by Kalingga Destriarsa, M. Isa, M. Rizky Fajar and Ferry Rio Van Briand
On Tuesday, September 5, 2017, be a DATA Engineers if they be a
our team had visited PT Promosindo Pressure Engineers for enough time, Midia Tenaga (PMT) in Pondok and after be a DATA Engineers for Pinang, and here is the summary of 10 years they can be a Well-site our conversation. Geologist. What does PT PMT do? What is the important parameters in mud logging? PT PMT is mud logging service company that contracted by the oil Mud logging team observe the Ir. Feriyanto company such as Pertamina, indicators in the mud returns during Mr. Feri is a geologist, graduate Medco, Humpuss patragas, Husky, the drilling process, and at regular engineer from Geological Engineering Java Petroleum, and many more. intervals log properties such as UGM Yogyakarta. He has work They do some interpretive science drilling rate, mud weight, flowline experience in Dresser Magcobar from involving the detailed analysis of temperature, oil indicators, pump 1982-1986 as DATA Engineers, in the rock cuttings and hydrocarbons pressure, pump rate, lithology (rock PT.Pilona from 1986-1988 as Log carried to the surface by the drilling type) of the drilled cuttings, and Analysis, in PT.Radiant Utama from fluid. Then organize the information other data. Another important task 1988-1989 as DATA Engineers, in in the form of a graphic log, is to monitor gas levels and types PT.Promosindo Media Tenaga from showing the data on a representation and notify other personnel on the rig 1989 until now as DATA Engineers. of the wellbore. This information when gas levels may be reaching helps the wellsite team and dangerous levels, so appropriate stakeholders determine the presence steps can be taken to avoid a of oil and gas, reduce reservoir dangerous well blowout. uncertainty, mitigate hazards, and optimize drilling efficiency. What is your job description and the team? Mud logging is all about team work. Mr. Feri as Data Aquisition & Technical Analysis (DATA) Engineer is responsible for analyzing all geological data during Our Team operations and preparing all final Kalingga Destriarsa (101316017) logs and reports for Well-Site Muhamad Rizky Fajar (101316039) Geologist and the Company Man. Muhamad Isa (101316051) DATA Engineer as team leaders is Ferry Rio Van Briand (101316117) The mud logging cabin responsible for the wellbeing and cohesion of the unit team. In conclusion, mud logging provides service of information for Petroleum Engineering Meanwhile, mud logger is junior Faculty of Exploration and Production the decision about wells and DATA Engineers who collect Technology drilling performance to help compilation task about drilling data, University of Pertamina drilling wells more efficient. gathering information and creating Critical decision depends on a detailed well log. As a mud logger, accurate information of reservoir they monitor and record drilling composition and lithology in mud activity, providing information log. Mud log contains the entire about the well status during the geological record of the drilled extraction of oil or gas, which will hole, along with other important be evaluate by DATA Engineers. parameters such as drill time, mud To become a DATA Engineer, a characteristic and oil-gas presence. mud logger must be Pressure Engineers first, after that they can