FM(16)220
ECC
CEPT
86th Meeting
Bordeaux, France, 17th - 21st October 2016
Summary:
This progress report is intended to inform WG FM about the activities of the Project Team FM 22 since the
last report presented in June 2016.
Proposal:
to WGFM to
adopt the new ECC Recommendation on measurement uncertainty for public consultation
adopt the revision of ERC Recommendation 54-01 on frequency deviation measurements for public
consultation
finally approve the new ECC Report 256 on LTE coverage measurements
finally approve ECC Recommendation (16)04 on field strength measurements within 87.5 108 MHz
finally approve the revision of ECC Recommendation (11)06 on BEM measurements
Background:
Page 2
1 Meetings
The 46th meeting of FM 22 was held 3 6 October 2016 in Copenhagen. There were 53
delegates representing 27 CEPT administrations, ECO, ITU and Orange as well as 2 observers
from Kosovo.
The next meeting will be held from 4 7 April 2017 at the premises of ECO in Copenhagen.
3 Monitoring campaigns
The automatic observation of the HF frequency range from several monitoring stations is
ongoing.
In response to the new WI-FM22_30 the meeting drafted Doc. FM22(16)42 Annex 08, an Annex
to the minutes of the meeting. This document invites administrations to monitor the bands
adjacent to the band 406 to 406.1 MHz which is used by COSPAS-SARSAT and to report to the
Radiocommunication Bureau of the ITU.
4.2 Determination of the radiated power through field strength measurements along a
route
Latvia proposed a new method to determine the radiated power of transmitters. The idea is to
perform measurements along a route instead of taking a height scan. Administrations are
invited to do measurements on FM broadcast transmitters along a route and report on their
experience. The goal is to quantify the dependency between measurement route length and
accuracy.
5 New issues