MECHANICAL HANDLING
1st Group
3 G50-VD-26-01A/B/C 1st Group Compressor Suction KOD A/B/C 3 63.8
Compressor
1st Group
4 G50-KA-26-01A/B/C 1st Group Centrifugal Compressor A/B/C 3 29
Compressor
EXECUTION OF GAS COMPRESSION AND
ZCINA HMD NORT
MECHANICAL HANDLING
60
5 G50-DMT-26-01A/B/C 1st Group Gas Turbine 1st Group Turbine 3
150
1st Group 1) Each Bundle :18.17 (total 4 bundles)
6 G50-GC-26-01A/B/C 1st Group Air Cooler A/B/C (Forced Draft) 3 2) Motor-fan Assembly: 7 (2 No in each unit)
Compressor
3)Structure: 60 (common)
1st Group
7 G50-VD-26-04 Sales Gas Drum 1 50.7
Compressor
2nd Group
8 G50-VD-26-02A/B/C 2nd Group Compressor Suction KOD A/B/C 3 64.9
Compressor
EXECUTION OF GAS COMPRESSION AND
ZCINA HMD NORT
MECHANICAL HANDLING
2nd Group
9 G50-KA-26-02A/B/C 2nd Group Centrifugal Compressor A/B/C 3 30
Compressor
60
10 G50-DMT-26-02A/B/C 2nd Group Gas Turbine 2nd Group Turbine 3
EXECUTION OF GAS COMPRESSION AND
ZCINA HMD NORT
MECHANICAL HANDLING
2nd Group
12 G50-VD-26-05A/B Gas Lift Drum A/B 2 75.3
Compressor
3rd Group
13 G50-VD-26-03A/B 3rd Group Compressor Suction KOD A/B 2 82.5
Compressor
3rd Group
14 G50-KA-26-03A/B 3rd Group Centrifugal Compressor A/B 2 26
Compressor
EXECUTION OF GAS COMPRESSION AND
ZCINA HMD NORT
MECHANICAL HANDLING
33
15 G50-DMT-26-03A/B 3rd Group Gas Turbine 3rd Group Turbine 2
45
3rd Group 1) Each Bundle : 10.5 (total 2 bundles)
16 G50-GC-26-03A/B 3rd Group Air Cooler A/B (Forced Draft) 2 2) Motor-fan Assembly: 3.5 (2 No in each unit)
Compressor
3)Structure:18 (common)
MECHANICAL HANDLING
25 140-VM-26-09 Gas Lift Pig Launcher 8" Gas lift Header (8") 1 2.7
26 140-VM-26-10 Gas Lift Pig Receiver 8" Gas lift Header (8") 1 3
MECHANICAL HANDLING
29 140-VM-26-15 Gas Lift Pig Launcher 6" Gas lift Header (6") 1 3.1
30 140-VM-26-16 Gas Lift Pig Launcher 6" Gas lift Header (6") 1 1.9
Empty Weight -
a) Comp skid - 12.5
420-UK-63-01A/B/C Electric Motor Driven Air Compressors b) Cooler skid- 4
31 Air System 3
Oper. Weight -
a) Comp Skid -12.6
b) Cooler Skid - 4.1
MECHANICAL HANDLING
MECHANICAL HANDLING
MECHANICAL HANDLING
MECHANICAL HANDLING
61 4R0-RA-69-03 Spent/regenrated Lube Oil Storage Tank Lube oil System 1 4.5
4R0-PE-69-03
63 Machine Building Lube Oil Unloading Pumps Lube oil System 5 0.25
A/B/C/D/E
MECHANICAL HANDLING
0.6
69 450-PA-42-01 Methanol unloading Pump Methanol System 1
Note 1) A space/access for mobile crane shall be provided around all equipment to enable removal installation of spools, fittings, valves and flanges during Ma
Note 2) The air cooler vendor will provide provision for the removal of Motor/fan components for all bundles. The temporary chain pulley block for component/m
provided by Maintenance contractor since there is no need of permanent lifting/removal tool for the same.
Note 3) The Jib Crane are designed to take consideration of the humid weight of the Intelligent pig with deberis and impurities . Item No. 19 to 30 are skid mou
AND REINJECTION STATION
NORTH Annexure - 1
REV. B
LING LIST DATE: 23/12/2015
REV. B
LING LIST DATE: 23/12/2015
REV. B
LING LIST DATE: 23/12/2015
REV. B
LING LIST DATE: 23/12/2015
REV. B
LING LIST DATE: 23/12/2015
0.508 7.2 0.7 1.5 Yes Intelligent Pig 810 Jib Crane (Note 3) 1 Ton
0.508 12 0.7 1.5 Yes Intelligent Pig 810 Jib Crane (Note 3) 1 Ton
AND REINJECTION STATION
NORTH Annexure - 1
REV. B
LING LIST DATE: 23/12/2015
REV. B
LING LIST DATE: 23/12/2015
REV. B
LING LIST DATE: 23/12/2015
No permananet Lifting
NA 7 3 3 Yes Motor 200 Mobile Crane/Fork Lift
Equipment required
REV. B
LING LIST DATE: 23/12/2015
REV. B
LING LIST DATE: 23/12/2015
REV. B
LING LIST DATE: 23/12/2015
NA 4.6 1.98 2.566 Yes Diesel Engine 1215 EOT Crane 5 Ton
AND REINJECTION STATION
NORTH Annexure - 1
REV. B
LING LIST DATE: 23/12/2015
id mounted Mobile equipment and shall be lifted/transported using mobile crane at the time of operation.