Vous êtes sur la page 1sur 2

IN

ABOUT

Interview Report with Mr. Feri


by Kalingga Destriarsa, M. Isa, M. Rizky Fajar and Ferry Rio Van Briand

On Tuesday, September 5, 2017, be a DATA Engineers if they be a


our team had visited PT Promosindo Pressure Engineers for enough time,
Midia Tenaga (PMT) in Pondok and after be a DATA Engineers for
Pinang, and here is the summary of 10 years they can be a Well-site
our conversation. Geologist.
What does PT PMT do? What is the important
parameters in mud logging?
PT PMT is mud logging service
company that contracted by the oil Mud logging team observe the Ir. Feriyanto
company such as Pertamina, indicators in the mud returns during Mr. Feri is a geologist, graduate
Medco, Humpuss patragas, Husky, the drilling process, and at regular engineer from Geological Engineering
Java Petroleum, and many more. intervals log properties such as UGM Yogyakarta. He has work
They do some interpretive science drilling rate, mud weight, flowline experience in Dresser Magcobar from
involving the detailed analysis of temperature, oil indicators, pump 1982-1986 as DATA Engineers, in
the rock cuttings and hydrocarbons pressure, pump rate, lithology (rock PT.Pilona from 1986-1988 as Log
carried to the surface by the drilling type) of the drilled cuttings, and Analysis, in PT.Radiant Utama from
fluid. Then organize the information other data. Another important task 1988-1989 as DATA Engineers, in
in the form of a graphic log, is to monitor gas levels and types
PT.Promosindo Media Tenaga from
showing the data on a representation and notify other personnel on the rig
1989 until now as DATA Engineers.
of the wellbore. This information when gas levels may be reaching
helps the wellsite team and dangerous levels, so appropriate
stakeholders determine the presence steps can be taken to avoid a
of oil and gas, reduce reservoir dangerous well blowout.
uncertainty, mitigate hazards, and
optimize drilling efficiency.
What is your job description and
the team?
Mud logging is all about team work.
Mr. Feri as Data Aquisition &
Technical Analysis (DATA)
Engineer is responsible for
analyzing all geological data during Our Team
operations and preparing all final Kalingga Destriarsa (101316017)
logs and reports for Well-Site Muhamad Rizky Fajar (101316039)
Geologist and the Company Man. Muhamad Isa (101316051)
DATA Engineer as team leaders is Ferry Rio Van Briand (101316117)
The mud logging cabin
responsible for the wellbeing and
cohesion of the unit team. In conclusion, mud logging
provides service of information for Petroleum Engineering
Meanwhile, mud logger is junior Faculty of Exploration and Production
the decision about wells and
DATA Engineers who collect Technology
drilling performance to help
compilation task about drilling data, University of Pertamina
drilling wells more efficient.
gathering information and creating
Critical decision depends on
a detailed well log. As a mud logger,
accurate information of reservoir
they monitor and record drilling
composition and lithology in mud
activity, providing information
log. Mud log contains the entire
about the well status during the
geological record of the drilled
extraction of oil or gas, which will
hole, along with other important
be evaluate by DATA Engineers.
parameters such as drill time, mud
To become a DATA Engineer, a
characteristic and oil-gas presence.
mud logger must be Pressure
Engineers first, after that they can

Vous aimerez peut-être aussi