Vous êtes sur la page 1sur 19

Form: 1 SCADA/DMS Control Center Cost (BOQ)

S.No Equipment Unit Quantity Per Unit Cost

A B C D F
1 SERVER/WORKSTATIONS
1.1 SCADA Server (Application)
1.2 FEP server
1.3 ISR server
1.4 Development server
1.5 Workstation with dual TFT Monitors
1.6 Development console with one TFT
Laser based Video Projection system with 2x3 Module
1.7 configuration with each module at least 70" diagonal with
common projector (Optional)
1.8 External DAT tape drive
1.9 Racks 42U- OEM
Sub Total 1
2 SWITCHES
2.1 Layer II switch (SCADA/DMS Dual LAN) (48 ports)
Sub Total 2
3 SECURITY SYSTEM (DMZ)
3.1 Web server with load balancing

3.2 Router with Minimum 8 Ethernet ports (1 Gbps) and 4 Fiber


Optic Ports
3.3 Firewall & network IDS/IPS for Iinterface system
3.4 Layer II switch (24 ports)
Sub Total 3
4 OTHER ACTIVE DEVICES
4.1 GPS Time synchronization system
4.2 Time, day & date digital displays
Sub Total 4
5 PRINTERS
5.1 Color laser printer

5.2 Black and White laser printer with Multifunction devices

Sub Total 5
6 CABLING SYSTEMS
6.1 Cable, Jacks etc

6.2 Any other hardware to meet functional /performance


requirement
Sub Total 6
7 Software for Control Centre
7.1 SCADA software
7.2 ISR Software
7.3 Development software
7.4 NMS software
Sub Total 7
8 Recommended Spares
8.1 5% of Sub total 1+2+3+4+5+6
Sub Total 8
Cost (BOQ)

Total Cost FMS Cost


taxes & dutiesTotal Unit Cost(Incl. taxes for 01 year
& duties)

G H=F+G I= D x H J
Form: 2 RTU

S.No Equipment Unit Quantity Per Unit Cost taxes & duties

A B C D F G
1 RTUs

RTU base equipment comprising panels, racks,


sub-racks, Power Supply modules, CPU,
interfacing equipment, required converters & all
other required items/accessories including
complete wiring for all modules for all locations
and Communication modules for interfacing
energy meters/multi-function transducers using
RS 485, MODBUS protocol & 2 ethernet port.
1.1 (assuming 2 nos. RS485 ports per module)
Multifunction Transducers (15 Nos Transformer
1.2 Panel + 61 Nos Feeders)

DC Transducer for monitoring DCDB analogs and


communicable on IEC 104/Modbus protrocol (6
1.3 Nos S/Stn)
1.4 Router (6 Nos)
Any other hardware to meet functional
1.5 /performance requirement
Sub Total 1
2 TEST EQUIPMENTS for RTU
RTU Database Configuration & Maintenance
2.1 Software tool
Master Station cum RTU Simulator & Protocol
2.2 analyser software tool

Laptop PC for above software tools along with


interfacing hardware including USB to serial
2.3 convertor
Sub Total 2
3 Recommended Spares
5% of subtotal 1+2
Sub Total 3
GRAND TOTAL
Total
Cost FMS Cost
Total Unit Cost (Incl. for 01
taxes & year
duties)

H=F+G I= D x H J
Form: 3 Communication system - VPN (MLLN/ MPLS) Broadband

S.No Equipment Unit QuantityPer Unit Cost


taxes & duties
Total Unit Cost

A B C D F G H=F+G
1 Bandwidth Charges

Network Connectivity Charges for 2.0


MBPS MPLS-broadband Link for 6 Nos.
1.1 S/stn for 36 months

Network Connectivity Charges for 6.0


MBPS MPLS-broadband Link for Control
1.2 Center for 36 months
GRAND TOTAL
nd

Total Cost FMS Cost


(Incl. for 01
taxes & year
duties)

I= D x H J
Form: 4 Auxiliary Power supply

S.No Equipment Unit QuantityPer Unit Cost

A B C D F
1 II For RTU / Data Concentrator / Communication Eqpts.

For RTU / Data Concentrator / Communication Equip-


24V/48V/220V DC Power Supply (DCPS) system based on
SMPS along with Battery bank for above DCPS (VRLA Type)
1.1 for minimum 4 hrs backup
Sub Total 1
2 Recommended Spares
2.1 5% of Sub total 1
Sub Total 2
3 Other Items
3.1 Any other required items
Sub Total 3
GRAND TOTAL
Total Cost FMS Cost
(Incl.
taxes & duties
Total Unit Costtaxes for 01
& year
duties)

G H=F+G I= D x H J
Form: 5 : BCPU

S.No Equipment Unit QuantityPer Unit Cost


taxes & duties

A B C D F G
1 Trf. Diff. Relays

SITC of of Trf. Diff. Relays alongwith follwing item


Supply of metal sheets of colour similar to existing C&R
Panel to cover the left out cut-outs Supply of CAT-6
Cable from BCPU to Ethernet Switch Supply of Double
Pole DC MCB of suitable rating (for each IEDs) Supply
of 1.5 sq.mm. and 2.5 sq.mm. Control Cables Supply of
Terminal Blocks Supply of Pin Type, U-Type, Ring Type
Lugs & Sleeves with Printed Ferrules Supply of any
miscellaneous accessories required for commissioning
Any other hardware to meet functional /performance
1.1 requirement (for 15 Nos Transformers)
Sub Total 1
2 BCPU's

SITC of BCPU alongwith following items: Supply of


metal sheets of colour similar to existing C&R Panel to
cover the left out cut-outs. Supply of CAT-6 Cable from
BCPU to Ethernet Switch Supply of Double Pole DC
MCB of suitable rating (for each IEDs) Supply of 1.5
sq.mm. and 2.5 sq.mm. Control Cables Supply of
Terminal Blocks Supply of Pin Type, U-Type, Ring Type
Lugs & Sleeves with Printed Ferrules Supply of any
miscellaneous accessories required for commissioning
2.1 (15 Nos Transformer + 61 Nos of Feeders)
Sub Total 2
3 Ethernet Switches
SITC of Industrial Grade Ethernet Switches IEC-61850
Complaince along with accessories i.e. CAT-6 Cable
from Ethernet Switch to RTU and Router Panel, Double
Pole DC MCB of suitable rating (for each IEDs),1.5
sq.mm. Control Cables, Supply of Terminal Blocks,Pin
Type, U-Type, Ring Type Lugs & Sleeves with Printed
Ferrules and any miscellaneous accessories required
3.1 for commissioning.
Sub Total 3
4 Disturbance Evaluation Unit
4.1 Disturbance Evaluation Unit
Sub Total 4
5 Recommended Spares
5.1 5% of Sub total 1+2+3+4
Sub Total 5
6 Other Items
6.1 Any other required items
Sub Total 6
GRAND TOTAL
Total Cost FMS Cost
(Incl.
Total Unit Costtaxes for 01
& year
duties)

H=F+G I= D x H J
Form: 6 Training

Per Unit
S.No Equipment Unit Quantity Cost

A B C D F
A Operator's Training
1 Operator for SCADA Control Centre
B Maintenance Training
1 Computer Hardware & System Software
2 RTU
3 BCPU/Relays
4 Database & display development
5 Auxiliary Power Supply
6 Communication System
GRAND TOTAL
Total Cost FMS Cost
taxes & Total Unit (Incl. taxes for 01
duties Cost & duties) year

G H=F+G I= D x H J
Form: 7 FMS
S.No. Equipment FMS Cost
A B C
1 FMS charges for Control Center (Form 1) for 01 year
2 FMS charges for RTU (Form 2) for 01 year
3 FMS charges for Aux. Power Supply (Form 4) for 01 year
4 FMS charges for Relays (Form 5) for 01 year
Grand Total
Form: 8 Total

S.No. Equipment

A B
1 Total Cost for Control Center (Form 1)
2 Total Cost for RTU (Form 2)
3 Total Cost for Communication (Form 3)
4 Total Cost for Aux. Power Supply (Form 4)
5 Total Cost for Relays (Form 5)
6 Total Cost for Training (Form 6)
7 FMS charges for Control Center (Form 1) for 3 years
8 FMS charges for RTU (Form 2) for 3 years
9 FMS charges for Aux. Power Supply (Form 4) for 3 years
10 FMS charges for Relays (Form 5) for 3 years
11 FMS charges for Control Center (Form 1) for additonal 2 years (Optional)*
12 FMS charges for RTU (Form 2) for additonal 2 years (Optional)*

13 FMS charges for Aux. Power Supply (Form 4) for additonal 2 years (Optional)*

14 FMS charges for Relays (Form 5) for additonal 2 years (Optional)*


Grand Total

* - Initially the FMS will be for 3 years after 1 year warranty period, however FMS may be extended further for 2-3 y
mutual agreement between Utility & Vendor.
Note:-
The rates are invited for entering into an RC valid for one year from the date of issue of contract. Prices are to be q
mentioned above are for evaluation purposes only. Actual Quantities may vary as per site requirement and Release
be
Theplaced
quoted accordingly.
rates must be inclusive of all taxes as applicable at the time of bidding.
Bidders are to quote their rates strictly as per above format.
Total Duration for 3 Years + 2 Total Cost
years (Optional) years after for 3 years
warranty
C D

ver FMS may be extended further for 2-3 years on same terms and conditions on

date of issue of contract. Prices are to be quoted accordingly. The quantities


vary as per site requirement and Release Orders against this Rate Contract (RC) shall
f bidding.