Vous êtes sur la page 1sur 4

HealthvSolutions

Evaporator
#premium 2yi
with HYDnoTECTu pans
Drain Part# 96654002
February,03

Evaporatorcoil Installationlnstructions

,*ojol !io) i

General
ADPevaporator
coilsaredesigned
forusewithcondensing
unitsor heatpumpunits.Theseinstructions
are
intended as a generalgyile anddo notsupersede
localcodesin anyway.Consultwithlocalauthorities
having
jurisdiction
befofoinstallation.

Receiving
Checkcoil for shippingdamage.lf you shouldfind damage,immediatelycontactthe last carrier. Verify
contents.

AdvancedDistributorProducts
2175WestParkPlaceBtvd.
Sto.neMountain,GA 30082
www.adpnow.com
Configuration
Verifythe capacityand SEERrequirements
(if applicable)
are appropriate
withthe matchedcondensing
or
heatpump units.
Coifsaresuitedfor R22and R410refrigerants and canbe usedwithor withouta TXV.
*HA, HE,GUor CT seri_es
coilsare set up for upflow/downflow applicationsand can be factoryconfigured with
optionalsidedrainpanfor horizontal applications. Verticaldrainpanshavedrainconnections on the-rightand
leftsideand refrigerantthe connections can be orderedfor eitherleftor rightside
Mutipositioncoils(withfactoryinstalledhorizontal drainpan)can be configured for upflow,counterflow
or
horizontalinstallations.
TheHH,cR, cs6, Gs7 & GS8slabcoilsareset upfor horizontal application
only.
*Thefirstlettermay
differto reflecta particular
cabinetcolor.

t
Installation-All coils
Position
the coilon theoutletof thefurnaceusingsheetmetalscrews.Coilshouldbe level,or pitchedslighly
towardthe drainconnection.Selecta blowerspeedthatwillallow350-450CFMperton.
-A coils
Counterflow
Positionthe coilon the outletof the furnaceusingsheetmetalscrews.Coilghouldbe level,or pitchedslighly
towardthedrainconnection. Airflowshouldbe set to 350GFMper ton..Referto engineering guidefor'
limitations.
lt is recommended thatthe coilbe washedwitha ioil cleanerto removean! residuit-oittnatmay
havebeenleftfromthe manufacturing process.
Multiposition
A Coils-standard
Horizontal
Application
Positionthe coilon the outletof the furnaceusingsheetmetalscrewsas shownin Figure1 (top).Coilshouldbe
level,or pitchedslightlytowardthe d.rainconnection.
Installsplashguard(included)
o-ntothe coll.ouget.
Bottom
flangeof guardshouldreston panahd sidesscrewedto the ductflinges

Furnace
MultipositionA Coil
StandardHorizontal
Application

Furnace
--+ |
MultipositionA Coil
CounterflowHorizontal
Application

Figure1

Page2
A Coils-Counterflow
Multiposition Application
Horizontal
Positionthe coilon the outletof the furnaceusingsheetmetalscrewsas shownin Figure2 (bottom).Coil
shouldbe level,or pitchedslightlytowardthe drainconnection.Airflow should be set to 350CFMper ton.
Referto engineering guidefor limitations. thatthe coilbe washedwitha coilcleanerto
lt is recommended
removeany residualoil thatmayhavebeenleftfromthe manufacturing process.

Refrigerant
Piping
Refrigerant are3/8"ODFLiquidand3l4"ODF(18-36MBTU)or7l8"ODF(42-60MBTU)suction.
connections
for properlinesizing.
Checkoutdoorunitmanufacturer

RefrigerantFlowControls
\
Coilscan be configured a fieldinstalledTXV
witha standardfloratorassemblyon the liquidlinethatwill acbtept
or withfactoryinstalledTXV.
IVote;Cased coirs with florafor assemblies are shipped with a cap and nut over the
threaded fitting, Removethe nut slowly, allowing charge to escape,and secure liquid
line stub (attached to cabinet) to floraforassembly with nut.
, , ,
FactoryInstalledValves
As shippedfromthe factory,the TXV installedin eachcoilis chosenfor the nominalBTUHcapacityof the coil.

Page 3
Condensate
Drain

,#
Coilsare equippedwith multipledrainconnections.Determinethe drainconnectionsto be usedand notethe
differencebetweenthe primaryand secondaryopenings.
Drainplugsare providedf or all openings,reni0veand discardthe appropriateplugs with %" drive ratchetand
verifythat remainingplugsare tight.(Footlbs) ' ,
.
Attachdrain line to pan with% " male pipe threadPVC fittings.Hand tight is adequate- Do not over tighten!
Do not reducedrain lines2es.
Routedrain(s)line so they will not be exposedto freezingtemperaturesand do not interferewith accessibility
to
the coil,air handlingsystemor filter.The drainshouldbe pitcheddownward1" per 10'with a2" trapas closeto
the coil as possible.lf line makesa secondtrap,or has an extendedrun beforetermination,a vent tee should
be installedafterthe trap closestto the pan.
lf the coil is locatedin or abovea livingspacewheredamagemay resultfrom condensateoverflow,a separate
3/o"drainmust be proviQpd"from the secondarydrainconnection.Run this drainto a plaid in compliancewith
local installationcodeswhbre it will be noticedwhen unit is operational.Condensateflowingfrom the secondary
drain indicatesa pluggedprimarydraiq.

t-.----
Pipe f-
Drain i'i---' Dif,me,ter
I
Pan i

Vent'T"
(it required)

Primethetrapwithwater.Testlinefor leaks.Testwaterflowwithunitin operation.

Page4