2.2 HV SWICHGEAR
2.2.1 DESING FIRST SUBMITION
2.2.2 DESING APPROVAL
2.2.3 PO PLACEMENT
2.2.4 READY FOR SHIPMENT
2.2.5 EQUPMENT UNLOADING IN SITE
2.2.6 DESING MODIFICATION AND SHOP DRAWING
2.2.7 EQUPMENT INSTALLATION
2.2.8 GI CONDUIT FABRICATION
2.2.9 GI CONDUIT FIXING
2.2.10 SUPPORT ARRANGEMENT FABRICATION
2.2.11 SUPPORT ARRANGEMENT FIXING
2.2.12 HV CABLE LAYING
2.2.13 HV CABLE TERMINATION
2.2.14 HV CABLE TESTING AND REPORT
2.2.15 CONTROL CABLE LAYING
2.2.16 CONTROL CABLE TERMINATION
2.2.17 CONTROL CABLE TESTING AND REPORT
2.2.18 CABLE DRESSING WORKE
2.2.19 EQUPMENT TESTING AND REPORT
2.2.20 EQUPMENT COMMISSIONING
2.2.21 OTHER MISC. WORKE
2.2.22 NUMBERING AND TAGING
2.2.23 RETENTION MONEY
2.3 ACCESSORIES
2.3.1 DESING FIRST SUBMITION
2.3.2 DESING APPROVAL
2.3.3 PO PLACEMENT
2.3.4 READY FOR SHIPMENT
2.3.5 EQUPMENT UNLOADING IN SITE
2.3.6 DESING MODIFICATION AND SHOP DRAWING
2.3.7 SUPPORT ARRANGEMENT FABRICATION
2.3.8 SUPPORT ARRANGEMENT FIXING
2.3.9 EQUPMENT INSTALLATION
2.3.10 EQUPMENT TESTING AND REPORT
2.3.11 EQUPMENT COMMISSIONING
2.3.12 OTHER MISC. WORKE
2.3.13 RETENTION MONEY
4,DESING,SUPPLY &
INSTALLATION OF 02 NOS, FINE
4.0
SCREENS AT THE EXISTING
INTAKE
4.1 4.1.1 DESING FIRST SUBMITION
4.1.2 DESING APPROVAL
4.1.3 PO PLACEMENT
4.1.4 READY FOR SHIPMENT
4.1.5 EQUPMENT UNLOADING IN SITE
4.1.6 DESING MODIFICATION AND SHOP DRAWING
4.1.7 EQUPMENT INSTALLATION
4.1.8 GI CONDUIT FABRICATION
4.1.9 GI CONDUIT FIXING
4.1.10 SUPPORT ARRANGEMENT FABRICATION
4.1.11 SUPPORT ARRANGEMENT FIXING
4.1.12 PVC LINE ARRANGEMENT FABRICATION
4.1.13 PVC LINE ARRANGEMENT FIXING
4.1.14 CONTROL CABLE LAYING
4.1.15 CONTROL CABLE TERMINATION
4.1.16 CONTROL CABLE TESTING AND REPORT
4.1.17 CABLE DRESSING WORKE
4.1.18 EQUPMENT TESTING AND REPORT
4.1.19 EQUPMENT COMMISSIONING
4.1.20 LOCAL CONTRAL PANEL DESING FIRST SUBMITION
4.1.21 LOCAL CONTRAL PANEL DESING APPROVAL
4.1.22 LOCAL CONTRAL PANEL SUPPLYED
4.1.23 LOCAL CONTRAL PANEL INSTALLATION
4.1.24 OTHER MISC. WORKE
4.1.25 NUMBERING AND TAGING
4.1.26 RETENTION MONEY
5.2 EQUIPMENT
5.2.1 AIR BLOWER
5.2.1.1 DESING FIRST SUBMITION
5.2.1.2 DESING APPROVAL
5.2.1.3 PO PLACEMENT
5.2.1.4 READY FOR SHIPMENT
5.2.1.5 EQUPMENT UNLOADING IN SITE
5.2.1.6 DESING MODIFICATION AND SHOP DRAWING
5.2.1.7 EQUPMENT INSTALLATION
5.2.1.8 GI CONDUIT FABRICATION
5.2.1.9 GI CONDUIT FIXING
5.2.1.10 SUPPORT ARRANGEMENT FABRICATION
5.2.1.11 SUPPORT ARRANGEMENT FIXING
5.2.1.12 PVC LINE ARRANGEMENT FABRICATION
5.2.1.13 PVC LINE ARRANGEMENT FIXING
5.2.1.14 CONTROL CABLE LAYING
5.2.1.15 CONTROL CABLE TERMINATION
5.2.1.16 CONTROL CABLE TESTING AND REPORT
5.2.1.17 CABLE DRESSING WORKE
5.2.1.18 EQUPMENT TESTING AND REPORT
5.2.1.19 EQUPMENT COMMISSIONING
5.2.1.20 LOCAL CONTRAL PANEL DESING FIRST SUBMITION
5.2.1.21 LOCAL CONTRAL PANEL DESING APPROVAL
5.2.1.22 LOCAL CONTRAL PANEL SUPPLYED
5.2.1.23 LOCAL CONTRAL PANEL INSTALLATION
5.2.1.24 OTHER MISC. WORKE
5.2.1.25 NUMBERING AND TAGING
5.2.1.26 RETENTION MONEY
5.2.19 PENSTOCKS
5.2.19.1 DESING FIRST SUBMITION
5.2.19.2 DESING APPROVAL
5.2.19.3 PO PLACEMENT
5.2.19.4 READY FOR SHIPMENT
5.2.19.5 EQUPMENT UNLOADING IN SITE
5.2.19.6 DESING MODIFICATION AND SHOP DRAWING
5.2.19.7 EQUPMENT INSTALLATION
5.2.19.8 EQUPMENT TESTING AND REPORT
5.2.19.9 OTHER MISC. WORKE
5.2.19.10 RETENTION MONEY
5.2.29 LV SWICHGER
A HIGHLIFT
1 DESING FIRST SUBMITION
2 DESING APPROVAL
3 PO PLACEMENT
4 READY FOR SHIPMENT
5 EQUPMENT UNLOADING IN SITE
6 DESING MODIFICATION AND SHOP DRAWING
7 EQUPMENT INSTALLATION
8 GI CONDUIT FABRICATION
9 GI CONDUIT FIXING
10 SUPPORT ARRANGEMENT FABRICATION
11 SUPPORT ARRANGEMENT FIXING
12 CONTROL CABLE LAYING
13 CONTROL CABLE TERMINATION
14 CONTROL CABLE TESTING AND REPORT
15 CABLE DRESSING WORKE
16 EQUPMENT TESTING AND REPORT
17 EQUPMENT COMMISSIONING
18 OTHER MISC. WORKE
19 NUMBERING AND TAGING
20 RETENTION MONEY
B FILTERR
1 DESING FIRST SUBMITION
2 DESING APPROVAL
3 PO PLACEMENT
4 READY FOR SHIPMENT
5 EQUPMENT UNLOADING IN SITE
6 DESING MODIFICATION AND SHOP DRAWING
7 EQUPMENT INSTALLATION
8 GI CONDUIT FABRICATION
9 GI CONDUIT FIXING
10 SUPPORT ARRANGEMENT FABRICATION
11 SUPPORT ARRANGEMENT FIXING
12 CONTROL CABLE LAYING
13 CONTROL CABLE TERMINATION
14 CONTROL CABLE TESTING AND REPORT
15 CABLE DRESSING WORKE
16 EQUPMENT TESTING AND REPORT
17 EQUPMENT COMMISSIONING
18 OTHER MISC. WORKE
19 NUMBERING AND TAGING
20 RETENTION MONEY
C CHEMICAL
1 DESING FIRST SUBMITION
2 DESING APPROVAL
3 PO PLACEMENT
4 READY FOR SHIPMENT
5 EQUPMENT UNLOADING IN SITE
6 DESING MODIFICATION AND SHOP DRAWING
7 EQUPMENT INSTALLATION
8 GI CONDUIT FABRICATION
9 GI CONDUIT FIXING
10 SUPPORT ARRANGEMENT FABRICATION
11 SUPPORT ARRANGEMENT FIXING
12 CONTROL CABLE LAYING
13 CONTROL CABLE TERMINATION
14 CONTROL CABLE TESTING AND REPORT
15 CABLE DRESSING WORKE
16 EQUPMENT TESTING AND REPORT
17 EQUPMENT COMMISSIONING
18 OTHER MISC. WORKE
19 NUMBERING AND TAGING
20 RETENTION MONEY
D INTAKE
1 DESING FIRST SUBMITION
2 DESING APPROVAL
3 PO PLACEMENT
4 READY FOR SHIPMENT
5 EQUPMENT UNLOADING IN SITE
6 DESING MODIFICATION AND SHOP DRAWING
7 EQUPMENT INSTALLATION
8 GI CONDUIT FABRICATION
9 GI CONDUIT FIXING
10 SUPPORT ARRANGEMENT FABRICATION
11 SUPPORT ARRANGEMENT FIXING
12 CONTROL CABLE LAYING
13 CONTROL CABLE TERMINATION
14 CONTROL CABLE TESTING AND REPORT
15 CABLE DRESSING WORKE
16 EQUPMENT TESTING AND REPORT
17 EQUPMENT COMMISSIONING
18 OTHER MISC. WORKE
19 NUMBERING AND TAGING
20 RETENTION MONEY
WORKSHOP
1 DESING FIRST SUBMITION
2 DESING APPROVAL
3 PO PLACEMENT
4 READY FOR SHIPMENT
5 EQUPMENT UNLOADING IN SITE
6 DESING MODIFICATION AND SHOP DRAWING
7 EQUPMENT INSTALLATION
8 GI CONDUIT FABRICATION
9 GI CONDUIT FIXING
10 SUPPORT ARRANGEMENT FABRICATION
11 SUPPORT ARRANGEMENT FIXING
12 CONTROL CABLE LAYING
13 CONTROL CABLE TERMINATION
14 CONTROL CABLE TESTING AND REPORT
15 CABLE DRESSING WORKE
16 EQUPMENT TESTING AND REPORT
17 EQUPMENT COMMISSIONING
18 OTHER MISC. WORKE
19 NUMBERING AND TAGING
20 RETENTION MONEY
5.2.30 LV CABLE
DESING FIRST SUBMITION
DESING APPROVAL
PO PLACEMENT
READY FOR SHIPMENT
CABALE UNLOADING IN SITE
DESING MODIFICATION AND SHOP DRAWING
CONTROL CABLE TESTING AND REPORT
CABLE LAYING
CABLE TERMINATION
CABLE DRESSING
CABLE LAYING
CABLE TERMINATION
CABLE DRESSING
CABLE TESTING AND REPORT
1,815,261.72 10000.00%
819,611.52
944,829.95
37,340,061.34
33,891,721.50
635,292.00
238,336.00
1,469,468.00
2,556,526.00
1,260,000.00
1,175,769.00
495,061.00
244,412.00
484,190.00
1,184,260.00
263,109.00
36,855.00
609,000.00
121,996.00
788,004.00
2,395,498.00
283,339.00
3,394,580.00
3,732,890.00
399,056.00
413,528.50
198,023.00
140,000.00
203,000.00
1,708,000.00
1,953,000.00
794,850.00
947,100.00
1,526,245.00