1. Probability of failure analysis is made from
a) loss of containment that occurs due to deterioration mechanism
b) Consequences of the failure
c) Done just with previous experience
d) All the above '
,-
IACET OAF 690 I Rev 00 I July 20. 2008 I Page 2 of 6
~
Jfawarcf ?:eclino[ogy ~icfcf[e rast
11. No deterioration found in the inspection program but still failure can occur
under the following conditions.
a} During plant construction period
b) As a result of change or process upset condition
c) All the above
--
12. Aqueous chloride solution is carried into a sensitized stainless steel vessel,
the following cracking mechanism takes very rapidly depending on
temperature.
a) Sulphide stress corrosion cracking
b) Leak can occur
c) Chloride stress corrosion cracking
.~ .
JfawardTeclino[ogy ~icfd[e CEast
18. Method used for consequence analysis should demonstrate the ability to
provide
a) Just an analysis
b) No out put is required
c) The required level of discrimination between higher and lower
consequence equipment items.
20. Which of the following measures are not covered under consequence
analysis?
a) Safety
b) Cost
c) Affected area
d) Environment damage
e) None of the above
--..___ _
23. RBI program will not consider the following release of common liquids such
as
a) Hot water, Steam
b) Acids
c) Caustics
d ) None of the above /
27. Users across the world will refer for more information on Risk acceptance.
a) ASME sec VIII
b) API 579, fitness for purpose
c) A comparison of criteria f or acceptance of Risk by Pressure vessel
research council ~
d) None of the above
28. Inspection and maintenance planning using risk assessment will follow
a) Items/ equipment require inspection
b) Inspection Technique
c) Extent of inspectiO!J
d) All the above ~
29. Sensitive analysis will help i n improving t he risk analysis.
a) Quality and accuracy ~
b ) Benefit cannot be achieved
c) Will drastically adverse the quality and accuracy
33. Following are the ways of risk mitigation during RBI Management
a) By Inspection / condition monitoring.
b ) Consequence mitigation
c) Probability of mitigation
d) All the above