Académique Documents
Professionnel Documents
Culture Documents
o
ELECTRICAL/ELV(BACK BOX ) SIZE EQUAL TAG QTY
WINDOWS DETAILS LIVING/DINING/BED ROOMS /KITCHEN/COMMON CORRIDOR
TO BE GIVEN
o o 2 MODULE BOX
4 MODULE BOX
76.5 x 76.5 x 51
76.5 x 136.8 x 51
2M1
4M1
14
06
17
h v
SINGLE BOX 76.5 x 76.5 x 51 X
l n SINGLE BOX
DOUBLE BOX
76.5 x 76.5 x 51
76.5 x 136.5 x 51
X
Y
07
02
Y u (2M1) (2M1)
2 MODULE BOX 76.5 x 76.5 x 51 2M 07
YARD 25 S3 02
FFL+ 23425
FFL+ 23425 Y SOFFIT (HIGH LEVEL)
SSL+23375
SSL+23375
e WM e ALTAIR
Indocean Developers (Pvt) Ltd
f g S3 WH
No: 121A, Sir James Peiris Mawatha
Colombo 02
25
z z
25
Approved
Approved as Corrected
Submit Specified Item
KITCHEN SSL+23250 Revise and Resubmit
Rejected
S4 FFL+ 23450 SECTION- d SECTION- p
SSL+23400 FFL+ 23450 SECTION- a SECTION- c The review is only for general conformance
with the design concept of the project and
d 25 S5 d RG2 SSL+23400 FFL+ 23450 BALCONY general compliance with the information given
in the Contract Documents. Contractor is
responsible for: Dimensions to be confirmed
VDP
MAID'D ROOM POWDER LIVING and correlated at the job site; information that
pertains solely to the fabrication processes or
SSL+23375 FFL+ 23450 FFL+ 23425 to the means, methods, techniques,
sequences, and the procedures of
constructions; coordination of the Work of all
FFL+ 23425 SSL+23400 SSL+23375 trades; and for performing all work in a safe
REF
and satisfactory manner.
x S2 S1
responsibility and obligation to comply with
25
all requirements under the Contract.
x RG1 Consultant/Engineer
a a i v (JB)
u Signature Date
ATR-DT3-AR-DWG-3562 R0 ATR-SPLL(MAX)-EL-DWG-IT-L22-0254 R0
q r
b b ATR-DT3-AR-DWG-3570 R0 ATR-SPLL(MAX)-EL-DWG-IT-L26-0258 R0
h
BATHROOM3 ATR-DT3-AR-DWG-3569 R0 ATR-SPLL(MAX)-EL-DWG-IT-L22-0093 R0
FFL+ 23425 ATR-DT3-AR-DWG-5432 R0 ATR-SPLL(MAX)-EL-DWG-IT-L26-0097 R0
SSL+23375 25 ATR-DT3-AR-DWG-5433 R0 ATR-SPLL(MAX)-LV-DWG-IT-L22-0415 R0
k SECTION- b ATR-DT3-AR-DWG-3569 R0 ATR-SPLL(MAX)-LV-DWG-IT-L26-0419 R0
CKR-2540-ST-PL-0202-00 R1
SSL+23400
j FFL+ 23450
CKR-2540-ST-LL-0202-00 R1
CKR-2540-ST-LC-0202-00 R1
BEDROOM2 DINING
BEDROOM 3
FFL+ 23450
FFL+ 23450
MASTER BEDROOM SSL+23400
SSL+23400
FFL+ 23450 c c
SSL+23400
(X)
BATHROOM2
25 FFL+ 23425
SSL+23375 (X)
(X) COLOMBO RESIDENTIAL TOWER
(X) (Z) (X) COLOMBO, SRI LANKA
(X) (X)
j k r s DESIGN ARCHITECT
l f q m w SAFDIE ARCHITECTS, LLC.
100 PROPERZIE WAY
SOMERVILLE, MA 02143-3740 USA
T 617.629.2100 F 617.629.2406
SECTION- e SECTION- v
ASSOCIATE ARCHITECT
DESIGN TEAM 3
SINGAPORE
T 658.499.7168
CM STRUCTURAL ENGINEER
MR. PREDRAG EROR
P.O. BOX 102803, DUBAI, UAE
FIN.CEILING = L+2400MM
T 9714.3629234 F 9174.3629234
(JB)
(JB)
MECH, ELECT, PLUMBING ENGINEER
CKR CONSULTING ENGINEERS PVT. LTD.
PO BOX 73889
(X) DUBAI, UAE
(2M1)
(Y)
T +97143384277
(Z)
(6M) (X) (X) (Y) (X) (Z) LANDSCAPE ARCHITECT
(X) P LANDSCALE CO., LTD.
59/3 SOI SUKHUMVIT 39 SUKHUMVIT ROAD, KLONGTON NUA
(X)
WATTANA, BANGKOK 10110 T. 662.261.3700.9
(2M)
(2M1) (2M1) (6M1) (6M1) LOCAL STRUCTURAL ENGINEER & SUPERVISION CONSULTANT
(6M1) (4M1) (4M1) DEEPAL WICKREMASINGHE ASSOCIATES
(X)
NO. 377/2, Thalawathugoda Road, Hokandara South, Sri Lanka.
T- +94 11 4402395
DISCIPLINE
ELECTRICAL
CM CM
CM WALL MOUNTED LIGHT CM
DRAWING TITLE
FIN.CEILING = L+2400MM
INCLINED TOWER UNIT A
LEVEL 22,26 WALL CONDUIT INSTALLATION FOR
ELECTRICAL AND ELV SYSTEMS