Project Planning & Control Engineer with more than 5 years experience in Oil and Gas industry
(Upstream & Downstream), Onshore Project with Fabricators Company and EPCIC Contractor.
Currently working as Planning & Schedulling Engineer with JGC-Encona Consortium for Pertamina
Refinery Unit IV Cilacap. Previous working handle Petronas Malaysia and ConocoPhillips Project, As a part
of the team, i actively involved in system wise completion schedule, planning and monitoring tie-in readiness
related shutdown operations, Coordinate the development of risk mitigation plan and deeply involve in
execution.

PERSONAL DATA

Name : Achmad Fachrudin


Place, Date of Birth : Sidoarjo, 8th October 1990
Sex : Male
Nationality, Race : Indonesia, Asian
Religion : Islam
Marital Status : Married
Phone Number : +62.85.330.931.693
Email Address : achmadfachrudin09@gmail.com
Skype id : achmad_ITS
Linked-in : https://www.linkedin.com/in/achmad-fachrudin-48265572
Home Address : Dsn Luwung 03/03 Ds Sidomojo Krian Sidoarjo 61262

Educational Backrgound

Formal : Material and Metallurgical Engineering, From Sepuluh Nopember Institut Of Technology (ITS)
Course : - Aveva PDMS
- Primavera P.6

Computer Competency

- PDMS
- Primavera P.6 (Certified)
- MS. Project
- Microsoft (Excel, Word, Power Point)
- Visio Technical

Safety Training

- National Institute for Occupational Safety and Health (NIOSH Petronas Chemical Sabah Sdn Bhd)
- First Aid and Fire Fighting (in-house training PT.Rekayasa Industri Conocophillips Indonesia)
- H2S and Mercury awareness (in-house training Conoco Phillips Indonesia)
- Working Permit Level 1 & Level 2 (in-house training Conoco Phillips Indonesia)
- Working at high (in-house training PT.Rekayasa Industri Conocophillips Indonesia)
- Incident & Injury Free Orientation Proram (in-house training JGC Pertamina RU IV Cilacap)

WORKING QUALIFICATION

- Project Control
- Planning & Schedulling
WORKING EXPERIENCES

11/2016 Current Position : Planning and Schedulling Engineer


JGC JO Encona Consortium
Client : Pertamina Refinery Unit IV Cilacap
Project Title: Pertamina Bluesky Project Cilacap Central Java - Indonesia

Developed and Maintain overall fabrication project plan, master schedule and detail schedule
using primavera P6
Developing progress measurement for weekly and monthly report
Performing database gathering and reporting for all man hour, cost, progress, man power and
project control activities as per project control plan
Update the Project Manager with accurate financial information to ensure the correct preparation
of the project status report

04/2016 11/2016 Position : Shutdown Planner/Tie-in Engineer


PT. Rekayasa Industri
Client : Conocophillips Indonesia Grissik Ltd
Project Title: Sumpal Gas Compression Project, Bayung Lencir South Sumatera

Prepare Work Package and Readiness execution related tie-in activity


Prepare Hourly schedule level 5 for execution work package
Prepare Hourly S Curve for tie-in activity
Manage and Review subcont schedule, Man Power and Consumable Readiness
Prepare executive report daily, weekly, monthly achievement for Prework Tie-in
Coordinate and monitoring each disclipine for achieving and forecast achievement every week
Prepare Integration schedule between system mechanical completion schedule and tie-in activity
Develop and monitoring RACI (Responsible Accountable Consulted Informed) for tie-in and
prework construction
Develop Risk register and mitigation plan during execution
Coordinate to the contractor for documentation report Daily, Weekly and Monthly.

10/2014 04/2016 Position : Project Control Engineer


PT. Rekayasa Industri Malaysia Sdn.Bhd (Subdiaries of PT Rekayasa Industri)
Client : Petronas Chemical Fertilizer Sabah Sdn Bhd
Project Title: Construction of Onshore Petrochemical Plant - Sabah Ammonia Urea Project
(SAMUR Project)
PT.Rekayasa Industri malaysia as Consortium Contractor with Mitsubishi Heavy Industri and Apex
Energy Sdn. Bhd

- Developed and Controlled Project S Curve for :


Piping (NG, FG, SM, SL, Waste Water Oil, and other piping mechanical package ) with total more
than 850.000 Dia Inch
Painting pipe and support more than 85.000 M2
Insulation for cold and hot (equipment and pipe)
Piping Test package for System Mechanical Completion (SMC)
Provide and Establish procedure for project progress control for phase of commodity project in
charge
Record and update progress achieved from construction, fabricators/sub contractors until ready
to commissioning
Provided executive report weekly and monthly
Daily Reporting for :
Spool released painted
Piping flow control status
Backup Sr project for handle RT backlog, repair backlog, piping daily production, task
force management meeting with owner,PWHT and system completion target plan
Piping Test package daily productivity status
Managing the activities of Project & Cost Control.

03/2013 10/2014 Position : Project Control Engineer


PT. Cilegon Fabricators
a) Client : Samsung C&T - Takraf Tenova Pty.Ltd
Project Title: Roy Hills Iron Ore (RHIO) Project Pilbara Western Australia 3 Unit
Semi Mobile Crusher Mining Platform 2454Ton

b) Client : Posco E&C


Project Title: 2 Unit Chocrane Thermoelectric PowerPlant 600MW for Chile Project

c) Client : Bianco Engineering Service Toyota Tsuso alliance


Project Title: RIO TINTO Dolphin Replacement for Coal Harbor - North Australia

Perform design, construction, and installation engineering


Prepare operational / work procedures as per required by the project
Perform project presentation during HAZOP
Familiarise with SO ships and relevant equipment with respect to capabilities and operation
sufficient information to the draughtsman in the form of sketches and calculations for production of
the construction drawings
monitoring of fabrication work
Be updated on all project-related matters. E.g. material / equipment; Project planning & reporting
Familiarise with matters pertaining to Perform calculations; Give input for daily reports; Monitor
contents of project equipment store
Update the Project Manager with accurate financial information to ensure the correct preparation
of the project status report

REFERENCES

a. Ginanjar Pranaditya Fakhringgi, Schedule Control Pertamina PLBC Email :


ginanjar@mitrakerja.pertamina.com
b. Danang Kurniawan, Planning Engineer ConocoPhillips email :
Danang.P.Kurniawan@contractor.conocophillips.com
c. Gatot Prasetyo, Project Control Manager Rekind, email : gatot_prasetyo@rekayasa.co.id
d. Wukir Tri W, Project Control Manager Rekind, email : wukir_wibowo@rekayasa.co.id
e. Idham Munir B Mohd, Piping Construction Engineer Petronas Chemical, email :
idham_munir@petronas.com.my
f. Eriswandi, GM Project Control Cilegon Fabricators email : eris@cilegonfab.co.id
UKAS
'''""""""'
SmtMS
001

PT. CILEGON FABRICATORS


FABRICATORS OF INDUSTRIAL EQUIPMENT
ASME AUTHORIZE SHOP "S" ; "U" ; "PP"

Head Office/ Factory :


JI. Raya Bojonegara-Salira, Argawana, Kee. Puloampel, Kab. Serang, Banten 42454, Indonesia
Tel. : (62-254) 5750068-73, 5750685-688 (Hunting)
Fax : (62-254) 5750069
E-mail : ptcf@cilegonfab.co.id
Homepage: http://www.cilegonfab.co.id

Argawana, October 17, 2014


L9 - CTF- 08

TO-WHOM IT MJ{Y CONCERN

The undersigned here by certify that

Name ACHMAD FACHRUDIN


NIK 13100550K
Date of Birth SIDOARJO OCTOBER 8, 1990
Address JL. RAYA KEMERAAN 63 RT. 009/003
KRIAN - SIDOARJO JAWA TIMUR

Has been employed by PT. CILEGON FABRICATORS

From MARCH 4, 2013


Up to OCTOBER 20, 2014
Occupation ENGINEER 1

He left from this company on account of his Contract completed. The Management of PT.
CILEGON FABRICATORS wishes to convey his high appreciation for his good co-operation
during his stay with us.