Vous êtes sur la page 1sur 32

ICS27.

100
F20
File No.: J1066-2009
DL
PROFESSIONAL STANDARD
OF THE PEOPLE'S REPUBLIC OF CHINA

P DL/T 5210.7-2010

Code for Construction Quality Acceptance and


Evaluation of Electric Power Construct - Part 7:
Welding

7 :

Issued on May 24, 2010 Implemented on October 1, 2010


Issued by the National Energy Administration of the People's Republic of China
Contents
Foreword ...........................................................................................................................................2
1 Scope...........................................................................................................................................3
2 Normative References.................................................................................................................4
3 Terms And Definitions ................................................................................................................5
4 General Rules..............................................................................................................................6
5 Standards for Welding Project Classification and Quality Acceptance and Evaluation............11
6 Condition Requirements of Quality Acceptance and Evaluation Of Welding Project ..............22
7 Items and Procedures of Quality Acceptance and Evaluation of Welding Project....................23
8 Quality Acceptance Criteria and Grade Estimation of Welding Project....................................30

1
Foreword

There are 8 parts of DL/T 5210 Code for Construction Quality Acceptance and
Evaluation of Electric Power Construct:
DL/T 5210.1 Part 1: Civil Construction Engineering
DL/T 5210.2 Part 2: Boiler Unit
DL/T 5210.3 Part 3: Turbine Generator Unit
DL/T 5210.4 Part 4: Instrumentation And Control
DL/T 5210.5 Part 5: Piping & System
DL/T 5210.6 Part 6: The equipment and the System with the Water Treatment and
Hydrogen Generation
DL/T 5210.7 Part 7: Welding
DL/T 5210.8 Part 8: Processing Preparatio
This standard is part 7 of DL/T 5210.
This Part is formualted by the National Development and Reform Commission according
to the requirements of the document "announcement on issuing the professional standard
revising and project planning in 2006" (Fagaiban Gongye [2006] No. 1093).
During the darfting procedure, this Part referenced Standard for Quality Inspection and
Evaluation of Thermal Power Construction" (Welding Part) issued by the Department of
Construction Coordination (the former Ministry of electronics industry) according to the
"Announcement on Issuing Standard for Quality Inspection and Evaluation of Thermal Power
Construction" (Boiler Part and Welding Part) and Inspection and Assessment Standard For
Adjustment and Commissioning of Thermal Power Project Temporary (Jian Zhi [1996]
No.111).
This standard is proposed by the China Electricity Council.
The Technical Committee for Standardization of Thermal Power Construction in power
industry is under the jurisdiction of and in charge of the explanation of this standard.
Chief Drafting Organization of this standard: China Electric Power Research Institute.
Participating Development Organizations of this standard: Anhui No.2 Electric Power
Engineering & Construction Corporation, Guangdong Power Engineering Corporation,
Shandong Electric Power Construction No. 2 Company, Hebei No.1 Power Engineering
Construction Company.
Chief drafting staffs of this Standard: Yang Jianping, Zhao Jun, Gan Huanchun, Liu
Zhenshui, Zhang Jian.
During the process of implementing this standard, the relevant opinions and advice,
whenever necessary, can be posted or passed on to the Standardization Center of the China
Electricity Council (No. 1, 2nd lane, Baiguang Road, Beijing 100761).

2
1 Scope

1.0.1 This Part in DL/T 5210 specifies the relevant requirements in quality acceptance and
quality grade evaluation of welding project of plant unit installation, maintenance,
modification projects and accessorial construction project in fuel electric plant.
1.0.2 This standard is applicable to the thermal generating unit burnt coal, gasses, fuel oil
and other solid fuels.

3
2 Normative References

The following documents contain contents which, through reference in this text,
composite provisions of this standard. For dated reference, subsequent amendments
(excepting corrigenda content) to, or revisions of, any of these publications do not apply.
Parties to agreements based on this standard are encouraged to investigate the possibility of
applying the most recent editions of the standards indicated below. For undated references,
the latest edition of the normative document referred to apply in the standard.
GB/T 3323 Radiographic Examination of Fusion Welded Joints in Metallic Materials
GB/T 11345 Method for Manual Ultrasonic Testing and Classification of Testing
Results for Ferritic Steel Welds
JB/T 4730.3 Nondestructive Testing of Pressure Equipments Part 3: Ultasonic Testing
DL/T 754-2001 Code of the Welding Technique for Aluminium Bus
DL/T 819 The Code of the Welding Heat Treatment for Power Plant
DL/T 820 The Code of Ultrasonic Inspection Section for Butt Welds Of Pipes
DL/T 821 The Code of Radiographic Examination of Butt Welded-joints of Pressure
Steels Pipes and Tubes
DL/T 869-2004 The Code of Welding for Power Plant
DL/T 1097 The Code of Welding for Tube-plate of Condenser of Power Plant

4
3 Terms And Definitions

The following terms and definitions are applicable to this part of DL/T 5210.
3.0.1
Visual examination
Visual inspection on the parts of welding joints which is visible directly or indirectly, or
inspected by instruments; and visual examination on the surface quality of welding joint by
touch method.
3.0.2
Measuring examination
Visual examination on the quality of welding joints surface by measuring tools (such as
welding inspection ruler).
3.0.3
Secondary inspector
Professional inspectors for inspect the welding project of construction organization.
3.0.4
Triple inspector
Professional inspectors for inspect the welding quality of construction organization.

5
4 General Rules

4.1 General Requirements

4.1.1 Acceptance and evaluation of welding project quality shall be divided into subitem
projects in advance, and then implement acceptance and evaluation after received the
approval of supervision unit and the warrant of construction organization. General procedures
of acceptance and evaluation as follow:
Interior acceptance and evaluation of construction organization: reported by construction
projecting unit and organized by the project quality department of construction organization.
Acceptance and evaluation of supervision unit (construction organization): reported by
construction organization and organized by supervision unit (or construction organization)
4.1.2 For the welding property specified as "Main Control" in the acceptance and evaluation
of steam turbine, boiler, pipeline, machining deployment and other specialized engineering,
shall be organized quality acceptance and evaluation as a subitem project, and the acceptance
and evaluation result shall be joined the acceptance and evaluation of subitem (branches or
units) project of corresponding specialized posts. Other welding project shall be formed a
separate visual examination record of welding joint surface quality, and carried out
acceptance and evaluation on the corresponding specialized posts according to the provisions
of this part.
4.1.3 For the welding subitem project with more welding project quantity or longer
execution cycle, according to the actual demand of engineering, quality acceptance of subitem
projects can be carried out in batch. Concealed project (surface assembling engineering) shall
be carried out quality acceptance in acceptance batch before concealed (hoisted). For the
subitem project divided into acceptance batches, acceptance and evaluation shall be organized
on the base of the quality acceptance result of gathering acceptance batches.
4.1.4 Acceptance quality of batched welding project shall meet the requirements of Article
6.0.1. Batch-acceptance and sampling inspection and repetition measurement during the
acceptance check shall be formed an inspection and acceptance record. Acceptance and
evaluation of welding subitem projects shall be carried out on the base of qualified
batch-acceptance and shall meet the requirements of Article 6.0.2.
4.1.5 The quality grade of welding project which organized overall evaluation as subitem
project shall be divided into two grade: qualified and excellent.
4.1.6 The measuring instruments used in the acceptance and evaluation shall be qualified
under gauging certification and used in the stated certification period.

4.2 Responsibility of Each Party of Engineering construction

organization

4.2.1 construction organization. Preparing the quality acceptance and evaluation dividing

6
list of welding subitem projects; completing corresponding welding project and all classes of
detection test mission; and according to the provisions of this part, completing welding
project batching inspection and acceptance and evaluation of welding subitem project;
submitting quality acceptance and evaluation application; and taking part in the acceptance
and evaluation organized by Supervision organization (or construction organizations).
4.2.2 Supervision organization (or construction organization). Examine and approve the
division list and acceptance and evaluation application of quality acceptance and evaluation
of welding subitem project, ensure that application content with qualified acceptance and
evaluation conditions. Carry out batch-acceptance of welding project and acceptance and
evaluation of subitem project.
Project division of each party of main construction organizations which take part in
quality acceptance and evaluation of welding project as shown in Table 4.2.2.

4.3 Responsibility of Staff at All Levels

4.3.1 Welders shall carry out visual quality examination on the weld surface of his project
according to the provisions of Article 7.1.1.
4.3.2 Welding shifter with responsibility for carry out cross-check on surface quality of
welding project, and take part in batch-acceptance and acceptance and evaluation of subitem
project.
4.3.3 Secondary inspector with responsibility for carry out visual examination on the
surface quality of welding joints according to the provisions of Article 7.1.2, and take part in
batch-acceptance of welding project and acceptance and evaluation of subitem project.
4.3.4 Triple inspector with responsibility for countercheck the surface quality of welding
joints, carry or take part in batch-acceptance and acceptance and evaluation of subitem
project.
4.3.5 Welding supervising staff (or professional executive of construction organizations)
take charge of personnel who with responsibility for carry out batch-acceptance of surface
quality of welding project, and acceptance and evaluation of welding subitem project.

4.4 Qualification of Acceptance and Evaluation Staff of Quality

Acceptance And Evaluation of Welding Project

4.4.1 The following staff in possession of the qualification of carry out quality acceptance
and evaluation of welding project:
Welding quality inspector who had been trained for professional skills and with
corresponding qualification certificates.
Welding technique staff who had been trained for professional skill training and with
corresponding qualification certificates.

7
Table 4.2.2 Type Division of Welding Project and Responsibility Division of Each Party
Quality acceptance and evaluation of subitem
Batch-acceptance
project
Project type Range
construction Supervision construction Supervision construction
organization organization organization organization organizations
1 Heating wall piping of boiler with the projecting pressure greater than or equal to 9.81MPa
Pipe and pipeline within the boiler body with outside diameter greater than 159mm or wall thickness greater
2 than 20mm, projecting pressure greater than 9.81MPa

A Steam pipeline with the outside diameter greater than 159mm and projecting temperature higher than 450
3

4 Steam, water, oil, air pipeline with the projecting pressure greater than 8MPa
Steam, water pipeline and fittings with the projecting temperature greater than 300 but no greater than
5
450.
1 Heating wall piping of boiler with the projecting pressure less than 9.81MPa

2 Steam pipeline and fittings with the projecting temperature greater than 150 but no greater than 300
B
3 Steam, water, oil, air pipeline with the projecting pressure from 4MPa to 8MPa

4 Steam, water, oil, air pipeline with the projecting pressure greater than 1.6MPa but less than 8MPa

1 Steam, water, oil, air pipeline with the projecting pressure from 0.1MPa to 1.6MPa
C
Drainage, water drain, decontaminate pipe and sampling pipe with the outside diameter less than 76mm and
2
overstep the hydraulic pressure of boiler
1 Pressure vessels with the projecting pressure from 0.1MPa to 1.6MPa
D
2 Vessels with the projecting pressure less than 0.1MPa
Load bearing steel structure (boiler steel rack, hoisting equipment structure, main machine hall roof truss,
1
supporter and hanger etc.)
2 Smoke, wind, coal, powder, ash pipeline and their accessories
E General supporting steel structure (equipment support, ladder, platform, footpath, tension bar, nonstaple
3 load bearing steel structure etc.)

4 Sealed structure

1 Aluminium busbar
F
2 Pipe sheet of condenser

8
Note: means this organization with responsibility, means this organization no responsibility.

9
4.4.2 The superintendent of carry out quality acceptance and evaluation of welding project
shall be occupied by the engineers and technicians who possessed of welding engineer
incumbency qualification or qualification certificate of welding quality inspection.
4.4.3 In the process of quality acceptance and evaluation of welding project, staff in charged
of correlated sampling detection and testing shall be possessed of corresponding qualification
and meet the requirements of DL/T 869- 2004 and the provisions of other relevant standard
and regulations.

10
5 Standards for Welding Project Classification and Quality
Acceptance and Evaluation
5.0.1 Classification and quality inspection, inspection items and selection check sample
quantity of welding project as shown in table 5.0.1.
5.0.2 Standards for quality acceptance and evaluation of welding project as shown in Table
5.0.2-1~Table 5.0.2-6.

11
Table 5.0.1 Classification, Quality Acceptance and Evaluation, Selection Check Sample a Quantity of Welding Project

Quality inspection, inspection item and selection check sample quantity


%

Types of
Project
Range welding Measuring examination of surface quality Detection, test result and record inspection
type
joint
Professional
inspection of Selection check of Nondestructive Tempering Rigidity Spectra
construction batch-acceptance examination report curve record c report report
organization

Heating wall piping of boiler with the projecting pressure greater than or equal to
1 2 0~1 5 5 2 5
9.81MPa

Pipe and pipeline within the boiler body with outside diameter greater than 159mm
2 5 0~3 10 20 20 100
or wall thickness greater than 20mm, projecting pressure greater than 9.81MPa

A Steam pipeline with the outside diameter greater than 159mm and projecting
3 10 0~5 10 20 20 100
temperature higher than 450

4 Steam, water, oil, air pipeline with the projecting pressure greater than 8MPa 5 0~3 10 10 20 50

Steam, water pipeline and fittings with the projecting temperature greater than
5 2 0~1 10 10 20 50
300 and no greater than 450.

1 Heating wall piping of boiler with the projecting pressure less than 9.81MPa 5 0~3 5 5 5 5

Steam pipeline and fittings with the projecting temperature greater than 150 but
2 10 0~5 10 10 10 10
no greater than 300
B

3 Steam, water, oil, air pipeline with the projecting pressure from 4MPa to 8MPa 10 0~5 10 10 10 10

Steam, water, oil, air pipeline with the projecting pressure greater than 1.6MPa but
4 10 0~5 10 10 10 10
less than 8MPa

12
1 Steam, water, oil, air pipeline with the projecting pressure from 0.1MPa to 1.6MPa 10 0~5 10
C
Drainage, water drain, decontaminate pipe and sampling pipe with the outside
2 2 0~1 10 5 5
diameter less than 76mm and overstep the hydraulic pressure of boiler

1 Pressure vessels with the projecting pressure from 0.1MPa to 1.6MPa 5 0~3 20b
D
2 Vessels with the projecting pressure less than 0.1MPa 2 0~1 5

Load bearing steel structure (boiler steel rack, hoisting equipment structure, main
1 2 0~1 5
machine hall roof truss, supporter and hanger etc.)

2 Smoke, wind, coal, powder, ash pipeline and their accessories 2 0~1
E
General supporting steel structure (equipment support, ladder, platform, footpath,
3 2 0~1
tension bar, nonstaple load bearing steel structure etc.)

4 Sealed structure 2 0~1

1 Aluminium busbar 10 0~5 10


F
2 Pipe sheet of condenser 0~1
a
Sample quantity of selection check shall comply with all classes of inspection scale as detailed in DL/T 8692-2004.
b
Selection check quantity of T-joints shall not less than 50% of total sample quantity.
c
Welding tempering curve and sampling inspection quantity record shall comply with the practical quantity of heat treated welding joints, welding heat treatment shall meet the requirements of DL/T 819.

Table 5.0.2-1 Quality Acceptance and Evaluation Standards of Welding Project A


Component
Quality standard a Checking procedures
Indices and requirements of acceptance and evaluation Property specification a
mm and instruments
Acceptance mm
and
No. Inspection requirements
evaluation
Acceptance and
items
evaluation indices
A-1 A-2 A-3 A-4 A-5 Items Indices Qualified Excellent

13
Smooth welding
Slinky, straight and sealed welding seam, excellent
Formation of weld Yes Yes Yes Yes Yes seam and excellent Visual measurement
joints
joints

10 0~2.5 0~2
Welding seam
Yes Yes Yes Yes Yes
reinforcement b
>10 0~3 0~2.5

10 3 2
Visual measurement,
Extent difference of
Yes Yes Yes Yes Yes weld seam detection
welding seam b
ruler
>10 4 3

Surface quality h0.5, 1


of welding Undercut Yes Yes Yes Yes Yes 0.1L, No
1 And 40
joints

Ectotheca 0.1, Ectotheca 0.1,


Misalignment Yes Yes Yes Yes Yes
and 4 and 1

D<100 1/100
Angular Visual measurement,
Yes Yes Yes Yes Yes
deformation ruler
D100 3/200

Crackle Yes Yes Yes Yes Yes Main No

Arc crater Yes Yes Yes Yes Yes No


Visual measurement,
3~5 times magnifier
Pore Yes Yes Yes Yes Yes Main No

Slag inclusion Yes Yes Yes Yes Yes Main No

14
Radial Yes Yes Yes Yes Yes Main Main Came up to Level II of DL/T 821 Detecting instruments
Nondestructive
2
examination Ultrasonoscope
Ultrasonic Yes Yes Yes Yes Yes Main Main Came up to Level I of DL/T 820
instruments

Metallurgical Welding seam No crackle and burnt structure, no martensitic structure in the non- 200~400 times
4 Yes
phase c microscopic view martensite steel metalloscope

5 Spectra Welding seam Yes Yes Yes Yes Yes No error, qualified Spectrograph

Total content of alloy<3%, upper limit is 270HBW; 3%total content of


6 Heat treatment Weld hardness Yes Yes Yes Yes Yes alloy Me10%, upper limit is 300HBW; total content of alloy Me>10%, Sclerometer
upper limit is 350HBW

a Wall thickness of pipe; hdepth of defect; Llength of weld; llength of defect; ltotal length of defect; Doutside diameter of pipe (the same as meanings of symbols in Table 5.0.2-2~Table 5.0.2-6).
b Overall length of welding seam, average value of three-points measurement (the same as Table 5.0.2-2~Table 5.0.2-6).
c Comply with the provisions of Article 6.5.3 in DL/T 869-2004.

Table 5.0.2-2 Quality Acceptance and Evaluation Standards of Welding Project B


Component
Indices and requirements of acceptance and Quality standards Checking procedures
Property specification
evaluation mm and instruments
mm
Acceptance and
No. evaluation Inspection requirements
Items Acceptance and
evaluation indices
B-1 B-2 B-3 B-4 Items Indices Qualified Excellent

Surface quality of Smooth welding seam and Slinky, straight and sealed welding
1 Formation of weld Yes Yes Yes Yes Visual measurement
welding joints excellent joints seam, excellent joints

15
10 0~3 0~2
Welding seam
Yes Yes Yes Yes
reinforcement
>10 0~4 0~2.5

Visual measurement,
10 3 2 weld seam detection
Extent difference of ruler
Yes Yes Yes Yes
welding seam
>10 4 3

h0.5, 10.2L, h0.5, 10.1L,


Undercut Yes Yes Yes Yes Main
and 40 and 20

Misalignment Yes Yes Yes Yes Ectotheca 0.1, and 4 Ectotheca 0.1, and 1

Visual measurement,
D<100 1/100 ruler
Angular deformation Yes Yes Yes Yes

D100 3/200

Crackle Yes Yes Yes Yes Main No

Arc crater Yes Yes Yes Yes No


Surface quality of Visual measurement, 3~5
welding joints times magnifier
Pore Yes Yes Yes Yes Main No

Slag inclusion Yes Yes Yes Yes Main No

16
Radial Yes Yes Yes Yes Main Main Came up to Level II of DL/T 821 Detecting instruments
Nondestructive
2
examination
Ultrasonoscope
Ultrasonic Yes Yes Yes Yes Main Main Came up to Level I of DL/T 820
instruments

Weld junction is up to the


3 Spectra Welding seam Yes Yes Yes Yes No error, qualified Spectrograph
mustard after repaired

Total content of alloy<3%, upper limit is 270HBW; 3%total content


4 Heat treatment Weld hardness Yes Yes Yes Yes of alloy Me10%, upper limit is 300HBW; total content of alloy Sclerometer
Me>10%, upper limit is 350HBW

Table 5.0.2-3 Quality Acceptance and Evaluation Standards of Welding Project C


Indices and requirements of acceptance
and evaluation
Quality standard
Acceptance and Property Component
Acceptance and mm Checking procedures
No. evaluation specification
evaluation items Acceptance and and instruments
requirements mm
evaluation indices
C-1 C-2 Items Indices Qualified Excellent

Surface quality of Formation of weld qualified,


1 Formation of weld Yes Yes Smooth welding seam and excellent joints Visual measurement
welding joints excellent joints

10 0~4 0~3
Welding seam
Yes Yes
reinforcement b
>10 0~5 0~4 Visual measurement,
weld seam detection
10 4 3 ruler
Extent difference of
Yes Yes
welding seam
>10 5 4

Visual measurement,
Misalignment Yes Yes D800 Ectotheca 0.1, and 4
ruler

17
Visual measurement,
h0.5, 10.2L, h0.5, 10.1L,
Undercut Yes Yes Main weld seam detection
and 40 and 30 (D426, 1100)
ruler

D<100 1/100
Welding angular Visual measurement,
Yes Yes
deformation ruler
D100 3/200

Crackle Yes Yes Main No

Arc crater Yes Yes No Visual measurement,


3~5 times magnifier
Pore Yes Yes Main No

Slag inclusion Yes Yes Main No

Nondestructive
2 Radial Yes Main Main Came up to Level III of DL/T 821 Detecting instruments
examination

Table 5.0.2-4 Quality Acceptance and Evaluation Standards of Welding Project D


Indices and requirements of
acceptance and evaluation
Quality standard
Acceptance and Property
Acceptance and Component mm Checking procedures
No. evaluation
evaluation items Acceptance and specification and instruments
requirements
evaluation indices
D-1 D-2 Items Indices Qualified Excellent

D-1Smooth welding seam and D-1 Slinky, straight and sealed welding
Surface quality of excellent joints; seam, excellent joints
1 Formation of weld Yes Yes Visual measurement
welding joints D-2Formation of weld qualified, D-2 Smooth welding seam and excellent
excellent joints joints

Adherence to specification and meet the requirements of Table 7 of DL/T Visual measurement,
Weld seam size Yes Yes weld seam detection
869-2004
ruler
h0.5, continuous length 100,
Undercut Yes Main h0.5, continuous length 50, 10.05L
10.1L

18
Incomplete root One side welding h0.15 and 2, One side welding h0.1 and 1,
Yes
penetration a 10.15L 10.1L

Visual measurement,
Misalignment Yes Longitudinal seam 0.1, and 2, Circumferential seam0.2 and 3
ruler

Crackle Yes Yes Main No

Arc crater Yes Yes No


Visual measurement,
3~5 times magnifier
Pore Yes Yes Main No

Slag inclusion Yes Yes Main No

Radial Yes Main Main Came up to Level II of JB/T 4730 Detecting instruments
Nondestructive
2
examination Ultrasonoscope
Ultrasonic Yes Main Main Came up to Level I of JB/T 4730.3
instruments

a Welding rod arc welding or submerged arc welding.

Table 5.0.2-5 Quality Acceptance and Evaluation Standards of Welding Project E

Indices and requirements of acceptance and Quality standard


evaluation mm
Property
Acceptance and Component Checking procedures
No.
evaluation items Inspection requirements specification and instruments
Acceptance and
Qualified Excellent
evaluation indices
E-1 E-2 E-3 E-4 Items Indices

Surface quality of Formation of weld qualified, Smooth welding seam and


1 Formation of weld Yes Yes Yes Yes Main Visual measurement
welding joints excellent joints excellent joints

Visual measurement,
Adherence to specification and meet the requirements of Table
Weld seam size Yes Yes Yes Yes weld seam detection
7 of DL/T 869-2004
ruler

19
Undercut Yes Main h0.5 h0.5, 10.1L

Incomplete one side


welding abutment Yes h0.15, 10.1L No
joint a

Crackle Yes Yes Yes Yes Main No

Arc crater Yes No


Visual measurement,
3~5 times magnifier
Pore Yes Yes Yes No

Slag inclusion Yes Yes Yes Yes No

Nondestructive Nondestructive
2 Yes Main According to design requirements Detecting instruments
examination examination

a Welding rod arc welding or submerged arc welding.

Table 5.0.2-6 Quality Acceptance and Evaluation Standards of Welding Project F


Quality standard
Indices and requirements of acceptance and evaluation
mm
Property Checking
Acceptance and Component
No. Acceptance and procedures and
evaluation items specification
Acceptance and evaluation evaluation requirements instruments
Qualified Excellent
indices
F-1 F-2 Items Indices

Surface quality of Smooth welding seam and Slinky, straight and sealed
1 Formation of weld Yes Yes Visual measurement
welding joints excellent joints welding seam, excellent joints

Visual measurement,
Weld seam size Yes Yes Comply with the requirements of DL/T 754 and DL/T 1097
weld seam detection

20
ruler
Undercut Yes h0.1, and h1, 1, 0.2L h0.5, 10.15L

Misalignment Yes 0.5

Welding angular deformation Yes 1/500

Crackle Yes Yes Main No

Arc crater Yes No


Visual measurement,
3~5 times magnifier
Pore Yes Yes No

Slag inclusion Yes Yes No

Color of welding seam surface Yes Main

Welding deflection Yes Comply with the requirements of DL/T 1097 Visual measurement

Pipe flanging Yes Main


Nondestructive Detecting
2 Nondestructive examination Yes Yes Main Main Comply with the requirements of DL/T 754 and DL/T 1097
examination instruments

21
6 Condition Requirements of Quality Acceptance and
Evaluation Of Welding Project

6.0.1 Condition requirements of batch-acceptance of welding project quality as follow:


1 Welding staff who take part in this welding project acceptance batch shall have
corresponding qualification certificate;
2 Welding materials used in this acceptance batch shall be equipped with corresponding
quality certificate;
3 Integrated welding technology file and process record of this acceptance batch;
4 Overall process of welding procedures of this acceptance batch is completed; all
classes of detection project is completed; repair project is completed; integrated and standard
records.
5 Make sure the organizations and staff who take part in acceptance.
6.0.2 Condition requirements of quality acceptance and evaluation of welding project as
follow:
1 Acceptance of each acceptance batch of subitem project is completed, and correlative
quality dispute is disposed, integrated acceptance record;
2 Make sure the organizations and staff who take part in evaluation.

22
7 Items and Procedures of Quality Acceptance and
Evaluation of Welding Project

7.1 Quality inspection of weld surface

7.1.1 Welders shall carry out visual examination on their project (the quality of welding
surface), fill in "Visual Examination Record of Welding Surface Quality" (see Table 7.1.1);
and then submit this record to the shifter for examination, deliver to secondary inspector for
countercheck.
Table 7.1.1 (Visual) Examination Record Of Weld Surface Quality
Name of projects: No.:
Name of subitem
Project type
projects

Steel designation Welding wire

Component
Welding rod
specification

Total number of
Welder No.
welding seam

Number range of Joints Formation Defect handing Signature of


Surface defect Inspection date
welding joints clearage of weld conditions welder

Inspection
record

Validated opinion of self-checking: Countercheck opinions of construction organizations:

Inspection
conclusion

Shifter date Secondary inspector date

Note: this table just applied to visual examination of surface quality, "joints is cleared" and "formation of weld" is up to the
mustard, expressed as ""; if there is a surface defect, the number of welding joints shall be marked; fill in actual defect and
handing information.

23
7.1.2 Secondary inspector shall carry out visual examination on the surface quality of
welding project according to the stated scale of Table 5.0.2-4 of DL/T 869-2004, and make a
countercheck opinion on Table 7.1.1. After the completion of acceptance-batch construction,
carry out sample drawing measuring examination of surface quality of welding project
according to the stated scale of Table 5.0.1, and fill in "Visual Examination Record of
Welding Surface Quality" (see Table 7.1.2), and then deliver this record to the quality
department of construction organization.

24
Table 7.1.2 Visual Examination Record of Welding Surface QualityName of projects:
No.:
Name of subitem Project
projects type

Quantity
Check the number range of
of welding joints welding
joints

Check and Inspection items


measure
the
Extent
Type number Welding seam Weld
Formation difference Angular Surface Inspection
range of reinforcement leg UndercutMisalignment
of weld of welding deformation defect conclusion
welding b size
seam
joints

Examination
record of
random
sampling
measurement

Random sampling Qualified


Quantity of check points Quantity of excellent
summarizing quantity

Check opinions of construction organizations: Countercheck opinion of quality department:

Inspection
conclusion

Secondary inspector date Triple inspector date

7.1.3 Triple inspector shall carry out surface countercheck on the surface quality of welding
project, and fill countercheck opinion in Table 7.1.2.

7.2 Internal Quality Inspection of Welding Seam

7.2.1 Contents, procedures and methods, as well as inspection scale of internal quality
inspection of welding joints shall comply with the provisions of DL/T 869-2004.
7.2.2 Nondestructive examination standards of welding joints, all classes of quality level of
welding seam, approval standard of weld hardness, metallurgical structure standard of
welding seam and spectral analysis requirements of weld metal shall meet the requirements of

25
DL/T 869-2004.

7.3 Batch-acceptance of Welding Project Quality

7.3.1 Batch-acceptance of welding project quality shall comply with the specified
classification of Table 4.2.2. Supplied acceptance information shall include the following
contents:
1 Correlative files as stated in Article 6.0.1;
2 Fill in recording Table 7.1.2;
3 Inspection report.
7.3.2 Interior batch-acceptance of welding project quality of construction organization shall
be reported and checked by secondary inspector. construction organization's quality
department shall organize professional inspector and welding shifter or welding technique
staff to carry out interior acceptance together. Confirming concerned contents according to the
field inspection and snap check report, check visual examination record and refer to the
technology record of construction.
7.3.3 For the items required to carry out acceptance by Supervision organization, acceptance
application shall be reported by the quality department of construction organization.
Supervision organization organize the supervising staff, of welding quality inspector of
construction organization, welding shifter or welding technique staff to carry out acceptance
together, acceptance mode shall be the same as Article 7.3.2; or direct countercheck and
confirm the contents of "Visual Examination Record of Welding Surface Quality" (see Table
7.3.3) delivered by construction organization.
7.3.4 For the field inspection of batch-acceptance of welding project quality, the type.
quantity and position of surface selection check shall be ascertained in advance according to
the stated scale of Table 5.0.1, acceptance team members (shall not less than 2 persons) come
to construction field and carry out visual examination on surface quality and make a record.
7.3.5 After completion of batch-acceptance, acceptance team fill in Table 7.3.3 and make a
signature.

7.4 Quality Acceptance and Evaluation of Subitem Welding Project

7.4.1 Quality acceptance and evaluation of subitem welding project shall comply with the
specified classification of Table 4.2.2. Supplied acceptance and evaluation information shall
include the following contents:
Table 7.3.3 Record Table of Batch-acceptance of Welding Project Quality
Name of projects: No.:

Name of subitem projects Project type

Weld joints number (or Quantity of welding


acceptance position) of joints
this acceptance batch Acceptance
organizations construction
organizatio
26
n

Supervision
organizatio
n

Conclusion of
Conclusion of spectra Heat treatment Inspection conclusion Documentary
nondestructive Other detection
countercheck record of appearance quality data instance
examination

Check and Inspection items


measure the
Extent
number Welding Inspection
Type differenc Wel Surfac
range of Formation seam Undercu Misalignmen Angular conclusion
e of d leg e
welding of weld reinforcemen t t deformation
welding size defect
joints tb
seam

Selection
check record
of surface
quality
acceptance
Random
sampling Qualified Quantity of
Quantity of check points
summarizin quantity excellent
g

Inspection
acceptance
records:

Acceptance opinions:

Construction shift representative (signature): Date:


Operating organization representative (signature): Date:
Quality departments representative (signature): Date:
Supervision organization representative (signature): Date:

27
1 Correlative files as specified in Article 6.0.2;
2 Batch-acceptance information of welding project quality;
3 Inspection report.
7.4.2 Internal acceptance and evaluation of subitem welding project of construction
organization shall be reported and checked by secondary inspector. Supervision organization
organize the supervising staff, of welding quality inspector of construction organization,
welding shifter or welding technique staff to carry out acceptance together; or direct
countercheck and confirm the contents of "Visual Examination Record of Welding Surface
Quality" delivered by construction organization.
7.4.3 For the items required to carry out acceptance by Supervision organization, acceptance
application shall be reported by the quality department of construction organization.
Supervision organization organize the supervising staff, of welding quality inspector of
construction organization, welding shifter or welding technique staff to carry out acceptance
together, acceptance mode shall be the same as Article 7.4.2. Besides, according to the quality
condition of batch-acceptance, construction organization may apply for the two levels of
acceptance and evaluation proceeded together.
7.4.4 If there is dispute between the measuring examination value of surface quality and the
result of internal quality inspection, selection check shall be carried out to each check and
inspection item. The third party with corresponding qualification shall be entrusted to carry
out selection check and make a record.
7.4.5 Field inspection of quality acceptance and evaluation of subitem welding project is
mainly on the visual examination on surface quality of welding joints, measuring selection
check also can be adopted, if required.
7.4.6 After completion of acceptance and evaluation of batch-acceptance, acceptance team
fill in "Overall Quality Acceptance and Evaluation Table of Subitem Welding Project" (Table
7.4.6) and make a signature.
Table 7.4.6 Overall Quality Acceptance and Evaluation Table of Subitem Welding Project
Name of projects: No.:
construction
organization
Acceptance and
Name of subitem Supervision
evaluation
projects organization
organizations
construction
organizations

The number of Conclusion of The number of Qualified Quantity of


Project type
acceptance batch batch-acceptance selection check quantity excellent

The number of Quantity of


Quality Selection check
Evaluation Total number practical Inspection scale excellent Evaluation
evaluation number
items of weld joints inspected weld % (qualified conclusion
record evaluation
joints quantity)

28
Visual
examination

Measuring
examination

Ultrasonic

Radial

Spectra

Rigidity

Metallurgical
phase

Overall
acceptance and
evaluation on
record of
selection check
instance

Conclusion of overall quality acceptance and evaluation:

Operating organization representative (signature): Date:


Quality departments representative (signature): Date:
Supervision organization representative (signature): Date:
construction organizations representative (signature): Date:

Note 1: selection check on the detection and test items is the inspection on test report and result.
Note 2: this table shall be in duplicate at least, one deliver to related authority, the other act as the overall acceptance and
evaluation information of welding quality.

29
8 Quality Acceptance Criteria and Grade Estimation of
Welding Project

8.1 Surface Quality Acceptance and Evaluation of Welding Project

8.1.1 For the surface quality inspection of welding joints, checkpoints division methods as
follows:
1 For pipeline and pipe, take a welding joint as a checkpoint.
2 For vessel and aluminium busbar, take a welding seam (irrespective length) as a
checkpoint.
3 For steel structure, take a node as a checkpoint.
8.1.2 When above 80% of inspection indices is excellent, and all main indices is excellent,
the surface quality of this sample will be evaluated as excellent, otherwise evaluated as
qualified.
8.1.3 In the process of batch-acceptance of welding project, if the weld surface of sample
without the surface defects (such as pore, slag inclusion, crackle, lack of fusion etc.), and the
other indices is qualified, this sample will be evaluated as qualified. If all random sampling
samples is qualified, this sample will be evaluated as qualified.
8.1.4 In the process of acceptance and evaluation of subitem welding project, if the each
acceptance batch of subitem project all came up to acceptance level, this sample will be
evaluated as qualified. If all samples of this subitem project is qualified, and above 80% of
sample surface quality is excellent, the welding surface quality of this subitem project will be
evaluated as excellent, otherwise evaluated as qualified.

8.2 Acceptance and Evaluation on The Check Result of Welding

Project

8.2.1 When the welding project is batch-acceptance, inspection report of each batch shall all
take part in acceptance and evaluation. Selection check the report according to the specified
scale of Table 5.0.1, if the report conform to corresponding specified regulations, this batch
shall be evaluated as qualified.
8.2.2 In the process of acceptance and evaluation of subitem welding project, if the each
acceptance batch of subitem project all meet the requirements of corresponding specified
regulations, this subitem project will be evaluated as qualified. If the recording quality of
welding joints is qualified, and the accuracy of inspection conclusion report came up to 95%
and above, the check result of this subitem project will be evaluated as excellent, otherwise
evaluated as qualified. If the rehandling and rewelding quantity of welding joints more than
10% of total number, this subitem project shall not be evaluated as excellent.

30
8.2.3 In the process of acceptance and evaluation of check result, any party takes part in
acceptance and evaluation can submit the check requirements of check result; check mode as
follow: refer to original record or refer to radial detection negative film, and carry out
repetition measurement in proportion to the weight of real object. Check and repetition
measurement may be entrusted to the third party who with corresponding qualification.
Repetition measurement result shall be reckoned in acceptance and evaluation record.
8.2.4 In the process of acceptance and evaluation of check result, if found the problems as
nonstandard general record, undetected or erroneous judgement, main construction
organizations will be instructed to adjust and correct, evaluated as qualified after adjusted and
corrected. In the process of acceptance and evaluation of check result, if spurious behavior is
found, the correlative checkout procedures of this batch and related subitem project shall be
repeated, recheck result may be evaluated as qualified, but shall not evaluated as excellent.

8.3 Overall Quality Grade Estimation of Subitem Welding Project

8.3.1 According to the acceptance and evaluation of surface quality of welding joints and
acceptance and evaluation conclusion of all classes of check result, carry out overall quality
grade estimation of subitem welding project.
8.3.2 On the base of all acceptance and evaluation items evaluated as qualified, and main
acceptance and evaluation items is evaluated as excellent (if no acceptance and evaluation
items, evaluated according to the main acceptance and evaluation indices), the overall quality
evaluated as excellent, otherwise valuated as qualified.
8.3.3 If a subitem project including weld joints of bearing pipeline or other weld joints, it's
overall quality scale shall be evaluated according to the quality grade of weld joints of bearing
pipeline. If a subitem project including welding joints of many project type, it's overall quality
grade shall be evaluated according to the higher quality grade of project type.
8.3.4 If required recheck the quality grade in the process of quality evaluation, it's quality
grade shall be evaluated according to the recheck result.
8.3.5 For the subitem project arisen serious welding quality problems during leak test and
the whole plant units start-up, evaluated quality grade shall be cancelled.

31