Type of Resource Requirement

Human resource For all activities, human resources are required to


make the project team and utilize labor for
project.
Software resources Software resources are required to make the
design of house.
Organizational process asset Organizational process assets contains
organizations policies, templates, standards and
help data for the guidance of team members so
that they can perform the project processes more
efficiently and with better utilization of time and
monetary resources.
Transportation resources Transportation is required for delivery of material.
Materials Different type of material is needed for this project
like cement, steel, sand, etc.
Equipment Equipment are also required for this project.

Activity Plan
Project Name: Date:
Activ Activity Name Description of Work Responsibility
ity
ID
No.
1 Proposal Writing The project charter identifies the Project Team
requirements of the housing plan, the
building works, budget, and resource
plan.
2 Working Drawings Complete working drawings and Architects
specifications for the -- of the project
proposal.
3 Contracts Agreements are made and securing of Illimit Architects
budget and finances for the project. and Builders
4 Document Review and Revision Approving and reviewing of documents Illimit Architects
and agreements. and Builders
5 Bidding Making copies of plans and finding Illimit Architects
bidders to finance the project. and Builders
6 Grading and Building Permits Securing permits to the local Contractors
government to allow the building of the
project.
7 Mobilization Clearing and grubbing of trees and Construction
other large vegetation within Workers
boundaries of the construction site, and
transferring of equipments to site.
8 Site Work Conducting of soil test, surveying, and Construction
cultivating of lot. Workers
9 Excavation Excavation of soil for foundation, Construction
leveling and compacting of the ground Workers
10 Whole Construction Execution of the proposed project from Illimit Architects
working drawings to actual building. and Builders and
Constructon
Workers
11 Handing and Taking Over Preparation for the handing over of the Illimit Architects
project to the client. and Builders

10 Whole Construction
a. Foundation The layout of the building foundation will Construction Workers
be carried out according to the plan.
Stabilizing poles are used and floaters are
set.
b. Rough Carpentry Setting of floor frames, roof trusses, and Construction Workers
steels.
c. Concrete Slabs Preparation to completion of slabs Mason
including soil poisoning.
d. Plumbing Rough-in Lay-out of plumbing pipes to sewage Plumber
system.
e. Electrical Rough-in Seettin of electrical boxes and installation Electrician
of wires.
f. Roofing Installation of roof sheets. Carpenter
g Exterior Finishes Trimming of bricks and concretes. Mason
h. Floor Finishes Installation of materials to the floor slab. Mason
i. Paint Work Preparation to completion of painting of Painter
walls.
j. Interior Trim Installation of furniture, such as cabinets. Carpenter
k. Exterior Trim Installation of fixtures, such as lavatory and Plumber
water closet.
l. Electrical Final Trim Installation of switch and outlets. Electrician
m. Exterior Landscaping Beautification of exterior of the project. Illimit Architects and
Builders
n. Hardware Installation of doors, glazing, and others. Carpenter and Mason
o. Cleaning Finishing touches. Construction Workers

Week
Activity 1 2 3 4 5 6 7 8 9 10 11 12 13 14
Proposal Writing
Working Drawings
Contracts
Document Review and Revision
Bidding
Grading and Building Permits
Mobilization
Site Work
Excavation
Whole Construction
Handing and Taking Over

Hours
Activity 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Foundation
Rough Carpentry
Concrete Slabs
Plumbing Rough-in
Electrical Rough-in
Roofing
Exterior Finishes
Floor Finishes
Paint Work
Interior Trim
Exterior Trim
Electrical Final Trim
Exterior Landscaping
Hardware
Cleaning
Hours
Activity 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Foundation
Rough Carpentry
Concrete Slabs
Plumbing Rough-in
Electrical Rough-in
Roofing
Exterior Finishes
Floor Finishes
Paint Work
Interior Trim
Exterior Trim
Electrical Final Trim
Exterior Landscaping
Hardware
Cleaning