This document provides a summary sheet for the fabrication and construction of a large storage tank. It outlines 28 separate components and lists the estimated number of days required for fabrication, erection, and welding of each part. Key stages include the 7 days for annular plate fabrication, 15 days for bottom fabrication, and various scaffolding and wind guider elements requiring 5 to 10 days each. The overall tank construction involves rolling, fabrication, erection, and welding steps taking place over the course of several weeks.
Description originale:
Construction Methodolgy-Royal Enterprises -29.05.17
Titre original
Construction Methodolgy-Royal Enterprises -29.05.17
This document provides a summary sheet for the fabrication and construction of a large storage tank. It outlines 28 separate components and lists the estimated number of days required for fabrication, erection, and welding of each part. Key stages include the 7 days for annular plate fabrication, 15 days for bottom fabrication, and various scaffolding and wind guider elements requiring 5 to 10 days each. The overall tank construction involves rolling, fabrication, erection, and welding steps taking place over the course of several weeks.
This document provides a summary sheet for the fabrication and construction of a large storage tank. It outlines 28 separate components and lists the estimated number of days required for fabrication, erection, and welding of each part. Key stages include the 7 days for annular plate fabrication, 15 days for bottom fabrication, and various scaffolding and wind guider elements requiring 5 to 10 days each. The overall tank construction involves rolling, fabrication, erection, and welding steps taking place over the course of several weeks.
Fabrication / SL NO DESCRIPTION Rolling Erection Welding NDT Completed 1 Annular Plate Fabrication 7 Days 7 Day 2 Bottom Fabrication 15 Day Continue on Process 3 SC-5 5 Day 5 to 7 Day 4 SC-6 5 Day 5 to 7 Day 5 Curbe Angle 2 Day 5 to7 Day 6 Foam Deflector Plate 2 Day 2 day 7 Top Landing Platform/Handrailing Post 1 Day 2 Day 8 Primary Wind guider 10 Day 5 to 7 Day 9 Stair Case and Mid landing Platform 2 day Continue on Process 10 Colling Ring Support / Foam Riser Support 2 day As Rqd 11 SC-4 5 Day 5 to 7 Day 12 Secondary Wind Guider 5 Day 5 Day 13 SC-3 5 Day 7 to 9 Day 14 Bottom Sump Fabrication 3 Day 2 Day 15 Bottom Deck Fabrication Continue on Process 5 day 16 Deck Ring/ Bulk head Fabrication Continue on Process 17 SC-2 5 Day 7 to 9 Day 18 SC-1 5 Day 7 to 9 Day 19 Top Deck Fabrication Continue on Process 20 Deck Structure / Deck Rim Angle 5 Day Continue on Process 21 Foam Dam Plate Fabrication Continue on Process 22 Leg Support Fabrication 1 Day Continue on Process 23 Deck Box Man hole with Cover Fabrication 2 Day Continue on Process 24 Tank Manhole /COD /All Nozzle Fabrication 3 Day Continue on Process 25 Gauge well pipe with Sleeve Fabrication 2 Day 2Day 26 Rolling Ladder fabrication 5 Day 3 Day 27 Riser pipe Fabrication 10 Day 28 Colling Ring pipe Rolling and Fabrication 15 Day Remark