NIM : 135020301111089
JML PER
JML BUS/
Direct Cost BIAYA @ITEM BUS/KORIDOR/ PER BULAN
KORIDOR
KM
Gaji Sopir 4.000.000 3 14 168.000.000
Gaji Karyawan Koridor 2.500.000 3 10 75.000.000
BBM 2.500 1 73.920 184.800.000
Maintance Bus 800.000 1,000326637 14,78 11.831.063
Maintance Alat 500.000 1 10 5.000.000
Pajak dan KIR 500.000 1 14 7.000.000
TOTAL DIRECT COST 451.631.063
TRAYEK JOR - LOTHE
JML PER
JML
Direct Cost BIAYA @ITEM BUS/KORIDOR/ PER BULAN
BUS/KORIDOR
KM
Gaji Sopir 4.000.000 3 10 120.000.000
Gaji Karyawan Koridor 2.500.000 3 8 60.000.000
BBM 2.500 1 32.400 81.000.000
Maintance Bus 800.000 1,000326637 6,48 5.185.693
Maintance Alat 500.000 1 8 4.000.000
Pajak dan KIR 500.000 1 10 5.000.000
TOTAL DIRECT COST 275.185.693
JML PER
JML
Direct Cost BIAYA @ITEM BUS/KORIDOR/ PER BULAN
BUS/KORIDOR
KM
Gaji Sopir 4.000.000 3 10 120.000.000
Gaji Karyawan Koridor 2.500.000 3 8 60.000.000
BBM 2.500 1 48.600 121.500.000
Maintance Bus 800.000 1,000326637 9,72 7.778.540
Maintance Alat 500.000 1 8 4.000.000
Pajak dan KIR 500.000 1 10 5.000.000
TOTAL DIRECT COST 318.278.540
TRAYEK BONA JAJO
JML PER
JML
Direct Cost BIAYA @ITEM BUS/KORIDOR/ PER BULAN
BUS/KORIDOR
KM
Gaji Sopir 4.000.000 3 12 144.000.000
Gaji Karyawan Koridor 2.500.000 3 14 105.000.000
BBM 2.500 1 90.000 225.000.000
Maintance Bus 800.000 1,000326637 18,00 14.404.704
Maintance Alat 500.000 1 14 7.000.000
Pajak dan KIR 500.000 1 12 6.000.000
TOTAL DIRECT COST 501.404.704
INDIRECT COST
BIAYA PER
TRAYEK JUMLAH JARAK PEMBEBANAN
TRAYEK
MIKAN - SENGHI 73.920 0,301812837 18.712.396
JOR - LOTTE 32.400 0,132288094 8.201.862
RIBON - BANTU 48.600 0,198432141 12.302.793
BONA - JAJO 90.000 0,367466928 22.782.950
TOTAL 244.920 62.000.000
PERHITUNGAN BIAYA BUS TRANS ANTAH
5. Karena daya beli masyarakat masih tinggi, maka pemerintah mungkin dapat meningkatkan tarif yang diberikan.
NAMA : SHOFIA MEGAWATI
NIM : 135020301111089
Prediki Pendapatan
3. Rawat Jalan
Kapasitas/dokter/h
No Ruang Dokter okupansi estimasi pasien Tarif rata2 RS Total
ari
1 Poli SP_1 2 20 22,95% 2754 125.000 344.250.000
2 Poli SP_2 1 20 19,32% 1159 100.000 115.900.000
3 Poli SP_3 1 20 16,00% 960 75.000 72.000.000
4 Poli SP_4 1 20 13,00% 780 75.000 58.500.000
5 Poli SP_5 1 20 13,00% 780 75.000 58.500.000
6 Poli SP_6 1 20 13,00% 780 75.000 58.500.000
Total 707.650.000
IGD
Kapasitas/ Hari/
Uraian Bed Okupansi Estimasi Pasien Tarif Rata2 RS Total
Bed
1 IGD 6 4 17,11% 1499 215.000 322.285.000
2. Non BPJS
RAWAT INAP
VISITE
RAWAT JALAN
Kapasitas/dokter/h
No Ruang Dokter okupansi estimasi pasien Tarif rata2 RS Total
ari
1 Poli SP_1 2 20 35,00% 4200 125.000 7.350.000.000,00
2 Poli SP_2 1 20 30,00% 1800 100.000 1.080.000.000,00
3 Poli SP_3 1 20 25,00% 1500 75.000 562.500.000,00
4 Poli SP_4 1 20 20,00% 1200 75.000 360.000.000,00
5 Poli SP_5 1 20 20,00% 1200 75.000 360.000.000,00
6 Poli SP_6 1 20 20,00% 1200 75.000 360.000.000,00
Total 10.072.500.000
IGD
Kapasitas/ Hari/
Uraian Bed Okupansi Estimasi Pasien Tarif Rata2 RS Total
Bed
1 IGD 6 4 40,00% 3504 215.000 7.232.256.000,00
FARMASI
OH Rata-Rata Total
1 Resep 11016 300000 3.304.800.000
LABORATORIUM
RADIOLOGI
LAINNYA
2015 2016
Jasa Pelayanan Obat/ BHP Manajemen RS Jasa Pelayanan Obat/ BHP Manajemen RS Total Jasa Pelayanan Obat/ BHP Manajemen RS Total
Pendapatan Jasa Layanan Kesehatan
Rawat Inap 30% 20% 50% 2.143.100.325 1.428.733.550 5.390.075.000 8.961.908.875 2.464.565.373,75 1.643.043.582,50 4.107.608.956,25 8.215.217.912,50
Rawat Jalan 40% 20% 40% 4.958.869.000 2.479.434.500 4.958.869.000 12.397.172.500 5.702.699.350,00 2.851.349.675,00 5.702.699.350,00 14.256.748.375,00
UGD 40% 20% 40% 3.475.088.860 1.737.544.430 3.475.088.860 8.687.722.150 3.996.352.189,00 1.998.176.094,50 3.996.352.189,00 9.990.880.472,50
Farmasi 5% 80% 15% 462.515.855 7.400.253.680 1.387.547.565 9.250.317.100 531.893.233,25 8.510.291.732,00 1.595.679.699,75 10.637.864.665,00
Pendukung Lainnya - - - - - - - -
Laboratorium 10% 80% 10% 151.288.250 1.210.306.000 151.288.250 1.512.882.500 173.981.487,50 1.391.851.900,00 173.981.487,50 1.739.814.875,00
Radiologi 30% 60% 10% 85.972.275 171.944.550 28.657.425 286.574.250 98.868.116,25 197.736.232,50 32.956.038,75 329.560.387,50
Bedah Sentral 60% 30% 10% 1.368.684.000 684.342.000 228.114.000 2.281.140.000 1.573.986.600,00 786.993.300,00 262.331.100,00 2.623.311.000,00
Lainnya 30% 60% 10% 45.686.625 91.373.250 15.228.875 152.288.750 52.539.618,75 105.079.237,50 17.513.206,25 175.132.062,50
Total 12.691.205.190 15.203.931.960 15.634.868.975 14.594.885.969 17.484.521.754 15.889.122.028
Pendapatan Kerjasama
Kerjasama Penelitian dan Pengembangan 100% 11454820000% 10929600000%
Kerjasama Pendidikan dan Pelatihan 100% 13003400000% 0%
Biaya Jasa Pelayanan 100% dari JP seluruh layanan (didistribusikan ke Instalasi masing-masing sesuai kontribusi dalam memperoleh pendapatan) 12.691.205.190 14.594.885.969
Biaya Pemeliharaan PL 7,00% dari Alokasi Total Manajemen RS 1.094.440.828,25 1.112.238.541,93
Biaya Barang dan Jasa 6,90% dari Alokasi Total Manajemen RS 1.078.805.959,28 -
Biaya Pelayanan Lainnya 1,50% dari Alokasi Total Manajemen RS 234.523.034,63 -
- -
BIAYA ADMINISTRASI UMUM - -
Biaya Pegawai UA 18,00% dari Alokasi Total Manajemen RS 2.814.276.415,50 -
Biaya Adm Kantor 20% dari Alokasi Manajemen RS seluruh layanan 3.126.973.795,00 -
Biaya Pemeliharaan 3,00% dari Alokasi Total Manajemen RS 469.046.069,25 -
Biaya Barang dan Jasa 16,10% dari Alokasi Total Manajemen RS 2.517.213.904,98 -
Biaya Promosi 2% dari Alokasi Manajemen RS seluruh layanan 312.697.379,50 -
Biaya Umum dan Adm lain2 3,50% dari Alokasi Total Manajemen RS 547.220.414,13 -
- -
INVESTASI - -
Tanah 0% - -
Peralatan dan Mesin 9% dari Alokasi Total Manajemen RS 1.407.138.207,75 -
Gedung dan Bangunan 0% - -
Jalan Irigasi Jaringan 0% - -
Aset Tetap Lainnya 0% - -
Aset Tidak berwujud 1% dari Alokasi Total Manajemen RS 156.348.689,75 -