DED DELIVERABLE LIST PT WIKA BITUMEN

MINI EXTRACTION PLANT 10000 TPY PT. WIKA REKAYASA


PT. WIJAYA KARYA (PERSERO) Tbk.
MEP-16-00-001 rev.0 As per 19-08-2016

MANHOUR
DOC. DOC. DOC.
NO DOCUMENT NUMBER DOCUMENT TITLE
TYPE SIZE NO. DRAFTER/ SENIOR/
ENGINEER LEAD
DESIGNER
ENGINEER

I Specification 5
1 Specification for Bore Pile DOC A4 1 - 1 -
2 Specification for Geomembrane DOC A4 1 - 1 -
3 Specification for HDPE Corrugated Perforated pipe DOC A4 1 - 1 -
4 Specification for HDPE Non Perforated DOC A4 1 - 1 -
5 Specification for Drainage DOC A4 1 - 1 -
II Report/Procedure 3
1 Report of Surveying DOC A4 1 1 1 -
2 Report of Design for Trial Mix DOC A4 1 - 1 -
3 Report of Mix Design Of Concrete DOC A4 1 - 1 -
III Standard Drawing 1
1 Standard Reinforcement Work DOC A4 1 1 1 -
IV Layout 2
1 General Layout DOC A3 1 1 1 -
2 Excavation/Leveling Layout Plan DOC A3 1 1 1 -
V Drawing 23
1 Cross Section Of Re- Profilling Power House #1 DWG A3 1 1 1 -
2 Cross Section Of Re- Profilling Power House #2 DWG A3 1 1 1 -
3 Cross Section Of Bore Pile Layout DWG A3 1 1 1 -
4 Cross Section Of Subdrain #1 DWG A3 1 1 1 -
5 Cross Section Of Subdrain #2 DWG A3 1 1 1 -
6 Cross Section Of Subdrain #3 DWG A3 1 1 1 -
7 Cross Section Of Subdrain #4 DWG A3 1 1 1 -
8 Long Section Of Subdrain #1 DWG A3 1 1 1 -
9 Long Section Of Subdrain #2 DWG A3 1 1 1 -
10 Long Section Of Subdrain #3 DWG A3 1 1 1 -
11 Long Section Of Subdrain #4 DWG A3 1 1 1 -
DED DELIVERABLE LIST PT WIKA BITUMEN

MINI EXTRACTION PLANT 10000 TPY PT. WIKA REKAYASA


PT. WIJAYA KARYA (PERSERO) Tbk.
MEP-16-00-001 rev.0 As per 19-08-2016

MANHOUR
DOC. DOC. DOC.
NO DOCUMENT NUMBER DOCUMENT TITLE
TYPE SIZE NO. DRAFTER/ SENIOR/
ENGINEER LEAD
DESIGNER
ENGINEER
12 Long Section Of Subdrain #5 DWG A3 1 1 1 -
13 Long Section Of Subdrain #6 DWG A3 1 1 1 -
14 Long Section Of Subdrain #7 DWG A3 1 1 1 -
15 Long Section Of Subdrain #8 DWG A3 1 1 1 -
16 Long Section Of Subdrain #9 DWG A3 1 1 1 -
17 Long Section Of Subdrain #10 DWG A3 1 1 1 -
18 Long Section Of Subdrain #11 DWG A3 1 1 1 -
19 Long Section Of Subdrain #12 DWG A3 1 1 1 -
20 Long Section Of Subdrain #13 DWG A3 1 1 1 -
21 Detail Of Bore Pile DWG A3 1 1 1 -
22 Layout Drainage Switchyard DWG A3 1 1 1 -
23 Cross Section Of Subdrain in Switchyard DWG A3 1 1 1 -
VIII MTO 5
1 MTO of Steel DOC A4 1 - 1 -
2 MTO of Concrete Structure DOC A4 1 - 1 -
3 MTO of Geomembrane DOC A4 1 - 1 -
4 MTO Of HDPE Corrugated Perforated pipe DOC A4 1 - 1 -
5 MTO Of HDPE Non Perforated DOC A4 1 - 1 -
IX OTHERS 7
1 Meeting With Client/Consignering DOC A4 1 1 1 -
2 Vendor Clarification DOC A4 1 1 1 -
4 Test Concrete DOC A4 1 1 1 -
5 Test Rebar DOC A4 1 1 1 -
6 Construction Support DOC A4 1 1 1 -
7 Construcbility Review DOC A4 1 1 1 -
8 Site Survey DOC A4 1 1 1 -
TOTAL MANHOUR 46 34 46 0