REFINERIA CONCHAN
2 JUSTIFICACIN CIVIL
2.1 02.02.03.07 RELLENO Y COMPACTADO C/EQUIPO - MATERIAL PROPIO M3 1,345.15 21.75 $11.63 $252.95
MEDIDAS
CDIGO X Y H BASE MURO TOTAL
B1 2.10 1.80 2.30 2.00 1.00 0.85 3.6 6.46 10.06
B2 1.90 1.60 1.90 1.60 2.10 1.95 2.56 12.48 15.04
B3 2.10 1.80 2.30 2.00 1.30 1.15 3.6 8.74 12.34
B4 1.90 1.60 1.90 1.60 2.10 1.95 2.56 12.48 15.04
B5 2.90 2.50 2.90 2.50 3.25 3.05 6.25 30.5 36.75
B6 3.00 2.60 3.00 2.60 5.35 5.15 6.24 78.28 84.52
B7 1.40 1.10 1.40 1.10 2.35 2.20 1.21 9.68 10.89
B8 3.00 2.60 3.00 2.60 4.35 4.15 6.24 63.08 69.32
B9 1.40 1.10 1.40 1.10 2.20 2.05 1.21 9.02 10.23
B10 3.00 2.60 3.00 2.60 4.25 4.05 6.24 61.56 67.8
CR1 1.40 1.10 1.40 1.10 1.40 1.25 1.21 5.5 6.71
CR2 1.40 1.10 1.40 1.10 1.75 1.60 1.21 7.04 8.25
CR3 1.40 1.10 1.40 1.10 1.40 1.25 1.21 5.5 6.71
CR4 1.40 1.10 1.40 1.10 1.75 1.60 1.21 7.04 8.25
361.91
SUSTENTO DE
CONSORCIO MASA-TT
2 JUSTIFICACIN CIVIL
TANQUE 65
Distancia Volumen de
Descripcin Distancia (m) Area de corte (m2)
acumulada (m) corte (m3)
CORTE 1 0 0 0 0
LONGITUD
DESCRIPCION DIAMETRO (m) ANCHO (m)
(D*3.1415926)
A1 29.40 92.36 2
A1
A2 A2
ITEM PARTIDA DESCRIPCIN UND
NIVELACION Y COMPACTACION DE
2.3 02.01.05 m2
SUPERFICIE
LONGITUD
DIAMETRO (m) ANCHO (m) AREA (m2)
(D*3.1415926)
TANQUE 66
Distancia Volumen de
Descripcin Distancia (m) rea de corte (m2)
acumulada (m) corte (m3)
CORTE 16 0 0 0 0
CORTE 17 0.2 0.2 1.482 0.15
CORTE 18 1 1.2 25.916 13.7
CORTE 19 1 2.2 37.355 31.64
CORTE 20 2.5 4.7 61.433 123.49
CORTE 21 2.5 7.2 45.957 134.24
CORTE 22 5 12.2 49.921 239.7
CORTE 23 5 17.2 52.209 255.33
CORTE 24 5 22.2 51.861 260.18
CORTE 25 5 27.2 49.243 252.76
CORTE 26 2.5 29.7 64.58 142.28
CORTE 27 2.5 32.2 39.933 130.64
CORTE 28 1 33.2 27.9 33.92
CORTE 29 1 34.2 2.316 15.11
CORTE 30 0.2 34.4 0 0.23
Nota: Area de corte acorde al trazo y replanteo TR-01
LONGITUD
DESCRIPCION DIAMETRO (m) ANCHO (m)
(D*3.1415926)
A1 29.40 92.36 2
A2 29.40 92.36 0.575
A1
A2 A2
ITEM PARTIDA DESCRIPCIN UND
NIVELACION Y COMPACTACION DE
2.7 03.01.05 m2
SUPERFICIE
LONGITUD
DIAMETRO (m) ANCHO (m) AREA (m2)
(D*3.1415926)
29.40 92.36 2 184.73
LONGITUD
DIAMETRO (D*3.1415926)
34.40 108.07
PRUEBAS DE LABORATORIO
SUSTENTO DE VALORIZACIN N 01
Fecha de Reporte xx
Adicionales Aprobados US $ 0
Volumen de corte
acumulado (m3)
0.27
16.08
51.25
334.86
601.11
875.78
1147.41
1402.46
1541.88
1668.16
1700.35
1714.32
1714.49
VOL. SUB-
ALTURA (m) N DE VECES VOLUMEN TOTAL (m3)
TOTAL (m3)
1.15 1 212.43
273.51
1.15 2 61.07
A1
A2 A2
METRADO METRADO VALORIZADO P. UNITARIO P. PARCIAL
ANTERIOR (US$) (US$)
oratorio
o y replanteo TR-01
Volumen de corte
acumulado (m3)
0
0.15
13.85
45.48
168.97
303.21
Area de corte de excavacin tipico
542.9
798.23
1058.4
1311.16
1453.44
1584.08
1618
1633.1
1633.34
VOL. SUB-
ALTURA (m) N DE VECES VOLUMEN TOTAL (m3)
TOTAL (m3)
1.15 1 212.43
273.51
1.15 2 61.07
A1
A2 A2
METRADO METRADO VALORIZADO P. UNITARIO P. PARCIAL
ANTERIOR (US$) (US$)
oratorio
o y replanteo TR-01
N DE VECES
TOTAL ML
2.00 216.14