ITEM NO TASK NAME local LKR

DESING, SUPPLY & INSTALATION


OF HIGH VOLTAGE EQUIPMENT
INCLUDING
TRANSFORMERS,SWITCH
GEARS,PROTECTION AND ALL
2.0 0.00
NECESSARY ACCESORISES TO
MAKE AVAILABLE POWER
SUPPLY TO ALL TREATMENT
FACILITES,PIMING STATIONS
ETC.
2.1 TRANSFORMER
2.1.1 DESING FIRST SUBMITION

2.1.2 DESING APPROVAL


2.1.3 PO PLACEMENT
2.1.4 READY FOR SHIPMENT
2.1.5 EQUPMENT UNLOADING IN SITE
2.1.6 DESING MODIFICATION AND SHOP DRAWING
2.1.7 EQUPMENT INSTALLATION
2.1.8 GI CONDUIT FABRICATION
2.1.9 GI CONDUIT FIXING
2.1.10 SUPPORT ARRANGEMENT FABRICATION
2.1.11 SUPPORT ARRANGEMENT FIXING
2.1.12 HV CABLE LAYING
2.1.13 HV CABLE TERMINATION
2.1.14 HV CABLE TESTING AND REPORT
2.1.15 CONTROL CABLE LAYING
2.1.16 CONTROL CABLE TERMINATION
2.1.17 CONTROL CABLE TESTING AND REPORT
2.1.18 CABLE DRESSING WORKE

2.1.19 EQUPMENT TESTING AND REPORT

2.1.20 EQUPMENT COMMISSIONING


2.1.21 OTHER MISC. WORKE
2.1.22 NUMBERING AND TAGING
2.1.23 RETENTION MONEY

2.2 HV SWICHGEAR
2.2.1 DESING FIRST SUBMITION
2.2.2 DESING APPROVAL
2.2.3 PO PLACEMENT
2.2.4 READY FOR SHIPMENT
2.2.5 EQUPMENT UNLOADING IN SITE
2.2.6 DESING MODIFICATION AND SHOP DRAWING
2.2.7 EQUPMENT INSTALLATION
2.2.8 GI CONDUIT FABRICATION
2.2.9 GI CONDUIT FIXING
2.2.10 SUPPORT ARRANGEMENT FABRICATION
2.2.11 SUPPORT ARRANGEMENT FIXING
2.2.12 HV CABLE LAYING
2.2.13 HV CABLE TERMINATION
2.2.14 HV CABLE TESTING AND REPORT
2.2.15 CONTROL CABLE LAYING
2.2.16 CONTROL CABLE TERMINATION
2.2.17 CONTROL CABLE TESTING AND REPORT
2.2.18 CABLE DRESSING WORKE
2.2.19 EQUPMENT TESTING AND REPORT
2.2.20 EQUPMENT COMMISSIONING
2.2.21 OTHER MISC. WORKE
2.2.22 NUMBERING AND TAGING
2.2.23 RETENTION MONEY

2.3 ACCESSORIES
2.3.1 DESING FIRST SUBMITION
2.3.2 DESING APPROVAL
2.3.3 PO PLACEMENT
2.3.4 READY FOR SHIPMENT
2.3.5 EQUPMENT UNLOADING IN SITE
2.3.6 DESING MODIFICATION AND SHOP DRAWING
2.3.7 SUPPORT ARRANGEMENT FABRICATION
2.3.8 SUPPORT ARRANGEMENT FIXING
2.3.9 EQUPMENT INSTALLATION
2.3.10 EQUPMENT TESTING AND REPORT
2.3.11 EQUPMENT COMMISSIONING
2.3.12 OTHER MISC. WORKE
2.3.13 RETENTION MONEY

3,DESING,SUPPLY & INSTALLATION OF 04


3.0 NOS, LOW LIFT PUMPS
3.1 3.1.1 DESING FIRST SUBMITION
3.1.2 DESING APPROVAL
3.1.3 PO PLACEMENT
3.1.4 READY FOR SHIPMENT
3.1.5 EQUPMENT UNLOADING IN SITE
3.1.6 DESING MODIFICATION AND SHOP DRAWING
3.1.7 EQUPMENT INSTALLATION
3.1.8 GI CONDUIT FABRICATION
3.1.9 GI CONDUIT FIXING
3.1.10 SUPPORT ARRANGEMENT FABRICATION
3.1.11 SUPPORT ARRANGEMENT FIXING
3.1.12 PVC LINE ARRANGEMENT FABRICATION
3.1.13 PVC LINE ARRANGEMENT FIXING
3.1.14 CONTROL CABLE LAYING
3.1.15 CONTROL CABLE TERMINATION
3.1.16 CONTROL CABLE TESTING AND REPORT
3.1.17 CABLE DRESSING WORKE
3.1.18 EQUPMENT TESTING AND REPORT
3.1.19 EQUPMENT COMMISSIONING
3.1.20 LOCAL CONTRAL PANEL DESING FIRST SUBMITION
3.1.21 LOCAL CONTRAL PANEL DESING APPROVAL
3.1.22 LOCAL CONTRAL PANEL SUPPLYED
3.1.23 LOCAL CONTRAL PANEL INSTALLATION
3.1.24 OTHER MISC. WORKE
3.1.25 NUMBERING AND TAGING
3.1.26 RETENTION MONEY

4,DESING,SUPPLY &
INSTALLATION OF 02 NOS, FINE
4.0
SCREENS AT THE EXISTING
INTAKE
4.1 4.1.1 DESING FIRST SUBMITION
4.1.2 DESING APPROVAL
4.1.3 PO PLACEMENT
4.1.4 READY FOR SHIPMENT
4.1.5 EQUPMENT UNLOADING IN SITE
4.1.6 DESING MODIFICATION AND SHOP DRAWING
4.1.7 EQUPMENT INSTALLATION
4.1.8 GI CONDUIT FABRICATION
4.1.9 GI CONDUIT FIXING
4.1.10 SUPPORT ARRANGEMENT FABRICATION
4.1.11 SUPPORT ARRANGEMENT FIXING
4.1.12 PVC LINE ARRANGEMENT FABRICATION
4.1.13 PVC LINE ARRANGEMENT FIXING
4.1.14 CONTROL CABLE LAYING
4.1.15 CONTROL CABLE TERMINATION
4.1.16 CONTROL CABLE TESTING AND REPORT
4.1.17 CABLE DRESSING WORKE
4.1.18 EQUPMENT TESTING AND REPORT
4.1.19 EQUPMENT COMMISSIONING
4.1.20 LOCAL CONTRAL PANEL DESING FIRST SUBMITION
4.1.21 LOCAL CONTRAL PANEL DESING APPROVAL
4.1.22 LOCAL CONTRAL PANEL SUPPLYED
4.1.23 LOCAL CONTRAL PANEL INSTALLATION
4.1.24 OTHER MISC. WORKE
4.1.25 NUMBERING AND TAGING
4.1.26 RETENTION MONEY

DESING, CONSTRUCTION AND


COMMISSION WATER TREAMENT
5.0 6,003,797,000.00
PLANT OF 180,000M3/D
CAPACITY.
5.1 BASIC DESING PACKAGE
5.1.1 DESING FIRST SUBMITION
5.1.2 DESING APPROVAL
5.1.3 DESING MODIFICATION AND SHOP DRAWING
5.1.4 Other Misc. Works
5.1.5 RETENTION MONEY

5.2 EQUIPMENT
5.2.1 AIR BLOWER
5.2.1.1 DESING FIRST SUBMITION
5.2.1.2 DESING APPROVAL
5.2.1.3 PO PLACEMENT
5.2.1.4 READY FOR SHIPMENT
5.2.1.5 EQUPMENT UNLOADING IN SITE
5.2.1.6 DESING MODIFICATION AND SHOP DRAWING
5.2.1.7 EQUPMENT INSTALLATION
5.2.1.8 GI CONDUIT FABRICATION
5.2.1.9 GI CONDUIT FIXING
5.2.1.10 SUPPORT ARRANGEMENT FABRICATION
5.2.1.11 SUPPORT ARRANGEMENT FIXING
5.2.1.12 PVC LINE ARRANGEMENT FABRICATION
5.2.1.13 PVC LINE ARRANGEMENT FIXING
5.2.1.14 CONTROL CABLE LAYING
5.2.1.15 CONTROL CABLE TERMINATION
5.2.1.16 CONTROL CABLE TESTING AND REPORT
5.2.1.17 CABLE DRESSING WORKE
5.2.1.18 EQUPMENT TESTING AND REPORT
5.2.1.19 EQUPMENT COMMISSIONING
5.2.1.20 LOCAL CONTRAL PANEL DESING FIRST SUBMITION
5.2.1.21 LOCAL CONTRAL PANEL DESING APPROVAL
5.2.1.22 LOCAL CONTRAL PANEL SUPPLYED
5.2.1.23 LOCAL CONTRAL PANEL INSTALLATION
5.2.1.24 OTHER MISC. WORKE
5.2.1.25 NUMBERING AND TAGING
5.2.1.26 RETENTION MONEY

5.2.2 VACUUM BLOWER


5.2.2.1 DESING FIRST SUBMITION
5.2.2.2 DESING APPROVAL
5.2.2.3 PO PLACEMENT
5.2.2.4 READY FOR SHIPMENT
5.2.2.5 EQUPMENT UNLOADING IN SITE
5.2.2.6 DESING MODIFICATION AND SHOP DRAWING
5.2.2.7 EQUPMENT INSTALLATION
5.2.2.8 GI CONDUIT FABRICATION
5.2.2.9 GI CONDUIT FIXING
5.2.2.10 SUPPORT ARRANGEMENT FABRICATION
5.2.2.11 SUPPORT ARRANGEMENT FIXING
5.2.2.12 PVC LINE ARRANGEMENT FABRICATION
5.2.2.13 PVC LINE ARRANGEMENT FIXING
5.2.2.14 CONTROL CABLE LAYING
5.2.2.15 CONTROL CABLE TERMINATION
5.2.2.16 CONTROL CABLE TESTING AND REPORT
5.2.2.17 CABLE DRESSING WORKE
5.2.2.18 EQUPMENT TESTING AND REPORT
5.2.2.19 EQUPMENT COMMISSIONING
5.2.2.20 LOCAL CONTRAL PANEL DESING FIRST SUBMITION
5.2.2.21 LOCAL CONTRAL PANEL DESING APPROVAL
5.2.2.22 LOCAL CONTRAL PANEL SUPPLYED
5.2.2.23 LOCAL CONTRAL PANEL INSTALLATION
5.2.2.24 OTHER MISC. WORKE
5.2.2.25 NUMBERING AND TAGING
5.2.2.26 RETENTION MONEY

5.2.3 LAMELLAR MODULES


5.2.3.1 DESING FIRST SUBMITION
5.2.3.2 DESING APPROVAL
5.2.3.3 PO PLACEMENT
5.2.3.4 READY FOR SHIPMENT
5.2.3.5 EQUPMENT UNLOADING IN SITE
5.2.3.6 DESING MODIFICATION AND SHOP DRAWING
5.2.3.7 EQUPMENT INSTALLATION
5.2.3.8 EQUPMENT TESTING AND REPORT
5.2.3.9 OTHER MISC. WORKE
5.2.3.10 RETENTION MONEY

5.2.8 TREATMENT WATER PUMP


5.2.8.1 DESING FIRST SUBMITION
5.2.8.2 DESING APPROVAL
5.2.8.3 PO PLACEMENT
5.2.8.4 READY FOR SHIPMENT
5.2.8.5 EQUPMENT UNLOADING IN SITE
5.2.8.6 DESING MODIFICATION AND SHOP DRAWING
5.2.8.7 EQUPMENT INSTALLATION
5.2.8.8 GI CONDUIT FABRICATION
5.2.8.9 GI CONDUIT FIXING
5.2.8.10 SUPPORT ARRANGEMENT FABRICATION
5.2.8.11 SUPPORT ARRANGEMENT FIXING
5.2.8.12 PVC LINE ARRANGEMENT FABRICATION
5.2.8.13 PVC LINE ARRANGEMENT FIXING
5.2.8.14 CONTROL CABLE LAYING
5.2.8.15 CONTROL CABLE TERMINATION
5.2.8.16 CONTROL CABLE TESTING AND REPORT
5.2.8.17 CABLE DRESSING WORKE
5.2.8.18 EQUPMENT TESTING AND REPORT
5.2.8.19 EQUPMENT COMMISSIONING
5.2.8.20 LOCAL CONTRAL PANEL DESING FIRST SUBMITION
5.2.8.21 LOCAL CONTRAL PANEL DESING APPROVAL
5.2.8.22 LOCAL CONTRAL PANEL SUPPLYED
5.2.8.23 LOCAL CONTRAL PANEL INSTALLATION
5.2.8.24 OTHER MISC. WORKE
5.2.8.25 NUMBERING AND TAGING
5.2.8.26 RETENTION MONEY

5.2.9 SURGE PROTATION SYSTEM


5.2.9.1 DESING FIRST SUBMITION
5.2.9.2 DESING APPROVAL
5.2.9.3 PO PLACEMENT
5.2.9.4 READY FOR SHIPMENT
5.2.9.5 EQUPMENT UNLOADING IN SITE
5.2.9.6 DESING MODIFICATION AND SHOP DRAWING
5.2.9.7 EQUPMENT INSTALLATION
5.2.9.8 GI CONDUIT FABRICATION
5.2.9.9 GI CONDUIT FIXING
5.2.9.10 SUPPORT ARRANGEMENT FABRICATION
5.2.9.11 SUPPORT ARRANGEMENT FIXING
5.2.9.12 EARTH TAP FIXING
5.2.9.13 TESTING AND REPORT
5.2.9.14 OTHER MISC. WORKE
5.2.9.15 NUMBERING AND TAGING
5.2.9.16 RETENTION MONEY

5.2.10 CHEMICAL DOSING PUMP


5.2.10.1 DESING FIRST SUBMITION
5.2.10.2 DESING APPROVAL
5.2.10.3 PO PLACEMENT
5.2.10.4 READY FOR SHIPMENT
5.2.10.5 EQUPMENT UNLOADING IN SITE
5.2.10.6 DESING MODIFICATION AND SHOP DRAWING
5.2.10.7 EQUPMENT INSTALLATION
5.2.10.8 GI CONDUIT FABRICATION
5.2.10.9 GI CONDUIT FIXING
5.2.10.10 SUPPORT ARRANGEMENT FABRICATION
5.2.10.11 SUPPORT ARRANGEMENT FIXING
5.2.10.12 PVC LINE ARRANGEMENT FABRICATION
5.2.10.13 PVC LINE ARRANGEMENT FIXING
5.2.10.14 CONTROL CABLE LAYING
5.2.10.15 CONTROL CABLE TERMINATION
5.2.10.16 CONTROL CABLE TESTING AND REPORT
5.2.10.17 CABLE DRESSING WORKE
5.2.10.18 EQUPMENT TESTING AND REPORT
5.2.10.19 EQUPMENT COMMISSIONING
5.2.10.20 LOCAL CONTRAL PANEL DESING FIRST SUBMITION
5.2.10.21 LOCAL CONTRAL PANEL DESING APPROVAL
5.2.10.22 LOCAL CONTRAL PANEL SUPPLYED
5.2.10.23 LOCAL CONTRAL PANEL INSTALLATION
5.2.10.24 OTHER MISC. WORKE
5.2.10.25 NUMBERING AND TAGING
5.2.10.26 RETENTION MONEY

5.2.11 CHLORINATION PACKAGE


5.2.11.1 DESING FIRST SUBMITION
5.2.11.2 DESING APPROVAL
5.2.11.3 PO PLACEMENT
5.2.11.4 READY FOR SHIPMENT
5.2.11.5 EQUPMENT UNLOADING IN SITE
5.2.11.6 DESING MODIFICATION AND SHOP DRAWING
5.2.11.7 EQUPMENT INSTALLATION
5.2.11.8 GI CONDUIT FABRICATION
5.2.11.9 GI CONDUIT FIXING
5.2.11.10 SUPPORT ARRANGEMENT FABRICATION
5.2.11.11 SUPPORT ARRANGEMENT FIXING
5.2.11.12 PVC LINE ARRANGEMENT FABRICATION
5.2.11.13 PVC LINE ARRANGEMENT FIXING
5.2.11.14 CONTROL CABLE LAYING
5.2.11.15 CONTROL CABLE TERMINATION
5.2.11.16 CONTROL CABLE TESTING AND REPORT
5.2.11.17 CABLE DRESSING WORKE
5.2.11.18 EQUPMENT TESTING AND REPORT
5.2.11.19 EQUPMENT COMMISSIONING
5.2.11.20 LOCAL CONTRAL PANEL DESING FIRST SUBMITION
5.2.11.21 LOCAL CONTRAL PANEL DESING APPROVAL
5.2.11.22 LOCAL CONTRAL PANEL SUPPLYED
5.2.11.23 LOCAL CONTRAL PANEL INSTALLATION
5.2.11.24 OTHER MISC. WORKE
5.2.11.25 NUMBERING AND TAGING
5.2.11.26 RETENTION MONEY

5.2.12 POLYMER PREPARATION UNIT


5.2.12.1 DESING FIRST SUBMITION
5.2.12.2 DESING APPROVAL
5.2.12.3 PO PLACEMENT
5.2.12.4 READY FOR SHIPMENT
5.2.12.5 EQUPMENT UNLOADING IN SITE
5.2.12.6 DESING MODIFICATION AND SHOP DRAWING
5.2.12.7 EQUPMENT INSTALLATION
5.2.12.8 GI CONDUIT FABRICATION
5.2.12.9 GI CONDUIT FIXING
5.2.12.10 SUPPORT ARRANGEMENT FABRICATION
5.2.12.11 SUPPORT ARRANGEMENT FIXING
5.2.12.12 PVC LINE ARRANGEMENT FABRICATION
5.2.12.13 PVC LINE ARRANGEMENT FIXING
5.2.12.14 CONTROL CABLE LAYING
5.2.12.15 CONTROL CABLE TERMINATION
5.2.12.16 CONTROL CABLE TESTING AND REPORT
5.2.12.17 CABLE DRESSING WORKE
5.2.12.18 EQUPMENT TESTING AND REPORT
5.2.12.19 EQUPMENT COMMISSIONING
5.2.12.20 LOCAL CONTRAL PANEL DESING FIRST SUBMITION
5.2.12.21 LOCAL CONTRAL PANEL DESING APPROVAL
5.2.12.22 LOCAL CONTRAL PANEL SUPPLYED
5.2.12.23 LOCAL CONTRAL PANEL INSTALLATION
5.2.12.24 OTHER MISC. WORKE
5.2.12.25 NUMBERING AND TAGING
5.2.12.26 RETENTION MONEY

5.2.13 LIME SATURATOR


5.2.13.1 DESING FIRST SUBMITION
5.2.13.2 DESING APPROVAL
5.2.13.3 PO PLACEMENT
5.2.13.4 READY FOR SHIPMENT
5.2.13.5 EQUPMENT UNLOADING IN SITE
5.2.13.6 DESING MODIFICATION AND SHOP DRAWING
5.2.13.7 EQUPMENT INSTALLATION
5.2.13.8 GI CONDUIT FABRICATION
5.2.13.9 GI CONDUIT FIXING
5.2.13.10 SUPPORT ARRANGEMENT FABRICATION
5.2.13.11 SUPPORT ARRANGEMENT FIXING
5.2.13.12 PVC LINE ARRANGEMENT FABRICATION
5.2.13.13 PVC LINE ARRANGEMENT FIXING
5.2.13.14 CONTROL CABLE LAYING
5.2.13.15 CONTROL CABLE TERMINATION
5.2.13.16 CONTROL CABLE TESTING AND REPORT
5.2.13.17 CABLE DRESSING WORKE
5.2.13.18 EQUPMENT TESTING AND REPORT
5.2.13.19 EQUPMENT COMMISSIONING
5.2.13.20 LOCAL CONTRAL PANEL DESING FIRST SUBMITION
5.2.13.21 LOCAL CONTRAL PANEL DESING APPROVAL
5.2.13.22 LOCAL CONTRAL PANEL SUPPLYED
5.2.13.23 LOCAL CONTRAL PANEL INSTALLATION
5.2.13.24 OTHER MISC. WORKE
5.2.13.25 NUMBERING AND TAGING
5.2.13.26 RETENTION MONEY

5.2.14 SLUGE CENTRIFUGLE


5.2.14.1 DESING FIRST SUBMITION
5.2.14.2 DESING APPROVAL
5.2.14.3 PO PLACEMENT
5.2.14.4 READY FOR SHIPMENT
5.2.14.5 EQUPMENT UNLOADING IN SITE
5.2.14.6 DESING MODIFICATION AND SHOP DRAWING
5.2.14.7 EQUPMENT INSTALLATION
5.2.14.8 GI CONDUIT FABRICATION
5.2.14.9 GI CONDUIT FIXING
5.2.14.10 SUPPORT ARRANGEMENT FABRICATION
5.2.14.11 SUPPORT ARRANGEMENT FIXING
5.2.14.12 PVC LINE ARRANGEMENT FABRICATION
5.2.14.13 PVC LINE ARRANGEMENT FIXING
5.2.14.14 CONTROL CABLE LAYING
5.2.14.15 CONTROL CABLE TERMINATION
5.2.14.16 CONTROL CABLE TESTING AND REPORT
5.2.14.17 CABLE DRESSING WORKE
5.2.14.18 EQUPMENT TESTING AND REPORT
5.2.14.19 EQUPMENT COMMISSIONING
5.2.14.20 LOCAL CONTRAL PANEL DESING FIRST SUBMITION
5.2.14.21 LOCAL CONTRAL PANEL DESING APPROVAL
5.2.14.22 LOCAL CONTRAL PANEL SUPPLYED
5.2.14.23 LOCAL CONTRAL PANEL INSTALLATION
5.2.14.24 OTHER MISC. WORKE
5.2.14.25 NUMBERING AND TAGING
5.2.14.26 RETENTION MONEY

5.2.15 SUPERNATANT RECOVERY ARMS


5.2.15.1 DESING FIRST SUBMITION
5.2.15.2 DESING APPROVAL
5.2.15.3 PO PLACEMENT
5.2.15.4 READY FOR SHIPMENT
5.2.15.5 EQUPMENT UNLOADING IN SITE
5.2.15.6 DESING MODIFICATION AND SHOP DRAWING
5.2.15.7 EQUPMENT INSTALLATION
5.2.15.8 EQUPMENT TESTING AND REPORT
5.2.15.9 OTHER MISC. WORKE
5.2.15.10 RETENTION MONEY

5.2.16 SUBMERSIBLE MIXES


5.2.16.1 DESING FIRST SUBMITION
5.2.16.2 DESING APPROVAL
5.2.16.3 PO PLACEMENT
5.2.16.4 READY FOR SHIPMENT
5.2.16.5 EQUPMENT UNLOADING IN SITE
5.2.16.6 DESING MODIFICATION AND SHOP DRAWING
5.2.16.7 EQUPMENT INSTALLATION
5.2.16.8 GI CONDUIT FABRICATION
5.2.16.9 GI CONDUIT FIXING
5.2.16.10 SUPPORT ARRANGEMENT FABRICATION
5.2.16.11 SUPPORT ARRANGEMENT FIXING
5.2.16.12 PVC LINE ARRANGEMENT FABRICATION
5.2.16.13 PVC LINE ARRANGEMENT FIXING
5.2.16.14 CONTROL CABLE LAYING
5.2.16.15 CONTROL CABLE TERMINATION
5.2.16.16 CONTROL CABLE TESTING AND REPORT
5.2.16.17 CABLE DRESSING WORKE
5.2.16.18 EQUPMENT TESTING AND REPORT
5.2.16.19 EQUPMENT COMMISSIONING
5.2.16.20 LOCAL CONTRAL PANEL DESING FIRST SUBMITION
5.2.16.21 LOCAL CONTRAL PANEL DESING APPROVAL
5.2.16.22 LOCAL CONTRAL PANEL SUPPLYED
5.2.16.23 LOCAL CONTRAL PANEL INSTALLATION
5.2.16.24 OTHER MISC. WORKE
5.2.16.25 NUMBERING AND TAGING
5.2.16.26 RETENTION MONEY

5.2.17 SLUGE THICKENERS SCRAPER BRIDGE


5.2.17.1 DESING FIRST SUBMITION
5.2.17.2 DESING APPROVAL
5.2.17.3 PO PLACEMENT
5.2.17.4 READY FOR SHIPMENT
5.2.17.5 EQUPMENT UNLOADING IN SITE
5.2.17.6 DESING MODIFICATION AND SHOP DRAWING
5.2.17.7 EQUPMENT INSTALLATION
5.2.17.8 GI CONDUIT FABRICATION
5.2.17.9 GI CONDUIT FIXING
5.2.17.10 SUPPORT ARRANGEMENT FABRICATION
5.2.17.11 SUPPORT ARRANGEMENT FIXING
5.2.17.12 CONTROL CABLE LAYING
5.2.17.13 CONTROL CABLE TERMINATION
5.2.17.14 CONTROL CABLE TESTING AND REPORT
5.2.17.15 CABLE DRESSING WORKE
5.2.17.16 EQUPMENT TESTING AND REPORT
5.2.17.17 EQUPMENT COMMISSIONING
5.2.17.18 LOCAL CONTRAL PANEL DESING FIRST SUBMITION
5.2.17.19 LOCAL CONTRAL PANEL DESING APPROVAL
5.2.17.20 LOCAL CONTRAL PANEL SUPPLYED
5.2.17.21 LOCAL CONTRAL PANEL INSTALLATION
5.2.17.22 OTHER MISC. WORKE
5.2.17.23 NUMBERING AND TAGING
5.2.17.24 RETENTION MONEY

5.2.18 COMPRESSED AIR UNIT


5.2.18.1 DESING FIRST SUBMITION
5.2.18.2 DESING APPROVAL
5.2.18.3 PO PLACEMENT
5.2.18.4 READY FOR SHIPMENT
5.2.18.5 EQUPMENT UNLOADING IN SITE
5.2.18.6 DESING MODIFICATION AND SHOP DRAWING
5.2.18.7 EQUPMENT INSTALLATION
5.2.18.8 GI CONDUIT FABRICATION
5.2.18.9 GI CONDUIT FIXING
5.2.18.10 SUPPORT ARRANGEMENT FABRICATION
5.2.18.11 SUPPORT ARRANGEMENT FIXING
5.2.18.12 PVC LINE ARRANGEMENT FABRICATION
5.2.18.13 PVC LINE ARRANGEMENT FIXING
5.2.18.14 CONTROL CABLE LAYING
5.2.18.15 CONTROL CABLE TERMINATION
5.2.18.16 CONTROL CABLE TESTING AND REPORT
5.2.18.17 CABLE DRESSING WORKE
5.2.18.18 EQUPMENT TESTING AND REPORT
5.2.18.19 EQUPMENT COMMISSIONING
5.2.18.20 LOCAL CONTRAL PANEL DESING FIRST SUBMITION
5.2.18.21 LOCAL CONTRAL PANEL DESING APPROVAL
5.2.18.22 LOCAL CONTRAL PANEL SUPPLYED
5.2.18.23 LOCAL CONTRAL PANEL INSTALLATION
5.2.18.24 OTHER MISC. WORKE
5.2.18.25 NUMBERING AND TAGING
5.2.18.26 RETENTION MONEY

5.2.19 PENSTOCKS
5.2.19.1 DESING FIRST SUBMITION
5.2.19.2 DESING APPROVAL
5.2.19.3 PO PLACEMENT
5.2.19.4 READY FOR SHIPMENT
5.2.19.5 EQUPMENT UNLOADING IN SITE
5.2.19.6 DESING MODIFICATION AND SHOP DRAWING
5.2.19.7 EQUPMENT INSTALLATION
5.2.19.8 EQUPMENT TESTING AND REPORT
5.2.19.9 OTHER MISC. WORKE
5.2.19.10 RETENTION MONEY

5.2.20 METALIC VALVES


5.2.20.1 DESING FIRST SUBMITION
5.2.20.2 DESING APPROVAL
5.2.20.3 PO PLACEMENT
5.2.20.4 READY FOR SHIPMENT
5.2.20.5 EQUPMENT UNLOADING IN SITE
5.2.20.6 DESING MODIFICATION AND SHOP DRAWING
5.2.20.7 EQUPMENT INSTALLATION
5.2.20.8 EQUPMENT TESTING AND REPORT
5.2.20.9 OTHER MISC. WORKE
5.2.20.10 RETENTION MONEY

5.2.21 LIFTING DEVICES


5.2.21.1 DESING FIRST SUBMITION
5.2.21.2 DESING APPROVAL
5.2.21.3 PO PLACEMENT
5.2.21.4 READY FOR SHIPMENT
5.2.21.5 EQUPMENT UNLOADING IN SITE
5.2.21.6 DESING MODIFICATION AND SHOP DRAWING
5.2.21.7 EQUPMENT INSTALLATION
5.2.21.8 GI CONDUIT FABRICATION
5.2.21.9 GI CONDUIT FIXING
5.2.21.10 SUPPORT ARRANGEMENT FABRICATION
5.2.21.11 SUPPORT ARRANGEMENT FIXING
5.2.21.12 CONTROL CABLE LAYING
5.2.21.13 CONTROL CABLE TERMINATION
5.2.21.14 CONTROL CABLE TESTING AND REPORT
5.2.21.15 CABLE DRESSING WORKE
5.2.21.16 EQUPMENT TESTING AND REPORT
5.2.21.17 EQUPMENT COMMISSIONING
5.2.21.18 LOCAL CONTRAL PANEL DESING FIRST SUBMITION
5.2.21.19 LOCAL CONTRAL PANEL DESING APPROVAL
5.2.21.20 LOCAL CONTRAL PANEL SUPPLYED
5.2.21.21 LOCAL CONTRAL PANEL INSTALLATION
5.2.21.22 OTHER MISC. WORKE
5.2.21.23 NUMBERING AND TAGING
5.2.21.24 RETENTION MONEY

5.2.22 UNDERGROUND PIPES

5.2.22.1 DESING FIRST SUBMITION


5.2.22.2 DESING APPROVAL
5.2.22.3 PO PLACEMENT
5.2.22.4 READY FOR SHIPMENT
5.2.22.5 EQUPMENT UNLOADING IN SITE
5.2.22.6 DESING MODIFICATION AND SHOP DRAWING
5.2.22.7 EQUPMENT INSTALLATION
5.2.22.8 EQUPMENT TESTING AND REPORT
5.2.22.9 RETENTION MONEY
5.2.22.10 OTHER MISC. WORKE

5.2.23 OVERHEADMETAL PIPE


5.2.23.1 DESING FIRST SUBMITION
5.2.23.2 DESING APPROVAL
5.2.23.3 PO PLACEMENT
5.2.23.4 READY FOR SHIPMENT
5.2.23.5 EQUPMENT UNLOADING IN SITE
5.2.23.6 DESING MODIFICATION AND SHOP DRAWING
5.2.23.7 EQUPMENT INSTALLATION
5.2.23.8 EQUPMENT TESTING AND REPORT
5.2.23.9 RETENTION MONEY
5.2.23.10 OTHER MISC. WORKE

5.2.24 SUBMERSIBLE PIPE


5.2.24.1 DESING FIRST SUBMITION
5.2.24.2 DESING APPROVAL
5.2.24.3 PO PLACEMENT
5.2.24.4 READY FOR SHIPMENT
5.2.24.5 EQUPMENT UNLOADING IN SITE
5.2.24.6 DESING MODIFICATION AND SHOP DRAWING
5.2.24.7 EQUPMENT INSTALLATION
5.2.24.8 EQUPMENT TESTING AND REPORT
5.2.24.9 RETENTION MONEY
5.2.24.10 OTHER MISC. WORKE

5.2.25 MISCELLANEOUS MECHANICAL EQUIPMENT


5.2.25.1 DESING FIRST SUBMITION
5.2.25.2 DESING APPROVAL
5.2.25.3 PO PLACEMENT
5.2.25.4 READY FOR SHIPMENT
5.2.25.5 EQUPMENT UNLOADING IN SITE
5.2.25.6 DESING MODIFICATION AND SHOP DRAWING
5.2.25.7 EQUPMENT INSTALLATION
5.2.25.8 EQUPMENT TESTING AND REPORT
5.2.25.9 RETENTION MONEY
5.2.25.10 OTHER MISC. WORKE
5.2.26 INSTRUMENTATION
5.2.26.1 DESING FIRST SUBMITION
5.2.26.2 DESING APPROVAL
5.2.26.3 PO PLACEMENT
5.2.26.4 READY FOR SHIPMENT
5.2.26.5 EQUPMENT UNLOADING IN SITE
5.2.26.6 DESING MODIFICATION AND SHOP DRAWING
5.2.26.7 EQUPMENT INSTALLATION
5.2.26.8 GI CONDUIT FABRICATION
5.2.26.9 GI CONDUIT FIXING
5.2.26.10 SUPPORT ARRANGEMENT FABRICATION
5.2.26.11 SUPPORT ARRANGEMENT FIXING
5.2.26.12 CONTROL CABLE LAYING
5.2.26.13 CONTROL CABLE TERMINATION
5.2.26.14 CONTROL CABLE TESTING AND REPORT
5.2.26.15 CABLE DRESSING WORKE
5.2.26.16 EQUPMENT TESTING AND REPORT
5.2.26.17 EQUPMENT COMMISSIONING
5.2.26.18 OTHER MISC. WORKE
5.2.26.19 NUMBERING AND TAGING
5.2.26.20 RETENTION MONEY

5.2.27 DIESEL GEN GENARATOR SET


5.2.27.1 DESING FIRST SUBMITION
5.2.27.2 DESING APPROVAL
5.2.27.3 PO PLACEMENT
5.2.27.4 READY FOR SHIPMENT
5.2.27.5 EQUPMENT UNLOADING IN SITE
5.2.27.6 DESING MODIFICATION AND SHOP DRAWING
5.2.27.7 EQUPMENT INSTALLATION
5.2.27.8 GI CONDUIT FABRICATION
5.2.27.9 GI CONDUIT FIXING
5.2.27.10 SUPPORT ARRANGEMENT FABRICATION
5.2.27.11 SUPPORT ARRANGEMENT FIXING
5.2.27.12 CONTROL CABLE LAYING
5.2.27.13 CONTROL CABLE TERMINATION
5.2.27.14 CONTROL CABLE TESTING AND REPORT
5.2.27.15 CABLE DRESSING WORKE
5.2.27.16 EQUPMENT TESTING AND REPORT
5.2.27.17 EQUPMENT COMMISSIONING
5.2.27.18 OTHER MISC. WORKE
5.2.27.19 NUMBERING AND TAGING
5.2.27.20 RETENTION MONEY
5.2.27.21 LOCAL CONTRAL PANEL DESING AND FRBRICATE
5.2.27.22 LOCAL CONTRAL PANEL SUPPLYED
5.2.27.23 LOCAL CONTRAL PANEL INSTALLATION
5.2.27.24 DESIEL TANK DESING AND FRBRICATE
5.2.27.25 DESIEL TANK SUPPLYED
5.2.27.26 DESIEL TANK INSTALATION
5.2.27.27 DESIEL TANK COMMTION
5.2.27.28 DESIEL LINE FABRICATE
5.2.27.29 DESIEL LINE FIXING
5.2.27.30 SOUND ATTENUATOR SYSTEM DESING
5.2.27.31 SOUND ATTENUATOR SYSTEM FRBRICATING
5.2.27.32 SOUND ATTENUATOR SYSTEM SUPPLYED
5.2.27.33 SOUND ATTENUATOR SYSTEM INSTALATION

5.2.28 UPE & BATTERY CHARGERS


5.2.28.1 DESING FIRST SUBMITION
5.2.28.2 DESING APPROVAL
5.2.28.3 PO PLACEMENT
5.2.28.4 READY FOR SHIPMENT
5.2.28.5 EQUPMENT UNLOADING IN SITE
5.2.28.6 DESING MODIFICATION AND SHOP DRAWING
5.2.28.7 EQUPMENT INSTALLATION
5.2.28.8 GI CONDUIT FABRICATION
5.2.28.9 GI CONDUIT FIXING
5.2.28.10 SUPPORT ARRANGEMENT FABRICATION
5.2.28.11 SUPPORT ARRANGEMENT FIXING
5.2.28.12 CONTROL CABLE LAYING
5.2.28.13 CONTROL CABLE TERMINATION
5.2.28.14 CONTROL CABLE TESTING AND REPORT
5.2.28.15 CABLE DRESSING WORKE
5.2.28.16 EQUPMENT TESTING AND REPORT
5.2.28.17 EQUPMENT COMMISSIONING
5.2.28.18 OTHER MISC. WORKE
5.2.28.19 NUMBERING AND TAGING
5.2.28.20 RETENTION MONEY

5.2.29 LV SWICHGER
A HIGHLIFT
1 DESING FIRST SUBMITION
2 DESING APPROVAL
3 PO PLACEMENT
4 READY FOR SHIPMENT
5 EQUPMENT UNLOADING IN SITE
6 DESING MODIFICATION AND SHOP DRAWING
7 EQUPMENT INSTALLATION
8 GI CONDUIT FABRICATION
9 GI CONDUIT FIXING
10 SUPPORT ARRANGEMENT FABRICATION
11 SUPPORT ARRANGEMENT FIXING
12 CONTROL CABLE LAYING
13 CONTROL CABLE TERMINATION
14 CONTROL CABLE TESTING AND REPORT
15 CABLE DRESSING WORKE
16 EQUPMENT TESTING AND REPORT
17 EQUPMENT COMMISSIONING
18 OTHER MISC. WORKE
19 NUMBERING AND TAGING
20 RETENTION MONEY

B FILTERR
1 DESING FIRST SUBMITION
2 DESING APPROVAL
3 PO PLACEMENT
4 READY FOR SHIPMENT
5 EQUPMENT UNLOADING IN SITE
6 DESING MODIFICATION AND SHOP DRAWING
7 EQUPMENT INSTALLATION
8 GI CONDUIT FABRICATION
9 GI CONDUIT FIXING
10 SUPPORT ARRANGEMENT FABRICATION
11 SUPPORT ARRANGEMENT FIXING
12 CONTROL CABLE LAYING
13 CONTROL CABLE TERMINATION
14 CONTROL CABLE TESTING AND REPORT
15 CABLE DRESSING WORKE
16 EQUPMENT TESTING AND REPORT
17 EQUPMENT COMMISSIONING
18 OTHER MISC. WORKE
19 NUMBERING AND TAGING
20 RETENTION MONEY

C CHEMICAL
1 DESING FIRST SUBMITION
2 DESING APPROVAL
3 PO PLACEMENT
4 READY FOR SHIPMENT
5 EQUPMENT UNLOADING IN SITE
6 DESING MODIFICATION AND SHOP DRAWING
7 EQUPMENT INSTALLATION
8 GI CONDUIT FABRICATION
9 GI CONDUIT FIXING
10 SUPPORT ARRANGEMENT FABRICATION
11 SUPPORT ARRANGEMENT FIXING
12 CONTROL CABLE LAYING
13 CONTROL CABLE TERMINATION
14 CONTROL CABLE TESTING AND REPORT
15 CABLE DRESSING WORKE
16 EQUPMENT TESTING AND REPORT
17 EQUPMENT COMMISSIONING
18 OTHER MISC. WORKE
19 NUMBERING AND TAGING
20 RETENTION MONEY

D INTAKE
1 DESING FIRST SUBMITION
2 DESING APPROVAL
3 PO PLACEMENT
4 READY FOR SHIPMENT
5 EQUPMENT UNLOADING IN SITE
6 DESING MODIFICATION AND SHOP DRAWING
7 EQUPMENT INSTALLATION
8 GI CONDUIT FABRICATION
9 GI CONDUIT FIXING
10 SUPPORT ARRANGEMENT FABRICATION
11 SUPPORT ARRANGEMENT FIXING
12 CONTROL CABLE LAYING
13 CONTROL CABLE TERMINATION
14 CONTROL CABLE TESTING AND REPORT
15 CABLE DRESSING WORKE
16 EQUPMENT TESTING AND REPORT
17 EQUPMENT COMMISSIONING
18 OTHER MISC. WORKE
19 NUMBERING AND TAGING
20 RETENTION MONEY

WORKSHOP
1 DESING FIRST SUBMITION
2 DESING APPROVAL
3 PO PLACEMENT
4 READY FOR SHIPMENT
5 EQUPMENT UNLOADING IN SITE
6 DESING MODIFICATION AND SHOP DRAWING
7 EQUPMENT INSTALLATION
8 GI CONDUIT FABRICATION
9 GI CONDUIT FIXING
10 SUPPORT ARRANGEMENT FABRICATION
11 SUPPORT ARRANGEMENT FIXING
12 CONTROL CABLE LAYING
13 CONTROL CABLE TERMINATION
14 CONTROL CABLE TESTING AND REPORT
15 CABLE DRESSING WORKE
16 EQUPMENT TESTING AND REPORT
17 EQUPMENT COMMISSIONING
18 OTHER MISC. WORKE
19 NUMBERING AND TAGING
20 RETENTION MONEY

1 DESING FIRST SUBMITION


2 DESING APPROVAL
3 PO PLACEMENT
4 READY FOR SHIPMENT
5 EQUPMENT UNLOADING IN SITE
6 DESING MODIFICATION AND SHOP DRAWING
7 EQUPMENT INSTALLATION
8 GI CONDUIT FABRICATION
9 GI CONDUIT FIXING
10 SUPPORT ARRANGEMENT FABRICATION
11 SUPPORT ARRANGEMENT FIXING
12 CONTROL CABLE LAYING
13 CONTROL CABLE TERMINATION
14 CONTROL CABLE TESTING AND REPORT
15 CABLE DRESSING WORKE
16 EQUPMENT TESTING AND REPORT
17 EQUPMENT COMMISSIONING
18 OTHER MISC. WORKE
19 NUMBERING AND TAGING
20 RETENTION MONEY

5.2.30 LV CABLE
DESING FIRST SUBMITION
DESING APPROVAL
PO PLACEMENT
READY FOR SHIPMENT
CABALE UNLOADING IN SITE
DESING MODIFICATION AND SHOP DRAWING
CONTROL CABLE TESTING AND REPORT
CABLE LAYING
CABLE TERMINATION
CABLE DRESSING
CABLE LAYING
CABLE TERMINATION
CABLE DRESSING
CABLE TESTING AND REPORT

5.2.31 CABLE TRAYS AND ACCESSORIES


DESING FIRST SUBMITION
DESING APPROVAL
PO PLACEMENT
READY FOR SHIPMENT
EQUPMENT UNLOADING IN SITE
DESING MODIFICATION AND SHOP DRAWING
EQUPMENT INSTALLATION
EQUPMENT TESTING AND REPORT
SAPAR PARTS AND MAINENTS EQUPMENT
Other Misc. Works
5.2.32 LIGHTING
DESING FIRST SUBMITION
DESING APPROVAL
PO PLACEMENT
READY FOR SHIPMENT
EQUPMENT UNLOADING IN SITE
DESING MODIFICATION AND SHOP DRAWING
EQUPMENT INSTALLATION
EQUPMENT TESTING AND REPORT
SAPAR PARTS AND MAINENTS EQUPMENT
Other Misc. Works
5.2.33 MISCELLANEOUS ELECTRICAL EQUIPMENT
DESING FIRST SUBMITION
DESING APPROVAL
PO PLACEMENT
READY FOR SHIPMENT
EQUPMENT UNLOADING IN SITE
DESING MODIFICATION AND SHOP DRAWING
EQUPMENT INSTALLATION
EQUPMENT TESTING AND REPORT
SAPAR PARTS AND MAINENTS EQUPMENT
Other Misc. Works
FORING
EUROS

1,815,261.72 10000.00%
819,611.52
944,829.95
37,340,061.34

33,891,721.50
635,292.00
238,336.00

1,469,468.00
2,556,526.00

1,260,000.00
1,175,769.00

495,061.00
244,412.00
484,190.00

1,184,260.00
263,109.00

36,855.00
609,000.00

121,996.00
788,004.00

2,395,498.00
283,339.00

3,394,580.00
3,732,890.00

399,056.00

413,528.50
198,023.00

140,000.00
203,000.00

1,708,000.00
1,953,000.00
794,850.00
947,100.00

1,526,245.00