METHOD STATEMENT OF RAW MATERIAL STORAGE
AND TRANSPORTATION OF STRUCTURAL SPAN
Document No: DOC/CTP-15B/QAQC/QSUB/0013 Rev.A
IIS-Larsen & Toubro Consortium Date of Rev. 13.07.17
Revision Summary
Page 2 of 8
METHOD STATEMENT OF RAW MATERIAL STORAGE
AND TRANSPORTATION OF STRUCTURAL SPAN
Document No: DOC/CTP-15B/QAQC/QSUB/0013 Rev.A
IIS-Larsen & Toubro Consortium Date of Rev. 13.07.17
INDEX
Sr. No. Item Description Pg. No.
1 INTRODUCTION
2 SCOPE
3 REFERENCES
4.3 Paints
6 DESPATCH
Page 3 of 8
METHOD STATEMENT OF RAW MATERIAL STORAGE
AND TRANSPORTATION OF STRUCTURAL SPAN
Document No: DOC/CTP-15B/QAQC/QSUB/0013 Rev.A
IIS-Larsen & Toubro Consortium Date of Rev. 13.07.17
1. INTRODUCTION:
IIS L&T Consortium has been awarded Design and Construction of Special Bridges across
Narmada River as CT P-15B Package, located in JNPT to Vadodara Section of Phase 2 of the
Western Dedicated Freight Corridor.
The main scope of Package CTP-15B is Design and Construction of Special Steel Bridge across
Narmada River involving Bridge Structure, Approaches (of 200m Length from Abutments on Both
Sides) in formation in Embankments with 01 No. RUB, Guide Bunds and protection works. The
Length of the Proposed Narmada Steel Bridge is 1.4 Km. It is located in JNPT-Vadodara Section
of Western Dedicated Freight Corridor under Phase-2, including a box type RUB, which is a part of
Bridge Approach on North Side of Alignment (Bharuch Side).
2. SCOPE:
This Method statement details the main particularities of the Raw Material Storage for Structural
Span we intend to use for the construction of Special Bridge.
This method statement covers detail storage details in terms of raw material storage, includes
Structural Steel, weld consumable, Paints of Structural Truss Structure.
3. REFERENCES:
Contract Documents
IS:2062 Hot rolled low, medium @ high tensile structural steel
IS:9595 metal arc welding of carbon and carbon manganese steel recommendations
IRS Specifications,M28 for electrodes,IRS M39
IRS B1-2000 Fabrication code
IRS steel bridge code
IRS Welding bridge code
4. STORAGE:
All structural steel shall be comply with IS :2062 E250/350 and addendum & corrigendum slip no.5
dated 30-08-2013 of Indian railway standard specification for fabrication and erection of steel girder
Page 1 of 8
METHOD STATEMENT OF RAW MATERIAL STORAGE
AND TRANSPORTATION OF STRUCTURAL SPAN
Document No: DOC/CTP-15B/QAQC/QSUB/0013 Rev.A
IIS-Larsen & Toubro Consortium Date of Rev. 13.07.17
Page 2 of 8
METHOD STATEMENT OF RAW MATERIAL STORAGE
AND TRANSPORTATION OF STRUCTURAL SPAN
Document No: DOC/CTP-15B/QAQC/QSUB/0013 Rev.A
IIS-Larsen & Toubro Consortium Date of Rev. 13.07.17
Electrodes shall be stored in their original packets in a dry and well ventilated, preferably under
heated conditions.
Electrodes stored area where relative humidity (RH) shall be less than external conditions
(preferred RH shall be approximately less than 50 percent).
The ideal storage temperate is about 10-15C above the ambient temperature. Where special
protection during storage or immediately prior to use is recommended by manufactures of
electrodes, they shall be treated in accordance with IS: 13851.
Wire electrodes shall be suitably packed to guard against damage, including that during
transportation.
Wire electrodes shall be kept in its original bundle in a dry store room.
Flux shall be packed and stored in a moisture resistance container in a dry store room.
Damaged electrodes, wires and flux shall be stored and stacked separately.
4.3 Paints:
All the paints shall be stored strictly in accordance with manufacture requirements laid down by the
paint manufactures.
The storage area shall be well ventilated and protected from sparks ,flame, direct exposure to
sunlight or excessive heat, preferably located in an isolated room or in separate building.
All paint containers shall be clearly labelled to show paint identification .date of manufacture, batch
number.
The container shall be opened only at the time of use, paints which have liveried, gelled during
storage, and shall not be used.
Paints for which the shelf life specified by the supplier has expired shall not be used with inspection
and approval by the engineer.
All Members and Sections Shall be appropriately marked with paint or grooved with their
identification numbers as detailed in the shop drawings.
Each fabricated member Weather assembled prior to dispatch or not so assembled, shall bear an
erection mark, which will help to identify the member and its position in respect of the whole
structure to facilitate at site.
These erection marks shall be suitably incorporated in the shop detail and erection drawings.
Each member shall be maintained with proper camber marking to check final truss camber
Page 3 of 8
METHOD STATEMENT OF RAW MATERIAL STORAGE
AND TRANSPORTATION OF STRUCTURAL SPAN
Document No: DOC/CTP-15B/QAQC/QSUB/0013 Rev.A
IIS-Larsen & Toubro Consortium Date of Rev. 13.07.17
6. DESPATCH:
Prior to dispatch all members shall be completed all coats of shop painting
Before dispatch all the members shall be inspected clearly in dimensional, weld visual, erection
and camber marks.
Each member shall be clearly stencilled on it with good paint the address of delivery.
Gross weight and Net weight description of contents and such marks must be shown against each
item in the invoice.
ELEVATION
PLAN
Page 4 of 8
METHOD STATEMENT OF RAW MATERIAL STORAGE
AND TRANSPORTATION OF STRUCTURAL SPAN
Document No: DOC/CTP-15B/QAQC/QSUB/0013 Rev.A
IIS-Larsen & Toubro Consortium Date of Rev. 13.07.17
The fabricated elements shall be stacked on the designated stacking platform provided in the
stacking yard.
Three tier stacking of elements shall be done with intermediate separator of rubber packings
to avoid any contact between the metal surfaces.
The elements shall be handled using gantry during loading / unloading from the trailer.
The elements shall be stacked in a conditioned manner to avoid any damages due to climate
changes.
Fabricated members shall be stacked in sequence as provided erection marks to easy marks.
Stacking area shall be floods free to protect the member by corrosion and distortion.
All fabricated member in stacking area shall be kept on proper wooden sleeper
All Erection and camber marks shall be covered with proper protection.
Hazard identification, risk assessment and risk control measures for each and every activities
and sub-activities involved in the Storage of raw material shall be identified and necessary
operation control measures shall be initiated prior commencement of fabrication work
In case of any emergency situation following measures will be taken as per emergency
preparedness and response plan and detailed site safety management system ,project safety
and health plan Doc.No : DOC/CTP/15B/EHS/GEN/0006 to be referred
Environmental aspects and impacts associated with various activities and sub-activities in the
present segment and their mitigation/control measures shall be identified and necessary
measures shall be initiated
Refer the following document for details about site environmental management plan
Environmental management plan Doc.No: DOC/CTP/-15B/EHS/GEN/0005
Essar Heavy Engineering Services to Sarfuddin Village A1 Side of WDFCC CTP 15B (Via NH 64)
Essar Heavy Engineering Services to Sarfuddin Village A1 Side of WDFCC CTP 15B (Via NH 48)
Page 5 of 8