rupee ignoring paise below fifty.
32 Owner/ Architect reserves the right to itself the right of altering the drawings and nature of work by adding to
or omitting any items of work or having portions of the same carried out without prejudice to this contract.
There shall be no limit on the scope and extent the changes that can be ordered by the Owner and the
contractor shall not be entitled to any compensation or claim due to such change(s) / order(s) by the Owner.
The contractor will only be paid for the actual quantity of works done payable at the agreed unit rates.
C.R.Narayana Rao
Architects & Engineers 4 1. General
Tidel,Coimbatore Preamble to Bills of Quantities
33 Any permission required for establishing the site office including executing the work to be obtained from the
statutory Authority shall be responsibility of the tenderer within the Quoted rates.
34 No Land will be provided by the company to the contractor for constructing any structure, his labour,
workman and supervisory camps, un-authorised hutments, canteen or teashops at site or within the
premises. Contractor shall make his own arrangements for the same outside the Premies / boundary. These
if any, shall be with the knowledge of and prior approval of the Owner/Architect.
35 The samples of materials for various finishing items such as Granite, Marble, Ceramic Tiles, Sealent, Glass
for various applications, Aluminium members etc. shall be produced by the tenderer as & when required by
the Owner/Architect during the evaluation of bids for scrutiny and approval. All samples required by the
specification for the approval of the Owner / Architect shall provide at any stage till the completion of work
and provide safe storage including recess for display, reference and inspection of approved sample at no
extra cost.
36 Successful tenderer shall provide the samples of materials for various finishing items such as Granite,
Marble, Vitrified Ceramic Tiles, Ceramic tile, Sealent, Glass for various applications, Aluminium members,
wooden & steel door, Hardwares & Fixtures, any other materials specified in the Bills of materials
necessiated approval by the Owner/Architect. All samples required by the specification for the approval of
the Owner / Architect shall provide at any stage during execution till the completion of work and provide safe
storage including recess for display, reference and inspection of approved sample at no extra cost.
37 Arranging, taking and providing colour photographs, video films during construction period at various stages
from different locations to show the progress of work at every week including on special occasions and
novel features of the work as desired through out the contract period.
The photographs shall be of acceptable quality and they shall be taken by a professionally competent
commercial photographer with camera having the facility to record the date of photographs taken in the
prints and negative. The Contractor shall supply five colour prints of each of the photographs taken to the
standard maximum size mounted in albums of acceptable quality. Also the negative in 35mm size shall be
supplied for each photograph. Each photograph in the album shall be suitably captioned.
Video films shall be taken by a professionally competent commercial video cameraman and edited with
Digital Photographs( Both Soft & Hard Copies ) to be taken and submitted as a part of Monthly Report - to
be included date and time. The edited video cassettes shall contain narration of the activities in Engilish by
a competent narrator. The edition of the video film and the script for narration shall be as approved. The
video cassettes shall be of acceptable quality and the film shall be capable of producing colour
pictures.Videocasettes shall be converted in to CD form as & when required by Owner/Architect and
required no. of copies shall be supplied. The entire expenses on this account shall be borne by the
Contractor and he is not eligible for any payment on this account.
38 The abbreviations used in the Specification and Bill of Quantities shall be read as follows :
IS - Indian Standard
A.S.T.M - American Society for Testing and Materials
A.W.S. - American Welding Society
MM & mm - Millimetre /s
CM & cm - centimetre /s
L.M.(lm) - Linear metre /s
RM (rm) / RMT (rmt) - Running metre /s
KG (kg) - Kilograme /s
Tonne/t/MT - Metric ton/s (1000 Kilogrammes)
Dia. - Diameter
Wt .- Weight
Sq.m. - Square metre
Cum - Cubic metre
No. - Number
Qty. - Quantity
L.S - Lumpsum.
P.S. - Provisional sum
C.R.Narayana Rao
Architects & Engineers 5 1. General
Tidel,Coimbatore Preamble to Bills of Quantities
39 A copy of soil report is enclosed in Part - I for the reference to the tenderer as to identify the nature of soil,
but the enclosed soil report is only indicative. The tenderer is expected to inspect the site to investigate the
following items before quoting the rates in the tender and the entire responsibility for amenities & services
therefore shall be sole responsibility of the tenderer.
a. Nature and type of soil proposed for excavation and safety of excavation..
b. Availability of Power for execution.
c. Availability of Water for execution.
d. Means of Disposal of storm water/bailingout water from the site.
e. Means of Disposal of water due to De-watering at the site.
f. Nature and type of protection required for Neighbouring property to ensure full safety during Construction
activities in Progress.
g.Place for disposal of serviciable / unserviciable materials obtained during Construction activities in
Progress.
40 Housekeeping for the entire site on a regular basis by deputing adequate dedicated resources (To be
agreed with PMC) at no extra cost.
41 Area lighting and Task lighting in accordance with site safety rules.
42 Fall protection for voids, cutouts, shafts & construction openings as per safety guidelines to be factored.
Place :
C.R.Narayana Rao
Architects & Engineers 6 1. General
Tidel, Coimbatore Preamble to Bills of Quantities
Unless otherwise specified rates quoted for all Excavation and Filling works shall include the following :
1 Cost of all materials, labour, equipment / tools & plants required, conveyance, infrastructure facilities
required etc.
2 Site clearance such as clearing shrubs and growth, roots and small trees brush wood, wild growth etc and
local humps, debris.
3 Work shall be at all levels, heights & elevation and location. Setting out the work to profile and making
the site suitable for marking layout of building by establishing the suitable Survey Equipments.
4 Providing and fixing of permanent grid points with Galvanised M.S. angle iron posts embedded in cement
concrete 1:1.5:3 and placed sufficiently away from building line, and establishing bench mark as well.
5 Excavation in any kind of soil including filled up soils, soft & hard disintegrated rock , hard murrom with
boulders and hard rock or as specified in the Bill of Quantities.
6 Excavation in hard rock shall be either by mechanical means like Air-compressed rock chissler/breaker,
Hydraulic hammer or manual means other than blasting (which is prohibited) or by using chemical
compound of `Accunix' of Associated Cement Company or equivalent approved make and as per
manufacturers specification, if required.
7 Excavation in any kind of soils including soft & hard dis-integrated rock shall be carried out as per site soil
condition and safety of excavation and as per the approved excavation plan. Methodology for Excavation
and De-Watering shall be got approved from the employer prior to commencement of work.
Employer/Architect's decision in this regard is final and binding on the Contractor.
8 Staging, timbering, strutting and de-watering (baling out water either sub soil, rain water or surface) and
keeping trenches and excavations dry at any stage of work. Rate shall also include de-watering, so as to
keep the excavated area dry during the progress of foundation works and till the measurements are
recorded and check measured. Necessary provision to be made to drain the water through peripheral
drain and connecting the same to the main drain. Any extra width of excavation as per site soil condition
and safety of excavation in the pits and trenches, mass excavation for working space or for any kind of
works including waterproofing treatment works required by the Contractor, shall be carried out as per site
condition and safety of excavation, within the quoted rates. Providing shoring & strutting / sand bag lining
for protecting the sides of excavation as required. Filling the extra width of excavated area by the
contractor for such purposes with approved fill material and consolidating the same to get the required
proctor density shall be within the quoted rates.
9 Cutting through old foundations of all description, hard deposits which may be encountered during the
course of excavation.
10 Dismantling, removing,stacking and disposing the same away from the site of existing water pipes and/or
soil pipes within the excavation portion as directed..
11 Providing shoring and strutting for protecting the sides of foundations / trenches, wherever required.
C.R.Narayana Rao
Architects & Engineers 7 2. Excavation & Filling
Tidel, Coimbatore Preamble to Bills of Quantities
12 Getting out and throwing spoil clear off area being excavated or depositing clear of edge of foundation to
avoid fall in.
13 Trimming all sides to plumb or otherwise as instructed at site, levelling all bottoms, clearing out all loose
earth etc.
14 The selected fill material shall be approved by the Employer / Architect before the same is used for
filling.The fill material shall be as specified. Black cotton, clayey or silty soil shall not be used. Soils
having laboratory density of less than 1.44 gm/cc may not be used for filling.
15 Filling in foundations and in plinth in layers not exceeding 150 mm, watering, consolidation, dressing etc.
complete and include for all lifts and leads, transport from stacks, rehandling etc.
16 Filled earth shall be watered and compacted by power roller or any other approved mechanical means or
adequate capacity to achieve the required minimum proctor density of 95% to 98 %.
17 Top layer of filling shall be brought to the specified line, levels grade and to the required proctor density
and as directed.
18 Disposing of excavated earth as directed and dressing to proper level and grade as required or by
transporting out of site to dumping ground legally approved by local authorities at no extra cost.
20 Removal of excavated earth out of the premises shall be done simultaneously during the excavation stage
itself due to paucity of working space.
21 Supplying of utility services as directed and providing guard lights and Guard railing for trenches wherever
required.
22 Wherever the double handling of excavated earth is required, the place of deposit should be decided in
the first instance and to be deposited as directed.
23 Excavation will be measured on the basis of the horizontal area of open mass excavation at the base for
raft slab or any other structures to be built. The actual depth of excavation will be arrived at as the
difference between the spot levels taken at existing ground level prior to excavation at a spacing of 3m
intervals in both directions and the final bottom level of founding level as per drawings.Quoted rate shall
include cost of excavation of working space as required, slopes and berms as per site soil
condition/nature of the site soil and safety of excavation.Rate shall also include for refilling the such
excavation of working space with approved filling Material including consolidating to the required proctor
density.Quoted rate shall be deemed to have considered the above stipulation.
24 Excess excavation if any, in horizontal direction shall be filled with concrete of Grade 1:2:4, on prior
approval by the Employer/Architect for making up the excavated area to the required level at no extra
cost. Any other means of filling shall not be allowed.
25 Cement for all works shall be High strength ordinary portland cement Grade 43 and 53 grade shall be
used.
26 Tests on materials shall conform to IS Specification and the test shall be carried out as directed either at
site Laboratory or at any approved test laboratory.
C.R.Narayana Rao
Architects & Engineers 8 2. Excavation & Filling
Tidel, Coimbatore Preamble to Bills of Quantities
27 The method statement shall include all safety features and protection to workmen, thitrd party as well as
property and services nearby. Methods of shoring and struting should be fully detailed in the method
statement.Removal of excavated material from excavated area,method of handling,method of storage(
including double handling if necassary) as well as disposal shall be explained fully. Where controlled
blasting resircted to,the contractor should ensure that all necassary statutory approvals are obtained in
advance and kept in current and all necassary insurance and other covers shall be taken and kept valid in
the case of sub-contracting this job,such cover shall include sub-contractor's workman also.Where
controlled blasting is resorted to, contractor should take all necasry precaution for ensuring safety of life
end property in the visinity.Suitable barigading,warning systems, sand cushing,heavy duty protection in
the blast area shall be under contractors responsibility. The contractor shall note that surrounding
buildings are fully occupied and are in operation and as such, all possible special preacautions shall be tak
into account in view of restricted area availabe for contruction.No extra claim for payment are
additional time will be accepted on account of failure to take into account the above factors prior to
quoting.
Place :
C.R.Narayana Rao
Architects & Engineers 9 2. Excavation & Filling
Tidel,Coimbatore Preamble to Bills of Quantities
Unless otherwise specified, the rates quoted for Anti-Termite treatment shall include the following :
1 Cost of all materials, labour, equipment / tools & plants required, conveyance, infrastructure facilities
required etc.
4 Treatment to all areas required to be treated at any depth & level in the sequence including trenches,
pits and tunnels etc.
6 Treatment should be carried out by an approved specialised pest control agency on prior approval.
7 Treatment should be carried out generally in accordence with the technical specification and
confirming to IS 6313.
8 The chemical to be used as insecticides for the treatment shall be CHLOROPYRIPHOS 20% EC
and the application shall be Dilute 1 part of chemical 20/50 EC with 19/49 parts of water to get 1%
Emulsion and as per manufacture's specification.
9 Connected civil work such as cut-open the surface for treatment, insertions like nozzles at require
places. Protecting the treated surface and other works in progress and redoing in case of any
damage.
10 The description and specification for treatment contained in the Bill of Quantities is indicative only
and is meant to set out a general outline of the Proprietary system as commonly understood. The
eventual requirement is performance oriented to achieve total termite proof expected from the
system that is adopted. Since the systems, both in materials and methodology of application, are
proprietary, the onus of examining the drawings, BOQ, specifications and site conditions lies on the
Contractor. The prices quoted shall be comprehensive and appropriate and shall include all the
applicable items envisaged in the system, whether or not they have specifically described in the
documents / information supplied.
11 Anti-termite treatment shall be guaranteed for a period of 10 (Ten) years in an approved proforma
acceptable to the Employer on a stamp paper.
12 Material Safety Data Sheet to be submitted and approved prior to use at site.
Place :
C.R.Narayana Rao
Architects & Engineers 10 3. Anti-termite Treatment works
Tidel,Coimbatore Preamble to Bills of Quantities
PREAMBLE TO THE BILL OF QUANTITIES - 4. PLAIN & REINFORCED CEMENT CONCRETE WORKS.
Unless otherwise specified, the rates quoted for Concrete items shall include the following:
1 Cost of all materials, labour, equipment / tools & plants required, conveyance, infrastructure facilities
required etc.
3 Cost of suitable form work and bracing according to the floor height specified in the drawing, moulds,
centering and shuttering, single / double height scaffolding, GI pipe as directed at site. Dimension of
form work will be within the tolerance as specified in IS 456 and shuttering should be water tight.
Shuttering materials shall be steel, timber or plywood as directed.
4 Exclude cost of reinforcement steel, structural steel and any inserts like bolts, plates, sleeves, pipes etc,
but include building in and placing in position any inserts supplied
5 Form work ( which shall be measured and paid seperately under relavent item ) include splayed edges,
notching, allowances for overlaps and passing at angles, batterns, strutting, bolting, wedging, casing,
rocking, centering, boxing, shuttering, propping strut braces etc., removal thereof and dressing the
shuttering with oil to prevent, cement sticking to shutter faces.Form work shall be either straight, curved,
plain or tapered and also with provision for specified slopes, if directed. Wind tie bolts for wall
shuttering.
6 Form work for fair faced concrete items will be of resin bonded plywood of approved make in any size
required for the purpose under such item, fixed on suitable frame work including MS clear separators, if
so specified.
7 Bitumen/Ocean kraft papers shall, where directed be laid at all places of flooring before laying levelling
course for flooring.
8 Adequate protection to edges and corners of Plain & Reinforced Cement Concrete works from damage
during construction.
9 Weigh batching, machine mixing, transporting, pumping, placing and consolidation using vibrators of
approved type as directed.
10 Keeping the work well watered for 10 days for plain cement concrete works and 21 days for Reinforced
cement concrete works after casting and it shall confirm to IS Specification.Providing water tight casting
platform, curing yard, form work, steel or plywood mould for preparation of precast slabs & Jolly.
11 Roughening and hacking the concrete surfaces wherever required after removal of centering or
shuttering.
12 Forming key and construction joints, providing cement slurry work and cleaning at any stage of work,
sand papering of existing reinforcement bars of column and dowels from pile caps etc. as directed
before taking up fresh work.
13 All projections, toothings, ornamental work, finishing to shape as per drawing and as directed.
16 Machine crushed coarse graded aggregate shall be hard broken blue granite of sizes specified.
17 Cement for all concrete works shall only be High strength ordinary portland cement Grade-43.
C.R.Narayana Rao
Architects & Engineers 11 4. Concrete works
Tidel,Coimbatore Preamble to Bills of Quantities
18 Cement Grade 53 / Grade 43 shall be used only for the items so specified within the Quoted Rates.
Cement - Ordinary Portland Cement 53 grade conforming to IS: 12269 and Ordinary Portland Cement
43 grade conforming to IS: 8112 , shall be used for all Reinforced Cement Concrete works and Portland
Pozzalona Cement of 33 Grade conforming to IS: 269 for Plain Cement Concrete works, masonry,
plastering and any such other works. In general fly ash based cement shall not be used for RCC works.
Water used for concrete shall confirm to the requirement of IS: 456.
19 Minimum cement content for specified design mix shall be in accordance with specification. Minimum
cement content will be the same as specified in the Technical specification Irrespective of grade of
cement used.
20 Designing the concrete mix and batching as per specifications, wherever design mix is specified and
approved, if so directed.
21 Use of weighbatch equipment for design mix concrete and machine mixed and mechanically vibrated on
placement in position as directed.
22 Providing Ready Mix concrete from approved source conforming to Specification & standards.
23 Adding of admixture to increase the workability and consistancy in the concrete as slump retarder as per
manufacturers specification wherever required and applying admixture / bonding agent to increase the
bonding between the old & New concrete and at Construction joints as per manufacturers specification
wherever required, on prior approval at no extra cost.
24 Limiting the temperature of concrete to the required level as directed, wherever required under such
item and if so specified on prior approval.
25 Providing sunk floors, pockets, cutouts, holes and larger size openings for security doors as also
concreting them after the doors are held in position, including grouting of hold fasts, under the
supervision and instructions of security contractors.
26 Embedding electrical conduits, junction boxes, fan hooks, cutout boxes and other inserts, sleeves hold
fasts, pipes etc.
27 Necessary spacer blocks made out of plain cement concrete 1:2:4 or cement mortar 1: 4 to be provided
to prevent the displacement of reinforcement and also to maintain the required dimension, if required..
28 No finishing item is to be considered in quoting the rates for plain cement concrete works & Reinforced
cement concrete works, if so specified.
30 Taking test cubes for all concrete items and testing them as specified in IS 456 at the site laboratory to
be set up with proper equipment etc. and other regular test shall be carried out as directed either at site
Laboratory or at any approved test laboratory.
31 Tenderer shall ensure that they have adequate quantity of shuttering and suitable propping materials
according to the floor height specified in the drawing to keep up the required Concreting cycle per floor
as set out in the Tender Documents, Drawings and tentative Bar chart enclosed. They shall also ensure
that the de-shuttering sequence with proper propping, taking into account the Construction Loading of
the upper slabs, as set out in the Tender Drawings, is also kept up.Scheme to maintain the props shall
ensure that main supports are not disturbed.Reproping by means of removal and reintrodusing of props
is not allowed.
De-shuttering and re-propping scheme shall be such that any undue loading on the structure is avoided
at all times. On award of contract, the scheme must be submitted by the contractor along with
submission of the CPM / PERT to the Architect / Owners Engineer for necessary approval.
C.R.Narayana Rao
Architects & Engineers 12 4. Concrete works
Tidel,Coimbatore Preamble to Bills of Quantities
No extra charge will be allowed to the Contractor for all above such works
32 Any tenderer who proposes any innovative or special propping according to the floor height specified in
the drawing, shuttering and de-shuttering methodology maintaining the required Concreting cycle per
floor shall furnish comprehensive and complete details of the same along with tender submission.
Place :
C.R.Narayana Rao
Architects & Engineers 13 4. Concrete works
Tidel, Coimbatore Preamble to Bills of Quantities
Unless otherwise specified, the rates quoted for items under masonry work shall include the following :
1 Cost of all materials, labour, equipment / tools & plants required, conveyance, infrastructure facilities
required etc..
2 Work at any depth below ground level or any height above ground level and at all levels, heights &
elevation and location.
3 All double height scaffolding, ladders, platforms, staging and plant required in the execution of work to
any height and depth.
4 Best quality well chamber burnt moulded bricks conforming to IS 1077 and with minimum compressive
strength of 50 Kg/Sqcm only shall be used on the masonary work.
6 Hacking and roughening of concrete or other surface in contact with masonry for proper bondage.
7 All work in narrow widths, curved or straight as per drawing and as directed.
8 Provision for drip moulds, projections and architectural mouldings etc. and excludes RCC mullions,
panels and stiffeners to be provided in Masonry work.
9 Embedding in Galvanised M.S. holdfasts in Plain cement concrete 1:1.5:3 blocks, coach screws,
anchor fasteners and such other inserts, including chasing, grouting,curing etc..
10 Fix in position electrical conduits, cut-outs, and with chasing wherever necessary.
15 Tests on bricks/block/ or any other masonry items as directed, conforming to IS Specification shall be
carried out as directed either at site Laboratory or at any approved test laboratory.
16 Providing water tight casting platform, curing yard, form work, steel or plywood mould for preparation of
precast blocks.
C.R.Narayana Rao
Architects & Engineers 14 5. Masonry works
Tidel, Coimbatore Preamble to Bills of Quantities
18 Solid / Hollow block to any size shall conform to IS : 2185 and confirming to :
A. Solid Block :
1. Size of Block :
400x200 mm - 100 mm thick
400x200 mm - 200 mm thick
400x200 mm - 300 mm thick
2.Dimension tolerance:
Length of the units - Not morethan (+) or (-) 5 mm.
Height & width of the units - Not morethan (+) or (-) 3 mm.
3.Percentage of solids - Not less than 75%
4.Weight of a block in Kg.
400x200 mm - 100 mm thick - Not less than 14.4 Kg.
400x200 mm - 200 mm thick - Not less than 28.8 Kg.
400x200 mm - 300 mm thick - Not less than 43.2 Kg.
5.Yard dry density in Kg/Cum - not less than 1800 Kg/Cum.
6. Water Absorption - 5 to 6 %
7. Compressive Strength - not less than 5 N/Sq.mm conforming to BOQ Specification.
8. Thermal resistance - .38 to .33 Sq.mm
9. Estimated sound - 46 to 58 Db.
B. Hollow Blocks :
1. Size of Block :
400x200 mm - 100 mm thick
400x200 mm - 200 mm thick
400x200 mm - 300 mm thick
2.Dimension tolerance
Length of the units - Not morethan (+) or (-) 5 mm.
Height & width of the units - Not morethan (+) or (-) 3 mm.
3.Percentage of solids - 55%
4.Weight of a block in Kg.
400x200 mm - 100 mm thick - Not less than 12 Kg.
400x200 mm - 200 mm thick - Not less than 24 Kg.
400x200 mm - 300 mm thick - Not less than 36 Kg.
5.Yard dry density in Kg/Cum - Not less than 1500 Kg/Cum.
6. Water Absorption - 5 to 6 %
7. Compressive Strength - not less than 5.5 N/Sq.mm conforming to BOQ Specification.
Compressive Strength - not less than 3.5 N/Sq.mm conforming to BOQ Specification.
8. Thermal resistance - .38 to .33 Sq.mm
9. Estimated sound - 46 to 58 Db.
19 Providing reinforced cement concrete binder of specified grade - 80mm thick with reinforcement steel of
Fe 500 - 8 mm dia. 3 Nos.at bottom & 2 Nos at top and 8mm dia for stirrups at 200mm centres for Half
brick masonry wall - 115mm thick at 1000mm intervals under the respective BOQ item.
C.R.Narayana Rao
Architects & Engineers 15 5. Masonry works
Tidel, Coimbatore Preamble to Bills of Quantities
20 Providing reinforced cement concrete binder of specified grade - 80mm thick with reinforcement steel of
Fe 500 grade - 8 mm dia. 3 Nos.at bottom & 2 Nos at top and 8mm dia for stirrups at 200mm centres for
Solid / Hollow block masonry wall - 100 /150 mm thick under the respective BOQ item.
21 At the junction of Hollow block or brick masonry a bearing block of concrete or intervening brick in
mortar courses shall have to be introduced wherever required including nominal reinforcement.
22 Cement used for all Masonry works shall be Portland Pozzalona Cement of Grade 33 conforming to
IS 269.
23 Coarse graded sand shall be used for mortars in all masonry works.
24 Machine crushed coarse graded aggregate shall be hard broken blue granite of sizes specified only to
be used for concrete works.
Place :
C.R.Narayana Rao
Architects & Engineers 16 5. Masonry works
Tidel, Coimbatore Preamble to Bills of Quantities
Unless otherwise specified, the rates quoted for items under Reinforced steel Iron works shall include the
following:
1 Cost of all materials, labour, equipment / tools & plants required, conveyance, infrastructure facilities
required etc..
2 Work at any depth below ground level or any height above ground level and at all levels, heights &
elevation and location.
3 All reinforcement steel shall be the Grade of Fe 500 Thermo Mechanically Treated conforming to IS
1786 and shall be used as specified elsewhere in the bills of materials.
4 Cutting and waste, straightening, bending, hoisting, fixing, supporting in position using precast plain
cement concrete 1:2:4 cover blocks / PVC cover blocks as directed and tying with approved binding
wire made out of no 18 gauge G.I. annealed and welding with electrodes for lapping the rods wherever
required. All welding with electrodes shall be in accordance with IS.
5 Unless otherwise noted in the bills of Quantities, method of measurements shall be generally in
accordence with IS 1200. Reinforcement shall be measured only in lengths of bars as actually placed in
position on standard weight basis, no allowance being made in the weight for rolling margin. Authorised
laps and splices ,Chairs of any shape & profile, Spacer bar of any shape & profile, cover block,
wastage and binding wire will not be measured and shall be included in the quoted rates.
6 All materials supplied shall be free from manufacturing defects and defective workmanship and
guaranteed. Any defects noticed shall be made good at no extra cost.
7 Steel doors and Steel casement windows and ventilators, including all its fittings, shall be manufactured
to conform to IS 1038 and IS 7452.
8 Appropriate sections having the specified weight characteristics only shall be used for the frames and
shutters.
9 Shutters of all Doors, windows and ventilators shall be as per drawing and as approved.
10 Projecting type stainless steel hinges / pivot hinges must be provided for all side hung shutters.
11 Providing and fixing all joinery hardware fittings like floor spring, mortice lock, cylindrical lock, door
closer, handle, hinges of approved make and ISI mark.
12 All the members shall be finished with one coat of Anti- corrosive primer/ Zinc chromate / Zinc
phosphate primer after through cleaning of the surface to remove rust/scale, oil etc., in accordance with
relavant I.S standards and specifications. Extra coat of painting shall be given to obtain uniform and
good finish and extra putty shall be applied to ensure uniform and smooth finish, if directed.
13 Fittings supplied shall be sturdy and samples of all fittings shall be got approved before fabrication.
C.R.Narayana Rao
Architects & Engineers 17 6. Reinforced steel & Iron works
Tidel, Coimbatore Preamble to Bills of Quantities
14 Workmanship and finish of the Doors, windows, ventilators and fittings should be as per approved
standards and confirming to IS specification.
15 All hardware fittings such as Pegstays with screws, Standard Handles, Spring, catches, lugs with
suitable screws, Glazing clips, Transomes, Mullions, Coupling bars, Weathering bars, where necessary
Cast aluminium alloy or pressed steel stove enameled wrinkle finish.
16 Supply of hardware fittings like coupling, mullions, and additional fixing like clamps, bolts, nuts,
washers etc., for continuous fastening of windows / structural steel members.
17 Fabrication of Doors, windows and ventilators shall be in all respects including all associated costs upto
delivery at site.
18 Erection of fabricated Doors, windows and ventilators shall be placed in position including lifting,
jointing and painting as specified in the bills of quantities.
19 All welding with electrodes used for fabrication shall be in accordence with IS specification and as
approved.
20 Tests on materials shall conform to IS Specification and the test shall be carried out as directed either
at site Laboratory or at any approved test laboratory.
Place :
C.R.Narayana Rao
Architects & Engineers 18 6. Reinforced steel & Iron works
Tidel, Coimbatore Preamble to Bills of Quantities
Unless otherwise specified, the rates quoted for items under Structural steel works and sheeting work shall
include the following:
1 Cost of all materials, labour, equipment / tools & plants required, conveyance, infrastructure facilities
required etc..
2 Work at any depth below ground level or any height above ground level and at all levels, heights &
elevation and location.
3 Weight of steel will be the measured on weight basis in accordance with IS 1200, but no wastage will
be considered.
4 No deduction will be made for bolt holes, notches, chamfers etc and no addition will be made for
welding.
5 Weights of bolts, nuts, washers etc. should be included in the main steel work and as such no
separate payment for these will be allowed.
6 Fabrication of the structural steel items shall be completed in all respects including all associated
costs upto delivery at site.
7 Erection of fabricated items shall be carried out including lifting, placing in position, jointing and
painting as specified in the Bills of materials.
8 All welding with electrodes shall be in accordence with IS specification and as approved.
9 Anti-corrosive treatment to structural steel with specialised painting for all steel works should be
carried out including preparation of surface confirming to IS specifications, if specified in the bills of
materials.
10 Provide and use cranes of different capacities for material handling and leading, separate mobile
crawler / wheel mounted crane with telescopic boom etc., as appropriate for erection of roof steel
works at all levels and various locations.
11 Provide use of suitable type of cranes, since as several works will be in progress simultaneously like
mass exacavation for pits and trenches and close and usual access may not be available for steel
work erection.
12 Sufficient number of cranes for material handling, feeding and larger capacity cranes for erection at
all levels and various locations should be mobilized.
13 provide for using sufficient cranes with telescope boom for carrying on truss erection work in a speedy
manner, with sufficient telescope reach boom and carrying capacity as erection may have to be done
from a long distance from actual spot. Due to progress of other works such as excavation or
concreting of pits and trenches at the same time more than one crane may be required for safety
consideration.
C.R.Narayana Rao
Architects & Engineers 19 7. Structural Steel
Tidel, Coimbatore Preamble to Bills of Quantities
14 All materials supplied shall be free from manufacturing defects and defective workmanship and
guaranteed. Any defects noticed shall be made good,at no extra cost
15 Workmanship and finish of the fabricated items should be as per approved standards and confirming
to IS specification.
16 Painting shall be provided with two or more coats of approved brand as specified in the Bills of
materials.
17 Extra coat of painting shall be given to obtain uniform and good finish and extra putty shall be applied
to ensure uniform and smooth finish, if directed.
18 Performance guarantee for anti-corrosive treatment with specialised painting for 5 (Five) years in
stamp paper in approved Format.
19 Sheeting to the roof shall be generally provided with authorised Laps, Gutters, Flashing, Bolts & nuts,
washers and all necessary accessories, welding the Gutter if required with consumables, stop ends
with in the quoted rates.
20 Tests on materials shall conform to IS Specification and the test shall be carried out as directed
either at site Laboratory or at any approved test laboratory.
Place :
C.R.Narayana Rao
Architects & Engineers 20 7. Structural Steel
Tidel, Coimbatore Preamble to Bills of Quantities
Unless otherwise specified, the rates quoted for items under Flooring works shall include the following :
1 Cost of all materials, labour, equipment / tools & plants required, conveyance, infrastructure facilities
required etc..
2 Work at any depth below ground level or any height above ground level and at all levels, heights &
elevation and location.
3 All scaffolding, ladders, platforms, staging and plant required in the execution of work to any height and
depth.
4 Final preparation of base sub-grade or sub-floor by cleaning of all dust/dirt, loose particles, caulked mortar
dropping by scrubbing with coir or steel wire brushes, caulking etc. Roughening surface if so directed,
cleaning with water and keeping surface wet for 12 hours and removing surplus water by mopping before
topping is laid and minor trimming of the base to remove undulations.
5 Cleaning, preparation of surface and watering immediately before laying the floor as directed.
6 Providing bedding layer of mortar for flooring / skirting / dadoing / steps shall be as specified in bills of
materials either in the case of slabs or tiles, etc. to correct levels and gradients as called for.
7 Cutting, rubbing and polishing where applicable (both machine and hand) including grinding, rubbing,
acid cleaning, wax and tin-oxide polishing etc.
9 Providing all Marble and granite slab / tile flooring, skirting, dadooing with neat white cement slurry coat
to the required thickness over bed mortar before laying the slab/tile. All cladding works in marble and
granite slab/tile etc,shall be provided with requisite brass / gun metal clamps / stainless steel clamps and
keys in required sizes and pattern.
Unless noted otherwise in the bills of materials brass / gun metal clamps / stainless steel clamps and keys
shall be suitably designed to the requirement of internal wall cladding and to be designed to the specified
wind pressure in the case of external wall cladding.
10 Providing vitrified ceramic tile,ceramic tile, glazed tile flooring with the clamps bedding layer of mortar as
specified in the bill of quantities .
11 Providing vitrified ceramic tile, ceramic tiles glazed tile skirting and dadoing with bedding layer of mortar
as specified in the bill of quantities or with bedding layer of "ROFF TILE Water proof Tile Adhesive or
equivalent "Laticrete product" for fixing and pointing shall have Roff Tile Joint Fillers or equivalent
"Laticrete product" of approved shade and colour as per Manufacturer's Specification.
12 All vitrified ceramic tile, ceramic tile, glazed tile skirting and dadoing shall have final light acid cleaning,
as directed.
13 Work in jambs, soffits and sills of openings in Lift entrance/ Main entrance shall be arranged to match with
the surrounding finishes and as directed.
C.R.Narayana Rao
Architects & Engineers 21 8. Flooring works
Tidel, Coimbatore Preamble to Bills of Quantities
14 Formation of vertical grooves on vertical surfaces and provision of mortar bed of required thickness to
achieve proper level/slope.
15 Provision in small quantities, narrow width, mitred and returned ends, sinking, risers, set back and any
other sundry items for cutting, fixing, making good upto and which may be required for forming base.
16 Any additional mortar or concrete required to bring the surface to the required level and gradient before
laying the base mortar at no extra cost.
17 Machine crushed coarse graded aggregate shall be hard broken blue granite of sizes specified only to be
used for concrete works.
18 Cement used for all flooring works shall be High strength ordinary portland cement Grade- 43.
19 Coarse graded sand shall be used for mortars in all flooring works.
20 Tests on materials shall conform to IS Specification and the test shall be carried out as directed either at
site Laboratory or at any approved test laboratory.
Place :
C.R.Narayana Rao
Architects & Engineers 22 8. Flooring works
Tidel, Coimbatore Preamble to Bills of Quantities
Unless otherwise specified, the rates quoted for items under Internal & External finishes shall include the
following:
1 Cost of all materials, labour, equipment / tools & plants required, conveyance, infrastructure facilities
required etc..
2 Work at any depth below ground level or any height above ground level and at all levels, heights &
elevation and location.
3 Works internally and externally at any heights and in any position or shape as directed..
4 Providing scaffolding, staging, working platforms, ladder, plants etc., as required and removal of the same
after completion of the work.
5 Hacking and for bush hammering to form key for plaster and for better dash treatment as and where
necessary.
6 All work in narrow width haunching chamfered drips external angles, drip moulds to chajjas, balcony,
parapet projections etc.
7 Providing and fixing a layer of GI chicken mesh (Double folded) to a required width at the junctions of
concrete and brick work before plastering and curing the works.
8 Providing and fixing GI corner beads of ARPITHA EXPORTS or equivalent in all edges of plastering and
isolated column, column projections everywhere.
9 Providing plaster grooves wherever different materials are used and at junctions of RCC members and
masonry works both in ceiling and on walls and the junctions at wall & openings,as directed.
10 Hacking or roughening concrete surface, ceilings or masonry surface by raking out joints, preparing and
wetting the surface to receive the plaster / paint and curing etc. complete.
11 Holes on the walls shall not be made to provide support to the single scaffolding, staging,working platform
etc.
12 Different grades of coarse sand required for use of work including sieving sand to get the required grade of
sand.
13 Making the surface well watered and thoroughly soaked for atleast 12 hours prior to plastering.
14 Keeping the plastered surfaces wet continuously for a period of 7 days after the completion of the item in
any area by proper spraying of water.
15 Neat finishing of junctions of plaster at the junctions of skirting, dadooing and cladding works.
16 Washing floors, cleaning of glass, aluminium works, aluminium composite Panel, flooring works, cladding
works shall be carried out to ensure the premises is clean and tidy after completion of plastering and
painting works.
C.R.Narayana Rao
Architects & Engineers 23 9. Int. & Ext. finish
Tidel, Coimbatore Preamble to Bills of Quantities
17 Work in jambs, soffits and sills of openings shall be carried out as directed.
18 Providing plaster in small areas & quantities, narrow width, mitred and returned ends, sunken areas, risers,
making the surface good upto and which may be required for forming good finish. Any additional plaster
required to bring the surface to the required level and plumb shall be carried out at no extra cost.
19 Tests on materials shall conform to IS Specification and the test shall be carried out as directed either at
site Laboratory or at any approved test laboratory.
20 Cement used for all finishing and plastring works shall be Portland Pozzalona Cement of 33 Grade.
21 Paint shall be applied as per the specification and to Manufacturers specification & instructions.
22 Curing, protecting the painted surface, adjacent work and thoroughly cleaning of the premises.
23 Paint shall be ready mixed and of first quality of the approved brand and manufacturer. The paint shall
generally conform to the chemical composition and other characteristics laid down in the relevant Indian
standard specification.
25 In the case of selection of special shades and colours (not available standard shades), the Contractor shall
mix different shades of ready mixed paints at approved place and as per Manufacturers instructions.
26 Materials shall be the highest grade products of well known approved manufacturers. It is desired that
materials of one manufacturer only shall be used as far as possible and paint of one shade be obtained
from the same manufacturing batch. All paints shall be subjected to analysis from random samples taken
at site from the painters bucket, if so desired.
27 Any materials found not conforming to the relevant specification shall have to be removed by the
Contractor from the site at no extra cost.
28 All primer coats shall be compatible to the material of the surface to be finished as well as to the finishing
coats to be applied.
29 Lime for white washing shall be pure shell lime or fat lime, or a mixture of both and shall conform to IS:712
and approved lime shall be brought to site in an unslaked condition.
30 Synthetical enamel paint shall be in a smooth, hard, durable and glossy finish to all exterior and interior
surfaces and it shall conform to IS:2932 and IS:2933.
32 Dry distemper of required colour conforming to IS:427.The primer where used shall be cement primer or
distemper primer of same manufacturer as that of distemper.
C.R.Narayana Rao
Architects & Engineers 24 9. Int. & Ext. finish
Tidel, Coimbatore Preamble to Bills of Quantities
33 Acrylic Emulsion Paint Shall be in accordance with the specification. The paint should be able to withstand
washing with mild soap and water without any deterioration in colour or without showing flaking, blistering
or peeling after its dried.
34 Oil bound distemper shall confirm IS:428. The primer where used be cement primer or distemper primer of
same manufacturer as that of distemper. The distemper shall be diluted with prescribed thinner in a
manner recommended by the manufacturer.
35 Chemical resistant paint shall confirm IS:157 and the primer coat shall be used as per manufacturers
specifications.
36 Fire resisting paint (silicate type & waterbased) shall confirm IS:162 and and the primer coat shall be used
as per manufacturers specifications.
37 Oil resistant paint shall confirm IS:161 and and and the primer coat shall be used as per manufacturers
specifications.
39 Concrete / masonry surface and cement plastered surfaces shall be thoroughly cleaned of mortar
droppings and other stickings. All loose scales and flakes shall be removed by rubbing with hessian cloth
or sand papering. All holes shall be filled and the surface rubbed smooth to get evenness of the existing
surface. The surface shall be free from all oil, grease, efflorescence, mildew, loose paint or other foreign
and loose materials. Masonry cracks shall be cleaned out and patch filled with mortar similar to the original
surface and uniformly textured. Where this type of resurfacing may lead to the finishing paint being
different in shade from the original surfaces, the resurfaced area shall be treated with a minimum of one
coat of cement primer and should be continued to the surrounding area for a distance of atleast 100mm.
40 Painting work on wood, steel and iron surface shall conform to IS : 1477 and one shop coat of red oxide or
zinc chromate primer or as specified shall be given to all iron surfaces. Preparation of surface by sand
papering in the case of wood works and wire brushing/sanding or chemical removal of rust and scaling in
the case of steel work.
41 All primer coats shall be compatible to the material of the surface to be finished as well as to the finishing
coat to be applied.
42 No painting shall be done when plastering is in progress or is drying. Paint which seals the surfaces to
moisture shall be applied only after the moisture on and below the surface has dried out.
43 All coats shall be thoroughly dry before being sand papered or before the succeeding coat is applied.
Coats of painting as specified are intended to cover surfaces perfectly. In case the surface is not covered
properly by applying the specified number of coats, further coats shall be applied by the Contractor when
so directed by the Engineer at no extra cost.
44 All parts of mouldings and ornaments shall be left clean and true to finish after completion of painting.
45 Stopping and filling carpentry work should be carried out when the primer is just dry. Providing deep
scratches,holes,stopping with putty of plastic wood confirming to IS 423. The putty shall be white lead with
linseed oil base or synthetic metal putty.
C.R.Narayana Rao
Architects & Engineers 25 9. Int. & Ext. finish
Tidel, Coimbatore Preamble to Bills of Quantities
46 Providing filling to the all minor scratches and rough surfaces, like flush doors faces shall be made out of
one part of white lead, two parts of whiting (powdered chalk) mixed and kneaded in double boiled linseed
oil shall be evenly applied and rubbed down with G/220 or G/240 sand paper after allowing it to dry .
47 Painting shall be done by skilled labourers in a workmanlike manner. All materials shall be evenly applied
so as to be free from sags, runs, crawls, or other defects. All coats shall be of proper consistency and
shall be well brushed out, so that no brush marks are visible, except varnish and enamels which shall be
uniformly flowed on. The brushes shall be clean and in good condition before application of paint.
48 Ready mixed synthetic enamel paint or fill paint may be used for the undercoat. The undercoating should
be nearest to the specified colour of the finishing coat and shall be uniform and free of all brush marks.
49 Undercoats should be completely dry before finishing coat is taken up. For synthetic enamels overnight
and for oil paints, a whole day shall be left between undercoat and finishing coat. The undercoat shall then
be rubbed with G/240 sand paper and dusted clean. The finishing coat of approved paint shall then be
applied. If the surface is not satisfactory additional finish coats shall be applied at no extra cost. The
paints shall be applied with bristle brushes and not horse hair ones.
50 When the final coat is applied, if directed, the surface shall be rolled with a roller or if directed it shall
be stippled with a stippling brush.
51 All painted surfaces shall be uniform and pleasing the appearance.The colour, texture etc. shall match
exactly with approved samples. All stains, splashes and splatters of paint shall be removed from
surrounding surfaces.
52 Ceiling of basement floor is not intended to be plastered but finished under form finish with neat cement
wash only. Hence, shuttering must be of such type that uniform and level finish is obtained without
requiring plastering.However rate shall include neat cement wash. Cost to include deburring of shuttering
joints and ensuring smooth finish as directed.
Place :
C.R.Narayana Rao
Architects & Engineers 26 9. Int. & Ext. finish
Tidel, Coimbatore Preamble to Bills of Quantities
Unless otherwise specified, rate quoted for Miscellaneous works shall include the following:
1 Cost of all materials, labour, equipment, tools & plants required, conveyance, infrastructure facilities
required etc..
3 All reinforcement steel shall be the grade of Fe 500 CRS or Fe 500 or Fe 415 or mild steel and shall be
used as specified elsewhere in the Bills of mateirals. Unless otherwise noted in the bills of Quantities,
method of measurements shall be generally in accordence with IS 1200. Reinforcement shall be
measured only in lengths of bars as actually placed in position on standard weight basis, no allowance
being made in the weight for rolling margin. Authorised laps and splices only will be measured. Chairs
of any shape & profile, Spacer bar of any shape & profile, cover block,wastage and binding wire will not
be measured and shall be included in the quoted rates.
4 Cement for all works shall be High strength ordinary portland cement Grade 43.
6 Machine crushed coarse graded aggregate shall be hard broken blue granite of sizes specified only to
be used for concrete works.
7 All materials supplied shall be free from manufacturing defects and defective workmanship and
guaranteed. Any defects noticed shall be made good,at no extra cost
8 Tests on materials shall conform to IS Specification and the test shall be carried out as directed either
at site Laboratory or at any approved test laboratory.
9 Provide all materials, hardwares, bolts and nuts, washers, any fastening materials and devices, anchor
fasteners shall be of approved make and conform to IS specification if required.
10 All Specialized items shall be pre-ordered and to be carried out only on prior approval.
11 Hardware fittings and fixtures shall be made with structural properties to sustain safety and withstand
strains and stresses to which they are normally subjected, such as opening and closing, wind pressure
etc. Fittings shall generally conform to relevant IS specifications.
12 Hardware fittings shall be made true, clean, straight, with sharply defined profiles and unless otherwise
shown or specified, with true smooth surfaces and edges, free from defects, screw holes shall be
counter sunk to suit the head of wood screws.
14 All other specified Hardware fittings shall be free from defects impairing strength, durability or
appearance and of the best quality obtainable for their particular function and situation in structure and
the approved fittings only shall be used.All screws shall be of best quality stainless steel Mild Steel
Copper Oxidised or brass.Weight and / or thickness of the fittings without screws shall be in accordance
with IS.
C.R.Narayana Rao
Architects & Engineers 27 10-Miscellaneous works
Tidel, Coimbatore Preamble to Bills of Quantities
15 Hardware fittings like aldrops, handles and knobs etc., shall be fitted to the joinery items with the
machine threaded stainless steel screws from the back side in addition of regular screws and nuts so as
not to permit removal of fittings from the side where fittings are seen.
16 Aldrops shall be of aluminium colour anodised or as specified and shall be capable of smooth sliding
action. Aldrops shall conform to I.S 281. In case of single leaf door, hole of suitable size shall be made
in the door frame and a plate cut to shape shall be fixed at the face of the hole. Generally, size of
aldrop shall be taken as the length of the rod.
17 Sliding Bolts / Latches shall be of stainless steel /M.S Brass / aluminium colour anodised and shall be
capable of smooth sliding action. Generally, size of latch shall be taken as the length of the bolt catch.
18 Tower Bolts shall be aluminium colour anodised from extruded section/ brass. Tower bolts shall be
provided with steel spring and ball shall be provided between the sheet and the barrel. Size of tower
bolts shall be taken as the length of barrel without top socket.
Place :
C.R.Narayana Rao
Architects & Engineers 28 10-Miscellaneous works
TIDEL PARK COIMBATORE LTD
( A JV OF TIDCO, ELCOT, TIDEL & STPI )
BUILDING COMPLEX OF INFORMATION TECHNOLOGY PARK AT VILANKURICHI
(SEZ AREA), COIMBATORE
BILLS OF QUANTITIES FOR SHELL & CORE, CIVIL FINISHES & SUBSIDIARY WORKS
1 Earthwork Excavation
4 Form Works
7 Miscellaneous Works
Sub - Total of 3 A in Rs.
1 Masonry Works
3 Joinery Works
2 Drains &Trenches
3 Compound Wall
4 HSD Tank
6 UnderGround Sump
Sub - Total of 3 C in Rs.
SECTION 3 D - SUB-STAION BUILDINGS, SECURITY & DRIVER'S REST ROOM TOTAL Amount (Rs.)
1 Sub-Station Buildings
2 Secutiry Buuilding
_____________________________________________________________________only
Date :
Place :
SECTION 3A,3B,3C & 3 D - SHELL & CORE , CIVIL FINISHES , SUBSIDIARY, SUBSTATION, SECURITY &
DRIVER'S REST ROOM
C.R.Narayana Rao
Architects &Engineers 31 Part - II - Bill of Quantities
Tidel, Coimbatore
1.02 Excavation in Medium rock ( more than 1/2 Cum in size -Un-
poclainable) to the required level & depth (Mass
excavation) including all leads and lifts, stacking excavated
material within plot at approved location , if required de-
watering of both ground and surface water, removal of
slurry generated while excavation and keeping the area free
of water with necessary shoring, strutting, stepping, Cum 500
dressing, grading required for keeping earth in position etc.
as per detailed specificationand conforming to safety rules
during progress of the work. Note:Authorised working
space and Provision of slopes if required for execution
shall not be paid separately.
C.R.Narayana Rao
Architects &Engineers 32 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 33 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 34 Part - II - Bill of Quantities
Tidel, Coimbatore
3.04 Columns at
M45 Grade
Basement 3 Cum 1150
M40 Grade
Ground floor Cum 950
C.R.Narayana Rao
Architects &Engineers 35 Part - II - Bill of Quantities
Tidel, Coimbatore
M35 Grade
Third Floor Cum 950
M30 Grade
Terrace Floor Cum 125
3.05 Columns drops / Solid portion at
M45 Grade
Basement 2 Cum 1800
M40 Grade
First Floor Cum 1700
M35 Grade
Fourth Floor Cum 1700
M40 Grade
Basement 3 Cum 450
M35 Grade
Ground floor Cum 250
M30 Grade
Third Floor Cum 250
M30 GRADE
Basement 2 Cum 5450
C.R.Narayana Rao
Architects &Engineers 36 Part - II - Bill of Quantities
Tidel, Coimbatore
M40 GRADE
First Floor Cum 4150
M30 GRADE
Basement 2 Cum 350
Retaining wall
i Basement 3 Cum 785
ii Basement 2 Cum 85
C.R.Narayana Rao
Architects &Engineers 37 Part - II - Bill of Quantities
Tidel, Coimbatore
ii Basement 2 Cum 2
C.R.Narayana Rao
Architects &Engineers 38 Part - II - Bill of Quantities
Tidel, Coimbatore
a Columns at
C.R.Narayana Rao
Architects &Engineers 39 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 40 Part - II - Bill of Quantities
Tidel, Coimbatore
Basement 3 Sqm 20
Basement 2 Sqm 20
Basement 1 Sqm 20
C.R.Narayana Rao
Architects &Engineers 41 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 42 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 43 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 44 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 45 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 46 Part - II - Bill of Quantities
Tidel, Coimbatore
Mode of measurement:
Note : Item no. a) Top of raft slab of basement lift pit base
slab and UG sump base slab ie. width and length between
the retaining wall only will be measured and paid for.
C.R.Narayana Rao
Architects &Engineers 47 Part - II - Bill of Quantities
Tidel, Coimbatore
6.04 Treatment on Toilet floor slab, junctions of floor slab & wall
and side walls in toilets internal surfaces etc. covering the
following sequence of operation:
C.R.Narayana Rao
Architects &Engineers 48 Part - II - Bill of Quantities
Tidel, Coimbatore
6.05 Supplying and filling for sunken slab area with brickbat coba
using half bricks/ full bricks as per specification by adding
CICO NO:1 or approved equivalent admixture at the
specified in the manufacture's specification after entire
completion of laying pipes, sanitary fittings etc. Rate shall
Cum 2050
include for preparation of surface, protecting the laid pipes
and sanitary fittings, finishing the surface smooth to receive
the top coat of water proofing application etc. complete and
all as directed.
6.07 Water proofing treatment over RCC roof slab laid to slope in
terrace and gutter slab covering the following sequence of
operation and specifications:
a) The roof slab laid in slope / gutter slab shall be
thoroughly cleaned by removing the debris and dust, to
receive the water proofing treatment.
C.R.Narayana Rao
Architects &Engineers 49 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 50 Part - II - Bill of Quantities
Tidel, Coimbatore
6.08 Extra rate over and above item no (6.07 g) above, for
Providing and laying brickbat coba using well burnt brick
bats set in cement mortar 1:3 by adding CICO no.1or Cum 1000
approved equivalent water proofing compound including
curing etc complete as directed
C.R.Narayana Rao
Architects &Engineers 51 Part - II - Bill of Quantities
Tidel, Coimbatore
a 40 mm dia. Rmt 25
b 50 mm dia. Rmt 25
c 75 mm dia Rmt 25
C.R.Narayana Rao
Architects &Engineers 52 Part - II - Bill of Quantities
Tidel, Coimbatore
a. 8 / 10 MM Dia - Rebar
I 12 / 14 mm dia & 120 Depth Each 25
ii. 12 / 14 mm dia & 140 Depth Each 25
iii. 12 / 14 mm dia & 150 Depth Each 25
iv. 12 / 14 mm dia & 160 Depth Each 25
v. 12 / 14 mm dia & 200 Depth Each 25
b. 12 MM Dia Rebar
I. 16 mm dia & 150 Depth Each 25
ii. 16 mm dia & 160 Depth Each 25
iii. 16 mm dia & 200 Depth Each 25
iv. 16 mm dia & 210 Depth Each 25
v. 16 mm dia & 220 Depth Each 25
c. 20 MM Dia Rebar
I. 28mm dia & 200mm Depth Each 25
ii. 28mm dia & 210mm Depth Each 25
iii. 28mm dia & 220mm Depth Each 25
iv. 28mm dia & 250mm Depth Each 25
v. 28mm dia & 280mm Depth Each 25
d. 25 mm dia Rebar
I. 30mm dia & 200mm Depth Each 25
ii. 30mm dia & 210mm Depth Each 25
iii. 30mm dia & 220mm Depth Each 25
C.R.Narayana Rao
Architects &Engineers 53 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 54 Part - II - Bill of Quantities
Tidel, Coimbatore
7.11 Supplying and fixing 40mm dia. and 150mm or more long
G.I. pipe spouts in sun shades including painting two coats
of first quality synthetic enamel paint of approved make
and tint over one coat of primer all as per specification and Each 50
as directed.
C.R.Narayana Rao
Architects &Engineers 55 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 56 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 57 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 58 Part - II - Bill of Quantities
Tidel, Coimbatore
f Fire protection for wall entry from service areas into the
open office areas or into adjacent rooms : Providing and
applying moldable Putty to seal construction gaps between
walls and in the junction of wall and partition or between
partitions as also in the concentric spaces between the
vertical surfaces and service inlets or outlets such as ducts,
conduits, cable trays, pipes, dampers, grilles, actuators and
any peneration for return air etc. against air draft, smoke,
noxious gas and flame propagation. The product shall be
intumescent elastomer. Under normal environmental Sqm 100
conditions, the material shall be non-corrosive to metal and
compatible with synthetic cable jackets. When exposed to
flame or heat it shall be capable of expanding and sealing
any gaps caused due to the fire conditions. The required
fire rating is 2 hours and the application is to be done
around the gaps between the masonry and frame or frame
and service frames.
C.R.Narayana Rao
Architects &Engineers 59 Part - II - Bill of Quantities
Tidel, Coimbatore
The rate shall include a two hour rated system shall consist
of 2 x 50mm x 120kg coated (Each on one face) mineral
fibre batts. Each batt is placed in the wall opening with the
coated face exposed and sitting flush with the face of the
wall. Any fire sealer applied shall be to either cover all gaps Sqm 100
or to an extent of 100mm beyond the point of penetration of
the services conduits etc. For all openings around cable
entry, grille, tray , duct etc in walls
C.R.Narayana Rao
Architects &Engineers 60 Part - II - Bill of Quantities
Tidel, Coimbatore
a 450 mm dia
Rmt 100
b. 300 mm dia
Rmt 200
c 150mm dia
Rmt 250
C.R.Narayana Rao
Architects &Engineers 61 Part - II - Bill of Quantities
Tidel, Coimbatore
1.02 Providing and constructing brick work with best quality well
chamber burnt moulded bricks with minimum compressive
strength of 50 Kg per Sq.cm. in cement mortar 1:5 for Cum 50
superstructure at all levels complete and as directed.
C.R.Narayana Rao
Architects &Engineers 62 Part - II - Bill of Quantities
Tidel, Coimbatore
1.06 Extra rate over & above Solid / Hollow Masonry wall for
providing R.C.Binders of 80 mm thick laid horizontally to
the full length of the wall at 1000 mm ctc using coarse
graded aggregate of 12 mm and downsize and reinforced
with 8 mm dia. 3 Nos.at bottom & 2 Nos at top and 8mm
dia for stirrups at 200mm centres using Fe-500 grade steel,
including cost of reinforcements and tying in postion using
binding wire made out of 16 gauge GI annealed or 18
gauge SS, form work, scaffolding, all labour, hire and fuel
charges for all tools and plants employed and all other
incidental charges etc. all complete, as directed. ( For both
internal and extrernal walls )
C.R.Narayana Rao
Architects &Engineers 63 Part - II - Bill of Quantities
Tidel, Coimbatore
a 65 mm thick.
Sqm 62113
b 50 mm thick.
Sqm 2850
c 40 mm thick.
Sqm 200
d 25 mm thick.
Sqm 100
f Extra rate over & above item no (a) , for providing and
laying self levelling three component pigmented epoxy
jointless floor topping " Shaliscreed - AS " -1000 microns
and the application at the rate specified by Manufacturer
STP Ltd including laying over granolithic flooring in panels
not more than 20 sqm. in plan as per manufacturer's Sqm 850
specification, including preparation of surface, application,
wastage, equipment, tools and plants, work at all levels etc.
complete as directed.-Electrical Rooms.
C.R.Narayana Rao
Architects &Engineers 64 Part - II - Bill of Quantities
Tidel, Coimbatore
2.04 Extra over for providing and mixing Graded fibrillated 100%
virgin poly propelene fibres in concrete at the rate of 0.90
kg/cum as per manufacturers specifications. Fibremesh MD
Supplied by M/s Millenium buiding systems or equivalent.
a Fibremesh MD Cum 50
b Recron 3S by Reliance Cum 6225
c Cemfil HD Cum 25
2.05 Extra over for providing and mixing READY MIX DRY
SHAKE ABRASION RESISTANT FLOOR HARDENER of
non - metallic monolithic surface floor hardening compound
CICO FLORTOP-E RTU from CICO or TecTM Floor Z from
TECHNY CHEMY make over the laid concrete at the rate of Sqm 62113
minimum 5.0kg/m2 using power trowelling for quick and
making smooth levelled surface etc.,all as per
manufacturers' specifications.
C.R.Narayana Rao
Architects &Engineers 65 Part - II - Bill of Quantities
Tidel, Coimbatore
Sqm 2000
a. Size : 1200 x 1200 mm
Sqm 1500
b Size : 600 x 600 mm - 9 mm thick.
Sqm 500
c Size : 400 x 400 mm - 7 mm thick.
2.07 Providing flooring with best quality approved colour granite
slab not less than 20 mm thick of size not less than 1200 x
900 mm / 900 x 600 / 600 x 600 mm or as directed,
machine cut and machine high pre-polished, set in C.M 1:4,
20 mm thick topped with white cement slurry (for surface
contact of the bottom of the granite slab) as per approved
pattern / design including finishing the joints with white
cement slurry, cutting, edge chamfering and polishing Sqm 1000
rough, medium, nice and acid wash and tin-oxide polish as
per manufacturer's Specification and as directed. Rate shall
include for preparation of base surface & finished the
surface, protection with gypsum / pop layer over plastic
sheet and removing the same before handing over, work at
all levels and as directed.
C.R.Narayana Rao
Architects &Engineers 66 Part - II - Bill of Quantities
Tidel, Coimbatore
2.08 Providing and fixing step risers and treads with approved
colour granite slab of thickness not less than 22 mm in
single piece for each step patterned as per drawing over a
bed of C.M 1:4, 20 mm thick, all edges machine cut,
machine polished including cutting, Flame the Granite for
the entire width of the steps (Entrance steps), as per
manufacturers specification and as directed. Rate shall Sqm 900
include for preparation of base surface, jointing with
matching cement slurry and finished surface protection with
gypsum / POP layer over plastic sheet and removing the
same before handing over, work at all levels etc complete,
all as directed.
2.09 Providing and fixing step treads with approved Kotah stone
slab of thickness not less than 22 mm in single piece for
each step rounded or patterned as per drawing over a bed
of C.M 1:4, 20 mm thick, all edges machine cut, machine
polished including cutting, chamfering and making groove
to the specified size in the edges( Staircase steps),edge
polishing to rough, medium, nice, acid wash and tin oxide
polishing as per manufacturers specification and as Sqm 1700
directed. Rate shall include for preparation of base surface,
jointing with matching cement slurry and finished surface
protection with gypsum / POP layer over plastic sheet and
removing the same before handing over, work at all levels
etc complete, all as directed.
C.R.Narayana Rao
Architects &Engineers 67 Part - II - Bill of Quantities
Tidel, Coimbatore
3.01 Providing and fixing of hollow metal fire rated steel door 2
Hour / 1 Hour rating confirming to IS 3614 or Equivalent BS
and General purpose steel door at all levels with frames
and with fully flush type shutter having 48 mm thick made
out of Pressed Galvanised steel sheet confirming to IS 277,
(Coating shall be GLP grade Z 120 microns coating) to any
type, Size, Shape with various opening policy and of
System Schroders or approved equivalent make, but in
general the door consists of the following and the quoted
rate shall include the following :
C.R.Narayana Rao
Architects &Engineers 68 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 69 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 70 Part - II - Bill of Quantities
Tidel, Coimbatore
G) Hardwares :
i) Vision panel : Providing and fixing Borosilicate single
clear toughened glass of Pyron or approved equivalent
make to the thickness of 6 mm to with stand two hours fire
rating including making cutouts in the steel door & fixing in
position with spin turned rings. Rate shall include for
providing one side adhesive Glazing tape in the frame to
hold the vision panel glass in position and to ensure the
stability of the fixing. One vision panel shall be provided in
the active leaf of the Single / Double leaf shutter.
ii) Hinge : Providing and fixing Stainless steel satin finish
double ball bearing butt hinges with SS screws of size 100
x 75 x 3 mm thick - Model No. SS 551 B - class 8 / 9 from
Dorma or approved equivalent make suitably for Single /
Double leaf door. Stainless steel conforming to SS 316 L
grade to BS 7352 or BS EN 1935-2002. 4 Nos for Single
Leaf Shutter and 8 Nos for Double Leaf Shutter.
ii) Flush Bolt : Providing and fixing Stainless steel satin
finish consealed tower bolt with SS screws of approved
equivalent make for Double leaf door in the In - Active leaf.
H) Provision :
i) Provision / fixing arrangements to be made in the shutter
as well as in the frame to receive / fix the Hinges, Locks,
Electro magnetic latch, Electro magnetic contact for hooter
with reinforcement pads and in such a way to connect the
same to the card access control system / IBMS.
ii) Refer hardware schedule enclosed for the details of
Mortise sash lock, Mortise dead lock, Handles, Push plates
and Panic bar etc. Necessary provision shall be made in
the frame and shutter to receive and fix the hardwares.
iii) Supplying Master key for the doors either floor wise or
wing wise as per the Master key plan including supplying
Grand Master key for all the doors.
Note :
1. All the Materials and hardware specifications proposed
for door shall conform to the codes, technical specification
and preamble to the bills of quantities.
2. Quoted rate shall be deemed to have considered all the
items covered in the specification and drawings, whether
explicitly stated or not.
C.R.Narayana Rao
Architects &Engineers 71 Part - II - Bill of Quantities
Tidel, Coimbatore
Extra rate over and above steel door items for providing and
fixing the following Hardwares in position in the doors
supplied with all necessary accessories etc complete and
as directed.
a Mortice Sash lock with lever handle on both sides with
internal thump turn and external key operation - Stainless
steel satin finish - 316 L grade of ST - 8100 with 752 lock
or Dorma or approved euivalent make with forend with Euro
profile cylinder Pc 93 with external key operation and
Each 150
Internal thump turn and strike plate of Dorma make and
the strike plate shall be provided to suit the type of door
specified. (ie.Single/Double leaf). Stainless steel shall
conform to BS. (AHU Room and Other Servises )
C.R.Narayana Rao
Architects &Engineers 72 Part - II - Bill of Quantities
Tidel, Coimbatore
ii Model.No.TGD1 300 22 S
Each 32
3.03 Providing and fixing 35mm thick flush door shutters (Kutty /
Diamond/Jackson's make) single leaf / Double leaf of solid
core of block board type bonded with phenol formaldehyde
synthetic resin thermo pressed with 8 mm thick teak wood
tongue & groove external lipping. The construction
procedure of the shutter should be as per IS 2202. The
shutter shall be shop prepared for taking mortice lock or
latches suitable lock block of wood may be provided for
fixing the hardware. The size of block, shall perfectly
correspond to the maximum size of lock, covered in IS
2209. All the four edges of the door shutter shall be
square. The shutter shall be free from twist or warp in its
plane and of required size etc. complete as directed.
i) Hardwares :
i) Hinge : Providing and fixing Stainless steel satin finish
double ball bearing butt hinges with SS screws of size 100
x 75 x 3 mm thick - Model No. SS 551 B - class 8 / 9 from
Dorma or approved equivalent make suitably for Single /
Double leaf door. Stainless steel conforming to SS 316 L
grade to BS 7352 or BS EN 1935-2002. 4 Nos for Single
Leaf Shutter and 8 Nos for Double Leaf Shutter.
ii) Provision :
i) Provision / fixing arrangements to be made in the shutter
as well as in the frame to receive / fix the Hinges, Locks,
Electro magnetic latch, Electro magnetic contact for hooter
with reinforcement pads and in such a way to connect the
same to the card access control system / IBMS.
ii) Refer hardware schedule enclosed for the details of
Mortise sash lock, Mortise dead lock, Handles, Push plates
and Panic bar etc. Necessary provision shall be made in
the frame and shutter to receive and fix the hardwares.
iii) Supplying Master key for the doors either floor wise or
wing wise as per the Master key plan including supplying
Grand Master key for all the doors.
C.R.Narayana Rao
Architects &Engineers 73 Part - II - Bill of Quantities
Tidel, Coimbatore
Note :
1. All the Materials and hardware specifications proposed
for door shall conform to the codes, technical specification
and preamble to the bills of quantities.
2. Quoted rate shall be deemed to have considered all the
items covered in the specification and drawings, whether
explicitly stated or not.
ii. Fully flush shutter with commercial ply on both sides and
finished with 1.5mm thick laminate on both sides of
approved colour, make and shade. Sqm Qro
ii. Fully flush shutter with commercial ply on both sides and
finished with 1.5mm thick laminate on both sides of
approved colour, make and shade. Sqm Qro
3.04 Providing and fixing 32mm thick flush door shutters (Kutty /
Diamond/Jackson's make) single leaf / Double leaf of solid
core of block board type bonded with phenol formaldehyde
synthetic resin thermo pressed with 8 mm thick teak wood
tongue & groove external lipping. The construction
procedure of the shutter should be as per IS 2202. The
shutter shall be shop prepared for taking mortice lock or
latches suitable lock block of wood may be provided for
fixing the hardware. The size of block, shall perfectly
correspond to the maximum size of lock, covered in IS
2209. All the four edges of the door shutter shall be
square. The shutter shall be free from twist or warp in its
plane and of required size etc. complete as directed.
C.R.Narayana Rao
Architects &Engineers 74 Part - II - Bill of Quantities
Tidel, Coimbatore
i) Hardwares :
i) Hinge : Providing and fixing Stainless steel satin finish
double ball bearing butt hinges with SS screws of size 100
x 75 x 3 mm thick - Model No. SS 551 B - class 8 / 9 from
Dorma or approved equivalent make suitably for Single /
Double leaf door. Stainless steel conforming to SS 316 L
grade to BS 7352 or BS EN 1935-2002. 4 Nos for Single
Leaf Shutter and 8 Nos for Double Leaf Shutter.
ii) Provision :
i) Provision / fixing arrangements to be made in the shutter
as well as in the frame to receive / fix the Hinges, Locks,
Electro magnetic latch, Electro magnetic contact for hooter
with reinforcement pads and in such a way to connect the
same to the card access control system / IBMS.
ii) Refer hardware schedule enclosed for the details of
Mortise sash lock, Mortise dead lock, Handles, Push plates
and Panic bar etc. Necessary provision shall be made in
the frame and shutter to receive and fix the hardwares.
iii) Supplying Master key for the doors either floor wise or
wing wise as per the Master key plan including supplying
Grand Master key for all the doors.
Note :
1. All the Materials and hardware specifications proposed
for door shall conform to the codes, technical specification
and preamble to the bills of quantities.
2. Quoted rate shall be deemed to have considered all the
items covered in the specification and drawings, whether
explicitly stated or not.
Rate shall include for making provision to fix the approved
hardwares as specified in the tender drawing schedule as a
separate item etc. complete and as directed.
Rate shall include the following
Extra rate over and above steel door items for providing and
fixing the following Hardwares in position in the doors
supplied with all necessary accessories etc complete and
as directed.
C.R.Narayana Rao
Architects &Engineers 75 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 76 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 77 Part - II - Bill of Quantities
Tidel, Coimbatore
Sqm 650
a Double Leaf door with Top & side Fixed panel
Sqm Qro
b Single Leaf door with Top & side Fixed panel
C.R.Narayana Rao
Architects &Engineers 78 Part - II - Bill of Quantities
Tidel, Coimbatore
4.07 Providing two coats of first quality water proof cement paint
of approved make and colour over a priming coat of white
colour water proof cement paint or any primer specified by
the manufacturer including preparation of surface by
Sqm 1500
thorough cleaning and wetting before painting and curing all
as per manufacturer`s specifications and as directed.
C.R.Narayana Rao
Architects &Engineers 79 Part - II - Bill of Quantities
Tidel, Coimbatore
4.10 Providing Novakote Pliolite resin solvent based flat paint for
exterior surface as per Manufacturers specification and as
directed. Rate shall include for preparation of surface,
Sqm 5000
scaffolding if any, and cleaning the surface after applying
etc. complete, and as directed.
C.R.Narayana Rao
Architects &Engineers 80 Part - II - Bill of Quantities
Tidel, Coimbatore
4.15 Extra rate over plaster item rate for providing Plaster mesh
made out of galvanised iron of nominal thickness 0.35 mm
with a Zinc coating of 120 gms per Sqm at the junctions of
Masonry and concrete works to a width of 100 to 125 mm
including tying in position with suitable clamps / screws etc.,
complete and as per manfacturer specification,from M/s.
Arpitha exports, Bangalore. Rate shall include for
preparation of surface, cleaning, curing etc. complete, all as
directed. as directed.
C.R.Narayana Rao
Architects &Engineers 81 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 82 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 83 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 84 Part - II - Bill of Quantities
Tidel, Coimbatore
1.10 Providing thermoplastic painting for car park and road line
involving cleaning the surface free of dirt and loose
particles applying one coat of primer and two coats of
thermoplastic paint wih drop on glass beads. Rate shall Sqm 50
include for all materials & labour components etc.,
complete.
C.R.Narayana Rao
Architects &Engineers 85 Part - II - Bill of Quantities
Tidel, Coimbatore
M30 Grade
C.R.Narayana Rao
Architects &Engineers 86 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 87 Part - II - Bill of Quantities
Tidel, Coimbatore
2.07 Providing and fixing reinforcement for RCC work with high
yield strength TMT bar of various diameters of Grade of
reinforced steel - Fe 500 - Thermex TMT bars conforming
to BIS specification including cutting, bending, fabricating
and placing in position according to drawings and binding
the reinforcement with 16 gauge galvanised annealed
binding wire of double fold or 18 gauge SS wires and
providing precast cement cover blocks for main
reinforcements to ensure specified cover according to
relevant IS code. The measurements will be in accordance MT 180
with IS code 1200.However reinforcement shall be
measured only in lengths of bars as actually placed in
position on standard weight basis, no allowance being
made in the weight for rolling margin. Authorised laps and
splices only will be measured. Chairs of any shape &
profile, Spacer bar of any shape & profile, wastage and
binding wire will not be measured and shall be included in
the quoted rates.
C.R.Narayana Rao
Architects &Engineers 88 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 89 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 90 Part - II - Bill of Quantities
Tidel, Coimbatore
M30 Grade
C.R.Narayana Rao
Architects &Engineers 91 Part - II - Bill of Quantities
Tidel, Coimbatore
d Coping slab
Cum 52
e Planter box
Cum 5
3.06 Providing, fabricating and erecting form work at all levels
and places wherever needed/specified as per drawing
including striking with 12mm Plastic coated, marine
resistant waterproof ply/Smooth finished MS plates with
adjustable steel props of acceptable Staging system and
with sufficient bracing as approved by consultant. Cost to
include designing of proper form work and staging system
to suit the requirements,Submission of design calculations
and shop drawings for approval,sealing the joints with
heavy duty brown self adhesive tape, aligning to line and
levels including M.S. Ties, PVC Spacer, Providing
openings/ cutouts/ pockets, applying deshuttering chemical,
Deshuttering as approved by the consultant etc., complete
at all levels, double/tripple heights and profiles for Note :
Only plan area shall be considered.No extra shall be paid
for Side shuttering of Drop panel/column capitals.
C.R.Narayana Rao
Architects &Engineers 92 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 93 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 94 Part - II - Bill of Quantities
Tidel, Coimbatore
3.21 Providing and fixing Weep holes with 75mm dia heavy duty
(6Kg / Sqcm) PVC pipe at locations indicated and as
directed. Rate to include for providing filter bed 300mm x RM 420
300mm deep with coarse aggregate
3.22 Supplying and fixing 50mm dia. and 200mm or more long
G.I. pipe spouts including painting two coats of first quality
synthetic enamel paint of approved make and tint over one Each 15
coat of primer all as per specification and as directed.
C.R.Narayana Rao
Architects &Engineers 95 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 96 Part - II - Bill of Quantities
Tidel, Coimbatore
M30 Grade
Cum 22
a RC walls
Cum 18
b Raft slab
Cum 25
c Pedestals
4.06 Providing and laying reinforced cement concrete1:2:4 using
coarse graded aggregate of 20 mm and down size for
floors of unloading platform including necessary lead and
lifts, tools & Plants, pumbing the concrete to all levels,
curing and necessary centering and shuttering but Cum 5
excluding cost of reinforcements. Depending on the size
and location, the maximum depth of concreting will be
decided by Engineer in casting at a time.
C.R.Narayana Rao
Architects &Engineers 97 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 98 Part - II - Bill of Quantities
Tidel, Coimbatore
4.10 Providing, fabricating & fixing weld mesh fencing along with
weld mesh gate, comprissing of RCC precast post of 2.0m
ht @ 2.4m c/c with varying size as per drawing including
fixing the weld mesh -14 gauge of 50mm Square with 50 x
50 x 6 mm angles on either ends and with 2 Nos of MS flats
25 x 3mm on back to back and top and bottom and with
intermediate stiffiners with 2 Nos of MS flats 25 x 3 mm at
every 1m intervals including welding the weld mesh into the
frames with necessary consumables, preparation of
surface, necessary excavation to fix the post in the ground
and concreting the foundation of post with C.C. 1:3:6 - Sqm 120
610mm depth to a required size etc complete, as directed.
Rate shall include for supply and erection of welded mesh
fencing gate of 4500 mm wide and 1600mm height hinged
with necessary angle iron frame work at intervals as shown
in the drawing. Rate shall include for providing 2 coats of
sythetic enamel paint over a 1 coat of primer for structurel
member and weld mesh area and white washing 2 coats for
the RCC precast pole etc complete, as directed.
C.R.Narayana Rao
Architects &Engineers 99 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 100 Part - II - Bill of Quantities
Tidel, Coimbatore
M30 Grade
C.R.Narayana Rao
Architects &Engineers 101 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 102 Part - II - Bill of Quantities
Tidel, Coimbatore
5.11 Providing and fixing of hollow metal fire rated steel door 2
Hour / 1 Hour rating confirming to IS 3614 or Equivalent BS
and General purpose steel door at all levels with frames
and with fully flush type shutter having 48 mm thick made
out of Pressed Galvanised steel sheet confirming to IS 277,
(Coating shall be GLP grade Z 120 microns coating) to any
type, Size, Shape with various opening policy and of
System Schroders or approved equivalent make, but in
general the door consists of the following and the quoted
rate shall include the following :
C.R.Narayana Rao
Architects &Engineers 103 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 104 Part - II - Bill of Quantities
Tidel, Coimbatore
G) Hardwares :
i) Vision panel : Providing and fixing Borosilicate single
clear toughened glass of Pyron or approved equivalent
make to the thickness of 6 mm to with stand two hours fire
rating including making cutouts in the steel door & fixing in
position with spin turned rings. Rate shall include for
providing one side adhesive Glazing tape in the frame to
hold the vision panel glass in position and to ensure the
stability of the fixing. One vision panel shall be provided in
the active leaf of the Single / Double leaf shutter.
ii) Hinge : Providing and fixing Stainless steel satin finish
double ball bearing butt hinges with SS screws of size 100
x 75 x 3 mm thick - Model No. SS 551 B - class 8 / 9 from
Dorma or approved equivalent make suitably for Single /
Double leaf door. Stainless steel conforming to SS 316 L
grade to BS 7352 or BS EN 1935-2002. 4 Nos for Single
Leaf Shutter and 8 Nos for Double Leaf Shutter.
ii) Flush Bolt : Providing and fixing Stainless steel satin
finish consealed tower bolt with SS screws of approved
equivalent make for Double leaf door in the In - Active leaf.
H) Provision :
i) Provision / fixing arrangements to be made in the shutter
as well as in the frame to receive / fix the Hinges, Locks,
Electro magnetic latch, Electro magnetic contact for hooter
with reinforcement pads and in such a way to connect the
same to the card access control system / IBMS.
ii) Refer hardware schedule enclosed for the details of
Mortise sash lock, Mortise dead lock, Handles, Push plates
and Panic bar etc. Necessary provision shall be made in
the frame and shutter to receive and fix the hardwares.
iii) Supplying Master key for the doors either floor wise or
wing wise as per the Master key plan including supplying
Grand Master key for all the doors.
Note :
1. All the Materials and hardware specifications proposed
for door shall conform to the codes, technical specification
and preamble to the bills of quantities.
2. Quoted rate shall be deemed to have considered all the
items covered in the specification and drawings, whether
explicitly stated or not.
C.R.Narayana Rao
Architects &Engineers 105 Part - II - Bill of Quantities
Tidel, Coimbatore
Rate shall include to fix the main frames into masonry wall /
RC concrete surface with necessary clamps, fastening
straps, nuts, bolts, rivets, washers and other fastening
materials shall be in stainless steel or aluminium. Rate
shall include for providing clear toughened glass 6 mm
thick and to be fixed with snap fit aluminium beading section
and special water proof EPDM Gasket, Neoprene etc. -
complete. Necessary silicon sealant of Dowcorning 991 HP
or Non Bleeding Sealant of GE silicon or approved
equivalent make shall be provided at the junctions between
wall and main frames.
C.R.Narayana Rao
Architects &Engineers 106 Part - II - Bill of Quantities
Tidel, Coimbatore
5.20 Providing two coats of first quality water proof cement paint
of approved make and colour over a priming coat of white
colour water proof cement paint or any primer specified by
the manufacturer including preparation of surface by Sqm 950
thorough cleaning and wetting before painting and curing all
as per manufacturer`s specifications and as directed.
C.R.Narayana Rao
Architects &Engineers 107 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 108 Part - II - Bill of Quantities
Tidel, Coimbatore
Mode of measurement:
Note : Item no. a) Top of raft slab of basement lift pit base
slab and UG sump base slab ie. width and length between
the retaining wall only will be measured and paid for.
C.R.Narayana Rao
Architects &Engineers 109 Part - II - Bill of Quantities
Tidel, Coimbatore
5.24 Treatment on junctions of base slab & wall and side walls
in STP internal surfaces etc. covering the following
sequence of operation:
C.R.Narayana Rao
Architects &Engineers 110 Part - II - Bill of Quantities
Tidel, Coimbatore
5.25 Water proofing treatment Treatment over RCC roof slab laid
to slope in terrace and gutter slab covering the following
sequence of operation and specifications:
a) The roof slab laid in slope / gutter slab shall be
thoroughly cleaned by removing the debris and dust, to
receive the water proofing treatment.
C.R.Narayana Rao
Architects &Engineers 111 Part - II - Bill of Quantities
Tidel, Coimbatore
5.26 Extra rate over and above item no (25 g) above, for
Providing and laying brickbat coba using well burnt brick
bats set in cement mortar 1:3 by adding CICO no.1or Cum Qro
approved equivalent water proofing compound including
curing etc complete as directed
C.R.Narayana Rao
Architects &Engineers 112 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 113 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 114 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 115 Part - II - Bill of Quantities
Tidel, Coimbatore
M30 Grade
C.R.Narayana Rao
Architects &Engineers 116 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 117 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 118 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 119 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 120 Part - II - Bill of Quantities
Tidel, Coimbatore
G) Hardwares :
i) Vision panel : Providing and fixing Borosilicate single
clear toughened glass of Pyron or approved equivalent
make to the thickness of 6 mm to with stand two hours fire
rating including making cutouts in the steel door & fixing in
position with spin turned rings. Rate shall include for
providing one side adhesive Glazing tape in the frame to
hold the vision panel glass in position and to ensure the
stability of the fixing. One vision panel shall be provided in
the active leaf of the Single / Double leaf shutter.
ii) Hinge : Providing and fixing Stainless steel satin finish
double ball bearing butt hinges with SS screws of size 100
x 75 x 3 mm thick - Model No. SS 551 B - class 8 / 9 from
Dorma or approved equivalent make suitably for Single /
Double leaf door. Stainless steel conforming to SS 316 L
grade to BS 7352 or BS EN 1935-2002. 4 Nos for Single
Leaf Shutter and 8 Nos for Double Leaf Shutter.
ii) Flush Bolt : Providing and fixing Stainless steel satin
finish consealed tower bolt with SS screws of approved
equivalent make for Double leaf door in the In - Active leaf.
H) Provision :
i) Provision / fixing arrangements to be made in the shutter
as well as in the frame to receive / fix the Hinges, Locks,
Electro magnetic latch, Electro magnetic contact for hooter
with reinforcement pads and in such a way to connect the
same to the card access control system / IBMS.
ii) Refer hardware schedule enclosed for the details of
Mortise sash lock, Mortise dead lock, Handles, Push plates
and Panic bar etc. Necessary provision shall be made in
the frame and shutter to receive and fix the hardwares.
iii) Supplying Master key for the doors either floor wise or
wing wise as per the Master key plan including supplying
Grand Master key for all the doors.
Note :
1. All the Materials and hardware specifications proposed
for door shall conform to the codes, technical specification
and preamble to the bills of quantities.
2. Quoted rate shall be deemed to have considered all the
items covered in the specification and drawings, whether
explicitly stated or not.
Fire Rated Steel - 1 Hr Rating
Single Leaf door Sqm 5
b. Double Leaf Sqm Qro
C.R.Narayana Rao
Architects &Engineers 121 Part - II - Bill of Quantities
Tidel, Coimbatore
Rate shall include to fix the main frames into masonry wall /
RC concrete surface with necessary clamps, fastening
straps, nuts, bolts, rivets, washers and other fastening
materials shall be in stainless steel or aluminium. Rate
shall include for providing clear toughened glass 6 mm
thick and to be fixed with snap fit aluminium beading section
and special water proof EPDM Gasket, Neoprene etc. -
complete. Necessary silicon sealant of Dowcorning 991 HP
or Non Bleeding Sealant of GE silicon or approved
equivalent make shall be provided at the junctions between
wall and main frames.
C.R.Narayana Rao
Architects &Engineers 122 Part - II - Bill of Quantities
Tidel, Coimbatore
6.19 Providing two coats of first quality water proof cement paint
of approved make and colour over a priming coat of white
colour water proof cement paint or any primer specified by
the manufacturer including preparation of surface by Sqm 485
thorough cleaning and wetting before painting and curing all
as per manufacturer`s specifications and as directed.
C.R.Narayana Rao
Architects &Engineers 123 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 124 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 125 Part - II - Bill of Quantities
Tidel, Coimbatore
Mode of measurement:
Note : Item no. a) Top of raft slab of basement lift pit base
slab and UG sump base slab ie. width and length between
the retaining wall only will be measured and paid for.
C.R.Narayana Rao
Architects &Engineers 126 Part - II - Bill of Quantities
Tidel, Coimbatore
6.27 Treatment on junctions of base slab & wall and side walls
in UG Sump internal surfaces etc. covering the following
sequence of operation:
C.R.Narayana Rao
Architects &Engineers 127 Part - II - Bill of Quantities
Tidel, Coimbatore
6.28 a Water proofing treatment Treatment over RCC roof slab laid
to slope in terrace and gutter slab covering the following
sequence of operation and specifications:
a) The roof slab laid in slope / gutter slab shall be
thoroughly cleaned by removing the debris and dust, to
receive the water proofing treatment.
C.R.Narayana Rao
Architects &Engineers 128 Part - II - Bill of Quantities
Tidel, Coimbatore
b Extra rate over and above item no (g) above, for Providing
and laying brickbat coba. Cum Qro
C.R.Narayana Rao
Architects &Engineers 129 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 130 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 131 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 132 Part - II - Bill of Quantities
Tidel, Coimbatore
1.02 Excavation in Medium rock ( more than 1/2 Cum in size -Un-
poclainable) to the required level & depth (Mass
excavation) including all leads and lifts, stacking excavated
material within plot at approved location , if required de-
watering of both ground and surface water, removal of
slurry generated while excavation and keeping the area free
of water with necessary shoring, strutting, stepping, Cum 250
dressing, grading required for keeping earth in position etc.
as per detailed specificationand conforming to safety rules
during progress of the work. Note:Authorised working
space and Provision of slopes if required for execution
shall not be paid separately.
C.R.Narayana Rao
Architects &Engineers 133 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 134 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 135 Part - II - Bill of Quantities
Tidel, Coimbatore
2.04 Columns at
M35 Grade
Basement-1 Cum 75
M30 Grade
M30 GRADE
M30 GRADE
Basement 1 Cum 10
Ground floor Cum 10
First Floor Cum 10
2.12 Lintels at all levels
Basement 1 Cum 2
Ground floor Cum 4
First Floor Cum 4
Terrace Floor Cum 2
C.R.Narayana Rao
Architects &Engineers 136 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 137 Part - II - Bill of Quantities
Tidel, Coimbatore
a Columns at
c Beams
C.R.Narayana Rao
Architects &Engineers 138 Part - II - Bill of Quantities
Tidel, Coimbatore
Basement 1 Sqm 70
Basement 1 Sqm 25
C.R.Narayana Rao
Architects &Engineers 139 Part - II - Bill of Quantities
Tidel, Coimbatore
4.01 Providing and fixing reinforcement for RCC work with high
yield strength ribbed cold twisted tor steel (HSD) bar of
various diameters and grade of steel as specified below
conforming to IS or equivalent BS specification including
cutting and waste, bending, hoisting, fabricating and placing
in position according to drawings and binding the
reinforcement with galvanised annealed binding wire of
double fold of 18 gauge and providing PVC cover blocks
for placing the reinforcements in position and for
maintaining the cover specified and/or according to
relevant IS or equivalent BS code.
C.R.Narayana Rao
Architects &Engineers 140 Part - II - Bill of Quantities
Tidel, Coimbatore
5.02 Providing and constructing brick work with best quality well
chamber table moulded bricks with minimum compressive
strength of 50 Kg per Sqcm. in cement mortar 1:5 in Cum 50
superstructure at all levels etc. complete, all as directed.
C.R.Narayana Rao
Architects &Engineers 141 Part - II - Bill of Quantities
Tidel, Coimbatore
I. 50 mm thick.
Sqm 4658
ii) 25 mm thick.
Sqm Qro
6.02 Extra over for providing and mixing READY MIX DRY
SHAKE ABRASION RESISTANT FLOOR HARDENER of
non - metallic monolithic surface floor hardening compound
CICO FLORTOP-E RTU from CICO or TecTM Floor Z from
TECHNY CHEMY make over the laid concrete at the rate of sqm 4658
minimum 5.0kg/m2 using power trowelling for quick and
making smooth levelled surface etc.,all as per
manufacturers' specifications.
C.R.Narayana Rao
Architects &Engineers 142 Part - II - Bill of Quantities
Tidel, Coimbatore
6.04 Providing and fixing step treads with approved Kotah stone
slab of thickness not less than 20 mm in single piece for
each step rounded or patterned as per drawing over a bed
of C.M 1:4, 20 mm thick, all edges machine cut, machine
polished including cutting, chamfering and making groove
to the specified size in the edges( Staircase steps),edge
polishing to rough, medium, nice, acid wash and tin oxide
polishing as per manufacturers specification and as Sqm 18
directed. Rate shall include for preparation of base surface,
jointing with matching cement slurry and finished surface
protection with gypsum / POP layer over plastic sheet and
removing the same before handing over, work at all levels
etc complete, all as directed.
C.R.Narayana Rao
Architects &Engineers 143 Part - II - Bill of Quantities
Tidel, Coimbatore
I. Group V / V + / IV series
Sqm Qro
6.08 Providing and laying , M20 grade ready mixed concrete for
non slippery, Vaccum dewatered flooring including
cleaning, trimming, watering the surface, laying in strips to
required levels, trovelling, smoothening curing etc., Cum 175
complete to the required slope, formation, finish. (VD
operation shall be paid separately)
6.10 Extra over for providing and mixing Graded fibrillated 100%
virgin poly propelene fibres in concrete at the rate of 0.90
kg/cum as per manufacturers specifications. Fibremesh MD
Supplied by M/s Millenium buiding systems or equivalent.
C.R.Narayana Rao
Architects &Engineers 144 Part - II - Bill of Quantities
Tidel, Coimbatore
i) Hardwares :
i) Hinge : Providing and fixing Stainless steel satin finish
double ball bearing butt hinges with SS screws of size 100
x 75 x 3 mm thick - Model No. SS 551 B - class 8 / 9 from
Dorma or approved equivalent make suitably for Single /
Double leaf door. Stainless steel conforming to SS 316 L
grade to BS 7352 or BS EN 1935-2002. 4 Nos for Single
Leaf Shutter and 8 Nos for Double Leaf Shutter.
ii) Provision :
i) Provision / fixing arrangements to be made in the shutter
as well as in the frame to receive / fix the Hinges, Locks,
Electro magnetic latch, Electro magnetic contact for hooter
with reinforcement pads and in such a way to connect the
same to the card access control system / IBMS.
ii) Refer hardware schedule enclosed for the details of
Mortise sash lock, Mortise dead lock, Handles, Push plates
and Panic bar etc. Necessary provision shall be made in
the frame and shutter to receive and fix the hardwares.
iii) Supplying Master key for the doors either floor wise or
wing wise as per the Master key plan including supplying
Grand Master key for all the doors.
Note :
1. All the Materials and hardware specifications proposed
for door shall conform to the codes, technical specification
and preamble to the bills of quantities.
2. Quoted rate shall be deemed to have considered all the
items covered in the specification and drawings, whether
explicitly stated or not.
C.R.Narayana Rao
Architects &Engineers 145 Part - II - Bill of Quantities
Tidel, Coimbatore
Extra rate over and above steel door items for providing and
fixing the following Hardwares in position in the doors
supplied with all necessary accessories etc complete and
as directed.
c. Extra rate over and above item no a & b for making opening
in Toilet door in all blocks / floors for fixing the Air Transfer
grill
7.04 Providing and fixing of hollow metal fire rated steel door 2
Hour / 1 Hour rating confirming to IS 3614 or Equivalent BS
and General purpose steel door at all levels with frames
and with fully flush type shutter having 48 mm thick made
out of Pressed Galvanised steel sheet confirming to IS 277,
(Coating shall be GLP grade Z 120 microns coating) to any
type, Size, Shape with various opening policy and of
System Schroders or approved equivalent make, but in
general the door consists of the following and the quoted
rate shall include the following :
C.R.Narayana Rao
Architects &Engineers 146 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 147 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 148 Part - II - Bill of Quantities
Tidel, Coimbatore
G) Hardwares :
i) Vision panel : Providing and fixing Borosilicate single
clear toughened glass of Pyron or approved equivalent
make to the thickness of 6 mm to with stand two hours fire
rating including making cutouts in the steel door & fixing in
position with spin turned rings. Rate shall include for
providing one side adhesive Glazing tape in the frame to
hold the vision panel glass in position and to ensure the
stability of the fixing. One vision panel shall be provided in
the active leaf of the Single / Double leaf shutter.
ii) Hinge : Providing and fixing Stainless steel satin finish
double ball bearing butt hinges with SS screws of size 100
x 75 x 3 mm thick - Model No. SS 551 B - class 8 / 9 from
Dorma or approved equivalent make suitably for Single /
Double leaf door. Stainless steel conforming to SS 316 L
grade to BS 7352 or BS EN 1935-2002. 4 Nos for Single
Leaf Shutter and 8 Nos for Double Leaf Shutter.
ii) Flush Bolt : Providing and fixing Stainless steel satin
finish consealed tower bolt with SS screws of approved
equivalent make for Double leaf door in the In - Active leaf.
H) Provision :
i) Provision / fixing arrangements to be made in the shutter
as well as in the frame to receive / fix the Hinges, Locks,
Electro magnetic latch, Electro magnetic contact for hooter
with reinforcement pads and in such a way to connect the
same to the card access control system / IBMS.
ii) Refer hardware schedule enclosed for the details of
Mortise sash lock, Mortise dead lock, Handles, Push plates
and Panic bar etc. Necessary provision shall be made in
the frame and shutter to receive and fix the hardwares.
iii) Supplying Master key for the doors either floor wise or
wing wise as per the Master key plan including supplying
Grand Master key for all the doors.
Note :
1. All the Materials and hardware specifications proposed
for door shall conform to the codes, technical specification
and preamble to the bills of quantities.
2. Quoted rate shall be deemed to have considered all the
items covered in the specification and drawings, whether
explicitly stated or not.
C.R.Narayana Rao
Architects &Engineers 149 Part - II - Bill of Quantities
Tidel, Coimbatore
Extra rate over and above steel door items for providing and
fixing the following Hardwares in position in the doors
supplied with all necessary accessories etc complete and
as directed.
ii Model.No.TGD1 300 22 S
Each 25
C.R.Narayana Rao
Architects &Engineers 150 Part - II - Bill of Quantities
Tidel, Coimbatore
Rate shall include to fix the main frames into masonry wall /
RC concrete surface with necessary clamps, fastening
straps, nuts, bolts, rivets, washers and other fastening
materials shall be in stainless steel or aluminium. Rate
shall include for providing clear toughened glass 5.5 mm
thick and to be fixed with snap fit aluminium beading section
and special water proof EPDM Gasket, Neoprene etc.
complete. Necessary silicon sealant of Dowcorning 795 or
approved equivalent make shall be provided at the
junctions between wall and main frames.
C.R.Narayana Rao
Architects &Engineers 151 Part - II - Bill of Quantities
Tidel, Coimbatore
Rate shall include to fix the main frames into masonry wall /
RC concrete surface with necessary clamps, fastening
straps, nuts, bolts, rivets, washers and other fastening
materials shall be in stainless steel or aluminium. Rate
shall include for providing clear toughened glass 5.5 mm
thick and to be fixed with snap fit aluminium beading section
and special water proof EPDM Gasket, Neoprene etc.
complete. Necessary silicon sealant of Dowcorning 795 or
approved equivalent make shall be provided at the
junctions between wall and main frames.
C.R.Narayana Rao
Architects &Engineers 152 Part - II - Bill of Quantities
Tidel, Coimbatore
7.13 Providing and fixing pull and push type rolling shutters of
approved make out of 18 gauge, 75mm wide cold rolled
steel laths of convex corrugation, with side guides and
bottom rails, with interlocking arrangements for steel laths
by means of alternate clips, suspension shaft with High
tension coil type springs two numbers, mounted on
specially designed pipe shaft, with bracket plater, guide
Sqm 91
channels, ball bearing arrangements, for inside and outside
lockign with push and pull operation complete including
pulling hooks, 4 nos. handles with all fittings and
accessories, painted with a coat of red lead paint (without
top cover) cost of materials, labour, HOM of machinery
complete as per specification.
C.R.Narayana Rao
Architects &Engineers 153 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 154 Part - II - Bill of Quantities
Tidel, Coimbatore
8.07 Providing two coats of first quality water proof cement paint
of approved make and colour over a priming coat of white
colour water proof cement paint or any primer specified by
the manufacturer including preparation of surface by
Sqm Qro
thorough cleaning and wetting before painting and curing all
as per manufacturer`s specifications and as directed.
C.R.Narayana Rao
Architects &Engineers 155 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 156 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 157 Part - II - Bill of Quantities
Tidel, Coimbatore
Mode of measurement:
Note : Item no. a) Top of raft slab of basement lift pit base
slab and UG sump base slab ie. width and length between
the retaining wall only will be measured and paid for.
C.R.Narayana Rao
Architects &Engineers 158 Part - II - Bill of Quantities
Tidel, Coimbatore
9.04 a Water proofing treatment over RCC roof slab laid to slope in
terrace and gutter slab covering the following sequence of
operation and specifications:
a) The roof slab laid in slope / gutter slab shall be
thoroughly cleaned by removing the debris and dust, to
receive the water proofing treatment.
C.R.Narayana Rao
Architects &Engineers 159 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 160 Part - II - Bill of Quantities
Tidel, Coimbatore
b Extra rate over and above item, for Providing and laying
brickbat coba using well burnt brick bats set in cement
mortar 1:3 by adding CICO no.1or approved equivalent Cum 600
water proofing compound including curing etc complete as
directed
C.R.Narayana Rao
Architects &Engineers 161 Part - II - Bill of Quantities
Tidel, Coimbatore
10.04 Extra rate over plaster item rate for providing Plaster mesh
made out of galvanised iron of nominal thickness 0.35 mm
with a Zinc coating of 120 gms per Sqm at the junctions of
Masonry and concrete works to a width of 100 to 125 mm
including tying in position with suitable clamps / screws etc.,
complete and as per manfacturer specification,from M/s.
Arpitha exports, Bangalore. Rate shall include for
preparation of surface, cleaning, curing etc. complete, all as
directed. as directed.
10.06 Providing and laying 20mm size grade aggregate for any
specified works with the specified width and depth as
indicated in the drawing, cost shall include necessay lead Cum Qro
and lift etc., complete.
C.R.Narayana Rao
Architects &Engineers 162 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 163 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 164 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 165 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 166 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 167 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 168 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 169 Part - II - Bill of Quantities
Tidel, Coimbatore
6.02 Providing and constructing brick work with best quality well
chamber table moulded bricks with minimum compressive
strength of 50 Kg per Sqcm. in cement mortar 1:5 in Cum 5
superstructure at all levels etc. complete, all as directed.
C.R.Narayana Rao
Architects &Engineers 170 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 171 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 172 Part - II - Bill of Quantities
Tidel, Coimbatore
7.05 Providing & laying best quality approved colour granite slab
of any approved colour for counter top not less than 20mm
thick of size not less than 1800mm x 600mm , machine cut
and machine high pre-polished, set in C.M 1:4, 20 mm thick
topped with white cement slurry (for surface contact of the
bottom of the granite slab) as per approved pattern / design
including finishing the joints with white cement slurry,
cutting, edge chamfering and polishing rough, medium, nice Sqm 20
and acid wash and tin-oxide polish as per manufacturer's
Specification and as directed. Rate shall include for
preparation of base surface & finished the surface,
protection with gypsum / pop layer over plastic sheet and
removing the same before handing over, work at all levels
and as directed.
i) Hardwares :
i) Hinge : Providing and fixing Stainless steel satin finish
double ball bearing butt hinges with SS screws of size 100
x 75 x 3 mm thick - Model No. SS 551 B - class 8 / 9 from
Dorma or approved equivalent make suitably for Single /
Double leaf door. Stainless steel conforming to SS 316 L
grade to BS 7352 or BS EN 1935-2002. 4 Nos for Single
Leaf Shutter and 8 Nos for Double Leaf Shutter.
ii) Provision :
i) Provision / fixing arrangements to be made in the shutter
as well as in the frame to receive / fix the Hinges, Locks,
Electro magnetic latch, Electro magnetic contact for hooter
with reinforcement pads and in such a way to connect the
same to the card access control system / IBMS.
ii) Refer hardware schedule enclosed for the details of
Mortise sash lock, Mortise dead lock, Handles, Push plates
and Panic bar etc. Necessary provision shall be made in
the frame and shutter to receive and fix the hardwares.
iii) Supplying Master key for the doors either floor wise or
wing wise as per the Master key plan including supplying
Grand Master key for all the doors.
C.R.Narayana Rao
Architects &Engineers 173 Part - II - Bill of Quantities
Tidel, Coimbatore
Note :
1. All the Materials and hardware specifications proposed
for door shall conform to the codes, technical specification
and preamble to the bills of quantities.
2. Quoted rate shall be deemed to have considered all the
items covered in the specification and drawings, whether
explicitly stated or not.
Extra rate over and above steel door items for providing and
fixing the following Hardwares in position in the doors
supplied with all necessary accessories etc complete and
as directed.
c. Extra rate over and above item no a & b for making opening
in Toilet door in all blocks / floors for fixing the Air Transfer
grill
C.R.Narayana Rao
Architects &Engineers 174 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 175 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 176 Part - II - Bill of Quantities
Tidel, Coimbatore
10.01 Water proofing treatment Treatment over RCC roof slab laid
a to slope in terrace and gutter slab covering the following
sequence of operation and specifications:
a) The roof slab laid in slope / gutter slab shall be
thoroughly cleaned by removing the debris and dust, to
receive the water proofing treatment.
C.R.Narayana Rao
Architects &Engineers 177 Part - II - Bill of Quantities
Tidel, Coimbatore
b Extra rate over and above item, for Providing and laying
brickbat coba using well burnt brick bats set in cement
mortar 1:3 by adding CICO no.1or approved equivalent Cum 10
water proofing compound including curing etc complete as
directed
C.R.Narayana Rao
Architects &Engineers 178 Part - II - Bill of Quantities
Tidel, Coimbatore
11.02 Providing and laying 20mm size grade aggregate for any
specified works with the specified width and depth as
indicated in the drawing, cost shall include necessay lead Cum 5
and lift etc., complete.
C.R.Narayana Rao
Architects &Engineers 179 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 180 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 181 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 182 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 183 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 184 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 185 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 186 Part - II - Bill of Quantities
Tidel, Coimbatore
7.02 Providing and constructing brick work with best quality well
chamber table moulded bricks with minimum compressive
strength of 50 Kg per Sqcm. in cement mortar 1:5 in Cum 5
superstructure at all levels etc. complete, all as directed.
C.R.Narayana Rao
Architects &Engineers 187 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 188 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 189 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 190 Part - II - Bill of Quantities
Tidel, Coimbatore
8.07 Providing and fixing step risers and treads with approved
Kotah stone slab of thickness not less than 30mm in
single piece for each step patterned as per drawing over
a bed of C.M 1:4, 20 mm thick, all edges machine cut,
machine polished as per manufacturers specification and
as directed. Rate shall include for preparation of base
surface, jointing with matching cement slurry and finished Sqm 35
surface protection with gypsum / POP layer over plastic
sheet and removing the same before handing over, work at
all levels etc complete, all as directed.
i) Hardwares :
i) Hinge : Providing and fixing Stainless steel satin finish
double ball bearing butt hinges with SS screws of size 100
x 75 x 3 mm thick - Model No. SS 551 B - class 8 / 9 from
Dorma or approved equivalent make suitably for Single /
Double leaf door. Stainless steel conforming to SS 316 L
grade to BS 7352 or BS EN 1935-2002. 4 Nos for Single
Leaf Shutter and 8 Nos for Double Leaf Shutter.
C.R.Narayana Rao
Architects &Engineers 191 Part - II - Bill of Quantities
Tidel, Coimbatore
ii) Provision :
i) Provision / fixing arrangements to be made in the shutter
as well as in the frame to receive / fix the Hinges, Locks,
Electro magnetic latch, Electro magnetic contact for hooter
with reinforcement pads and in such a way to connect the
same to the card access control system / IBMS.
ii) Refer hardware schedule enclosed for the details of
Mortise sash lock, Mortise dead lock, Handles, Push plates
and Panic bar etc. Necessary provision shall be made in
the frame and shutter to receive and fix the hardwares.
iii) Supplying Master key for the doors either floor wise or
wing wise as per the Master key plan including supplying
Grand Master key for all the doors.
Note :
1. All the Materials and hardware specifications proposed
for door shall conform to the codes, technical specification
and preamble to the bills of quantities.
2. Quoted rate shall be deemed to have considered all the
items covered in the specification and drawings, whether
explicitly stated or not.
Extra rate over and above steel door items for providing and
fixing the following Hardwares in position in the doors
supplied with all necessary accessories etc complete and
as directed.
C.R.Narayana Rao
Architects &Engineers 192 Part - II - Bill of Quantities
Tidel, Coimbatore
c. Extra rate over and above item no a & b for making opening
in Toilet door in all blocks / floors for fixing the Air Transfer
grill
Rate shall include to fix the main frames into masonry wall /
RC concrete surface with necessary clamps, fastening
straps, nuts, bolts, rivets, washers and other fastening
materials shall be in stainless steel or aluminium. Rate
shall include for providing clear toughened glass 5.5 mm
thick and to be fixed with snap fit aluminium beading section
and special water proof EPDM Gasket, Neoprene etc.
complete. Necessary silicon sealant of Dowcorning 795 or
approved equivalent make shall be provided at the
junctions between wall and main frames.
C.R.Narayana Rao
Architects &Engineers 193 Part - II - Bill of Quantities
Tidel, Coimbatore
Rate shall include to fix the main frames into masonry wall /
RC concrete surface with necessary clamps, fastening
straps, nuts, bolts, rivets, washers and other fastening
materials shall be in stainless steel or aluminium. Rate
shall include for providing clear toughened glass 5.5 mm
thick and to be fixed with snap fit aluminium beading section
and special water proof EPDM Gasket, Neoprene etc.
complete. Necessary silicon sealant of Dowcorning 795 or
approved equivalent make shall be provided at the
junctions between wall and main frames.
C.R.Narayana Rao
Architects &Engineers 194 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 195 Part - II - Bill of Quantities
Tidel, Coimbatore
10.07 Providing two coats of first quality water proof cement paint
of approved make and colour over a priming coat of white
colour water proof cement paint or any primer specified by
the manufacturer including preparation of surface by
Sqm 50
thorough cleaning and wetting before painting and curing all
as per manufacturer`s specifications and as directed.
C.R.Narayana Rao
Architects &Engineers 196 Part - II - Bill of Quantities
Tidel, Coimbatore
C.R.Narayana Rao
Architects &Engineers 197 Part - II - Bill of Quantities
Tidel, Coimbatore
11.02 Supplying and filling for sunken slab area with brickbat coba
using half bricks/ full bricks as per specification by adding
CICO NO:1 or approved equivalent admixture at the
specified in the manufacture's specification after entire
completion of laying pipes, sanitary fittings etc. Rate shall Cum 20
include for preparation of surface, protecting the laid pipes
and sanitary fittings, finishing the surface smooth to receive
the top coat of water proofing application etc. complete and
all as directed.
C.R.Narayana Rao
Architects &Engineers 198 Part - II - Bill of Quantities
Tidel, Coimbatore
11.04 Water proofing treatment over RCC roof slab laid to slope in
a terrace and gutter slab covering the following sequence of
operation and specifications:
a) The roof slab laid in slope / gutter slab shall be
thoroughly cleaned by removing the debris and dust, to
receive the water proofing treatment.
C.R.Narayana Rao
Architects &Engineers 199 Part - II - Bill of Quantities
Tidel, Coimbatore
b Extra rate over and above item, for Providing and laying
brickbat coba using well burnt brick bats set in cement
mortar 1:3 by adding CICO no.1or approved equivalent Cum 30
water proofing compound including curing etc complete as
directed
C.R.Narayana Rao
Architects &Engineers 200 Part - II - Bill of Quantities
Tidel,Coimbatore
Note: Tenderer to take copy of this document and sign with their seal and submit along with tender document for token of acceptance. This will form part of the contract
document.
A list of materials given below in the chart shall be treated only as indicative for the contractors. The custom duty/excise duty, VAT or any other tax component for which
exemption are available under SEZ Project and as well as for other materials may be provided.
They should also indicate the labour charges and service tax and cess exemptions available to TIDEL Park Coimbatore Limited.
The bidders may add any more items to the above list as appropriate and indicate the tax components for which TIDEL will get exemptions benefits.
Amount (Rs.)
SUPPLY
Total Material Cost
Entry tax- VAT-1, 2 as SEZ Project
CD/CVD ED ST/CST Total for
Materials Cost 1& 2 &3
Other Supply (C) =
Qty (B)
S.No Description Unit taxes/ (B) + [sum of
(A) (Unit Cost) in Rs.
duties (vi) taxes (i)
(i) (ii) (iii) (iv) (v) (A x B) in Rs.
though (vi)]
(including Basic cost,
transportation, handling and
Insurance Charges, etc.)
(Fill taxes applicable for the item)
A CIVIL WORKS
1 Sand
Cum
C.R.Narayana Rao
Architects &Engineers 201 201-209.xls
Tidel,Coimbatore
Amount (Rs.)
SUPPLY
Total Material Cost
Entry tax- VAT-1, 2 as SEZ Project
CD/CVD ED ST/CST Total for
Materials Cost 1& 2 &3
Other Supply (C) =
Qty (B)
S.No Description Unit taxes/ (B) + [sum of
(A) (Unit Cost) in Rs.
duties (vi) taxes (i)
(i) (ii) (iii) (iv) (v) (A x B) in Rs.
though (vi)]
(including Basic cost,
transportation, handling and
Insurance Charges, etc.)
(Fill taxes applicable for the item)
2 Gravel
Cum
3 Quarry Dust
Cum
Coarse aggregate
4 (Machine crushed)
a 40 mm size aggregate
Cum
b 25 mm size aggregate
Cum
c 20 mm size aggregate
Cum
d 12 mm size chips
Cum
e 10 mm size chips
Cum
4 Cement (Bench mark
rate) 3500
MT
5 Thermo Mechanically
Treated Bars (TMT)
(Bench mark rate)
a) 08 mm Fe415 MT
C.R.Narayana Rao
Architects &Engineers 202 201-209.xls
Tidel,Coimbatore
Amount (Rs.)
SUPPLY
Total Material Cost
Entry tax- VAT-1, 2 as SEZ Project
CD/CVD ED ST/CST Total for
Materials Cost 1& 2 &3
Other Supply (C) =
Qty (B)
S.No Description Unit taxes/ (B) + [sum of
(A) (Unit Cost) in Rs.
duties (vi) taxes (i)
(i) (ii) (iii) (iv) (v) (A x B) in Rs.
though (vi)]
(including Basic cost,
transportation, handling and
Insurance Charges, etc.)
(Fill taxes applicable for the item)
Fe500 MT 38000
Fe500
MT
CRS
b) 10 mm Fe415 MT
Fe500 MT 38000
Fe500
MT
CRS
c) 12 mm Fe415 MT
Fe500 MT 38000
Fe500
MT
CRS
d) 16 mm Fe415 MT
Fe500 MT 38000
Fe500
MT
CRS
C.R.Narayana Rao
Architects &Engineers 203 201-209.xls
Tidel,Coimbatore
Amount (Rs.)
SUPPLY
Total Material Cost
Entry tax- VAT-1, 2 as SEZ Project
CD/CVD ED ST/CST Total for
Materials Cost 1& 2 &3
Other Supply (C) =
Qty (B)
S.No Description Unit taxes/ (B) + [sum of
(A) (Unit Cost) in Rs.
duties (vi) taxes (i)
(i) (ii) (iii) (iv) (v) (A x B) in Rs.
though (vi)]
(including Basic cost,
transportation, handling and
Insurance Charges, etc.)
(Fill taxes applicable for the item)
e) 20 mm Fe415 MT
Fe500 MT 38000
Fe500
MT
CRS
f) 25 mm Fe415 MT
Fe500 MT 38000
Fe500
MT
CRS
g) 32 mm Fe415 MT
Fe500 MT 38000
Fe500
MT
CRS
6 Structural Steel
a Rolled Sections
C.R.Narayana Rao
Architects &Engineers 204 201-209.xls
Tidel,Coimbatore
Amount (Rs.)
SUPPLY
Total Material Cost
Entry tax- VAT-1, 2 as SEZ Project
CD/CVD ED ST/CST Total for
Materials Cost 1& 2 &3
Other Supply (C) =
Qty (B)
S.No Description Unit taxes/ (B) + [sum of
(A) (Unit Cost) in Rs.
duties (vi) taxes (i)
(i) (ii) (iii) (iv) (v) (A x B) in Rs.
though (vi)]
(including Basic cost,
transportation, handling and
Insurance Charges, etc.)
(Fill taxes applicable for the item)
a M 25 Grade Cum
b M 30 Grade Cum
c M 45 Grade Cum
a M 25 Grade Cum
b M 30 Grade Cum
c M 45 Grade Cum
C.R.Narayana Rao
Architects &Engineers 205 201-209.xls
Tidel,Coimbatore
Amount (Rs.)
SUPPLY
Total Material Cost
Entry tax- VAT-1, 2 as SEZ Project
CD/CVD ED ST/CST Total for
Materials Cost 1& 2 &3
Other Supply (C) =
Qty (B)
S.No Description Unit taxes/ (B) + [sum of
(A) (Unit Cost) in Rs.
duties (vi) taxes (i)
(i) (ii) (iii) (iv) (v) (A x B) in Rs.
though (vi)]
(including Basic cost,
transportation, handling and
Insurance Charges, etc.)
(Fill taxes applicable for the item)
B FINISHES
a 32 mm thick
b 35 mm thick
4 Fire Rates Stel Door
a 2 Hour Fire
b 1 Hour Fire
5 Patch Fitting Door
a Patches
b Laminated Glass - 10 mm
6 Sliding Door
C.R.Narayana Rao
Architects &Engineers 206 201-209.xls
Tidel,Coimbatore
Amount (Rs.)
SUPPLY
Total Material Cost
Entry tax- VAT-1, 2 as SEZ Project
CD/CVD ED ST/CST Total for
Materials Cost 1& 2 &3
Other Supply (C) =
Qty (B)
S.No Description Unit taxes/ (B) + [sum of
(A) (Unit Cost) in Rs.
duties (vi) taxes (i)
(i) (ii) (iii) (iv) (v) (A x B) in Rs.
though (vi)]
(including Basic cost,
transportation, handling and
Insurance Charges, etc.)
(Fill taxes applicable for the item)
7 Hardwares
a Vision panel
b Hinge
c Flush Bolt
a Teak Wood
b Padauk Wood
c Malaysian sal
a Teak Wood
b Padauk Wood
c Malaysian sal
Commercial plywood of
10
following items
a 6 mm thick
b 9 mm thick
c 12 mm thick
d 19 mm thick
C.R.Narayana Rao
Architects &Engineers 207 201-209.xls
Tidel,Coimbatore
Amount (Rs.)
SUPPLY
Total Material Cost
Entry tax- VAT-1, 2 as SEZ Project
CD/CVD ED ST/CST Total for
Materials Cost 1& 2 &3
Other Supply (C) =
Qty (B)
S.No Description Unit taxes/ (B) + [sum of
(A) (Unit Cost) in Rs.
duties (vi) taxes (i)
(i) (ii) (iii) (iv) (v) (A x B) in Rs.
though (vi)]
(including Basic cost,
transportation, handling and
Insurance Charges, etc.)
(Fill taxes applicable for the item)
e 25 mm thick
a 6 mm thick
b 9 mm thick
c 12 mm thick
d 19 mm thick
e 25 mm thick
Plain Medium Density
12
Fibre Board
a 6 mm thick
b 9 mm thick
c 12 mm thick
d 19 mm thick
e 25 mm thick
13 Vitrified Ceramic Tiles
14 Granite Slab
15 Kotah Stone
C.R.Narayana Rao
Architects &Engineers 208 201-209.xls
Tidel,Coimbatore
Amount (Rs.)
SUPPLY
Total Material Cost
Entry tax- VAT-1, 2 as SEZ Project
CD/CVD ED ST/CST Total for
Materials Cost 1& 2 &3
Other Supply (C) =
Qty (B)
S.No Description Unit taxes/ (B) + [sum of
(A) (Unit Cost) in Rs.
duties (vi) taxes (i)
(i) (ii) (iii) (iv) (v) (A x B) in Rs.
though (vi)]
(including Basic cost,
transportation, handling and
Insurance Charges, etc.)
(Fill taxes applicable for the item)
MISCELLANEOUS
C
WORKS
1 Expansion Joint
2 Laminates 1.5 mm tk
3 Veneer - 3.5 mm tk
Other Materials
( Contractor Should
Specify )
C.R.Narayana Rao
Architects &Engineers 209 201-209.xls
Tidel, Coimbatore Summary
BILLS OF QUANTITIES FOR SHELL & CORE, CIVIL FINISHES & SUBSIDIARY WORKS
1 Earthwork Excavation
4 Form Works
7 Miscellaneous Works
Sub - Total of 3 A in Rs.
SECTION 3B - MAIN BUILDING - CIVIL FINISHES MATERIALS SUPPLY Labour Charges TOTAL Amount
(A) + (B)
1 Masonry Works Basic cost Taxes Amount (A) Basic cost Taxes Amount (B)
3 Joinery Works
2 Drains &Trenches
3 Compound Wall
4 HSD Tank
6 UnderGround Sump
Sub - Total of 3 C in Rs.
2 Secutiry Buuilding