Vous êtes sur la page 1sur 4

Weekly / Daily Safety Inspection Report

Date

Name of person
undertaking Inspection
Job Title

Work Location

Safety Checklist:

Housekeeping Power tools (guards, training) Electrical issues (Cables, 110V)


Material storage Manual handling Barricades/barriers
Access/egress General health and safety First aid (equipment, 1st aiders)
Waste disposal Working height Trained operatives
Plant and machinery (Hoists, etc) Welfare facilities Sub-contractors
Edge protection SMS Documentation Toolbox talks
Ladders/stairwells Scaffolding Safety signage
Scaffold towers Temporary electricity Excavations
Safety harness/fall arrest COSHH/MSDS Smoking at site/office
PPE Lifting equipment
Emergency procedures Office safety
Slips, trip and falls Vibration
Protection of the public Safety Induction
Fire (exits, assembly points, etc) Control of noise
Fire extinguishers (in date) Pedestrian/ Traffic routes

Close out
Observations Action required
Name / Date
Weekly / Daily Safety Inspection Report

Close out
Observations Action required
Name / Date

Weekly / Daily Safety Inspection Report


Close out
Observations Action required
Name / Date

Weekly / Daily Safety Inspection Report


Close out
Observations Action required
Name / Date

Distribution:

Name: Signature:

_____________________________ __________________________

Close out meeting:

The purpose of a close out meeting is to discuss issues raised during the inspection, apportion
responsibility to close the issue with a degree of urgency attached and a timescale, whether it be urgent, or
routine.

Vous aimerez peut-être aussi