The idea of a small conference room Lights in the ball park and soccer
with all amenities described in the field as the park will be closed at
scope document was accepted and 6PM
approved as it will involve attracting
more corporate to rent it frequently. Changing rooms adjacent to
baseball/softball and soccer fields
The idea of implementing more
water bodies, trees and additional Optional features like jogging
lawn area apart from the existing trail, skate park, chess tables
in the site was accepted.
The Parking facility for 500 cars with
adequate lighting was accepted
Drinking fountain and fire safety
measures around the park
Milestone 1
Mid - Project
Design
/
FinalInspection
Approval Milestone 2
Site
n
Inspectio
r
Handove
Architectural Site
Engineerin
Preparation
g
completed
March 8 Demolishing,
Filling, Grading
Utility Milestone 3
Openings
Etc. Completion of
March 20 Conference Milestone 4
Center Completion of
April 18 Recreational
Area Milestone 5
Baseball-
/Softball fields Finish Work
Soccer Field
Kids Area
Utilities
June 14
Parking dscaping Restrooms
LotLan
Aug 2
Parks &
CUSTOMER PARK
Recreation
Committee Neighbor
Park
Painter
Accounting
Carpenter
HR
Plans, organizes
& supervises Security Personnel
park operations
Cleaning
Landscaping
Plans, organizes
Park Commission & supervises Customer Service
park (Cashiers, Attendants,
maintenance Vendors)
New Construction
Maintenance
MAINTENANCE
Team
Repairs
4. Monitoring 5. Park Inauguration
1. Procurement 2. Planning 3. Execution
and Control and Operations
Organize Inspection
1.1 Contracting Workforce 2.1 Design 3.1 Prepare the land 4.1 Site Inspection 5.1
with town committee
1.1.1 Hire team to clear Cut down the useless Build Complete The Snag
2.1.1 Survey The land
the land. 3.1.1 trees or bushes. 4.2 Inspection 5.2 list
1.1.2 Hire Architects and 2.1.2 Design for Park 3.1.2 Clear the area from rocks 4.3 landscaping 5.3 Recruit Maintenance
designers and amenities or garbage. Inspection Staff
Design for
1.1.3 Hire construction team. 2.1.3 Conference 3.1.3 Layout 4.4 Milestone 5.4 Soft Launch
Centre review
1.1.4 Hire team for Landscaping 2.1.4 Design Review 3.1.4 Grading and levelling of 5.5 Final Detailing
the land
1.1.5 Hire team for ongoing 2.1.5 Design approval 3.1.5 Excavate the foundations Handover to Park
5.6
operations of buildings committee
Mark baseball Foundation of the Foundation of the Install turf and Pave asphalt
Level Ground Install Turf
Install turf . the surfaces
field, bases, etc. structure. structure. sandboxes
Construct water Construct water Frame the Frame the Install Playing Install sprinkler
Lay track Install Drainage
drain. drain. structure structure Equipment system.
Design and install Design and install Install Utilities Install Utilities Install water Install dog
Install Lighting
sprinkler systems sprinkler systems Install Benches Fountains waste station.
and Plumbing
Install Fences
Place home plate Mark soccer field, Install Walls Complete Quality and Signs to Install sidewalks.
and turf . goals and lines. Install Walls
Check indicate the area
Add the baseball Install goal posts Complete roofing Complete roofing Mark the lot for
dirt to the field. and paint lines. the parking
Final details
Install fences,
Dig post holes (Sinks, ceramic Install frames for
and set benches refreshment Internal Detailing floor, paint walls, parking the bikes.
stand mirrors, etc.)
Install fences,
Install the Install Traffic
refreshment Quality Check
bleachers signs
stand
Install garbage
Install the Install Furnishing
cans and
bleachers and Amenities
benches
Install fences.
Legend
Normal Task
Critical Path
Legend
Normal Task
Critical Path
Estimated Labor Cost for Conference Center is
$37,700
Estimated Materials and
Labor Cost for
Conference Center is
$139,000
Estimated Labor Cost
for Park Project is
$281,200
Estimated Total
Cost Park Project
is $1,529,000
(with$1M for
acquisition)