Industrialised Building Systems (IBS): Current Shortcomings


and the Vital Roles of R&D
....................................................................................................................................................................................................................................................................
By: Engr. Dr Zuhairi bin Abd. Hamid, M.I.E.M., P.Eng., Engr. Mohd. Khairolden bin Ghani, Grad. IEM,
Engr. Ahmad Hazim bin Abdul Rahim, Grad. IEM and Engr. Kamarul Anuar Mohamad Kamar, Grad. IEM.

1.0 INTRODUCTION transportation and assembly techniques. built affordable and quality houses.
One of the challenges facing our Parid (1997) defined IBS as a system Nearly, 22.7 acres of land along Jalan
construction industry is the acute shortage which use industrilised production Pekeliling was dedicated to the project
of construction workers. This, together technique either in the production of comprising 7 blocks of 17 stories flat
with the social problems associated with component or assembly of the building or (3000 unit of low-cost flat and 40 shop lot.
foreign workers, further aggravates the both. Lessing et al (2005) defined IBS as This project is taken by Gammon/Larsen
situation [7]. As such, the Industrialised an integrated manufacturing and Nielsen using Danish System of large
Building System (IBS) is introduced to construction process with well planned panel of pre-fabricated system. In 1965,
reduce our dependency on foreign organisation for efficient management, the government of Malaysia launched
workers. Nevertheless, early effort by the preparation and control over resources second project, a 6 block of 17 story flats
government of Malaysia to promote usage used, activities and results supported by and 3 blocks of 18 stories flat at Jalan
of IBS as an alternative to conventional the used of highly developed Rifle Range. The project was awarded to
and labor intensive construction method components. Trikha (1999) defined as a Hochtief/Chee Seng using French Estoit
has yet to make headway. Although system in which concrete components System (Din, 1984). Between 1981 and
members of the industry are open to the prefabricated at site or in factory are 1993, PKNS a state government
idea, a major portion of the industry assembly to form the structure with development agency acquired pre-cast
stakeholders are indifferent, perhaps due minimum in situ construction. IBS also concrete technology from Praton Haus
to resistance towards change, insufficient defined as a set of interrelated element International based on Germany to build
information and lack of technology that act together to enable the designated low cost house and high cost bungalow
transfer method to support feasibility of performance of the building [17]. Esa and in Selangor [2]. In Malaysia construction
change to IBS. In this case, it has proven Nurudin (1998) asserted that IBS is a industry today, the use of IBS as a
that it is difficult to introduce new continuum beginning from utilising method of construction is evolving. More
technologies and method in the craftsmen for every aspect of construction local manufacture is established
construction sector when compared to to a system that make use of themselves in the market. As a result pre-
other sectors. According to Hervas (2007), manufacturing production in order to cast, steel frame and other IBS were used
construction sector is known as traditional minimize resource wastage and enhance as hybrid construction to build national
sector that can be charecterised as value end users. Junid (1986), identify IBS landmark such as Bukit Jalil Sport
reluctant and even resistant to change. as process by which components of Complex, LRT and Petronas Twin Tower.
This paper discusses the current building are conceived, planned and It was reported that at least 21 of various
implementation of IBS in Malaysia, its fabricated, transported and erected at site. manufactures and suppliers of IBS are
shortcomings and the way forward. The system includes balance combination actively promoting their system in
between software and hardware Malaysia [15]. IBS move to next step of
2.0 IBS DEFINITIONS component. The software element the development through the
To date there has been no one commonly- include system design, which is complex establishment of IBS Centre initiated by
accepted or agreed definition of IBS. process of studying the requirement of CIDB at Jalan Chan Sow Lin, Cheras,
However, the authors have gathered few the end user, market analysis and the Kuala Lumpur. The obligation to
definitions by researchers who studied development of standardise component. implement IBS strategies and activities
into this area previously, that is reflected from this centre serves concurrent both to
to IBS concept accepted by the Malaysian 3.0 HISTORY OF IBS IN improve performance and quality in
construction. IBS is defined as a MALAYSIA construction, also to minimize the
construction system which components IBS began in early 1960s when Ministry dependency of unskilled foreign labours
are manufactured in a factory, on or off of Housing and Local Government of flooding the construction market.
site, positioned and assembled into Malaysia visited several European
structure with minimal additional site countries and evaluate their housing 4.0 SHORTCOMING OF IBS
work [1]. Dietz (1971) earlier defined IBS development program [15]. After their CIDB has published IBS Roadmap 2003-
as total integration of all subsystem and successful visit in the year 1964, the 2010 which entailed the needs and
components into overall process fully government had launched pilot project requirement of Malaysian construction
utilising industrialised production, on IBS to speed up the delivery time and industry. This roadmap was endorsed

JURUTERA, April 2008 31


F E AT U R E

by cabinet on 29 October 2003. The Institute of Malaysia (CREAM) has taken Earthquake protection of IBS buildings
roadmap is a comprehensive document the initiative from the problem identified (base isolation and rubber damping
that divided the IBS programme into the earlier and has continue to conduct three systems)
five main focus areas that reflect the workshops session with the industry No standard joint developed for
inputs needed to drive the programme, between 2006 and 2007. After a lengthy building component
each beginning with M. They are deliberation with the stakeholders, it was
Manpower, Materials, Management, concluded that the factors contributing to 5.0 THE WAY FORWARD
Monetary, and Marketing [7]. The inputs the delays of IBS implementation are as The establishment of CREAM should be
are then divided into its elements and follows [3]: seen as very significant development in
the activities to be implemented for each IBS is not popular choice among the the structure of R&D, which was
element were then identified and design consultants previously at very formative stages
included into the time span of the Lack of knowledge among the rather organisationally ad-hoc and often
roadmap in order to achieve the mission designers confusing. CREAM can be assigned a
within the stipulated time-frame. The The needs of mindset change and task of managing the IBS research.
content of this roadmap is focused providing proper education The R&D themes and topics for IBS
towards achieving the industrialisation Costing chicken and egg problem identified through series of workshops
of the construction sector and the longer Private sector adoption organised by CREAM are aligned to the
term objective of Open Building Proprietary systems make it hard to be requirement of IBS Roadmap 2003-2010 [1].
Systems concept. It has been five years adopted by designers The initiatives in IBS though lead by CIDB,
since the launching of the roadmap and Poor quality products participative from contractors, consultants,
after more than half-way through the Joints are not standardised making it universities, companies and research
mission of industrialising construction hard to design as the design will have institutes are critical. The obligation to
[10]. It is pertinent to examine the to be fixed to a particular manufacturer implement IBS serves concurrent both to
progress and how close to the Insufficient push factor improve performance and quality in
completion of the mission to date. More Lack of technical know-how e.g. construction, also to minimise the
importantly, it is imperative to evaluate structure dependency of unskilled foreign labours
whether the implementation of the Volume and economy of scale flooding the construction market. It is a
roadmap has met the market response to The monopoly of big boys, limiting daunting task as 2010 is just around the
the IBS programme so far. Most policy opportunities to Bumiputra corner. The process and mechanism to
issues have been resolved and contractors. Required appropriate achieve the target depend on the
implemented, while all relevant training for Bumiputra contractors integration and acceptance of the players
documents required to support the Low offsite manufacturing of construc- towards IBS. Three years ahead will be a
programme have been developed. In tion components to guarantee quality, challenging one. A strategic approach will
particular activities under the charge of mechanization and standardization be the way forward. As the R&D arm for
CIDB are all meeting their datelines. To consider IBS design that promote CIDB, CREAMs R&D output will geared
Notwithstanding these achievements a energy conservation towards industrys application and
number of implementation snags were Sustainability of construction industry, requirements.
identified as being potential hurdles to government to lead during downturn CREAM shall take the following actions
the implementation of the roadmap. Require onsite specialised skills for as a pre requisite to expedite the success of
These include the following which have assembly and erection of components the roadmap implementation with respect
been identified by IBS Steering Lack of special equipments and to R&D in IBS [8]:
Committee 2003-2005 [10]: machinery which hampered work. A long term and strategic approach of
Development of standard plans and Require more local R&D, support conducting research on IBS shall be
standard component drawings for Services, technologies and testing labs established,
common use, Insufficient capacity building for Involvement of universities, companies,
Apprentice and on-the-job training in contractors to secure project in organisations and research institutes
the area of IBS moulds and casts, and construction (G1-G7) right from the onset of any IBS
assembly of components, Below 10% IBS construction R&D projects,
IBS testing and evaluation programme, involvement from Bumiputra contractors Participation and inclusion of IBS in
Vendor development program, Mismatch between readiness of JKR building design, i.e. JKR IBS
Readiness of designers and consultant industries with IBS targets by CIDB Design must be incorporated in its
practices, quality control, production The cost depends on volume and types Rekabentuk Bangunan Piawai for
of standard components in the field of the projects government quarters, schools and
of IBS. Earthquake resistant design pertaining government administrative offices.
Realising the implementation of IBS to IBS components (e.g jointing system, (CREAM should discuss this matter
is still to make headway, CIDB through seismic performance and design further with JKR on any issues related
its research arm, Construction Research guidelines) to R&D).

32 JURUTERA, April 2008


F E AT U R E

Malaysian standard joints for IBS (wet players mentioned earlier in synergic and [7] Gue, S. S. 2007, Bridging the Gap
or dry) must be designed and made strategic way. Between R&D and Construction
available for use by the industry, Industry, Keynote address at
Construction Industry Research
CREAM initiatives to lead Centre of
Achievement International
Research Excellence (CORE) on IBS ACKNOWLEDGEMENT
Conference, CIDB, PWTC,
and act as One Stop Centre for R&D are The authors would like to acknowledge Kuala Lumpur.
critical as this moves will consolidate the following committees for their
[8] Hamid, Z., Mohamad Kamar, K.A.,
the effort to centralise and able to contribution:
Ghani, M.K. and Abdul Rahim, A.H.
identify issues and problems first hand 1. IBS Steering Committee Session 2007, Strategic Planning for R&D on
from the industry, 2003-2005 Industrialised Building Systems (IBS)
The formation of R&D laboratory and 2. Construction Technology Development 2007-2010, Construction Research
acts as CORE for IBS is urgent and Division, CIDB Institute of Malaysia (CREAM),
Kuala Lumpur (draft report)
CREAM should initiate and take the 3. IBS Centre, Cheras, Kuala Lumpur
lead, 4. Participants who had attended [9] Hervas 2007, Open Building
CREAM is to apply for a double workshop entitled: Manufacturing Core Concept and
Industrial Requirement,
deduction status foundation to a) Workshop on Aligning R&D
ManuBUILD Consortium, Holland.
expedite participation from private PriorityArea to CIMP 2006-2015 on
entities as they will also in return be 26th -28th May 2006 at Guoman Port [10] Hussein, J., 2007, Industrialised
Building System: The Challenge and
benefited in getting tax rebates when Dickson Resort, Negeri Sembilan.
The Way Forward, Keynote address
contributing research fund to the b) Workshop on Aligning R&D Themes at Construction Industry Research
industry, and Titles to the Requirement of Achievement International Conference,
Open Building System must be compe- Construction Industry, 21st -22nd CIDB, PWTC, Kuala Lumpur.
titive in terms of cost, performance and April 2007, Avillion Village Resort,
[11] Jaafar, S., Thanoon, W.A.M.,
quality as compared to Proprietary Port Dickson, Negeri Sembilan. Noorzaei, J., Kadir, M., R., A., and
system and conventional methods in Hassim, S., 2003, Proceedings of the
order to be sustainable in the International Conference on
Industrialised Building System
construction market,
IBS 2003, Malaysia, Kuala Lumpur.
Not reinventing the wheel on R&D but
REFERENCES [12] Junid, S.M.S. 1986, Industrialised
to focus on IBS applied research,
Soft issues related to IBS such as [1] Construction Industry Development Building System, Proceedings of
Board (CIDB), 2003a, Industrialised UNESCO/ FEISEAP Regional
marketing, social impact, involvement
Building Systems (IBS) Roadmap Workshop, Universiti Putra Malysia
of Bumiputera contractors in vendor (UPM), Serdang, Selangor.
2003-2010, CIDB Malaysia,
development program as highlighted Kuala Lumpur.
[13] Lessing, J., Ekholm, A., and Stehn, L.
in the roadmap should be taken on
[2] Construction Industry Development 2005, Industrialised Housing-
board right at the early stage, Definition and Categorisation of the
Board (CIDB), 2003b, National IBS
A complete comprehensive study on Survey 2003, CIDB Malaysia, Concept, 13th International Group for
IBS solutions encompassing the entire Kuala Lumpur. Lean Construction, Sydney, Australia.
value chain will ensure its success. [3] Construction Research Institute of [14] Parid, W. (1997), Global Trends in
These shall include verification, Malaysia (CREAM) 2007, Workshop Research, Development and
validation and certification of process on Aligning R&D Themes and Titles Construction, Proceeding of the
on IBS components, fabricator, factory, to the Requirement of Construction International Conference on
Industry, 21st -22nd April 2007, Industrialised Building System (IBS
erector and related skills of specialisation,
Avillion Village Resort, Port Dickson, 2003), CIDB Malaysia.
A technology transfer model via Negeri Sembilan (draft report)
knowledge management adapted [15] Thanoon, W.A.M., Peng, L.W., Abdul
[4] Dietz, A.G.H. 1971, Global Trends in Kadir, M.R., Jaafar, M.S. and Salit,
fromEU, Japan and Singapore best
Research, Development and M.S. 2003, The Experiences of
practices in implementing IBS will Construction, Proceeding of the Malaysia and Other Countries in
add value and expedite the imple- International Conference on Industrialised Industrialised Building System in
mentation process. Building System (IBS 2003), CIDB Malaysia, Proceeding on IBS
Malaysia, Kuala Lumpur. Seminar, UPM, Malaysia
A combination of integrated [5] Din, H. 1984, Industrialised Building [16] Trikha, D.N. 1999, Industrialised
approach and long term strategic and Its Application in Malaysia, Building System: Prospect in
partnering among stakeholders tackling Proceeding on Seminar on Prefabrication Malaysia. Proceeding of World
Building Construction, Kuala Lumpur. Engineering Congress, Kuala Lumpur.
specific agenda on IBS 5M strategies are
the way forward. A well coordinated [6] Esa, H. and Nurudin, M.M. (1998), [17] Warszawski, A. 1999, Industrialised
planned R&D themes and titles Policy on Industrialised Building and Automated Building System,
System, report on Colloqium on Technion-Israel Institute of
discussed in previous section have to be
Industrialised Construction System, KL. Technology, E & FN Spon.
implemented simultaneously with all