The person who controls the resources required to maintain the fabric
of the installation. Typically, the Asset Manager, supported by the
Structural and Safety TAs.
The person responsible for running the maintenance system for the
temporary refuge (TR), escape routes and other structural safety
critical elements (SCE). Typically, the contractors technical authority
and/or duty holder (DH) technical authority.
You may wish to involve other persons such as the independent competent
person (ICP), the HSE advisors, and discipline engineers.
While interviewing, you may wish to take advantage of the PEACE technique
described in HSE Investigative Interviewing course. Essentially, this takes the
form of one inspector asking the questions and a second taking notes on the
responses. The second interviewer has responsibility for keeping the interview
on track and for going back to clarify inconsistencies etc.
TA-A: Inspection and Maintenance basics
3 Describe how fabric inspection and remedial action tasks are prioritised.
How are priority ratings reviewed?
1 How do the onshore technical authorities and support staff monitor the
quality of offshore inspection and maintenance activities?
1 How does the duty holder assess the competence of personnel and
companies involved in survey and repair work?
1 What is the process by which work packs for survey activity are produced?
What performance standards are in place for secondary structural elements
(e.g. escape routes)?
2 What happens if the acceptance criteria are not met? Request a copy of the
documentation describing the contingency action to follow should the SCE fail
the acceptance criteria.
TA-E: Supervision
2 What mechanisms are in place to elevate the priority of structural work that
is in backlog?
1 Give examples of where temporary repairs could be made. How are these
temporary repairs monitored? What approval is required from the TA before a
temporary repair can be made?
1 Are there suitable performance standards for the topsides structure (e.g.
availability of escape routes)?
2 Check that all anomalies have been assessed, and appropriate action
taken.
TA-M: Measuring the quality of maintenance work
1 For the topsides structure, provide evidence that the verification scheme
defines the ICPs tasks in terms of the nature of examination, the frequency of
examination, how results and recommendations are recorded, and how
remedial action is recorded.
4 How are SCE performance standards reviewed? What triggers this review?
Condition of installation
Walkways/stairways/handrails/gratings
Pipework supports
Cable trays (including continuity of earthing)
Lighting supports
Fire/blast walls
Passive fire protection (PFP)
Secondary structural elements
o Equipment supports
o Flare/vent supports/attachments
o Helideck support frame
Spider deck: access to and condition of the spider deck
Conductors
Caissons
Riser clamps
Flare/vent structure
Lifeboat stations: davits
Communication aerials
Boat bumpers/fenders
Fire pump enclosures
Crane pedestals
Anti-vibration mounts/supports for modules/large equipment