SUMMARY

INSPECTED PADDING SURVEY WATER INJECTION


PUMP AND CONDENSER TURBINE NO # 1
AND CONDENSER TURBINE NO # 1 AND CONDENSER
NO # 2 AND CONDENSER TURBINE NO # 2

SITE PROBLEM REMIDIAL TARGET


DESCRIPTION ACTION.

1. Position 1. Condenser # 1. Condenser


1. Centerline Condenser In 1 and # 1,
and Port Not Condenser Condenser
Dimensional Centre Line. # 2 Position #2
Of Between Still Level in And Pump
Condenser. Condenser Center Line. Perfected.
For T/G # 1 # 1 and Condition.
& T/G # 2 Condenser
# 2.

Mechanical Weekly Report


Konsultan Supervisi Konstruksi dan QA/QC PLTU 3 BANGKA BELITUNG ( 2 x 30 MW )
Contract No. 19. PJ/121/PIKITRING SBS/2008

KSO AMYTHAS-ARKONIN-REKADAYA

Condenser 2. All
#2. Must Connection
be Same. Flanges from 2. Installatio
Condenser to n From
2. Alignment Connected Turbine
Of Water Pipe Line Generator
Injection 2. Oil Lube Tank thru Lube Oil # 1 and
Pumps. must be Tank. Ok. Turbine
T/G # 1 welded Generator
Connect to 3. Manual # 2 Thru
Flange and Operation Main
Leak Off Test. and Master
Maintenance Steam
3. Gate Valves Equipment valve and
3. The must be Ok. Had been Oil Lube
elevation of To Test Run Done. Tank .Ok
Top Padding for Open and 3. Leak Of
Plate of Closed Valves. test.
Cond. Pipe Line,
Pumps. Condenser
and Lube
Oil Tank
and
Pumps.
4. Last Will be
Drawing Test. Ok.
Approval.
4. Operator
Profession
al and
Experience
Must Be
5. Certificated Prefect.
Equipment
Had been 5. Calibrated
Down. Had been
done.

INSPECTED OF TURBINE GENERATOR NO. # 1 #


( TO ENCLOSED UPPER CASING TURBINE GENERATOR
#1).
DESCRIPTION SITE PROBLEM REMEDIAL TARGET
ACTION 1. Closed Cover

Mechanical Weekly Report


Konsultan Supervisi Konstruksi dan QA/QC PLTU 3 BANGKA BELITUNG ( 2 x 30 MW )
Contract No. 19. PJ/121/PIKITRING SBS/2008

KSO AMYTHAS-ARKONIN-REKADAYA

1. Padding Inspected Of Unit 1. Already Turbine


Survey. Front Gland Checked perfected.
Clearance. The
2. Centerline Inspected. 2. Tightening
Survey. Grade 1 : Ok. Bolts.

3. Pre 0 to 270 Degree : 2. Compared 3. Installed


Alignment = 0.50 ( a and b). Last Pipe Line
Generator Drawing from TG 1
#1. Grade 2 : and Actual Thru Lube
Inspected. Tank,
4. Pre 0 Degree : OK. Condenser 1
Alignment = 0.45 ( a and b). and Master
Turbine # 1. 3. All Steam
90 -270 Degree : Equipment Valves.
5. Last = 0.50 ( a and b). Cleaned
Drawing Out. 4. Installed AC
Approval. Grade 3 : Ok. Aciter and
Pipe Lines.
6. Certificate 0 Degree : 4. Closed
Had been = 0.50 ( a and b). Cover 5. Flushing
done. Turbine. Pipe Lines.
90 180 Degree : Ok.
7. Calibration = 0.60 ( a and b). 6. Air Test Line.
Equipments
and Tools. 270 Degree : 7. Water Test
Had been = 0.50 ( a and b). Line.
done.
Grade 4 : 8. Test Welded
8. Manual In Pipe
Instruction 0 Degree : Lines.
from = 0.60 ( a and b).
Fabricator. 9. Individual
Had been 90-180 Degree. Test.
done. = 0.45 ( a and b).
10.Manual
9. SOP. 270 Degree. Operation
= 0.55 ( a and b). Had been
10.Safety done.
Manual
Procedure. Grade 5 :

11.Final 0 Degree : 11.Operator


Inspected = 0.50 ( a and b). Experience
Before and
assembled 90-180 Degree : Excellent..
and = 0.45 ( a and b).
enclosed
upper 270 Degree :
casing. = 0.55 ( a and b).

Grade 6 :

0 Degree :
= 0.57 ( a and b).
Mechanical Weekly Report
Konsultan Supervisi Konstruksi dan QA/QC PLTU 3 BANGKA BELITUNG ( 2 x 30 MW )
Contract No. 19. PJ/121/PIKITRING SBS/2008

KSO AMYTHAS-ARKONIN-REKADAYA

Name : Marsaid.Arsyad / KSO - Mechanical Engineering.

Mechanical Weekly Report

Vous aimerez peut-être aussi