Vous êtes sur la page 1sur 1

VENT

5.00 S.R.L. CONCRETE S.R.L.


LATTICE VENT

C0296-02-HJ-04
SEE DRAWING
"1"

0.65
F.F.L.
???? LEVEL
WATER

0.60
K 2.23
MACHINE 1.03 1.20 SURGE TANK FILLING
ROOM HEIGHT WATER 2.250 M
VOLUME: 40,000 LTS.
C

1.20

2.70
D
E

2.25
ENTRANCY B C
MEN SUCTION

0.78

0.70
CONCRETE
1.20 BASE
TANK

SURGE TANK FILLING


4.00

HEIGHT WATER 2.250 M


VOLUME: 40,000 LTS.

SCALE: 1:30

ENTRANCY
MEN
1.20 1.00 CONCRETE S.R.L.
LATTICE VENT

F.F.L. F.F.L.
???? ????
A CENTRIFUGAL PUMP, 15 H.P.
B CENTRIFUGAL PUMP, 15 H.P.
C BUTTERFLY VALVE
SUCTION

SUCTION

MACHINE D CHECK VALVE


ROOM TO COME
INTERACTIVE E
GAME F PANEL BOARD
C C G ELECTRICAL HANDHOLES

2.70
E E

2.23

1.45
1.25
F.F.L. FINISH FLOOR LEVEL

0.74
CONCRETE CONCRETE S.W.L. STATIC WATER LEVEL
BASE BASE B.R.L. BOTTOM RIVER LEVEL
S.R.L. SUPERIOR ROOM LEVEL
TO COME I.R.L. INFERIOR ROOM LEVEL
MACHINE INTERACTIVE U.C.L. UPPER COLUMN LEVEL
ROOM GAME S.S.L. STARTING SLIDE LEVEL
0.50
5.00

1.- ALL DIMENSIONS AND LEVELS ARE IN METERS


2.- ALL LEVELS OF SLIDES SUPPORT ARE
TO COME CONCRETE SUMP PIT
SCALE: 1:30 REFERENCED AT +00.000
INTERACTIVE SUBMERSIBLE PUMP
GAME 0.75 HP 3.- SEE DRAWINGS C2647-02-HJ-02
HIDRAULICS DETAILS
"2" A A "2" 4.- SEE DRAWINGS C2647-02-HJ-04
DETAILS OF MACHINE ROOM
1.20 5.- SEE DRAWINGS C2647-02-OC-02 & OC-03
LOCATION OF FOUNDATIONS & PLATES FOR INTERACTIVE GAME
6.- LEVELS OF AREA REFERRED TO FINISHED FLOOR LEVEL +00.000
7.- PIPES IN THE MACHINE ROOM WILL PVC Schedule 40 BOUND BY THE
ENTRANCY 0.50 1.50 DIAMETER SHOWN IN THE DRAWING, UNLESS OTHERWISE STATED.
MEN ALL THE HYDRAULIC PIPE LINE MUST BE SUBTERRANEAN, AND UNDER
0.60 CONCRETE SUMP PIT
FREEZE LEVEL SPECIFIED IN THE CONSTRUCTION AREA.
1.20

SUBMERSIBLE PUMP
0.75 HP
8.- VALVES BUTTERFLIES IN THE MACHINE ROOM AND FLANGED
0.60

OPENING WILL INSTANTLY.


F
9.- CARRY OUT A PRESSURE TEST TO CHECK THE TIGHTNESS OF
THE SYSTEM. BEFORE ANY FINAL CONSTRUCTION WORK TO
PREVENT LEAKS
10.- FILTERING EQUIPMENT TO BE USED WATER SURGE TANK
11.- IS THE RESPONSIBILITY OF SUPERVISOR OF WORK, THE
G REVISION OF ALL LEVELS IN THE AREA OF CONSTRUCTION FOR
0.60

VERIFICATION OF HEIGHTS AND STILL RETURNS IN PIPES


HYDRAULIC
12.- ALL PIPING BEHIND THE CONCRETE WALLS (AND BENEATH
THE CONCRETE FLOOR) SHALL BE PLACED ON VERIFIED
COMPACTED SOIL OR SECURELY ATTACHED TO THE CONCRETE
0.60
WALLS IF THE REQUIRED BACKFILL AND COMPACTION CANNOT
"1" BE ATTAINED,THEN ALL PIPING SHALL BE STRAPPED TO THE
POOL SHELL AND THE MAXIMUN SPACING SHOWN BELOW.

SCALE: 1:25

IMPORTANT NOTE:
ITS A RESPONSIBILITY OF THE OWNER AND/OR
CONTRACTOR TO OBTAIN VERIFICATION FROM A
REGISTERED SOILS ENGINEER THAT THE ASSUMED DESIGN
LOAD-BEARING, CAPACITY OF 2,000 POUNDS PER SQUARE
FOOT IS AVAILABLE AT THE MACHINERY ROOM: LOCATION,
PREPARATION OF THE SURFACE OF LOAD-BEARING SOIL
SHALL BE IN ACCORDANCE WITH THE SOILS
REQUIREMENTS

Vous aimerez peut-être aussi