Vous êtes sur la page 1sur 2

US DEPARTMENT OF TRANSPORTATION

Description and Location of Work


Federal Highway Adminstration
(If using Critical Path Method, indicate (I-J) node)
A
INSPECTOR'S DAILY RECORD
B
OF
CONSTRUCTION OPERATIONS C
D
PRA- GWMP 11(2) E
Project

Contractor/Subcontractor
Sagres Construction F
Corp. G

Date H

Shift To I

Weather/Temp. J

A B C D E F G H I J TOTAL
NO. LABOR CLASSIFICATION WORK
PRODUCTION TIME (Work Hours) TIME
See C.D.R.

1 Superintendent

A B C D E F G H I J TOTAL
IDLE
NO. EQUIPMENT TYPE WORK
PRODUCTION TIME (Equipment Hours) *
TIME

See C.D.R.

* B = Broken Down, W = No Available Work, P = No Operator, S = Suspended

Form FHWA-1413 (Rev. 8-90) 50742.1- M 34e


Traffic Control Checked YES NO Traffic Control Problems YES NO

Erosion Control Checked YES NO Erosion Control Problems YES NO

Unsafe Operations YES NO Accidents YES NO

NARRATIVE REPORT: Descriptions, Problems, Visitors, Materials Received, etc.

a)

Remarks:

ITEM NO. DESCRIPTION LOCATION - STATIONS QTY. REMARKS

REVIEWED BY REPORTED BY
SIGNATURE (Project Engineer) DATE SIGNATURE (Inspector) DATE

Vous aimerez peut-être aussi