Dear Sir/Madam,
GAIL (India) Ltd. invites you to submit your offer in sealed envelope superscribing RFQ No. & Due date for the
following services in complete accordance with enquiry documents/attachments:
Name of work : Fabrication and Erection of Piping and Structures including supply
of structural material for PSV Modification Job & for Installation of
new control valve in plant by pass line in LPG Plant at
Bid Due Date & Time : 11.07.2007 at 14:00 Hrs
Opening of Bids on : 11.07.2007 at 15:00 Hrs (In case of Two Bid system
tender,unpriced bids shall be opened.)
Validity of Offer Upto : 11.11.2007
Date of Pre Bid Conference : at _________Hrs
Earnest Money:
Rs.11,000.00 as detailed in tender
Bids complete in all respects should reach office of Incharge (C&P), GAIL (India) Ltd., at the above address
on or before 14.00 hrs of the scheduled date. Bids received after the due date and time are liable to be rejected.
GAIL reserves the right to accept or reject any or all tenders received at its absolute discretion without assigning
any reason whatsoever.
Thanking You,
Yours truly,
For & on behalf of
GAIL (India) Ltd.
(Authorised Signatory)
Tender No.: VAGH\13822
SCHEDULE OF RATES
Out. lev.
Item No. Service Description Qty. UOM Rate Amount
ITEM 00001 FAB. & EREC OF PIPING & STR FOR PSV MOD
Plant : 6010,LPG Unit - Vaghodia
1 FAB. & EREC OF PIPING & STR FOR 0 EA ____________ _________
PSV MOD
1) Carbon Steel Piping (CS & LTCS) for hydrocarbon service of different pressure ratings up to Sch-80
and of different sizes as per supplied drawing or as per instruction of Engineer- In-Charge. Including
handling & shifting of required piping material from stores/workshop, dismantling of existing pipe line,
erection of new pipe line along with installation of PSV's, isolation valves, gas cutting, edge preparation
by grinding, fit-up, mud capping, welding as per standard engineering codes and practice, Root DPT,
Radiography of approx 134 Inch-Dia and Hydro testing upto the required test pressure, drying of pipe line
and leak testing of the line with full operating gas test pressure.
2)All Piping Welding to be done by Qualified welder with approved WPS only.
3)The detailed scope of work, and terms and conditions shall be as per the tender documents.
4)The brief description of fabrication and erection job is as given in Annexure attached with the tender
documents. The contractor may visit the site and acquaint himself fully about the details of the work.
1)Fabrication and Erection of Carbon Steel piping for hydrocarbon service of pressure rating upto Sch-80
as per the supplied drawing or as per the instruction of the engineer in charge the jobs includes handling
& shifting of required piping material from stores/workshop, dismantling of existing pipe line, erection of
new pipe line along with installation of control valve, isolation valves ,fabrication,gas cutting,edge
preparation by grinding fit up , welding, root by the gtaw (argon welding) and filler and final by smaw(arc
welding)support fixing, as per the standard engineering codes and practices and finally Root DPT,100%
Page 1
Tender No.: VAGH\13822
2)All Piping Welding to be done by Qualified welder with approved WPS only.
3)The detailed scope of work, and terms and conditions shall be as per the tender documents.
4) The contractor may visit the site and acquaint himself fully about the details of the work.
Page 2
SECTION I
INVITATION
FOR
BIDS
ITB- 1 of 41
INVITATION FOR BIDS
2.1 Bid Document is non-transferable. Bidder must submit the bid directly. Bids received from
bidders in whose name Bid Document has been issued.
2.2 Bids complete in all respects should reach the office of M (C&P), GAIL (India) Limited, GIDC
INDUSTRIAL ESTATE ,VAGHODIA 391 760 , Distt. Baroda on or before the BID DUE DATE
and TIME. Fax/Telegraphic/E-mail bids shall be rejected. Bids received beyond due date and
time shall be rejected.
2.3 Bids must be accompanied with Bid Security/EMD as mentioned above in the form of Demand
Draft/Bankers Cheque/Bank Guarantee. Bidders shall ensure that Bid Security having a validity
of two months beyond the bid validity [four months] from the bid due date, must accompany the
bid in the format made available in the Bid Document. Bid not accompanied with Bid Security
and not in requisite form shall be summarily rejected.
ITB- 2 of 41
2.4 GAIL will not be responsible for the cost incurred in preparation and delivery of bids.
2.5 This Invitation for Bids (IFB) is an integral and inseparable part of the enclosed Bid Document.
Bidders are advised to quote strictly as per the terms and conditions of the tender document
and not to stipulate any deviation/exception. Once quoted, the bidder shall not make any
subsequent price change whether resulting or arising out of any technical/commercial
clarification sought regarding the bid. Such price changes shall render the offer liable for
rejection. Bidder must note that the work cannot be sub-contracted under any circumstances.
2.6 GAIL reserves the right to reject any or all the bids received at its discretion without assigning
any reason whatsoever.
ii) The bidder must have permanent EPF registration with Govt.
regional Provident fund.
Documentary proofs ( duly attested, wherever required) for the above mentioned criteria
should be submitted along with the BID failing which the offer shall not be considered for
further evaluation.
2.8
TENDER MAY ALSO BE DROPPED IN OUR TENDER BOX PLACED AT
MAIN GATE (GATE NO.1) 'CISF' RECEPTION AT GAIL (INDIA)
LIMITED., VAGHODIA. IN CASE OF ANY PROBLEM BIDDER MAY
CONTRACT MANAGER(C&P), GAIL, VAGHODIA AT EXTN-380, GAIL,
VGHODIA AT EXTN-381.
ITB- 3 of 41
INSTRUCTIONS TO BIDDERS
1.1.2 Transfer of Bidding document issued to one intending bidder to another is not permissible.
1.1.3 Bid shall remain valid for 120 days from the date of submission of Bid.
2.1 The bid must be accompanied by earnest money (interest free) for the amount indicated in Letter
Inviting Tender in the form of a Demand Draft drawn on any Nationalized/Scheduled Bank in favour
of M/s. GAIL (India) Limited payable at STATE BANK OF INDIA, VAGHODIA, BARODA), or in
the form of Bank guarantee issued by Nationalized Bank for an equal amount valid for six (06) months
from the due date of submission of bid as per the format enclosed in bidding document. Bid not
accompanied by earnest money will not be considered unless the same is exempted as per Letter
Inviting Tender. Bank guarantee shall be revalidated for extended period as required by GAIL in
writing.
2.2 If the bidder, after submission, revokes his bid or modifies the terms and conditions thereof during the
validity of his bid except where the GAIL has given opportunity to do so, the earnest money submitted
by Bidder will, in such case, not be refunded to him.
2.3 GAIL may at any time cancel or withdraw the invitation to bid without assigning any reason and the
earnest money submitted by Bidder will in such case be refunded to him.
2.4 The successful Bidder shall be required to deposit within 10 days of acceptance of his bid, security
deposit / Initial Security Deposit with the GAIL in the manner indicated in General Conditions of
ITB- 4 of 41
Contract / Special Conditions of Contract. Should the successful Bidder fail or refuse to sign the
agreement or furnish the security deposit / initial security deposit within the period fixed by the GAIL
as indicated above, the earnest money shall be forfeited without prejudice to his being liable to any
further loss or damage incurred in consequence by the GAIL.
2.5 Earnest money shall be returned to the successful Bidder after the security deposit / initial security
deposit has been furnished by him to the GAIL.
3.2 The rates quoted by the bidder shall be firm and fixed for the completion period of the
tendered works, unless stated otherwise. The rates shall be quoted by the Bidder shall
include all taxes, duties & levies.
3.3 Rates must be filled in format for schedule of rates enclosed as part of bidding document. If
quoted in separate typed sheets and any variation in description, unit is noticed, the bid is
liable to be rejected. In any case bidder shall be presumed to have quoted against the
description of work and the same shall be binding on the bidder.
3.4 In case any activity through specifically not covered in description of Schedule of Rates but
is required to complete the work as per Scope of Work, Scope of Supply, Specifications ,
Standards, Drawings, General Conditions of Contract, Special condition of contract or any
other part of bidding document, the quoted rates will deemed to be inclusive of cost incurred
for such activity.
3.5 Rates quoted shall be in Indian Rupees Only.
3.6 Bidder shall quote rates both in figures as well as in words.
3.7 Bidders are advised to include the Rebate / Discount, if any , in the Schedule of Rates (
SOR) itself and NOT to mention the same separately.
In case, it is observed that any of the bidder(s) has/have mentioned the discount/ rebate
separately, the same shall not be considered for evaluation. However, in the event of the
bidder emerging as the lowest bidder, the discount/ rebate offered by the bidder shall be
considered for Award of Work and the same will be binding on the bidder.
4.0 DOCUMENTS COMPRISING THE BID
4.1 Bidder is advised that GAIL intend to fully evaluate the technical and un-priced commercial
submissions.
4.2 It is important that Bidder clearly demonstrates his experience and capability, giving to GAIL a
high level of confidence that if awarded, the Bidder will be able to perform the works within the
stipulated Time Schedule and quoted price and meeting all other requirements listed in the
Bidding document.
4.3 Bidder is requested to furnish the complete and correct information required for evaluation of
his Bid. If the information with regard to resources and concurrent commitments or any other
information / documentation forming basis of evaluation is found in complete / incorrect the
same may be considered adequate ground for rejection of the bid.
4.4 Bidder shall arrange his bid in the following order:
a) Earnest Money Deposit and its details.
b) Power of Attorney in favour of authorized signatory of the Bidding document
& PF certificate
c) Exception and Deviation statement as per Annexure I to INSTRUCTIONS
TO BIDDERS respectively.
d) Schedule of Rates duly filled in and Signed.
e) Check list
f) Documents required for BEC qualifications
g) Signed copy of tender documents as acceptance of all terms & condition of
tender
h) Bidders are advised to include the Rebate / Discount, if any , in the
Schedule of Rates ( SOR) itself and NOT to mention the same
separately.
In case, it is observed that any of the bidder(s) has/have mentioned the discount/ rebate
separately, the same shall not be considered for evaluation. However, in the event of the
bidder emerging as the lowest bidder, the discount/ rebate offered by the bidder shall be
considered for Award of Work and the same will be binding on the bidder.
ITB- 5 of 41
5.0 SUBMISSION OF BID
Tender document must be submitted in one single sealed envelopes in following manner:
a) The bid shall contain technical and commercial part of offer alongwith duly
filled in SOR. The envelope shall comprise the signed copy of Bidding
document (Tender document), drawings, addendum (if any), information
listed for submission in Part I under Para 4.4. above.
b) The envelope shall have following information clearly written on the outside of
the envelope, failing which GAIL will assume no responsibility for the
misplacement or premature opening of the bid.
MANAGER (C&P)
GAIL (INDIA) LIMITED
LPG RECOVERY PLANT
GIDC INDUSTRIAL ESTATE VAGHODIA, BARODA
5.2.2 Bid received after the time and date fixed for receipt of bid is liable for rejection.
6.2.2 Techno-commercial discussions with bidder shall be arranged, if needed. Bidder shall depute his
authorized representative (s) for attending the discussion. The representative(s) attending the
discussions shall produce authorization from his organization to attend the discussions and sign the
minutes of meeting on behalf of his organization. The authorized representatives must be competent
ITB- 6 of 41
a) Total Scope of work.
b) Security deposit /Contract Performance Bank Guarantee.
c) Validity of bids.
d) Schedule of Rates.
e) Payment Terms
f) Arbitration clause
g) Force Majeure.
h) Completion period
i) Prior to the financial evaluation of bids, the GAIL will determine whether each bid is
substantially responsible to the requirements of the Bidding document.
ii) For the purpose of this clause, a substantially responsible bid is one, which conforms
to all the terms and conditions and specifications of the bidding document without
material deviation or reservation. A material deviation or reservation is one which
affects in any substantial way the scope, quality, or performance of the works or
which limits in any substantial way, in consistent with the bidding document, the
employers rights of contractors obligation would affect unfairly the competitive
position of bidders presenting substantially responsive bids.
iii) If a bid is not substantially responsive to the requirements of the Bidding documents,
it may be rejected by the GAIL.
6.3.6 Bidders must submit the bid in line with bid stipulations without taking any deviation. However,
in case it becomes unavoidable and the Bidder seek some clarifications / queries with respect
to technical / commercial part, the bidder may stipulate the same strictly as per Annexure-VIII
for the technical and commercial part.
ITB- 7 of 41
Information related to the examination, clarification, evaluation and comparison of bids
recommendations for award of contract shall not be disclosed to bidder or other person not
officially concerned with such process. Any effort by bidder to influence the GAIL processing
of bid or award decisions may result in rejection of such Bids.
6.7 OWNERS RIGHT TO ACCEPT OR REJECT A BID
GAIL reserves the right to accept a bid other than the lowest and to accept or reject any bid in
whole or part, to annual the bidding process or to reject all bids with or without notice or
reasons. Such decisions by GAIL shall bear no liability whatsoever consequent upon such
decisions.
7.0 AWARD OF WORK AND CONTRACT DOCUMENT
7.1 AWARD OF WORK
7.1.1 The bidder whose bid is accepted by GAIL shall be issued Letter of Intent / fax of Intent (LOI/FOI)
prior to expiry of bid validity. Bidder shall confirm acceptance by returning a signed copy of the LOI /
FOI.
7.1.2 GAIL shall not be obliged to furnish any information / clarification / explanation to the
unsuccessful bidders as regards non acceptance of their bids. Except for refund of EMD to
unsuccessful bidder, GAIL shall correspond only with the successful bidders.
7.2 CONTRACT DOCUMENT
7.2.1 The successful bidder shall be required to execute a formal agreement in accordance with the Form of
Contract (Annexed to General Condition of Contract (GCC)), within 10 days of receipt of
LOI/FOI/Detailed Letter of Award specified period.
7.2.2 Contract Documents to be signed between GAIL & selected bidder shall consist of the following :
iii) Detailed letter of award / acceptance along with agreed variation and other enclosures.
7.2.3 Stamp paper of appropriate value shall be provided by the successful bidder after ascertaining its value.
7.2.4 The statement of Agreed variation prepared based on the deviation if any, finally retained by the
bidder and accepted by GAIL, shall form part of detailed letter of award.
ITB- 8 of 41
ANNEXURE I
NOTE : Bidders are advised not to stipulate any deviation(s) / condition(s) and to confirm compliance
to tender conditions in toto .However, in the event of bidder seeking any deviation(s), the same should
be submitted separately for commercial & technical sections strictly as per the format given above,
otherwise, the same shall not be considered and it will be presumed that the bidder has accepted all
terms & conditions of the tender.
SIGNATURE : ____________________________________
NAME : ____________________________________
1
Section II
1.0 GENERAL:
1.1 The Special Condition of Contract shall be read in conjunction with the General
Conditions of Contract, Schedule of rates, specifications, drawings and any
other documents forming part of contract, wherever the context so requires.
Notwithstanding the sub-division of the documents into these separate sections
and volumes, every part of each shall be deemed to be supplementary to and
complementary of every other part and shall be read with and into the
CONTRACT so far as it may be practicable to do so.
1.2 Where any portion of the General Condition of Contract is repugnant to or at variance
with any provisions of the Special Conditions of Contract, unless a different intention
appears, the provisions of the Special Conditions of Contract shall be deemed to over-
ride the provisions of the General Conditions of Contract and shall to the extent of such
repugnancy, or variations, prevail.
1.4 The materials, design, and workmanship shall satisfy the relevant
INDIAN STANDARDS, the JOB SPECIFICATIONS contained herein and
CODES referred to. Where the job specification stipulate requirements in
addition to those contained in the standard codes and specifications,
these additional requirements shall also be satisfied.
1.5 The intending bidder shall be deemed to have visited the site. Non-familiarity with site
condition and unawareness of General Condition of contract will not be considered a
reason either for extra claim or for not carrying out work in strict conformity with
drawings and specifications.
2.0 LOCATION:
GAIL (India) Limited, Vaghodia(Vadodara)
3.0 SCOPE OF WORK:
The Scope of work shall be as per Special Conditions of Contract Part-B.
The work shall be executed strictly as per time Schedule given in Tender
Document. The period of completion given includes the time required for
mobilization as well as testing, rectifications, if any, re-testing and completion in
all respects to the entire satisfaction of the Engineer-in-Charge.
2
5.0 TERMS OF PAYMENT:
Payment will normally be made within 30 days of submission of bills to Engineer-in-charge after applicable
deduction of Income Tax and any other taxes and duties. Bidders are required to submit details of PAN no. along
with their bid.
Ensuring one more step ahead to facilitate our Vendors / Parties/ Consultants, GAIL has introduced Centralized
Bill Receipt System. Under this system, all the parties are required to send their bills in an envelop invariably
mentioning the following information on its top to enable our Central Dak Receipt Cell to identify such
envelops without opening, to make necessary entry and send to the concerned Officer/Department for further
necessary action:
The above mentioned system would enable our Indenting Deptt. to generate the computerized
acknowledgement of your bills through our Bill Watch System(BWS)
Payment will be released preferably through electronic mode (e-banking) from SBI Bank and accordingly vendors /
contractors are requested to provide details of their Account No. and Bank Branch Code in the enclosed format
(SCA 10/10) to which payment will be released electronically. However, in case of specific request from the
contractor, payment will be made through crossed Bankers Cheques/Demand draft payable at SBI Bank,
Vaghodia (Branch Code: 177) only, at the sole discretion of GAIL. All bank charges shall be to partys account.
3
The service tax shall be payable extra at actuals as per applicable at the time
of services.. The bidder shall indicate in its bid the Service Tax registration
no. and in case the Service Tax registration no. is not available, the bidder
will give confirmation for obtaining registration with a copy of application for
registration. The amount of service tax is payable against the invoice raised
as per Service tax Act and rules.
The bidders who are non- resident or are from outside India are requested
to clearly state whether they have any office in India or not. If they have any
office in India, they are requested to give the address of their office situated
in India.
The Contractors liable to pay Service Tax for the work / services rendered to
GAIL, shall specifically mention the Service Tax registration No. in their
Invoice(s). Further, the amount and rate of Service Tax shall be separately
and distinctly specified in the Invoice(s).
9.3 Contractor can furnish the initial or total security deposit amount through bank
guarantee from any nationalized /Schedule bank in prescribed proforma which shall be valid for 90 days beyond
completion of the job or expiry of Defect Liability Period which ever is applicable.
9.4 Security Deposit shall be refunded after the expiry of 90 days beyond the completion of work or Defect
Liability Period which ever is applicable.
10.0 TECHNICAL SPECIFICATION:
As enumerated in Special Conditions of Contract/Scope of Work/attached Drawing/ Details/Schedule of Rates.
11.0 TESTS AND INSPECTION:
11.1 The Contractor shall carry out the various tests as enumerated in the technical
specifications of this tender document and the technical documents that will be
furnished to him during the performance of the work and no separate payment
shall be made unless otherwise specified in schedule of rates.
11.2 All the tests either on the field or at outside laboratories concerning the execution
of the work and supply of materials by the Contractor shall be carried out by
Contractor at his own cost.
11.3 The Contractor shall provide for purposes of inspection access ladders, lighting
and necessary instruments at his own cost for inspection work.
11.4 Any work not conforming to execution drawings, specifications or codes shall be
rejected forthwith and the Contractor shall carryout the necessary rectification at his own cost.
11.5 All results of inspection and tests will be recorded in the inspection reports,
Proforma of which will be approved by the Engineer-in-Charge. These reports
shall form part of the completion documents.
11.6 For materials supplied by Owner, Contractor shall carryout the tests, if required
by the Engineer-in-Charge, and the cost of such tests shall be reimbursed by the
owner at actual to the Contractor on production of documentary evidence.
Contractor shall inspect carefully all equipment before receiving them from
Owner for installation purposes. Any damage or defect noticed shall be brought to
the notice of Engineer-in-Charge.
4
11.7 Inspection and acceptance of work shall not relieve the Contractor from any of his
responsibilities under this Contract.
12.1 Measurement of works shall be made in the units mentioned in the Schedule of
Rates as per details given in Technical/Standards specifications.
12.2 Wherever details are not available or inadequate in the execution drawings, physical measurements will be taken
by the contractor in the presence of the representative of the Engineer-in-Charge. In such cases payment will be
made on actual measurements.
13.0 DEFECT LIABILITY PERIOD:
The defect liability period shall be as per Special Conditions of Contract of Part-B.
14.0 CONSTRUCTION EQUIPMENT AND SITE ORGANIZATION:
14.1 The Contractor shall without prejudice to his overall responsibility to execute and
complete the work as per specifications and time schedule, progressively deploy
adequate equipment and tools and tackles and augment the same as decided by
the Engineer-in-Charge depending on the exigencies of the work so as to suit the
work/construction schedule without any additional cost to owner. The bidder shall
submit a list of construction equipment he proposes to deploy for the subject
work along with deployment schedule. No Construction Equipment shall be
supplied by the Owner.
14.2 Subject to the provisions in the tender document and without prejudice to
Contractor's liabilities and responsibilities to provide adequate qualified and
skilled personnel on the work, contractor shall deploy site organization and
augment the same as decided by the Engineer-in-Charge depending on the
exigencies of work, without any additional cost to owner. The bidder shall
submit the details of minimum site organization proposed by him.
15.0 MOBILIZATION ADVANCE (M.A.):
No mobilization advance is payable for this work.
16.0 COMPENSATION FOR EXTENDED STAY:
No compensation for extended stay is payable to contractor.
17.0 ABNORMALLY HIGH RATED ITEMS (AHR ITEMS):
In items rate contract where the quoted rates for the items exceed 50% of the owners/estimated rates, such items
will be considered as Abnormally High Rates Items (AHR) and payment of AHR items beyond the SOR stipulated
quantities shall be made at the least of the following rates:
(I) Rates as per SOR, quoted by the contractor.
(II) Rate of the item, which shall be derived as follows:
a)Based on rates of machine and labor as available from the contract (which includes
contractor's supervision, profit, overheads and other expenses).
b) In case rates are not available in the contract, rates will be calculated based on prevailing
market rates of machine, material and labor plus 15% to cover contractor's supervision profit,
overhead & other expenses.
18.0 MISCELLANEOUS:
All obligations arising of labor deployment labor laws to meet the necessary statutory requirement would solely lie
on the contractor. Contractor would be solely responsible for safety and security of manpower and materials.
19.0 SUBMISSION OF TENDER DOCUMENTS:
Over-writing should be avoided. Any overwriting or cutting should be signed by the bidder. All copies of tender
documents along with drawings should be signed and submitted by the bidder.
5
20.0 SCHEDULE OF RATES:
20.1 The quantities indicated in Schedule of Rates are just tentative. The rates quoted by the bidder shall remain firm
for any variation and will be inclusive of all taxes & duties.
20.2 No escalation of whatsoever nature shall be paid to the contractor for the entire Contract Period.
21.0 COMPENSATION FOR DELAY:
21.1 In case of delay in mobilization or in completion of work in all respects and to the full satisfaction of Engineer-In-
Charge, the Engineer-In-Charge may at his discretion impose a penalty at the rate of % of the total order value
per week for delay in completion of work subject to a maximum (ceiling) of 5% of the total contract value.
21.2 Alternatively, in case the Engineer-In-Charge feels that the progress of work is dissatisfactory and the work may
be delayed beyond the scheduled or contractual completion date, he may at his discretion get the work done
through other agency at the risk and cost of the contractor without prejudice to other rights available to owner
under the contract. The decision of the Engineer-In-Charge shall be final and binding in this regard.
22.0 REBATE, IF ANY:
In case bidder is desirous of offering any rebate, they are allowed to do so in the Price-Summary sheet or
schedule of rate submitted by them. Rebate offered at any other place shall be considered invalid.
23.0 TERMINATION OF CONTRACT:
The Owner/ Engineer-in-Charge reserve the right to terminate the contract on giving one-week notice without
assigning any reason.
24.0 CONTRACT AGREEMENT:
If the work is awarded the contractor shall enter into an agreement with GAIL in the prescribed Performa with in 10
days of the issue of LOA/LOI whichever is earlier. The agreement shall be executed on non-judicial stamp paper
of RS. 100/- .The cost of stamp paper shall be borne by the contractor. The format of agreement can be obtained
from the office of the Dy. Manager (C&P), GAIL (India) Ltd., Vaghodia.
25.0 SUPERVISION OF WORK:
Contractor or his authorized representative shall be available at site all times, during the progress of the work.
26.0 CLEARANCE OF SITE:
26.1 As a part of the contract the contractor shall completely remove all temporary/disposable materials, while
execution of work at his own cost and initiative and dispose off the same as directed by Engineer-in-charge.
26.2 The works will not be considered as complete and taken over by the owner, until all the temporary works, labor
and staff colonies etc. constructed are removed and the work site cleared to the satisfaction of the Engineer-in-
charge, surplus materials and rubbish is cleared off the site completely and the work shall have been measured by
the Engineer-in-charge whose measurement shall be binding and conclusive.
26.3 If the contractor fails to comply with the requirements of this clause on or before the date fixed for the completion
of the work, the Engineer-in-charge may at the expenses of the contractor remove such, surplus materials and
rubbish and disposal off the same as he thinks fit and clean off such dirt as aforesaid, and the contractor shall
forthwith pay the amount of all expenses as incurred and shall have no claim in respect of any such surplus
materials as aforesaid except for any sum actually realized by the sale thereof.
27.0 ADHERENCE TO SAFETY REGULATIONS:
Contractor shall ensure that all safety precautions required one observed at all times during the execution of the
job.
28.0 NUISANCE:
The contractor or his representative shall not at any time cause any nuisance on the site or do anything which
shall cause unnecessary disturbance to the owners or tenants or occupants or their properties near the site and to
the public generally.
29.0 OWNER NOT BOUND BY PERSONAL REPRESENTATION:
6
The contractor shall not be entitled to any increases on the schedule of rates or any other right or claim
whatsoever by reason of any representation, explanation statement or alleged representation explanation
statement or alleged representation, promise or guarantees given or called to have been given to him by any
person.
30.0 CARE OF WORKS:
From the commencement to completion of the work, the contractor shall take full responsibility for the care for all
works including all temporary works any in case any damages, loss or injury shall happen to the work or to a part
thereof or to any temporary works from any reason.
32.3 The contractor is required to obtain labor license under the provisions of Contract Labor (R&A) Act, 1970 from the office
of ALC (Central), Ministry of Labor, Govt. of India.
32.4 The contractor is liable to abide by all necessary licenses / permissions from the concerned authorities
as provided under the various labor legislations.
32.5 The contractor shall discharge obligations as provided under various statutory enactment including the
employees provident fund and Miscellaneous Provisions Act, 1952, Contract Labor (R&A) Act, 1970, Minimum Wages
Act, 1948, Payment of wages act 1936, workman compensation act and other relevant acts, rules and regulations
enforced from time to time.
32.6 The contractor shall be solely responsible for the payment of wages and other dues to the personnel, if any, deployed
by him latest by 7th day of the subsequent month.
32.7 The contractor shall be solely responsible and indemnify the GAIL against all charges, dues, claim etc. arising out of
the disputes relating to the dues and employment of personnel, if any, deployed by him.
32.8 The contractor shall indemnify GAIL against all losses or damages, if any, caused to it on account of acts of the
personnel, if any, deployed by him.
32.9 All personnel deployed by the contractor should be on the rolls of the contractor.
32.10 The contractor shall ensure regular and effective supervision and control of the personnel, if any, deployed by him
and give suitable direction for undertaking the contractual obligations.
32.11 The personnel to be deputed by the contractor shall observe all security, fire and safety rules of GAIL while at the
site. His work will be supervised by the supervisors of contractor. Contractor has to be strictly adhere to guidance,
instruction when required.
32.12 Contractor shall provide proper identification cards for his employees to be deputed by him for work, duly signed by the
contractor or authorized person on behalf of contractor. Also the contractor should obtain entry passes from RIL,
Vaghodia through engineer-in-charge for his employees.
32.13 Contractor has to deploy the personnel with no past criminal records. Reformed people, names of such persons should
be clearly indicated in case of. Also the contractor has to provide police verification for all the persons deployed by him.
32.14 While confirming to any of these conditions, the contractor should ensure that no law of state regarding labor, their
welfare, conduct etc, is violated. The contractor shall indemnify GAIL for any action brought against him for violation,
non-compliance of any act, rules & regulation of center / state / local statutory authorities.
7
32.15 All existing and amended safety / fire rules of GAIL (India) Ltd., Vaghodia are to be followed within the site premises or
service center.
32.16 Contractor shall ensure payment of wages to the person employed and meet all statutory obligation of payment as per
Minimum Wages act 1948 and payment of wages Act 1936.
32.17 Boarding and lodging facilities for contractors personal for carrying out the work is to be made by the contractor at his
own cost outside the plant premises.
32.18 Special safety equipment e.g. breathing apparatus etc. if required will be provided by GAIL (India) Ltd., Vaghodia.
Contractor will be responsible for accounting of the same.
32.19 Before undertaking jobs, contractor shall take work permit from engineer-in-charge and same shall be returned after
completion of job.
32.20 All types of transport connected with the work shall be in the scope of the contractor.
32.21 Suitable site office space may be provided by GAIL (India) Ltd., Vaghodia if required and available.
32.22 GAIL will provide free water, steam, air and electricity at suitable points, if required, for under taking the job.
32.23 All personnel undertaking the job proposed to be deployed by the contractor shall be medically examined and
declared fit by qualified medical practitioner. It should be insured that no personnel engaged by the contractor is
suffering from communicable disease.
32.24 Technicians/ supervisors deployed by the contractor should be technically qualified for fulfilling the contractual
obligation.
32.25 In case of account, injury and death caused to the employee of the contractor while executing the work under the
contract, the contractor shall be solely responsible for payment of adequate compensation, insurance money etc.
to the next kith & kin of injured / diseased. Contractor shall indemnity GAIL from such liabilities.
32.26 The contractor shall also undertake to obtain necessary insurance coverage covering all risks connected with the job to be undertaken by him
under the contract from insurance company and pay the premium accordingly.
34.8 Subject to aforesaid the provisions of the Indian Arbitration and Conciliation Act, 1996
or any statutory modification or re-enactment thereof and the rules made there under,
8
and for the time being in force, shall apply to the arbitration proceeding under this
clause.
35.0 JURISDICTION:
The CONTRACT shall be governed by and constructed according to the laws in force in INDIA. The
CONTRACTOR hereby submits to the jurisdiction of the Courts situated at VAGHODIA for the purpose of
disputes, actions and proceedings arising out of the CONTRACT.
36.0 PRICE PREFERENCE:
Price Preference to Central/State Government/Public Sector, Enterprises (PSEs), Public Sector Construction and
Services Enterprises or joint ventures with PSEs shall be applicable as per directives of Government of India.
37.0 SUMMARY TERMINATION OF CONTRACT DUE TO SUBMISSION OF FALSE DOCUMENT:
37.1 Bidders are required to furnish the complete and correct information/documents required for evaluation of their
bids. If the information/documents forming basis of evaluation is found to be false/forged, the same shall be
considered adequate ground for rejection of the Bids and forfeiture of Earnest Money Deposit.
37.2 In case, the information/document furnished by the contractor forming basis of evaluation of his bid is found to be
false/forged after the award of the contract, GAIL shall have full right to terminate the contract and get the
remaining job executed at the risk & cost of such contractor without any prejudice to other rights available to GAIL
under the contract such as forfeiture of Security Deposit, withholding of payments etc.
37.3 In case the issue of submission of false document comes to the notice after execution of the work, GAIL shall have
full right to forfeit any amount due to the contractor along with forfeiture of Security Deposit furnished by the
contractor.
37.4 Further, such contractor/bidder shall be blacklisted for future business with GAIL.
38.0 SUBMISSION OF ATTESTED COPIES OF CERTIFICATES/DOCUMENTARY EVIDENCES
38.1 The bidders are required to submit the copy of PF certificates duly attested by Guzzetted Officer/Officer of Public
Sector Enterprises.
38.2 Further, the bidders are required to furnish the attested copy(ies) of Power of Attorney/Partnership Deed.
38.3 Bidders are required to furnish the attested copy(ies) of documentary evidence in support of meeting the Bidders
Eligibility Criteria.
38.4 Non-submission of the attested copies of the certificates/documents will render they bid non-responsive and liable
for rejection.
39.0 AFFIDAVIT
The bidder shall submit an affidavit duly notarized to the effect that the document submitted by him are true and
genuine and in case of any discrepancy noticed or observed at any stage the bidder shall be personally
responsible not only for the damages or loss to GAIL, but also for criminal proceedings under the relevant laws.
40. NO CLAIM CERTIFICATE
The contractor has to provide a no claim certificate before release of final payment
against the contract. The certificate should clearly stated that there is no further or
previous amount pending with GAIL besides final bill.
9
Dy.Manager (F&A)
GAIL (India) Ltd.
VAGHODIA Date :
Dear Sir,
Thanking You.
Yours truly,
For..
(Name)
Director/ Proprietor
Note : The letter should be on letter head of the organization mentioning E-mail ID of the
contact person.
10
SECTION-III
11
SECTION-III
SCOPE OF SERVICES &SPECIAL CONDITIONS OF CONTRACT
1. GENERAL NOTES:
i. Special conditions of contract shall be read in conjunction with the General
conditions of contract, specification of work, and any other documents forming part
of this contract wherever the context so requires.
ii. Notwithstanding the sub-divisions of the documents into these separate sections
every part of each shall be deemed to be supplementary to and complimentary of
every other part and shall be read with and into the contract so far as it may be
practicable to do so.
iii. Where any portion of the special conditions of the contract is repugnant to or at
variance with any provisions of the general conditions of the contract then unless a
different intention appears, the provision of this special conditions of contract shall
be deemed to override the provisions of the general conditions of the contract only
to the extent such repugnancies or variations in the special conditions of the contract
as are not possible of being reconcile with the provision of the general conditions of
the contract.
iv. The materials, design and workmanship shall satisfy the applicable standards,
specifications contained herein and codes referred to. Where the technical
specifications stipulate requirements in addition to contained in the standard codes
and specifications, those additional requirements shall also be satisfied.
v. Wherever it is mentioned in the specifications that the contractor shall perform
certain work or provisions certain facilities, it is understood that the contractor shall
do so at his own cost and the contract price shall be deemed to have included cost of
such performance and provisions, so mentioned.
vi. It is understood that the scope of work shall include, inter-alia, the carrying out of
any and all works and providing any all facilities as required for completing the
works as per the terms and conditions of contract document.
vii. The contractor shall be responsible to complete the entire work in all respects and
any of the work necessary to complete the job though specifically not covered in the
scope of work above.
viii. The work is to be carried out in restricted area and contractor will have to work as
per the instructions of EIC.
ix. The work shall be carried out round the clock during shutdown if required and as
per the instructions of EIC. Accordingly manpower shall be specified and
12
distributed for Day Shift and Night Shift separately. A list of total specified
respective shift manpower shall be submitted to EIC before the start of the job.
x. All the material required to complete the entire job shall have to bring and properly
stocked at site before the start of job so that the prefabrication of pipe welding
joints, structure etc can be carried out at workshop before the start of plant
shutdown. However minimum 07 (Seven ) days advance intimation before startup
of shutdown will be given to the contractor.
xi. All the necessary preparatory jobs listed below shall be completed before the start of
the Plant Shutdown as per the instruction of EIC:
a) Adequate required scaffolding shall be erected at all the locations.
b) Any other activity, which can be carried out before the shutdown shall be
completed before time like welder qualification as per approve WPS,
prefabrication of pipe welding joints, structures at workshop etc.
c) Any other preparatory job required for in-time completion of the entire job as
per time schedule.
xii. The contractor shall deploy adequate number of skilled and qualified persons to
discharge its obligations under the contract.
xiii. In case of any contradictions the decision of Engineer-in-charge will be final and
binding on the contractor.
xiv. Any materials damaged during execution of the job by the contractor or his
personnel, shall be made good, otherwise suitable deduction from the contractors
bill shall be made as decided by EIC.
ii) Prefabrication of pipe in the mechanical work shop at GAIL Vaghodia and Fabrication of pipe in
field (site).
iii) Erection of piping including installation of Valves, PSV's and control valve with actuator in
position. The job shall include transportation and handling piping material and valves from store or
any other place in the plant, cleaning and polishing of flange faces & greasing of nuts and bolts as
directed by the Engineer-in-Charge.
iv) The contractor shall furnish an approved WPS (welding procedure specification) certified by
reputed agency like EIL/PDIL/BAXCOUNSEL/LLOYD/MECON/ DNV/TUV, for welding of the
13
piping material to be fabricated as per Annexure-II attached with the tender document. Welding
procedure qualifications for all piping shall be as per the latest edition of Standard for welding
pipelines and related Facilities, ASME Section IX. The Contractor shall submit the welding
procedure after receipt of work order. Owners Inspector shall review, check and approve welding
procedure after conducting such tests as are necessary. It shall be the responsibility of Contractor
to arrange and carry out such tests at his own cost. A sample format of the WPS is attached as
Appendix-A for the reference.
v) The welding shall be done by a qualified welder as per the WPS for 6-G position. Welders
qualification for all piping shall be in accordance with ASME Sec. IX. Contractor shall deploy
qualified welder certified by EIL/PDIL/BAXCOUNSEL/ LLOYD/MECON/DNV/TUV or may
arrange for welder qualification test on his account by any of the above certifying agencies. A
sample format for welder qualification record is attached as Appendix-B for reference.
vii) End preparation: Preparation of ends to be welded will be preferably made by machining.
However, preparation of the ends may be made by flame cutting, providing all grooves and
irregularities are ground off and all the oxidation is removed.
viii) Cleaning: The ends to be welded shall be properly cleaned. All paint, oil, grease, rust and Oxide in
general shall be removed, as well as all earth, sand or any other material This could be harmful to
the welding. Ends shall be totally dry when welded. No dirt or debris will be permitted in the
pipeline. Prior to alignment, the inside of each joint shall be adequately swabbed, either by use of
leather of canvas belt disc of proper diameter or other improved method.
ix) Fit Up, Alignment and Spacing: Fit up shall be as per the standard. EIC or his representative
shall check and approve the joint fit up and alignment prior to the commencement of welding.
x) Root welding by GTAW and filler and capping by SMAW. Stress relieving of the welding joints
if required to be done by the contractor.
xi) The electrodes and filler rods used for welding shall be of reputed make like Advani/ Esab/ D&H/
L&T/ Phillips. The contractor shall submit manufacturers certificates for each batch of electrodes
supplied by him.
xii) Root DP test shall be done on the welded joints for the root pass as per standard procedure, for the
joints for which hydro test is not feasible.
xiii) Radiography shall be carried out for the welded joints, as per specified code or as per the
instructions of EIC. However repeat radiography required due to contractors fault/poor
performance of his welders, defective films/retake shall be done at contractors own cost.
xiv) Hydro testing at specified pressure or above as per instructions of EIC. The same shall be
witnessed and certified by GAIL or its representative.
xv) Boxing up after hydro testing is completed, the water to be drained, the normalization of the
system.
xvi) Leak testing shall be carried out up to full operating pressure stage wise with soap solution during
plant start up. If any leakages are observed the same shall be rectified.
14
xvii) Supports, guide and anchors for piping shall be fabricated and provided as per the requirement.
Fabrication and erection supporting elements and structural fixtures wherever required and pointed
out. Contractor has to take care of the stress; flanged connection should be in such a way not to
induce any stress due to misalignment, excessive gap etc.
xviii) Painting: the contractor shall carry out the painting of the piping included welded
portion i.e. two coats of red-oxide primer & two coats of synthetic enamel paint as
per standard procedure.
xix) Contractor has to arrange to collect the material from the store and shift the same to site within the
premises of GAIL Vaghodia.
xx) Contractor shall supply all the consumables which includes Welding electrode, DA & O2 gases
and all the tools and Tackles such as three phase welding machine, unjointed welding and earthling
cable , Pre-heat oven, Grinding machine, cutting and grinding wheel , Argon set, Gas cutting set,
DP test kit etc any other tools and tackles required for the job. The contractor shall bring the
machine in sufficient quantity in good working condition to avoid unnecessary delay in work due
to breakdown of the machine.
xxii) The contractor shall take care of cleaning of the site from time to time during execution of the job
for easy access and safety of the work site.
xxiii) All necessary handling equipment, tools, tackles precision measuring instrument for carrying out
the works as per specified shall be provided by the contractor at his own cost. The contractor must
provide all tools and gauges for erection and alignment.
xxiv) The contractors shall be responsible for organizing the lifting of the material in the proper
sequence, so that other equipment should not disturb or damaged.
xxv) Electricity shall be provided for fabrication and erection jobs at single specified location.
Contractor has to arrange the emergency power for fabrication and erection job in case of non-
availability of power due to maintenance of the electrical system.
GAIL will hand over the pipe lines specific to the job in depressurized and inertized condition.
All the piping materials, valves; PSVs ,control valve, gaskets, studs, bolts & nuts required for
execution of piping job shall be in the scope of GAIL.
Electricity, air & water required for the Jobs at single specified location. GAIL shall supply electricity
15
free of cost subject to availability of power.
6.0 VALIDITY OF CONTRACT: The contract will remain valid for a period of 6
months from the date of issue of work order/letter of intent.
b) As the job is to be completed within the shutdown period the fabrication & erection
job will be done simultaneously on PSV-1601 piping, Psv-1603 piping and plant by-
pass line. The contractor shall mobilize minimum THREE fabrication groups along
with all the required equipments, welding sets, cutting sets etc, workforce and
sufficient nos. of welders to ensure execution of job in all the three locations
simultaneously.
c) All entries and exists of materials and equipment should be done with proper gate
passes and records at security gate.
d) It shall be entirely the contractor's responsibility to provide, operate and maintain all
necessary equipments, scaffoldings and safety gadgets, lifting tackles, tools and
accessories to perform the work in a workman like and efficient manner and complete
all the jobs as per time schedule. All these equipments, tools, tackles and accessories
16
shall be safe for use.
f) The contractor shall abide by all safety norms of GAIL. It will be the responsibility of
the contractor to provide safety shoes, helmets, safety belts & other safety equipment
to the workmen at his own cost.
Contractor shall ensure due compliance of al applicable and governing Industrial and
labour laws, rules and regulations, bye-laws, both of Central and State Govt. and all other
local authorities and shall keep the Owners harmless and indemnify in respect thereof as
specified in GCC.
A. The contractor shall have his own PF code No. with the RPFC as required under
17
EPF Misc. Provisions Act, 1952.
B. The Contractors shall periodically submit the proof of depositing PF contribution
with RPFC.
C. The contractor is responsible for obtaining the labour licence under the provision of
the Contract labour (R&A) Act, 1970 from the office of ALC (Central), Ministry of
labour, Govt. of India, Baroda.
D. The contractor is liable to abide by all necessary licenses/permission from the
concerned authorities as provided under the various labour legislations.
E. The contractor shall discharge obligations as provided under various statutory
encashment including the Employees Provident fund and miscellaneous provisions
Act. 1952, Contractor Labour (R&A) Act, 1970, Minimum Wages Act, 1948, the
Payment of Wages Act.1936, the Workmen Compensation Act 1923 and other
relevant Acts, Rules and Regulations enforced from time to time.
F. The contractor shall be solely responsible for the payment of wages and other dues
to the personnel, if any, deployed by him latest by 7th day of the subsequent month.
G. The contractor shall be solely responsible and indemnify the GAIL against all
charges, dues, claim etc. arising out of the disputes relating to the dues and
employment of personnel, if any, deployed by him.
H. The contractor shall indemnify the GAIL against all losses or damages, if any,
caused to it on account of acts of the personnel, if any, deployed by him.
I. The contractor shall ensure regular and effective supervision and control of the
personnel, if any, deployed by him and give suitable direction for undertaking the
contractual obligations.
J. The contractor is required to maintain registers and records as required under
different laws.
K. The contractor will obtain a Workmens compensation insurance policy covering
the risk of accident at the work place and injury sustains cut of in course of
employment in respect of his workers deployed for this work as per Workmens
compensation Act 1923 and rules frames there under submit a copy thereof before
commencement of work.
L. The vendor shall take care of the health insurances of all their employees and
workmen deputed for this work.
M. The party will deploy adequate number of qualified & experienced Personnel to
discharge the contractual obligations effectively.
18
III. MOVEMENT OF THE CONTRACT WORKERS: General movement of the
workers should be restricted to their work area only and they should not move, rest,
and relax, in any other area except their work place.
IV. WORK PERMIT: Any job inside the plant premises must be carried out under the
work permit. Different types of work permits are Hot Work, Cold Work permit, vessel
entry, excavation, vehicle entry, electrical lock out and work at height permit.
b) The PPEs shall be checked by Fire & Safety Department of GAIL before use.
IX. FIRST AID: Report to your Supervisor/ Control Room! F&S Department. If you are
injured on the job phone F&S Department - 444/442, Medical- 200, and Concerned
Control Room.
XI. RECOVERIES: GAIL shall provide the following on a chargeable and returnable
basis at the following rates:-
(a) Safety Belt - Rs. 50 per day, (b) Safety Helmets - Rs.20 per day, (c) Spark arrestor
- Rs. 50 per day, (d) Fire resistance blanket (Asbestos free) (6'x4') - Rs. 20 per day
In case the contractor fails to return the safety equipment issued to him, he shall be
charged at the following rates, which will be deducted from the contractor's bill: (a)
Safety Belt - Rs. 1250 per Safety Belt (b) Safety Helmets - Rs. 150 per Safety Helmet
(c) Spark arrestor - Rs. 1000 per Spark Arrestor (d) Fire resistance blanket (Asbestos
free) (6'x4') - Actual cost + 10% extra
XII. Vendors may submit safety record of jobs executed in support of experience shown in
bids.
19
SECTION - IV
FORMS
AND
FORMATS
20
F-1
To,
GAIL (India) Limited,
VAGHODIA
Bidders Name____________________________________________________
21
F-2
BID FORM
To
Until a final Agreement is prepared and executed, the bid together with your written acceptance thereof in your notification of
award shall constitute a binding Agreement between us.
We understand that Bid Document is not exhaustive and any action and activity not mentioned in Bid Documents but may be
inferred to be included to meet the intend of the Bid Documents shall be deemed to be mentioned in Bid Documents unless
otherwise specifically excluded and we confirm to perform for fulfillment of Agreement and completeness of the Work in all
respects within the time frame and agreed price.
We understand that you are not bound to accept the lowest priced or any bid that you may receive.
22
F-3
LIST OF ENCLOSURES
23
F-4
Ref...............
Bank Guarantee No Date
To,
GAIL (India) Limited,
VAGHODIA
Dear Sir(s),
In accordance with Letter Inviting Tender under your reference no.M/s.having their registered
/ head office at. (hereinafter called the tender) wish to participate in the said tender
for
As an irrevocable Bank Guarantee against Earnest Money Deposit for an amount ofis required to be submitted by the
bidder as a condition precedent for participation in the said tender which amount is liable to be forfeited on the happening of any
contingencies mentioned in the tender document.
This guarantee shall be irrevocable and shall remain valid up to .(this date should be 120 days (one hundred & twenty days)
after the date finally set out for closing of tender). If any further extension of this guarantee is required the same shall be extended to such
required period on receiving instructions from M/s.on whose behalf this guarantee is issued.
In witness whereof the Bank, through its authorized office, has set its hand and stamp on this.day of..20.at
..
Witness
(Signature) (Signature)
Name Name
Official address Official address
Designation with Bank Stamp
1. The Bank Guarantee by bidders will be given on non-judicial stamp paper as per stamp duty applicable. The non-judicial stamp
paper should be in the name of the issuing bank. In case of foreign bank, the said banks guarantee to be issued by its
correspondent bank in India on requisite non-judicial stamp paper.
2. The expiry date as mentioned in bid document should be arrived at by adding 30 days to the date of expiry of the bid validity
unless otherwise specified in the Bid Documents.
3. The bank guarantee by bidders will be given from bank as specified in ITB.
4. A letter from the issuing bank of the requisite Bank Guarantee confirming that the said Bank Guarantee and all future
communication relating to the Bank Guarantee shall be forwarded to the Employer at its address as mentioned at ITB.
5. Bidders must indicate the full postal address of the bank along with the banks E-mail/Fax/Phone from where the earnest money
bond has been issued.
6. If a bank guarantee is issued by a commercial bank, then a letter to Employer confirming its net worth is more than Rs.
1,000,000,000/- (Rupees one hundred crore) or equivalent along with a documentary evidence.
24
F-5
ANNUAL TURNOVER
Year 2:
Year 3:
25
F-5A
Reasons
Full Postal Address
Date of Scheduled for delay in
Description of Location of the and phone nos. of Value of Date of Actual
Commencement Completion project
the Work Work Client & Name of Contract Completion
of Work Time (Months) completion,
Officer-in-Charge
if any
Note: (1) Copies of Letter of Awards and Completion Certificates for the above works to be enclosed
(2) The Work completed earlier than three years need not be indicated here
(3) The list of work, not of similar nature need not be indicated here
(4) Failing to comply aforementioned instructions may lead to rejection of bid
26
F-6
NO DEVIATION CONFIRMATION
To,
VAGHODIA.
Dear Sir,
We understand that any deviation/exception in any form may result in rejection of bid. We, therefore,
certify that we have not taken any exceptions/deviations anywhere in the bid and we agree that if any
deviation/exception is mentioned or noticed, our bid may be rejected.
27
F-6A
DECLARATION
To,
VAGHODIA.
Dear Sir,
We hereby confirm that we are not under any liquidation, any court receivership or similar proceedings
or BANKRUPTCY and we agree that if any noticed in future, our bid/contract may be
rejected/terminated.
28
F-7
CERTIFICATE
To,
VAGHODIA
Dear Sir,
We agree and acknowledge that the Employer is entering into the Agreement solely on its own behalf and
not on behalf of any other person or entity. In particular, it is expressly understood and agreed that the
Government of India is not a party to the Agreement and has no liabilities, obligations or rights there under. It
is expressly understood and agreed that the Employer is authorized to enter into Agreement, solely on its
own behalf under the applicable laws of India. We expressly agree, acknowledge and understand that the
Employer is not an agent, representative or delegate of the Government of India. It is further understood and
agreed that the Government of India is not and shall not be liable for any acts, omissions, commissions,
breaches or other wrongs arising out of the Agreement. Accordingly, we hereby expressly waive, release and
forego any and all actions or claims, including cross claims, VIP claims or counter claims against the
Government of India arising out of the Agreement and covenants not to sue Government of India as to any
manner, claim, cause of action or things whatsoever arising of or under the Agreement.
29
F-8
COMMERCIAL QUESTIONNAIRE
30
F-9
In consideration of the GAIL (India) Ltd., Vaghodia (here in after referred to as the OWNER which expression shall unless repugnant to the context of
meaning that include its successors, administrators and assigns) having awarded to
M/s..................................................................................................................having Principal Office at.............................(herein after referred to as the
"CONTRACTOR" which expression shall unless repugnant to the context or meaning thereof include their respective successors, administrators,
executors and assigns) the WORK by issue Letter of Award No.............Dated............. and the same having been accepted by the CONTRACTOR
resulting into CONTRACTS for completion of work as per above referred Letter of Award having a total value of Rs...................
(Rupees.)
for the complete supply of materials/equipments and the Contractor having agreed to provide a Contract Performance and warranty Guarantee for the
faithful performance of the aforementioned contract and warranty to quality for 10% value of the order viz Rs ................ (Rupees ......................) to
OWNER.
We, (Bank) , (code_________) having its Head Office at hereinafter referred to as the "Bank" which expression shall unless repugnant
to the contract or meaning thereof include its successors, administrators, executors and assigned do hereby guarantee and undertake to pay the
OWNER, on demand any and all moneys payable by the seller to the extent of 10% (ten percent) of the Contract Price as aforesaid at any time up
to................. without any demur, reservation, context recourse or protest and/or without any reference to the CONTRACTOR. Any such demand
made by OWNER on the Bank shall be conclusive and binding notwithstanding any difference between OWNER and Contractor or any dispute
pending before any Court, Tribunals, Arbitrator or any other Authority. The Bank undertakes not to revoke this guarantee during its currency without
previous consent of OWNER and further agrees that the guarantee herein contained shall continue to be enforceable till the OWNER discharges this
guarantee OWNER shall have the fullest liberty without affecting in any way the liability of the BANK under this guarantee from time to time to extend
the time for performance by Contractor or any one or more CONTRACTS of all contracts enumerated above. OWNER shall have the fullest liberty,
without affecting this guarantee, to postpone from time to time the exercise of any power vested in them or of any right which they might have against
Contractor and to exercise the same at any time in any manner, and either to enforce to forebear to enforce any covenants contained or impelled, in
the aforementioned Contracts between OWNER and Contractor or any other course of or remedy or security available to OWNER. The bank shall not
be released of its obligations under these presents by any exercise by OWNER of its liability with reference to the matters aforesaid or any of them or
by reason or any other acts of omission or commission on the part of OWNER or any other indulgence shown by OWNER or by any other matter or
thing whatsoever which under law would, but for this provision, have the effect of relieving the Bank.
The BANK also agrees that OWNER at its option shall be entitled to enforce this Guarantee against the Bank as a Principal Debtor, in the first
instance without proceeding against Contractor and notwithstanding any security or other guarantee that OWNER may have in relation to the
Contractors liabilities.
Not withstanding anything contained herein above our liability under this Guarantee is restricted to Rs................................ (Rupees........................
AND it shall remain in force upto and including.................................... and shall be extended form time to time for such period as may be desired by
the Contractor on whose behalf this Guarantee has been given.
Dated thisdate of
Place:
WITNESS
1. The Bank Guarantee by successful bidder(s) will be given on non-judicial stamp paper as per stamp duty applicable. The non-judicial
stamp paper should be in name of the issuing bank. In case of foreign bank, the said bank guarantee to be issued by its correspondent
bank in India on requisite non-judicial stamp paper and place of bid to be considered as Delhi.
2. The Bank Guarantee by bidders will be given from bank as specified in the General Terms & Conditions.
3. A letter from the issuing bank of the requisite Bank Guarantee confirming that said Bank Guarantee and all future communication relating
to the Bank Guarantee shall be forwarded to Employer
If a Bank Guarantee is issued by a commercial bank, then a letter to Owner and copy to Consultant confirming its net worth is
more than Rs. 1,000,000,000/- (Rupees one hundred crore) or its equivalent in foreign currency along with a documentary
evidence.
31
F- 10
To,
Dear Sir,
I/We offer to provide against your Tender No. _________________________________for use by GAIL as per terms &
conditions of the tender document:
The acceptance of tender by GAIL shall constitute a binding contract between us and GAIL (India) Limited.
I/We have read and understood the terms and conditions of the Tender Document in totality before submitting the offer.
It is further understood that offer without Earnest Money in the required form stands to be rejected summarily.
32
33
ANNEXURE-2
BRIEF DESCRIPTION OF FABRICATION & ERECTION JOB
1 ISMC 150 2.5 MTR X 2 + 1 Mtr Cross Channel:2 nos. PSV-1601 7 MTR.
2 M.S. CHEQURED PLATE (2.5 MTR X 1 MTR) THICKNESS: 8 mm PSV-1601 2.5 SQ. MTR
3 ISMC 150 2.5 MTR X 2 + 2.5 Mtr Cross Channel:2 nos. PSV-1603 10 Mtr.
4 M.S. CHEQURED PLATE (2.5 MTR X 2.5 MTR) THICKNESS: 8 mm PSV-1603 6.25 SQ. MTR.
NOTE: The quantity and details shown above are indicative only and this may vary as per actual job
requirement and as per direction of GAIL Engineer-In-Charge