Changes to be done in the auditorium

1. Curtain controller needs to be fixed. They couldnt fix it that day.


2. One VGA cable should be wired from the stage to AV control room to control
the projector from the AV room.
3. Number of channels in Dimmer pack should be increased from 6 to at least 18
channels (24 channel dimmer pack will be very good). We need at least this much
to manage the play performances.
4. Lighting points need to be separated. Now there is only one connection for all
the lights in a bar. We cant manage with this system for performances like plays
and even sometimes dances.
5. These lighting points need to have separate plug ports to connect. Plug ports in
2nd bar which is near the front edge of the stage will be increased more than the
actual number of lights
6. Instead of wooden doors (in front of the room to watch the performance) to the
AV control room we need sliding glass doors, so that the sound produced inside
the AV room wont travel outside and disturb the audience during the
performance.
7. There is need for a feedback speaker inside the AV control room. Present
speaker system is synthesized in such a way that it is properly audible till the last
bench of the auditorium. It will be creating problem for the controller to measure
the actual sound of the speakers.
8. The cyclorama flexi needs to be tightened. It is fixed very loosely.
9. Half of the LED bulbs in many of the lights are not functioning properly. They
need to be fixed.
10. There is need of a DMX controller to control the color of the RGB lights.
Otherwise these lights cannot be used for plays and dance programs.
11. There is need of two more floor microphones (flatter ones). Now we have only
one such kind of mic.
12. There is need of two more spot lights for effective lighting during the play
performances.
13. There is need of Air conditioner inside the AV controller room. Even though
there is a central AC it is designed in such a way that it wont reach inside the
AV room. AV room must have AC to control the temperature of the processors
which are very expensive.
14. There is need of cyclorama cleaning kit to clean the fungus.