1. The measurement which best shows the difference between actual work and actual costs is
a. Cost variance
b. Percent over or under
c. Schedule variance
d. CPI
e. This is not a valid measurement
3. Quality is:
a. Meeting and exceeding the customer's expectations.
b. Adding extras to make the customer happy.
c. The degree to which the project meets requirements.
d. Conformance to management's objectives.
4. The breakdown structure the lowest level of the breakdown for the project manager is called the:
a. Activity.
b. Task.
c. Work package.
d. Cost account.
5. A project manager has just been assigned to a project. The document that recognizes the existence of the
project is called:
7. Which of the following conflict resolution techniques will generate the MOST lasting solution?
a. Forcing
b. Smoothing
c. Compromise
d. Problem solving
TECHNICAL TEST Project Coordinator
8. Decomposing the major deliverables into smaller, more manageable components to provide better control is
called:
a. Scope planning.
b. Scope definition.
c. Scope base lining.
d. Scope verification.
10. A project manager has just been assigned to a new project and has been given the preliminary project
scope statement and the project charter. The first thing the project manager must do is:
12. You are a new project manager who has never managed a project before and are asked to plan a
new project. It would be best in this situation to rely on ____________ during planning in order to
improve your chance of success?
a. Your intuition
b. Your training
c. Historical records
d. Responsibility charts
14. Ideally, communication between the project manager and the project team members should
take place:
a. Via daily or weekly status reports.
b. Through approved template forms.
c. By written and oral communication.
d. Through the formal chain of command.
TECHNICAL TEST Project Coordinator
15. A project schedule completion date will change if:
a. The critical path is shortened.
b. Contingency funds are used.
c. Float time is allocated too late.
d. Project resources are added early.
16. The most crucial time for project risk assessment is:
a. When a problem surfaces.
b. During the planning phase.
c. During the closeout phase.
d. After the schedule is published.