Vous êtes sur la page 1sur 207

NOVEMBER 2004 by Dover Kohl & Partners

FINAL UPDATE MAY 2009 by the City of Miami Planning Department


(Ver. 2.0)

i
Table of Contents for the
Southeast Overtown/Park West Community Redevelopment Plan
November 2004
Final Updated May 2009

Section ONE Introduction


Page 2 This Document
2 Topics Frequently Asked from Neighborhood Stakeholders
2 Historical Context
Page 3 21st Century Context
Page 5 The Potential: A Livable City
5 History of the CRA
Page 6 Revised Boundaries
6 Revisions from the Original CRA Redevelopment Plan
Page 7 Findings of Necessity
Page 9 New Legal Description

Section TWO Goals and Guiding Principles


Page 11 Redevelopment Goals
#1 Preserving Historic Buildings & Community Heritage
#2 Expanding the Tax Base using Smart Growth Principles
#3 Housing: Infill, Diversity, & Retaining Affordability
#4 Creating Jobs within the Community
#5 Promotion & Marketing of the Community
#6 Improving the Quality of Life for Residents
Page 13 Guiding Principles
1. The community as a whole has to be livable. Land uses and transportation systems must be
coordinated with each other.
2. The neighborhood has to retain access to affordable housing even as the neighborhood
becomes more desirable to households with greater means.
3. There must be variety in housing options.

ii
4. There must be variety in job options.
5. Walking within the neighborhood must be accessible, safe, and pleasant.
6. Local cultural events, institutions, and businesses are to be promoted.
Section TWO 7. The City and County must provide access to small parks and green spaces of an urban
(continued) character.
8. Older buildings that embody the areas cultural past should be restored.
9. Newer buildings must respond to our climate and reflect the communitys cultural heritage
10. Streets and buildings must be attractive.
11. Twenty-four-hour environments are to be encouraged.
12. Identifiable neighborhood centers are to be established in a distributed pattern within
Overtown and Park West.
13. The zoning and other development regulations must be reworked to yield the results
envisioned in this Redevelopment Plan.
14. Restore a sense of community and unify the area culturally.

Section THREE The Build-out Plan


Page 19 Conceptual Plan Diagram
o Land Uses & Residential Units
Page 21 Hypothetical Build-out Plan
Page 22 o Publicly Owned Land for Public Improvements
Page 23 o Open Spaces: Parks, Plazas, and Green Spaces
Page 25 o Transportation System: Mobility and Access
Reestablishing the Traditional Urban Network of Streets
Pedestrian Friendly Street Improvements
Promoting the Return of Two-way Streets
Rail and Transit Routes
Key Ideas from the Miami at Midnight Report
Page 27 o Parking
Providing and Retaining On-street Parking
Off-street Parking
Page 39 o Land Development Regulations
Adherence to Local Land Development Regulations
Revisions to the Citys Zoning and Land Development Regulations
Page 40 o Physical Plan

iii
Possible Changes to I-395
Section FOUR Projects and Programs
Page 44 Projects and Project Areas, Overview
44 Criteria for Physical Improvements
44 Project Areas
44 o Stakeholders Roles
Page 46 o Project Area A. NW 1st Avenue
Page 54 o Project Area B. Overtown (including Little Broadway and Lyric Plaza)
Page 62 o Project Area C. NW 3rd Avenue Neighborhood Center
Page 66 o Project Area D. Historic Overtown Priority Business Corridor
Page 69 o Project Area E. West Overtown
Page 74 o Project Area F. Properties facing Biscayne Boulevard
Page 77 o Project Area G. The Promenade Park West Entertainment District
Page 86 o Project Area H. NE 8th Street: Miami WorldCenter
Page 88 o Project Area I. New Camillus House/UM Research Center
88 o Project Area J. Townpark Homeownership District
Page 89 Projects and Programs
89 o Community Heritage and Historic Preservation
Page 94 o Promotion and Enhancement of Overtown and Park West as a Business Location
Page 97 o Planning, Development, Technical Assistance and Program Compliance
Page 99 o Street Improvements, Utility Infrastructure and Transportation
Page 101 o Home Ownership Pre-qualification and Counseling
101 o Grants to Existing Businesses
101 o Laredo/Re-use Plan (CLUC 90 Properties)
Summary Chart of Projects and Goals

iv
Section FIVE Capital Improvement Costs and Timeline
Page 108 Introduction
108 Capital Improvement Goals
108 Prioritizing Capital Improvements
Page 109 Potential Funding Sources
109 Capital Improvement Costs by Project Area
Page 117 Capital Improvement Costs Not Project Area Specific
Page 119 Timeline and Capital Improvement Costs Summary
Section SIX Residential Uses and Neighborhood Impact of Redevelopment
Page 121 Neighborhood Overview
Page 122 Housing Policy
122 Relocation Policy
Page 123 Traffic Circulation
123 Environmental Quality
Page 124 Effect on School Population
Page 125 Community Facilities and Services
Page 126 Physical and Social Quality

Section SEVEN Plan Management


Page 128 Powers of the SEOPW CRA
Page 129 Powers Not Given to the SEOPW CRA
129 Authority to Undertake Redevelopment
Page 130 Future Amendments to this Redevelopment Plan
Page 131 State of Florida Statutory Requirements
131 Safeguards and Assurances
131 Land Acquisition

Section EIGHT Definitions

Section NINE Directory of Local Organizations

v
Section TEN Appendices
Page 142 A. Previous Planning Work for the Area
Page 145 B. Acknowledgements
Page 146 C. School Impact Analysis for the SEOPW CRA Redevelopment Plan
Page 156 D. 1982 Resolution adopting the SEOPW CRA
Page 170 E. Resolution Adopting New Boundaries
Page 180 F. Advertisements Of Public Notice
Page 190 G. Findings of Slum and Blight

vi
1
This Document presented by current initiatives and trends, and Affordable housing for existing
transform Southeast Overtown/Park West residents.
This is a 2009 update to the 2004
into a thriving mixed-use neighborhood and Support for small businesses and the
Amendment of the 1982 Southeast
commercial hub in the heart of downtown, as creation of new jobs for current residents in
Overtown/Park West Community
provided for by this revised Community Overtown and Park West.
Redevelopment Plan (referred to as
Redevelopment Plan. This update reflects the
Redevelopment Plan or Community
expansion of the Redevelopment Areas
Redevelopment Plan), and was
commissioned by the Southeast
boundaries to include the southwest section Historical Context
and part of the northeast section of the The Southeast Overtown/Park West
Overtown/Park West Community
Overtown area. Redevelopment Area encompasses one of the
Redevelopment Agency (CRA or SEOPW
CRA), and the CRAs governing bodies, the oldest residential and commercial areas of the
City of Miami (City) and Miami-Dade City of Miami, although few structures of
County (County) to provide an updated
Topics Frequently Asked historic or cultural significance remain.
planning document for the redevelopment of About From Neighborhood Overtown and Park West each have their own
the Park West and Overtown neighborhoods Stakeholders historic past, but for practical reasons and
in accordance with the Community proximity, their futures are linked together.
Every redevelopment area has certain
Redevelopment Act of 1969 (Act). urgent concerns and problems that the
The 1982 Redevelopment Plan has not OVERTOWN
community wants addressed. While a number
been effective in the redevelopment area, due "Overtown" is one of the oldest
of these issues can be resolved through local
to the lack of financing ability by the CRA and neighborhoods in Miami settled by African
government, some of these issues need to be
private enterprises. The need to update the Americans about the time that Miami was
remedied by members of the community.
1982 Plan and provide a financing strategy for founded in the 1890s. African Americans
Adopting redevelopment plans and
the implementation of the CRAs activities in were not allowed to live in the other
creating community redevelopment agencies
the redevelopment area became imminent as developing areas of Miami. Jobs available to
are not solutions in themselves, but only
land throughout South Florida became scarce Overtown residents were mostly associated
vehicles to get to solutions. There needs to be
and the last portions of undeveloped land lie with Henry Flaglers Florida East Coast (FEC)
grass-root efforts to further stimulate interest
within the redevelopment area boundaries. It Railroad Company, the burgeoning tourist
in, education of, and visions for the
is the intent of this extensive amendment of service industry, and agriculture. Like in many
revitalization of the redevelopment
the 1982 Redevelopment Plan to address ways southern American towns, the African
neighborhoods. Overtown and Park West
in which the CRA can maximize opportunities American community lived on the other side
stakeholders frequently ask questions about:
of the railroad tracks from most white

2
families, closer to the citrus and pineapple Previous Plan Studies. 21st Century Context
farms. The name Overtown came from
The 1982 Southeast Overtown/Park West
people saying that they were going over PARK WEST
Redevelopment Area encompassed
town to this neighborhood. It was also
approximately 279 acres of land generally
referred to in the past as Colored Town. Most of the area currently referred to as
bounded by Biscayne Boulevard on the east;
The area grew and developed into a Park West was part of the original "Miami"
I-95 on the west; I-395 on the north; and NW
vibrant community. African Americans Subdivision platted in 1896 by the principal
5th Street on the south. In 1986, the
became business owners and established a developers of the early City of Miami, Mary
boundaries were expanded to include the areas
viable economic community by constructing and William Brickell, Julia Tuttle, Henry
bounded by NW 1st Street on the south,
schools, homes, churches, hotels, apartments, Flagler, and the Fort Dallas Land Company.
Metrorail right-of-way on the west, NW 5th
theaters, night clubs and small neighborhood While the initial development of Park
Street on the north, and North Miami Avenue
markets. West focused on residential projects, it soon
on the east. This Plan expands the SEOPW
In the 1920's and 1930's, N.W. 2nd established a commercial character, in the
CRA boundary to include area bounded by
Avenue was known as Avenue G, and was a form of warehouses, associated with its
NW 22nd Street on the north, NW 1st Place on
major corridor for entertainment, retail stores, downtown location and proximity to the Port
the east, NW 5th Street on the south, and NW
and hotels. Dr. W.B. Sawyer built the first of Miami, when formerly located at the site of
7th Avenue on the west (referred to as
African American hotel in the area in 1921. present day Bicentennial Park. The name
expanded area). The expanded areas have a
The population continued to grow until Park West derives from this area being
direct effect on the existing Redevelopment
the early 1960's. Desegregation, urban renewal, located west of the park. Before 1964,
Area and present excellent redevelopment
the Neighborhood Development Program, this area was basically a warehouse and
opportunities. It is an area of hard edges,
and construction of the SR-836/I-395 and I- wholesale district related to the old port.
heavily traveled highways to the west and
95 expressways significantly changed the When the port moved, so did the wholesale
north, and the less imposing but still
character of the neighborhood. and tragically, businesses and storage facilities. Few of the
disruptive boundary created by the
residents from Overtown were scattered and remaining businesses have any functional
Metromover and Metrorail tracks to the east
relocated. Economic, physical and social relation to the port now located on Dodge
and south. Moreover, the Florida East Coast
decay became pronounced and has Island in Biscayne Bay. New warehouses and
railroad tracks serve as a psychological and
progressively contributed to the decline in the container storage areas are provided on Dodge
physical barrier dividing the area into
area. Island and areas west of the Miami
Southeast Overtown to the west and Park
Various planning efforts have taken place International Airport.
West to the east.
over the last few decades. For a list of these
In preparation of this planning effort, an
planning studies, see Appendix A, entitled

3
evaluation of the existing slum and blight NE 14th Street. Just east of Big Time constructed along [Biscayne Boulevard]. Most
conditions was conducted in the expanded Productions studio buildings is the new of these developments are viewed as market
CRA areas. This evaluation revealed that slum [Adrienne Arsht] Center for the Performing rate and luxury rate properties with limited
and blight conditions persist throughout, Arts of Miami-Dade County. The center accommodation for the middle class or
providing further justification for expanding includes a 2,200-seat symphony hall, a 2,480- working class citizens desiring an urban
the SEOPW CRA boundaries. Addressing seat ballet/opera house, a 200-seat black box residence. With its advantageous location and
and improving these conditions is a key theater, and ancillary support and educational untapped redevelopment potential, Southeast
purpose of this plan. A summary of the services. The completion of this exciting Overtown/Park West presents perhaps the
evaluation of slum and blight conditions are complex has served as a strong catalyst for best opportunity to develop a livable
set forth in Appendix G, entitled Findings of redevelopment, a phenomenon that has been downtown core.
Slum and Blight. further enhanced by a concerted effort to The City of Miami is proactively planning
Despite its challenges, Southeast attract media, arts, and entertainment related for the future of its neighborhoods, and there
Overtown/Park West is advantageously businesses and facilities to the neighborhood. are a number of current initiatives that will
situated between downtown Miami and the South of Overtown and Park West, have a direct impact on the Southeast
Omni area, Motion Picture/Media (Media) downtown Miamis central business district is Overtown/Park West Redevelopment Area,
District, and the Entertainment District, and is a flourishing center of international business, including the expanded area. Planning efforts,
in close proximity to Miami Beach, Miami finance, telecommunications, government and such as the Baylink Draft Environmental
International Airport, and the regional trade. With over 131,000 workers, 4,000+ Impact Statement (DEIS), The Park West
transportation system. What happens in the hotel rooms, and attractions, such as the Entertainment District Promenade Special
larger context will therefore shape and be Bayside Marketplace, the American Airlines Area Plan, Biscayne Boulevard Special Area
shaped by what happens in Southeast Arena, and the Miami-Dade Cultural Center, Plan, Bicentennial Park Master Plan,
Overtown/Park West. downtown Miami is a dynamic destination that Downtown Transportation Master Plan, and
Located directly north of Overtown and has the potential to positively impact adjacent Overtown Greenprint Plan are integral to
Park West, the Omni Media and neighborhoods such as Southeast the redevelopment of the area, and
Entertainment Districts are currently Overtown/Park West. Despite its dynamism, coordination between these efforts is key.
undergoing a rapid transformation into a downtown Miami once lacked the residential Some of the more specific planning projects
regional epicenter of the cultural and component that was necessary to transform it include: the Flagler Marketplace development
performing arts. Big Time Productions, Inc., a into a true 24-hour city center. With the latest in downtown Miami; redevelopment of the
studio/production company, moved its development boom of 2003-2007, several new Omni Mall into a retail, entertainment and
headquarters from Miami Beach to the Omni residential and mixed-use development office complex; the newly redeveloped
area creating a movie production hub along projects have been planned and/or Margaret Pace Park in the Omni area;

4
redevelopment of the historic Lyric Theater as Despite these advantages, Miami has This has resulted in a reversal of trends of the
the cornerstone of the planned Folklife Village lacked one of the most important 1970s and 1980s, which saw economic
in Southeast Overtown; and the planned characteristics of great world cities a activity centers move from city centers to
extension of the 9th Street Pedestrian Mall in walkable, mixed-use center that is a desirable suburban office parks and "edge cities" that
Park West. This Plan presents the best place to work, play and live. Bathed in sprang up overnight. In contrast, the
opportunity to integrate these initiatives into a decorative neon light, the downtown Miami economic activity centers of the new economy
cohesive vision for the area as a whole. skyline beckons at night, which belies the fact are increasingly located in central city
that its streets are virtually deserted. Few of neighborhoods like San Francisco's
the approximately 131,000 people who work Multimedia Gulch, the Digital Harbor in
The Potential: A Livable City in downtown actually live there. At the close Baltimore, and downtown San Jose.
Well-located at the confluence of the of each business day, they disperse to points With its strategic location and untapped
Americas, Miami has emerged as the Western north, east, south and west of Miami. While redevelopment potential, the Southeast
Hemisphere's international trading center and in the recent past, it is true that many would Overtown/Park West neighborhood presents
one of the world's most vibrant and dynamic choose a suburban location regardless, it is the best opportunity for the development of a
metropolises. Founded in 1896, Miami quickly also true that downtown Miami has a shortage thriving, mixed-use economic and activity
established itself as one of the nation's premier of affordable housing and neighborhood center in Miami's downtown. This plan charts
tourist destinations with its world-renowned services that would make it a viable alternative a course to fully realizing Southeast
climate and natural beauty. Tourism defined for those who would otherwise find it a Overtown/Park West's possibilities.
the economy for much of the last century and desirable place to both live and work.
remains a major industry. Nonetheless, the last In the past few decades, Miami has made
thirty years have seen an unprecedented a concerted effort to take advantage of the History of the CRA
diversification of Miami's economy, as its new economic realities of globalization and On July 29, 1982, the Miami City
strategic location, excellent transportation the rise of information technology. Its location Commission, by Resolution No. 82-755,
linkages, and culturally diverse population provides a competitive advantage, as does a approved the Southeast Overtown/Park West
have led to its ascent as the "gateway to Latin relatively well-developed privately initiated and Community Redevelopment Plan. On
America" and one of the nation's true funded technology infrastructure. While that December 7, 1982, the Board of County
international business centers. Greater Miami may not have been enough, recent studies Commissioners of Miami-Dade County, by
today is a cosmopolitan metropolis of over indicate that the businesses and workers of the Resolution No. R-1677-82, approved the
two million people, and a leading center of new economy seek out and thrive in mixed- Southeast Overtown/Park West Community
finance, trade, tourism and use environments that foster accessibility, Redevelopment Plan. On March 31, 1983, the
telecommunications. social interaction, and the exchange of ideas. City and the County executed an Interlocal

5
Agreement which provided for the delegation Redevelopment Plan to be prepared. This document is the extensive 2009
of redevelopment powers to the City and the amendment to the Southeast Overtown/Park
establishment of the redevelopment trust fund West Community Redevelopment Plan. This
to receive tax increment revenues. In 1985 the
Revised Boundaries document replaces the previous 82 Plan and
Park West area was included in the CRAs Section 163.361, Florida Statutes, provides is hereafter referred to as the Community
then-existing boundaries. During the summer that the CRA may recommend a change in the Redevelopment Plan or Redevelopment
of 2002, the SEOPW CRA Board proposed to boundaries when it becomes necessary or Plan.
expand the boundaries to include some of the desirable to amend or modify the Revisions from the 1982 Plan:
areas of Overtown west of Interstate 95 and redevelopment plan. Since 2001, the SEOPW Chapter I, Introduction, has been
areas surrounding NW 3rd Avenue north of CRA Board has been evaluating the need to significantly revised to identify the purpose for
Interstate 395. This boundary expansion was extend the existing boundaries to include more the SEOPW CRA, its potential, and to update
later adopted by the Miami City Commission of Overtown. Advantages to the enlarged the context with the 20 years that have passed
on July 28, 2002, pursuant to Ordinance No. boundary include being able to use the since the original plan was prepared and
12247. Notwithstanding, no action was taken SEOPW CRAs resources to facilitate adopted.
by the Board of County Commissioners of redevelopment in more disadvantaged Parts of Chapter II, Setting, were
Miami-Dade County on this boundary neighborhoods of Miami, and to improve the brought into Section 1, Introduction, of the
expansion. appearance and usefulness of the expressways Community Redevelopment Plan. For
On December 31, 2007, the City, the that have caused so much damage and example, Historic Evolution was re-edited
County, the SEOPW CRA, and the Omni fragmentation to the community environment. into a heading called Historical Context.
Redevelopment District Community Chapter III, Redevelopment
Redevelopment Agency entered into an Proposal, contained a description of the need
Interlocal Agreement to provide for, among Revisions from the Original for redevelopment. The objectives stated in
other things, the expansion of the Southeast CRA Redevelopment Plan Chapter III have been re-evaluated and can be
Overtown/Park West Redevelopment Area The Southeast Overtown/Park West found in Section 2, Goals and Guiding
and the extension of its life. Pursuant to the Community Redevelopment Plan, Revised December Principles.
Interlocal Agreement, the parties agreed that 1982 (sometimes referred to as the 82 Plan) Chapter IV, Redevelopment Plan,
the CRA would cause a Finding of Necessity was prepared for two primary reasons: contained projects and strategies. These have
report to be prepared in which the conditions 1) To establish the need for a CRA; and been re-evaluated and some have been
of slum and blight within the expanded area 2) To guide the SEOPW CRAs restated in Sections 2 through 6. These
would be documented, and to cause an update redevelopment activities. components are separated into different
to the 2004 Amendment to the Sections in the updated Community

6
Redevelopment Plan to group them by similar on January 20, 1981, to include the areas slum and blight were present. The 2009 FON
topics so that they can be more easily found in bounded on the west and south by the FEC provided evidence of the following:
the document. tracks; on the east by Biscayne Boulevard; and Predominance of defective or
All maps and graphics from the 1982 on the north by I-395, as well as the area inadequate street layout, parking facilities,
Plan have been replaced, including the bounded on the south by I-395; on the east by roadways, and public transportation;
Boundary Map. Biscayne Boulevard; on the north by NW 17th Faulty lot layout in relation to size,
The Land Use Plan, Zoning Plan, and Street in part, and the City of Miami Cemetery adequacy, accessibility, or usefulness;
Traffic & Transportation Plan have been in part; and on the west by the FEC tracks. Unsanitary or unsafe conditions due
completely overhauled. While the aforementioned areas were to environmental contamination;
The Park West Conceptual found to meet the definition of slum and Site and structural deterioration;
Redevelopment Plan and Acquisition strategy blight, only a portion of this area was Aggregate assessed values of real
has been abandoned for an incremental included in the original SEOPW CRA property in the expanded are for ad valorem
approach. Redevelopment Area. Most of the conditions tax purposes failing to show any appreciable
described in the 1982 Plan are still prevalent increase over the five (5) year prior to the
Findings of Necessity today in the existing Redevelopment Area, in finding of such conditions;
Section 163.355, state that [n]o county or that, there is still a decline in population, Existence of crime; and
municipality shall exercise the community marginal retail facilities, and an excessive Physical and economic conditions
redevelopment authority . . ., until after the amount of vacant and underdevelopment conducive to disease, infant mortality, poverty,
governing body has adopted a resolution, properties. The majority of multi-family and crime because of the predominance of
supported by data and analysis, which makes a buildings, single family houses, and duplexes dilapidated, deteriorating, antiquated and
legislative finding that the conditions in the suffer from structural deterioration. The obsolescent buildings and the existence of
area meet the statutory definition of slum majority of retail buildings are vacant, making conditions that endanger life and property by
and blight. the vacancy rate of commercial uses greater fire and other causes. The 2009 FON
In 1969, the Board of County than fifty percent. concluded that the existence of slum and
Commissioners of Miami-Dade County, by In February 2009, in accordance with blight conditions within the expanded area, if
Resolution No. R-1117-69 approved the Section 163.355, and as required by the left unattended, would persist and
Central Miami Renewal Plan (CMRP). The Interlocal Agreement dated December 31, undoubtedly extend to and beyond the
CMRP examined the area south of NW 20th 2007, the SEOPW CRA caused a Finding of boundaries of the existing Redevelopment
Street; west of the FEC Railroad, with an Necessity report (2009 FON) to be Area. These conditions will lead to an
extension to N.E. 2nd Avenue; east of I-95; prepared in which the expanded area was economic and social liability to the City of
and north of the Miami River. It was amended examined to determine whether conditions of Miami and could consume additional County

7
and municipal resources to address the myriad
of issues outlined above, while reducing the
local tax base.

8
along the north side of NW 14th Street to the
Legal Boundary Description
east side of NW 1st Avenue; then south along
for the SEOPW CRA
the east side of NW 1st Avenue to the
The Southeast Overtown/Park West
Redevelopment Area, including the expanded southern edge of the I-395 ROW; then east
area, is hereafter described as follows: along the southern edge of the I-395 ROW to
the western side of Biscayne Boulevard; then
The legal description of the Study Area is south along the west side of Biscayne
physically defined as beginning near the Boulevard to the north side of NE 5th Street;
southeast corner of Lummus Park; at the then west along the north side of NE 5th
southwest corner of the intersection of NW Street to the west side of North Miami
2nd Street and NW 3rd Court; continue north Avenue; then south along the west side of
to the north side of NW 5th Street; then west North Miami Avenue to the north side of NW
along the north side of NW 5th Street to the 1st Street; then west along the north side of
east side of NW 7th Avenue; then north along NW 1st Street past NW 1st Avenue, to include
the east side of NW 7th Avenue to the north properties abutting the west side of NW 1st
side of NW 22nd Street; then east along the Avenue; then north along the western edge of
SEOPW CRA Boundaries
north side of NW 22nd Street to the east side said properties to the north side of NW 5th
of NW 5th Avenue; then south on the east Street; then west along the north side of NW
side of NW 5th Avenue to the North Side of 5th Street to the east side of NW 3rd Avenue;
NW 22nd Street; then east on the north side of then south along the east side of NW 3rd
NW 22nd Street to the west side of NW 2nd Avenue to the south side of NW 2nd Street;
Avenue; then north on the west side of NW then west along the south side of NW 2nd
2nd Avenue to the north side of NW 22nd street to the southwest corner of the
Street; then east on the north side of NW intersection of NW 2nd Street and NW 3rd
22nd Street to the east side of NW 1st Place; Court.
then south on the east side of NW 1st Place to
the north side of NW 14th Street; then east

9
10
Redevelopment Goals facilitate the achievement of the
aforementioned Redevelopment Goals. The
numbering of goals and principles in this plan
The redevelopment goals set forth in this
is not intended to imply a prioritization of
2009 updated Redevelopment Plan serve as
importance. All goals and principles are of
parameters for the SEOPW CRA Board and
equal importance to the revitalization of the
staff members when making decisions, taking
Redevelopment Area. The matrix on the
actions, and strategizing projects and
following page shows that all of the Guiding
programs for the Redevelopment Area. They
Principles work toward more than one goal.
guide the Agencys public policy,
Following the Matrix, each of the Guiding
appropriation of funds, and priorities in
Principles is further explained.
eliminating the conditions of slum and blight
within the Redevelopment Area.

The goals are:


1) Preserving historic buildings and
community heritage;
2) Expanding the tax base through the
use of Smart Growth planning
principles;
3) Creating infill housing, diversity in
housing types, and retaining
affordable housing;
4) Creating jobs within the community;
5) Promotion and marketing of the
community; and
6) Improving the quality of life for
residents of the Redevelopment Area.

This Redevelopment Plan identifies


fourteen (14) guiding principles aimed to

11
Goals and Supporting Principles

Goal #1: Goal #2: Goal #3: Goal #4: Goal #5: Goal #6:
Preserving Expanding the Housing: Infill, Creating Jobs Promotion & Improving
Note:
The names of the Guiding Historic Buildings Tax Base using Diversity, & within the Marketing of the Quality
Principles below have been
& Community Smart Growth Retaining Community the Community of Life for
reduced to a few key words for
purposes of brevity. Heritage Principles Affordability Residents
Principle 1: * * * * *
Livable Community
Principle 2: * *
Affordable Housing
Principle 3: * * * * *
Housing Variety
Principle 4: * * * *
Job Variety
Principle 5: * * *
Walkable Streets
Principle 6: * * * * *
Promotion
Principle 7: * *
Green / Open Space
Principle 8: * * * *
Historic Preservation
Principle 9: * * * *
Appropriate Architecture
Principle 10: * * *
Attractive Streets
Principle 11: * * * *
24-Hour Environment
Principle 12: * * *
Neighborhood Centers
Principle 13: * *
Revise Zoning Regs.
Principle 14: * *
Restore community *

12
stores, bank branches, dry cleaners, residents can come to know many of their
Guiding Principles restaurants, day care facilities, and neighbors well, and form a detailed mental
All actions affecting the Redevelopment entertainment establishments (i.e. bowling map of their daily territory. This helps
Area by a government entity, agency, service alleys, cinemas, video stores, etc) should be explain why the ten-minute walk diameter can
provider, or private property owner are to be incorporated into the neighborhood fabric to be observed in historical settlements from
judged according to the Guiding Principles serve the population and reduce automobile many time periods, and in cultures all around
and the Hypothetical Build-out Plan described dependency. Also, civic buildings and the world.
in Section 3. If any new projects or efforts are community-serving uses such as schools, Perhaps more importantly today, most
being proposed that are not identified in libraries, police stations, fire stations, and people are willing to walk distances
Section 4, then their relevance should be parks should be provided and located in such approximately ten minutes away before
judged by the Goals and these Principles. a manner as to create community focal points choosing another mode of transportation,
and strengthen neighborhood identity. Great provided they are presented with a pedestrian-
Principle 1: The community as a cities are built up from groups of such friendly, safe environment. To reduce
whole has to be livable. Land uses neighborhoods. unnecessary car trips and dependence on the
and transportation systems must be
Transportation modes have to be automobile, the most livable neighborhoods in
coordinated with each other.
balanced and varied too, so that one can modern cities include an array of residential,
The most important combination to make
choose to walk, drive, take a taxi, or ride a business, retail, and neighborhood-serving
a community livable is to have land uses and
bike, a bus, or community transit in the form uses within that ten-minute area. While today's
transportation systems working together in
of Metrorail or Metromover. technology offers multiple means of
concert. Ideally, a successful neighborhood
Overtown and Park West can be thought transportation, "walkability" remains a key
will offer the opportunity to reside, work, and
of as a group of neighborhoods. In order to component of the vibrant and healthy
carry out the other activities of daily life (i.e.,
reposition Southeast Overtown/Park West as neighborhood and an important determinant
shopping, recreation, entertainment, religious
a livable area, a mixture of housing types, of neighborhood boundaries.
and cultural events, education, etc) all within
service establishments, and employment Superimposing a ten-minute walking
an area of comfortable walking distance. To
centers must be provided within each of these diameter on Southeast Overtown/Park West,
achieve this, a thoughtful mix of residential,
neighborhoods. and a review of historic development patterns,
employment, commercial and community-
Though no two neighborhoods are reveals that the area is actually comprised of
serving uses should be promoted by the City
exactly alike, neighborhoods are traditionally five distinct neighborhoods: Park West,
and CRA in a densely developed and well-
about one-quarter mile from center to edge, Southeast Overtown, North Overtown, West
designed urban fabric. Neighborhood-serving
for several reasons. This is thought by Overtown, and The Government District.
commercial uses, such as pharmacies, grocery
scholars to be a dimension within which Determining how to improve infrastructure,

13
services and the provision of uses in each of Principle 3: There must be variety in those who wish to live in proximity to their
these smaller neighborhoods is the most housing options. work and reduce dependence on the
effective strategy for improving the area as a The housing stock in Downtown Miami automobile and long commutes. As with
whole. The vision of this Redevelopment and the neighborhoods of Southeast access to affordable housing, there appears to
Plan is, therefore, to improve the Overtown/Park West is extremely limited. be general consensus in the community that
Redevelopment Area by transforming it into a The existing inventory consists mostly of employment opportunities be made available
group of healthy mixed-use neighborhoods, lower-priced and substandard houses and to existing residents of Overtown has a high
and connecting those neighborhoods with a apartments. This lack of residential priority.
variety of transportation options. alternatives inhibits efforts to foster a 24-hour
downtown and limits options for those who Principle 5: Walking within the
Principle 2: The neighborhood has would otherwise choose to reside in a center neighborhood must be accessible,
to retain access to affordable housing city location. safe, and pleasant.
even as the neighborhood becomes A mix of market rate and affordable Streets have many responsibilities. They
more desirable to households with housing units and types, including rental units, act as a system for movement, providing
greater means. ownership units, multi-family units, single- mobility and ways to move around the City.
Based on comments and discussions family units, and accessory apartments, is Even more importantly, their right-of-way
made at various community meetings in necessary to accommodate the diversity and serves as the front door to private
Overtown and Park West, it is quite clear that lifestyles of existing and future residents. properties. The character and design of the
there is general consensus among existing The Overtown and Park West of the street, and thus the resulting curb appeal,
residents, former residents, CRA and City future will take advantage of their urban have a direct correlation to the type and
staff, and elected officials that Overtown has character and infrastructure and provide an quality of development projects, real estate
to retain affordable housing, and first priority attractive array of residential choices for values, and economic potential.
to affordable housing and job opportunities current and new residents. The Providing a range of choices for moving
must be given to existing and former residents neighborhoods have to ensure the integration safely and comfortably throughout the
of Overtown. of different economic sectors to stimulate a neighborhood is an integral function of the
The SEOPW CRAs Housing Policy is positive shaping of the urban space. city street network. Neighborhood streets
stated in this Redevelopment Plan and can be should therefore be designed to accommodate
found in Section 6. Principle 4: There must be variety in a number of transportation choices, including
employment opportunities. walking, bicycles, mopeds, automobiles, and
Employment centers should be located mass transit. The provision of a continuous,
within the neighborhoods to accommodate two-way street grid in Southeast

14
Overtown/Park West will increase Principle 7: The City and County 1982 Plan have been demolished despite the
accessibility and reduce congestion, while the must provide access to small parks efforts of The Black Archives History and
provision of wide shaded sidewalks, walkable and green spaces of an urban Research Foundation of South Florida, Inc.
character.
block sizes, on-street parking, bicycle paths, and other local initiatives.
Access to public parks and green spaces is
and transit services increases the range of
a key element of quality of life in urban
choices for moving to, from, and within the Principle 9: New and rehabilitated
neighborhoods, as natural environments
Redevelopment Area. Creating pedestrian- buildings must respond to our
provide essential respite in an urban climate and reflect the communitys
friendly streets encourages the development of
environment. Therefore, it is vital that a series cultural heritage.
street-level businesses and natural surveillance.
of green spaces and parks, preferably linked by Established neighborhoods are
greenways, be developed within each distinguished by architecture that is indicative
Principle 6: Local cultural events,
neighborhood and that existing green spaces of their history, climate, and function.
institutions, and businesses are to be
promoted. and parks be enhanced to provide a genuine Successful redevelopment efforts capitalize on
In order for Southeast Overtown/Park amenity to the quality of life for existing and these elements rather than imposing
West to achieve its full potential, it is necessary future residents. These green spaces, parks, development that is disconnected from what
to address and improve the neighborhood and greenways will be an important element in has come before. South Beach provides an
economy and expand the economic developing and maintaining community excellent example of this concept in action; its
opportunities of present and future residents aesthetics and identity, providing recreational redevelopment was predicated on its rich
and businesses. This entails both the support and social opportunities for residents and architectural heritage and history, and as a
and enhancement of existing businesses and visitors, and attracting new residents and result, has been wildly successful. The five (5)
local entrepreneurs and the attraction of new businesses. neighborhoods that comprise Southeast
businesses that provide needed services and Redevelopment Area boast unique features
economic opportunities. New economy Principle 8: Older buildings that and architecture that reflect their history and
business centers are characterized by embody the areas cultural past function. For example, Park West's
should be restored. architecture still reflects its former function as
concentrations of competing but
These older buildings are physical a warehouse district for the Port of Miami,
complementary firms that are driven by the
reminders of the communitys heritage and while the story of Overtown's heyday as a
advantages of co-location. Redevelopment
enhance the experience of the place, giving it a thriving center for black-owned businesses
efforts should actively identify opportunities
richness that cannot easily be obtained once and culture is told in its remaining buildings of
for Southeast Overtown/Park West to
the buildings are lost. Unfortunately far too note. The redevelopment of these
capitalize on this trend.
many of the historic buildings identified in the neighborhoods should occur within the

15
context of these histories and new should come together to form a continuous neighborhood centers are to be
development should acknowledge the past facade. established in a distributed pattern
traditions and further their future. Whenever Maintenance of public streets and spaces within Overtown and Park West.
possible, buildings of architectural merit has to occur in a consistent manner to show Cohesive neighborhoods have strong
should be adapted to new needs and creatively that the community is cared for. Private centers, identifiable from their concentration
reused. property owners have to do their part too, of higher density residential, commercial, and
painting buildings when they start to peel or civic uses, and/or a signature public open
space such as a park, square or plaza. The
Principle 10: Streets and buildings fade badly, and clean up yards or vacant
must be attractive. properties if garbage collects there. If the neighborhood center helps ensure the
Neighborhoods are defined by their public owners are not inspired to make provision of various uses within a walkable
realm, the spaces between buildings. The improvements or repairs when the need area and is essential to the establishment of
streets, sidewalks, parks, greenways, and civic becomes visually obvious, then it is Code neighborhood identity. Neighborhood centers
uses bring the community together and link it Enforcements job to deliver a citation to should be developed in each of the five
to the outside world. A vibrant and engaging them. neighborhoods that comprise the
public realm serves as the neighborhood's Redevelopment Area.
canvas and lifeblood, a means for inspiring Principle 11: 24-hour environments
and captivating residents and visitors. should be encouraged. Principle 13: The zoning and other
Sound urban design, attractive buildings, A common feature of prosperous development regulations must be
reworked to yield the results
and streetscapes are essential to having streets metropolitan cores is a 24-hour
envisioned in this Community
that are both functional and visually attractive. environment: a broad and diverse offering of
Redevelopment Plan.
Looks are important to current residents who cultural, entertainment, and recreational
Both the SEOPW CRA and the City of
will feel community pride when receiving options that attract and engage residents and
Miami Planning and Zoning Department agree
pleasant comments about where they live. visitors on weekends and after the workday
that the zoning requirements within the CRA
Looks are important to attracting investors to ends. This environment encourages social
boundaries must be improved to further
make other improvements to the interaction and is a catalyst for economic
redevelopment of the desired type.
neighborhood. vitality and attracting businesses and residents.
To have attractive, pedestrian-friendly Southeast Overtown and Park West provide Principle 14: Restore a sense of
urban streets, buildings must be set close an excellent opportunity to create the 24-hour community and unify the area
together, and building heights and road widths environment that downtown Miami lacks. culturally.
must be compatible. Building walls with their The SEOPW CRA needs to do what ever
windows and doors, that open to the street, Principle 12: Identifiable is in its power to bring back the vitality that

16
once gave Overtown its character, sense of
place, and cultural distinctiveness.

17
18
Conceptual Plan Diagram Previous Planning Work for the Area.
The Conceptual Plan Diagram to the right
shows the basic framework used to shape the
Hypothetical Build-out Plan, which is very
detailed and has many layers. A number of
public and private groups have studied the
same areas either prior to or in parallel with
this Redevelopment Plan. Many concepts set
forth in these plans have been incorporated or
consolidated into the diagrams, and have
contributed to shape this Community
Redevelopment Plan. These plans include the
following:
The Overtown Greenway Plan
The Overtown Greenprint Plan
Miami Downtown Transportation Master
Plan
Miami: The Downtown Master Plan
Miami at Midnight Report
The Historic Overtown Folklife Village
Plan
Overtown Civic Partnership Ray
Gindroz Plan
Bicentennial Park Plan
Biscayne Blvd Special Area Plan
Grand Promenade Special Area Plan
FEC Corridor Study
Performing Arts Center Site Plan

A summary of the many ideas raised by


various planning efforts over the last few
decades is provided in Appendix A, entitled

19
Land Uses & Residential Units
As described throughout this
Redevelopment Plan, the intent is to mix land
uses within the Redevelopment Area as much
as possible. The exceptions will be where
there are large areas of government offices and
facilities or where there are concentrations of
single-family detached houses. A wide range
of residential types is sought with this
Redevelopment Plan. Measures must be put
in place to retain affordability while
[insert Jobs / Housing Imbalance encouraging market rate housing in the area.
Diagram on this page]

20
Hypothetical Build-out Plan
The Hypothetical Build-out Plan portrays
one possible built-out future for the
Redevelopment Area in a very advanced state
of redevelopment and infill development. It is
useful to show possible configurations for
public and private building placement, streets
and access ways, parking areas, and public
spaces and street patterns.
Think of the Hypothetical Build-out Plan
as a series of layered ideas that have all been
flattened into one drawing. These layers
include:
Publicly-Owned Land, available for public
improvements
Open Spaces: parks, plazas, and green
spaces, and greenways
Transportation System
Parking Policy
Land Development Regulations
Physical Plan, showing physical conditions
of public and private buildings, parking
locations, sidewalks, and yards

Each of these layers is described in further


detail in the pages that follow in this section.

21
Publicly-Owned Land 3) Coordinate with other private and public
Each of the properties shown on the map entities for the development of surplus
to the left, either owned by the CRA, City of real property within the Redevelopment
Miami, County or State agencies, are Area that will further the goals set forth
considered suitable for public improvements herein.
or public-private redevelopment initiatives.
This map shows a snapshot of the
current ownership and should not be viewed
as an end result in itself. (To obtain a copy of
the most updated property ownership map,
contact the City of Miamis Planning
Department). Additional properties may need
to be purchased and some currently owned
may need to be sold to reach the goals of this
Redevelopment Plan.
Properties that would be ideal for the
CRA to purchase are purposefully not
identified in the plan, to avoid costly problems
in time and money associated with land
speculation. These problems have already
hindered the CRAs performance over the past
twenty years.

Required CRA Actions:


1) Continue to evaluate and negotiate future
land purchases to meet the goals of the
Redevelopment Plan.
2) Evaluate and advertise public-private
development opportunities, utilizing the
land owned by the CRA in furtherance of
the goals set forth herein.

22
Open Spaces: parks, plazas, and 4) Require development projects within the
green spaces, and greenways. Redevelopment Area to maintain green
Urban dwellers do not have the luxury of spaces within project scope.
large amounts of private open space in their
rear gardens and back yards. Instead, urban
living highlights the enjoyment of pedestrian-
friendly streets and public spaces (parks,
squares, greens, greenways, and plazas).
Creating and maintaining high-quality public
spaces is necessary for the Redevelopment Insert Open Space Map
Area to achieve its potential. Of the five HERE
neighborhoods that have been identified, only
Overtown, west of the Interstate, has adequate
open space. The acquisition of land to create
these public spaces and the necessary
construction and maintenance is possible
through a variety of means.

Required CRA Actions:


1) Acquire more land for publicly accessible
green space for active and passive
recreational use.
2) Coordinate with the City of Miamis
Planning & Zoning Departments to
improve public safety with natural
surveillance; requiring that neighboring
buildings front all public spaces with
doors and windows.
3) Coordinate with the City of Miamis Parks
Department on the installation and
maintenance of public spaces.

23
Ways to acquire more land: Land to expedite the purchase of land. provided by the City of Miami.. These
1. Land Swaps Matching grants can be pursued. services can also be provided by locally owned
The City and CRA can directly exchange 4. Land Pooling businesses through an incentive program.
properties with property owners. For Land pooling is the consolidation of small Recreational facilities and functions should
example, if property that is in a good location landholdings for their unified planning, also be provided as part of City or County
for a park is privately owned, and the CRA servicing, subdivision and redistribution. This programs.
owns land that is a suitable development site, method for land assemblage provides many The CRA can also coordinate with local
then the CRA could swap land with the opportunities including the shared cost and churches, civic groups, or organizations that
private property owner. The community gets returns of land subdivision between the are willing to donate the time and resources to
a park where it makes sense and the original landowners in an equitable way at no cost to maintain public spaces.
owner gets a good development opportunity. the CRA and the orderly design of the
2. Revolving fund for public lands subdivision layout for the planned urban land Successful Small Urban Parks & Squares:
The County, City, and CRA can create a use. This process would counter excessive The following are qualities that make
revolving fund for public lands. For example, land speculation and ensure an adequate small parks and squares safe and useable:
suppose the CRA needed to consolidate supply of land for development purpose. 1) Design matters more than acreage or uses
several properties to make an adequately large 5. Ask for donations. or luxury.
green space. It already owns or recently The CRA can ask property owners to 2) Natural surveillance is essential.
purchased a few of the parcels, but one or two donate their land for public use. The old 3) Enliven the place with regular activity.
remaining owners hold out and refuse to sell. expression still holds true, It doesnt hurt to 4) Shape the public space with carefully placed
To avoid the need to use eminent domain, the ask. trees and buildings surrounding its edges.
CRA could give up and decide to sell the land 5) Open and frame the views into and from
recently purchased. The revenue from the sale Proper maintenance of public spaces within the space.
could be put into a fund, and used later in New public spaces are best maintained 6) Pedestrian access is all-important.
another location for the purpose of acquiring through taxing districts applied to the 7) Calm the traffic, beautifully.
land for green space. This may require neighborhood and adjacent properties. These 8) Provide shade.
specific transaction controls. plazas and green spaces will be relatively small 9) Provide flexible open space for diverse
3. Purchase the land outright. in comparison to other City of Miami parks. functions; do not fill up the park with excess
The CRA Board can, as it has in the past, Maintenance, including grass, tree, and shrub equipment.
purchase the land outright for a fair market planting, landscape mowing and clipping, 10) Reserve places for symbols of civic pride
value. Assistance can be sought from the emptying of garbage cans, litter cleanup, and and uniqueness.
County, City, State, and the Trust for Public pressure cleaning paved surfaces should be 11) Plan for sustained care and maintenance.

24
Transportation System: Mobility and attempts to suggest ways to diminish these Station to enhance intermodal transfers,
Access negative effects and maximize the positive as described in the Miami at Midnight
Successful urban environments are ones through the location of buildings and report.
supported by a variety of mobility choices, public spaces.
thereby affording residents the freedom to Re-establishing the traditional urban
network of streets.
move about comfortably, whether on foot, Required CRA Actions:
bicycle, via transit or automobile. In contrast, Throughout the Redevelopment Area, the
Restoring the urban fabric and mitigating
areas designed primarily around the traditional urban block structure has been
some of the negative impacts of previous
automobile do not provide the level of altered. In several locations, streets have been
transportation improvements are possible
mobility and access necessary to create vibrant eliminated, and the network compromised.
through a set of changes carried out in
places with an active street life. This has created super-blocks, some of which
concert. These include:
Part of the challenge of redeveloping Park are 1,100 feet long or even longer. These
1) Advocate, fund, and/or facilitate the re-
West and Overtown is poor mobility and blocks are unusually large and do not fit with
establishment of the traditional urban
access. Mobility is the ability to travel over the established grain and size of the original
network of streets and restoration of
distances. Access is the ability to get to a street system and blocks, making navigation
missing links in the street grid.
destinationto actually get to the door. This needlessly difficult. Super-blocks limit both
2) Advocate, fund, and/or build pedestrian-
condition has been created through a vehicular and pedestrian access, causing an
friendly street improvements.
combination of barriers such as the Interstate unnecessary waste of time and fuel for
3) Promote the return of two-way streets.
Highways and the elevated Metrorail, and motorists and longer distances to travel for
4) Advocate, facilitate, and construct on-
further compounded by the system of one- pedestrians.
street parking.
way streets. The one-way streets discourage Newly created or connected streets should
5) Assist with solutions to any noise, access,
motorists from comfortably circulating within generally do the following:
and privacy problems associated with
the area. These streets also create "straight- Be designed as two-way streets with on-
properties along the rail and transit routes.
aways" that encourage motorists to speed and street parking;
6) Develop pedestrian compatible
make it unsafe for pedestrians to cross streets. Be of a similar right-of-way width to the
community transit system to link all
Although rail cargo and the elevated segments of existing streets with which
Southeast Overtown, Park West, and the
transit facilities of Metrorail and the connections are being re-established; and,
nearby Central Business District and
Metromover, are seen as positive features in Provide pedestrian-friendly street
Omni area, as described in the Miami at
the neighborhood, there are some specific improvements. in this section.
Midnight report.
negative effects that these have on adjacent 7) Explore the possibility of a pedestrian
properties and streets. The physical plan zone adjacent to the Overtown Metrorail

25
There are some locations within the
Redevelopment Area where streets are fenced
off or blocked by highways, rail lines, and the
Metrorail. If for some reason vehicular access
cannot be achieved in these locations, then
every effort needs to be made to at least open
them up for safe pedestrian access.
In contrast to the large super-blocks, there
are several locations where existing blocks are
extremely small. On a very limited basis it
may be advisable to close some of the
intermediate streets to form blocks of a size
more conducive to infill development. This
should be evaluated on a case-by-case basis
and not adopted as an overall policy. The
merits of enlarging a block include:
Selling the rights-of-way and using the
proceeds toward the purchase of public
green space or for rights-of-way needed
elsewhere.
Increasing the legibility of the
major streets.
Directing and organizing routes of travel
without diminishing the primary street
system.
Providing a larger development site for
contemporary buildings that may need
more room for midblock parking.

<<< Map showing locations where the street


grid should be opened.

26
Existing Street Grid
Showing Two-way Streets (No Arrows)
and One-Way Street (With Arrows)

27
Suggested Changes to the Street
Grid

28
Pedestrian Friendly Street Improvements particular: Creating a two-way street system will alleviate
In an urban setting, street level businesses Create wide sidewalks that allow these problems and also help to orient those
need a comfortable pedestrian environment, as pedestrians to walk side-by-side as well as traveling within the street system. Conversion
they are reliant on a walk-in customer base. pass each other, and also allow outdoor to two-way streets must be treated as a
Strategies to make streets pedestrian friendly dining to be part of the street scene. priority.
include: Shade pedestrian paths. This is an
Create a two-way street system. Two-way absolute necessity in the South Florida All three scenarios in the Downtown
streets have calmer traffic than one-way climate. While shade trees should be Transportation Master Plan include improving
streets, because drivers are more cautious installed wherever practical, in general the streets into a two-way street system. The
when adjacent to oncoming traffic. shade trees are not as effective in Downtown Transportation Master Plan's
Provide on-street parking to create a providing shade as projecting elements on study area is east of I-95. Areas of Overtown
safety buffer between pedestrians on the buildings such as awnings and colonnades. west of I-95 are currently set up as one-way
sidewalk and moving vehicles, and assist Therefore these features should be streets. To extend and complete the system of
ground level retail, restaurants, and facilitated by zoning and mandated as part two-way streets, the following streets should
businesses. of CRA-funded projects. be converted as well: 10th Street, 11thStreet, 5th
Create narrow travel lanes to discourage Minimize crosswalk distance to limit the Street, and 6th Street between I-95 and NW
speeding, and conserve the much-needed amount of time when pedestrians are 7th Avenue. 5th and 6th Streets east of I-95
space for on-street parking and wider walking in the travel lanes. should remain one-way to accommodate Port
sidewalks. of Miami related traffic only if the FDOT
Maintain and create small curb radii, Promoting the Return of Two-Way Streets improvements take place.
which will require motorists to slow down The existing street system within the
when turning at intersections. Redevelopment Area contains a multitude of Rail and Transit Routes
At neighborhood centers and intermodal one-way streets. These are unfavorable to the Rail:
pedestrian zones, provide a rough road future success of the area for several reasons. The FEC rail line that runs along NW 1st
surface (bricks or cobble stones, etc) that One-way streets increase the speed of traffic, Avenue carries cargo to the Port of Miami.
discourage speeds beyond 20 mph) thereby reducing pedestrian activity. Retail has This serves a useful purpose, but the tracks
great difficulty thriving on one-way streets themselves form a barrier down the middle of
Creating continuity on the streets is also a not only is their drive-by volume cut in half, Overtown. Fortunately for the neighborhood,
top priority. Sidewalks should be designed to but each street is traversed primarily by either the train moves slowly though this area
encourage ground level businesses and the morning or the evening commuters, and because it is nearing the end of the line at the
pedestrian activity from block to block. In therefore, hours of high visibility are limited. port.

29
adjacent properties less desirable as places subway does not have to go through Park
To diminish the physical separation to live. West. It could travel east on NW 2nd or 3rd
between Overtown and Park West, more Although the appearance isnt unsightly, it Streets and turn to the port under Bayfront
crossings are needed at 9th, 10th, and 12th isnt beautiful either. Park or under Biscayne Bay.
Streets. Preferably these crossings will be for Another suggestion comes from the
both pedestrians and vehicles; however Miami-Dade County and the City of Miami at Midnight report. Just as Metrorail
priority should be given to pedestrian Miami have been studying the location for a will be connected to the Miami International
crossings. new Metrorail route in the East/West Airport (MIA) with the ongoing development
direction, linking the Miami International of the Miami Intermodal Center (MIC), the
Transit Routes Airport to the Port of Miami. Many of the Port of Miami could be connected to
In November 2002, the Peoples possible paths for the link between Metrorail with the creation of the Overtown-
Transportation Plan (PTP) was approved by Government Center and the Port pass Park West Community Intermodal System.
the voters of Miami-Dade County. The new through Park West, but underground. An As described in the report, these intermodal
transportation Plan added numerous rapid underground Metrorail will be an improvements would be structurally very
transit corridors to the existing Metrorail improvement compared to the elevated tracks. different than the MIC, but would serve the
system, which currently serves only a limited The route once preferred by the County same intermodal purposes. It is basically
area, linking the remainder of the greater and City planning departments may have been calling for passenger and freight intermodal
metropolitan region. ruined. The preferred route passes under the access improvements to integrate all modes of
Having the convenience of Metrorail in Wilkie D. Ferguson, Jr. United States intercity and local transportation as well as
Overtown is advantageous for the residents; Courthouse on NW 1st Avenue. The Board of connections with the private automobile in the
however, the physical structure of the elevated County Commissioners of Miami-Dade context of the existing historic Overtown and
rail has a negative impact on the County chose not to pay for the special Park West communities.
neighborhood with the following problems: foundation required to accommodate the
The elevated tracks further break up the subway train under the federal courthouse, Key Ideas in the Miami at Midnight
neighborhood into little pieces by and instead has a foundation that cannot Report
separating neighbors and commercial accommodate a future subway underneath it. The Miami at Midnight Report explores
streets. In light of that problem, and since Park the opportunities and options for narrow
The space underneath the rail lines is West is well served by transit already, the best gauge rail transportation modality and shared
generally unlit and unsupervised, making subway routes for Park West may be those parking strategies to link the proposed
it unsafe, especially at night that spare the inhabitants of Park West the Promenade improvements to the Bicentennial
The noise from the trains makes the inconvenience of building a new line. The Park, the Miami Beach Baylink project and

30
other destinations within the redevelopment transport. shuttles from parking to the various
area. It includes a description of the strategies attractions and transportation services in
to create a pedestrian-oriented intermodal 2) Narrow gage rail: Since narrow gage rail is this intermodal system. To make the
access plan and a case for using cost efficient designed for shorter slower trips, the costs garages meet the objectives of a
narrow gauge rail and small community transit of installation and maintenance are lower. pedestrian-oriented downtown neighbor-
vehicles for short distance intermodal hood, the garages must be lined with
3) Pedestrian Intermodal Access: Traffic
movements of passenger and goods. The useable habitable space that is accessible
calming and pedestrian amenities will
Report includes a description and from the street for commercial and
need to be provided along the streets and
recommended locations for shared parking residential uses.
mixed mode corridors where the transit
structures and mixed-use buildings that are
routes will occur.
placed on their perimeter (liner buildings) and 6) Community Intermodal System: The
concludes with a description of the various components of the
4) Freight Intermodal Access: The Miami at
opportunities to secure federal and state Redevelopment Plan will function as
Midnight Report assumes that 5th and 6th
funding, a scale of magnitude cost estimate elements of a community based
streets become the primary truck route for
and recommended actions to be undertaken. intermodal system (e.g., passenger and
the Port. Recently the MPO has rejected
The value to the CRA in the Miami at freight intermodal facilities and
primary truck route due to opposition
Midnight Report is that it describes a unique connectors). While the redevelopment of
from the Overtown community and
mechanism to meet many of the the existing Metrorail and Metromover
Miami-Dade Community College. This
redevelopment objectives with a real funding station sites into a series of connected
portion of the Report, therefore, may no
source. Key ideas from the Report include: liner buildings and parking structures
longer be valid. However, continued
1) Rail Vehicles: The rail vehicles are (with properly designed interior and
community discussions should be
intended to be small, seven feet wide, and exterior spaces to better relate the
undertaken to find a beneficial design that
nine feet tall. The floor height should be pedestrian activities at the street level with
provides port access but minimizes truck
5 inches from the street grade making it the transit station floors twenty to thirty
traffic adverse to the community.
easy to get in and out. Some cars can be feet above grade) can obviously be
open air and some air-conditioned. proposed as an intermodal transportation
5) Liner buildings and Parking Structures:
Seating can be positioned to project that would qualify for
The transit system is not simply tracks
accommodate bicycles, baby carriages, transportation trust funds, to a greater or
and vehicles, but also parking garages.
wheelchairs, luggage, grocery shopping lesser degree, every improvement within
The slower speed community transit and
bags and other goods typical for the Redevelopment Area should be seen
narrow gauge rail vehicles also serve as
pedestrian, bicycle or automotive as an opportunity to improve the

31
intermodal movements within the 7) Funding Opportunities: In order to the congressional schedule for TEA 21
Redevelopment Area. The understand the magnitude of these Reauthorization and the United States
Overtown/Park West Community funding opportunities, we only have to Department of Transportation
Intermodal System, therefore, consists of look at the Florida Department of (USDOT) SAFETEA legislation
specific pedestrian-oriented transportation Transportations (FDOT) annual provisions, there is a clear opportunity to
projects to enhance intermodal budget (approximately $4 billion) and the define elements of the Redevelopment
connections and significantly increase significance of their ongoing efforts to Plan in fundable transportation project
modal splits. identify and focus funding towards the terms.
critical elements of Floridas Strategic
Intermodal System. When combined with

This illustration shows how a narrow gauge rail vehicle can be small enough to fit within narrow right-of-way.
32
8) Recommended Actions: The CRA needs To be seriously considered for state and other public and private partners, to
to immediately consider and approve federal funding, the proposed intermodal demonstrate how such a system will work
these transportation projects as projects need to be identified in the and why their transportation funding
intermodal projects and seek the support MPOs long-range plan and should be partners (USDOT, FDOT, County and
for these projects from the Miami City scheduled within the FDOTs five-year City) should participate in such
Commission, the Board of County work program. Further, such intermodal community redevelopment related
Commissioners of Miami-Dade County, improvements need to also be identified transportation intermodal improvements.
the Miami-Dade Metropolitan Planning as an element of the Strategic Intermodal
Organization (MPO), the USDOT, the Systems (SIS) (intermodal connectors or Three maps have been included in this
FDOT, the Florida House and Senate otherwise) and addressed in the TEA 21 Redevelopment Plan for reference. Obviously
legislative delegation, the U.S. Reauthorization and related federal the details of the routes, systems, and parking
Congressional delegation and both U.S. appropriations decisions. garage locations may change as the system is
Senators from the State of Florida. closer to implementation.
Immediate discussions with members of In undertaking these efforts, the CRA
the FTC and SITAC would be very must recognize that they will need to be a
important as well. funding participant with the City of Miami
and the Miami-Dade County as to any
The proposals need to be presented as state and federal originated transportation
consistent with USDOT and FDOT funds. With the incorporation of
intermodal initiatives and well-established pedestrian-oriented mixed-mode streets
transportation law and policy. While and corridors, parking shuttles and
historically large-scale pedestrian-oriented community transit, parking structures and
transportation improvements have been liner buildings into this Redevelopment
difficult to conceptualize as valid Plan, the CRA, along with the Omni
transportation expenditures, with the Redevelopment District Community
federal and state interest in intermodal Redevelopment Agency should
projects (virtually all passenger intermodal implement initial components of the
movements involve pedestrian trips), intermodal improvements plan in
there would seem to be a better partnership with the Miami Parking
opportunity to undertake such an Authority (also known as the
initiative at this time. Department of Offstreet Parking), or

33
Promenade Area Map #1
Narrow Gauge Rail
A. Promenade to I-395 Parking Loop
B. Promenade to 14th Street Loop
C. 10th and 11th Street Loop
D. NW 3rd Avenue Loop
E. 8th and 10th Street Loop
F. Miami Avenue Area Loop
G. Central Loop
H. Port of Miami Loop
I. Jackson Memorial Hospital Loop
(a) via NW 3rd Avenue
(b) via N. Miami Avenue
J. Omni East Loop
K. Omni West Loop

Metromover / Station

Metrorail / Station

Intermodal Areas (Passenger, Freight, and


Connectors)

Interregional Destinations &


Strategic Intermodal System (SIS)
Hubs

Port of Miami (POM)


Miami Intermodal Center (MIC)
Miami International Airport (MIA)
Jackson Memorial Hospital (JMH)
Downtown Bus Terminal (DBT)
Miami Beach Convention Center (Miami Beach)
Orange Bowl
Greyhound Intercity Bus Facility (GIB)
Miami River (and to MIA / MIC / POM and other
waterfront destinations via waterborne transit service

34
Promenade Area Map 2
Regional Rail Connectors

1. Baylink Connector to Port of Miami


2. Port of Miami Connector via Metrorail Extension
3. East - West Corridor via 5th and 6th Streets
to Port of Miami
4. Baylink

Metromover / Station

Metrorail / Station

Intermodal Areas (Passenger, Freight, and


Connectors)

Interregional Destinations &


Strategic Intermodal System (SIS)
Hubs

Port of Miami (POM)


Miami Intermodal Center (MIC)
Miami International Airport (MIA)
Jackson Memorial Hospital (JMH)
Downtown Bus Terminal (DBT)
Miami Beach Convention Center (Miami Beach)
Orange Bowl
Greyhound Intercity Bus Facility (GIB)
Miami River (and to MIA / MIC / POM and other
waterfront destinations via waterborne transit service

35
Promenade Area Map #3
Proposed Community Intermodal
System Improvements

Passenger Intermodal Facility Improvements


Area

Freight Intermodal Facility Improvements Area


and Freight Intermodal Connectors

Pedestrian-Oriented Intermodal Connectors

Recommended Liner Building / Parking Structure


Area

Metromover / Station

Metrorail / Station

Interregional Destinations &


Strategic Intermodal System (SIS)
Hubs

Port of Miami (POM)


Miami Intermodal Center (MIC)
Miami International Airport (MIA)
Jackson Memorial Hospital (JMH)
Downtown Bus Terminal (DBT)
Miami Beach Convention Center (Miami Beach)
Orange Bowl
Greyhound Intercity Bus Facility (GIB)
Miami River (and to MIA / MIC / POM and other
waterfront destinations via waterborne transit service

36
Parking regulations to be adopted by the City of Off-street Parking
Having more than enough spaces in Miami to reduce the unnecessary burden
In overly car-dependent regions such as
surface parking lots can fragment the urban on private developers. To jumpstart
South Florida, each development will
environment and looks unsightly, while having redevelopment, new businesses in existing
commonly attempt to provide for their own
too few spaces can frustrate residents and buildings should be exempt from parking
parking on-site with a parking structure or
patrons. However, if individual property requirements to reduce their startup costs
parking lot. In urban areas, some of the
owners maximize the amount of parking that and therefore their financial risks.
negative effects of storing large quantities of
can be created on each private lot, and meet cars on each site are:
1970s-style parking ratio expectations, the Providing & Retaining On-Street Parking
Experiencing gaps between buildings,
result would be at best a blighted, unsuccessful On-street parking provides motorists with from parking lots, when walking down a
aspiring suburb rather than a pleasant, access to street level businesses. These sidewalk is disruptive for retail
walkable urban environment. More businesses can capture the attention of both environments. Shoppers are easily turned
commonly, high parking requirements make pedestrians and drive-by motorists. On-street off by these gaps and will often stop
small-scaled infill developments too difficult. parking also creates a comfortable pedestrian shopping or pause and turn around if it
Therefore the CRA should promote a environment by buffering pedestrians from looks like there are not any worthwhile
balanced strategy that seeks to use space vehicles in the travel lanes. Sidewalks destinations down the street.
efficiently and facilitate a system-wide automatically become active with pedestrians Parking structures greatly increase the
approach. Parking should be treated among because of people getting in and out of their costs to develop a building. This makes
matters of public infrastructure rather than cars parked in the on-street spaces. market rate and workforce housing, for
just as a private endeavor on private Existing on-street parking throughout the example, more difficult to find in central
properties. The CRA should not enter the Redevelopment Area should be maintained. urban areas, where such housing is
business of parking, but can help implement The potential for adding on-street parking to primarily needed. Luxury apartment
projects that can be managed privately or by streets where it is not currently provided dwellers more easily absorb the cost of
the Miami Parking Authority. should be explored when roadway the parking garages.
improvements occur over time. All new and Development that includes parking
Required CRA Actions: improved streets within the Redevelopment structures requires larger parcels to create
1) Advocate, fund, and/or build on-street Area should be designed to include on-street functional structures and financially viable
parking spaces in any future parking. projects. This generally requires the
redevelopment efforts within public projects to be large in scale, and therefore
rights-of-way. harder to finance and harder to fit within
2) Support a reform of off-street parking

37
the fabric of the neighborhood. facilities. This will take the burden off local lit during all hours of operation and
Parking structures associated with one property owners interested in redeveloping or patrolled by security officers.
building do not necessarily create a improving their properties and buildings.
shared situation, which can reduce the
overall needed parking spaces. The Reducing the Impact of Parking Garages:
concept of shared parking means that at To diminish the visual and negative
night an apartment resident can use the impact of parking garages, these guidelines
same parking space used by an office should be followed:
employee during the day. In the suburban No blank walls of parking garages or walls
model, office buildings and residential with openings to the parking garage
buildings are not typically designed to should directly face public streets.
share parking; nor is the building A liner of habitable space with a
management company in the business of minimum depth of twenty feet should be
managing parking. constructed between the street and the
garage portion of the building. Ground
Without shared parking, the inefficient floors of garages may contain lobby
end result is that more money is spent and entrances, entrances to parking, and
more land is utilized for parking than is really should also contain retail space.
necessary. Recommended liner building depths are
thirty to forty feet for residential and
Making shared parking work office, fifty to sixty feet for retail. First
As shared parking facilities are built and floor residential uses should be raised a
the area becomes more developed, livable, minimum of two feet above the average
interesting, and walkable, with daily needs and sidewalk grade.
services present, some households may opt to Gates or payment kiosks should be at
do without an automobile or share fewer cars least forty feet from the sidewalk if the
among family members. Developers of new entrance is on a street.
buildings will not have to provide as much of Wherever possible, entrances to the
their own parking as they did in the past. The parking garage should be from an alley or
CRA can do its part by participating in public- side street.
private ventures to build shared parking For safety reasons, garages should be well

38
Land Development Regulations city block. Building Envelope: how the mass of the
To reduce this need to assemble several building is expressed to maintain quality
Adherence to, and revisions of, the Citys parcels into one, the Maximum Building street spaces, while optimizing
Zoning and Land Development footprint should be increased, minimum development potential.
Regulations. parking requirements reduced, and Floor Area Architectural Elements: the basic
All CRA Redevelopment activities shall Ratio either de-emphasized or eliminated. architectural features to create fit with the
adhere to the City of Miamis Comprehensive Then buildings will be allowed to vary in size climate and visual interest in buildings and
Plan and all zoning and regulatory and scale, and an orderly mixture of buildings to provide harmony among diverse
requirements, as revised from time to time. can occur within any given city block. Specific designs by many architects.
The existing zoning regulations do not reforms that should be reflected in the new A Mixture of Uses: Reducing or
necessarily encourage or ensure the Design Standards, for at least some areas eliminating off-street parking
development of street-oriented, urban within the Redevelopment Area include: requirements for storefront businesses
buildings. This situation is not unique to the Increased maximum building footprints located at the street level will be attractive
Redevelopment Area. A fine-tuning of the Revised floor area ratios, in certain zones to small business, provided there is
citywide land development regulations will Decreased parking requirements enough pedestrian traffic on the adjacent
eventually occur. However, to assist projects Decreased open space requirements street. This may also be an incentive for a
that are entering the development stage in a Building envelope requirements (i.e., step- developer to build retail square footage at
timely manner, a new set of Urban Design backs and tower orientation rules) to the base of an office or residential
Standards for Redevelopment Area, plus maintain access to sunlight and prevailing building, furthering the initiative of
accompanying incentives, can offer an breezes. This will have the added benefit mixing uses.
intermediate solution. of optimizing east-west view corridors.
The proposed Urban Design Standards The new Urban Design Standards shall The overall benefit will be to create
would reflect adjusted zoning mechanisms in describe the following: flexibility within a framework of reasonable
certain zones within the Redevelopment Area. The Building-To-Street Relationship: how certainty, allowing the development
In the past, the low Maximum Building buildings should face the street at the community to deliver a variety of building
footprint (the percentage of the property ground level. This includes elements such types to provide a range of housing options
which can be covered with a building), and the as distance between operable doors, and services needed to accommodate
Floor Area Ratio (the amount of square percentage of window glazing, and the use individuals of numerous lifestyles and
footage that is habitable based on size of the of projecting elements to provide shade, economic positions.
lot) required land assembly to form large such as colonnades and awnings,
parcels, sometimes encompassing an entire balconies, or overhangs.

39
Physical Plan
The Physical Plan shows the physical and
geographic conditions of public and private
buildings. The plan identifies civic buildings,
private buildings, streets, highways, and mass
transit lines. Various colors for areas between
buildings identify parks and open spaces,
parking locations, sidewalks, street trees, and
yards.

40
Possible Changes to I-395
The MPO has been discussing
modifications to I-395 between I-95 and the
Macarthur Causeway. Various scenarios have
been presented by the Florida Department of
Transportation, the apparent favored
alternative being the one with trenched
through-lanes with at-grade frontage roads.
Park West and the Omni area would be
reconnected with bridges for city streets
spanning the travel lanes below. This
alternative suggests moving the alignment of I-
395 northward along NE-NW 13th Street, and
therefore creating a re-developable swath of
land at its current location.

The plans on the right compare this


alternative with the Redevelopment Plan as
drawn and show that it is compatible.

41
42
43
Projects and Project Areas: An the project, then it should be considered part street, all corners of an intersection, or
Overview of the Project Area. all sides of a park or green space should
This section is organized into two primary The current projects and programs to be be built out or renovated.
subsections, Project Areas, and Projects facilitated by the CRA are listed and described It includes a significant residential
and Strategies. The Project Areas are in the second half of this section, following component, preferably owner-occupied;
numbered A through J and as a group do the description and intent of the Project one desire is to repopulate the area and
not encompass the entire Redevelopment Areas. These projects may need to be updated to correct an imbalance of renters
Area. They should be thought of as various from time to time as the projects evolve and versus owners.
starting points for projects within the components are implemented. Some may It lures residents of moderate incomes
Redevelopment Area. The impetus of need to be removed from the plan when they or varied incomes; these are colonists
focusing efforts into these Project Areas is a are sufficiently completed. New projects may who will demonstrate the viability of
direct response to the unfair accusations by need to be added. This section can be close-in convenient neighborhoods and
some members of the public that the CRA has supplemented by another document or whose discretionary income will help
spent large sums of money and has little to documents revising the list of projects or support businesses.
show for it. When money is spent evenly describing them in greater detail. It suggests what the larger
throughout the Redevelopment Area, it is neighborhood will be like as
difficult to see where the money has gone, Criteria for Physical Improvements revitalization spreads, and it inspires
because you can not stand in one location and The following are criteria for any physical private reinvestment.
see a 100% transformation. The purpose of improvement project to be endorsed by the Its purpose meets the principles and
having the Project Areas is to focus CRA: goals described in Section 2 of this
expenditures and efforts in small areas to totally It produces a total, outdoor redevelopment plan
transform them, creating as dramatic and environment of exceptional beauty,
visible an impact as possible. By which exudes safety and optimism, and Project Areas
concentrating the efforts, people will which stands out in marked contrast to Stakeholders Roles.
experience what the larger area will look, feel, blight. Specific roles for each of the stakeholders
smell, and sound like as revitalization spreads, It involves a combination of adaptive appear below and with the Project Area
inspiring additional private reinvestment. re-use of existing (or better, historic) descriptions. In the spirit of teamwork, the
The boundaries for Project Areas are not structures with new buildings and stakeholders can each do their part to
intended to be treated as finite boundaries. If improved public spaces. revitalize the area. The roles for stakeholders
a redevelopment proposal is adjacent to the It involves a completion of the public other than the CRA should be considered as
area and it meets the urban design solutions of space; for example, both sides of the

44
suggestions. Approval of this plan should in Residents in the Community: As most are Community Churches: Stay involved and
no way require agencies or individuals outside aware, revitalization takes a long time. Spend stay aware of the revitalization activities in the
of the CRA to perform the suggested actions. the effort and money to improve the community. Help the CRA distribute
Stakeholders include: appearance of homes and yards. Sometimes information as needed from time to time.
little tasks that do not cost too much can make Sponsor activities to improve the visual
CRA: Perform actions as sanctioned under a big difference, such as repainting, adding a appearance of the neighborhoods and
the Redevelopment Act of 1969 and identified tree or shrubs, and picking up litter that might continue to promote the area as a proud
in this Community Redevelopment Plan. be on your street or in your or your neighbors community that cares.
yard.
City of Miami: Continue support for the CRA
and make changes to the zoning and other land Rental or Commercial Property Owners
development regulations for properties in this and Business Operators: Maintain or
part of the City. The City should maintain and improve the appearance of your buildings.
improve its properties in Overtown, and use its Grants and low-interest loan programs are
resources to provide a safe and attractive available to accelerate improvements. Property
community. owners who do not intend to make
improvements should consider selling their
Overtown Civic Partnership: Focus efforts properties or partnering with others who have
in partnership with the City of Miami and the greater resources.
CRA. The Overtown Civic Partnerships goals
mirror those of the CRA. These include goals Overtown Community Oversight Board:
regarding housing and physical development, Continue monitoring and guiding the various
economic development, community buildings, activities within Overtown, including
and leadership development. implementation strategies and creating new
alliances.
For-Profit Developers, Community
Development Corporations, and Investors: The Black Archives, History & Research
Continue redeveloping properties, adding Foundation of South Florida, Inc.:
more jobs and housing options within the Continue the efforts to promote and preserve
community. the cultural heritage of the community.

45
Project Area A: NW 1st Avenue Better pedestrian routes and improved walking 3) A number of changes and improvements
General Boundaries: conditions will allow residents and visitors are proposed in the Physical Plan to create
North: I-395 Overpass alike to circulate between the two areas. a more pedestrian-friendly environment
South: NW 1st Street Another opportunity is that the railroad right- along NW 1st Avenue. Several new at-
East: properties that face NW 1st Avenue of-way can accommodate a new light rail grade crossings of the railroad tracks are
West: properties that face NW 1st Avenue system, the Baylink. A station along this proposed. This will allow for safer
section of the avenue will bring people to the pedestrian movement across the tracks as
Challenges Promenade and serve as a link to downtown well as establish missing connections in
There is an awkward traffic pattern for Miami and Miami Beach for neighborhood the street grid. Improvements to
vehicles proceeding north along NW 1st residents. sidewalks and the addition of street lights
Avenue. NW 1st Avenue does not need to be a and shade trees along the median will
Pedestrians are crossing the railroad tracks strong retail oriented street. A mixture of provide a more enjoyable walking
under unsafe condition, simply because office and residential buildings are the best environment at all times of the day.
they are walking the shortest route choice for the extra-wide roadway. Retail 4) Taller building heights, when combined
between two points. efforts should be focused on the core area of with the landscape improvements, will
The railroad tracks, buildings, and vacant Overtown and the key east-west streets such increase the definition of the public space
properties lining NW 1st Avenue are as 9th, 11th, and 14th. on both sides of the tracks and will
unsightly. Urban Design Solutions contribute to creating a sense of place.
There is a general lack of sense of place 1) With the current traffic pattern, The natural surveillance that occurs when
resulting from low building heights in northbound vehicles need to stop, turn people can watch the Avenue through the
proportion to the street width. This takes left and cross the railroad tracks and then windows of their homes or offices will
away from the potential of NW 1st stop and turn right to continue north. To make NW 1st Avenue a much safer place.
Avenue becoming an important signature resolve this odd driving route, the main 5) A parking structure in some location
location. travel lanes of NW 1st Avenue will curve along NW 1st Avenue, perhaps in
New Opportunities across to the western side of the railroad Overtown, will service the parking need
There are a number of opportunities that tracks and continue to the north. The generated by the influx of visitors and
an enhanced NW 1st Avenue will afford the roadway on the eastern side of the tracks daily inhabitants to the area. Any
neighborhood. One of these is the should remain a two-way street. proposed parking structures must be lined
improvement of the pedestrian connection 2) Legitimize parking on the east side of NW with habitable spaces (such as offices,
between the newly proposed Promenade in 1st Avenue by marking on-street spaces apartments, or hotel rooms) facing the
Park West and the Overtown neighborhood. and installing parking meters. streets or avenues.

46
47
48
49
50
51
52
Stakeholders Roles for Redevelopment Overtown Civic Partnership: Continue
CRA: efforts to implement publicprivate joint
Make sure there are Credit Counseling development projects.
Services available for existing Overtown
residents, to help them qualify for Residents in the Community: Residents
homeownership. should participate in programs to better
Make sure there is an organization set up prepare them to take advantage of home
that can offer basic financial literacy ownership and opportunities that arise from
training, job training, education and other redevelopment.
supportive services for people with
extremely low incomes that can not Developers: Provide residential units along
qualify for home ownership. NW 1st Avenue that meet the goals and
Begin talks with FEC and Miami-Dade principles of this redevelopment plan.
County Public Works to change the
configuration of NW 1st Avenue. This Commercial Property Owners: Look for
Avenue has historically been the divider opportunities for apartments or
between Overtown and Park West, and condominiums to increase the number of
the redesign is needed to make it the patrons for the local businesses.
unifier.
Support the City with the effort of Overtown Community Oversight Board:
revising the land development regulations, Continue to monitor and offer
by funding the effort and/or promoting it recommendations on activities.
with the community.
The Black Archives, History & Research
City of Miami: The Planning Department Foundation of South Florida, Inc.:
should prepare new development regulations Continue the efforts to promote and preserve
for properties along Biscayne Boulevard in communitys cultural heritage.
Park West to create rules that will provide an
attractive and safe pedestrian environment
facing Biscayne Boulevard.

53
Project Area B: Overtown The Project Area called Overtown is anchor of Historic Overtown, and can serve
General Boundaries: intended to be the central core of Overtown. to significantly enhance efforts to create a
North: NW 14th Street Groups like the Overtown Civic Partnership tourist destination. The long-term viability of
South: NW 5th Street are proactively planning to revive Overtown, the Lyric Theater as the cultural anchor, and
East: NW 1st Avenue creating a destination of choice. The Lyric future commercial retail and residential
West: NW 3rd Avenue Plaza will be the focal public open space for developments is critical. Keeping the theater
cultural and entertainment activities. The open and active may require additional public-
Challenges Black Archives, History & Research private partnerships.
The historic cultural life of arts and Foundation of South Florida, Inc. has restored Urban Design Solutions
entertainment and expression of heritage the Lyric Theater and rents it out for activities 1) The Lyric Plaza should be surrounded on
in this area needs to be regenerated. and events. The Lyric Theater will also attract three sides by mixed-use buildings, with
Many of the historic buildings have been business to the area from performances the fourth side being the planned addition
demolished. associated with the Adrienne Arsht Center for to the theater. The ground level of these
There is a need for a safe public gathering the Performing Arts of Miami-Dade County. buildings should contain restaurants, bars,
space associated with the restored and The CRA, the County, and the South clubs, and shops offering unique
expanded Lyric Theater. Florida Land Trust already control significant merchandise with cultural appeal. These
Insuring the economic viability of the land parcels in this vicinity, and have been establishments will complement the
Lyric Theater as the cultural anchor of assembling them for the purpose of theater-going experience and will
Historic Overtown redevelopment. encourage people to come early and linger
Once the Lyric Theater and surrounding The May 2002 Economic Programming after performances at the Lyric Theater
businesses become successful, there will Study prepared by ZHA, Inc. for all of and other future clubs in the area.
be a perceived shortage of parking spaces, Overtown recommends that an enticement 2) Offices and/or apartments should occupy
and new parking spaces will be needed for program be created by an Action Team for the upper floors around the Lyric Plaza.
infill redevelopment. Procurement. The Action Team is to be made 3) Vehicular access should be provided on
Residential population has decreased in up of commercial realtors, bankers, the west and north sides of the Lyric
year 2000 from year 1990 according to the commercial developers, and a senior CRA Plaza, providing a drop-off location for
Federal Census, explaining the decrease in staff member. Their job is to attract a tenant patrons and providing access to midblock
viable businesses that offer services to the mix that supports the jazz, blues, and gospel parking facilities.
residents. entertainment venues and the supporting 4) The city blocks between NW 2nd Avenue
businesses in retail and services. and 3rd Avenue should follow the Folk
New Opportunities The Lyric Theater serves as the cultural Life Village Plan in character, with two to

54
four story buildings. Action Team as described in ZHA, Inc.s recommendations on activities.
5) Taller buildings should be built facing 2002 Economic Programming Study.
NW 1st Avenue and the Metrorail tracks. The Black Archives, History & Research
Integrated into these buildings should be City of Miami: Change the Land Foundation of South Florida, Inc.:
garages that provide shared parking spaces Development Regulations for Overtown, to Carry out the plan to expand the Lyric
to theatergoers, the businesses, residents, meet the vision for this area, and examine the Theater and manage the Lyric Plaza.
and visitors on NW 2nd Avenue and in the extension or inclusion of the area around the Continue to maintain the Lyric Theater
Folk Life Village area. Lyric Theater into the Citys Entertainment and rent it for events.
. District, so new businesses in Overtown can Continue with art and heritage exhibits
Stakeholders Roles for Redevelopment receive the same incentives that businesses in showcasing African American cultural
CRA: parts of Park West receive. contributions at the Lyric Theater to
Offer land as part of publicprivate joint provide a destination in Overtown.
development projects, and coordinate Overtown Civic Partnership: Continue Continue the efforts to promote the
County efforts to do the same. efforts to implement publicprivate joint Folklife Village.
Support the City with the effort of development projects, and help existing Assist in the development of
revising the land development regulations, business owners improve the appearance of complementary uses along the NW 2nd
by funding the effort and/or promoting it their storefronts by offering design Avenue corridor.
with the community. suggestions for the facades and windows.
Make sure there are Credit Counseling
Services available for existing Overtown Residents in the Community: Residents
residents, to help them qualify for should participate in programs to better
homeownership. prepare them to take advantage of home
Make sure there is an organization set up ownership and opportunities that arise from
that can offer basic financial literacy redevelopment.
training, job training, education and other
supportive services for people with Developers: Provide residential units in
extremely low incomes that can not Overtown that meet the goals and principles
qualify for home ownership. of this Redevelopment Plan.
Help existing and future commercial
property owners attract quality tenants, Overtown Community Oversight Board:
and national retailers, by starting the Continue to monitor and offer

55
56
57
58
59
60
61
Project Area C: NW 3rd Avenue Village will increase the variety of housing Center should face the new green
Neighborhood Center choices and diversify the household types and square.
General Boundaries: incomes, and return the customers needed for c) The remaining portion of the Culmer
North: NW 22nd Street the businesses. The Culmer Center could be Center property along NW 3rd
South: I-395 Overpass rebuilt and expanded as an impressive street- Avenue should be redeveloped as 2-
East: NW 1st Place oriented building, with a courtyard for certain to 4-story flexible-use buildings,
West: NW 4th Avenue outdoor activities. The corner at NW 17th oriented toward the street like those
Street and NW 3rd Avenue has large trees that on the east side of NW 3rd Avenue.
Challenges will enhance what could be turned into a d) The remaining portion of the Culmer
Buildings that once opened toward the public green square. Vehicular traffic around Center Property along NE 4th Avenue
street with doors and windows have been the new green square will make it safer than should be redeveloped for residential
closed up, presumably due to crime or the the property currently appears. or office uses. Live/work
perception of vulnerability to crime. ZHAs 2003 Economic Programming combinations should be encouraged.
Neighborhood-serving retail has been Report supports the need for additional retail 2) Properties on the eastern side of NW 3rd
reduced to a handful of bars, small in North Overtown, especially with the 102 Avenue should be refurbished or
markets, hair salons and barber shops, new units that are soon to come on the redeveloped into 2- to 4-story mixed-use
and laundromats. market. buildings. Windows and doors must face
The Culmer Center building is far from Urban Design Solutions NW 3rd Avenue to make walking along
the street, fenced off, poorly lit at night, 1) Use the Culmer Center property as a the sidewalk safe and worthwhile.
and the property is significantly redevelopment site. 3) Implement the Trust for Public Lands
underutilized. a) The existing facility should be Overtown Greenway Plan (the portions
Existing apartment buildings in the area replaced with a new structure built at for North Overtown, in particular).
are at best plain and, in many cases, aging the corner of NW 17th Street and NE/NW 14th Street is the main
and unattractive. NW 4th Avenue. The new building pedestrian connection into the Omni
New Opportunities should be oriented to the street, with Area.
NW 3rd Avenue could become a thriving an open air courtyard. 4) Sidewalks should be repaired where
mixed-use commercial street with businesses b) An unfenced public green or park broken and trees planted where there are
that better support the daily needs of both should be built at the corner of NW gaps. This segment of NW 3rd Avenue
longtime residents and newcomers. New 17th Street and NW 3rd Avenue where currently has a nice mature street tree
residential development, such as Village of St. currently there are large trees. The canopy that should be retained during any
Agnes, Carrie Meek Tower, and St. John front entrance of the new Culmer future streetscape project.

62
Stakeholders Roles for Redevelopment City of Miami: Assist with streetscape Overtown Community Oversight Board:
CRA: improvements for North Overtown, and Continue to monitor and offer
Make sure there are Credit Counseling request the County to redevelop the Culmer recommendations to activities in North
Services available for existing Overtown Center. Overtown.
residents, to help them qualify for
homeownership. Overtown Civic Partnership: The Black Archives, History &Research
Make sure there is an organization set up Request the County to redevelop the Foundation of South Florida, Inc.:
that can offer basic financial literacy Culmer, or seek a third party to enter into Continue the efforts to promote and preserve
training, job training, education and other a joint venture with the County. the cultural heritage of the community.
supportive services for people with Focus efforts on West Overtown in a
extremely low incomes that can not similar manner to that of the core of Community Churches:
qualify for home ownership. Overtown. Evaluate your building and grounds to see
Initiate a streetscape improvement project if changes can be made to the appearance
for North Overtown. Residents in the Community: Residents to help beautify NW 3rd Avenue.
Help attract new businesses to NW 3rd should participate in programs to better Study the possibility of developing excess
Avenue in anticipation of new residents prepare them to take advantage of home church property for housing or
moving into Village of St. Agnes, Carrie ownership and opportunities that arise from commercial uses.
Meek Tower, and St. John Village, making redevelopment. Host or sponsor community events to
those businesses more viable than with attract tourists or visitors to Overtown.
the current population. Developers: Continue to provide more
Provide assistance perhaps through a residential units in North Overtown that meet
faade improvement program or the goals and principles of this redevelopment
rehabilitation grant or loan program for plan.
existing commercial building/business
owners to upgrade the existing stores on Commercial Property Owners: Make
NW 3rd Avenue. improvements to buildings, and look for
Request the County to redevelop the opportunities for apartments or
Culmer Center, or seek a third party to condominiums to increase the number of
enter into a joint venture with the County. patrons for the local businesses.

63
64
65
Project Area D: Historic Overtown There is a lack of shade for pedestrians. that is also accessible for existing
Priority Business Corridor Sidewalks are narrower than those for neighborhing buildings.
General Boundaries: typical main streets, making it less 2) Shade for pedestrians is urgently needed.
North: I-395 Overpass comfortable for shoppers and other This can be accomplished by planting
South: NW 8th Street pedestrians. trees between the on-street parking
East: properties that face NW 3rd Avenue New Opportunities spaces, or with awnings, canopies, roof
West: properties that face NW 3rd Avenue The potential for a thriving NW 3rd overhangs, balconies, colonnades, or
Avenue has not been lost. The segment near arcades attached to the buildings.
On June 9th, 1998, the Miami City NW 8th Street is quite visible for people 3) Vehicular travel lanes should be narrowed
Commission, by Resolution No. R-98-592, getting on I-95, and it is somewhat visible for so that the extra space can be added to
designated NW 3rd Avenue from northbound motorists on I-95. More the sidewalk width. On-street parking
approximately NW 8th Street to noticeable improvements between NW 8 and th must remain in any future streetscape
approximately NW 14 Street, and NW 8th
th NW 10th Streets will attract people to stop project, to help the businesses along the
Street from NW 2nd Avenue to NW 3rd there who might otherwise pass by, or who street, and to add a safety barrier between
Avenue, as the Historic Overtown Priority might be interested enough by a passing the moving cars and the pedestrians.
Business Corridor. This general designation glance to want to return when they have more 4) Landscaping along the embankments of
gave the CRA the ability to start planning time. the Interstate Highways and the Metrorail
activities, to assist the overall commercial Urban Design Solutions should be continued.
revitalization of Overtown. 1) Do not build any more parking lots until 5) Improve the appearance of Church-
Challenges the demand for the area increases to the owned parking lots. These are mostly
More buildings require renovation. point where there is a real parking empty except during Sunday services and
The community has criticized the problem. The project entitled Planning and other events and they could be landscaped
construction of parking lots, because they Development of Parking Facilities for the better. Better yet, develop new buildings
appear to remain empty and decrease the Historic Priority Business Corridor, should be to house church programs, community
sense of a built-up neighborhood. considered complete until more parking is outreach services, subsidized housing or
The street has many churches, each needed in the Priority Business Corridor. for generating revenue through renting
needing additional parking during church The surface parking lots constructed by and leasing. Any new buildings will likely
events and funerals that occur on days the CRA were intended to be an interim have to include parking structures, and
other than Sundays. These events further use. The CRA is interested in minimize the view to parking from NW
reduce the parking availability for business development proposals for those 3rd Avenue.
patrons. properties, provided parking is included

66
Implementation Strategies Stakeholders Roles for Redevelopment of home ownership and opportunities that
The 1998 Study for the Historic Overtown CRA: arise from redevelopment.
NW 3rd Avenue Priority Business Corridor Continue to plan and coordinate Appeal to FDOT and the City of Miami to
recommended that an economic study was improvements for this Project Area. renovate Athalie Range #1 Mini Park
needed, that a business capacity and Coordinate efforts with the Overtown consistent with the goals to revitalize
identification program be created, and a Civic Partnership. Overtown.
theme be adopted. The May 2002 Help existing and new commercial
Economic Programming Study, prepared by property owners attract quality tenants, Commercial Property Owners and
ZHA, Inc. for all of Overtown, estimates the and national retailers, by starting the Developers: Continue making
magnitude of commercial and residential Action Team as described in ZHAs 2003 improvements, and look for opportunities for
development that Overtown can sustain. It Economic Programming Study. apartments or condominiums to increase the
recommends that an enticement program be Make sure there is an organization set up number of patrons for the local businesses.
created by an Action Team for Procurement. that can offer basic financial literacy
The Action Team is to be made up of training, job training, education and other Overtown Community Oversight Board:
commercial realtors, bankers, commercial supportive services for people with Pay close attention to NW 3rd Avenue while
developers, and a senior CRA staff member. extremely low incomes that can not focusing on the Overtown efforts. Look for
Their job is to attract a tenant mix that qualify for home ownership. actions that can benefit NW 3rd Avenue.
supports the jazz, blues, and gospel
entertainment venues and the supporting City of Miami: Examine current land The Black Archives, History & Research
businesses in retail and services. The study development regulations for the possibility of Foundation of South Florida, Inc.:
suggests that the success of future residential revisions, and upgrade the appearance and Continue the efforts to promote the
development is dependant upon the success of facilities at Athalie Range #1 Mini Park. Folklife Village.
the commercial uses. This action team will Continue efforts to secure funding and
have to work on the Priority Commercial Overtown Civic Partnership: Continue organize businesses consistent with the
Corridor in a coordinated manner with development efforts for this area. Main Street Program that the Foundation
entertainment district intended for Overtown. currently oversees.
A theme is not so important, but Residents in the Community: Continue to work jointly with the
positioning the Overtown neighborhood Patronize the businesses on NW 3rd Overtown Civic Partnership towards
properly in an advertising and marketing Avenue. improvements in the neighborhood.
campaign will be important to its success. Residents should participate in programs
to better prepare them to take advantage

67
Community Churches:
Evaluate your building and grounds to see
if changes can be made to the appearance
to help beautify NW 3rd Avenue.
Study the possibility of developing excess
church property and surface parking lots
for housing or commercial uses.
Host or sponsor community events to
attract tourists or visitors to Overtown.

68
Project Area E: West Overtown trips and removing confusion for motorists. property.
General Boundaries: Apartments could be quite desirable facing all 5) Provide on-street parking, especially near
North: NW 11th Street four sides of Reeves Park. Opening up the neighborhood serving commercial
South: NW 7th Street superblock so that streets will surround all buildings and around Reeves Park.
East: I-95 four sides of Reeves Park will make the park 6) Implement the Trust for Public Lands
West: NW 7th Avenue appear to be safer. Overtown Greenway from the Miami
West Overtown does have industrial uses River to Overtown.
Challenges along NW 7th Avenue. Those that are Stakeholders Roles for Redevelopment
Streets were closed off near Reeves Park, compatible to the neighborhood should not be CRA:
and in turn, create large blocks, referred to discouraged. Special attention will need to be Help the Trust for Public Land
as superblocks. These sometimes are given to the transition from industrial to implement their Overtown Greenway.
difficult for pedestrians to cross, and residential uses. These businesses provide Make sure there are Credit Counseling
make motorists drive farther, consuming jobs for local residents at wage levels higher Services available for existing Overtown
time and expensive fuel. than retail jobs and likely high enough to residents, to help them qualify for
Boarded up buildings greet motorists support a family. homeownership.
entering Downtown from the I-95 ramp Urban Design Solutions Make sure there is an organization set up
that becomes NW 3rd Court. 1) To break up the superblocks, former that can offer basic financial literacy
The two blocks of neighborhood serving streets will need to be restored, especially training, job training, education and other
retail blocks on NW 5th Avenue might be the superblock bordered by NW 8th Street supportive services for people with
difficult to revive in the near term. and NW 10th Street between NW 5th extremely low incomes that can not
New Opportunities Avenue and NW 7th Avenue. qualify for home ownership.
The location of this area between 2) Apartment buildings must vary in form Help promote neighborhood serving retail
downtown and the Miami River will become and color to enhance the visual for West Overtown in a similar manner to
desirable as a neighborhood in which to live appearance of the neighborhood. Historic Overtown Priority Business
once the apartments and neighborhood 3) The fronts of new apartment buildings Corridor.
amenities become more attractive and facing Reeves Park shall have their front Encourage the City to change the one-way
functional. ZHAs 2003 Economic doors facing the Park. streets in West Overtown back to two-
Programming Report supports the need for 4) Neighborhood serving commercial land way streets.
residential units in West Overtown. uses shall be encouraged on NW 5th Assist residential developers to provide
The one-way streets in this neighborhood Avenue between NW 7th Street and NW additional quality housing in West
could be returned to two-way, shortening car 10th Street, except on the Reeves Park Overtown.

69
Help existing and future commercial the goals and principles of this Redevelopment
property owners attract quality tenants, Plan.
and national retailers, by starting the
Action Team as described in ZHAs 2003 Residents in the Community:
Economic Programming Study Residents should participate in programs
to better prepare them to take advantage
City of Miami: of home ownership and opportunities that
The Public Works Department should arise from redevelopment.
turn the one-way streets to two-way Appeal to FDOT and the City of Miami to
streets which is recommended for renovate Athalie Range #1 Mini Park in
Overtown and Park West in the accordance with the goals to revitalize
Downtown Transportation Master Plan. Overtown.
Contribute to changes to Reeves Park as
new development opportunities arise on Commercial Property Owners: Make
surrounding properties. improvements to buildings as necessary, and
Upgrade the appearance and facilities at paint or clean building facades on a frequent
Athalie Range #1 Mini Park. basis.
Encourage buildings that face Reeves
Park and Athalie Range #1 Mini Park to Overtown Community Oversight Board:
provide natural surveillance of the parks Continue to monitor and offer
and provide incentives for creative recommendations to activities in West
architectural designs that blend residential Overtown.
buildings with the culture of the
neighborhood. The Black Archives, History & Research
Foundation of South Florida, Inc.:
Overtown Civic Partnership: Focus efforts Continue the efforts to promote and preserve
on West Overtown in a similar manner to that the cultural heritage of the community.
of The core of Overtown.

Developers: Continue to provide more


residential units in West Overtown that meet

70
71
72
73
Project Area F: Properties Facing provide needed protection from the elements 3) Additional pedestrian crossings are to be
Biscayne Boulevard for passing pedestrians. These sheltered located along Biscayne Boulevard to
General Boundaries: locations will also provide opportunities for increase pedestrian safety and mobility.
North: I-395 outdoor dining along Biscayne Boulevard, 4) With the two new museums planned for
South: NE 5th Street contributing to Miamis warm-weather Bicentennial Park, their parking demands
East: Biscayne Boulevard lifestyle. should be met offsite, on the west side of
West: NE 2nd Avenue Parking garages lined with habitable Biscayne Boulevard. By making the
spaces facing the streets will help satisfy the motorists park west of Biscayne and walk
Challenges parking needs of the new Biscayne Boulevard down the streets and across the
Most properties facing Bicentennial Park buildings. The habitable space lining the Boulevard, merchants gain better
remain vacant and only used for parking garages will give these utilitarian structures an visibility, and the pedestrian traffic makes
for events at the American Airlines Arena. urban face toward the public spaces of the the streets safer, just by their presence.
However, ownership has changed, which streets and Park. Stakeholders Roles for Redevelopment
may signal that change is not too far off. Urban Design Solutions CRA:
Zoning regulations for buildings fronting 1) The primary solutions to the challenges Support the City with the effort of
Bicentennial Park do not necessarily faced by Biscayne Boulevard buildings will revising the land development regulations,
promote street-oriented buildings. be found in changes to the zoning code. by funding the effort and/or promoting it
Biscayne Boulevard is difficult to cross These code changes must address such with the community.
with the fast-moving traffic and the large issues as building placement, awnings, and Until such time as the new land
number of travel lanes. There are very colonnades, among others. The Biscayne development regulations are in place,
few marked crosswalks. Boulevard Special Area Plan details these facilitate meetings with property owners
New Opportunities recommended changes. prior to the completion of their
Requiring buildings to be sited on the 2) More control is to be exercised over the construction documents and approvals to
front property line or a designated build-to building envelope, allowing buildings to show them the intentions of the new
line will allow Biscayne Boulevard to develop interact more sensitively with prevailing regulations.
into an urban street befitting its location and breezes and improve air quality. A twelve
history. Building envelope controls should story building base requirement should be City of Miami:
prevent new buildings from blocking air flow instituted to create a more unified street Help the CRA implement a shared
and light from existing buildings behind them, wall and improve the spatial enclosure parking garage to serve the Museums and
to optimize air quality. along Biscayne Boulevard and Adrienne Arsht Center for the Performing
Awnings, colonnades, and balconies must Bicentennial Park. Arts of Miami-Dade County on the west

74
side of Biscayne Boulevard.
The Planning and Zoning Departments
should prepare new development
regulations for properties along Biscayne
Boulevard in Park West to create rules
that will provide an attractive,
comfortable, and safe pedestrian
environment facing Biscayne Boulevard.

Commercial Property Owners and


Developers:
Every floor facing Biscayne Boulevard
should have habitable and useable space.
Parking garages on lower floors should
have liners of habitable space. Drop-
offs may occur in the on-street parking
lane, should FDOT create a parking lane
in its new design for the roadway.
Primary entrances should face Biscayne
Boulevard.
Vehicular entrances to garages and
delivery bays should occur on NE 2nd
Avenue, but not on Biscayne Boulevard.

75
76
Project Area G: The Promenade be some of the patrons supporting the local surveillance of the space making the
General Boundaries: economy. The parking needs of these patrons environment safer. New regulations
North: NE/NW 11th Street will be accommodated in a lined parking could add incentives additional parking
South: NE/NW 10th Street structure adjacent to NW 1st Avenue. for civic buildings such as the Center for
East: Biscayne Boulevard New mid-block plazas that will be created the Performing Arts, the two arenas, and
West: NW 1st Avenue along the Promenade will function as public the future museums in Bicentennial Park.
gathering spaces for the clubs that have 2) Design a construction plan that will detail
Challenges recently been relocating to the Promenade. the approach to lighting, signage, and new
Unused railroad right-of-way that has Most successful commercial districts have pavement in an effort to encourage
become an unsightly alley. anchors to draw patrons. The Promenade will business activity and make the area safer.
Nondescript, windowless buildings lining have on its eastern edge a renovated This could be implemented on a block by
the right-of-way, contributing to a bleak Bicentennial Park, with two new museums, the block basis as funds permit.
atmosphere. Miami Art Museum (MAM), and the Miami 3) Modify the boundaries of the Citys
The current physical conditions provide Childrens Museum. At the western end of Entertainment District to include just the
hiding locations for wrong-doers and the the Promenade, along NW 1st Avenue, a properties that face NE/NW 11th Street
homeless. significant anchor has not yet been identified. and NE/NW 10th Street from Biscayne
Rapid success of the Entertainment . This anchor should attract people to the Blvd on the east to NW 1st Avenue on the
District has resulted in peak times for neighborhood during daylight hours, as well as west (including both sides of NW 1th
parking and traffic congestion. at night. Avenue).
Businesses open during daylight hours are Terraces, whether part of new buildings 4) Review the Promenade Special Area Plan
few, causing the area to look empty and or added to the existing buildings, will provide for more design concepts and strategies.
abandoned during the day. space for outdoor dining at ground level and Stakeholders Roles for Redevelopment
New Opportunities above, improving the outdoor lifestyle that CRA:
The Promenade holds the promise of a great Miamis weather allows. Fund and implement improvements to
location for a vibrant entertainment district Urban Design Solutions the former railroad now known as the
and setting for an urban lifestyle in Miami. It 1) Examine and modify, if necessary, zoning Promenade. These improvements should
will be a pedestrian link between Overtown, regulations to encourage new multi-story include, but not be limited to, re-surfacing
Biscayne Boulevard, and the new museums in mixed-use buildings and parking garages. pavement, landscaping, increased lighting,
Bicentennial Park, activated by nightclubs and The requirement of windows, doors, and and painting. Acquiring the services of
restaurants at night and locally serving terraces to the existing buildings along the engineers or landscape architects may be
businesses during the day. New residents will Promenade will contribute to the natural required.

77
Coordinate and help facilitate in some portion of the boundaries should be unsightliness.
manner, an air conditioned garbage removed. The boundaries can be Work with the CRA or City to create a
location accessible by all the businesses extended to the west to include portions shared garbage facility.
along the Promenade. This could be of Overtown. The area around the Lyric
constructed as part of a new building or Theater should be included.
by renovating an existing one. Continue to provide police support for
Management of this facility should be the Redevelopment Area.
taken on by one of the building managers Solve the homeless situation in the area
for collecting fees, for example. and assist Charities Unlimited in the
Support the City with the effort of relocation and/or upgrade of its Camillus
revising the land development regulations, House facility.
by funding the effort and/or promoting it Assist in the infrastructure installation for
with the community. the area, particularly the wiring of fiber
optics.
City of Miami:
Work with the CRA if necessary to Overtown Civic Partnership: Seek
implement the shared garbage facility. opportunities for the positive effects of the
The City should not be responsible for Entertainment District to spill over into
the management of this facility. Overtown
The Planning Department should prepare
new development regulations for Commercial Property Owners and
properties with C-1 zoning in Park West, Developers:
to allow an increase in development When renovating existing structures or
opportunity. building new ones orient patio entrances,
Support the creation of a zoning outdoor dining, or entertainment spaces
ordinance that allows outdoor dining for to the Promenade.
the Promenade. Enclose unsightly rear building items,
Examine the modification of the such as electrical meters, back flow,
boundaries for the Citys Entertainment preventers, etc.
District. Interest appears to be focused Place mechanical equipment on roofs to
on the 11th Street area. The southern keep the Promenade free of the noise and

78
79
80
81
82
83
84
85
Project Area H: NE 8th Street/ and attracting a new business market in and businesses catering to the preventative
Miami WorldCenter preventative medical care to Park West, medical market and to typical residential and
General Boundaries: generally supported by people with greater commercial markets. The physical form of this
North: NE 10th Street means, spending more than 19 billion dollars district will not vary from the urban form for
South: NE 6th Street nationally each year. These medical related Park West described elsewhere in this plan.
East: Biscayne Boulevard uses are not necessarily required for the 8th Current property owners should be
West: N. Miami Avenue Street Spine but are offered here as a unique interested in this idea, because if successful, it
market potential for the area. will provide demands for leaseable space or
Challenges: Despite the location, properties Preventative medical care includes health land/building purchases in a unique market
are somewhat separated from the neighboring maintenance tests and scans to make sure that for South Florida. If this is slow to
downtown. Barriers include the elevated customers are healthy and for early diagnosis implement, conventional market demands can
Metromover tracks on 5th Street and the FEC of possible health problems. Tests may provide tenants.
railroad right-of-way between 6th and 7th include EKG (resting and treadmill), visual As in the Promenade Area and elsewhere,
Streets. 7th Street is not a through-street, acuity testing, audiogram, chest x-ray, the zoning regulations need to be examined
because it is blocked by the former Miami spirometry, non-invasive colonoscopy, blood and modified, if necessary, throughout Park
Arena site. workup, body composition, and nutrition West to encourage new multi-story mixed-use
New Opportunities counseling. Customers will have access to buildings and parking garages. The
Recently various property owners in this over 100 specialists and may receive additional requirement of windows, doors, and terraces
area have organized a collective effort to diagnostic tests such as calcium-score heart to the existing buildings along streets will
coordinate future development across multiple scan, CT lung scans, total body scan of the contribute to the natural surveillance making
City blocks. They can do this with flexibility if heart, lungs and abdomen/pelvis, ultrasound the environment safer. New regulations
the City designates a zoning district that would for carotid arteries, dental examination, skin could:
allow transferring certain zoning requirements exams, and cosmetic surgery consultations.
and entitlements from one block to another Mingled with the medical services are increase the FAR and density limits, or
eliminating them all together.
within the district. This flexibility will allow holistic services that include traditional
have separate FAR requirements for each
opportunities for a grocery store, additional therapeutic massages, facials and body use as an incentive to get mixed used
commercial anchor stores, and better treatments, and energy healing (Tai Chi, Yoga buildings.
configurations for parking structures since and meditation classes, hands-on healing). allow for transfer of development
some of the blocks are very small for garage. Urban Design Solutions potential from one property or block to
another.
ZHA, Inc. identified in its 2003 report to The success of this project depends on
the CRA that there is potential in setting up the creation of a district of various buildings

86
add flexibility to setbacks and increased City of Miami: buildable area across nearly 30 acres of prime
greenway setbacks on certain streets Economic Development Initiatives: validate the
connecting major public facilities; real estate.
swapping public and privately owned land economic viability of preventative medical
to move public rights-of-way from their uses and make recommendations to the
existing locations to new ones. For CRA board whether to pursue this
example, 7th Street could be swapped for project.
land next to 8th Street to make a larger
right-of-way that could include a Planning Department: prepare new
significant green way between the two development regulations for properties in
arenas. Park West, to allow an increase in
include a streamlined the regulatory development opportunity.
process and increase MUSP thresholds.

Commercial Property Owners and


Stakeholders Roles for Redevelopment
Developers:
CRA:
Collaborate with the CRA to get this
The CRA must first approach the
project started. Volunteer to participate
hospitals and confirm ZHAs solicitation
on the planning committee devoted to
of the hospitals interest and the
designing a coordinated effort and for
understanding this is a hospital-related
recruiting and setting up the potential
real estate venture as part of the
preventative medical care market.
regionalization of medical/health services.
Leasing agents may want to assist with
Set up a long range planning committee
meeting with the hospitals and doctors.
devoted to finding a workable manner to
construct and recruit tenancy for the
Miami WorldCenter
complex. See ZHAs 2003 report for
more details regarding this committee.
Envisioned as a dynamic urban core of
Support the City with the effort of
revising the land development regulations, diversity and excitement, Miami WorldCenter
by funding the effort and/or promoting it proposed to be a blend of exceptional retail,
with the community. restaurant, entertainment, hotel, residential,
and commercial offerings in one unique
location with up to 20 million square feet of

87
Project Area I: Camillus Project Area J: Townpark Ownership
House/UM Research District District
General Boundaries: General Boundaries:
North: NW 20th Street North: NE 20th Street
South: NW 15th Street South: NW 16th Street
East: I-95 East: NW 4th Avenue
West: NW 7th Avenue West: I-95

Camillus Houses new home on a 3.1-acre lot Townpark Village is a cooperative housing
adjacent to the intersection of US95 and 836.
development by HUD for low income

The seven-building center will provide a safe- families. Built in 1972, these 2 and 3-story
haven and services for up to 4,500 persons homes consist of 2, 3, and 4 bedroom units.
each year who are homeless and in need of Homeownership has been a major theme to
food, shelter, medical attention and job
encourage redevelopment in the Overtown
training. The new center will be built
community and these residents have decided
following the latest green construction
guidelines, which will provide Camillus House to transition from co-ownership with HUD to
with a significant reduction in operational private homeowners.
costs.

The center, which is located in Miamis health


district, an area surrounded by other well-
established medical, research and community
service buildings, includes a central courtyard
and a total of 340 beds including emergency
shelter beds, rehabilitation and treatment beds,
80 permanent housing units and 64 beds for
individuals in job training programs.

88
Projects and Strategies: 1. Renovation of Historically Significant themes to attract night clubs and
Buildings restaurants; programming special cultural
9 #1-#6 supports all of the goals events, designing signs, street furniture
The Projects and Programs for the CRA
and public plaza spaces; and creating
are organized into the following headings:
Overtown promotional literature for tourism and
I. Community Heritage and Historic The CRA proposes to build on the local marketing.
Preservation historic character of the area by preserving and Preserve, where feasible, surviving
II. Promotion and Enhancement of
revitalizing historically significant structures in buildings which represent important links
Overtown and Park West as a
Business and Investment Location the Redevelopment Area. Projects will be to persons, activities or events of major
III. Planning, Development, Technical implemented following the completion of the significance in the past.
Assistance and Program Compliance designation of the significant historic Encourage new development to
IV. Street Improvements, Utility
Infrastructure and Transportation structures for rehabilitation. The Black incorporate uses which would contribute
V. Home Ownership Pre-Qualification Archives, History & Research Foundation of to the vitality of the district such as stores,
and Counseling Program South Florida, Inc.s Master Plan identifies the nightclubs, restaurants, theaters.
VI. Grants to Existing Business Program following objectives as a guide in the Encourage new buildings to incorporate
VII. Laredo/Re-Use Plan (CLUC 90
Properties) Program redevelopment process: selected design elements from the past
The ordering and numbering of these which reflect special cultural or thematic
projects are not intended to reflect a Effectively communicate information and feelings which are relevant today and
prioritization. The programs and develop broad based awareness and should be re-established.
programs identified here should change appreciation of historic achievements of
over time as projects are completed and the African-American community through Consideration will be given to the
new projects become important. Each of exhibits, special events, tours, and the preservation of all of the identified historic
the projects and programs has underneath media. buildings, wherever structural conditions and
them check marks that illustrate which of Develop a magnet area within the target cost of rehabilitation might be favorable.
the goals set forth in Section 2 above they community for the purposes of: (1) re- However, recognizing that overall economic
are supporting. establishing a special identity for Culmer- revitalization plans for Overtown require
Overtown by focusing one era in its extensive new development, emphasis should
I. Community Heritage and history, the "Little Broadway" jazz era; (2) be placed on preservation of the following
Historic Preservation to establish interest in the Afro-Caribbean historic structures, which are considered to be
heritage by encouraging tourism, trade of major importance, located within the
and cultural exchanges. Develop these Redevelopment Area:

89
Churches Street relationship to planned redevelopment sites,
Greater Bethel A.M.E. Church, 245 NW Lyric Theatre, 819 NW 2nd Avenue potential for moving to a new site, potential
8th Street Clyde Killens' Recreation Hall, NW 2nd sources of funding. Buildings to be of first
Mt. Zion Baptist Church, 301 NW 9th Avenue and NW 10th Street priority concern because of imminent threats
Street of demolition, deterioration or vandalism
Building which was formerly the Lyric Public Buildings include:
Church, NW 2nd Avenue and 8th Street, Black Police Precinct and Courthouse, Stirrup Building
and the adjacent building 1009 NW 5th Avenue Stewart-Scott Building
Ebenezer Methodist Church, 1042 NW Dorsey Library, 100 NW 17th Street Thomas Building
3rd Avenue Ward Rooming House (only front
St. Johns Baptist Church, 1328 NW 3rd Residences remains with temporary structural
Avenue Dorsey House, 250 NW 9th Street support)
St. Agnes Episcopal Church, 1750 NW 3rd Killens House, corner, NW 2nd Avenue X-Ray Clinic
Avenue and NW 11th Street
Buildings that should be considered for
Businesses The City of Miami, in conjunction with reconstruction (due to previous demolition or
X-Ray Clinic, 171 NW 9th Street the Black Police Benevolent Association, neglect) include:
Stirrup Building, the corner of NW 8th completely rehabilitated the former Police Ward Rooming House
Street and 3rd Avenue Precinct located at 5th Avenue and 11th Street Cola Nip Building, formerly at 233-5 NW
Longshoreman's Hall, NW 2nd Avenue in Overtown. The building hasd been vacant 9th Street
and NW 8th Street since 1990s and was renovated to be used as a Divine Mission Building
Stewart-Scott Building, NW 2nd Avenue Black Police Museum. In addition, the facility Brown House
and NW 10th Street was designed and equipped to promote
Dr. Davis' Office Building, NW 2nd cultural activities for and within the Overtown Park West
Avenue and NW 10th Street community. Older structures located in Park West that
Judge L. E. Thomas' Office NW 2nd Possible preservation strategies must be have historic and cultural significance to the
Avenue and NW 10th Street studied for each of the above buildings overall Miami Community should be
Ward Rooming House, NW 9th Street and individually. Among the factors to be preserved when economically feasible. Special
NW 2nd Court considered are: ownership, need for repairs, attention will be given to the Freedom Tower.
Clyde Killens' residence & business, economic productivity, potential for new uses, Properties of major architectural,
corner, NW 2nd Avenue and NW 11th eligibility for federal tax benefits, location and historical and/or contextual significance

90
include: designated Historic or listed in the National make preservation economically or
500 NE 1st Avenue, Central Baptist Register for Historic Places, or both, through architecturally feasible.
Church the efforts of the Planning and Zoning
505 NE 2nd Avenue Departments. The following properties have The following properties have been listed
521 NE 2nd Avenue been designated by the City of Miami as on the National Register of Historic Places:
545 NE 2nd Avenue, Valencia (Gibson) historic sites: Dorsey House, 250 NW 9th Street
Hotel Dorsey House, 250 NW 9th Street X-Ray Clinic, 171 NW 9th Street
135 NE 5th Street X-Ray Clinic, 171 NW 9th Street Cola Nip Building, 233-5 NW 9th Street,
49 NE 5th Street, Salvation Army Citadel Chapman House, 526 NW 13th Street building demolished
600 Biscayne Blvd., Freedom Tower Cola Nip Building, 233-5 NW 9th Street, St. Johns Baptist Church, 1328 NW 3rd
building demolished Avenue
These buildings reflect the wide variety of Lyric Theatre, 819 NW 2nd Avenue Mt. Zion Baptist Church, 301 NW 9th
architectural styles common to Miami, St. Johns Baptist Church, 1328 NW 3rd Street
particularly Mediterranean Revival and frame Avenue Greater Bethel A.M.E. Church, 245 NW
and masonry vernacular structures. Two of Ebenezer Methodist Church, 1042 NW 8th Street
the buildings, however, are examples of styles 3rd Avenue
unusual to Miami: Venetian Gothic (Salvation Mt. Zion Baptist Church, 301 NW 9th There may come a time when more
Army Citadel) and Neo-Palladian (Central Street structures will become elligible. Should that
Baptist Church). The preservation of these Greater Bethel A.M.E. Church, 245 NW occur, the CRA will work with The Black
structures should be included in any 8th Street Archives, History & Research Foundation of
redevelopment project. St. Agnes Episcopal Church, 1750 NW 3rd South Florida, Inc. and the City of Miami to
Avenue further designate properties of historic value in
2. Historic Designation Black Police Precinct and Courthouse, the community.
9 #1 Preserving Historic Buildings & Community 1009 NW 5th Avenue
Heritage Dorsey Library, 100 NW 17th Street 3. Promote and/or Organize Activities
and Events That Recreate the Former
The City of Miamis Planning and Zoning The properties listed above as historic Vitality and Atmosphere of the
Departments have evaluated Overtown and sites may utilize the Historic Preservation Community
Park West as a possible historic district and HP Zoning Overlay District permits, that 9 #1 Preserving Historic Buildings & Community
have determined that it is not eligible. provide certain modification to zoning and Heritage
However, significant buildings have been building code regulations where necessary to 9 #5 Promotion & Marketing of the Community

91
An African-American/Caribbean theme is A "Saturday Marketplace" where vendors would encourage selected elements of historic
recommended to recreate the feeling and are allowed to set up in a designated street building forms to be incorporated into the
atmosphere of "Historic Overtown". The block or public plaza, featuring ethnic foods, design of new buildings should be considered.
establishment of an annual Historic Overtown crafts, fresh produce, artwork, a VIP
Cultural Arts Festival reminiscent of the jazz Convention Center for local organizations 5. Establish a First-Class Residential
era will provide the setting for jazz concerts to with national and international chapters, and a Village Containing a Cluster of
be held within the proposed district. permanent center to exhibit ongoing Restored Buildings The Folklife
The establishment of an international collections unique to the black experience Village.
cultural complex featuring activities would also increase the number of visitors to 9 #1-#6 supports all of the goals
reminiscent of the nineteen thirties, forties, the area throughout the year.
and fifties will provide artists with the The placement of distinctive street
opportunity to receive training as well as to 4. Provide Incentives for Revitalization furniture wherever redevelopment plans call
perform in concert. in Historic Overtown for new improvements to sidewalks and plaza
Events that would aid in attracting people 9 #1 Preserving Historic Buildings & Community spaces such as paving, benches, signs, trash
into the community include a national Heritage cans, landscaping, etc., and the development
oratorical competition, hair styling contests, 9 #2 Expanding the Tax Base using Smart of landscaping standards utilizing historical
tennis tournaments and other sporting events, Growth Principles and thematic plant materials can aid in
culinary contests specializing in soul food 9 #3 Housing: Infill, Diversity, & Retaining achieving this goal. Public plaza, street,
from the Caribbean and Southern States, and Affordability sidewalk and park improvements should be
the establishment of a hall of fame with annual 9 #4 Job Creation designed to accommodate the special cultural
recognition of national figures. Families from 9 #6 Improving the Quality of Life for Residents events the area will attract.
all over the world will be encouraged to hold As a complement to the Historic Folk
annual family reunions in Miami-Dade Incentives or requirements may be Life Village Master Pan, the CRA shall
County, particularly in the Historic Overtown provided to attract retail stores at the ground promote public private partnerships including
district. level on selected commercial blocks, and to partnerships with non-profit organization
The establishment of specialty shops attract jazz clubs, permit-controlled street and/or development entities located and
which feature products of Africa, the vendors, and outdoor markets. operating within Historic Overtown to
Caribbean and the Southern States including Special zoning incentives in the HP develop the first-class residential village in a
restaurants, caterers, photographer's studios Overlay Ordinance may be used for the manner consistent with Historic Overtown.
specializing in passports, bookstores and art preservation of existing historic structures.
galleries would help attract visitors to the area. Design guidelines for new construction that

92
5a. Provide Planning, Coordination, use the theater as a venue for cultural support the increasing use of the Lyric
and Technical Assistance to the programming, community meeting Theater and the eventual development of
Historic Folklife Village facilities and an anchor for the Historic the Folklife Village.
Development Overtown Folklife Village. The CRA will
assist in The Black Archives, History & 6. Promotion of Historic Overtown as
The Historic Folklife Village is Dade Research Foundation of South Florida, a Tourist Destination
County's proposed African American Inc.s on-going efforts to rehabilitate the 9 #1 Preserving Historic Buildings & Community
heritage tourist destination. Plans were theater and make available related support Heritage
proposed in 1997 and 1998 to guide the facilities. Assistance will include a right of 9 #5 Promotion & Marketing of the Community
redevelopment of the tourist site by way for access to back of house related 9 #6 Improving the Quality of Life for Residents
emphasizing reestablishment of mixed activities and potential parking.
uses. The CRA will assist The Black The establishment of a Tourist
Archives, History & Research Foundation 5c. Planning, Design and, information center which would direct tourists
of South Florida, Inc. in providing a Development of Infrastructure to attractions, restaurants, hotel
detailed survey, a complete economic and Improvements in the Historic accommodations, and historical sites
functional evaluation of all the land uses Folklife Village throughout Miami-Dade County would serve
and proposed development within the to mark Historic Overtown as a tourist
Historic Folklife Village, and initiate any As a complement to the Historic destination. The placement of historic
environmental assessments in order to Folklife Village Master Plan, the CRA will markers delineating historic sites (including
assist in the efforts of developing the area. assist in providing technical assistance for sites now vacant or redeveloped) and the
the provision of infrastructure establishment of tours of local historical sites
5b. Technical Assistance to Historic improvements, such as streetscape including bus tours to visit sites county-wide
Lyric Theater Redevelopment improvements and landscaping. and mini-tours for sites within the district are
among several strategies that can be used to
The Lyric Theater is a performing 5d. Planning, Design and generate interest.
arts theater that was the center of local Development of Parking Facilities Historic Overtown, especially those
nightlife in its heyday. Located at NW 2nd to Support the Lyric Theater and areas along the historic NW 2nd Avenue
Ave. and NW 8th St., it is currently under the Folklife Village corridor, should be developed in a manner to
renovation by The Black Archives, create a tourist destination in suitable sites for
History & Research Foundation of South The CRA proposes to assist with the commercial/tourist/cultural uses. As suitable
Florida, Inc. Their primary objective is to development of parking facilities to sites for commercial/tourist/cultural uses

93
continue to diminish within Historic corridor. 8. Update Housing Policy, Periodically
Overtown, the need to insure the economic 9 #3 Housing: Infill, Diversity, & Retaining
vitality of existing uses becomes more critical. 7. Establishment of Artists District by Affordability
Therefore, economic conflicts between Legislation
existing land uses must also be viewed from a 9 #1 Preserving Historic Buildings & Community The Housing Policy should be reviewed at
perspective of improving and redeveloping Heritage least every two years. Changes will be made to
existing commercial/tourist/cultural uses, 9 #4 Job Creation to the policy that increase, support, or
where appropriate. 9 #6 Improving the Quality of Life for Residents maintain affordablity in the CRA as new
The strategic objectives for the promotion outcomes are discovered by the current policy
of Historic Overtown as a tourist The CRA will petition for the designation or as issues arrise from new development in
destination are: of an Artists District for Overtown. The the neighborhood.
(1) increase the number of commercial and Overtown area possesses a fascinating history
cultural attractions, restaurant, hotel as a center of black culture and the focal point II. Promotion and Enhancement of
accommodations and historical sites of area entertainment. This legacy is still seen Overtown and Park West as a
offering information and memorabilia in its buildings, plazas and theaters. The Business and Investment
about Historic Overtowns rich establishment of an Arts District-would Location
heritage to visitors; capitalize on these resources by directing
(2) increase public visitation to historical future growth in a manner compatible with its 1.Seeking Public/Private Development
resources within Historic Overtown; history. The establishment of legitimate Opportunities
(3) provide public accessibility to cultural theater, writers, and artists workshops; and 9 #1-#6 supports all of the goals
events within Historic Overtown; first class night clubs and restaurants should
(4) increase the number of Overtown be encouraged based on the guidelines of the The CRA will search for, evaluate, and
residents and visitors benefiting from Historic district. The establishment of advertise public-private development
cultural activities each year; and manufacturing as well as other related opportunities that will utilize the land owned
(5) coordinate with the Miami-Dade County businesses for the arts, i.e. manufacturing and by the CRA in a effort to further the goals of
African-American Tourist Site Task Force distributing equipment and supplies for the Redevelopment Plan. This may include
Board, and similar board, entities and dancing, music, art, etc. should also be tasks associated with:
organizations to locate and develop encouraged. coordinating with other private and
business opportunities for tourist public entities for the development of
attractions within Historic Overtown, surplus real property within the CRA.
especially along the NW 2nd Avenue offering land as part of publicprivate

94
joint development projects. greater means, spending more than 19 billion consultants, has identified in its 2003 report to
coordinating efforts with Miami-Dade dollars nationally each year. This is identified the CRA an approach to attracting new
County to do the same. in Project Area H, of this section. businesses to Overtown, with incentives and
Request the County to redevelop the The CRA will approach the hospitals and organization.
Culmer Center to improve the facility confirm ZHAs solicitation of the hospitals The CRA will review the strategy and
and help improve NW 3rd Avenue, or interest as a hospital-related real estate establish an Action Team for the purpose of
seek a third party to joint venture with venture, part of the regionalization of attracting new businesses to Overtown. The
the County. medical/health services. If there is interest on CRA may elect to call the committee by a
coordinating, and help facilitate in some behalf of the City and the hospitals to pursue name different from Action Team. To start,
manner, an air conditioned garbage this idea, the CRA will also establish long the Action Team will focus on NW 3rd
location accessible by all the businesses range planning committee devoted to finding a Avenue from the Culmer Center south to NW
along the Promenade. This could be workable manner to construct and recruit 8th Street, the area identified in this plan as
constructed as part of a new building or tenancy for the complex. See ZHAs 2003 The core of Overtown, and along NW 1st
by renovating an existing one. report for more details regarding this Avenue from I-395 south to NW 5th Street,
Management of this facility should be committee. The location for this grouping of and along 11th Street and the Promenade. The
taken on by one of the building medical related uses may occur elsewhere than CRA will keep the Action Team informed of
managers for collecting fees, for along NE 7th or 8th Streets, provided it new residential projects as they are being
example remains within the CRA. proposed to help in the effort to attract new
businesses.
2. Investigation into Hospital-related 3. Establish an Action Team for
Real Estate Ventures Procurement to enlarge the Business 4. Enhancement of Property
9 #2 Expanding the Tax Base using Smart Community Assessments and Options to Improve
Growth Principles 9 #1 Preserving Historic Buildings & Community Values in the Vicinity of Camillus
9 #4 Job Creation Heritage House
9 #6 Improving the Quality of Life for Residents 9 #2 Expanding the Tax Base using Smart 9 #2 Expanding the Tax Base using Smart
Growth Principles Growth Principles
ZHA, Inc., has identified in its 2003 9 #4 Job Creation
report to the CRA that there is potential in 9 #5 Promotion & Marketing of the Community Camillus House is a unique facility serving
setting up and attracting a new business 9 #6 Improving the Quality of Life for Residents special needs and indigent populations. This
market in preventative medical care to Park area of the CRA is in need of special attention.
West, generally supported by people with ZHA, Inc., the CRAs economic feasibility In order to promote growth along this

95
segment of the Biscayne Boulevard entrance Growth Principles meeting area suited for passive gathering and
into the City of Miami, the CRA is proposing 9 #4 Job Creation socializing, retail restaurants and other
to research and implement specific options for 9 #5 Promotion & Marketing businesses uses and services.
spurring growth in this key segment of Park 9 #6 Improving the Quality of Life for Residents
West. Potential courses of action include 8. Development of a Professional
improving deterrent uses, planning The creation of strategic partnerships Business Office
enhancements and alternatives, and stabilizing between franchisers and minority urban based 9 #2 Expanding the Tax Base using Smart
neighborhoods. businesses represents a market of untapped Growth Principles
consumers, investors, and entrepreneurs. 9 #4 Job Creation
5. Property Assessment Reevaluation Location of these businesses along the
9 #2 Expanding the Tax Base using Smart corridor and impact area will give impetus for The CRA proposes to develop a
Growth Principles the expansion and location of other professional office building within the Historic
businesses. The CRA will continue its efforts Priority Business Corridor or its impact area.
The property values in the CRA continue to identify, negotiate, and market the Historic If the building is constructed within the
to appear under assessed. In 1998, the City of Overtown Priority Business Corridor to Historic Overtown Folklife Village, it should
Miami requested that the Governor of Florida potential franchisers by offering favorable follow the design guidelines of the Historic
undertake a review of the Dade County direct or indirect development incentives. Overtown Folklife Village Master Plan.
Property Appraisal methodology and practice
of assessing property values in the City of 7. Planning, Design, and Development of 9. Development and relocation of new
Miami. The practice of undervalued a Job Creation Plaza Businesses to Overtown and Park
assessments particularly related to commercial 9 #2 Expanding the Tax Base using Smart West
property negatively impacts the incentives for Growth Principles 9 #2 Expanding the Tax Base using Smart
a developer to invest in the area. The CRA 9 #4 Job Creation Growth Principles
proposes to continue efforts to follow up on 9 #4 Job Creation
this request. In order to help create critical mass along 9 #5 Promotion & Marketing
the Historic Priority Business Corridor, the 9 #6 Improving the Quality of Life for Residents
6. Identification, Marketing and CRA is making plans to develop a job creation
Negotiation of a National Franchiser plaza that will serve the local community and The CRA will provide marketing and
as a Pioneer Project for the Historic other users. The plaza will be a pedestrian assistance for new and compatible businesses
Priority Business Corridor friendly environment incorporating open to relocate to Overtown and Park West.
9 #2 Expanding the Tax Base using Smart space, landscaping, a much needed plaza or

96
Funding, and/or building off-street
III. Planning, Development, The CRA will initiate the re-zoning of all parking spaces in any future
Technical Assistance and properties within the Redevelopment Area, for redevelopment efforts within the CRA
Program Compliance reasons described in Section 3 of this boundaries.
Redevelopment Plan. Tasks will include: Coordinating and facilitating efforts
1.Facilitation of the improvements Funding this initiative and promoting it with the City of Miami that support the
identified in each of the Project Areas within the community reform of off-street parking regulations
9 #1-#6 supports all of the goals Hold workshops and meetings with the to reduce the unnecessary burden on
community and the City of Miami private developers. For example, to
Efforts regarding the Project Areas, as Planning Department to prepare the jump-start redevelopment, new
described elsewhere in this section, will take first draft of an ordinance for a new businesses in existing buildings should
precedence over other efforts being zoning district or districts for properties be exempt from parking requirements
undertaken by the CRA. The Project Areas within the CRA. to reduce their startup costs and
are: Revise a subsequent draft of the therefore their financial risks
NW 1st Avenue ordinance.
Overtown (including Little Broadway - Provide guidance and support for the 4. Miscellaneous Land Acquisition
Lyric Plaza) re-zoning effort during the re-zoning 9 #1-#6 supports all of the goals
NW 3rd Avenue Neighborhood Center process.
Historic Overtown Priority Business The CRA proposes to acquire land, as
Corridor 3. Increase Parking Supply necessary, to support the implementation of
West Overtown 9 #2 Expanding the Tax Base using Smart the projects described in this Redevelopment
Properties facing Biscayne Boulevard Growth Principles Plan within the Redevelopment Area.
The Promenade Park West 9 #6 Improving the Quality of Life for Residents Acquiring more land for publicly accessible
Entertainment District green space for active and passive recreational
NE 8th Street/Miami WorldCenter The CRA will examine ways to increase use will also be a priority.
Camillus House/UM Research Center the supply of parking within its boundaries.
Townpark Homeownership District Tasks may include: 5. Support for Greenways
Advocating, funding, and/or building 9 #6 Improving the Quality of Life for Residents
2. Changes to Land Development on-street parking spaces in any future
Regulations streetscape or redevelopment efforts The CRA will assist, where possible, the
9 #1-#6 supports all of the goals within public rights-of-way. Trust for Public Land with implementation of

97
their Overtown Greenprint Plan and Commission to make requests to the School specified in the Historic Overtown Folklife
Greenway Plan within the Redevelopment Board as well. Since many of the schools Village Master Plan.
Area. serving the CRA area are outside of the
Redevelopment Area, the CRA can only fund, 8. Technical Assistance/Liaison to
6. Monitor Conditions At Public Schools if possible, improvements to those schools Optimist Club Activities
Serving Students in the inside the boundaries. 9 #4 Promotion & Marketing
Redevelopment Area 9 #6 Improving the Quality of Life for Residents
9 #3 Housing: Infill, Diversity, & Retaining 7. Create and Design an Overlay of
Affordability Special Fencing for all CRA-owned The CRA proposes to continue to provide
9 #6 Improving the Quality of Life for Residents properties and others governmental assistance and support to the Optimist Clubs
and non-profit institution owned in terms of policy guidance, assistance with
The CRA will send an individual or small properties within its jurisdiction in local governmental organizations, and other
committee to each of the public schools that Overtown technical assistance.
serve students that live within the 9 #6 Improving the Quality of Life for Residents
Redevelopment Area. Since the quality of 9. Plan Improvements of the Overtown
schools is often the number one factor for Historically, public agencies that own land Parks: Gibson Park, Williams Park,
chosing where to buy a house, the intention of maintain the properties vacant while Reeves Park, Dorsey Park and Athalie
this project is for the CRA to help improve redevelopment occurs or is proposed and this Range #1 Mini-Park
the neighborhood schools where possible. does not give redeveloping communities a 9 #6 Improving the Quality of Life for Residents
The purpose of the school visits is to look for: look that is pleasing and does not do much for
Physical improvements that can better the image of the area. The CRA proposes to According to a report by the Trust for
the appearance of the schools create and design an overlay of special fencing Public Land, parks and recreational
Review the performance of the students in the Bahamian, Caribbean style for all CRA opportunities are important to all
as compared to other local, state and owned properties and for other properties communities. The lack of adequate
national public schools within its jurisdiction to transform an recreational space has been an element of
Overcrowding or under utilization of otherwise challenging situation into an contention in the studies of urban violence.
the facilites opportunity to provide the Historic Business Inadequate parks ranked above unemployment
Corridor and its impact areas with a linking and difficulties with police amongst the most
The CRA will record observations and element that will provide character within a significant problems within the inner city
make recommendations and requests to the historic framework. The fencing should be neighborhoods. This realization was behind
School Board. The CRA may ask the City compatible with the design parameters the creation and support of the Safe

98
Neighborhoods Parks Bond Program. should be in accordance with the Historic to their permit application submissions to the
Unfortunately, neighborhoods such as Overtown Folklife Village Master Plan. City. The purpose of the meeting is for the
Overtown have the least park land and the Efforts to be coordinated with the Trust for CRA to encourage and negotiate for as much
fewest facilities with the most difficulty in Public Land in implementing their affordable housing as possible in each new
improving and maintaining the existing areas. Greenway/Greenprint Plan, and with The developemnt. The CRA will not offer
The CRA will coordinate efforts with the City Black Archives, History & Research assistance of any kind to developers unless the
of Miamis Parks and Planning Departments Foundation of South Florida, Inc., Overtown developers comply with the CRAs Housing
to provide for incentives to allow for the Civic Partnership and the City of Miami in Policy.
creation of additional park/green space and implementing these gateways and preserving
for the maintenance of such recreational areas. the historic context of the area. IV. Street Improvements, Utility
The CRA may produce schematic designs for
Infrastructure, and
facility improvements and public safety 11. Update the Housing Policy
Transportation
measures within the parks. 9 #1 Preserving Historic Buildings & Community
Heritage
1. Streetscape Projects
10. Development of a "Gateway" Project 9 #3 Housing: Infill, Diversity, & Retaining
9 #1 Preserving Historic Buildings & Community
into the Omni and the Affordability
Heritage
Overtown/Park West Areas
9 #5 Promotion & Marketing of the Community
9 #1 Preserving Historic Buildings & Community The CRA will adopt a new housing policy
9 #6 Improving the Quality of Life for Residents
Heritage and will update it periodically as changes occur
9 #5 Promotion & Marketing of the Community in the market places and as property values
The CRA has begun or completed
shift from time to time.
streetscape design and construction in a few of
The CRA proposes to study and evaluate
the Project Areas. The CRA will continue the
the potential of entry features for the 12. Promote Affordable Housing to
efforts to conclude those projects that have
entrances into the Omni Area at the I-395 exit, Developers
not begun or been completed. The
11th Street and Biscayne Boulevard and into 9 #1 Preserving Historic Buildings & Community
streetscape projects include:
the Southeast Overtown Area at NW 14th St. Heritage
1. 9th Street Pedestrian Mall
and connections with I-395, I-95, and NW 3rd 9 #3 Housing: Infill, Diversity, & Retaining
2. The Promenade (between 10th and 11th
Ave., at NW 3rd Ave and NW 8th StSt. and at Affordability
Streets)
NW 4th Ave. and NW 8th St. Specific entry
3. NW 3rd Avenue (south of I-395) for the
features for the Park West Area will also be The CRA will meet with developers of
Historic Priority Business Corridor
determined. Entry features for Overtown projects within the Redevelopment Area prior

99
4. NW3rd Avenue (north of I-395) CRA efforts are concentrated on planning access, and privacy problems associated
5. NE/NW 11th Street (Entertainment infrastructure improvements in the with properties along the rail and transit
District) Redevelopment Area, such as street routes
6. NW 1st Avenue improvements, landscaping, lighting, parking Assisting in the decision making
and pedestrian amenities, and enhancements. process of possible changes to I-395
Additional streetscape projects may be Coordination with local and state agencies and I-95 as the MPO continues its
included in the future. Related tasks may responsible for implementing these study and discussion regarding the
include infrastructure improvements, as well as private removal or reconfiguration of those two
regular maintenance of lighting, street developers and community members, federal highways.
furniture, landscaping, and paving becomes paramount to set priorities,
materials. coordinate and avoid duplication of efforts, 3. Pedestrian Compatible Community
acquiring the services of engineers or and find new avenues to pursue resources. Transit System
landscape architects. Tasks may include: 9 #6 Improving the Quality of Life for Residents
Discussions FEC and Miami-Dade Upgrades to water mains and sewer
County Public Works to change the mains, by implementing actual The CRA will review, and act accordingly
configuration of NW 1st Avenue. This reconstruction or by subsidizing the towards the work of Thomas Gustafson and
Avenue has historically been the divider upgrades performing others. Nova Southeastern University related to the
between Overtown and Park West, and Collaborating with the MPO to return development of a pedestrian compatible
the redesign is needed to make it the one-way streets back into two-way community transit system to link all Southeast
unifier. streets. Overtown, Park West, and the nearby Central
Improving pedestrian features such as Business District and Omni areas, as described
2. Coordination of Infrastructure crosswalks that are more visible to in the Miami at Midnight report. The Report
Improvements with City of Miami and motorists or securing easements or also describes the possibility of a large
Miami Public Works Departments, access for pedestrian routes separated pedestrian zone adjacent to the
Miami Dade Water and Sewer from the roadways. Overtown/Arena Metrorail Station to enhance
Department, FDOT, Miami Parking Influencing the decision to subdivide intermodal transfers.
Authority and Other Relevant larger blocks into smaller ones with the
Agencies creation of new streets. 4. Pilot Infrastructure Improvement and
9 #2 Expanding the Tax Base using Smart Increasing public on-street parking in Maintenance Program
Growth Principles rights-of-way. 9 #2 Expanding the Tax Base using Smart
9 #6 Improving the Quality of Life for Residents Assisting with solutions to any noise, Growth Principles

100
9 #4 Job Creation Village Master Plan. 9 #2 Expanding the Tax Base using Smart
9 #6 Improving the Quality of Life for Residents Growth Principles
V. Home Ownership Pre- 9 #4 Job Creation
The CRA will establish for Overtown and 9 #6 Improving the Quality of Life for Residents
Qualification and Counseling
Park West a pilot street cleaning, sweeping
Program The CRA proposes to assist in creating
program and a grass cutting program,
9 #1 Preserving Historic Buildings & Community jobs by providing technical assistance with
primarily for security reasons, for the areas of
Heritage Section 108 loan applications and
the CRA and maintain a closer coordination
9 #3 Housing: Infill, Diversity, & Retaining administering a revolving loan pool, which will
with existing property owners and the
Affordability make low interest, low downpayment, long
Downtown Development Authority, and the
9 #6 Improving the Quality of Life for Residents terms loans in the amount of $25,000 to $1
City of Miami.
million for business improvement projects to
The CRA will coordinate efforts with the
area businesses. Tasks may include:
5. Plan, Coordinate, and Design Special City of Miami, local real estate organizations,
facilitating grants,
Lighting; Security District (Pedestrian mortgage lenders and community bankers,
technical assistance to business owners,
Enhancements) community development corporations, faith-
architectural and design services for
9 #2 Expanding the Tax Base using Smart based institutions, consumer advocates, and
building or faade renovation or new
Growth Principles residents to implement a home ownership pre-
construction
9 #6 Improving the Quality of Life for Residents qualification and counseling program which
will provide homeownership training sessions, VII. Laredo/Re-Use Plan (CLUC
Security is an important issue in the area.
market public sector assistance programs, and 90 Properties) Program
The CRA proposes to provide pedestrian
assist in pre-qualifying home buyers. Services 9 #1 Preserving Historic Buildings & Community
enhancements, special lighting, and create a
will be accessible to existing Overtown Heritage
more pedestrian friendly atmosphere in the
residents. The program is intended to provide 9 #3 Housing: Infill, Diversity, & Retaining
Redevelopment Area by developing and
basic financial literacy training, job training, Affordability
implementing a Security and Lighting District
education and other supportive services for
and a Police Enhancement Program, including The CRA will continue to support
people with extremely low incomes that can
the Entertainment District, the 9th Street development proposals that utilize current
not qualify for home ownership.
Pedestrian Mall, and Sawyers Walk. Within vacant government owned and County Land
the Historic Overtown Folklife Village, Use Code (CLUC) 90 properties located
VI. Grants to Existing Businesses
lighting should be consistant with the within the Redevelopment Area. The CRA
9 #1 Preserving Historic Buildings & Community
character identified in the Historic Folklife will liaise with Miami-Dade County in clearing
Heritage

101
title and promoting scattered site housing on
these properties.

Comparison Chart: Goals and


Supporting Projects

The charts on the next four pages list each


of the projects and programs and identify
which of the goals they primarily support.

102
Goal #1: Goal #2: Goal #3: Goal #4: Goal #5: Goal #6:
Comparison Chart: Preserving Expanding the Housing: Creating Promotion Improving
Goals and Supporting Projects Historic Tax Base using Infill, Jobs within & the Quality
Buildings & Smart Growth Diversity, & the Marketing of Life for
Community Principles Retaining Community of the Residents
Project Names Heritage Affordability Community

I. Community Heritage and Historic Preservation

1. Renovation of Historically Significant Buildings


* * * * * *
2. Historic Designation *
3. Promote and/or Organize Activities and Events That
Recreate the Former Vitality and Atmosphere of the * *
Community
4. Provide Incentives for Revitalization in Historic
Overtown
* * * * *
5. Establish a First-Class Residential Village Containing a
Cluster of Restored Buildings, The Folklife Village.
* * * * * *
5a. Provide Planning, Coordination, and Technical
Assistance to the Black Archives Historic Folklife * * * * * *
Village Development
5b. Technical Assistance to Historic Lyric Theater
Redevelopment
* * * * *
5c. Planning Design and Development of
Infrastructure Improvements in the Historic Folklife * * * * * *
Village
5d. Planning, Design and Development of Parking
Facilities to Support the Lyric Theater and the
Folklife Village Historic Preservation
* * * * *

6. Promotion of Historic Overtown as a Tourist


Destination * * *

7. Establishment of Artists District by Legislation


* * *
8. Update Housing Policy, Periodically
*

103
Comparison Chart: Goal #1: Goal #2: Goal #3: Goal #4: Goal #5: Goal #6:
Preserving Expanding the Housing: Creating Promotion Improving
Goals and Supporting Projects Historic Tax Base using Infill, Jobs within & the Quality
(Continued) Buildings & Smart Growth Diversity, & the Marketing of Life for
Community Principles Retaining Community of the Residents
Project Names Heritage Affordability Community

II. Promotion and Enhancement of Overtown and Park West as a Business and Investment Location

1. Seeking Public/Private Development Opportunities


* * * * * *
2. Investigation into Hospital-related Real Estate Ventures * * *
3. Establish an Action Team for Procurement to
enlarge the Business Community
* * * * *
4. Enhancement of Property Assessments and Options to
Improve Values in the Vicinity of Camillus House
*
5. Property Assessment Reevaluation *
6. Identification, Marketing and Negotiation of a National
Franchiser as a Pioneer Project for the Historic Priority * * * *
Business Corridor
7. Planning, Design and Development of a Job Creation
Plaza
* *
8. Development of a Professional Business Office * *
9. Development and relocation of new Businesses to
Overtown and Park West * * * *

104
Comparison Chart: Goal #1: Goal #2: Goal #3: Goal #4: Goal #5: Goal #6:
Preserving Expanding the Housing: Creating Promotion Improving
Goals and Supporting Projects Historic Tax Base using Infill, Jobs within & the Quality
(Continued) Buildings & Smart Growth Diversity, & the Marketing of Life for
Community Principles Retaining Community of the Residents
Project Names Heritage Affordability Community

III. Planning, Development, Technical Assistance and Program Compliance

1. Facilitation of the improvements identified in each of


the Project Areas
* * * * * *
2. Changes to Land Development Regulations * * * * * *
3. Increase Parking Supply * *
4. Miscelaneous Land Acquisition * * * * * *
5. Support for Greenways *
6. Monitor Conditions At Public Schools Serving Students
in the SEOPW CRA
* * *
7. Create and Design an Overlay of Special Fencing for all
CRA owned properties and others governmental and non-
profit institution owned properties within its jurisdiction
*
in Overtown
8. Technical Assistance/Liaison to Optimist Club
Activities
* *
9. Plan the Improvements of the Overtown Parks: Gibson
Park, Williams Park, Reeves Park, Dorsey Park and Athalie *
Range #1 Mini-Park
10. Development of a "Gateways" Project into the Omni
and the Southeast Overtown Park West Areas
* *
11. Update the Housing Policy * *
12. Promote Affordable Housing to Developers

* *

105
Comparison Chart: Goal #1: Goal #2: Goal #3: Goal #4: Goal #5: Goal #6:
Preserving Expanding the Housing: Creating Promotion Improving
Goals and Supporting Projects Historic Tax Base using Infill, Jobs within & the Quality
(Continued) Buildings & Smart Growth Diversity, & the Marketing of Life for
Community Principles Retaining Community of the Residents
Project Names Heritage Affordability Community

IV. Street Improvements, Utility Infrastructure, and Transportation


1. Streetscape Projects
* * *
2. Coordination of Infrastructure Improvements with City
of Miami and Miami Public Works Departments, Miami
Dade Water and Sewer Department, FDOT, Miami
* *
Parking Authority and Other Relevant Agencies
3. Pedestrian Compatible Community Transit System *
4. Pilot Infrastructure Improvement and Maintenance
Program
* * *
5. Plan/Coordinate/Design Special Lighting, Security
District (Pedestrian Enhancements)
* *

V. Home Ownership Pre-Qualification and Counseling Program

* * *

VI. Grants to Existing Businesses Program

* * * *

VII. Laredo/Re-Use Plan (CLUC 90 Properties) Program

* *

106
107
Introduction caused by existing or inadequate others, as they will with their 5-year
infrastructure. improvement plan.
This section identifies the primary capital
Areas outside of the Project Areas may
improvements, their costs, and timeframe for
implementation. It is not the intent of this
Prioritizing Capital need improvements too, such as water and
section to serve as an implementation plan or Improvements sewer upgrades, parking structures and parking
shuttles. These will be evaluated as to their
as an operations budget. The CRA has an The approach to prioritizing improvement
impact on furthering the efforts in the specific
independent operation strategy and budget projects focuses on key Project Areas
Project Areas.
that will identify capital improvements among described in Section 4. These Project Areas
its other projects and expenses. The known are characteristically unique and show the
and desired capital projects listed in this plan greatest potential for immediate positive
are prioritized. It should be expected that this change.
section will become obsolete over time as Place Corridors
projects get completed and new ones become
important to the community, which is the The Project Areas set forth in Section 4
reason for a separate budget strategy. do not encompass the entire Redevelopment
Area, but when started, should attract interest
Capital Improvement Goals in the community and spark additional private
The goals for making capital investment within the Redevelopment Area.
improvements within the Redevelopment Area The idea behind concentrating efforts in small
are: areas is to totally transform them, creating as
1) Eradicate the visual blight seen from dramatic and visible an impact as possible.
streets and public places within the When money is spent evenly throughout the
CRA to upgrade the appearance to entire CRA, it is difficult to see where the
attract new investors and money has gone. By focusing the efforts,
development. people will see what the larger area will be like
2) Protect the health and safety of the as revitalization spreads, inspiring additional
residents by improving the private reinvestment.
performance of the Citys First Priority should go towards efforts
infrastructure systems. within the Project Areas. The CRA Board will
3) Remove or diminish negative impacts decide if certain projects rank higher than

108
Potential Funding Sources Capital Improvement Costs by
It is important for the CRA staff to Project Area 4. Projects budgeted for FY 2003-2004
coordinate with the City and County staff to Projects budgeted for the Fiscal Year
Each Project Area has improvements
leverage or match tax increment funds with 2003 2004 have been added to the Project
itemized as:
Federal, State, and locally available funds. Area they serve. Some currently budgeted
1. Streetscape Improvements
Sources include but should not be limited to: projects affect multiple project areas and are
Streetscape improvement estimates
Capital programs for the City, County listed under the category of Other Capital
include costs associated with pavement, curbs,
or other local governmental entities. Improvements.
sidewalks, concrete pavers, drainage,
Community Development Block landscaping, utilities, signage, and pavement
Grants. markings. The construction costs were
Federal, State, and local Transportation prepared from information in the Draft
Trust Funds Report for the Southeast Overtown / Park
Peoples Transportation Plan funded West Redevelopment Plan dated September
through the local option half-penny 2003. The costs exclude structures and any
sales tax and overseen by the Citizens right of way acquisition.
Independent Transportation Trust.
Federal, State, and Local Park Funds. 2. Water Main
Partnerships with educational Water Main estimates include costs for
institutions. upgrading underground mains that provide
New Market Tax Credits water service to the properties. Hookup fees
are not included.

3. Sewer
Sewer estimates include costs for
upgrading underground sewer pipes that
provide solid waste disposal from adjacent
properties. Hookup fees are not included.

109
Capital Improvements by Project Area

Project A - NW 1st Avenue


Project A - NW 1st Avenue OVERALL EST. COST: $5,297,400
Overall Priority: Medium
Future Items:
The visual nature of the street needs
ITEM LINEAR FT COST / Lin. Ft. COST
improvement since the railroad right-of-way is
NW Avenue Streetscape
1st 3,600 $1,120 $4,032,000
rather unsightly. This avenue can become a
Water Main $306,000
linear park (with transit & rail) with similar
Sanitary Sewer Main $76,500
buildings and uses on both sides of the track,
so that the two areas become more unified in TOTAL: $4,414,500
character. 20% Contingency $882,900
TOTAL: $5,297,400
First Steps High Priority
Discussion should begin immediately with
FEC to find out their intentions for the right-
of-way and to find the possibility of modifying
the roadways on both sides as described in this
plan, which will require acquisition of portions
of the right-of-way.

Project F - Biscayne Boulevard


No items are listed for Biscayne
Boulevard because improvements within the
right-of-way are part of current projects in the
planning stage by the Florida Department of
Transportation.

110
Capital Improvements by Project Area

Project B - Overtown - Little


Project B - Overtown OVERALL EST. COST: $10,340,887
Broadway
Future Items:
Overall Priority: High ITEM LINEAR FT COST / Lin. Ft. COST
Overtown is the heart of the African-
NW 11th. St. 1,500 $750 $1,125,000
American community. The CRA will
NW 10th. St. 1,500 $750 $1,125,000
reinforce its previous investments in the
NW 9th. St. 1,500 $750 $1,125,000
neighborhood by focusing its present efforts
NW 1st. Ct. 450 $750 $337,500
and resources here to get results.
NW 2nd. Ave. 1,400 $750 $1,050,000
NW 3rd. Ave. 1,400 $750 $1,050,000
Current Improvements identified in the
Water Main $281,925
budget for FY 2004:
Sanitary Sewer Main $70,481
Grant to Lyric Theater expansion
Land Acquisitions (after FY04) $1,500,000
Grant to Renovation of Ward Rooming
House Historic Folk Life Village Tech. Assistance (after FY04); Type: Grant 100,000
Land Acquisitions (including appraisals, SUBTOTAL: $7,764,906
environmental, etc.) 20% Contingency $1,552,981
Grant for Historic Folk Life Village Food
TOTAL: $9,317,887
Franchise
Items currently listed in the budget for FY2004:
Lyric Theater expansion Type: Grant To be determined
Ward Rooming house renovation Type: Grant 8,000
Land Acquisitions (including appraisals,
environmental, etc.) 1,000,000
Historic Folk Life Village Food Franchise Type: Grant 15,000
TOTAL: $1,023,000

111
Capital Improvements by Project Area

Project C - NW 3rd Avenue


Project C - NW 3rd Avenue Neighborhood Center OVERALL EST. COST: $6,111,750
Neighborhood Center
Future Items:
Overall Priority: Medium
ITEM LINEAR FT COST / Lin. Ft. COST
This project provides attention to the
northern portion of Historic Overtowns NW 3rd Ave. 1,500 $750 $1,125,000
Business Corridor (NW 3rd Avenue) that was NW 7th. St. 1,000 $750 $750,000
sliced in two by the creation of I-395. NW 4th Ave. 1,250 $750 $937,500
NW 14th. St. 340 $750 $255,000
First Steps High Priority
Provide streetscape improvements similar NW 15th. St 340 $750 $255,000
to Project D Historic Overtown Priority NW 16th. St. 340 $750 $255,000
Business Corridor. NW 16th. Terr. 780 $750 $585,000
I-395 Frontage Road 550 $850 $467,500
Water Main $370,500
Sanitary Sewer Main $92,625
SUBTOTAL: $5,093,125
20% Contingency $1,018,625
TOTAL: $6,111,750

112
Capital Improvements by Project Area

Project D - Historic Overtown Priority Business OVERALL EST. COST:


Project D - Historic Overtown
Corridor $12,711,250
Priority Business Corridor
Future Items:
ITEM LINEAR FT COST / Lin. Ft. COST
Overall Priority: High
This corridor is the historic main street NW 11th. St. 1,400 $750 $1,050,000
along NW 3rd Avenue. Portions of this area NW 10th. St. 1,400 $750 $1,050,000
also fall within the Folk Life Village. The NW 9th. St. 1,600 $750 $1,200,000
CRA will reinforce its previous investments in
NW 8th. St. 1,800 $750 $1,350,000
the neighborhood by focusing its present
efforts and resources here to get results. NW 7th. St. 1,800 $750 $1,350,000
NW 3rd. Ave./I-95 Exit 450 $750 $337,500
Current Improvements identified in the NW 4th. Ave. 700 $750 $525,000
budget for FY2004:
NW 5th. Ave. 1,200 $750 $900,000
Facade Program on NW 3rd Avenue
between 8th Street and 14th Street. NW 6th. Ave. 1,200 $750 $900,000
NW 7th. Ave. 1,200 $750 $900,000
Water Main $157,500
Sanitary Sewer Main $39,375
SUBTOTAL: $9,759,375
20% Contingency $1,951,875
TOTAL: $11,711,250
Items currently listed in the budget for FY2004:

Faade Program on NW 3rd Avenue between 8th Street and 14th Street 1,000,000
TOTAL: 1,000,000

113
Capital Improvements by Project Area

Project E West Overtown


Project E West Overtown OVERALL EST. COST: $4,101,750
Overall Priority: Medium
West Overtown is the core of the area Future Items:
added to the Redevelopment Area west of I- ITEM LINEAR FT COST / Lin. Ft. COST
95, but east of NW 7th Avenue. NW 3rd Ave. 1,500 $750 $1,125,000
NW 14th. St. 400 $750 $300,000
First Steps High Priority
NW 13th St. 400 $750 $300,000
See Section 4, Projects and Programs
(Project E) for actions that do not require NW 12th. St. 400 $750 $300,000
capital improvements. NW 11th. St 400 $750 $300,000
NW 10th. St. 400 $750 $300,000
Water Main $634,500
Sanitary Sewer Main $158,625
SUBTOTAL: $3,418,125
20% Contingency $683,625
TOTAL: $4,101,750

114
Capital Improvements by Project Area

Project G - The Promenade

Project G - The Promenade OVERALL EST. COST: $6,993,000


Overall Priority: High
The Promenade occupies the former
municipal railroad right-of-way owned by the Future Items:
CRA in the burgeoning Entertainment ITEM LINEAR FT COST / Lin. Ft. COST
District. The CRA will reinforce its previous Miami Ave. 700 $750 $525,000
investments in the neighborhood by focusing Grand Promenade 1,800 $750 $1,350,000
its attention here to get results. Additional
N 11th. St. 1,800 $750 $1,350,000
parking, shuttles to distant parking locations,
and changes to the land development N 10th. St. 1,800 $750 $1,350,000
regulations are urgently needed to support the NE 1st. Ave. 700 $750 $525,000
recently renovated businesses on NE 11th NE 2nd. Ave. 700 $850 $525,000
Street.
Water Main $162,000

Current Improvements identified in the Sanitary Sewer Main $40,500


budget for FY 2004: SUBTOTAL: $5,827,500
Security Cameras for the Entertainment 20% Contingency $1,165,500
District, however there is no cost identified.
TOTAL: $6,993,000
Interim Promenade construction: to clean
up, pave a center lane, and add landscaping
has been approved for $500,000.

115
Capital Improvements by Project Area

Project H - NE 8th Street/


Project H - NE 8th Street / Miami WorldCenter OVERALL EST. COST: $3,315,938
Miami WorldCenter
Future Items:
Overall Priority: Low ITEM LINEAR FT COST / Lin. Ft. COST
Priority should be raised if property
Miami Ave. 500 $750 $375,000
owners or elected officials show stronger
interest in the concept as described in Section NE 6th. St. 700 $750 $525,000
4, Projects and Programs, and further NE 7th. St. 700 $750 $525,000
described in the market analysis performed for NE 8th. St. 700 $750 $525,000
the CRA by ZHA, Inc.
NE 1st. Ave. 500 $750 $375,000
NE 2nd. Ave. 500 $850 $375,000
Water Main $50,625
Sanitary Sewer Main $12,656
SUBTOTAL: $2,763,281
20% Contingency $552,656
TOTAL: $3,315,938

116
Capital Improvement Costs -
Not Project Area Specific
There are capital improvement projects
within the Redevelopment Area that are
needed outside of the specific project areas
and some that address problems that face all
Other Capital Improvements OVERALL EST. COST: $19,431,119
areas within the Redevelopment Area. These
typically connect or link the city
Future Items:
infrastructure and mobility of people living,
ITEM COST
working, shopping, and visiting the
Redevelopment Area. Property Maintenance $146,000
WASD Infrastructure Improvements Major entertainment commercial
corridors (first effort to include: 3rd Avenue, 14th Street, 11th Street, 2nd Avenue) $2,000,000
WASD Impact Fee Reduction Subsidized Loan Program $300,000
Entertainment Grants $200,000
Other Capital Improvements
Developer Construction Loans (leveraged) via Grow Miami Fund $2,000,000
Overall Priority: High Grants to private property owners for existing structures $1,905,000
The items in this category are listed in the 11th Street Expansion PD&E in FY2004 $150,000
FY 2004 Budget, except for the Water Main
11th Street Expansion PD&E beyond 2004 $5,850,000
and Sanitary Sewer Main items shown at the
9th Street Streetscape Phase 3 $1,400,000
very bottom of the list.
Water Main $4,360,443
Sanitary Sewer Main $1,119,676
TOTAL: $19,431,119

117
Capital Improvement Costs -Not Project Area Specific

Community Intermodal System


Projects in this category include various
Intermodal system improvements in the Community Intermodal System, 2004 - 2012 OVERALL EST. COST: $30,900,000
context of the redevelopment of the CRA and
are subject to intermodal designations and the Future Items:
availability of grants and appropriations of ITEMS: COST
Federal and State transportation trust funds.
Intermodal Connectors for Freight, Goods, and Passengers
Overall Priority: High These pedestrian and vehicular access improvements include substantial
Time is of the essence to attract Federal street, mixed-mode corridor and greenway improvements as described in
funding for these improvements. the Miami at Midnight report. Additionally the SEOPW CRA should use
these improvements to enhance future Amtrak-Florida East Coast (FEC)
Breakdown of the item: Intermodal service options for Overtown and Park West $6,000,000
Connectors for Freight, Goods, and Parking Structures and Parking Shuttles
Passengers, (shown in chart, right) The pedestrian-oriented parking structures and associated parking line
buildings will help establish the urban form of the walking environment.
Intermodal Connectors: $6.0 Million The parking shuttle vehicles will help extend the travel distance of the
Passenger zone Intermodal improvements pedestrian trip and thereby improving the Intermodal access between
Freight Intermodal Facility Improvements Port of Miami, , Metrorail, Metromover, I-95,and Miami International
Additional Intermodal Improvements Airport. (and Amtrak when FEC service is established) $23,400,000
would be scheduled for implementation Contingencies and Incentive Fees
after 2012 costing approximately Every large capital project needs to reserve funds for contingencies and
$76Million incentive fees to better manage project costs and to meet the completion
schedule (remainder 3.3 million for contingencies and incentive fees for
Breakdown of the item: Parking Structures work scheduled after 2012). $1,500,000
and Parking Shuttles (shown in chart, right) TOTAL: $30,900,000
Vehicles and infrastructure: $ 8.4 Million
Promenade to I-395 Parking Loop
(Demonstration Project)
Central Loop (connecting Cultural Community Intermodal System, After year 2012 OVERALL EST. COST: $110,300,000
Buildings)
NW 3rd Avenue Loop
Miami Avenue Area Loop ***** Note: The costs referenced in the charts above are further described in the Miami at
Midnight report, Section H, Order of Magnitude Cost, on pages 19 through 24.
(Breakdown is continued on next page)

118
Breakdown of the item: Parking Structures The Promenade
and Parking Shuttles (continued from prev. page) Revisions to the development regulations should
be completed and adopted by year end 2004. All the
Additional Routes (per Miami at Midnight remaining projects, provided efforts to obtain
Report) would be scheduled for
implementation after 2012 costing additional funding are successful, should be completed
approximately $10 million. by 2012.

Parking Structures: $ 12 Million


For 800 Spaces x 15K per space
Structures associated with additional
Routes (per Miami at Midnight Report)
would be scheduled for implementation
after 2012 costing approximately $18 Capital Improvement Costs -Summary
million.
Capital Improvements Summary OVERALL EST. COST: $99,203,094
Transit Barn $ 3 million
With Shared Freight Loading Facilities
and Maintenance Facilities (5K sq. ft.) BY PROJECT AREA: COST
Expansion associated with additional Project A - NW 1st Avenue $5,297,400
Routes (per Miami at Midnight Report)
Project B - Overtown $10,340,887
would be scheduled for implementation
after 2012 costing additional $3 million. Project C - NW 3rd Avenue Neighborhood Center $6,111,750
Project D - Historic Overtown Priority Business Corridor $12,711,250
Timeline for Improvements Project E West Overtown $4,101,750
Everyone familiar with the area will Project F Biscayne Boulevard ***Funded by FDOT*** $0
express the concern that time is of the Project G - The Promenade $6,993,000
essence. Every project is important. Projects Project H - NE 8th Street Spine $3,315,938
in the 2004 Budget should be completed by
SUBTOTAL: $48,871,975
the year end of 2006. Substantial
NOT PROJECT AREA SPECIFIC:
accomplishments to the projects deserving the
Other Capital Improvements $19,431,119
highest priority should be completed by 2008.
Community Intermodal System $30,900,000
These are:
Overtown, SUBTOTAL: $50,331,119
NW 3rd Avenue, and

119
120
Neighborhood Overview Overtown residents reside in largely low-rise, about 35% of its residential units owner
older rental development scattered throughout occupied. In 2002, almost 50 percent of
The Redevelopment Area has a wide
the community. There is a large homeless Overtowns households earned less than
range of land uses because of its proximity to
population and an outdated homeless feeding $15,000 per year. The population of the CRA
the Central Business District.
facility in Park West that the City of Miami is area has increased by 2.9% between 1990
Park West, the eastern part of the
in the process of providing assistance in (6,599) and 2000 (6,792).
Redevelopment Area, predominantly has old
relocating. The existing population in
warehouses that once contained businesses
Southeast Overtown is considerably younger The following are residential
that relied on the proximity of the Port of
and poorer than the City of Miami and Miami- characteristics in surrounding areas:
Miami, when it was located at what is now
Dade County as a whole, and reflects a slightly Northeast of the Redevelopment Area is
Bicentennial Park. Park West is now home to
higher median household size. The existing the Omni Redevelopment Area. The
one sports stadiums - American Airlines Arena
households in Southeast Overtown are more Adrienne Arsht Center for the Performing
(Miami Arena demolished in September
likely to be headed by single head of Arts of Miami-Dade County (PAC) was
2008), the Network Access Point (NAP)
household than the City of Miami as a whole. completed in 2006 and serves as a catalyst
facility that provides computer data storage
Unemployment rates in the community are to draw new people, businesses and
related services, three large residential towers,
also higher than the rates for the City and residents into that area. North of the
an expansion of the Wolfson Campus of
County. PAC between Biscayne Boulevard and
Miami-Dade Community College, and several
Overtown is comprised of small Biscayne Bay are several new multi-family
new nightclubs catering to the after hours
neighborhood businesses, churches, single residential towers under construction
market.
family homes and apartment buildings, with and/or recently completed.
The majority of the existing residents in
the latter being the most dominant. North of the Redevelopment Area, the
Park West reside in the three towers located
According to ZHAs 2003 Economic conditions are similar to Overtown.
on NW 1st Avenue near the former Miami
Programming Study, a review of the 1990 and Redevelopment efforts within the
Arena site, while four new luxury mixed-use
2000 US Census and Claritas market research Redevelopment Area can only have a
residential towers were development during
service data shows that homeownership is very positive effect on its northern neighbors.
the recent real estate boom from 2003-2007.
low in Overtown, about 10%. This low Southwest and West of the
This represents a potential increase in new
homeownership rate is a reflection of the low Redevelopment Area is the Miami River
middle to upper income residents to the Park
household incomes in the community and the and the Spring Garden neighborhood.
West area but the recent recession, occupancy
lack of affordable homeownership The river has mostly industrial uses, but
of these edifices will proves to be a challenge
development in the community. For future loft style apartments and mixed use
for the next 2-5 years. The Southeast
comparison, the City of Miami as a whole has developments have been advertised on

121
signs posted at various properties. Spring c) Includes design features and new rental and homeownership
Garden is a stable residential considerations that contribute to the developments to be affordable to low
neighborhood primarily of single family livability of the community and very low-income families, with
homes, separated from western Overtown d) Furthers the development of best efforts being made to serve
by the Seybold canal. workforce housing through existing Overtown residents.
To the south is the Central Business partnerships with employers located d) Assisting developers, who provide
District with mostly government related in and surrounding the community, rental housing serving families,
buildings on the southern edge of the including the use of Employer including seniors, earning below 50%
Redevelopment Area. Assisted Housing models of the area median income, to secure
Northwest of the Redevelopment Area is 2) A goal for the level of affordable housing project based assistance for those
the hospital area comprised of several that should be made available in the units.
hospitals, doctors offices, and related Redevelopment Area of, at least, 20% of e) Ensuring that existing supportive
businesses and research facilities. any new development or rehabilitation of housing is better integrated into the
To the East are properties facing Biscayne existing housing stock, to be periodically community, and expanding
Bay, including Bicentennial Park and the reviewed for results. supportive housing models to address
American Airlines Arena. Two museums 3) Affordability can be achieved by: the unmet needs of existing residents.
are anticipated for Bicentennial Park, (to a) Working with both non-profit and f) Ensuring adequate funding of and
be renamed Museum Park). for-profit developers to help them access to mortgage subsidy programs
find redevelopment opportunities and for existing families who seek
Housing Policy to assist with overcoming obstacles homeownership opportunities in the
The following items constitute the CRAs they may encounter. community.
Policy toward Housing, both market rate and b) Developing and supporting programs
affordable: that will assist in the development of Relocation Policy
housing that is affordable to lower- As stated in this Redevelopment Plans
1) The CRA will only endorse, support, income families by providing Housing Policy, it is the CRAs goal and intent
encourage, assist or initiate housing developer incentives such as density to retain, improve and increase the housing
initiatives that will do their part to: bonuses, parking concessions and stock in the Redevelopment Area and not to
a) Improve living conditions for all project subsidies. replace it with a non-residential use.
residents of the neighborhoods c) Establish inclusionary zoning In the future, if any unforeseen
b) Incorporate a variety of housing [proposed Miami21] policies that will redevelopment project involving the CRA
options and serve a range of incomes require a percentage of the units in all

122
requires the involuntarily displacement of have created some real and psychological modifications to NE/NW 5th and 6th Streets
anyone from either a rented or owned housing barriers; however there are several locations to have three travel lanes in each direction,
unit, the project proposal must contain a where the city streets pass under or over the and additional ramps on to I-95 for
Project Relocation Plan which adheres to all highway. The FEC Railroad, which runs along northbound traffic, and traffic westbound on
applicable laws and regulations. The Project NW 1st Avenue, interrupts circulation for SR836, The Dolphin Expressway. This
Relocation Plan must be approved by the both pedestrians and motorists in several project was recently rejected by the MPO so
CRA Board in a publicly noticed CRA Board locations. efforts to determine new alternatives should
meeting prior to any final approval of the For this Redevelopment Plans proposed be undertaken.
project. traffic changes, see Section 3, Hypothetical Transportation capacity is controlled by
If any future projects were to require Build-out Plan: Transportation System: the downtowns DRI agreement
relocation and CRA funding were to be Mobility and Access. The primary change (Development of Regional Impact). The local
partnered with Federal funds, the CRA shall proposed is returning many of the streets from circulation is addressed on a project by project
make it a condition of its participation that all a one-way configuration back to two-way basis in the Major Use Special Permits
provisions of the Uniform Relocation streets. The current conditions appear to (MUSP).
Assistance Act are met. This strategy adheres make it easy for visitors to enter Overtown,
to the requirements of Chapters 163 and 421, but confusing to leave. The current roadways Environmental Quality
Florida Statues. should handle the projected increase in Redevelopment will improve
Through the Housing Policy and residential units, since the same city streets environmental quality due to existing
Relocation Policy described in this accommodated a former population of 40,000 provisions in the Citys building permit
Redevelopment Plan, the existing residents in 1960. The population in 2000 was 6,792, an process. Miami-Dade Countys Department
within the Redevelopment Area who may be increase from 6,599 in 1990. Also, public of Environmental Resource Management
temporarily or permanently displaced as a transit serves Overtown rather well, which did reviews all new construction permits to insure
result of redevelopment activities directly not exist in 1960. health standards are followed. Asbestos
supported by the CRA will have access to safe, Further community transit and transit testing is required for existing buildings that
sanitary and decent replacement housing. access improvements will be explored related are to undergo renovation. The Countys
to Airport to Sea Port Metrorail linkages Health Department must also approve any
Traffic Circulation through the Overtown/Arena Station and water and sewer changes, restaurants,
The network of streets within the other possible livable community intermodal hospitals, clinics, and schools.
Redevelopment Area is the typical Miami system improvements. Miami Dade Water and Sewer
grid. The older portions of Overtown have FDOT is proposing changes for the Port Department (M-DWASD) provides water
smaller blocks. The I-95 and I-395 Highways of Miami traffic, which will include and sewage services and runoff drainage for

123
the Redevelopment Area. M-DWASD has Since the projected population growth for not factor them into their formulas. Factors
upgraded their standards which means that the Redevelopment Area is difficult to that can affect the projections of the school
nearly all new construction and renovations estimate given the large development impact analysis:
within the Redevelopment Area will require potential, two scenarios were calculated using 1) Increases in zoning causing additional
upgrades to the water service lines, given the the School Impact Review Analysis Process residential units beyond existing
age and smaller diameter of the existing water (see Section 10, Appendix C). Based on this zoning.
lines. analysis, substantial numbers of new residents 2) A lowering of the student drop-out
Locations of concern within the will require the construction of new schools or rate, primarily affecting the high
Redevelopment Area are those locations that major additions to existing ones. If every school level.
once had industrial uses and gas stations, property in the Redevelopment Area was built 3) A large percentage of new residents
which are primarily in Park West, along the out to its maximum potential, with current sending their children to charter or
FEC railroad tracks, and along NW 7th zoning, Miami-Dade Public Schools will need private schools.
Avenue. to double the size of Booker T. Washington
High School and add multiple middle and Miami-Dade County Public Schools is
Effect on School Population elementary schools assessing their facilities and the number of
In 2000, the population of the Currently with the low utilization of the students since Florida voters passed a
Redevelopment Area was 3,904. The average one high school serving the neighborhood, referendum in 2002 requiring a mandatory
household size in the 2000 Census for Miami- 2000 to 3000 more residential units can be classroom size reduction in public schools.
Dade County was 2.90, which means there are added to the school district and stay within The deadline for this is the 2008-9 school year.
approximately 1,347 households. Using capacity limits. That is not true for the middle In 2008, Miami Dade County Public Schools
Miami-Dade County Public Schools five-step and elementary schools. The two middle implemented a school concurrency system
School Impact Review Analysis Process, this schools serving the area are both currently which allows them to receive information
suggests that there are currently overcrowded. The elementary schools are from the all local municipalities to determine
approximately: currently underutilized but new development the amount of future growth a community can
238 school children enrolled in elementary generates more students at the elementary anticipated based on new/proposed
school; level. development or redevelopment.. This will
130 school children enrolled in middle The analysis only took into account the also impact the students living in the
school; and public schools, not charter schools. The Redevelopment Area.
151 school children enrolled in high student population in the charter schools can
school. come from outside the Redevelopment Area
519 total students (estimated) and Miami-Dade County Public Schools does

124
Current Schools serving the reasons, have been unsuccessful in a professional careers in the arts.
Redevelopment Area include: traditional high school. Facilities
accommodate approximately 160 young School for Advanced Studies,
Elementary Schools: adults. Instructional program is tailored Wolfson Campus
Frederick Douglass Elementary to the needs of the individual student. Provides an accelerated, full-time dual
Paul Laurence Dunbar Elementary Through a partnership with Communities enrollment program (high school &
Phillis Wheatley Elementary In Schools of Miami, Inc., students college) at Miami-Dade Community
Riverside Elementary participate in mentoring programs that College.
include opportunities to explore careers in
Elementary Charter Schools: many of Miami's larger companies. Young Mens Preparatory Academy
Mater Academy East Charter School Provides a rigorous curriculum along with
Rosa Parks Charter School Overtown Jobs for Miami Training Academy positive role model using intensive study
Provides vocational and educational of Sean Coveys The Seven habits for
Magnet / Elementary Alternative Schools: training for adults, young adults, out of Highly Effective Teens.
Ada Merritt Elementary school youth, dislocated workers, welfare
A commuter school within close recipients and refugees. Community Facilities and
proximity to the Redevelopment Area, Services
providing a dual language education:
Community Facilities and Services in and
English plus Spanish or Portuguese. Miami Skills Center
near the Redevelopment Area:
Provides basic education, and technical
Parks / Public Spaces
Secondary Schools: and career development skills.
o Bicentennial Park [to be renamed
Jose de Diego, Middle School
Museum Park]
Booker T. Washington Senior High New World School of the Arts
o Gibson Park
A state-supported school cooperatively
o Athalie Range Park
Secondary Charter Schools: administered by the Miami-Dade County
o Lyric Plaza
Downtown Miami Charter School Public Schools, Miami-Dade Community
o Culmer Centers grounds
Mater Academy East Charter School College, and the University of Florida.
o Williams Park
The grades 9-12 program provides a
o Rainbow Village Park
Magnet / Alternative Secondary Schools: comprehensive educational sequence of
o Henry Reeves Park
Corporate Academy North artistic training, academic and creative
o Lummis Park
Accommodates students who, for various development and preparation for

125
Service, Meeting, & Recreational Centers Entertainment Venues tree planting.
o Culmer/Overtown Neighborhood o Historic Lyric Theater The CRA has identified that new zoning
Center, o Adrienne Arsht Center for the regulations are needed with design guidelines.
o The Overtown Youth Center Performing Arts of Miami-Dade The intention of the design guidelines is to
o Freedom Tower County ensure that both publicly and privately
o Accion Community Action Agency o Bicentennial Park [to be renamed constructed buildings are attractive and
Service Center (CAA), 858 West Museum Park] support the need for pedestrian access,
Flagler Street, (305) 547-4892 o American Airlines Arena comfort, and safety.
o Wynwood Neighborhood Center o Bayfront Park and Amphitheater Proposed new developments at the time
(DHS), 2902 NW 2nd Avenue, (305) o Gusman Center of writing this amendment all provide a mix of
547-7661 uses including residential, making it possible to
Public Transit live and work within walking distance or
Churches o Metrorail (two stations) transit.
o Central Baptist Church o Metromover (five stations) The greatest asset of this community is its
o Greater Bethel A.M.E. Church o Metrobus, (many routes) location. The Central Business District is
o Mount Zion Baptist Church within walking distance, it is served by public
o St. Johns Baptist Church transit, and it is centrally located in Miami-
o St. Agnes Episcopal Church Physical and Social Quality Dade County.
o St. Peters Catholic Church Until recently, Park West and Overtown
have been overlooked as a desirable place to
Educational live and work. With the attraction of the Park
o University of Miami Medical Campus West Entertainment District during evening
(Jackson Hospital) and early morning hours, and with the
o Miami-Dade Community College, anticipated spill-over effect of the Performing
Wolfson Campus, Arts Center, expansion of the Historic Lyric
o The Culmer/Overtown Branch Theater, and new proposed market rate and
Library, Miami-Dade County Library affordable housing, the physical character of
System the Redevelopment Area is about to change.
o Main Library, Miami-Dade County Recent projects from the CRA have been
geared toward beautification of the public
rights-of-way with sidewalk improvements and

126
127
The Redevelopment Plan shall be managed market value in accordance with h. To apply for financing and to borrow
through the items specified in this section. Section 163.380, Florida Statute; money from the Federal
The CRA shall conform to all requirements c. Demolishing and removing existing Government, the State, the County,
and standards as designated by the structures, landscaping, or previous the City or other public body or from
Community Redevelopment Act of 1969. The improvements to real property or any public or private sources in the
CRA is entitled to undertake all activities facilities; and form of loans, bonds, grants,
under the Act, as it may be modified from d. Installing, constructing, or rebuilding contributions, and any other form of
time to time. streets, sidewalks, utilities, parks, financial assistance to be used for
playgrounds, and public spaces. redevelopment activities;
Powers of the CRA 4) Within the Redevelopment Area: i. To acquire air rights which shall be
The CRA shall be empowered to engage a. To make inspections, surveys, used for implementing
in the activities set forth in Section 163.370, appraisals, soundings, or test borings redevelopment projects;
Florida Statutes, which include the following: on private property; j. To appropriate funds and pay
1) To write and execute contacts and other b. To conduct environmental tests and expenditures as necessary to perform
implementation means that may be surveys on private property; the actions identified in this plan;
necessary or timely to exercise its powers c. To purchase, lease, option, gift, grant, k. To organize, coordinate, and direct
under the Community Redevelopment or bequest, any real property together the administration of redevelopment
Act. or without any other improvements; activities, projects, and programs the
2) To distribute information regarding d. To hold, improve, clear or prepare City of Miami and/or Miami-Dade
community redevelopment to the for redevelopment any acquired real County;
communitys residents, property owners, property; l. To establish community parking
elected officials, and activists. e. To mortgage, pledge, hypothecate or projects;
3) To commence with community otherwise encumber or dispose of m. To fund pilot programs to market
redevelopment and related activities any property; activities within the Redevelopment
within the Redevelopment Area, which f. To enter into contracts that are Area; and,
may include: necessary for any redevelopment n. To establish a community
a. Acquisition of property by purchase, activities, projects or programs; development entity under the U.S.
lease, option, gift, grant, bequest, g. To solicit requests for proposals, Treasury New Market Tax Credit
devise, or other voluntary method of requests for qualification, and bid Program;
acquisition. solicitation for redevelopment o. To establish, implement and fund
b. Disposition of property at its fair activities; community policing innovations.

128
5) The CRA shall be permitted to issue capital improvements or projects which to the City on behalf of an applicant;
redevelopment revenue bonds and other are not an integral part of or necessary for or
financial instruments in accordance with carrying out the community c. Independently close or vacate public
Section 163.385, Florida Statutes. Bonds redevelopment plan if such projects or rights-of-way.
issued under this section do not constitute improvements are normally financed by
indebtedness within the meaning of any the governing body with user fees or if The CRA Board shall not have the power
constitutional or statutory debt limitation such projects or improvements would be to grant final approval of this Redevelopment
or restrictions as they apply to the City of installed, constructed, reconstructed, Plan and future revisions.
Miami or Miami-Dade County. repaired, or altered within 3 years of the
6) The CRA may exercise all or any part in approval of the community Authority to Undertake
combination of redevelopment powers as redevelopment plan by the governing Redevelopment
prescribed in the Community body pursuant to a previously approved
This Redevelopment Plan has been
Redevelopment Act. public capital improvement or project
prepared in accordance with the Florida
schedule or plan of the governing body
Community Redevelopment Act, Chapter 163,
Powers not assigned to the which approved the community
Part III of the Florida Statutes. The adoption
SEOPW CRA redevelopment plan,
of this Redevelopment Plan and any later
3) General government operating expenses
The following activities may not be paid modifications or amendments shall follow the
unrelated to the planning and carrying out
for or financed by increment revenues, but procedures set forth in Chapter 163, Part III.
of a community redevelopment plan.
may be purchased through alternative funding By adopting this Redevelopment Plan, the
sources: CRA is authorized to perform community
Regarding zoning and land development
1) Construction or expansion of redevelopment as defined in Section
regulations, the CRA shall not have the power
administrative buildings for public bodies 163.340(9), Florida Statutes.
to:
or operational police and fire buildings, The CRA is the government agency that
a. Independently zone or rezone
unless each taxing authority agrees to such oversees and monitors development within
property; however the CRA can
method of financing for the construction the Redevelopment Area, and as such, all
recommend and advocate zoning
or expansion, or unless the construction development projects proposed within its
changes to the City of Miami;
or expansion is contemplated as part of a environs must be presented before the CRA
b. Grant variances or exceptions from
community policing innovation. Board prior to the City of Miami granting
zoning, building regulations, or life-
2) Installation, construction, reconstruction, approval of the project.
safety codes.; however the CRA can
repair, or alteration of any publicly owned
request such variances and exceptions

129
Future Amendments to this
Redevelopment Plan
This Redevelopment Plan is an
amendment and update to the original 1982
Plan. In the future, this Redevelopment Plan
may need to be amended as new, innovative
projects eligible for tax increment revenues are
proposed for the area.
Amendments to the Plan shall be in
accordance with Section 163.361, Florida
Statutes. The CRA Board will initiate any
amendment action by adopting a resolution
recommending that the Miami City
Commission adopt the proposed amendment
to the Plan, and requesting transmittal to
Miami-Dade County for approval by the
Board of County Commissioners.
The original Findings of Necessity
should be reaffirmed with regard to the
proposed modification or amendment.
Should any provision of the Community
Redevelopment Plan, including later revisions,
be found to be invalid, unconstitutional or
illegal, such provision shall not affect the
remaining portions of the Plan.

130
Safeguards & Assurances
State of Florida Statutory Technical Item Section
Safeguards to Ensure Redevelopment
Requirements Legal Description
1 Activities Follow the Redevelopment
Plan
Diagram Showing
The Community Redevelopment Act of 1969
Open Space 3
requires that specific elements be included in 1) The CRA shall file an annual financial
every redevelopment Plan. The chart to the report by March 31 of each year with
right identifies the location for each of those
Diagram Showing
Street Layout
3 Miami-Dade County, and the City of
elements within this Master Plan Report. Limitations On Miami. This annual report shall contain a
Massing, Intensity And 3 programmatic overview of the public
Density and/or private funded activities of the
CRA as allowed by the Redevelopment
Properties For Parks
And Other Public Use
3 Plan.
Neighborhood Impact 6 2) The CRA shall file a Five Year Capital
Program budget with the City of Miami,
Publicly Funded
Capital Improvements
5 for inclusion in the Citys Five Year
Comprehensive Plan, and update this
Safeguards And
Assurances
7 budgeting document annually.
3) The CRA Board shall be fully subject to
Retention Of Controls the Florida Sunshine Law and meet at
And Restrictions With 7 least on a monthly basis in a public forum.
Land Sales 4) The CRA shall provide adequate
Residential Use-
Affordability
2&6 safeguards to ensure that all leases, deeds,
contracts, agreements and declarations of
Costs 5 restrictions relative to any real property
conveyed shall contain restrictions and
Timeline
5 covenants running with the land and its
uses, or other such provisions necessary
to carry out the goals and objectives of
the Redevelopment Plan. The CRA shall

131
further ensure that such conveyance owners and business tenants within the be provided to inform the public of the
comply with the requirements of Section Redevelopment Area preference for re- availability for review of the Annual Audit
163.380, Florida Statutes. entry into business, provided the business and Annual Financial Report.
5) The CRA shall continue to acquire is compatible with the uses, theme and 2) All CRA tax increment financing (TIF)
property and to convey such interest to quality of development in the funds shall be held in a Redevelopment
developers and investors for Redevelopment Area and that the Trust Fund separately from other funds as
redevelopment. business owner or tenant has the financial required by Florida Statutes.
6) The CRA shall promote the use of land ability to operate the business consistent 3) The SEOPW CRA shall request specific
pooling to provide existing property with the overall integrity of the goals and objectives from developers that
owners with an opportunity to participate redevelopment district. utilize Tax Increment Financing (TIF)
in the redevelopment as an equity partners funds.
in return for the use of the private owners Safeguards to Ensure Financial
land for such development. Accountability Safeguards to Ensure Proper
7) The CRA shall present a Regulatory Plan 1) The CRA shall maintain adequate records Implementation and
to the City of Miami for adoption and to provide for an annual external audit Project/Program Accountability
continue to recommend zoning changes which shall be conducted by a 1) The CRA shall establish measurable goals
consistent with the Redevelopment Plan. knowledgeable Certified Public and objectives for each activity it
8) The CRA shall request to the City that all Accountant. The findings of the audit administers and/or funds.
proposals for new development, once shall be presented at a public meeting of 2) The CRA shall coordinate with related
reviewed by the City administration, shall the CRA Board and such findings shall be agencies, entities, community based
be forwarded to the CRA for review and forwarded to the City of Miami and organizations and stakeholders,
consistency with the Redevelopment Plan. Miami-Dade County by March 31 of each specifically including the Water and Sewer
9) The CRA shall request specific goals and year for the preceding fiscal year which Authority (WASA), the City and County
objectives from developers that utilize shall run from October 1 through Public Works, Capital Improvement
Tax Increment Financing (TIF) funds. September 30. The annual Audit Report Projects, and Planning departments to
10) The CRA shall require a Local shall be accompanied by the CRAs ensure the proper planning, budgeting and
Participation Agreement for all Annual Financial Report and shall be implementation of projects.
development projects occurring within the provided to the City of Miami, and 3) The CRA shall hold public hearings on
Redevelopment Area. Miami-Dade County and shall be made the following at its monthly Board
11) The CRA shall, or will require the available for public review. Legal notice Meetings:
developer to provide existing business in newspapers of general circulation shall a. Report and status on its programs

132
and projects (the Activities) . behalf of the CRA. The CRA shall
b. Gather input from property recommend that the City resist resorting to
owners, citizens and interested such proceedings, because of its costly nature
parties regarding redevelopment which is further typically perceived as a non-
activities; and collaborative action by property owners in the
c. Discuss strategies to resolve local Redevelopment Area. In the event that
redevelopment issues property owners are unwilling to participate in
the redevelopment, despite the provision of
Providing for a Time-Certain and financial and technical assistance, the CRA
Severability shall recommend to the City of Miami that
The term of the CRA shall be through the year eminent domain proceedings commence.

2030, or through the end of the fiscal year in .

which any outstanding bonds are retired,


whichever is later.

Land Acquisition
Section 163.370, Florida Statutes, provides
that the CRA may acquire land. In Section 4
of this Redevelopment Plan, under District
Wide Program #9, Miscellaneous Land
Acquisition, the CRA objective states that [t]he
CRA proposes to acquire land, as necessary, to
support the implementation of the projects
described in this Redevelopment Plan within
the Redevelopment Area.

The CRA cannot acquire property


through eminent domain proceedings. The
City of Miami has the sole authority to
commence eminent domain proceedings on

133
134
Definitions compared to the remainder of the county agreement or agreements with the agency or
or municipality; by resolution, that the area is blighted. Such
The following terms, wherever used or
(h) Tax or special assessment delinquency agreement or resolution shall only determine
referred to in this part, have the following
exceeding the fair value of the land; that the area is blighted. For purposes of
meanings:
(i) Residential and commercial vacancy rates qualifying for the tax credits authorized in
higher in the area than in the remainder of chapter 220, "blighted area" means an area as
Blighted Area
the county or municipality; defined in this subsection.
An area in which there are a substantial
(j) Incidence of crime in the area higher than
number of deteriorated, or deteriorating
in the remainder of the county or Board or Commission
structures, in which conditions, as indicated by
municipality; A board, commission, department, division,
government-maintained statistics or other
(k) Fire and emergency medical service calls office, body or other unit of the county or
studies, are leading to economic distress or
to the area proportionately higher than in municipality.
endanger life or property, and in which two or
the remainder of the county or
more of the following factors are present:
municipality; Community Policing Innovation
(a) Predominance of defective or inadequate
(l) A greater number of violations of the
street layout, parking facilities, roadways, A policing technique or strategy designed to
Florida Building Code in the area than the
bridges, or public transportation facilities; reduce crime by reducing opportunities for,
number of violations recorded in the
(b) Aggregate assessed values of real property
remainder of the county or municipality; and increasing the perceived risks of engaging
in the area for ad valorem tax purposes
(m) Diversity of ownership or defective or in, criminal activity through visible presence of
have failed to show any appreciable
unusual conditions of title which prevent police in the community, including, but not
increase over the 5 years prior to the
the free alienability of land within the
finding of such conditions; limited to, community mobilization,
deteriorated or hazardous area; or
(c) Faulty lot layout in relation to size, neighborhood block watch, citizen patrol,
(n) Governmentally owned property with
adequacy, accessibility, or usefulness;
adverse environmental conditions caused citizen contact patrol, foot patrol,
(d) Unsanitary or unsafe conditions;
by a public or private entity. neighborhood storefront police stations, field
(e) Deterioration of site or other
improvements; interrogation, or intensified motorized patrol.
However, the term "blighted area" also
(f) Inadequate and outdated building density
means any area in which at least one of the
patterns; Community Redevelopment Agency
factors identified in paragraphs (a) through (n)
(g) Falling lease rates per square foot of A public agency created by, or designated
are present and all taxing authorities subject to
office, commercial, or industrial space pursuant to Section 163.356, Florida Statutes.
s. 163.387(2)(a) agree, either by interlocal

135
Community Redevelopment Area Mixed-Mode Corridor affordable housing, whether for rent or for
A slum area, a blighted area, or an area in A street limited to pedestrian, bicycle and sale, to residents of low or moderate income,
which there is a shortage of housing that is transit movements for all or part of the day including the elderly, and may include slum
affordable to residents of low or moderate and night. clearance and redevelopment in a community
income, including the elderly, or a coastal and redevelopment area or rehabilitation and
tourist area that is deteriorating and Public officer revitalization of coastal resort and tourist areas
economically distressed due to outdated Any officer who is in charge of any that are deteriorating and economically
building density patterns, inadequate department or branch of the government of distressed, or rehabilitation or conservation in
transportation and parking facilities, faulty lot the county or municipality relating to health, a community redevelopment area, or any
layout or inadequate street layout, or a fire, building regulations, or other activities combination or part thereof, in accordance
combination thereof which the governing concerning dwellings in the county or with a community redevelopment plan and
body designates as appropriate for community municipality. may include the preparation of such a plan.
redevelopment.
Real Property Related Activities
Community Redevelopment Plan All lands, including improvements and fixtures Either:
A plan, as it exists from time to time, for a thereon, and property of any nature
1) Planning work for the preparation of a
community redevelopment area. appurtenant thereto or used in connection
general neighborhood redevelopment plan
therewith and every estate, interest, right, and
or for the preparation or completion of a
Federal Government use, legal or equitable, therein, including but
communitywide plan or program pursuant
The United States Government or any agency not limited to terms for years and liens by way
to Section 163.365, Florida Statutes.
or instrumentality, corporate or otherwise, of of judgment, mortgage, or otherwise.
2) The functions related to the acquisition
the United States.
Redevelopment or Community and disposal of real property pursuant to
Redevelopment Section 163.370, Florida Statutes.
Housing authority
Undertakings, activities, or projects of a 3) The development of affordable housing
A housing authority created by and established
county, municipality, or community for residents of the area.
pursuant to Chapter 421, Florida Statutes.
redevelopment agency in a community 4) The development of community policing
redevelopment 0area for the elimination and innovations.
Increment Revenue
The amount calculated pursuant to Section prevention of the development or spread of
163.387, Florida Statutes. slums and blight, or for the reduction or
prevention of crime, or for the provision of

136
Slum Area
An area having physical or economic
conditions conducive to disease, infant
mortality, juvenile delinquency, poverty, or
crime because there is a predominance of
buildings or improvements, whether
residential or nonresidential, which are
impaired by reason of dilapidation,
deterioration, age, or obsolescence, and
exhibiting one or more of the following
factors:
(a) Inadequate provision for ventilation, light,
air, sanitation, or open spaces;
(b) High density of population, compared to
the population density of adjacent areas
within the county or municipality; and
overcrowding, as indicated by
government-maintained statistics or other
studies and the requirements of the
Florida Building Code; or
(c) The existence of conditions that endanger
life or property by fire or other causes.

137
138
Directory Chairperson, Miami, Florida 33130
Telephone: (305)250-5390 Telephone: (305)416-1800
Updating this directory from time to time
E-mail: mspence-jones@miamigov.com E-mail: law@ci.miami.fl.us
does not constitute a revision to this
redevelopment plan.
Commissioner Marc Sarnoff Department of Community Development
Vice-Chairperson Main Number (305) 416-2080
Southeast Overtown/Park West Community
Telephone: (305)250-5333 George Mensah, Director
Redevelopment Agency
E-mail: jwinton@ci.miami.fl.us Telephone: (305) 416-2099
James Villacorta, Executive Director
E-mail: jhvillacorta@miamigov.com Commissioner Angel Gonzalez, Planning Department
49 NW 5 Street, Suite 100 Miami, Fl 33128 Board Member Main Number: (305) 416-400
Telephone: (305) 679-6800 Telephone: (305)250-5430 Fax: (305) 416-1435
E-mail: agonzalez@ci.miami.fl.us Ana Gelabert-Sanchez, Director
Miami Dade County
Telephone: (305) 416-1435
Board of County Commissioners Commissioner Joe M. Sanchez,
Audrey Edmonson, District 3 Board Member
Economic Initiatives Division
Stephen P. Clark Center E-mail: jsanchez@ci.miami.fl.us
City Managers Office
111 N.W. 1st Street, Suite 220 Telephone: (305)250-5380
Main Number (305) 416-1400
Miami, Florida 33128
Fax: (305) 416-2156
Telephone (305) 375-5393 Commissioner Tomas P. Regalado,
Lisa Mazique, Director
Email: district3@miamidade.gov Board Member
Telephone: (305) 416-1411
E-mail: tregalado@ci.miami.fl.us
Dennis C. Moss, District 9 Telephone: (305)250-5420
Chairperson, Board of County Public Works Department
Commissioners City of Miami Main Number (305) 416-1200
111 N.W. 1st Street, Suite 320 Pedro G. Hernandez, City Manager Stephanie Grindell, Director
Miami, Florida 33128 3500 Pan American Drive, Miami, FL 33133 E-mail: sgrindell@ci.miami.fl.us
Telephone (305) 375-4832 Telephone: (305)250-5400
Email: district9@miamidade.gov E-mail: phernandez@miamigov.com Building Department
Main Number (305) 416-1100
CRA Board of Commissioners Julie O. Bru, City Attorney Hector Lima, Director
Commissioner Michelle Spence-Jones, 444 SW 2nd Avenue, Suite 945 E-mail: hlima@ci.miami.fl.us

139
Overtown Community Oversight Board Collins Center for Public Policy Beacon Council Inc.
Saliha Nelson, Chairperson 150 SE 2nd Avenue Suite 703, 80 SW 8 Street, Suite 2400, Miami, FL 33130
1600 NW 3 Ave, Bldg C Miami, FL 33131 Telephone: (305) 579-1300
Miami, FL 33128 Telephone: (305) 377-4484 www.beaconcouncil.com
Telephone: (305) 573-8217 www.collinscenter.org
Habitat for Humanity
Overtown Civic Partnership & Design St. Johns CDC Anne Manning, Director
Center David Alexander, President/CEO 9350 S. Dadeland Blvd., Suite 200
Philip Bacon, Executive Director 1324 NW 3 Avenue, Miami FL 33136 Miami, Florida
Dorsey House Telephone: (305) 372-0682 Telephone: (305) 670-2224
250 NW Ninth Street .Miami, FL 33136 www.miamihabitat.org
St. Agnes CDC
Phone: 305-416-3301 Fax: 305-416-3302
2031 NW 4th Court Miami FL 33136 Florida Department of Transportation
www.overtown.org
Telephone: (305) 573-6885 District VI Secretary
The Black Archives, History & Research 1000 NW 111th Avenue Miami, FL 33172
Mt. Zion CDC
Foundation of South Florida, Inc. Telephone: (305) 470-5197
Don Patterson, Director
819 NW 2 Avenue, Miami, FL 33136 Fax (305) 470-5610
301 NW 9 St, Miami, FL 33136
Telephone: 305-636-2390 General Information: (305) 470-5349
Telephone: (305) 379-4147
Fax: (305) 636-2391 www.dot.state.fl.us

The Overtown Youth Center


The Trust for Public Land
Carla Penn, Executive Director
7900 Red Road, Suite 25
450 NW 14th Street, Miami FL 33136
South Miami, FL 33143
Telephone: (305) 349-1204
Telephone: (305) 667-0409
www.tpl.org
Local Initiatives Support Corporation
(LISC)
BAME Development Corporation of
150 S. E. 2nd Ave., Suite 911
South Florida
Miami, FL 33131
245 NW 8th Street, Miami, Florida 33136
Telephone: (305) 381-7967
Telephone: (305) 373-7233
Fax (305) 372-1890
Fax: (305) 373-8915
www.liscnet.org

140
141
Prepared by the City of Miami Planning and
Appendix A 1979 -1980 Zoning Department, this plan stated to the
Overtown Redevelopment Plan State of Florida the need for a Community
Previous Planning Work for Prepared by the City of Miami Planning and Redevelopment Agency, and specified projects
the area Zoning Department with extensive citizen and operations for the CRA. Although the
review, this plan was for the larger Overtown plan was modified over the following few
community, not just the CRA boundaries. years, it is now out of date, which has led to
1973
This plan was adopted by both the City of the Community Redevelopment Plan to which
Urban Development and Zoning Plan.
Miami and Miami-Dade County. Portions of this appendix is attached. The 1982
This report recommended redevelopment of
this plan that referred to Southeast Overtown redevelopment plan was reviewed and
the area north of the port access road to I-395
were incorporated into the original SEOPW modified over a six-month period by the
between N.W. 1st Avenue and Biscayne
Community Redevelopment Plan. Southeast Overtown/Park West Ad Hoc
Boulevard, later designated as Park West. This
Committee that included representatives of
recommendation was incorporated within the
1979 - 1981 the Overtown and Park West communities
MCNP in 1976.
Miami Park West, A Redevelopment Program and provided a forum for community
for Downtown Miami concerns.
1976
Prepared by Wallace, Roberts and Todd
Miami Comprehensive Neighborhood Plan
(WRT), American Cities Corporation, and 1986-87
(MCNP)
Parsons Brinckerhoff Quade and Douglas, this Omni Area Redevelopment Plan, September
A Comprehensive Plan is required by the State
plan called for land purchase of a 16-block 1986
of Florida for every municipality. Miamis
area, extensive clearance and redevelopment Prepared by the City of Miami Planning
Comprehensive Plan provides the framework
of the industrial area into a residential and Department, this is the Community
for the overall development of the City of
commercial community. The focal point of Redevelopment Plan for the Omni Area CRA.
Miami. This plan is periodically updated and
the plan was a large linear green space linking
continues to guide the Citys decisions. In
Overtown to Bicentennial Park. This plan was August 1984
1976 Development opportunities were
incorporated into the 1982 SEOPW Design Standards and Guidelines for the
identified for the CRA area within this
Community Redevelopment Plan. Southeast Overtown / Park West
document including the establishment of an
Redevelopment Project
in-town residential community and
This document was prepared by the
redevelopment opportunities made possible by
1981-82 Downtown Development Authority for the
the expanded transit system.
SEOPW Community Redevelopment Plan SEOPW CRA. These standards contain many

142
common sense practices for treating pavement Master Plan for Historic Overtown Folklife Coast Regional Planning Council and
and landscaping on public streets. The Village, May 1997. produced through a grant from the Florida
guidelines however reinforce a plan that is This plan was prepared by Duany, Plater- Department of Community Affairs to the
heavily dependent upon a wide landscaped Zyberk & Company as an update to the 1989 South Florida Regional Planning Council for
pedestrian mall, an idea since widely plan for the Black Archives. It offers new Eastward Ho initiatives. SFRPC brought in
discredited nationally. The small segment of implementation strategies for the previous the Treasure Coast Regional Planning Council
the pedestrian mall that was constructed on plan. to provide a community design charrette
NW 9th Street in the late 1980s has already workshop and produce a detailed plan for all
been re-opened to traffic. 1998 of Overtown. Many local architects and
NW 3rd Avenue Priority Business Corridor. planners participated along with local property
February 1989 This document prepared by Bermello-Ajamil owners and residents. The plan showed how
The Historic Overtown Folklife Village, & Partners, Inc for the SEOPW CRA the community can redevelop over time with
Master Plan / Urban Design Guidelines. examines the physical existing conditions small incremental improvements and
This plan and accompanying guidelines were along this historic commercial corridor. reinvestment, unlike typical grand schemes.
prepared for the Black Archives, History and Recommendations are also included to Unfortunately the plan failed to capture the
Research Foundation of South Florida, Inc. by stimulate business. excitement needed in the investment
Ronald E. Frazier & Associates. The plan community and official circles, and is
surveys a three block area of historic buildings September 1999 perceived by some members of the
and offers architectural guidelines for City of Miami Community Redevelopment community as the latest in a string of broken
buildings. Agency, Fiscal Year 2000 and 5-Year Plan promises.
2000-2004, Budgeted Projects and Programs
1989 Prepared by the SEOPW CRA, this document March 2000
Downtown Miami Master Plan 1989 lays out the current five-year plan of programs Housing Needs and Potential of the
This document was prepared by the City of and expenditures. Projects and programs Overtown / Park West Area
Miami Department of Planning, Building, & from this document have been included in the This document was prepared by Reinhold P.
Zoning and the Downtown Development SEOPW Community Redevelopment Plan. Wolff Economic Research, Inc. for South
Authority. This plan was officially adopted by Florida Partnership Office Fannie Mae. It is a
the City Commission in 1989 and continues to March 2000 market housing study.
guide decision making for the downtown. Overtown, Redevelopment Area Design
Charrette Report Spring 2000
May 1997 This document was prepared by Treasure History of the City of Miami, a brief summary

143
of its past in pictures, maps and writings streetscape guidelines. transportation trust funds and to develop such
This was prepared by students at the improvements as a community intermodal
University of Miami School of Architecture October 2002 system.
under the directions of professors Allan Overtown Greenprint Plan
Shulman and Adolfo Albaisa. This is not a Prepared by the Trust for Public Land, The
planning document but rather a summary Greenprint Steering Committee, and Glatting
showing how Downtown Miami has changed Jackson Kerscher Anglin Lopez Rinehart Inc.
over the years. The Greenprint Plan is a strategic plan to
design and build an interconnected system of
urban open spaces, including parks, greens,
2002 gardens, plazas, bikeways and sidewalks.
Miami River Corridor Urban Infill and
Redevelopment Plan This document was December 2002
prepared by Kimley-Horn and Associates, Inc Overtown: A Look Back, Connections to the
for the Miami River Commission, City of Future
Miami and Miami-Dade County. This plan was prepared by Urban Design
Associates on behalf of the Collins Center for
2002 Public Policy, Inc and the Overtown Civic
Park West Club District Streetscape Master Partnership. The document analyzes the
Plan. This plan was prepared by Wallace existing conditions and shows design
Roberts & Todd for the CRA. It identifies alternatives for Downtown Overtown, the
parking areas and streetscape improvements core area of Overtown.
along Eleventh Street.
November 2003
August 2002 Miami at Midnight
Overtown Greenway Plan This report was prepared by Thomas F.
This document was prepared by Trust for Gustafson, P.A. to examine the use of narrow
Public Land and Wallace Roberts & Todd. gauge rail modality in the SEOPW and OMNI
This document identifies the various planning CRA areas and to suggest locations for liner
efforts taking place in the area and offers buildings and related parking structures. The
greenway alignments and landscaping and report provides a basis for requesting

144
CRA consultants: Transportation)
Appendix B o TY Lin International/HJ Ross Thomas F. Gustafson and Nova
o ZHA, economists Southeastern Universitys Center for
Acknowledgements o Thomas Gustafson Public Policy and Leadership
City of Miamis Planning and Zoning
The Southeast Overtown Park West Departments
Community Redevelopment Plan, Update Many residents, property owners, and
2004 was prepared initially by Dover Kohl & business owners within and near the
Partners, Town Planners, with the 2009 Redevelopment Area.
Update modified by City of Miami Planning Overtown Community Oversight
Department. Incredible support, ideas and Board
information for the entire plan was received Overtown Civic Partnership
from: The Black Archives, History &
City of Miami Commissioners and Research Foundation of South
CRA Board Members: Florida, Inc.
o Commissioner Angel The Trust for Public Land
Gonzalez, District 1 LISC of Greater Miami
o Commissioner Marc Sarnoff, The Overtown Youth Center
District 2 Several Community Development
o Commissioner Joe M. Sanchez, Corporations, including:
District 3 o BAME CDC
o Commissioner Tomas P. o St. Agnes CDC
Regalado, District 4 o St. Johns CDC
o Commissioner Michelle Park West Civic Association
Spence-Jones, District 5 Florida Department of
County Commissioner, Audrey Transportation
Edmonson, District 3 Several Community Churches,
City Manager, Pedro Hernandez including:
CRA Executive Director, James H. o St Agnes
Villacorta o Mt Zion
FDOT (Florida Department of

145
gross square footages, and the maximum factor becomes the maximum density instead
Appendix C Floor Area Ratio (FAR) for each zoning of the FAR. There was no analysis prepared
district. The spreadsheet generates the to determine if a developer could maximize
School Impact Analysis for approximate number of dwelling units with the density within the FAR limitations.
the CRA Redevelopment the assumption that the average apartment size
is 1,250 square feet of space. This dwelling Findings:
Plan
unit size is from a recent analysis by a Using M-DCPSs equations to estimate
developer for a project in Overtown. The the number of students for each school, the
This Impact Analysis has been performed
columns on the right of the spreadsheet new capacity is compared with the existing
to examine the impact of the CRA
separate out the number of possible dwelling capacity as reported in M-DCPSs Region IV
Community Redevelopment Plan on the
units that occur in each of the school districts FISH Design Capacity (Permanent +
public school system in Miami-Dade County.
provided by Miami-Dade County Public Relocatable). The comparison suggests the
This analysis is projecting a total
Schools (M-DCPS). There is one high following:
redevelopment of all properties within the
school that serves the Redevelopment Area,
Redevelopment Area as if almost all of the
two middle schools, and three elementary Booker T. Washington High School:
area were to be built out today using the
schools. Scenario 1 reveals 3,060 new high school
current zoning code. This scenario is not
students would be added to the neighborhood,
likely to occur because the eventual
A second scenario: putting the high school at 202% of its current
redevelopment will happen gradually over a
While examining the FAR, it became capacity. This reveals that another high school
long time, and many of the existing structures
apparent that a developer could build smaller of a similar size would need to be added, or
will remain. However, this is the best
units and stay within the maximum density the school would need to double its current
approach to examine possible problems that
allowed in each zoning district. Therefore a student capacity, by renovation or additions to
can be avoided over the next few years as
second spreadsheet was prepared that removes the existing school. Scenario 2 reveals 6,278
properties do get redeveloped.
the FAR limitations and estimates the possible new high school students, requiring much
number of units using the maximum density more capacity. Booker T. Washington HS is
Approach:
allowed. The SD-6, and SD-16 zones do not presently under utilized. It can accommodate
Each City block within the
specify a maximum density, so for those areas approximately 1,000 additional students before
Redevelopment Area was numbered. (See
we used the first scenario (with FAR) to exceeding M-DCPSs acceptable threshold of
attached map) The zoning for each block was
estimate the number of units on those blocks. 115%.
cross-referenced. A spreadsheet was
This second scenario suggests that more
generated that lists each block, corresponding
dwelling units are possible if the controlling

146
Citrus Grove Middle School: Paul Dunbar Elementary School: were to occur, an additional Elementary
Only a small portion of the Redevelopment Only a small portion of the School will be needed for the neighborhood.
Area lies within the Citrus Grove Middle Redevelopment Area lies within the Paul Phillis Wheatley Elementary is presently under
School district. Scenario 1 (by FAR) reveals Dunbar Elementary School district. Scenario utilized. It can accommodate approximately
35 new middle school students could be added 1 reveals 129 new elementary school students 310 additional students before exceeding M-
to the school. Scenario 2 (by maximum could be added to the school. Scenario 2 DCPSs acceptable threshold of 115%.
density) reveals 150 new middle school reveals 451 new elementary school students.
students. Without any new students, Citrus It appears that new development within the Frederick Douglass Elementary School:
Grove currently has a capacity problem at Redevelopment Area will cause minimal A greater portion of the Redevelopment
151% utilization. More capacity is currently capacity problems at Paul Dunbar Elementary Area lies within the Frederick Douglass
needed at Citrus Grove Middle School. The School. With 451 new students from the Elementary School district. Scenario 1 reveals
utilization becomes a concern to the School unlikely Scenario 2, the capacity is at 119% 3,800 new elementary school students could
Board when it increases above 115%. utilization. be added to the school. Scenario 2 reveals
7,841 new elementary school students. Most
Jose de Diego Middle School: Phillis Wheatley Elementary School: of these new students would be living in Park
The majority of the Redevelopment Area Scenario 1 reveals 925 new elementary West, where the development potential is very
lies within the Jose de Diego Middle School school students could be added to the school. large. If Park West develops in a manner
district. Scenario 1 reveals 2,603 new middle Scenario 2 reveals 1,768 new elementary similar to Brickell Avenue, many of the
school students could be added to the school students. There appears to be no households will then be part-time residents,
neighborhood. Scenario 2 reveals 5,318 new capacity problems at Phillis Wheatley professionals without children, or parents who
middle school students. This is a significant Elementary School. send their children to charter schools or
number of new students. Without any new Scenario 1 reveals 925 new elementary private schools. If this is the case, then the
students, Jose de Diego currently has a slight school students would be added to the Phillis actual number of students for public schools
capacity problem at 119% utilization. Scenario Wheatley Elementary school district, putting will be reduced from the projected amount in
1 creates a capacity utilization of 342% and the school at 209% of its current capacity of this study. With both scenario projections,
Scenario 2 creates it at 575%. Jose de Diego 655 students. This reveals that another additional elementary schools will be needed
Middle School needs to be increased in size elementary school of a similar size would need in the neighborhood. Frederick Douglass
immediately for more capacity. Another to be added, or the school would need to Elementary can accommodate approximately
middle school should be planned now if it more than double its current student capacity. 414 additional students before exceeding M-
isnt already. Scenario 2 reveals 1,768 new elementary DCPSs acceptable threshold of 115%.
school students. If this much redevelopment

147
This Redevelopment Plan was prepared by Dover,
Kohl & Partners in, October 2003, and updated by
the City of Miamis Planning Department in May
2009.

148
SEOPW CRA BLOCK NUMBERS FOR
DWELLING UNIT PROJECTIONS

149
150
151
152
153
154
155
Appendix D

1982 Resolution adopting


the SEOPW CRA

Please see next few pages for:

City of Miami Resolution 82-755,


adopted July 29, 1982

156
157
158
159
160
161
162
163
164
165
166
167
168
169
Appendix E

Resolution Adopting New


Boundaries

Please see next few pages for:

SEOPW CRA Resolution 0293,


adopted May 30, 2002

and

City of Miami Ordinance 12247,


adopted July 9, 2002

170
171
172
173
174
175
176
177
178
179
Appendix F

Advertisements Of Public
Notice

Please see the next few pages.

180
181
182
183
184
185
186
187
188
189
Appendix G

Findings of Slum and Blight

Please See Next Page

190
191
192
193
194
195
196
197
198
199
200
201

Vous aimerez peut-être aussi