METRADO PARA UNA EDIFICACIN

N PARTIDA LARGO ANCHO ALTURA N VECES N ELEMENTOS METRADO


1 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES
1.1 OBRAS PROVISIONALES
1.1.1 CASETA DE GUARDIANA 7.50
CASETA DE GUARDIANA 2.50 3.00 - 1 1 7.50
1.1.2 ALMACN 7.50
ALMACN PARA MATERIALES 2.50 3.00 - 1 1 7.50
1.2 TRABAJOS PRELIMINARES
1.2.1 LIMPIEZA DEL TERRENO MANUAL 108.88
REAS PARCIALES
A1 = 9.50 10.10 - 1 1 95.95
A2 = /2 2.56 10.10 - 1 1 12.93
1.2.2 TRAZO Y REPLANTEO 108.88
REAS PARCIALES
A1 = 9.50 10.10 - 1 1 95.95
A2 = /2 2.56 10.10 - 1 1 12.93
2 ESTRUCTURAS
2.1 MOVIMIENTO DE TIERRAS
2.1.1 NIVELACIN DE TERRENO 108.88
REAS PARCIALES
A1 = 9.50 10.10 - 1 1 95.95
A2 = /2 2.56 10.10 - 1 1 12.93
2.1.2 EXCAVACIONES 40.91
CIMIENTOS CORRIDOS
CORTE 1-1
0.43 0.50 1.00 2 1 0.43
1.55 0.50 1.00 2 1 1.55
3.43 0.50 1.00 2 1 3.43
3.78 0.50 1.00 1 1 1.89
3.63 0.50 1.00 1 1 1.81

Docente: Ing Ivn Meja


METRADO PARA UNA EDIFICACIN
3.89 0.50 1.00 1 1 1.95
4.15 0.50 1.00 1 1 2.08
1.58 0.50 1.00 1 1 0.79
1.25 0.50 1.00 1 1 0.63
CORTE 2-2
9.10 0.50 1.00 1 1 4.55
3.63 0.50 1.00 3 1 5.44
3.43 0.50 1.00 1 1 1.71
1.55 0.50 1.00 1 1 0.78
0.43 0.50 1.00 1 1 0.21
0.33 0.50 1.00 1 1 0.16
CORTE 3-3
0.53 0.40 0.80 2 1 0.34
ZAPATAS
0.90 0.90 1.20 10 1 9.72
0.88 1.20 1 1 1.06
1.68 1.20 1 1 2.02
0.32 1.20 1 1 0.39
2.1.3 RELLENO CON MATERIAL PROPIO
2.1.4 ELIMINACIN DE MATERIAL EXCEDENTE
2.2 OBRAS DE CONCRETO SIMPLE
2.2.1 CIMIENTOS CORRIDOS 22.16
CORTE 1-1
0.43 0.50 0.80 2 1 0.34
1.55 0.50 0.80 2 1 1.24
3.43 0.50 0.80 2 1 2.74
3.78 0.50 0.80 1 1 1.51
3.63 0.50 0.80 1 1 1.45
3.89 0.50 0.80 1 1 1.56
4.15 0.50 0.80 1 1 1.66
1.58 0.50 0.80 1 1 0.63
1.25 0.50 0.80 1 1 0.50

Docente: Ing Ivn Meja


METRADO PARA UNA EDIFICACIN
CORTE 2-2
9.10 0.50 0.80 1 1 3.64
3.63 0.50 0.80 3 1 4.35
3.43 0.50 0.80 1 1 1.37
1.55 0.50 0.80 1 1 0.62
0.43 0.50 0.80 1 1 0.17
0.33 0.50 0.80 1 1 0.13
CORTE 3-3
0.53 0.40 0.60 2 1 0.25
2.2.2 SOLADO 1.10
0.90 0.90 0.10 10 1 0.81
0.88 0.10 1 1 0.09
1.68 0.10 1 1 0.17
0.32 0.10 1 1 0.03
2.2.3.1 SOBRECIMIENTOS
PARA EL CONCRETO 4.16
CORTE 1-1
0.43 0.15 0.50 2 1 0.06
1.55 0.15 0.50 2 1 0.23
3.43 0.15 0.50 2 1 0.51
3.78 0.15 0.50 1 1 0.28
3.63 0.15 0.50 1 1 0.27
3.89 0.15 0.50 1 1 0.29
4.15 0.15 0.50 1 1 0.31
1.58 0.15 0.50 1 1 0.12
1.25 0.15 0.50 1 1 0.09
CORTE 2-2
9.10 0.15 0.50 1 1 0.68
3.63 0.15 0.50 3 1 0.82
3.43 0.15 0.50 1 1 0.26
1.55 0.15 0.50 1 1 0.12
0.43 0.15 0.50 1 1 0.03

Docente: Ing Ivn Meja


METRADO PARA UNA EDIFICACIN
0.33 0.15 0.50 1 1 0.02
CORTE 3-3
0.53 0.10 0.50 2 1 0.05

2.3 OBRAS DE CONCRETO ARMADO


2.3.1 ZAPATAS
2.3.1.1 CONCRETO PARA ZAPATAS f'c=210kg/cm2 6.04
0.90 0.90 0.50 10 1.1 4.46
0.88 0.50 1 1.1 0.48
1.68 0.50 1 1.1 0.93
0.32 0.50 1 1.1 0.18
2.3.1.2 PARA EL ACERO fy=4200kg/cm2 77.53
0.75 m.
= 1/2"
L= 6 m.
6.00 - - 13 1 77.53
0.75 m. d= 0.994 kg/m.

2.3.2 COLUMNAS
2.3.2.1 PARA EL CONCRETO 4.42
1er PISO
C-1 0.25 0.25 3.00 13 1 2.44
C-2 0.25 0.15 2.40 2 1 0.18
2do PISO
C-1 0.25 0.25 2.40 12 1 1.80
2.3.2.2 PARA LA ARMADURA DE ACERO 268.00
C-1
ESQUINA : 3
0.30 m.
= 1/2"
6.24 m. L= 6.735 m.
d= 0.994 kg/m.
6.74 - - 6 1 40.17

0.25 m.

Docente: Ing Ivn Meja


METRADO PARA UNA EDIFICACIN
0.55m.

= 1/2"
6.258m.
L= 6.985 m. 6.99 6 1 41.66
d= 0.994 kg/m.
0.25 m.

0.19 m.
= 1/4"
0.075 m.
0.19 m. L= 0.91 m.
0.91 - - 108 1 24.57
d= 0.25 kg/m.

INTERMEDIA :10
0.30 m.
= 1/2"
6.258 m. L= 6.735 m.
d= 0.994 kg/m. - - 33.68

0.25 m.
6.74 20 1
0.30m.

= 1/2"
6.258m.
L= 6.985 m. - - 34.93
d= 0.994 kg/m.
0.25 m.
6.99 20 1
0.19 m.
= 1/4"
0.04 m.
0.09 m. L= 0.91 m. 0.91 - - 360 1 81.90
d= 0.25 kg/m.

C-2

= 1/2"
2.90m.
L= 3.15 m. 3.15 - - 8 1 6.30
d= 0.994 kg/m.
0.25 m.

Docente: Ing Ivn Meja


METRADO PARA UNA EDIFICACIN
0.19 m.
= 1/4"
0.04 m.
0.09m. L= 0.91 m. 0.64 - - 30 1 4.80
d= 0.25 kg/m.

2.3.2.3 PARA EL ENCOFRADO 25.43


1er PISO
C-1
ESQUINA : 3
0.45 - 3.00 1 1 1.35
0.20 - 3.00 1 1 0.60
0.60 3.00 1 1 1.80
INTERMEDIA :10
0.55 - 3.00 2 1 3.30
0.70 - 3.00 2 1 4.20
0.35 - 3.00 1 1 1.06
C-2
0.80 - 2.50 1 1 2.00
0.51 - 2.50 1 1 1.27
2do PISO
C-1
ESQUINA : 3
0.45 - 2.40 1 1 1.08
0.20 - 2.40 1 1 0.48
0.60 2.40 1 1 1.44
INTERMEDIA :10
0.55 - 2.40 2 1 2.64
0.70 - 2.40 2 1 3.36
0.35 - 2.40 1 1 0.85
2.3.3 VIGAS
2.3.3.1 PARA EL CONCRETO 7.76
1er PISO

Docente: Ing Ivn Meja


METRADO PARA UNA EDIFICACIN
eje 1 9.50 0.25 0.20 1 1.1 0.52
eje 2 10.76 0.25 0.20 1 1.1 0.59
eje 3 9.50 0.25 0.20 1 1.1 0.52
eje diagonal 9.87 0.25 0.20 1 1.1 0.54
eje A - cortado 1.11 0.20 1 1.1 0.24
eje A - tramo 4.60 0.25 0.20 3 1.1 0.76
4.75 0.25 0.20 3 1.1 0.78
4.60 0.20 0.20 1 1.1 0.20
2.25 0.20 0.20 1 1.1 0.10
2do PISO
9.50 0.25 0.20 1 1.1 0.52
10.76 0.25 0.20 1 1.1 0.59
5.80 0.25 0.20 1 1.1 0.32
4.93 0.25 0.20 1 1.1 0.27
1.11 0.20 1 1.1 0.24
4.60 0.25 0.20 3 1.1 0.76
4.75 0.25 0.20 3 1.1 0.78
2.3.3.2 PARA EL ACERO 992.40
1er PISO
9.47 m.

0.35 m. T= 0.38 m. 0.35 m.


= 1/2" 10.55 - - 4 1 41.95
L= 10.55 m.
d= 0.994 kg/m.
10.73 m.

0.35 m. T= 0.38 m. 0.35 m.

= 1/2" 11.97 - - 4 1 47.59


L= 11.81 m.
d= 0.994 kg/m.

Docente: Ing Ivn Meja


METRADO PARA UNA EDIFICACIN
11.97m.

0.35 m. T= 0.38 m. 0.35 m.

= 1/2" 13.05 - - 4 1 51.89


L= 11.81 m.
d= 0.994 kg/m.
4.75 m.

0.35 m. 0.35 m.

= 1/2" 5.45 - - 4 4 86.68


L= 5.45 m.
d= 0.994 kg/m.
4.60 m.

0.35 m. 0.35 m.

= 1/2" 5.30 - - 4 4 84.29


L= 5.30 m.
d= 0.994 kg/m.

4.82 m.
0.35 m.

= 1/2" 5.52 - - 4 1 21.95


0.35 m.
L= 5.52 m.
d= 0.994 kg/m.

4.72 m.
0.35 m.

= 1/2" - - 4 1 21.55
0.35 m.
L= 5.42 m.
d= 0.994 kg/m. 5.42
2do PISO
9.47 m.
4.40

0.35 m. T=4.40
0.38m.
m. 0.35 m.
= 1/2" 10.55 - - 4 1 41.95
L= 10.55 m.
d= 0.994 kg/m.

Docente: Ing Ivn Meja


METRADO PARA UNA EDIFICACIN
10.73 m.

0.35 m. T= 0.38 m. 0.35 m.

= 1/2" 11.97 - - 4 1 47.59


L= 11.81 m.
d= 0.994 kg/m.
5.72 m.

0.35 m. 0.35 m.

= 1/2" 6.42 - - 4 1 25.53


L= 11.81 m.
d= 0.994 kg/m.
4.75 m.

0.35 m. 0.35 m.

= 1/2" 5.45 - - 4 4 86.68


L= 5.45 m.
d= 0.994 kg/m.
4.60 m.

0.35 m. 0.35 m.

= 1/2" 5.30 - - 4 4 84.29


L= 5.30 m.
d= 0.994 kg/m.

4.82 m.
0.35 m.

= 1/2" 5.52 - - 4 1 21.95


0.35 m.
L= 5.52 m.
d= 0.994 kg/m.
1er PISO
0.19 m.
= 3/8"
0.04 m.
0.14 m. L= 0.74 m. 0.74 - - 23 3 28.59
d= 0.56 kg/m.

Docente: Ing Ivn Meja


METRADO PARA UNA EDIFICACIN
0.19 m.
= 3/8"
0.04 m.
0.14 m. L= 0.74 m.
0.74 - - 24 3 29.84
d= 0.56 kg/m.

0.19 m.
= 3/8"
0.04 m.
0.14 m. L= 0.74 m. 0.74 - - 33 7 95.73
d= 0.56 kg/m.

0.19 m.
= 3/8"
0.04 m.
0.14 m. L= 0.74 m. 0.74 - - 34 3 42.27
d= 0.56 kg/m.

0.19 m.
= 3/8"
0.04 m.
0.14 m. L= 0.74 m. 0.74 - - 37 2 30.67
d= 0.56 kg/m.

2do PISO
0.19 m.
= 3/8"
0.04 m.
0.14 m. L= 0.74 m. 0.74 - - 23 3 28.59
d= 0.56 kg/m.

0.19 m.
= 3/8"
0.04 m.
0.14 m. L= 0.74 m. 0.74 - - 24 3 29.84
d= 0.56 kg/m.

Docente: Ing Ivn Meja


METRADO PARA UNA EDIFICACIN
0.19 m.
= 3/8"
0.04 m.
0.14 m. L= 0.74 m. 0.74 - - 33 2 27.35
d= 0.56 kg/m.

0.19 m.
= 3/8"
0.04 m.
0.14 m. L= 0.74 m. 0.74 - - 34 3 42.27
d= 0.56 kg/m.

0.19 m.
= 3/8"
0.04 m.
0.14 m. L= 0.74 m. 0.74 - - 37 1 15.33
d= 0.56 kg/m.

2.3.3.3 PARA EL ENCOFRADO 4.42


1er PISO
0.25 0.25 3.00 13 1 2.44
0.25 0.15 2.40 2 1 0.18
2do PISO
0.25 0.25 2.40 12 1 1.80
2.3.4 LOSAS ALIGERADAS
2.3.4.1 PARA EL CONCRETO 0.53
VOL LOSA TOTAL 81.13 0.20 1.1 1 17.85
VIGAS - - - - -7.76
LADRILLO 0.30 0.30 0.15 656 1 -8.86
ESCLERA 3.50 0.20 1 1 -0.70
2.3.4.2 PARA EL ACERO 141.68
VIGUETAS

Docente: Ing Ivn Meja


METRADO PARA UNA EDIFICACIN
4.40 m.
0.10 m. 0.10m.
= 3/8"
L= 4.60 m.
d= 0.56 kg/m.
4.60 - - 11 5 141.68

2.3.4.3 PARA EL ENCOFRADO 110.30


1er PISO 1.97
9.03
20.90
8.74
10.15
4.37
2do PISO 1.97
9.03
20.90
8.74
10.15
4.37
2.3.5 ESCALERAS
2.3.5.1 PARA EL CONCRETO 6.00
5.45 1.00 1.1 1 6.00
2.3.5.2 PARA EL ACERO 15.95

4.22 m.

= 1/2"
L= 4.22 m.
d= 0.994 kg/m.
4.22 - - 1 1 4.19

Docente: Ing Ivn Meja


METRADO PARA UNA EDIFICACIN
1.00m.

= 3/8"
L= 1.00 m.
d= 0.56 kg/m.
1.00 - - 21 1 11.76
2.3.5.3 PARA EL ENCOFRADO 7.34
0.17 1.00 - 1 1 0.17
3.15 1.00 - 1 1 3.15
0.17 1.00 - 1 1 0.17
3.85 - 1 1 3.85
3 ARQUITECTURA
3.1 MUROS Y TABIQUES DE ALBAILERA
3.1.2 MUROS DE LADRILLO KINGKONG DE ARCILA 143.97
1er PISO
COCINA 4.80 - 2.40 1 1 11.52
0.98 - 2.40 1 1 2.35
0.99 - 2.40 1 1 2.37
0.85 - 2.40 1 1 2.04
3.95 - 2.40 1 1 9.48
SALA-COMEDOR 7.50 - 2.40 1 1 18.00
4.70 - 2.40 1 1 11.28
3.60 - 2.40 1 1 8.64
2.44 - 2.40 1 1 5.86
LAVANDERA 4.84 - 2.40 1 1 11.62
2.24 - 2.40 1 1 5.38
3.80 - 2.40 1 1 9.12
BAO 0.90 - 2.40 1 2 4.32
0.70 - 2.40 1 1 1.68
HALL 1.90 - 2.40 1 1 4.56
DORMITORIA SERVICIO 3.70 - 2.40 1 1 8.88
2.20 - 2.40 1 1 5.28
4.60 - 2.40 1 1 11.04

Docente: Ing Ivn Meja


METRADO PARA UNA EDIFICACIN
COCHERA 4.40 - 2.40 1 1 10.56
2do PISO
BAO 2.68 - 2.40 1 1 6.43
0.77 - 2.40 1 1 1.84
0.85 - 2.40 1 1 2.04
2.85 - 2.40 1 1 6.84
ESTAR 0.98 - 2.40 1 1 2.35
1.00 - 2.40 1 1 2.40
DORMITORIO 1 3.75 - 2.40 1 1 9.00
2.20 - 2.40 1 1 5.28
3.60 - 2.40 1 1 8.64
1.40 - 2.40 1 1 3.36
BAO 0.90 - 2.40 1 1 2.16
1.08 - 2.40 1 1 2.59
2.80 - 2.40 1 1 6.72
DORMTRIO PRINCIPAL 3.40 - 2.40 1 1 8.16
3.60 - 2.40 1 1 8.64
2.62 - 2.40 1 1 6.29
HALL 3.70 - 2.40 1 1 8.88
1.07 - 2.40 1 1 2.57
DORMITORIO 2 2.08 - 2.40 1 1 4.99
0.80 - 2.40 1 1 1.92
2.20 - 2.40 1 1 5.28
4.80 - 2.40 1 1 11.52
3.2 REVOQUES Y REVESTIMIENTOS
3.2.1 TARRAJEO
3.2.1.1 TARRAJEO MUROS 261.87
1er PISO
COCINA 4.80 - 2.40 1 1 11.52
0.98 - 2.40 1 1 2.35
0.99 - 2.40 1 1 2.37
0.85 - 2.40 1 1 2.04

Docente: Ing Ivn Meja


METRADO PARA UNA EDIFICACIN
3.95 - 2.40 1 1 9.48
SALA-COMEDOR 7.50 - 2.40 1 1 18.00
4.70 - 2.40 1 1 11.28
3.60 - 2.40 1 1 8.64
2.44 - 2.40 1 1 5.86
LAVANDERA 4.84 - 2.40 1 1 11.62
2.24 - 2.40 1 1 5.38
3.80 - 2.40 1 1 9.12
BAO 0.90 - 2.40 1 2 4.32
0.70 - 2.40 1 1 1.68
HALL 1.90 - 2.40 1 1 4.56
DORMITORIO SERVICIO 3.70 - 2.40 1 1 8.88
2.20 - 2.40 1 1 5.28
4.60 - 2.40 1 1 11.04
COCHERA 4.40 - 2.40 1 1 10.56
2do PISO
BAO 2.68 - 2.40 1 1 6.43
0.77 - 2.40 1 1 1.84
0.85 - 2.40 1 1 2.04
2.85 - 2.40 1 1 6.84
ESTAR 0.98 - 2.40 1 1 2.35
1.00 - 2.40 1 1 2.40
DORMITORIO 1 3.75 - 2.40 1 1 9.00
2.20 - 2.40 1 1 5.28
3.60 - 2.40 1 1 8.64
1.40 - 2.40 1 1 3.36
BAO 0.90 - 2.40 1 1 2.16
1.08 - 2.40 1 1 2.59
2.80 - 2.40 1 1 6.72
DORMTRIO PRINCIPAL 3.40 - 2.40 1 1 8.16
3.60 - 2.40 1 1 8.64
2.62 - 2.40 1 1 6.29

Docente: Ing Ivn Meja


METRADO PARA UNA EDIFICACIN
HALL 3.70 - 2.40 1 1 8.88
1.07 - 2.40 1 1 2.57
DORMITORIO 2 2.08 - 2.40 1 1 4.99
0.80 - 2.40 1 1 1.92
2.20 - 2.40 1 1 5.28
4.80 - 2.40 1 1 11.52
3.2.1.2 TARRAJEO CIELO RASO 110.30
1.97
9.03
20.90
8.74
10.15
4.37
1.97
9.03
20.90
8.74
10.15
4.37
4 INSTALACIONES SANITARIAS
4.1 APARATOS SANITARIOS
BAOS 3.00

Docente: Ing Ivn Meja


METRADO PARA UNA EDIFICACIN

UNIDAD

M2

M2

M2

M2

M2

M3

Docente: Ing Ivn Meja


METRADO PARA UNA EDIFICACIN

M3

Docente: Ing Ivn Meja


METRADO PARA UNA EDIFICACIN

M3

M3

Docente: Ing Ivn Meja


METRADO PARA UNA EDIFICACIN

M3

KG

M3

KG

Docente: Ing Ivn Meja


METRADO PARA UNA EDIFICACIN

M2

M3

Docente: Ing Ivn Meja


METRADO PARA UNA EDIFICACIN

KG

Docente: Ing Ivn Meja


METRADO PARA UNA EDIFICACIN

M2

M3

KG

Docente: Ing Ivn Meja


METRADO PARA UNA EDIFICACIN

M2

M3

KG

Docente: Ing Ivn Meja


METRADO PARA UNA EDIFICACIN

M2

M2

Docente: Ing Ivn Meja


METRADO PARA UNA EDIFICACIN

M2

Docente: Ing Ivn Meja


METRADO PARA UNA EDIFICACIN

M2

UNID

Docente: Ing Ivn Meja


ANLISIS DE PRECIOS UNITARIOS
1. OBRAS POVISIONALES TABAJOS POVISIONALES
1.1. OBRAS POVISIONALES
Partida 1.1.1 CASETA DE GUARDIANA

Rendimiento m3/DIA 15.0000 EQ. 15.0000 Costo unitario directo po

Cdigo Descripcin Recurso Unidad Cuadrilla


Mano de Obra
0101010003 OPERARIO hh 1.0000
0101010005 PEON hh 2.0000

Materiales
0290130022 TRIPLEY plch.
02041200010004 CLAVOS PARA MADERA CON CABEZA DE 2 1/2" kg
0231130003 MADERA EUCALIPTO p2

Equipos
0301010006 HERRAMIENTAS MANUALES %mo
0301100001 COMPACTADORA VIBRATORIA TIPO PLANCHA 7 HP hm 1.0000

Partida 1.1.2 ALMACN

Rendimiento m3/DIA 15.0000 EQ. 15.0000 Costo unitario directo po

Cdigo Descripcin Recurso Unidad Cuadrilla


Mano de Obra
0101010003 OPERARIO hh 1.0000
0101010005 PEON hh 2.0000

Materiales
0290130022 TRIPLEY plch.
02041200010004 CLAVOS PARA MADERA CON CABEZA DE 2 1/2" kg
0231130003 MADERA EUCALIPTO p2
Equipos
0301010006 HERRAMIENTAS MANUALES %mo
0301100001 COMPACTADORA VIBRATORIA TIPO PLANCHA 7 HP hm 1.0000

1.2. TRABAJOS PRELIMINARES

Partida 1.2.1 LIMPIEZA MANUAL DEL TERRENO

Rendimiento m2/DIA 100.0000 EQ. 100.0000 Costo unitario directo po

Cdigo Descripcin Recurso Unidad Cuadrilla


Mano de Obra
0101010005 PEON hh 1.0000

Equipos
0301010006 HERRAMIENTAS MANUALES %mo

Partida 1.2.2 TRAZO Y REPLANTEO PRELIMINAR P/ESTRUCTURAS

Rendimiento m2/DIA 400.0000 EQ. 400.0000 Costo unitario directo po

Cdigo Descripcin Recurso Unidad Cuadrilla


Mano de Obra
0101010004 OFICIAL hh 1.0000
0101010005 PEON hh 2.0000
0101030000 TOPOGRAFO hh 1.0000

Materiales
02041200010004 CLAVOS PARA MADERA CON CABEZA DE 2 1/2" kg
02130300010001 YESO BOLSA 28 kg bol
0231130003 MADERA EUCALIPTO p2
0240020001 PINTURA ESMALTE gal

Equipos
0301000009 ESTACION TOTAL hm
0301000020 NIVEL TOPOGRAFICO hm
0301010006 HERRAMIENTAS MANUALES %mo

2.0 ESTRUCTURAS
2.1. MOVIMIENTO DE TIERRAS
Partida 2.1.1 NIVELACIN DE TERRENO

Rendimiento m2/DIA 400.0000 EQ. 400.0000 Costo unitario directo po

Cdigo Descripcin Recurso Unidad Cuadrilla


Mano de Obra
0101010004 OFICIAL hh 1.0000
0101010005 PEON hh 2.0000
0101030000 TOPOGRAFO hh 1.0000

Materiales
02041200010004 CLAVOS PARA MADERA CON CABEZA DE 2 1/2" kg
02130300010001 YESO BOLSA 28 kg bol
0231130003 MADERA EUCALIPTO p2
0240020001 PINTURA ESMALTE gal

Equipos
0301000009 ESTACION TOTAL hm
0301000020 NIVEL TOPOGRAFICO hm
0301010006 HERRAMIENTAS MANUALES %mo

Partida 2.1.2 EXCAVACIONES

Rendimiento m3/Dia MO. 2.5000 EQ.


Costo unitario directo por :
Codigo Descripcion Recurso Unidad Cuadrilla
Mano de Obra
PEON hh 1.0000

Equipos
HERRAMIENTAS MANUALES % MO
2.2 OBRAS DE CONCRETO SIMPLE
Partida 2.2.1 CIMIENTOS CORRIDOS

Rendimiento m3/Dia MO. 20.0000 EQ.


Costo unitario directo por :
Codigo Descripcion Recurso Unidad Cuadrilla
Mano de Obra
OPERARIO hh 1.0000
OFICIAL hh 1.0000
PEON hh 10.0000

Materiales
CEMENTO PORTLAND TIPO I (42.5 kg) bls
HORMIGON DE RIO m3
AGUA m3

Equipos
HERRAMIENTAS MANUALES % MO
MEZCLADORA DE CONCRETO TAMBOR 18 HP 11 p3 hm 1.0000

Partida 2.2.2 SOLADOS

Rendimiento m2/Dia MO. 100.0000 EQ.


Costo unitario directo por :
Codigo Descripcion Recurso Unidad Cuadrilla
Mano de Obra
OPERARIO hh 0.8338
OFICIAL hh 0.8338
PEON hh 5.0000

Materiales
CEMENTO PORTLAND TIPO I (42.5 kg) bls
HORMIGON DE RIO m3
AGUA m3

Equipos
HERRAMIENTAS MANUALES % MO
MEZCLADORA DE CONCRETO TAMBOR 18 HP 11 p3 hm 0.8338

Partida 2.2.3 SOBRECIMIENTOS

Rendimiento m3/Dia MO. 12.0000 EQ.


Costo unitario directo por :
Codigo Descripcion Recurso Unidad Cuadrilla
Mano de Obra
OPERARIO hh 1.0000
OFICIAL hh 2.0000
PEON hh 10.0000

Materiales
PIEDRA CHANCADA 1/2" m3
PIEDRA CHANCADA 3/4" m3
ARENA GRUESA m3
CEMENTO PORTLAND TIPO I (42.5 kg) bls
AGUA m3

Equipos
HERRAMIENTAS MANUALES % MO
VIBRADOR DE CONCRETO 4 HP 1.50" hm 1.0000
MEZCLADORA DE CONCRETO TAMBOR 18 HP 11 p3 hm 1.0000

2.3 OBRAS DE CONCRETO ARMADO


2.3.1 ZAPATAS
Partida 2.3.1.1 CONCRETO PARA ZAPATAS f'c=210kg/cm2

Rendimiento m3/Dia MO. 12.0000 EQ.


Costo unitario directo por :
Codigo Descripcion Recurso Unidad Cuadrilla
Mano de Obra
CAPATAZ hh 0.1000
OPERARIO hh 1.0000
OFICIAL hh 1.0000
PEON hh 0.6000
OPERADOR DE EQUIPO LIVIANO hh 1.2000

Materiales
PIEDRA CHANCADA DE 1/2" y 3/4" m3
ARENA GRUESA m3
CEMENTO PORTLAND TIPO I (42.5 kg) bls
AGUA m3

Equipos
VIBRADOR DE CONCRETO 4 HP 1.50" hm 1.0000
MEZCLADORA DE CONCRETO TAMBOR 18 HP 11 p3 hm 1.0000

Partida 2.3.1.2 PARA EL ACERO fy=4200kg/cm2

Rendimiento kg/Dia MO. 240.0000 EQ.


Costo unitario directo por :
Codigo Descripcion Recurso Unidad Cuadrilla
Mano de Obra
OPERARIO hh 1.0000
OFICIAL hh 2.0000

Equipos
HERRAMIENTAS MANUALES % MO

2.3.2 COLUMNAS
Partida 2.3.2.1 PARA EL CONCRETO

Rendimiento m3/Dia MO. 12.0000 EQ.


Costo unitario directo por :
Codigo Descripcion Recurso Unidad Cuadrilla
Mano de Obra
CAPATAZ hh 0.1000
OPERARIO hh 1.0000
OFICIAL hh 1.0000
PEON hh 0.6000
OPERADOR DE EQUIPO LIVIANO hh 1.2000

Materiales
PIEDRA CHANCADA DE 1/2" y 3/4" m3
ARENA GRUESA m3
CEMENTO PORTLAND TIPO I (42.5 kg) bls
AGUA m3

Equipos
VIBRADOR DE CONCRETO 4 HP 1.50" hm 1.0000
MEZCLADORA DE CONCRETO TAMBOR 18 HP 11 p3 hm 1.0000

Partida 2.3.2.2 PARA LA ARMADURA DE ACERO

Rendimiento kg/Dia MO. 240.0000 EQ.


Costo unitario directo por :
Codigo Descripcion Recurso Unidad Cuadrilla
Mano de Obra
OPERARIO hh 1.0000
OFICIAL hh 2.0000

Equipos
HERRAMIENTAS MANUALES % MO

Partida 2.3.2.3 PARA EL ENCOFRADO

Rendimiento m2/Dia MO. 12.0000 EQ.


Costo unitario directo por :
Codigo Descripcion Recurso Unidad Cuadrilla
Mano de Obra
OPERARIO hh 1.0000
PEON hh 1.0000

Materiales
PETROLEO D-2 gal
ALAMBRE NEGRO # 8 kg
CLAVOS PARA MADERA CON CABEZA DE 3" kg
CLAVOS PARA MADERA CON CABEZA DE 4" kg
MADERA TORNILLO p2

2.3.3 VIGAS
Partida 2.3.3.1 PARA EL CONCRETO

Rendimiento m3/Dia MO. 22.0000 EQ.


Costo unitario directo por :
Codigo Descripcion Recurso Unidad Cuadrilla
Mano de Obra
OPERARIO hh 1.0000
OFICIAL hh 1.0000
PEON hh 6.0000
OPERADOR DE EQUIPO LIVIANO hh 1
Materiales
PIEDRA CHANCADA DE 1/2" y 3/4" m3
ARENA GRUESA m3
CEMENTO PORTLAND TIPO I (42.5 kg) bls

Partida 2.3.3.2 PARA EL ACERO

Rendimiento kg/Dia MO. 240.0000 EQ.


Costo unitario directo por :
Codigo Descripcion Recurso Unidad Cuadrilla
Mano de Obra
OPERARIO hh 1.0000
OFICIAL hh 2.0000

Equipos
HERRAMIENTAS MANUALES % MO

Partida 2.3.3.3 PARA EL ENCOFRADO

Rendimiento m2/Dia MO. 8.0000 EQ.


Costo unitario directo por :
Codigo Descripcion Recurso Unidad Cuadrilla
Mano de Obra
OPERARIO hh 1.1429
OFICIAL hh 1.1429
PEON hh 0.5714

Materiales
ALAMBRE NEGRO # 8 kg
CLAVOS PARA MADERA CON CABEZA DE 2 1/2" kg
CLAVOS PARA MADERA CON CABEZA DE 3" kg
CLAVOS PARA MADERA CON CABEZA DE 4" kg
MADERA TORNILLO p2

Equipos
HERRAMIENTAS MANUALES % MO

2.3.4 LOSAS ALIGERADAS


Partida 2.3.4.1 PARA EL CONCRETO

Rendimiento m3/Dia MO. 28.0000 EQ.


Costo unitario directo por :
Codigo Descripcion Recurso Unidad Cuadrilla
Mano de Obra
OPERARIO hh 0.1000
OFICIAL hh 1.0000
PEON hh 13.0000
CAPATAZ hh 0.1000
OPERADOR DE EQUIPO LIVIANO hh 3.0000

Materiales
PIEDRA CHANCADA DE 1/2" y 3/4" m3
ARENA GRUESA m3
CEMENTO PORTLAND TIPO I (42.5 kg) bls

Equipos
WINCHE ELECTRICO 3.6 HP DE DOS BALDES hm 1

Partida 2.3.4.2 PARA EL ACERO

Rendimiento kg/Dia MO. 240.0000 EQ.


Costo unitario directo por :
Codigo Descripcion Recurso Unidad Cuadrilla
Mano de Obra
OPERARIO hh 1.0000
OFICIAL hh 2.0000

Equipos
HERRAMIENTAS MANUALES % MO

Partida 2.3.4.3 PARA EL ENCOFRADO

Rendimiento m2/Dia MO. 16.0000 EQ.


Costo unitario directo por :
Codigo Descripcion Recurso Unidad Cuadrilla
Mano de Obra
OPERARIO hh 2.0000
OFICIAL hh 2.0000
PEON hh 1.0000

Materiales
ALAMBRE NEGRO # 8 kg
CLAVOS PARA MADERA CON CABEZA DE 2 1/2" kg
CLAVOS PARA MADERA CON CABEZA DE 3" kg
CLAVOS PARA MADERA CON CABEZA DE 4" kg
MADERA TORNILLO p2

Equipos
HERRAMIENTAS MANUALES % MO

Partida 01.02.03.05.01 LOSAS ALIGERADAS, LADRILLO HUECO 15X30X30

Rendimiento m2/Dia MO. 1500.0000 EQ.


Costo unitario directo por :
Codigo Descripcion Recurso Unidad Cuadrilla
Mano de Obra
OPERARIO hh 1.0000
OFICIAL hh 1.0000
PEON hh 10.0000

Materiales
LADRILLO HUECO PARA TECHO 12 X 30 X 30 cm und

Equipos
HERRAMIENTAS MANUALES % MO

Partida 01.02.03.05.03 ESCALERAS, CONCRETO f'c=210 kg/cm2

Rendimiento m3/Dia MO. 28.0000 EQ.


Costo unitario directo por :
Codigo Descripcion Recurso Unidad Cuadrilla
Mano de Obra
CAPATAZ hh 0.1
OPERARIO hh 2.8000
OFICIAL hh 1.0000
PEON hh 1.4000
OPERADOR DE EQUIPO LIVIANO hh 3.0000

Materiales
PIEDRA CHANCADA DE 1/2" y 3/4" m3
ARENA GRUESA m3
CEMENTO PORTLAND TIPO I (42.5 kg) bls

Equipos
WINCHE ELECTRICO 3.6 HP DE DOS BALDES hm 1
ENCOFRADO RAMPA PROVISIONAL DE ACCESO A TECHO h=2.50 m. und

Partida 01.02.03.05.02 ESCALERAS, ENCOFRADO Y DESENCOFRADO


Rendimiento m2/Dia MO. 18.0000 EQ.
Costo unitario directo por :
Codigo Descripcion Recurso Unidad Cuadrilla
Mano de Obra
OPERARIO hh 2.0000
OFICIAL hh 2.0000
PEON hh 1.0000

Materiales
ALAMBRE NEGRO # 8 kg
CLAVOS CON CABEZA DE 2 1/2 ", 3", 4" kg
MADERA TORNILLO p2

Equipos
HERRAMIENTAS MANUALES % MO

Partida 02.03.05.03 ESCALERAS, ACERO fy=4200kg/cm2

Rendimiento kg/Dia MO. 250.0000 EQ.


Costo unitario directo por :
Codigo Descripcion Recurso Unidad Cuadrilla
Mano de Obra
OPERARIO hh 1.0000
OFICIAL hh 1.0000

Materiales
ALAMBRE NEGRO # 8 m3
ACERO DE REFUERZO fy=4200 kg/cm2 GRADO 60 bls

Equipos
HERRAMIENTAS MANUALES % MO

3.0 ARQUITECTURA
3.1 MUROS Y TABIQUES DE ALBAILERA
PARTIDA: 3.1.2 MUROS DE LADRILLO KINGKONG DE ARCILA RENDIMIENTO:
DESCRIP: MURO DE LADR ITEM METRADO: UNIDAD:
CODIGO DESCRIPCION UNID. CUADRILLA CANTIDAD PRECIO PARCIAL
MANO DE OBRA
CAPATAZ HH 0.10 0.080 27.42 2.19
OPERARIO HH 1.00 0.800 18.28 14.62
PEON HH 0.50 0.400 13.77 5.51

MATERIALES
ARENA GRU m3 0.027 72.90 2.00
CEMENTO PO bol 0.193 19.07 3.68
LADRILLO K und 41.000 0.50 20.50
AGUA m3 0.010 2.59 0.03

EQUIPOS
ANDAMIO M HM 1.00 0.800 5.00 4.00
HERRAMIEN %M.O. 3.000 22.33 0.67
COSTO UNITARIO=

00.00.00. 0

PARTIDA: 0.00 RENDIMIENTO: 14.50 m2/Da


DESCRIP: TARRAJEO RAY ITEM METRADO: UNIDAD:
CODIGO DESCRIPCION UNID. CUADRILLA CANTIDAD PRECIO PARCIAL
MANO DE OBRA
CAPATAZ HH 0.10 0.055 27.42 1.51
OPERARIO HH 1.00 0.552 18.28 10.09
PEON HH 0.55 0.303 13.77 4.18

MATERIALES
ARENA FIN m3 0.016 81.00 1.30
CEMENTO PO bls 0.117 19.07 2.23
AGUA m3 0.006 2.59 0.01

EQUIPOS
ANDAMIO M HM 1.00 0.552 5.00 2.76
HERRAMIEN %M.O. 3.000 15.78 0.47
COSTO UNITARIO=

PARTIDA: 0.00 RENDIMIENTO: 12.00 m2/Da


DESCRIP: TARRAJEO INT ITEM METRADO: UNIDAD:
CODIGO DESCRIPCION UNID. CUADRILLA CANTIDAD PRECIO PARCIAL
MANO DE OBRA
CAPATAZ HH 0.10 0.067 27.42 1.83
OPERARIO HH 1.00 0.667 18.28 12.19
PEON HH 0.50 0.333 13.77 4.59

MATERIALES
ARENA FIN m3 0.016 81.00 1.30
CEMENTO PO bls 0.157 19.07 2.99
AGUA m3 0.006 2.59 0.01

EQUIPOS
ANDAMIO M HM 1.00 0.667 5.00 3.33
HERRAMIEN %M.O. 3.000 18.60 0.56
COSTO UNITARIO=

PARTIDA: 0.00 RENDIMIENTO: 14.00 m2/Da


DESCRIP: TARRAJEO EXT ITEM METRADO: UNIDAD:
CODIGO DESCRIPCION UNID. CUADRILLA CANTIDAD PRECIO PARCIAL
MANO DE OBRA
CAPATAZ HH 0.10 0.057 27.42 1.57
OPERARIO HH 1.00 0.571 18.28 10.45
PEON HH 0.50 0.286 13.77 3.93

MATERIALES
ARENA FIN m3 0.016 81.00 1.30
CEMENTO PO bls 0.118 19.07 2.25
AGUA m3 0.006 2.59 0.01

EQUIPOS
ANDAMIO M HM 1.00 0.571 5.00 2.86
HERRAMIEN %M.O. 3.000 15.95 0.48
COSTO UNITARIO=

PARTIDA: 0.00 RENDIMIENTO: 16.00 m2/Da


DESCRIP: TARRAJEO DE ITEM METRADO: UNIDAD:
CODIGO DESCRIPCION UNID. CUADRILLA CANTIDAD PRECIO PARCIAL
MANO DE OBRA
CAPATAZ HH 0.10 0.050 27.42 1.37
OPERARIO HH 1.00 0.500 18.28 9.14
PEON HH 0.50 0.250 13.77 3.44

MATERIALES
ARENA FIN m3 0.016 81.00 1.30
CEMENTO PO bls 0.189 19.07 3.60
AGUA m3 0.006 2.59 0.01

EQUIPOS
ANDAMIO M HM 1.00 0.500 5.00 2.50
HERRAMIEN %M.O. 3.000 13.95 0.42
COSTO UNITARIO=

PARTIDA: 0.00 RENDIMIENTO: 10.00 m2/Da


DESCRIP: TARRAJEO DE ITEM METRADO: UNIDAD:
CODIGO DESCRIPCION UNID. CUADRILLA CANTIDAD PRECIO PARCIAL
MANO DE OBRA
CAPATAZ HH 0.10 0.080 27.42 2.19
OPERARIO HH 1.00 0.800 18.28 14.62
PEON HH 0.50 0.400 13.77 5.51

MATERIALES
ARENA FIN m3 0.016 81.00 1.30
CEMENTO PO bls 0.189 19.07 3.60
AGUA m3 0.006 2.59 0.01

EQUIPOS
ANDAMIO M HM 1.00 0.800 5.00 4.00
HERRAMIEN %M.O. 3.000 22.33 0.67
COSTO UNITARIO=

PARTIDA: 0.00 RENDIMIENTO: 8.00 m2/Da


DESCRIP: TARRAJEO DE ITEM METRADO: UNIDAD:
CODIGO DESCRIPCION UNID. CUADRILLA CANTIDAD PRECIO PARCIAL
MANO DE OBRA
CAPATAZ HH 0.10 0.100 27.42 2.74
OPERARIO HH 1.00 1.000 18.28 18.28
PEON HH 0.50 0.500 13.77 6.89

MATERIALES
ARENA FIN m3 0.016 81.00 1.30
CEMENTO PO bls 0.189 19.07 3.60
AGUA m3 0.006 2.59 0.01

EQUIPOS
ANDAMIO M HM 1.00 1.000 5.00 5.00
HERRAMIEN %M.O. 3.000 27.91 0.84
COSTO UNITARIO=

PARTIDA: 0.00 RENDIMIENTO: 18.00 m/Da


DESCRIP: VESTIDURA D ITEM METRADO: UNIDAD:
CODIGO DESCRIPCION UNID. CUADRILLA CANTIDAD PRECIO PARCIAL
MANO DE OBRA
CAPATAZ HH 0.10 0.044 27.42 1.22
OPERARIO HH 1.00 0.444 18.28 8.12
PEON HH 0.33 0.147 13.77 2.02

MATERIALES
ARENA FIN m3 0.003 81.00 0.20
CEMENTO PO bls 0.018 19.07 0.34
AGUA m3 0.021 2.59 0.05
EQUIPOS
ANDAMIO M HM 1.00 0.444 5.00 2.22
HERRAMIEN %M.O. 3.000 11.36 0.34
COSTO UNITARIO=

PARTIDA: 0.00 RENDIMIENTO: 14.00 m/Da


DESCRIP: PREPARACIN ITEM METRADO: UNIDAD:
CODIGO DESCRIPCION UNID. CUADRILLA CANTIDAD PRECIO PARCIAL
MANO DE OBRA
OPERARIO HH 1.00 0.571 18.28 10.45
PEON HH 0.50 0.286 13.77 3.93

MATERIALES
ARENA FIN m3 0.016 81.00 1.30
CEMENTO PO bls 0.118 19.07 2.25
AGUA m3 0.006 2.59 0.01

EQUIPOS
HERRAMIEN %M.O. 3.000 14.38 0.43
COSTO UNITARIO=

PARTIDA: 0.00 RENDIMIENTO: 14.00 m2/Da


DESCRIP: PREPARACIN ITEM METRADO: UNIDAD:
CODIGO DESCRIPCION UNID. CUADRILLA CANTIDAD PRECIO PARCIAL
MANO DE OBRA
OPERARIO HH 1.00 0.571 18.28 10.45
PEON HH 0.50 0.286 13.77 3.93

MATERIALES
ARENA FIN m3 0.016 81.00 1.30
CEMENTO PO bls 0.118 19.07 2.25
AGUA m3 0.006 2.59 0.01

EQUIPOS
HERRAMIEN %M.O. 3.000 14.38 0.43
COSTO UNITARIO=

00.00.00. 0

PARTIDA: 0.00 RENDIMIENTO: 100.00 m2/Da


DESCRIP: 0.00 ITEM METRADO: Err:509 UNIDAD:
CODIGO DESCRIPCION UNID. CUADRILLA CANTIDAD PRECIO PARCIAL
MANO DE OBRA
CAPATAZ HH 0.10 0.008 27.42 0.22
OPERARIO HH 2.00 0.160 18.28 2.92
OFICIAL HH 2.00 0.160 15.31 2.45
PEON HH 4.00 0.320 13.77 4.41
OPERADOR HH 1.00 0.080 18.28 1.46

MATERIALES
ARENA GRU m3 0.038 72.90 2.73
CEMENTO PO bls 0.300 19.07 5.72
AGUA m3 0.075 2.59 0.19
MADERA PA p2 0.025 8.30 0.21

EQUIPOS
MEZCLADOR HM 1.00 0.080 23.10 1.85
HERRAMIEN %M.O. 3.000 11.46 0.34
COSTO UNITARIO=

PARTIDA: PISOS Y PAVIMENTOS RENDIMIENTO: 16.00 m2/Da


DESCRIP: PORCELANATO ITEM METRADO: UNIDAD:
CODIGO DESCRIPCION UNID. CUADRILLA CANTIDAD PRECIO PARCIAL
MANO DE OBRA
CAPATAZ HH 0.10 0.050 27.42 1.37
OPERARIO HH 1.00 0.500 18.28 9.14
PEON HH 0.50 0.250 13.77 3.44

MATERIALES
ARENA FIN m3 0.027 81.00 2.19
CEMENTO PO bol 0.262 19.07 5.00
PORCELANA m2 1.050 65.00 68.25
PORCELAN kg 0.195 2.85 0.56
AGUA m3 0.004 2.59 0.01
MADERA PA p2 0.045 8.30 0.37

EQUIPOS
HERRAMIEN %M.O. 3.000 13.95 0.42
COSTO UNITARIO=

PARTIDA: PISOS Y PAVIMENTOS RENDIMIENTO: 12.00 m2/Da


DESCRIP: PISO CERAMIC ITEM METRADO: UNIDAD:
CODIGO DESCRIPCION UNID. CUADRILLA CANTIDAD PRECIO PARCIAL
MANO DE OBRA
CAPATAZ HH 0.10 0.067 27.42 1.83
OPERARIO HH 1.00 0.667 18.28 12.19
PEON HH 0.50 0.333 13.77 4.59
MATERIALES
ARENA FIN m3 0.027 81.00 2.19
CEMENTO PO bol 0.266 19.07 5.07
LOSETA CE m2 1.050 28.55 29.98
PORCELAN kg 0.195 2.85 0.56
AGUA m3 0.004 2.59 0.01
MADERA PA p2 0.045 8.30 0.37

EQUIPOS
HERRAMIEN %M.O. 3.000 18.60 0.56
COSTO UNITARIO=

00.00.00. 0

PARTIDA: ZOCALOS Y CONTRAZOCALOS RENDIMIENTO: 6.00 m2/Da


DESCRIP: CONTRAZOCALO ITEM METRADO: UNIDAD:
CODIGO DESCRIPCION UNID. CUADRILLA CANTIDAD PRECIO PARCIAL
MANO DE OBRA
CAPATAZ HH 0.10 0.133 27.42 3.66
OPERARIO HH 1.00 1.333 18.28 24.37
PEON HH 0.50 0.667 13.77 9.18

MATERIALES
ARENA FIN m3 0.021 81.00 1.70
CEMENTO PO bol 0.187 19.07 3.57
LOSETA CER m2 1.050 23.05 24.20
CEMENTO B bol 0.004 52.00 0.20
AGUA m3 0.004 2.59 0.01

EQUIPOS
HERRAMIEN %M.O. 3.000 37.21 1.12
COSTO UNITARIO=

PARTIDA: ZOCALOS Y CONTRAZOCALOS RENDIMIENTO: 18.00 m2/Da


DESCRIP: CONTRAZOCAL ITEM METRADO: UNIDAD:
CODIGO DESCRIPCION UNID. CUADRILLA CANTIDAD PRECIO PARCIAL
MANO DE OBRA
CAPATAZ HH 0.10 0.044 27.42 1.22
OPERARIO HH 1.00 0.444 18.28 8.12
PEON HH 0.50 0.222 13.77 3.06

MATERIALES
ARENA FIN m3 0.003 81.00 0.24
CEMENTO PO bol 0.016 19.07 0.31
CONTRAZOC m2 1.050 7.60 7.98
CEMENTO B bol 0.004 52.00 0.20
AGUA m3 0.004 2.59 0.01

EQUIPOS
HERRAMIEN %M.O. 3.000 12.40 0.37
COSTO UNITARIO=

00.00.00. 0

PARTIDA: CARPINTERIA DE MADERA RENDIMIENTO: 6.00 m2/Da


DESCRIP: PUERTA CONT ITEM METRADO: UNIDAD:
CODIGO DESCRIPCION UNID. CUADRILLA CANTIDAD PRECIO PARCIAL
MANO DE OBRA
OPERARIO HH 1.00 1.333 18.28 24.37
OFICIAL HH 1.00 1.333 15.31 20.41

MATERIALES
CLAVOS CO kg 0.067 3.51 0.23
LIJA PARA hja 1.100 1.25 1.38
LAMINA PLA pln 0.672 57.00 38.30
AGLOMERADO pln 0.356 92.30 32.87
COLA SINTE gln 0.103 13.72 1.41
PEGAMENTO und 0.168 18.06 3.03
MADERA C p2 11.271 8.30 93.55

EQUIPOS
CEPILLADO HM 0.20 0.267 28.30 7.55
SIERRA CIR HM 0.20 0.267 6.50 1.73
HERRAMIEN %M.O. 3.000 44.79 1.34
COSTO UNITARIO=

00.00.00. 0

PARTIDA: 0.00 RENDIMIENTO: 60.00 Pza/Da


DESCRIP: BISAGRAS ZIN ITEM METRADO: UNIDAD:
CODIGO DESCRIPCION UNID. CUADRILLA CANTIDAD PRECIO PARCIAL
MANO DE OBRA
OPERARIO HH 1.00 0.133 18.28 2.44

MATERIALES
BISAGRA DE und 1.000 21.77 21.77

EQUIPOS
HERRAMIEN %M.O. 3.000 2.44 0.07
COSTO UNITARIO=

PARTIDA: 0.00 RENDIMIENTO: 5.00 Pza/Da


DESCRIP: CERRADURA P ITEM METRADO: UNIDAD:
CODIGO DESCRIPCION UNID. CUADRILLA CANTIDAD PRECIO PARCIAL
MANO DE OBRA
OPERARIO HH 1.00 1.600 18.28 29.25

MATERIALES
CERRADURA und 1.000 81.52 81.52

EQUIPOS
HERRAMIEN %M.O. 3.000 29.25 0.88
COSTO UNITARIO=

PARTIDA: 0.00 RENDIMIENTO: 6.00 Pza/Da


DESCRIP: CERRADURA SI ITEM METRADO: UNIDAD:
CODIGO DESCRIPCION UNID. CUADRILLA CANTIDAD PRECIO PARCIAL
MANO DE OBRA
OPERARIO HH 1.00 1.333 18.28 24.37

MATERIALES
CERRADURA und 1.000 61.25 61.25

EQUIPOS
HERRAMIEN %M.O. 3.000 24.37 0.73
COSTO UNITARIO=

00.00.00. 0

PARTIDA: 0.00 RENDIMIENTO: 30.00 m2/Da


DESCRIP: PINTURA LAT ITEM METRADO: UNIDAD:
CODIGO DESCRIPCION UNID. CUADRILLA CANTIDAD PRECIO PARCIAL
MANO DE OBRA
OPERARIO HH 1.00 0.267 18.28 4.87

MATERIALES
LIJA PARA hja 0.200 1.25 0.25
IMPRIMAN gln 0.056 23.40 1.30
PINTURA L gln 0.050 40.00 2.00

EQUIPOS
ANDAMIO M HM 1.00 0.267 5.00 1.33
HERRAMIEN %M.O. 3.000 4.87 0.15
COSTO UNITARIO=

PARTIDA: 0.00 RENDIMIENTO: 35.00 m2/Da


DESCRIP: PINTURA LAT ITEM METRADO: UNIDAD:
CODIGO DESCRIPCION UNID. CUADRILLA CANTIDAD PRECIO PARCIAL
MANO DE OBRA
OPERARIO HH 1.00 0.229 18.28 4.18

MATERIALES
LIJA PARA hja 0.200 1.25 0.25
IMPRIMAN gln 0.056 23.40 1.30
PINTURA L gln 0.080 40.00 3.20

EQUIPOS
ANDAMIO M HM 1.00 0.229 5.00 1.14
HERRAMIEN %M.O. 3.000 4.18 0.13
COSTO UNITARIO=

PARTIDA: 0.00 RENDIMIENTO: 25.00 m2/Da


DESCRIP: PINTURA LAT ITEM METRADO: UNIDAD:
CODIGO DESCRIPCION UNID. CUADRILLA CANTIDAD PRECIO PARCIAL
MANO DE OBRA
OPERARIO HH 1.00 0.320 18.28 5.85

MATERIALES
LIJA PARA hja 0.200 1.25 0.25
IMPRIMAN gln 0.056 23.40 1.30
PINTURA L gln 0.050 40.00 2.00

EQUIPOS
ANDAMIO M HM 1.00 0.320 5.00 1.60
HERRAMIEN %M.O. 3.000 5.85 0.18
COSTO UNITARIO=

PARTIDA: 0.00 RENDIMIENTO: 22.00 m2/Da


DESCRIP: PINTURA LAT ITEM METRADO: UNIDAD:
CODIGO DESCRIPCION UNID. CUADRILLA CANTIDAD PRECIO PARCIAL
MANO DE OBRA
OPERARIO HH 1.00 0.364 18.28 6.65

MATERIALES
LIJA PARA hja 0.200 1.25 0.25
IMPRIMAN gln 0.056 23.40 1.30
PINTURA L gln 0.050 40.00 2.00
EQUIPOS
ANDAMIO M HM 1.00 0.364 5.00 1.82
HERRAMIEN %M.O. 3.000 6.65 0.20
COSTO UNITARIO=

PARTIDA: 0.00 RENDIMIENTO: 20.00 m2/Da


DESCRIP: PINTURA LAT ITEM METRADO: UNIDAD:
CODIGO DESCRIPCION UNID. CUADRILLA CANTIDAD PRECIO PARCIAL
MANO DE OBRA
OPERARIO HH 1.00 0.400 18.28 7.31

MATERIALES
LIJA PARA hja 0.200 1.25 0.25
IMPRIMAN gln 0.056 23.40 1.30
PINTURA L gln 0.050 40.00 2.00

EQUIPOS
ANDAMIO M HM 1.00 0.400 5.00 2.00
HERRAMIEN %M.O. 3.000 7.31 0.22
COSTO UNITARIO=
Costo unitario directo por : m3 50.77

Cantidad Precio S/.

0.5333 18.87
1.0667 14.05
32.92

0.0500 0.50
0.1500 3.81
0.0660 2.55

3.0000 0.99
0.5333 10.00

Costo unitario directo por : m3 50.77

Cantidad Precio S/.

0.5333 18.87
1.0667 14.05
32.92

0.0500 0.50
0.1500 3.81
0.0660 2.55

3.0000 0.99
0.5333 10.00

Costo unitario directo por : m2 1.15

Cantidad Precio S/.


0.0800 14.05

3.0000 1.12

Costo unitario directo por : m2 3.38

Cantidad Precio S/.

0.0200 16.87
0.0400 14.05
0.0200 18.87

0.1500 3.81
0.0050 4.66
0.0660 2.55
0.0200 35.00

1.0000 0.0200 22.50


1.0000 0.0200 7.50
3.0000 1.28

Costo unitario directo por : m2 3.38

Cantidad Precio S/.

0.0200 16.87
0.0400 14.05
0.0200 18.87

0.1500 3.81
0.0050 4.66
0.0660 2.55
0.0200 35.00

1.0000 0.0200 22.50


1.0000 0.0200 7.50
3.0000 1.28

2.5000
m3 36.06
Cantidad Precio S/. Parcial S/.

3.2000 10.94 35.01


35.01

0.0300 35.01 1.05


1.05

20.0000
m3 105.59
Cantidad Precio S/. Parcial S/.

0.4000 14.31 5.72


0.4000 12.19 4.88
0.4000 10.94 4.38
14.98

2.9400 18.65 54.83


0.7634 40.00 30.54
0.0980 13.21 1.29
86.66

0.0300 14.98 0.45


0.4000 8.75 3.50
3.95

100.0000
m2 8.20
Cantidad Precio S/. Parcial S/.

0.0667 14.31 0.95


0.0667 12.19 0.81
0.4000 10.94 4.38
6.14

0.0600 18.65 1.12


0.0018 40.00 0.07
0.0070 13.21 0.09
1.28

0.0300 6.14 0.18


0.0667 8.75 0.58
0.77

12.0000
m3 247.98
Cantidad Precio S/. Parcial S/.

0.6667 14.31 9.54


1.3333 12.19 16.25
6.6667 10.94 72.93
98.73

0.5700 80.00 45.60


0.5700 80.00 45.60
0.5200 60.00 31.20
0.5700 18.65 10.63
0.1840 13.21 2.43
135.46

0.0300 98.73 2.96


0.6667 7.50 5.00
0.6667 8.75 5.83
13.80

12.0000
m3 172.99
Cantidad Precio S/. Parcial S/.

0.0667 15.74 1.05


0.6667 14.31 9.54
0.6667 12.19 8.13
0.4000 10.94 4.38
0.8000 17.17 13.74
36.83

0.9000 80.00 72.00


0.4000 60.00 24.00
0.1221 18.65 2.28
0.0833 4.20 0.35
98.63

0.6667 50.00 33.33


0.6667 6.30 4.20
37.53

240.0000
kg 1.35
Cantidad Precio S/. Parcial S/.

0.0333 14.31 0.48


0.0667 12.19 0.81
1.29

0.0500 1.29 0.06


0.06

12.0000
m3 172.99
Cantidad Precio S/. Parcial S/.

0.0667 15.74 1.05


0.6667 14.31 9.54
0.6667 12.19 8.13
0.4000 10.94 4.38
0.8000 17.17 13.74
36.83

0.9000 80.00 72.00


0.4000 60.00 24.00
0.1221 18.65 2.28
0.0833 4.20 0.35
98.63
0.6667 50.00 33.33
0.6667 6.30 4.20
37.53

240.0000
kg 1.35
Cantidad Precio S/. Parcial S/.

0.0333 14.31 0.48


0.0667 12.19 0.81
1.29

0.0500 1.29 0.06


0.06

12.0000
m2 30.65
Cantidad Precio S/. Parcial S/.

0.6667 14.31 9.54


0.6667 10.94 7.29
16.83

0.0500 5.90 0.30


1.5000 3.39 5.09
0.1200 3.39 0.41
0.1000 3.39 0.34
1.8300 4.20 7.69
13.81

22.0000
m3 #REF!
Cantidad Precio S/. Parcial S/.

0.3636 14.31 5.20


0.3636 12.19 4.43
2.1818 10.94 23.87
0.3636 17.17 6.24
39.75
0.8500 80.00 68.00
0.4200 60.00 25.20
9.0000 18.65 167.85
261.05

240.0000
kg 1.35
Cantidad Precio S/. Parcial S/.

0.0333 14.31 0.48


0.0667 12.19 0.81
1.29

0.0500 1.29 0.06


0.06

8.0000
m2 64.30
Cantidad Precio S/. Parcial S/.

1.1429 14.31 16.35


1.1429 12.19 13.93
0.5714 10.94 6.25
36.54

0.2000 3.39 0.68


0.2400 3.39 0.81
0.2400 3.39 0.81
0.2400 3.80 0.91
5.4100 4.20 22.72
25.94

0.0500 36.54 1.83


1.83

28.0000
m3 359.77
Cantidad Precio S/. Parcial S/.
0.0286 14.31 0.45
0.2857 12.19 16.35
3.7143 10.94 3.48
0.0286 15.74 40.63
0.8571 17.17 14.72
75.63

0.9000 80.00 72.00


0.5000 60.00 30.00
9.0000 18.65 167.85
269.85

0.2857 50 14.285
14.29

240.0000
kg 1.35
Cantidad Precio S/. Parcial S/.

0.0333 14.31 0.48


0.0667 12.19 0.81
1.29

0.0500 1.29 0.06


0.06

16.0000
m2 53.07
Cantidad Precio S/. Parcial S/.

1.0000 14.31 14.31


1.0000 12.19 12.19
0.5000 10.94 5.47
31.97

1.0000 3.39 3.39


0.1100 3.39 0.37
0.1100 3.39 0.37
0.1100 3.80 0.42
3.5600 4.20 14.95
19.51
0.0500 31.97 1.60
1.60

1500.0000
m2 2.86
Cantidad Precio S/. Parcial S/.

0.0053 17.17 0.09


0.0053 14.56 0.08
0.0533 13.11 0.70
0.87

1.0500 1.87 1.96


1.96

0.0300 0.87 0.03


0.03

g/cm2

28.0000
m3 154.41
Cantidad Precio S/. Parcial S/.

0.0286 15.74 0.45


0.8000 14.31 11.45
0.2857 12.19 3.48
0.4000 10.94 4.38
0.8571 17.17 14.72
34.47

0.9000 80.00 72.00


0.5000 60.00 30.00
0.1221 18.65 2.28
104.28

0.2857 50 14.29
0.0044 311.72 1.371568
15.66
18.0000
m2 55.28
Cantidad Precio S/. Parcial S/.

0.8889 14.31 12.72


0.8889 12.19 10.84
0.4444 10.94 4.86
28.42

0.0800 3.39 0.27


0.1000 3.39 0.34
5.7400 4.20 24.11
25.44

0.0500 28.42 1.42


1.42

cm2

250.0000
kg 4.50
Cantidad Precio S/. Parcial S/.

0.0320 17.17 0.55


0.0320 14.56 0.47
1.02

0.0500 3.39 0.17


1.1500 2.84 3.27
3.44

0.0500 1.02 0.05


0.05

10.00 m2/Da
m2
SUB TOTAL
22.33

26.21
4.67

53.20

m2
SUB TOTAL
15.78

3.54

3.23

22.55

m2
SUB TOTAL
18.60

4.30

3.89
26.80

m2
SUB TOTAL
15.95

3.56

3.34

22.84

m2
SUB TOTAL
13.95

4.91

2.92

21.78

m2
SUB TOTAL
22.33
4.91

4.67

31.91

m2
SUB TOTAL
27.91

4.91

5.84

38.65

m
SUB TOTAL
11.36

0.60
2.56

14.53

m
SUB TOTAL
14.38

3.56

0.43

18.37

m2
SUB TOTAL
14.38

3.56

0.43

18.37

m2
SUB TOTAL
11.46
8.86

2.19

22.51

m2
SUB TOTAL
13.95

76.37

0.42

90.75

m2
SUB TOTAL
18.60
38.18

0.56

57.34

m2
SUB TOTAL
37.21

29.68

1.12

68.01

m2
SUB TOTAL
12.40

8.74
0.37

21.52

m2
SUB TOTAL
44.79

170.77

10.62

226.18

Pza
SUB TOTAL
2.44

21.77

0.07
24.28

Pza
SUB TOTAL
29.25

81.52

0.88

111.65

Pza
SUB TOTAL
24.37

61.25

0.73

86.35

m2
SUB TOTAL
4.87

3.55

1.48
9.91

m2
SUB TOTAL
4.18

4.75

1.27

10.20

m2
SUB TOTAL
5.85

3.55

1.78

11.18

m2
SUB TOTAL
6.65

3.55
2.02

12.22

m2
SUB TOTAL
7.31

3.55

2.22

13.08
APORTE UNITARIO MADERA PARA ENCOFRADO DE COLUMNAS

ENCOFRADOS PARA COLUMNAS


seccin (in ) (A) Longitud Cantidad de Pies^2 (D)
Elemento Descripcin Elementos (A*B*C)/12
Nro a" b" ml ft (B)
1 Tablones 1 1/2 8 3.35 10.99 5 54.95
2 Barrotes 2 4 0.55 1.8 20 24
3 Pie derechos 1 1/2 4 2.75 9.02 4 18.04
4 Estacas 2 4 0.6 1.97 4 5.25

APORTE UNITARIO MADERA PARA ENCOFRADO DE VIGAS

ENCOFRADOS PARA VIGAS


seccin (in ) (A) Longitud Cantidad de Pies^2 (D)
Elemento Descripcin Elementos (A*B*C)/12
Nro a" b" ml ft (B)
1 Tablones 1 1/2 8 0.6 1.97 4 7.88
2 Barrotes 2 3 0.25 0.82 4 1.64
3 soleras (a) 2 4 0.6 1.97 2 2.63
3 soleras (b) 2 3 0.6 1.97 2 1.97
4 Tornapuntas ( 1 1/2 3 0.45 1.48 2 1.11
4 Tornapuntas ( 1 4 0.6 1.97 2 1.31
5 Cabezales 3 3 1.2 3.94 1 2.96
6 pies derecho 3 3 2.5 8.2 1 6.15
7 arriostres 1 4 0.6 1.97 1 0.66
8 cuas 2 3 0.25 0.82 1 0.41
1*3.35 3.35
Desperdicio N de U.M
H =E/G
10% Usos (G) (H/U.M)
60.45 7 8.64 2.58
26.4 7 3.77 1.13
19.84 10 1.98 0.59
5.78 4 1.45 0.43
TOTAL 4.73

0.75*0.6 0.45
Desperdicio N de U.M
H =E/G
10% Usos (G) (H/U.M)
8.67 7 1.24 2.76
1.8 7 0.26 0.58
2.89 10 0.29 0.64
2.17 10 0.22 0.49
1.22 11 0.11 0.24
1.44 12 0.12 0.27
3.26 4 0.82 1.82
6.77 5 1.35 3
0.73 6 0.12 0.27
0.45 4 0.11 0.24
TOTAL 10.31
Presupuesto VIVIENDA UNIFAMILIAR UPN

Subpresupuesto 001 VIVIENDA UNIFAMILIAR UPN


Cliente Paredes Paredes, Andrs
Lugar CAJAMARCA - CONTUMAZA - YONAN

Item Descripcin Und. Metrado Precio S/.


01 OBRAS PROVISIONALES Y TRABAJOS
01.01 PRELIMINARES
OBRAS PROVISIONALES
01.01.01 CASETA DE GUARDIANA m2 7.50

01.02 TRABAJOS PRELIMINARES


01.02.01 LIMPIEZA DEL TERRENO MANUAL m2 108.88
01.02.02 TRAZO Y REPLANTEO m2 108.88
02 ESTRUCTURAS
02.01 MOVIMIENTO DE TIERRAS
02.01.01 NIVELACION DE TERRENO m2 108.88
02.01.02 EXCAVACIONES m3 40.91
02.02 OBRAS DE CONCRETO SIMPLE
02.02.01 CIMIENTOS CORRIDOS m3
02.02.02 SOLADO m3
02.02.03 SOBRECIMIENTOS m3
02.03 OBRAS DE CONCRETO ARMADO
02.03.01 ZAPATAS
02.03.02 CONCRETO PARA ZAPATAS f'c=210 kg/cm2 m3
02.03.03 ACERO fy=4200 kg/cm2 GRADO 60 en ZAPATAS kg
02.03.04 COLUMNAS
02.03.05 CONCRETO EN COLUMNAS f'c=210 kg/cm2 m3
02.03.06 ACERO fy=4200 kg/cm2 GRADO 60 en COLUMNAS kg
02.03.07 ENCOFRADO Y DESENCOFRADO NORMAL EN m2
02.03.08 COLUMNAS
VIGAS
02.03.09 CONCRETO EN VIGAS f'c=210 kg/cm2 m3
02.03.10 ACERO fy=4200 kg/cm2 GRADO 60 en VIGAS kg
02.03.11 ENCOFRADO Y DESENCOFRADO NORMAL EN m2
02.03.12 VIGAS
LOSAS ALIGERADAS
02.03.13 CONCRETO EN LOSAS ALIGERADAS f'c=210 m3
02.03.14 kg/cm2
ACERO fy=4200 kg/cm2 GRADO 60 en LOSAS kg
02.03.15 ALIGERADAS
LADRILLO HUECO DE ARCILLA h=15 cm PARA pza
02.03.16 TECHO ALIGERADO
ENCOFRADO Y DESENCOFRADO NORMAL EN m2
02.03.17 LOSAS ALIGERADAS
ESCALERAS
02.03.18 CONCRETO EN ESCALERAS f'c=210 kg/cm2 m3
02.03.19 ACERO fy=4200 kg/cm2 GRADO 60 en ESCALERAS kg
02.03.20 ENCOFRADO Y DESENCOFRADO NORMAL EN m2
03 ESCALERAS
ARQUITECTURA
03.01 ALBAILERIA
03.01.01 MURO LADRILLO K.K DE ARCILLA 18H m2
( 09x013x0.24) AMARRE DE CABEZA,JUNTA 1.5
cm.MORTERO 1:1:5
03.02 REVOQUES Y REVESTIMIENTOS
03.02.01 TARRAJEOS
03.02.01.01 TARRAJEO DE MUROS INTERIORES m2
03.02.01.02 TARRAJEO DE CIELORASO m2
03.03 PISOS Y PAVIMENTOS
03.03.01 CONTRAPISO DE 2" m2
03.03.02 PISO DE LOSETA VENECIANA 40x40 cm m2
03.03.03 PISO DE PORCELANATO DE 30 X 30 cm m2
03.03.04 PISO DE PARQUET HUAYACAN CANELO OSCURO m2
03.04 6 X 30 cm
CONTRAZOCALOS
03.04.01 CONTRAZOCALO DE MADERA CEDRO DE 3/4" X 2" m
03.05 CON RODON DE 3/4"
ZOCALOS
03.05.01 ZOCALO DE PORCELANATO 30X30 cm m2
03.06 REVESTIMIENTOS
03.06.01 FORJADO DE PASOS Y CONTRAPASOS m
03.07 CUBIERTAS
03.07.01 LADRILLO PASTELERO 0.25x0.25x0.03 m2
03.08 m.ASENTADO
CARPINTERIACON MORTERO 1:4
DE MADERA
03.08.01 PUERTA CONTRAPLACADA und
03.08.02 VENTANA CON HOJAS DE MADERA CEDRO m2
03.09 CERRAJERIA
03.09.01 BISAGRAS CAPUCHINA ALUMINIZADA DE 3 1/2 X 3 und
03.09.02 1/2"
CERRADURA PARA PUERTA INGRESO und
03.09.03 CERRADURA PARA PUERTA DE BAOS und
03.09.04 CERRADURA PARA PUERTA INTERIORES und
03.10 VIDRIOS, CRISTALES Y SIMILARES
03.10.01 VIDRIO SEMIDOBLE INCOLORO CRUDO p2
03.11 PINTURA
03.11.01 PINTURA LATEX EN CIELO RASO m2
03.11.02 PINTURA LATEX EN MUROS INTERIORES m2
03.11.03 PINTURA LATEX EN MUROS EXTERIORES m2
03.11.04 BARNIZ EN VENTANAS DE MADERA m2
03.11.05 BARNIZ EN PUERTAS DE MADERA m2
03.12 APARATOS Y ACCESORIOS SANITARIOS
03.12.01 INODORO ONE PIECE BLANCO und
03.12.02 LAVATORIO PEDESTAL BLANCO und
03.12.03 DUCHA CROMADA DE CABEZA GIRATORIA Y und
03.12.04 LLAVE MEZCLADORA
TOALLERO DE LOSA BLANCO und
03.12.05 PAPELERA LOSA BLANCO und
03.12.06 JABONERA LOSA BLANCO und
04 INSTALACIONES SANITARIAS
04.01 SISTEMA DE DESAGUE
04.01.01 SALIDA DESAGUE DE PVC SAL 2" pto
04.01.02 SALIDA DESAGUE DE PVC-SAL 4" pto
04.01.03 SALIDA VENTILACION DE PVC-SAL 2" pto
04.01.04 MONTANTE DE TUBERIA PVC SAL 4" m
04.01.05 REGISTRO DE BRONCE 3" und
04.01.06 CAJAS DE REGISTRO DE DESAGUE 12" x 24" und
04.02 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO
04.02.01 SALIDA DE AGUA FRIA TUBERIA PVC C-10 O 1/2" pto
04.02.02 RED DE DISTRIBUCION INTERNA CON TUBERIA m
04.02.03 DE
REDPVCDE C-10 DE 1/2"
DISTRIBUCION INTERNA CON TUBERIA m
04.02.04 DE PVC C-10 DE 3/4" DE 1/2"
VALVULA COMPUERTA und
04.02.05 VALVULA COMPUERTA DE 3/4" und
04.02.06 SISTEMA DE RIEGO CONVENCIONAL und
04.02.07 TANQUE DE AGUA DE ETERNIT DE 1000 LITROS und
04.03 INCLUYE
SISTEMA ACC. INTERNOS
DE AGUA CALIENTE
04.03.01 SALIDA AGUA CALIENTE TUBERIA CPVC O 1/2" pto
04.03.02 RED DE DISTRIBUCION DE AGUA CALIENTE CON m
04.03.03 TUBERIA
VALVULA CPVC DE 1/2" DE 1/2"
COMPUERTA und
05 INSTALACIONES ELECTRICAS
06 SALIDA PARA CENTRO DE LUZ pto
07 SALIDA PARA BRAQUETE pto
08 SALIDA PARA SPOT LIGHT pto
09 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE pto
10 + L.T. A PRUEBA
SALIDA DE AGUA
PARA COCINA ELECTRICA pto
11 SALIDA PARA CALENTADOR ELECTRICO pto
12 SALIDA PARA TELEFONO EXTERNO pto
13 SALIDA PARA TELEVISION pto
14 SALIDA PARA GONG und
15 POZO DE TIERRA und
16 TABLEROS DISTRIBUCION CAJA METALICA CON und
12
SONPOLOS
: CERO Y 00/100 NUEVOS SOLES
Costo al 17/02/2016

Parcial S/.