Vous êtes sur la page 1sur 1

Project Name Asessment Gedung Fatmawati

Project Location Fatmawati


Testing Concrete Strength Direct Pulse Velocity

Direct
Number ID Sample Element Of Structure Velocity poisson ratio* Density (Kg/m3) Ec (Mpa)** fc' Mpa***
Pulse

1 BI-C-BT-1-LT.2 BALOK INDUK 3265 0.2 2400 24235.01 26.59


2 BI-C-BL-4-LT.2 BALOK INDUK 3271 0.2 2400 24314.24 26.76
3 BI-B-C-BT-1-LT.2 BALOK ANAK 3260 0.2 2400 24155.91 26.42
4 BI-B-C-BL-4-LT.2 BALOK ANAK 3219 0.2 2400 23547.25 25.10
5 K1-2-B-LT-2-1 KOLOM 3237 0.2 2400 23821.17 25.69
6 K1-1-C-LT-2-1 KOLOM 3196 0.2 2400 23221.61 24.41
7 K1-2-F-LT-2-1 KOLOM 3200 0.2 2400 23280.74 24.54
8 BI-E-BT-3-1-LT.3 BALOK INDUK 2944 0.2 2400 19699.89 17.57
9 BI-E-BL-3-4-LT.3 BALOK INDUK 2972 0.2 2400 20071.90 18.24
10 BA-D-E-BT-1-LT.3 BALOK ANAK 2917 0.2 2400 19344.62 16.94
11 BA-D-E-BL-3-LT.3 BALOK ANAK 2894 0.2 2400 19032.03 16.40
12 PL-LT-3-1 PELAT 3133 0.2 2400 22310.48 22.53
13 K1-2-B-LT.DSR-1 KOLOM 3231 0.2 2400 23725.12 25.48
14 K1-1-C-LT.DSR-1 KOLOM 3269 0.2 2400 24284.52 26.70
15 K1-2-F-LT.DSR-1 KOLOM 3402 0.2 2400 26299.42 31.31

Average Fc'/ Element


Number Element Of Structure Floor Structure (Mpa)

1 BALOK INDUK Lt.2 26.68


2 BALOK ANAK Lt.2 25.76
3 BALOK INDUK Lt.3 17.90
4 BALOK ANAK Lt.3 16.67
5 KOLOM Lt.1 27.83
6 KOLOM Lt.2 24.88
7 PELAT Lt.3 22.53

Vous aimerez peut-être aussi