C-System Physical Properties DOT-168 QPL-36 One per Project
171
TEMPORARY SILT Wood Post Spacing
FENCE Length DOT-168 Visual Inspection One per Project
Area
Steel Post Spacing
Shape
DOT-168 Visual Inspection One per Project
Weight
Galvanization ASTM A123
Woven Wire Height
Vertical & Horizontal Spacing
Diameter DOT-168 Visual Inspection One per Project
Number of Wires
Galvanization ASTM A123
Fasteners Dimensions
DOT-168 Visual Inspection One per Project
Spacing
Silt Fence Tensile Strength ASTM D4632
Fabric DOT-168 QPL-36 One per Project
GUIDE FREQUENCY
Width
Condition of Fabric
C-System Physical Properties DOT-168 QPL-36 One per Project
205
ROADWAY Embankments Theoretical Density GDT-7 or Roadway (before
EXCAVATION (to within 1 ft of GDT-67 Compacting) Volume Change tests may
top) be omitted on acceptance
Gradation GDT-4 DOT-408 One per major soil samples, except the first
30 lbs.
/DOT-97 Type sample & each fifth sample
Volume Change GDT-6
thereafter, which shall be
Classification Section 810 submitted to the Branch or
In-Place Density GDT-20, GDT- DOT-553 One per 5,000 yd3 Completed Lift Central Lab for testing,
21, GDT-55 & GDT-59 unless provisions are
made for testing on the
Project. Percent Moisture
is part of Density test
procedure.
Rock Gradation Visual
Abrasion T96
Requires approval by Pit &
Soundness T104 DOT-658 QPL-2 Quarry if not from QPL-2
Petrographic Analysis ASTM Source
C295
Pond Sand Gradation T27
Volume Change GDT-6 DOT-408 / Requires approval by Pit &
Density GDT-7 or GDT-67 DOT-97 Quarry
206
BORROW Soil Gradation GDT-4
EXCAVATION Percent Clay GDT-4
Volume Change GDT-6 DOT-408 /
Class II, B-3 or better
Density GDT-7 or GDT-67 DOT-97
Type II Gradation T27 DOT-658 45 lbs. One per 500 tons As required by
Backfill based upon QPL-2, Project Engineer
Aggregate except for Section D,
Stockpile Basis
Sources; material
from Section D must
be sampled.
209
GUIDE FREQUENCY
In-Place In-Place Density GDT-20, GDT- DOT-553 45 lbs. One per 1,500 ft, per Completed Course
Material 21, GDT-55 & GDT-59 2 lanes
Type II - Gradation T27 DOT-658 45 lbs. One per 500 tons As required by Stockpile
Aggregate based upon QPL-2, Project Engineer
except for Section D,
Stockpile Basis
Sources; material
from Section D must
be sampled.
212
GRANULAR Soil Gradation GDT-4
EMBANKMENT Percent Clay GDT-4
Volume Change GDT-6 DOT-408 / One per major Soil
Density GDT-7 or GDT-67 DOT-97 Type, Class I, A-2
216
UNPAVED Select Material Theoretical Density GDT-7,
SHOULDERS & Impervious GDT-24, GDT-48, GDT-49 &
Material GDT-67 Volume Change tests may
be omitted on acceptance
Gradation GDT-4 samples, except the first
Volume Change GDT-6 DOT-408 / One per mile, per In-Place Material sample & each fifth sample
30 lbs.
DOT-97 shoulder (before Compacting) thereafter, which shall be
Classification Section 810 submitted to the Branch or
Central Lab made for
testing on the Project.
GUIDE FREQUENCY
219
CRUSHED Graded GDT-49
AGGREGATE Aggregate Gradation T27 QPL-2 Sources, 1
SUBGRADE One per 1,500 tons per 20,000 tons,
Sand Equivalent GDT-63
based upon QPL-2, except for Section D,
except for Section D, Stockpile Basis
DOT-658 45 lbs. Stockpile Basis Sources; GDOT will Roadway
Sources; material perform acceptance
from Section D must tests on materials
be sampled. delivered from
Section D Sources.
Gradation GDT-4
Volume Change GDT-6
GUIDE FREQUENCY
In-Place In-Place Density GDT-20, GDT- DOT-553 45 lbs. One per 1,500 ft, per Completed Course
Material 21, GDT-55 & GDT-59 2 lanes
Thickness Measurement GDT- DOT-176 One per 1,500 ft, per Completed Course When required
42 2 lanes
225
SOIL LIME Soil Gradation GDT-4
CONSTRUCTION Percent Clay GDT-4 Plant Mix Base: 1
per 1,000 yd3
Volume Change GDT-6 DOT-408 / Road Mix Base: 1
30 lbs. Before Lime is added
Density GDT-7 or GDT-67 DOT-97 per 2,000 ft
Non-Base: 1 per Soil
Type
CBR T193
Hydrated Lime Physical & Chemical Analysis Misc. DOT- 1 qt.* QPL-41 One per 2,000 tons, Stock *air-tight container
M216-84 168 per Source
Water Physical & Chemical Analysis DOT-088 1 qt.* One per unpotable Enough in advance so *non-metal container
T26 Source that results are known
before use
In-Place Theoretical Density GDT-19 One per Soil Type or In-Place Material *Check if GDT-67 is used
Material (Lime in lieu of Cement) 1 per compaction* (before Compacting)
DOT-553
In-Place Density GDT-20, GDT-
21 or GDT-59 30 lbs.
One per 1,500 ft, per
Completed Course
Thickness Measurement GDT- DOT-176 2 lanes, per Lift
42