Hindrance Register

Item of works which


Reasonable time As per CA extra
could not be executed Date of start of Date of Removal Overlapping if Net Hindrance Net effective days of Sign. Of Remarks of
S.No. Nature of Hindrance for days to be Sig. of A.E. Weightage of this Hindrance Letter No.
on account of this hindrance of Hindrance any in days Hindrance E.E. reviewing Officer
approval/work considered
hindrance
Looking forward to receive your valued order.Keeping in
view the good and long term relation with DJB we offered All work related to Notified vide letter No:-
1 27-02-2013
discount and our price shall remain at 5.5% above NIT the project LTCD/DJB/DLRO/68
estimate
Shifting of water lines in Deepak Vihar and Shakti Vihar
Notified vide letter No:-
2 because it is not possible to lay sewer lines without shifting Delay of work 18-07-2013
LTCD/DJB/MG/19
water pipelines
Requested for getting alignment and levels of laid pipelines Notified vide letter No:-
3 Delay of work 30-07-2013
from IOCL LTCD/DJB/MG/20
Request for providing list of colonies which are on private
Notified vide letter No:-
4 land so that we can assure that sewer is being laid in the Delay of work 26-08-2013
LTCD/DJB/MG/25
colonies which are in private land only.
Notified vide letter No:-
5 Regarding variation in levels provided by DJB. Delay of work 30-09-2013
LTCD/DJB/MG/30
Due to implementation of Model Code of conduct for
Delhi Assembly Election on Dated 04-10-2013 and All work related to
6 04-10-2013 09-12-2013 0 0 66 100% 66
final result declaration up to 08-12-2013, the work the project
could not be started
Regarding drawing of cover slab for construction of Notified vide letter No:-
7 Delay of work 18-10-2013
manhole chamber at site. LTCD/DJB/MG/36
Request to give clearance for execution regarding HDD Notified vide letter No:-
8 Delay of work 30-11-2013
works at VIPIN GARDEN LTCD/DJB/MG/45
Checking and providing necessary permission for rerouting Notified vide letter No:-
9 Delay of work 10-12-2013
of pipeline Sidhatri enclave area LTCD/DJB/MG/46
Request to approve QAP and drawings of RCC pipes due to Notified vide letter No:-
10 Delay of work 06-12-2013
change in the dia of RCC pipes LTCD/DJB/MG/49A
Shifting of underground water pipeline 16inch dia near Notified vide letter No:-
11 Delay of work 13-01-2014
Shivshakti chowk LTCD/DJB/MG/62
Conformation with DJB to lay sewer lines where water Notified vide letter No:-
12 Delay of work 30-01-2014
supply network does not exist LTCD/DJB/MG/69
Regarding change of alignment for microtunneling on Notified vide letter No:-
14 Delay of work 25-02-2014
outfall no. 2 . LTCD/DJB/MG/78
Shifting of underground water pipeline 16inch dia in Notified vide letter No:-
15 Delay of work 24-03-2014
40 feet road near Shivshakti chowk LTCD/DJB/MG/83
Shifting of underground water pipeline 4inch dia in 40 Notified vide letter No:-
16 Delay of work 02-04-2014
feet road near Chaandi Masjid LTCD/DJB/MG/87
Notified vide letter No:-
17 Permission to start the work at outfall no. 3 Delay of work 08-05-2014
LTCD/DJB/MG/101
Regarding manhole and stoneware pipes damaged by Notified vide letter No:-
18 Delay of work 28-07-2014
NWS LTCD/DJB/MG/120
Notified vide letter No:-
19 Permission for shifting of 100mm dia waterline Delay of work 01-08-2014
LTCD/DJB/MG/122
Notified vide letter No:-
20 Delay in payment Delay of work 25-09-2014
LTCD/DJB/MG/135
Notified vide letter No:-
21 Delay in certification of Bill Delay of work 25-09-2014
LTCD/DJB/MG/137
Notified vide letter No:-
22 Permission from I&FC for outfall no. 2 Delay of work 24-11-2014
LTCD/DJB/MG/151
Notified vide letter No:-
23 Delay in payment Delay of work 11-12-2014
LTCD/DJB/MG/156
Notified vide letter No:-
24 Permission to start work at outfall no. 3 Delay of work 09-01-2015
LTCD/DJB/MG/158

Shifting of underground water pipeline 4inch dia in Notified vide letter No:-
25 Delay of work 22-02-2015
park wali Gali near Angel Public School OM Vihar LTCD/DJB/MG/164

Notified vide letter No:-


26 Outfall wise permission for work Delay of work 30-03-2015 LTCD/DLCO/WET/WW/RKJ/2015-
16/053
Notified vide letter No:-
27 Permission for connection work at outfall no. 01 Delay of work 06-05-2015
LTCD/DJB/MG/179
Notified vide letter No:-
28 Slow progress of road restoration work Delay of work 07-07-2015
LTCD/DJB/MG/193A
Notified vide letter No:-
Slow progress due to non-payment of Bills Delay of work 21-07-2015
LTCD/DJB/MG/196
Due to space constraints for mobilization of HDD
Notified vide letter No:-
29 P&Ms,alternate route was proposed and was being Execution of job 03-09-2015
LTCD/DJB/MG/201
waited for approval to execute the job.
Due to non feasibility of open excavation, HDD was
Notified vide letter No:-
30 proposed,without permission work could not be Pipe laying 28-10-2015
LTCD/DJB/MG/208
started
Request for replacement of 280mm HDPE pipes as per Notified vide letter No:-
31 Execution of job 29-10-2015
specifications LTCD/DJB/MG/209
Notified vide letter No:-
32 Constraints during execution of work Execution of job 09-11-2015
LTCD/DJB/MG/210

Constraints created at JAIN road,LAXMI VIHAR main


Notified vide letter No:-
33 road and P-BLOCK while laying sewer pipe by open Execution of job 17-11-2015
LTCD/DJB/MG/212
cut.Waited for permission to use HDD method.
Change in alignment of HDD work due to non Notified vide letter No:-
34 Pipe laying 18-11-2015
availability of soil i.e because of dumping yard. LTCD/DJB/MG/213
Due objection of road restoration from local Notified vide letter No:-
35 Road restoration 01-01-2016
authorities LTCD/DJB/MG/221

Request for shifting of 1200mm dia water line because Commissioning of Notified vide letter No:-
36 26-04-2016
it is affecting the commissioning of the system system LTCD/DJB/MG/248

Because of tremendous delay in certification and


Notified vide letter No:-
37 release of payment the progress of project has Delay of work 26-04-2016
LTCD/DJB/MG/249
suffered delay
Request for shifting of 1200mm dia water line because Commissioning of Notified vide letter No:-
38 17-05-2016
it is affecting the commissioning of the system system LTCD/DJB/MG/251

All work related to Notified vide letter No:-


39 Request to issue extension of time till december 2016 18-05-2016
the project LTCD/DJB/MG/252
Unable to sustain the progress of work due to high Notified vide letter No:-
40 Delay of work 08-06-2016
negative cash flow. LTCD/DJB/MG/254

Due to water logging at different locations we need


Notified vide letter No:-
41 for dewatering,but the local tankers are charging very Delay of work 27-06-2016
LTCD/DJB/MG/256
high.We requested to arrange 3-4 tankers
Notified vide letter No:-
42 Non release of outstanding payment Delay of work 24-08-2016
LTCD/DJB/MG/264

Due to non feasibility of open excavation, due to Notified vide letter No:-
43 Delay of work 15-11-2016
narrow roads.Requested for new proposed alignment LTCD/DJB/MG/281

Request for extension of time till May 2017 due to


heavy unprecedented rainfall,hindrance due to front All work related to Notified vide letter No:-
44 05-12-2016
constrain,work stopped due to high pollution and long the project LTCD/DJB/MG/288
pending outstanding.
Hindrance at site due to heavy water leakage from
All work related to Notified vide letter No:-
45 existing water supply system and high water table 20-12-2016
the project LTCD/DJB/MG/296
below 1m G.L
Proposal of laying sewer network by shallow depth for Notified vide letter No:-
46 Delay of work 27-02-2017
your review and approval. LTCD/DJB/MG/313
Instructions for stopping works at Raghuveer singh Notified vide letter No:-
47 Delay of work 03-04-2017
school road for the conductance of JEE mains exam. LTCD/DJB/MG/325
All work related to Notified vide letter No:-
48 Request for extension of time till October 2017 09-05-2017
the project LTCD/DJB/MG/334
Due to public issues we were unable to continue the Notified vide letter No:-
49 Delay of work 20-06-2017
works at Bansal Farm. LTCD/DJB/MG/343