Académique Documents
Professionnel Documents
Culture Documents
KSO AMYTHAS-ARKONIN-REKADAYA
KSO AMYTHAS-ARKONIN-REKADAYA
Condenser 2. All
#2. Must Connection
be Same. Flanges from 2. Installatio
Condenser to n From
2. Alignment Connected Turbine
Of Water Pipe Line Generator
Injection 2. Oil Lube Tank thru Lube Oil # 1 and
Pumps. must be Tank. Ok. Turbine
T/G # 1 welded Generator
Connect to 3. Manual # 2 Thru
Flange and Operation Main
Leak Off Test. and Master
Maintenance Steam
3. Gate Valves Equipment valve and
3. The must be Ok. Had been Oil Lube
elevation of To Test Run Done. Tank .Ok
Top Padding for Open and 3. Leak Of
Plate of Closed Valves. test.
Cond. Pipe Line,
Pumps. Condenser
and Lube
Oil Tank
and
Pumps.
4. Last Will be
Drawing Test. Ok.
Approval.
4. Operator
Profession
al and
Experience
Must Be
5. Certificated Prefect.
Equipment
Had been 5. Calibrated
Down. Had been
done.
KSO AMYTHAS-ARKONIN-REKADAYA
Grade 6 :
0 Degree :
= 0.57 ( a and b).
Mechanical Weekly Report
Konsultan Supervisi Konstruksi dan QA/QC PLTU 3 BANGKA BELITUNG ( 2 x 30 MW )
Contract No. 19. PJ/121/PIKITRING SBS/2008
KSO AMYTHAS-ARKONIN-REKADAYA