Vous êtes sur la page 1sur 3

For for more Sample Engineering Resumes

go to - ThinkEnergyGroup.com
Sample Consulting Engineer Resume

John Doe, PE
1234 Main Street, City, State 12345
Phone: (123) 456-7890
JohnDoe@yahoo.com

Civil Engineer / Structural Engineer / Mechanical Engineer / Piping Engineer

Results oriented Professional Engineer with 15+ years experience in design and construction for Pulp and
Paper / Energy Generation / Petrochemical industries. Multi-disciplined versatility with superb trouble-
shooting and analytical skills to assess problems and provide expert on-site reliability solutions. Excellent
communication skills. Estimate, design, schedule, and oversee all phases of new construction from initial
conception through successful startup. Analyze energy efficiency, identify problems, assess environmental
impact, calculate solutions, and generate capital expenditure versus projected savings reports. Reliability
Engineer, expert in industrial piping and plant operations.

SKILLS & EXPERTISE:


> Computer - AutoCAD 2000, Rebis/AutoPlant, Caesar II, CaePipe, MS Word, MS Excel, MS Project, MP2
> P&IDs, orthographics, isometrics, pipe stress analysis, hanger design
> Estimation, shutdown scheduling, subcontract coordination; Construction management
> Steam and condensate systems, piping, boilers, pumps, wastewater treatment; equipment reliability

EDUCATION:
> University of Large State in Large City: BSCE with Mechanical PE (State #1 & State #2))
> University of Huge City: AutoDesk National Certification
> Member, National Society of Professional Engineers, GSPE, & NCEES National Registry

PROFESSIONAL EXPERIENCE:
2004
Maintenance Manager, Reliability Consultant, Company #1, City, State
Reorganized personnel chart for greater manpower efficiency. Investigated reliability problems for true
root cause & effect and designed solutions to increase machine uptime. Upgraded MP2 for enhanced
equipment history and maintenance scheduling. Initiated equipment Criticality ratings for maintenance
priority ranking. Subcontractor awards and coordination. Conducted meetings and presented advanced
concepts to improve operation.

2003
Maintenance Efficiency Consultant, Company #2, City, State
Investigated reliability problems for true root cause and effect and designed solutions for $500,000 annual
savings in equipment repair, increasing production to 98.7percent equipment uptime. Generated key
personnel job descriptions, established equipment criticality, and streamlined preventive maintenance
routines. Initiated directives for a smooth functioning workforce and cleaned out 75 percent of useless
MP2 maintenance software storage.

2002-Present
Vice-President of Engineering, Company #3, City, State
Analyze boiler, steam supply, and condensate collection operations. Identify problems, optimize
solutions, and estimate capital expenditures versus projected savings. Manage engineering/construction
from initial concept through successful startup.
2001-2002
Project Manager, Company #4, City, State
Oversee all aspects of five expansion projects, protecting the plants interests with respect to
Engineering, Procurement, Contract Coordination, and Construction through completion and startup.
> Produce on-the-spot engineering as required to complete the projects.
> Performed stress analysis and hanger design, saving client $7,800 in additional engineering
> Designed additional platforms, routed air piping
> Revised CAD drawings for as-built status
> Awarded bids, ordered equipment and materials, expediting and tracking shipments
> Prepared equipment and instrumentation folders for one-source maintenance reference
> Prepared punchlist with scope, drawings, bill of material, and preliminary pricing.

1999-2001
Project Engineering Coordinator, Company #6, City, State
Key member of executive management team and lead strategist for design and project development.
Chief engineer for planned facility of 250 engineers and designers.
> Conceptualized the 400-acre site layout for 36,000 TPD Urea Plant ($4B project).
> Conducted progress meetings with client and presented design concepts for management team.
> Designed transportation delivery system, consolidating conveyors, rail and shipping port,
to handle 360 railcars per day and a 50,000-ton ship per day.
> Routinely evaluated the system-integrated operation for each project.
> Invented an innovative technique to measure thermal loss and analyze cost-to-savings payback.
> Optimized boiler operation, steam headers, condensate recovery, cooling water systems.
> Analyzed clients energy efficiency, identified problems, assessed environmental impact,
calculated solutions, advised client on energy optimization, and generated capital expenditure
versus projected savings reports, resulting in $500,000 savings per operating unit per year and
additional project awards.

1996-1999
Plant Engineer, Company #7, City, State
Engineering manager for $50M per year recycle pulp mill. Engineer, design, schedule, and oversee all
phases of new construction from initial conception through complete start-up, on time and under budget.
> Generated annual Capital Expenditures Budget.
> Conducted planning meetings, bid awards, and contract negotiation.
> Established instant rapport with employees by initiating open-door safety policy.
> Increased production by 56% and yield by 16%
> Achieved a record-breaking 12% improvement in brightness quality.
> Re-engineered water treatment system: balance, lagoons, clarifiers, and outfall quality.
> Introduced AutoCAD record storage, entire plant in 3D.
> Initiated program of proactive/preventive techniques, and maintenance qualification exam.
> Recognized by Small State Department of Environmental Quality for innovative solution
installing standpipes on manholes, which successfully protected outfall line during annual
Large River flood.

1995
Chief Construction Engineer, Company #8, City, State
Managed 30 Engineers, Technicians, Inspectors, Document Control, and Surveyors for $380M paper mill
expansion. Coordinated action plans for daily operations; establish work priorities, while meeting cost,
productivity and quality assurance goals. Constructed Recycle Plant, Paper Machine No. 3, Package Boiler,
and Wastewater Treatment Plant.

1991-1994
Piping/Mechanical Engineer, Company #9, City, State
Utilize troubleshooting and analytical skills to accurately assess field routing problems for 21 miles of
piping on pipe racks; provide expert on-site design solutions; revise drawings; constructed 1250 psig
Steam Power Turbine Generator and Building; compiled pipe hanger package

1988-1991
Project Engineer, Company #10, City, State

> $20M Project for Company #11


Solely responsible for surveying, designing, drawing (piping, structural, mechanical) and bid evaluation for
redesign of pulping /refining operation that increased production by 32%.
> Designed and installed a sulfuric acid system and soda ash handling system (with 90 foot
storage tower); revised the evaporators; installed a parallel sawing line (structural/
mechanical) in lumber mill.
> Increased on-site production from 640TPD to 850TPD, increasing profits by $10,000 per hour.

> $785M Project for Company #12


Area supervisor responsible for directing 500 workers representing 30 crafts, subcontract coordination and
overseeing construction of: 51 miles of pipe in racks; High Density Storage Tanks, pumps, digesters,
evaporators, conveyors, Lime Kiln, and No. 8 Paper Machine. Recognized by Safety Department for
achieving 2 million safe man-hours.

Previous experience:
Estimator, Piping Engineer
Company #13; Company #14; Company #15; Company #16