Vous êtes sur la page 1sur 3

JOB HAZARD ANALYSIS WORKSHEET

PROJECT B11LQ
MAJOR WORK RE-INSTATEMENT
ACTIVITY
LOCATION B11 LQ B11DR-A
SIMOPS Production Online Shut down but pressurised Shut down but not pressurised
DESCRIPTION OF
CONCURRENT RE-INSTATEMENT
ACTIVITIES
BEFORE AFTER ACTION
NO GUIDEWORD CAUSES CONSEQUENCES CONTROLS, BARRIERS RECOMMENDATION
P A E R P A E R PARTY/DATE
1 Increased ignition Hot work activities 3C 2B 1B 3B Explosion Proper ventilation during hot 1B 1B 0 0 Proper job planning and HUC team /
sources work,Fire watcher, fire extinguisher supervision and good Production Optr.,
are in placed coordination HT Technician &
Rigger

2. Unignited HC N/A
release
Toxic/Asphyxiating
Release

3. High Pressure Verify all mechanical and other 3B 2C 2B 2B Slip & Fall Walk & Work steadily and look out 1B 0 0 0 HUC team /
Liquid / Gas preparatory works for purging for tripping hazards Production Optr.,
Release HT Technician &
Rigger
Make ready nitrogen Faulty pressure regulator Test pressure regulator
cylinders / skid with regulators
and manifolds
Slip & Fall Walk / Work steadily & keep good
housekeeping
Back ache injury Follow kinetic lifting and avoid
back twisting

Install barricade & warning Slip & Fall Walk & Work steadily and look out
signs around area for purging for tripping hazards
Isolate the system to be Slip & Fall Walk & Work steadily and look out
purged except nitrogen fitting for tripping hazards
point

Fit nitrogen connection, open Personal injury- hit by rotating Ensure to fully tighten all tube
the block valve, regulate to dislodged tubings. fitting and secured down clamp /
pressure to desired setting & support tubings.
commence purging.
Nitrogen gas leak in poor Wear BA if necessary to prevent
ventilated / confined area Asphyxiation
Frost bite Wear gloves, Pressurize slowly

Continue the Nitrogen purging Personal injury- hit by rotating Ensure to fully tighten all tube
and maintain to the desired dislodged tubings. fitting and secured down clamp /
pressure for re-instatement support tubings.
work
Frost bite Wear gloves, Pressurize slowly

1 of 3
JOB HAZARD ANALYSIS WORKSHEET
PROJECT B11LQ
MAJOR WORK RE-INSTATEMENT
ACTIVITY
LOCATION B11 LQ B11DR-A
SIMOPS Production Online Shut down but pressurised Shut down but not pressurised
DESCRIPTION OF
CONCURRENT RE-INSTATEMENT
ACTIVITIES
BEFORE AFTER ACTION
NO GUIDEWORD CAUSES CONSEQUENCES CONTROLS, BARRIERS RECOMMENDATION
P A E R P A E R PARTY/DATE
4. High / Low N/A
Temperature
Liquid / Gas

5. Dropped Improper handling of Nitrogen 3D 3C 2B 1B Finger, back injury Proper handling tools and 1B 1B 0 0 Proper job planning and HUC team /
Objects/Swinging during transfer work procedure, access platform to be supervision Production Optr.,
loads use, proper PPE, handling posture HT Technician &
Rigger

6. Ship Impact Improper lifting of materials 3B 3B 2B 2B Slip Proper Coordination Proper job planning and HUC team /
and coordination supervision Mechanic and
Millwright
7. Structural Failure / corroded structure 3B 3B 2B 3C Damage property Inspect the work area/structure 1B 1B 0 0 Proper Inspection HUC team /
Buoyancy Loss before work commences. Production Optr.,
HT Technician &
Use of weak structure to 3B 2C 1C 2C Personnel Injury Scaffolders and inspectors should 1B 1B 0 0 Proper Inspection Rigger
support scafffolding inspect the work area before
errecting of scaffolding.

8. Manual Handling Bring Re-instatement 3B 2B 1C 2C Trip, Slip, Fall and Hip Injury Walk steadily, Hold to handrail 1B 1B 0 0 Proper job planning and HUC team /
equipment when using the staircase, Ensure supervision Production Optr.,
Re-instatement euipment is not too HT Technician &
heavy Rigger

9. Chemical Handling N/A

10 Access / Engress Working at height 3B 2C 2B 2B Personnel Injury Use certified access / scaffold at 1B 1B 0 0 Proper Inspection and HUC team /
all times comply wit scaff. Tag housekeeping Production Optr.,
system. HT Technician &
Rigger
11. Escape/Evacuation Unfamiliar to escape route 2B 2B 1C 1C Personnel Injury,Trap Limit the personnel working in the 1B 1B 0 0 Proper Inspection and HUC team /
area housekeeping Production Optr.,
HT Technician &
Rigger

2 of 3
JOB HAZARD ANALYSIS WORKSHEET
PROJECT B11LQ
MAJOR WORK RE-INSTATEMENT
ACTIVITY
LOCATION B11 LQ B11DR-A
SIMOPS Production Online Shut down but pressurised Shut down but not pressurised
DESCRIPTION OF
CONCURRENT RE-INSTATEMENT
ACTIVITIES
BEFORE AFTER ACTION
NO GUIDEWORD CAUSES CONSEQUENCES CONTROLS, BARRIERS RECOMMENDATION
P A E R P A E R PARTY/DATE
12. Location / H2S area, weather 3B 0 3B 3B Personnel Injury Proper H2S detection & escape 1B 0 0 0 Proper training and provision of HUC team /
Escalation equipment equipment Production Optr.,
HT Technician &
Rigger

13. Electricity Electric shock 3C 2B 1C 1C Personal Injury Rubber type of gloves shall to be 2B 0 0 0 Proper job planning and HUC team /
use for hand protection.PTW supervision and good Production Optr.,
coordination HT Technician &
Improper Isolation 2C 2B 2C 1C Personal Injury Observed Lock out & tag out. 2B 0 0 0
Rigger

14. Working Heat from live equipment 1B 1C 1C 1C Barricade the area and sinage in 1B 0 0 0 Proper job planning and HUC team /
Conditions, e.g. place. supervision and good Production Optr.,
heat, noise, bad coordination HT Technician &
Working beside high noise 1C 1C 1C 1C Personal Injury Use of ear muff/ear plug 1B 0 0 0
weather etc Rigger
equipment
Raining/windy condition. 1C 3C 1C 1B Stop work. 1B 0 0 0

15. Others