Action Plan for Implementation of EPCPROMAN-Piping (14 Days)

The following activities will be performed by Client user as part of the Implementation
(Sample files & master templates will be provided by PCPL for implementation purpose)
SR. No. MODULE ACTIVITY

1 ICGP Activities to be performed during implementation session


1 Importing Catalogue.
2 Description Breakup.
3 Set Dictionary.
4 Set Rules.
5 Generate Itemcode.
2 AUTOSPEC Topics to be covered during Training session.
1 Import catalague
2 Update catalogue
3 Create specification
4 Export specification

3 ISOMEC Activities to be performed during implementation session


1 Importing catalogue/MTO.
2 Creation of specification.
3 Creation of Project.
4 Create 5 Lines & Routing Isometrics.
5 Set Dimensions & Print preview.
6 Generation of Line MTO & Bulk MTO reports.
7 Global Option And Dimension Settings.
8 Backing Sheet (Importing and Mapping).
4 MTOMAN Topics to be covered during Training session.
1 Create Logins & password
Route line:
2 Upload Itemmaster
3 Create/Import Line numbers to Route
4 Check In line & add components for Routing
Route line using Short keys.
5 Split spools by converting Shop weld to Field weld
6 Save the Routing & Generate Report
7 Global settings,Weld settings,Spool settings,Precision settings etc.
To Estimate MTO using Spec:
8 Import Specification
9 Import Line numbers to Estimate
10 Check In line & Add components and quantities
11 Save & Generate Bulk/Linewise MTO
5 AUTOSPOOL Activities to be performed during implementation session
1 Create New project
2 Define Users
3 Create Logins & Passwords for the users to access specific Units.
4 Perform Project Setting.
5 Process 20 IDF (or) PCF files in AUTOSPOOL
6 Generate Drawings.
7 Generate MTO Reports
8 SPOOLMAN Activities to be performed during implementation session
1 Create New project
2 Define Users
3 Create Logins & Passwords for the users to access specific modules
4 Create planning Masters and upload in SPOOLMAN
5 Upload MTO generated from AUTOSPOOL into SPOOLMAN
6 Perform Engineering Release
7 Perform Matching Front Analysis
8 Assign Spools to contractors
9 Create MIV (material issuance vouchers) in SPOOLMAN
10 Create Spool Allocation & Issuance Transmittal
11 Perform Front release
12 Create Fitup, perform Fitup Inspection & generate report
13 Upload WPS & Welder master
14 Perform welding, create Weld visual inspection report
15 Create Lot & assign joints to lot
16 Offer joints for NDT
17 Create NDT reports (RT/UT/DPT/MTP)
18 Create PWHT & Hardness Inspection Report
19 Perform Spool clearance
20 Create Spool Hydrotest repot (if required)
21 Create Painting report
22 Create Laydown report
23 Create Dispatch repot
24 Generate Review reports
9 Bar Code System Activities to be performed during implementation session
Notes :- Fitup report,Weld Visual report,RT report,UT report,DPT report,MPT report,PWHT report,HI
report,Spool painting report,Spool laydown report,Spool hydrotest report will be
customized 1 time w.r.t to header,footer & realligning of columns using report designer tool.
Configuration/Mapping of 1 backing sheet template in AUTOSPOOL (input template shall be
provided in *.dwg format)
*1
*2

Action Plan for Training of EPCPROMAN-Piping modu


SR. No. MODULE ACTIVITY

Overview EPCPROMAN Overview


ALL MODULES Submission of the sample report format of all the modules and finalisation of the
format
1 ICGP Topics to be covered during Training session.
1 Importing catalogue.
2 Breaking up description into parameters
3 To set Dictionary.
4 To set Rules
5 Generation of Itemcode.
2 AUTOSPEC Topics to be covered during Training session.
1 Import catalague
2 Update catalogue
3 Create specification
4 Export specification
3 ISOMEC Topics to be covered during Training session.
1 Importing catalogue /Catalogue creation, appending the catalogue
2 Creation of specification.
3 Updating the Branch Table.
4 Creation of Project.
5 Define Lines & Routing Isometrics.
6 Set Dimensions & Print preview.
7 Generation of Isometrics drawing
8 Generation of Line MTO & Bulk MTO reports.
9 Tools Menu (Set 3D coordinates, Flow arrow, Insulation and Tracing).
10 Global Option And Dimension Settings.
11 Backing Sheet (Importing and Mapping).
4 MTOMAN Topics to be covered during Training session.
1 Create Logins & password
Route line:
2 Upload Itemmaster
3 Create/Import Line numbers to Route
4 Check In line & add components for Routing
Route line using Short keys.
5 Split spools by converting Shop weld to Field weld
6 Save the Routing & Generate Report
7 Global settings,Weld settings,Spool settings,Precision settings etc.
To Estimate MTO using Spec:
8 Import Specification
9 Import Line numbers to Estimate
10 Check In line & Add components and quantities
11 Save & Generate Bulk/Linewise MTO
5 AUTOSPOOL Topics to be covered during Training session.
1 Creation of Project and creation of users.
2 Importing files into INFC node.
3 Assigning Files to users.
4 Check in files & spool marking by introducing Field welds.
5 Adding New welds on pipe.
6 Check out files & moving to IFC node.
7 Label Management (Label creation & moving files into labels).
8 Generation of Drawings(spool drawings & erection drawings)
9 Generation of Reports.
10 Overview on Global options, Weld settings & Spool settings.
11 Overview on Dimension setting and Annotation setting.
12 Report Designer.
Backing Sheet (Importing Backing sheet , Mapping Bill of materials & Attributes).
13
8 SPOOLMAN Topics to be covered during Training session.
1 Project Creation, Employee Definition & User logins/password creation.

2 Uploading Planning Masters (Spec. Master, Fluid Code Master, NDTMaster, etc.)
3 Uploading of MTO data in SPOOLMAN module.
4 Performing Engineering Release.
5 Performing Matching Front Analysis(MFA) for Spool Fabrication.
6 Generation MFA reports.
7 Assigning Spools to Contractors.

8 Generation of Material Issue Vouchers for Pipe spools (Soft MIV & Hard MIV).

9 Creation of Spool Allocation Transmittal (SATR) and Spool Issuance Transmittal.


10 Performing Front Release.
11 Performing Fitup, Fitup Inspection and generation of Fitup Report.
12 Uploading WPS and Welder Master.

13 Performing Welding, Welding inspection and generation of Welding Reports.


14 Creation of Lot & Assigning Joints to Lot.
15 Offering Joints for NDT & Creation of NDT reports.
16 NDT Clearance of spools (set NDT clearance).
17 Creation of PWHT and Hardness inspection reports.
18 Spool Clearance.
19 Creation of Transmittals for spool hydro test & for Painting.
20 Creation of spool hydro test reports.
21 Creation of spool painting reports.
22 Sending & Receiving of spools to Laydown, Dispatch.
23 Generation of Review reports (Daily Progress, Welder performance reports etc.)
9 Bar Code System Topics to be covered during Training session.
Total No of Days 12
Piping (14 Days)

No. Check Approved By Sign


Of Days Mark

4
2

PROMAN-Piping modules (12 Days)


No. Of Check Approved By Sign
Days Mark
1
sation of the 1

0.5

0.5
2

Attributes).

3
on.

aster, etc.)

rd MIV).

ansmittal.

eports.
ports etc.)
2