Vous êtes sur la page 1sur 3

RF

Serial RFI
QMIS No. Area Location
No. No.

1 SP-CCE-ELE-00030 B-38 PIB BUILDING B-0660


RFI ON 07 Oct -2017

Aramco
Description SATIP/ SAES SAIC
Activity No.

Electrical RFI 07 Oct 2017

INSPECTION INSTALLATION OF 2" 5 PVC CONDUITS


FOR FIRE AND GAS @ GL A/3-4. PIB BUILDING B-0660 SATIP-P-104-07 SAIC-P-3336 3.10
BA-168890-004 REV-00F2 & BA-168890-009 REV-00F2
IFC
CCE Date of
Drawing REV NO TIME
Inspector Inspection
No.

BA-168890-009 00F2 HANIF UMAR 9:00 HRS 7-Oct-17