Vous êtes sur la page 1sur 295

DL

ICS27.100
F20
File No.: J903-2009

PROFESSIONAL STANDARD
OF THE PEOPLES REPUBLIC OF CHINA

P DL/T 5210.4-2009

Code for construction quality acceptance


and evaluation of electric power construct -
Part 4: Instrumentation and control

Issued on July 22, 2009 Implemented on December 1, 2009


Issued by the National Energy Administration of the People's Republic of China
Contents
1 Scope...........................................................................................................................................1
2 Normative References.................................................................................................................1
3 General Provisions ......................................................................................................................2
4 Construction quality acceptance .................................................................................................3
4.1 Requirements in construction quality acceptance ............................................................3
4.2 Division of Construction Quality Acceptance Range and General Tables .......................5
4.3 General criteria.............................................................................................................104
4.4 Installation of Sampling element and sensitive element ..............................................105
4.5 Installation of Local Inspection and Control Instrument..............................................134
4.6 Installation of Control Panel (Console, Box and Cabinet) ...........................................149
4.7 Laying and Wiring of Wire and Cable .........................................................................156
4.8 Pipe laying and Connection .........................................................................................163
4.9 Protection and Grounding ............................................................................................166
4.10 Debugging and Acceptance of Measuring Instruments and Control Devices ............175
5 Evaluation on the Construction Quality of Individual project ................................................235
5.1 Basic Requirements......................................................................................................235
5.2 Evaluation Provisions ..................................................................................................236
5.3 Evaluation Content.......................................................................................................237
5.4 Evaluation Methods .....................................................................................................237
5.5 Construction quality evaluation on installations of sampling element and sensitive
element, local testing and control instrument........................................................................240
5.6 Construction quality evaluation of installing control panel (console, box, cabinet) .......244
5.7 Evaluation on construction quality of installing bridge, wire, cable laying and connection
..............................................................................................................................................247
5.8 Evaluation on construction quality of instrument pipe laying and connection ...............250
5.9 Evaluation on construction quality of I&C device debugging ........................................252
5.10 Evaluation score summarized table of each part of individual project .........................255
5.11 Report of individual project quality evaluation.............................................................256
6 Quality evaluation of individual unit .........................................................................................256
7 Overall project quality evaluation..............................................................................................258
Annex A (Normative) Insulation resistance of industrial automation instrument ...................263
Annex B (Normative) Selection of gasket material ................................................................264
Annex C (Normative) The shortest straight pipe segment length shall be required by orifice
plate, nozzle and venturi nozzle ....................................................................................................265
Annex D (Normative) Sealing test standard of pipe and valve ...............................................266
Annex E (Normative) The minimum distance between signal cable and power cable ...........267
Annex F (Normative) Selection of instrument pipe material and pipe diameter........................267
Annex G (Informative) General record table of sampling element and sensitive element
installation engineering .................................................................................................................269
Annex H (Informative) General record table of local testing and control instrument installation
engineering....................................................................................................................................273
Annex I (Informative) Common record list for installation engineering of control panel
(console, box, cabinet) ..................................................................................................................274
Annex J (Informative) General record list of wire, cable laying and wiring installation........275
Annex K (Informative) General record table of pipe laying and connection..........................278
Annex L (Informative) General record table of protection and grounding .............................279
Annex M (Informative) General record table of debugging and acceptance of measuring
instrument and control devices for heating engineering ...............................................................281

3
Foreword
The standard series DL/T 5210 "Code for Construction Quality Acceptance and
Evaluation of Electric Power Construct consists of 9 parts:
DL/T 5210.1 Part 1: civil work
DL/T 5210.2 Part 2: boiler unit
DL/T 5210.3 Part 3: steam turbine generator unit
DL/T 5210.4 Part 4: instrumentation and control
DL/T 5210.5 Part 5: piping & system
DL/T 5210.6 Part 6: water treatment/hydrogen generation equipment and system
DL/T 5210.7 Part 7: welding
DL/T 5210.8 Part 8: processing preparation
This Part is the fourth part of DL/T 5210.
This Part is formulated by the National Development and Reform Commission according
to the requirements of the document "Announcement on Issuing the Professional Standard
Project Planning in 2008" (Fagaiban Gongye [2008] No.1242).
During the drafting procedure, this Part references the content of "Standard for Quality
Inspection and Evaluation of Thermal Power Construction - Part of Thermal Meters and
Control Devices " (Dianzong [1998] No.145).
Annex A, Annex B, Annex C, Annex D, Annex E and Annex F in this Part are normative.
Annex G, Annex H, Annex I, Annex J, Annex K, Annex L and Annex M in this Part are
informative.
This Part is proposed by the China Electricity Council.
The Technical Committee for Standardization of Thermal Power Construction in power
industry is under the jurisdiction of and in charge of the explanation of this Part.
Chief Drafting Organizations: Guangdong Power Engineering Corporation, First Electric
Power Construction Company of Jiangsu Province
Participating organizations: Beijing Electric Power Construction Company, Northeast
China Power Administration - No.1 Engineering Corporation, Northwestern Electric Power
Construction Group Company, Zhejiang Electric Power Test & Research Institute
Chief drafting staffs: Fan Youlin, Chen Fayu, Guo Wei, Ye Mingjia, Wen Zhiguo, Gong
Jianhua, Liu Aimin, Cai Qibin, Tian Zhiqun, Liu Qiang, Lang Guocheng, Sun Changsheng
The former "Standard for Quality Inspection and Evaluation of Thermal Power
Construction - Part of Thermal Meters and Control Devices" (Dianzong [1998] No.145) shall
be abolished on the issuing date of this Part.
During the process of implementing this Part, the relevant opinions and advice, whenever
necessary, can be posted or passed on to the Standardization Center of the China Electricity
Council (No. 1, Baiguang Road Ertiao, Beijing 100761).
1 Scope
This Part in DL/T 5210 specifies the relevant requirements in the construction quality
acceptance standard for instrumentation and control device ("instrumentation and control", or
"I&C"), and quality evaluation for individual project, individual unit and overall project.
This Part is applicable to the construction quality acceptance and engineering quality
evaluation of I&C device for newly-built, extended and rebuilt thermal power generation
projects with unit capacity 300MW~1000MW. The unit capacity construction quality
acceptance and evaluation of I&C device for thermal power generation project with unit
capacity under 300MW may comply with this Part by reference.

2 Normative References
The following normative documents contain provision which, through reference in this
text, constitute provisions of this Part. Subsequent amendments (excluding correction to) to,
or revisions of, any of these publications do not apply. However, parties to agreements based
on this Part are encouraged to investigate the possibility of applying the most recent editions
of the standards indicated below. For undated references, the latest editions of the normative
documents are applicable to this part.
GB/T 2624.1-2006 Measurement of fluid flow by means of pressure differential
devices inserted in circular cross-section conduits running full -
Part 1: General principles and requirements
GB/T 2624.2-2006 Measurement of fluid flow by means of pressure differential
devices inserted in circular cross-section conduits running full -
Part 2: Orifice plates
GB/T 2624.3-2006 Measurement of fluid flow by means of pressure differential
devices inserted in circular cross-section conduits running full -
Part 3: Nozzles and Venturi nozzles
GB/T 2624.4-2006 Measurement of fluid flow by means of pressure differential
devices inserted in circular cross-section conduits running full -
Part 4: Venturi tubes
GB/T 2887 Specification for Electronic Computer Field
GB/T 3733.1 24 cone connectors - Straight thread
GB 4830 Pressure range and quality of air supply for the industrial process
measurement and control instruments
GB/T 5625~5653 Flared couplings - Straight thread
GB/T 8624 Classification on burning behaviour for building materials
GB/T 9261-1999 Electrical capacitance level meter
GB/T 12666 Test method on electric wires or cables under fire conditions
GB/T 13399-1992 Specification for steam turbine safety monitoring devices
GB/T 13969-1992 Displacement type level instruments
GB/T 15414-1994 Generic specification for furnace high-temperature television
system
GB/T 15415-1994 Methods of measurement for rurnace high-temperature television

1
system
GB/T 15479-1995 Technical requirements and test methods of insulation resistance
and insulating strength for use in industrial process measurement
and control instruments
GB/T 50166 Code for installation and acceptance of fire alarm system
GB 50168-2006 Code for construction and acceptance of cable system electric
equipment installation engineering
GB 50257 Code for construction and acceptance of electric device for
explosion atmospheres and fire hazard electrical equipment
installation engineering
GB/T 50375-2006 Evaluating standard for excellent quality of building engineering
DL/T 641-2005 Motor-driven valve actuators for power plant
DL/T 665 The acceptance standard of water and steam integrated sampling
and on-line analyzing unit
DL/T 677-1999 Checking and calibration code for on-line chemical analysis
instrument of fossil fuel power plant
DL/T 855-2004 The code for maintenance and safekeeping of thermal power
equipment in electric power construction
DL/T 869-2004 The Code of the Welding for Power Plant
DL 5009.1 Code of safety operation in power engineering construction Part
1: Steam power plants
DL 5011-1992 The code of erection and acceptance of electric power
construction - Part of steam turbine unit
DL 5027 Specification for Fire Protection of Electric Power Installation
DL/T 5035 Technical code for heating ventilation and air conditioning
design of fossil fuel power plant
DL/T 5047-1995 The Code of Election and Acceptance for Power Plant
Construction - Part of boiler unit
DL 5053 Design code of labor safety and industrial hygiene for fossil fuel
power plants
DL/T 5190.52004 The Code of Election and Acceptance for Power Plant
Construction - Part 5: thermal automation
CECS 31 Design specifications for steel cable bridge engineering
CECS 81 Technical specification on interference resistance of monitor
system for industrial computer
CECS 87 Technical specification on wiring works of flexible metallic wire
conduit
JJG 74 Verification Regulation of selfbalance Display Instruments
JJG 535-2004 Verification Regulation of Zirconia Oxygen Analyzers
JJG 617-1996 Verification Regulation of Digital Temperature Indicators and
Controllers

3 General Provisions

2
3.0.1 This standard is formulated with a view to intensifying construction engineering
quality control in electric power industry, improving construction quality level, and unifying
the relevant requirements in construction quality acceptance standard and evaluation for
thermal power generation engineering.
3.0.2 The construction quality acceptance for thermal power generation project shall be
conducted by batch, subitem, subsection, and subsystem. the construction quality acceptance
is only applied with a quality grade "qualified"; in case of any nonconformity, it shall comply
with the requirements in Article 4.1.12 in this Part.
3.0.3 The engineering quality evaluation shall be conducted for the projects that apply the
"high quality" titles.
3.0.4 The engineering quality evaluation shall be conducted by the three phases (stage) -
individual project, individual unit and overall project.
3.0.5 The construction quality evaluation for individual project shall be conducted upon that
the construction quality acceptance for all subsystems is qualified and the collection and
rearrangement of engineering technical document is completed, and the evaluation shall cover
the whole work content before 168-h trial running with full load.
3.0.6 The quality evaluation for individual unit shall be conducted after the construction
quality acceptance for all individual projects and the 168-h trial running of the unit with full
load are completed and the environmental works supported are normally put into operation.
The synergic system shall be bought into the evaluation for the first unit.
3.0.7 The quality evaluation for overall project shall be conducted after the quality
evaluation for all individual units, the performance tests of the units and the engineering
archives evaluation are completed.

4 Construction quality acceptance


4.1 Requirements in construction quality acceptance
4.1.1 The inspection, acceptance and certification for the installation engineering
construction quality of I&C device in the thermal power project shall be conducted
according to the requirements of this Part.
4.1.2 For the inspection and acceptance for the project construction quality, the construction
contractor shall prepare the quality acceptance range division table on the base of the works
scope according to the requirements of Chapter 4 in this Part; the supervisor shall conduct the
examination and the parties of construction, supervision and owner jointly sign and seal for
approval after the owner make a confirmation. For the engineering projects with engineering
general contract or construction project management (mode), the construction contractor may,
according to the actual situation, add acceptance organizations in column "acceptance
organization" in the construction quality acceptance range division table; if the designer and
the equipment supplier in column "acceptance organization" participate in the quality
acceptance, the owner may make proper calibration according to the actual situation.
4.1.3 The part of the inspection items in "Construction Quality Acceptance Range Division
Table" in Chapter 4, incongruent with the ones in the actual project, may be added or
canceled. the items added or canceled may be numbered or not in the project numbering in the
construction quality acceptance range, but the original number shall not be altered.

3
4.1.4 The project construction quality shall be inspected by the acceptance organization
specified in "Construction Quality Acceptance Range Division Table". the acceptance for
batch, subitem and subsection, the supervisor shall, if participating in, shall organize them,
and the organizations concerned shall participate; the owner shall organize the acceptance for
subsystem, and the organizations concerned shall participate; the designer and the supplier
shall participate in the acceptance of the related items according to the requirements of
"Construction Quality Acceptance Range Division Table". The quality acceptance personnel
shall hold the qualification certificate consistent with his/her acceptance profession, and the
qualification certificate shall be within the validity period. The acceptance authority of the
personnel involved in the quality acceptance for subsystem, subsection, subitem and batch
shall be determined by the organizations concerned under the organization of the owner.
4.1.5 In the engineering quality inspection and acceptance, the quality inspection personnel
at all levels shall strictly comply with the requirements of this part as well as the relevant
current national standard, professional standard, contract terms, design document and
manufacturing technical document, and they shall be responsible for the acceptance results.
4.1.6 The quality acceptance must be conducted after the construction project is completed.
the construction contractor shall apply the quality acceptance to the projects supervisor and
owner upon the construction contractor has completed self-checking and prepared complete
self-checking records.
4.1.7 The construction contractor shall notify the supervisor and the organizations
concerned to witness acceptance before being concealed, and complete the inspection
acceptance record and the certification.
4.1.8 The appearance quality of subsystems shall be inspected by the quality inspection
personnel with visual observation, feeling or necessary measurement, and confirmed and
singed according to the overall condition of the inspected project.
4.1.9 The inspection and acceptance of project construction quality shall comply with the
requirements in Chapter 4 of this Part and be conducted by batch, subitem, subsection and
subsystem; where a subsystem is constructed by multiple construction contractors by sections,
individual subsystems may be set up. the individual subsystem number is the original
subsystem number affixed with English letters for distinguishing.
4.1.10 The project construction quality acceptance shall meet the following requirements:
The acceptance for subitem shall be conducted only upon the acceptance for batches is
qualified; the acceptance for subsection shall be conducted only upon the acceptance for
subitems is qualified; the acceptance for subsystem shall be conducted only upon the
acceptance for subsections is qualified.
4.1.11 The "qualified" construction quality acceptance for batch, subitem, subsection and
subsystem shall meet the following requirements:
1 The complete inspection is conducted for the inspection items according to the
requirements on batches and subitems, and the inspection results meet the quality criteria; the
quality acceptance for this batch or subitem is qualified.
2 The acceptance for the batches contained in a subitem is qualified and the data for the
subitem is complete; the quality acceptance for this subitem is qualified.
3 The acceptance for the subitems contained in a subsection is qualified and the data
for the subsection is complete; the quality acceptance for this subsection is qualified.

4
4 The quality acceptance for the subsections contained in a subsystem is qualified and
the data for the subsystem is complete and meets the archives management requirements; the
quality acceptance for this subsystem is qualified.
4.1.12 The nonconformity of construction quality, if existing, shall be registered for record
and treated according to the following requirements:
1 The inspection items for reworked ones, or replaced instrument or equipment, shall
be conducted again.
2 The inspection items replaced, which satisfy the functional requirements of safe
handling, may be inspected according to the technical scheme and the agreement.
3 Unqualified inspection item, which cannot be replaced or reworked, shall be
identified by the certifying agency or the organizations concerned; the inspection items
without effects on inner quality, service life, use function and safe operation may be
concessional. The concessional items may not be inspected again, but they shall be indicted in
column "acceptance conclusion", and the written report shall be attached following the
acceptance table.
4.1.13 The construction quality of batch and subitem under one of the following conditions
shall not be inspected:
1 The inspection results of its dominant inspection items cannot meet the quality
criteria.
2 The designer or the supplier has data requirement in quality criteria and the measured
data are not filled in the inspection result columns.
3 The quality acceptance documents do not conform to the archives management
regulations.
4.1.14 The quality problems caused by design or equipment manufacturing shall be solved
by the designer or equipment supplier. When the onsite processing entrusted to the
construction contractor can not make individual dominant items meet the standard
requirements completely, the concessional treatment may be applied upon the certification in
writing made the owner jointly with the designer, supplier, supervisor and construction
contractor. the project (item) with concessional treatment may not be inspected again, but it
shall be indicated in column "acceptance conclusion", and the written report hereof shall be
attached following the acceptance table.
4.1.15 The quality acceptance documents for batch, subitem, subsection and subsystem
shall be of accurate data, complete document collection, and complete signature procedure;
and the material and handwriting for document preparation shall meet the requirements of
"durability" and the archives management specifications.

4.2 Division of Construction Quality Acceptance Range and General Tables


4.2.1 The construction quality acceptance shall be conducted by batch, subentry project,
subsection and subsystem; the division of quality acceptance range shall meet the
requirements specified in Table 4.2.1.

5
Table 4.2.1 Construction quality acceptance range division table
Project No. Project name Nature Acceptance organization Number of quality
acceptance table
Subsystem Subsection Subitem Batch Construction Supervisor Supplier Designer Owner
contractor

01 Installation of I&Cshared I&C system Dominant

01 Installation of I&C (panel, console, cabinetpanel,


console, box) at control room

01 Fabrication and installation of panel base

01 Fabrication and installation of panel base Table 4.6.2-1

02 Installation of panel (console, panel and cabinet) Dominant

01 Installation of panel (console, panel and cabinet) in rows Dominant Table 4.6.2-2

02 Installation of individual panel (console, box and Dominant Table 4.6.2-3


cabinet)

02 Installation of electronic equipment room (panel, Dominant


console, box)

01 Fabrication and installation of panel base

01 Fabrication and installation of panel base Table 4.6.2-1

02 Installation of panel (console, panel and cabinet) Dominant

01 Installation of panel (console, panel and cabinet) in rows Dominant Table 4.6.2-2

02 Installation of individual panel (console, box and Dominant Table 4.6.2-3


cabinet)

6
03 Installation of computer monitoring and control system Dominant

01 Installation of instruments on panel Dominant

01 Installation of instruments on panel Dominant Table 4.6.3-1

02 Installation of distributed control system equipment Dominant Table 4.6.3-2

03 Installation of digital display instrument Dominant Table 4.6.3-3

04 Installation of recording instrument Dominant Table 4.6.3-4

05 Installation of survey instrument Dominant Table 4.6.3-5

06 Installation of flashing-signal alarm devices Dominant Table 4.6.3-6

07 Installation of control system for PLC Dominant Table 4.6.3-7

04 Installation of I&C for steam-water analysis station

01 Installation of steam-water analysis instrument Dominant

01 Installation of steam-water analysis instrument Dominant Table 4.5.4-2

02 Installation of steam-water analysis station Dominant Table 4.5.4-3

02 Installation and piping installation of steam-water


analytical sampling device and pipe laying

01 Installation of steam-water analytical sampling device Table 4.4.6-2

02 Pipe laying Table 4.8.2-1

03 Cable laying and wiring

7
01 Cable laying Table 4.7.3-1

02 Laying of wire and compensating wire Table 4.7.3-2

03 Fabrication, installation and wiring of cable head Table 4.7.4

05 Installation of I&C for furnace injection system

01 Installation of instruments for furnace injection system

01 Installation of local indicating pressure gauges Table 4.5.2-1

02 Installation of indicating pressure gauge with signal Table 4.5.2-2


contact

03 Installation of local differential-pressure indicating Table 4.5.2-3


instrument

04 Installation of differential-pressure indicating Table 4.5.2-4


instrument with signal contact

02 Installation of furnace injection device and piping


installation

01 Pipe laying Table 4.8.2-1

02 Piping in panel and transmitter Table 4.8.2-2

03 Installation of stop valve and pressure relief valve Table 4.8.3-1

03 Cable laying and wiring

01 Cable laying Table 4.7.3-1

02 Laying of wire and compensating wire Table 4.7.3-2

8
03 Fabrication, installation and wiring of cable head Table 4.7.4

06 Installation of I&C for HVAC

01 Installation of I&C panel (box, cabinet)

01 Installation of panel (console, panel and cabinet) in rows Table 4.6.2-2

02 Installation of individual panel (console, box and Table 4.6.2-3


cabinet)

03 Installation of thermostat and protective box Table 4.6.2-4

02 Installation of sampling element and sensitive element

01 Installation of temperature measuring element for air Table 4.4.2-5


pipe and equipments

02 Installation of pressure sampling element for air pipe Table 4.4.3-2

03 Installation of pressure sampling element for steam, Table 4.4.3-1


water and oil pipe

03 Installation of measurement and control instrument

01 Installation of local indicating pressure gauge Table 4.5.2-1

02 Installation of indicating pressure gauge with signal Table 4.5.2-2


contact

03 Installation of local differential-pressure indicating Table 4.5.2-3


instrument

04 Installation of differential-pressure indicating instrument Table 4.5.2-4


with signal contact

9
05 Installation of transmitter Table 4.5.2-5

06 Installation of temperature switch Table 4.5.3-1

07 Installation of pressure and differential pressure switches Table 4.5.3-2

08 Installation of flow switch Table 4.5.3-3

04 Cable laying and wiring Dominant

01 Cable laying Dominant Table 4.7.3-1

02 Laying of wire and compensating wire Dominant Table 4.7.3-2

03 Fabrication, installation and wiring of cable head Dominant Table 4.7.4

05 Pipe laying

01 Pipe laying Table 4.8.2-1

02 Piping in panel and for transmitter Table 4.8.2-2

03 Installation of stop valve and pressure relief valve Table 4.8.3-1

07 Installation of I&C for compressed air system

01 Installation of I&C panel (box, cabinet)

01 Installation of panel (console, panel and cabinet) in rows Table 4.6.2-2

02 Installation of individual panel (console, box and Table 4.6.2-3


cabinet)

03 Installation of thermostat and protective box Table 4.6.2-4

10
02 Installation of sampling element and sensitive element

01 Installation of steam, water, oil pipe temperature Table 4.4.2-1


measuring elements

02 Installation of pressure sampling element for steam, Table 4.4.3-1


water and oil pipe

03 Installation of measurement and control instrument

01 Installation of local indicating pressure gauges Table 4.5.2-1

02 Installation of indicating pressure gauge with signal Table 4.5.2-2


contact

03 Installation of local differential-pressure indicating Table 4.5.2-3


instrument

04 Installation of differential-pressure indicating instrument Table 4.5.2-4


with signal contact

05 Installation of transmitter Table 4.5.2-5

06 Installation of temperature switch Table 4.5.3-1

07 Installation of pressure and differential pressure switches Table 4.5.3-2

08 Installation of flow switch Table 4.5.3-3

09 Installation of travel switch Table 4.5.3-5

04 Cable laying and wiring Dominant

01 Cable laying Dominant Table 4.7.3-1

02 Laying of wire and compensating wire Dominant Table 4.7.3-2

11
03 Fabrication, installation and wiring of cable head Dominant Table 4.7.4

05 Pipe laying

01 Pipe laying Table 4.8.2-1

02 Piping in panel and for transmitter Table 4.8.2-2

03 Installation of stop valve and pressure relief valve Table 4.8.3-1

08 Protection and grounding of plant I&C

01 Plant I&C protection

01 I&C explosion-proof work Table 4.9.2-1

02 I&C fire-proof inflaming-retarding work Table 4.9.2-2

03 Steam-tracing and anti-freezing Table 4.9.3-1

04 Electric-tracing and anti-freezinging work Table 4.9.3-2

05 I&C antifouling paint work Table 4.9.4

06 I&C waterproofing work Table 4.9.6

02 Plant I&C grounding Dominant

01 Installation of special grounding device for I&C Dominant Table 4.9.5-1

02 Installation of I&C protection, shielding and signal Table 4.9.5-2


grounding wires

03 Installation of grounding wire for dispersed system Table 4.9.5-2

12
2

Installation of boiler I&C Dominant


01
Installation of local I&C panel (box, cabinet)
01
Fabrication and installation of panel base

02 01 Fabrication and installation of panel base Table 4.6.2-1


02
Installation of panel (console and cabinet) Dominant

01 Installation of panel (console, panel and cabinet) in rows Dominant Table 4.6.2-2

02 Installation of individual panel (console, box and cabinet) Dominant Table 4.6.2-3

03 03 Installation of thermostat and protective box Dominant Table 4.6.2-4


03
Installation of instruments on panel

01 Installation of instruments on panel Table 4.6.3-1

02 Installation of equipments in distributed control system Dominant Table 4.6.3-2

03 Installation of digital display instrument Table 4.6.3-3

04 Installation of recording instrument Table 4.6.3-4

05 Installation of survey instrument Table 4.6.3-5

06 Installation of flashing-signal alarm devices Table 4.6.3-6

13
02 07 Installation of control system for PLC Table 4.6.3-7
02
Installation of sampling element and sensitive element
01
Installation of steam-water temperature measuring element Dominant

02 01 Installation of steam-water temperature measuring element Dominant Table 4.4.2-1


02
Installation of metallic wall temperature measuring element Dominant

01 Installation of armoured thermocouple for non-fixing device for measuring Dominant Table 4.4.2-2
metal wall temperature

02 Installation of armoured thermocouple for movable staple sleeve device for Dominant Table 4.4.2-3
measuring metal wall temperature

03 03 Installation of special thermal resistance for measuring metal wall Dominant Table 4.4.2-4
03 temperature

Installation of steam-water pressure sampling element Dominant

04 01 Installation of steam-water pressure sampling element Dominant Table 4.4.3-1


04
Installation of steam-water flow sampling element and throttling device Dominant

01 Installation of nozzle and standard orifice plate Dominant Table 4.4.4-1

02 Installation of assemble-type major-diameter nozzle Dominant Table 4.4.4-2

03 Installation of annubar flowmeter Dominant Table 4.4.4-3

04 Installation of wing speed measurement pipe Dominant Table 4.4.4-4

05 Installation of rotor flowmeter Dominant Table 4.4.4-5

14
06 Installation of oval gear flowmeter Dominant Table 4.4.4-6

07 Installation of target type flowmeter Dominant Table 4.4.4-7

08 Installation of turbine flowmeter Dominant Table 4.4.4-8

09 Installation of vortex (vortex street) flowmeter Dominant Table 4.4.4-9

10 Installation of electromagnetic flowmeters Dominant Table 4.4.4-10

05 11 Installation of ultrasonic flowmeter Dominant Table 4.4.4-11


05
Installation of steam-water liquid level sampling element Dominant

01 Installation of differential pressure type sampling element for liquid-level Dominant Table 4.4.5-1
measurement

02 Installation of electrical-contact water level gauge Dominant Table 4.4.5-2

03 Installation of float-ball level meter Dominant Table 4.4.5-3

04 Installation of floating-pipe level meter Dominant Table 4.4.5-4

05 Installation of capacitance level meter Dominant Table 4.4.5-5

06 06 Installation of ultrasonic (radar) level meter Dominant Table 4.4.5-6


06
Installation of fume-air temperature measuring element

07 01 Installation of fume-air temperature measuring element Table 4.4.2-5


07
Installation of fume-air pressure and flow sampling element

01 Installation of pressure sampling element for fume and air pipe Table 4.4.3-2

15
08 02 Installation of wing speed measurement pipe Table 4.4.4-4
08
Installation of flue gas analysis and sampling devices

01 Installation of zirconia oxygen-content analytical sampling device Dominant Table 4.4.6-1

09 02 Installation of gas analysis and sampling device Table 4.4.6-3


09
Installation of milling temperature measuring element

10 01 Installation of milling temperature measuring element Table 4.4.2-5


10
Installation of milling pressure and flow sampling element

01 Installation of pressure sampling element for pulverized fuel line Table 4.4.3-2

11 02 Installation of nozzle and standard orifice plate Dominant Table 4.4.4-1


11
Installation of milling level gauging device

01 Installation of capacitance level meter Table 4.4.5-5

12 02 Installation of ultrasonic (radar) level meter Table 4.4.5-6


12
Installation of fuel oil sampling element and sensitive element

01 Installation of steam, water, oil pipe temperature measuring elements Table 4.4.2-1

02 Installation of pressure sampling element for steam, water and oil pipe Table 4.4.3-1

03 Installation of speed regulating flowmeter Table 4.4.4-3

04 Installation of rotor flowmeter Table 4.4.4-5

16
13 05 Installation of electromagnetic flowmeter Table 4.4.4-10
13
Installation of monitoring device for furnace tank flame and steam drum Dominant
water level

01 Installation of furnace flame camera Dominant Table 4.4.9-1

02 Installation of water level camera Dominant Table 4.4.9-2

03 Installation of flame detection and monitoring probe Dominant Table 4.4.9-3

14 04 Installation of camera Dominant Table 4.4.9-4


14
Installation of special instrument for boiler auxiliary system Dominant

01 Installation of induced displacement measuring device Dominant Table 4.4.7-1

02 Installation of electromagnetic vibration measuring device Dominant Table 4.4.7-2

03 Installation of current vortex measuring device Dominant Table 4.4.7-3

04 Installation of magnetoelectric speed sensor Dominant Table 4.4.7-4

15 05 Installation of travel indicator measuring device Dominant Table 4.4.7-5


15
Installation of furnace tube leak probe

16 01 Installation of furnace tube leak probe Table 4.4.6-4


16
Installation of fly ash carbon-content measuring device

03 01 Installation of fly ash carbon-content measuring device Table 4.4.6-5


03
Installation of measurement and control instrument

17
01 Installation of local pressure and differential-pressure indicating instrument

01 Installation of local indicating pressure gauges Table 4.5.2-1

02 Installation of indicating pressure gauge with signal contact Table 4.5.2-2

03 Installation of local differential-pressure indicating instrument Table 4.5.2-3

04 Installation of differential-pressure indicating instrument with signal contact Table 4.5.2-4

02 05 Installation of transmitter Table 4.5.2-5


02
Installation of gas analysis instrument

03 01 Installation of gas analysis instrument Table 4.5.4-1


03
Installation of switching instrument

01 Installation of temperature switch Table 4.5.3-1

02 Installation of pressure and differential pressure switches Table 4.5.3-2

03 Installation of flow switch Table 4.5.3-3

04 Installation of level switch Table 4.5.3-4

04 05 Installation of travel switch Table 4.5.3-5


04
Installation of actuator Dominant

01 Installation of motor-driven actuator Dominant Table 4.5.5-1

02 Installation of pneumatic actuator Dominant Table 4.5.5-2

18
03 Installation of motor-driven valves motor Dominant Table 4.5.5-3

04 Installation of driving arm Dominant Table 4.5.5-4

05 Installation of solenoid valve Dominant Table 4.5.5-5

06 Installation of control system for vibration coal feeder Dominant Table 4.5.5-6

05 07 Installation of control system for pneumatic control valve Dominant Table 4.5.5-7
05
Installation of local-mounted instrument

01 Installation of pneumatic local-mounted instrument Table 4.5.6-1

04 02 Installation of PLC Table 4.5.6-2


04
Cable laying and wiring Dominant
01
Installation of connection box and thermostat

02 01 Installation of connection box and thermostat Table 4.6.2-4


02
Cable bridge (bracing) frame

01 Installation of cable bridge Table 4.7.2-1

02 Installation of independent cable support Table 4.7.2-2

03 Installation of wire slot Table 4.7.2-3

04 Installation of support and hanger Table 4.7.2-4

03 05 Installation of wiring pipe, cable conduit and metal hose Table 4.7.2-5

19
03 Cable laying Dominant

01 Cable laying Dominant Table 4.7.3-1

04 02 Laying of wire and compensating wire Dominant Table 4.7.3-2


04
Cable head making and wiring Dominant

05 01 Cable head making and wiring Dominant Table 4.7.4


05
Pipe laying Dominant
01
Laying of steam-water measuring tube Dominant

02 01 Laying of steam-water measuring tube Dominant Table 4.8.2-1


02
Installation of water blow-down pipe and apparatus

01 Installation of stop valve and pressure relief valve Table 4.8.3-1

02 Installation of blowdown container Table 4.8.3-2

03 03 Installation of separation container Table 4.8.3-3


03
Laying of fume-air milling pipe

01 Pipe laying Table 4.8.2-1

02 Piping in panel and for transmitter Table 4.8.2-2

04 03 Installation of stop valve and pressure relief valve Table 4.8.3-1


04
Laying of fuel oil measuring tube

20
01 Pipe laying Table 4.8.2-1

02 Piping in panel and for transmitter Table 4.8.2-2

05 03 Installation of stop valve and pressure relief valve Table 4.8.3-1


05
Laying of pneumatic control pipe Dominant

01 Pipe laying Table 4.8.2-1

02 Piping in panel and for transmitter Table 4.8.2-2

06 03 Installation of stop valve, solenoid valve and pressure relief valve Table 4.8.3-1
06
Pipe sealing test Dominant

01 Pipe sealing test Dominant Table 4.8.2-1


03
Installation of I&C for steam turbine generator units Dominant
01
Installation of local I&C panel (box, cabinet)
01
Fabrication and installation of panel base

02 01 Fabrication and installation of panel base Table 4.6.2-1


02
Installation of panel (console and cabinet) Dominant

01 Installation of panel (console, panel and cabinet) in rows Dominant Table 4.6.2-2

02 Installation of individual panel (console, box and cabinet) Dominant Table 4.6.2-3

21
03 03 Installation of thermostat and protective box Dominant Table 4.6.2-4
03
Installation of instruments on panel

01 Installation of instruments on panel Table 4.6.3-1

02 Installation of equipments in distributed control system Dominant Table 4.6.3-2

03 Installation of digital display instrument Table 4.6.3-3

04 Installation of recording instrument Table 4.6.3-4

05 Installation of survey instrument Table 4.6.3-5

06 Installation of flashing-signal alarm devices Table 4.6.3-6

02 07 Installation of control system for PLC Table 4.6.3-7


02
Installation of sampling element and sensitive element
01
Installation of steam-water temperature measuring element Dominant

02 01 Installation of steam-water temperature measuring element Dominant Table 4.4.2-1


02
Installation of steam-water pressure sampling element Dominant

03 01 Installation of steam-water pressure sampling element Dominant Table 4.4.3-1


03
Installation of steam-water flow sampling element and throttling device Dominant

01 Installation of nozzle and standard orifice plate Dominant Table 4.4.4-1

02 Installation of assemble-type major-diameter nozzle Dominant Table 4.4.4-2

22
03 Installation of annubar flowmeter Dominant Table 4.4.4-3

04 Installation of wing speed measurement pipe Dominant Table 4.4.4-4

05 Installation of rotor flowmeter Dominant Table 4.4.4-5

06 Installation of oval gear flowmeter Dominant Table 4.4.4-6

07 Installation of target type flowmeter Dominant Table 4.4.4-7

08 Installation of turbine flowmeter Dominant Table 4.4.4-8

09 Installation of vortex (vortex street) flowmeter Dominant Table 4.4.4-9

10 Installation of electromagnetic flowmeters Dominant Table 4.4.4-10

04 11 Installation of ultrasonic flowmeter Dominant Table 4.4.4-11


04
Installation of steam-water liquid level sampling element Dominant

01 Installation of differential pressure type sampling element for liquid-level Dominant Table 4.4.5-1
measurement

02 Installation of electrical contact water level gauge Dominant Table 4.4.5-2

03 Installation of float-ball level meter Dominant Table 4.4.5-3

04 Installation of float-cylinder level meter Dominant Table 4.4.5-4

05 Installation of capacitance level meter Dominant Table 4.4.5-5

05 06 Installation of ultrasonic (radar) level meter Dominant Table 4.4.5-6


05
Installation of metal temperature measuring element for steam cylinder and Dominant

23
bearing bush

01 Installation of armoured thermocouple for non-fixing device for measuring Dominant Table 4.4.2-2
metal wall temperature

02 Installation of armoured thermocouple for movable staple sleeve device for Dominant Table 4.4.2-3
measuring metal wall temperature

06 03 Installation of special thermal resistance for measuring metal wall Dominant Table 4.4.2-4
06 temperature

Installation of pressure sampling element for steam turbine main body Dominant

07 01 Installation of pressure sampling element for steam turbine main body Dominant Table 4.4.3-1
07
Installation of special instrument for steam turbine generator units Dominant

01 Installation of induced displacement measuring device Dominant Table 4.4.7-1

02 Installation of electromagnetic vibration measuring device Dominant Table 4.4.7-2

03 Installation of current vortex measuring device Dominant Table 4.4.7-3

04 Installation of magnetoelectric speed sensor Dominant Table 4.4.7-4

08 05 Installation of travel indicator measuring device Dominant Table 4.4.7-5


08
Installation of sampling element and sensitive element for turbine oil system

01 Installation of steam, water, oil pipe temperature measuring elements Table 4.4.2-1

09 02 Installation of pressure sampling element for steam, water and oil pipe Table 4.4.3-1
09
Inspection and installation of temperature measuring element for generator Dominant
body

24
10 01 Inspection and installation of temperature measuring element for generator Dominant Table 4.4.2-4
10 body

Installation of sampling element and sensitive element for generator cooling


and sealing system

01 Installation of steam, water, oil pipe temperature measuring elements Table 4.4.2-1

02 Installation of pressure sampling element for steam, water and oil pipe Table 4.4.3-1

03 Installation of pressure sampling element Table 4.4.3-2

04 Installation of annubar flowmeter Table 4.4.4-3

05 Installation of electromagnetic flowmeters Table 4.4.4-10

06 Installation of differential pressure type sampling element for liquid-level Table 4.4.5-1
measurement

07 Installation of electrical contact water level gauge Table 4.4.5-2

08 Installation of float-ball level meter Table 4.4.5-3

09 Installation of float-cylinder level meter Table 4.4.5-4

10 Installation of capacitance level meter Dominant Table 4.4.5-5

11 11 Installation of ultrasonic (radar) level meter Dominant Table 4.4.5-6


11
Installation of hydrogen analysis and sampling devices

12 01 Installation of hydrogen analysis and sampling devices Table 4.4.6-3


12
Installation of hydrogen leakage detection and sampling

25
03 01 Installation of hydrogen leakage detection and sampling Table 4.4.6-3
03
Installation of measurement and control instrument
01
Installation of local pressure and differential-pressure indicating instruments

01 Installation of local indicating pressure gauges Table 4.5.2-1

02 Installation of indicating pressure gauge with signal contact Table 4.5.2-2

03 Installation of local differential-pressure indicating instrument Table 4.5.2-3

04 Installation of differential-pressure indicating instrument with signal contact Table 4.5.2-4

02 05 Installation of transmitter Table 4.5.2-5


02
Installation of hydrogen analysis instrument

03 01 Installation of hydrogen analysis instrument Table 4.5."


03
Installation of hydrogen leakage detection device

04 01 Installation of hydrogen leakage detection device Table 4.5.4-1


04
Installation of switching value instrument

01 Installation of temperature switch Table 4.5.3-1

02 Installation of pressure and differential pressure switches Table 4.5.3-2

03 Installation of flow switch Table 4.5.3-3

04 Installation of level switch Table 4.5.3-4

26
05 05 Installation of travel switch Table 4.5.3-5
05
Installation of actuator Dominant

01 Installation of motor-driven actuator Dominant Table 4.5.5-1

02 Installation of pneumatic actuator Dominant Table 4.5.5-2

03 Installation of electric actuator for motor-driven valve Dominant Table 4.5.5-3

04 Installation of driving arm Dominant Table 4.5.5-4

05 Installation of solenoid valve Dominant Table 4.5.5-5

06 06 Installation of control system for pneumatic control valve Dominant Table 4.5.5-7
06
Installation of local-mounted instrument Dominant

01 Installation of pneumatic local-mounted instrument Dominant Table 4.5.6-1

04 02 Installation of PLC Dominant Table 4.5.6-2


04
Cable laying and wiring Dominant
01
Installation of connection box and thermostat

02 01 Installation of connection box and thermostat Table 4.6.2-4


02
Cable bridge (bracing) frame

01 Installation of cable bridge Table 4.7.2-1

02 Installation of independent cable support Table 4.7.2-2

27
03 Installation of wire slot Table 4.7.2-3

03 04 Installation of support and hanger Table 4.7.2-4


03
Cable laying Dominant

01 Cable laying Dominant Table 4.7.3-1

04 02 Laying of wire and compensating wire Dominant Table 4.7.3-2


04
Cable head making and wiring Dominant

05 01 Cable head making and wiring Dominant Table 4.7.4


05
Pipe laying Dominant
01
Laying of steam-water measuring tube Dominant

01 Pipe laying Dominant Table 4.8.2-1

02 Piping in panel and for transmitter Dominant Table 4.8.2-2

02 03 Installation of stop valve and pressure relief valve Dominant Table 4.8.3-1
02
Installation of water blow-down pipe and apparatus

01 Pipe laying Table 4.8.2-1

03 02 Installation of blowdown container Table 4.8.3-2


03
Laying of measuring piping for turbine oil system

01 Pipe laying Table 4.8.2-1

28
02 Piping in panel and for transmitter Table 4.8.2-2

04 03 Installation of stop valve and pressure relief valve Table 4.8.3-1


04
Laying of measuring tube for generator cooling and sealing system

01 Pipe laying Table 4.8.2-1

02 Piping in panel and for transmitter Table 4.8.2-2

05 03 Installation of stop valve and pressure relief valve Table 4.8.3-1


05
Laying of pneumatic control pipe Dominant

01 Pipe laying Dominant Table 4.8.2-1

02 Piping in panel and for transmitter Dominant Table 4.8.2-2

06 03 Installation of stop valve and pressure relief valve Dominant Table 4.8.3-1
06
Pipe sealing test Dominant

06 01 Pipe sealing test Dominant Table 4.8.2-1


06
Installation of I&C air cooling island
01
Installation of I&C panel (box, cabinet) Dominant

01 Installation of panel (console, panel and cabinet) in rows Dominant Table 4.6.2-2

02 Installation of individual panel (console, box and cabinet) Dominant Table 4.6.2-3

02 03 Installation of thermostat and protective box Dominant Table 4.6.2-4

29
02 Installation of sampling element and sensitive element

01 Installation of steam, water, oil pipe temperature measuring elements Table 4.4.2-1

03 02 Installation of pressure sampling element for steam, water and oil pipe Table 4.4.3-1
03
Installation of measurement and control instrument

01 Installation of local indicating pressure gauges Table 4.5.2-1

02 Installation of indicating pressure gauge with signal contact Table 4.5.2-2

03 Installation of local differential-pressure indicating instrument Table 4.5.2-3

04 Installation of differential-pressure indicating instrument with signal contact Table 4.5.2-4

05 Installation of transmitter Table 4.5.2-5

06 Installation of temperature switch Table 4.5.3-1

07 Installation of pressure and differential pressure switches Table 4.5.3-2

04 08 Installation of flow switch Table 4.5.3-3


04
Cable laying and wiring Dominant

01 Cable laying Dominant Table 4.7.3-1

02 Laying of wire and compensating wire Dominant Table 4.7.3-2

05 03 Fabrication, installation and wiring of cable head Dominant Table 4.7.4


05
Pipe laying Dominant

30
01 Pipe laying Table 4.8.2-1

02 Piping in panel and for transmitter Table 4.8.2-2

03 Installation of stop valve and pressure relief valve Table 4.8.3-1


04
Installation of I&C for deoxidation and feedwater system
01
Installation of local I&C panel (box, cabinet)
01
Fabrication and installation of panel base

02 01 Fabrication and installation of panel base Table 4.6.2-1


02
Installation of panel (console and cabinet) Dominant

01 Installation of panel (console, panel and cabinet) in rows Dominant Table 4.6.2-2

02 Installation of individual panel (console, box and cabinet) Dominant Table 4.6.2-3

03 03 Installation of thermostat and protective box Dominant Table 4.6.2-4


03
Installation of instruments on panel Dominant

01 Installation of instruments on panel Dominant Table 4.6.3-1

02 Installation of equipments in distributed control system Dominant Table 4.6.3-2

03 Installation of digital display instrument Dominant Table 4.6.3-3

04 Installation of recording instrument Dominant Table 4.6.3-4

05 Installation of survey instrument Dominant Table 4.6.3-5

31
06 Installation of flashing-signal alarm devices Dominant Table 4.6.3-6

02 07 Installation of control system for PLC Dominant Table 4.6.3-7


02
Installation of sampling element and sensitive element
01
Installation of sampling element and sensitive element for steam and water
circuit system

01 Installation of steam, water, oil pipe temperature measuring elements Table 4.4.2-1

02 02 Installation of pressure sampling element for steam, water and oil pipe Table 4.4.3-1
02
Installation of oil system sampling element and sensitive element for feed
pump oil system

01 Installation of steam, water, oil pipe temperature measuring elements Table 4.4.2-1

02 Installation of pressure sampling element for steam, water and oil pipe Table 4.4.3-1

03 Installation of annubar flowmeter Table 4.4.4-3

04 Installation of electromagnetic flowmeter Table 4.4.4-10

05 Installation of differential pressure type sampling element for liquid-level Table 4.4.5-1
measurement

06 Installation of electrical contact water level gauge Table 4.4.5-2

07 Installation of float-ball level meter Table 4.4.5-3

03 08 Installation of float-cylinder level meter Table 4.4.5-4


03
Installation of special instrument for feed pump Dominant

32
01 Installation of induced displacement measuring device Dominant Table 4.4.7-1

02 Installation of electromagnetic vibration measuring device Dominant Table 4.4.7-2

03 Installation of current vortex measuring device Dominant Table 4.4.7-3

04 Installation of magnetoelectric speed sensor Dominant Table 4.4.7-4

03 05 Installation of travel indicator measuring device Dominant Table 4.4.7-5


03
Installation of measurement and control instrument
01
Installation of local indicating instrument and transmitter

01 Installation of local indicating pressure gauges Table 4.5.2-1

02 Installation of indicating pressure gauge with signal contact Table 4.5.2-2

03 Installation of local differential-pressure indicating instrument Table 4.5.2-3

04 Installation of differential-pressure indicating instrument with signal contact Table 4.5.2-4

02 05 Installation of transmitter Table 4.5.2-5


02
Installation of switching value instrument

01 Installation of temperature switch Table 4.5.3-1

02 Installation of pressure and differential pressure switches Table 4.5.3-2

03 Installation of flow switch Table 4.5.3-3

04 Installation of level switch Table 4.5.3-4

33
03 05 Installation of travel switch Table 4.5.3-5
03
Installation of actuator Dominant

01 Installation of motor-driven actuator Dominant Table 4.5.5-1

02 Installation of pneumatic actuator Dominant Table 4.5.5-2

03 Installation of electric actuator for motor-driven valve Dominant Table 4.5.5-3

04 Installation of solenoid valve Dominant Table 4.5.5-5

04 05 Installation of control system for pneumatic control valve Dominant Table 4.5.5-7
04
Cable laying and wiring Dominant
01
Installation of connection box and thermostat

02 01 Installation of connection box and thermostat Table 4.6.2-4


02
Installation of cable bridge (bracing) frame and protecting tube Dominant

01 Installation of cable bridge Dominant Table 4.7.2-1

02 Installation of independent cable support Dominant Table 4.7.2-2

03 Installation of wire slot Dominant Table 4.7.2-3

03 04 Installation of support and hanger Dominant Table 4.7.2-4


03
Cable laying Dominant

01 Cable laying Dominant Table 4.7.3-1

34
04 02 Laying of wire and compensating wire Dominant Table 4.7.3-2
04
Cable head making and wiring Dominant

05 01 Cable head making and wiring Dominant Table 4.7.4


05
Pipe laying Dominant
01
Laying of measuring pipe Dominant

01 Pipe laying Dominant Table 4.8.2-1

02 Piping in panel and for transmitter Dominant Table 4.8.2-2

02 03 Installation of stop valve and pressure relief valve Dominant Table 4.8.3-1
02
Laying of pneumatic control pipe

01 Pipe laying Table 4.8.2-1

02 Piping in panel and for transmitter Table 4.8.2-2

03 03 Installation of stop valve and pressure relief valve Table 4.8.3-1


03
Pipe sealing test

01 Pipe sealing test Table 4.8.2-1


05
Installation of I&C for auxiliary plant water system
01
Installation of feedwater I&C Dominant

35
01 Installation of I&C panel (box, cabinet)

01 Installation of panel (console, panel and cabinet) in rows Table 4.6.2-2

02 Installation of individual panel (console, box and cabinet) Table 4.6.2-3

02 03 Installation of thermostat and protective box Table 4.6.2-4


02
Installation of sampling element and sensitive element

01 Installation of steam, water, oil pipe temperature measuring elements Table 4.4.2-1

02 Installation of pressure sampling element for steam, water and oil pipe Table 4.4.3-1

03 Installation of annubar flowmeter Table 4.4.4-3

04 Installation of electromagnetic flowmeters Table 4.4.4-10

05 Installation of differential pressure type sampling element for liquid-level Table 4.4.5-1
measurement

06 Installation of electrical contact water level gauge Table 4.4.5-2

07 Installation of float-ball level meter Table 4.4.5-3

08 Installation of float-cylinder level meter Table 4.4.5-4

03 09 Installation of steam-water analytical sampling device Table 4.4.6-2


03
Installation of measurement and control instrument

01 Installation of local indicating pressure gauges Table 4.5.2-1

02 Installation of indicating pressure gauge with signal contact Table 4.5.2-2

36
03 Installation of local differential-pressure indicating instrument Table 4.5.2-3

04 Installation of differential-pressure indicating instrument with signal contact Table 4.5.2-4

05 Installation of transmitter Table 4.5.2-5

06 Installation of temperature switch Table 4.5.3-1

07 Installation of pressure and differential pressure switches Table 4.5.3-2

08 Installation of flow switch Table 4.5.3-3

09 Installation of level switch Table 4.5.3-4

04 10 Installation of travel switch Table 4.5.3-5


04
Cable laying and wiring Dominant

01 Cable laying Dominant Table 4.7.3-1

02 Laying of wire and compensating wire Dominant Table 4.7.3-2

05 03 Cable head making and wiring Dominant Table 4.7.4


05
Pipe laying Dominant

01 Pipe laying Dominant Table 4.8.2-1

02 Piping in panel and for transmitter Dominant Table 4.8.2-2

02 03 Installation of stop valve and pressure relief valve Dominant Table 4.8.3-1
02
Installation of I&C for condensed water precision process

37
01 Installation of I&C panel (box, cabinet)

01 Installation of panel (console, panel and cabinet) in rows Table 4.6.2-2

02 Installation of individual panel (console, box and cabinet) Table 4.6.2-3

02 03 Installation of thermostat and protective box Table 4.6.2-4


02
Installation of sampling element and sensitive element

01 Installation of steam, water, oil pipe temperature measuring elements Table 4.4.2-1

02 Installation of pressure sampling element for steam, water and oil pipe Table 4.4.3-1

03 Installation of annubar flowmeter Table 4.4.4-3

04 Installation of electromagnetic flowmeters Table 4.4.-10

05 Installation of differential pressure type sampling element for liquid-level Table 4.4.5-1
measurement

06 Installation of electrical contact water level gauge Table 4.4.5-2

07 Installation of float-ball level meter Table 4.4.5-3

08 Installation of float-cylinder level meter Table 4.4.5-4

03 09 Installation of steam-water analytical sampling device Table 4.4.6-2


03
Installation of measurement and control instrument

01 Installation of local indicating pressure gauges Table 4.5.2-1

02 Installation of indicating pressure gauge with signal contact Table 4.5.2-2

38
03 Installation of local differential-pressure indicating instrument Table 4.5.2-3

04 Installation of differential-pressure indicating instrument with signal contact Table 4.5.2-4

05 Installation of transmitter Table 4.5.2-5

06 Installation of temperature switch Table 4.5.3-1

07 Installation of pressure and differential pressure switches Table 4.5.3-2

08 Installation of flow switch Table 4.5.3-3

09 Installation of level switch Table 4.5.3-4

04 10 Installation of travel switch Table 4.5.3-5


04
Cable laying and wiring Dominant

01 Cable laying Dominant Table 4.7.3-1

02 Laying of wire and compensating wire Dominant Table 4.7.3-2

05 03 Cable head making and wiring Dominant Table 4.7.4


05
Pipe laying Dominant

01 Pipe laying Dominant Table 4.8.2-1

02 Piping in panel and for transmitter Dominant Table 4.8.2-2

03 03 Installation of stop valve and pressure relief valve Dominant Table 4.8.3-1
03
Installation of I&C for circulating water system

39
01 Installation of I&C panel (box, cabinet)

01 Installation of panel (console, panel and cabinet) in rows Table 4.6.2-2

02 Installation of individual panel (console, box and cabinet) Table 4.6.2-3

02 03 Installation of thermostat and protective box Table 4.6.2-4


02
Installation of sampling element and sensitive element

01 Installation of steam, water, oil pipe temperature measuring elements Table 4.4.2-1

02 Installation of pressure sampling element for steam, water and oil pipe Table 4.4.3-1

03 Installation of annubar flowmeter Table 4.4.4-3

04 Installation of electromagnetic flowmeters Table 4.4.4-10

05 Installation of differential pressure type sampling element for liquid-level Table 4.4.5-1
measurement

06 Installation of electrical contact water level gauge Table 4.4.5-2

07 Installation of float-ball level meter Table 4.4.5-3

08 Installation of float-cylinder level meter Table 4.4.5-4

03 09 Installation of steam-water analytical sampling device Table 4.4.6-2


03
Installation of measurement and control instrument

01 Installation of local indicating pressure gauges Table 4.5.2-1

02 Installation of indicating pressure gauge with signal contact Table 4.5.2-2

40
03 Installation of local differential-pressure indicating instrument Table 4.5.2-3

04 Installation of differential-pressure indicating instrument with signal contact Table 4.5.2-4

05 Installation of transmitter Table 4.5.2-5

06 Installation of temperature switch Table 4.5.3-1

07 Installation of pressure and differential pressure switches Table 4.5.3-2

08 Installation of flow switch Table 4.5.3-3

09 Installation of level switch Table 4.5.3-4

04 10 Installation of travel switch Table 4.5.3-5


04
Cable laying and wiring Dominant

01 Cable laying Dominant Table 4.7.3-1

02 Laying of wire and compensating wire Dominant Table 4.7.3-2

05 03 Cable head making and wiring Dominant Table 4.7.4


05
Pipe laying Dominant

01 Pipe laying Dominant Table 4.8.2-1

02 Piping in panel and for transmitter Dominant Table 4.8.2-2

04 03 Installation of stop valve and pressure relief valve Dominant Table 4.8.3-1
04
Installation of I&C for wastewater

41
01 Installation of I&C panel (box, cabinet)

01 Installation of panel (console, panel and cabinet) in rows Table 4.6.2-2

02 Installation of individual panel (console, box and cabinet) Table 4.6.2-3

02 03 Installation of thermostat and protective box Table 4.6.2-4


02
Installation of sampling element and sensitive element

01 Installation of steam, water, oil pipe temperature measuring elements Table 4.4.2-1

02 Installation of pressure sampling element for steam, water and oil pipe Table 4.4.3-1

03 Installation of annubar flowmeter Table 4.4.4-3

04 Installation of electromagnetic flowmeters Table 4.4.4-10

05 Installation of differential pressure type sampling element for liquid-level Table 4.4.5-1
measurement

06 Installation of electrical contact water level gauge Table 4.4.5-2

07 Installation of float-ball level meter Table 4.4.5-3

08 Installation of float-cylinder level meter Table 4.4.5-4

03 09 Installation of steam-water analytical sampling device Table 4.4.6-2


03
Installation of measurement and control instrument

01 Installation of local indicating pressure gauges Table 4.5.2-1

02 Installation of indicating pressure gauge with signal contact Table 4.5.2-2

42
03 Installation of local differential-pressure indicating instrument Table 4.5.2-3

04 Installation of differential-pressure indicating instrument with signal contact Table 4.5.2-4

05 Installation of pressure and differential pressure switches Table 4.5.3-2

06 Installation of flow switch Table 4.5.3-3

07 Installation of level switch Table 4.5.3-4

04 08 Installation of travel switch Table 4.5.3-5


04
Cable laying and wiring Dominant

01 Cable laying Dominant Table 4.7.3-1

02 Laying of wire and compensating wire Dominant Table 4.7.3-2

05 03 Cable head making and wiring Dominant Table 4.7.4


05
Pipe laying Dominant

01 Pipe laying Dominant Table 4.8.2-1

02 Piping in panel and for transmitter Dominant Table 4.8.2-2

05 03 Installation of stop valve and pressure relief valve Dominant Table 4.8.3-1
05
Installation of I&C for domestic sewage
01
Installation of I&C panel (box, cabinet)

01 Installation of panel (console, panel and cabinet) in rows Table 4.6.2-2

43
02 Installation of individual panel (console, box and cabinet) Table 4.6.2-3

02 03 Installation of thermostat and protective box Table 4.6.2-4


02
Installation of sampling element and sensitive element

01 Installation of steam, water, oil pipe temperature measuring elements Table 4.4.2-1

02 Installation of pressure sampling element for steam, water and oil pipe Table 4.4.3-1

03 Installation of annubar flowmeter Table 4.4.4-3

04 Installation of electromagnetic flowmeters Table 4.4.4-10

05 Installation of differential pressure type sampling element for liquid-level Table 4.4.5-1
measurement

06 Installation of electrical contact water level gauge Table 4.4.5-2

07 Installation of float-ball level meter Table 4.4.5-3

08 Installation of float-cylinder level meter Table 4.4.5-4

03 09 Installation of steam-water analytical sampling device Table 4.4.6-2


03
Installation of measurement and control instrument

01 Installation of local indicating pressure gauges Table 4.5.2-1

02 Installation of indicating pressure gauge with signal contact Table 4.5.2-2

03 Installation of local differential-pressure indicating instrument Table 4.5.2-3

04 Installation of differential-pressure indicating instrument with signal contact Table 4.5.2-4

44
05 Installation of transmitter Table 4.5.2-5

06 Installation of temperature switch Table 4.5.3-1

07 Installation of pressure and differential pressure switches Table 4.5.3-2

08 Installation of flow switch Table 4.5.3-3

09 Installation of level switch Table 4.5.34

04 10 Installation of travel switch Table 4.5.3-5


04
Cable laying and wiring Dominant

01 Cable laying Dominant Table 4.7.3-1

02 Laying of wire and compensating wire Dominant Table 4.7.3-2

05 03 Cable head making and wiring Dominant Table 4.7.4


05
Pipe laying Dominant

01 Pipe laying Dominant Table 4.8.2-1

02 Piping in panel and for transmitter Dominant Table 4.8.2-2

06 03 Installation of stop valve and pressure relief valve Dominant Table 4.8.3-1
06
Installation of I&C at rain pump house
01
Installation of I&C panel (box, cabinet)

01 Installation of panel (console, panel and cabinet) in rows Table 4.6.2-2

45
02 Installation of individual panel (console, box and cabinet) Table 4.6.2-3

02 03 Installation of thermostat and protective box Table 4.6.2-4


02
Installation of sampling element and sensitive element

01 Installation of steam, water, oil pipe temperature measuring elements Table 4.4.2-1

02 Installation of pressure sampling element for steam, water and oil pipe Table 4.4.3-1

03 Installation of annubar flowmeter Table 4.4.4-3

04 Installation of electromagnetic flowmeters Table 4.4.4-10

05 Installation of differential pressure type sampling element for liquid-level Table 4.4.5-1
measurement

06 Installation of electrical contact water level gauge Table 4.4.5-2

07 Installation of float-ball level meter Table 4.4.5-3

08 Installation of float-cylinder level meter Table 4.4.5-4

03 09 Installation of steam-water analytical sampling device Table 4.4.6-2


03
Installation of measurement and control instrument

01 Installation of local indicating pressure gauges Table 4.5.2-1

02 Installation of indicating pressure gauge with signal contact Table 4.5.2-2

03 Installation of local differential-pressure indicating instrument Table 4.5.2-3

04 Installation of differential-pressure indicating instrument with signal contact Table 4.5.2-4

46
05 Installation of transmitter Table 4.5.2-5

06 Installation of temperature switch Table 4.5.3-1

07 Installation of pressure and differential pressure switches Table 4.5.3-2

08 Installation of flow switch Table 4.5.3-3

09 Installation of level switch Table 4.5.3-4

04 10 Installation of travel switch Table 4.5.3-5


04
Cable laying and wiring Dominant

01 Cable laying Dominant Table 4.7.3-1

02 Laying of wire and compensating wire Dominant Table 4.7.3-2

05 03 Cable head making and wiring Dominant Table 4.7.4


05
Pipe laying Dominant

01 Pipe laying Dominant Table 4.8.2-1

02 Piping in panel and for transmitter Dominant Table 4.8.2-2

07 03 Installation of stop valve and pressure relief valve Dominant Table 4.8.3-1
07
Installation of I&C at feedwater pump house
01
Installation of I&C panel (box, cabinet)

01 Installation of panel (console, panel and cabinet) in rows Table 4.6.2-2

47
02 Installation of individual panel (console, box and cabinet) Table 4.6.2-3

02 03 Installation of thermostat and protective box Table 4.6.2-4


02
Installation of sampling element and sensitive element

01 Installation of steam, water, oil pipe temperature measuring elements Table 4.4.2-1

02 Installation of pressure sampling element for steam, water and oil pipe Table 4.4.3-1

03 Installation of annubar flowmeter Table 4.4.4-3

04 Installation of electromagnetic flowmeters Table 4.4.4-10

05 Installation of differential pressure type sampling element for liquid-level Table 4.4.5-1
measurement

06 Installation of electrical contact water level gauge Table 4.4.5-2

07 Installation of float-ball level meter Table 4.4.5-3

08 Installation of float-cylinder level meter Table 4.4.5-4

03 09 Installation of steam-water analytical sampling device Table 4.4.6-2


03
Installation of measurement and control instrument

01 Installation of local indicating pressure gauges Table 4.5.2-1

02 Installation of indicating pressure gauge with signal contact Table 4.5.2-2

03 Installation of local differential-pressure indicating instrument Table 4.5.2-3

04 Installation of differential-pressure indicating instrument with signal contact Table 4.5.2-4

48
05 Installation of transmitter Table 4.5.2-5

06 Installation of temperature switch Table 4.5.3-1

07 Installation of pressure and differential pressure switches Table 4.5.3-2

08 Installation of flow switch Table 4.5.3-3

09 Installation of level switch Table 4.5.3-4

04 10 Installation of travel switch Table 4.5.3-5


04
Cable laying and wiring Dominant

01 Cable laying Dominant Table 4.7.3-1

02 Laying of wire and compensating wire Dominant Table 4.7.3-2

05 03 Cable head making and wiring Dominant Table 4.7.4


05
Pipe laying Dominant

01 Pipe laying Dominant Table 4.8.2-1

02 Piping in panel and for transmitter Dominant Table 4.8.2-2

08 03 Installation of stop valve and pressure relief valve Dominant Table 4.8.3-1
08
Installation of I&C for seawater desalination
01
Installation of I&C panel (box, cabinet)

01 Installation of panel (console, panel and cabinet) in rows Table 4.6.2-2

49
02 Installation of individual panel (console, box and cabinet) Table 4.6.2-3

02 03 Installation of thermostat and protective box Table 4.6.2-4


02
Installation of sampling element and sensitive element

01 Installation of steam, water, oil pipe temperature measuring elements Table 4.4.2-1

02 Installation of pressure sampling element for steam, water and oil pipe Table 4.4.3-1

03 Installation of annubar flowmeter Table 4.4.4-3

04 Installation of electromagnetic flowmeters Table 4.4.4-10

05 Installation of differential pressure type sampling element for liquid-level Table 4.4.5-1
measurement

06 Installation of electrical contact water level gauge Table 4.4.5-2

07 Installation of float-ball level meter Table 4.4.5-3

08 Installation of float-cylinder level meter Table 4.4.5-4

03 09 Installation of steam and water analyzing and sampling device Table 4.4.6-2
03
Installation of measurement and control instrument

01 Installation of local indicating pressure gauges Table 4.5.2-1

02 Installation of indicating pressure gauge with signal contact Table 4.5.2-2

03 Installation of local differential-pressure indicating instrument Table 4.5.2-3

04 Installation of differential-pressure indicating instrument with signal contact Table 4.5.2-4

50
05 Installation of transmitter Table 4.5.2-5

06 Installation of temperature switch Table 4.5.3-1

07 Installation of pressure and differential pressure switches Table 4.5.3-2

08 Installation of flow switch Table 4.5.3-3

09 Installation of level switch Table 4.5.3-4

04 10 Installation of travel switch Table 4.5.3-5


04
Cable laying and wiring Dominant

01 Cable laying Dominant Table 4.7.3-1

02 Laying of wire and compensating wire Dominant Table 4.7.3-2

05 03 Cable head making and wiring Dominant Table 4.7.4


05
Pipe laying Dominant

01 Pipe laying Dominant Table 4.8.2-1

02 Piping in panel and for transmitter Dominant Table 4.8.2-2

03 Installation of stop valve and pressure relief valve Dominant Table 4.8.3-1

04 Installation of blowdown container Table 4.8.3-2

05 Installation of separation container Table 4.8.3-3


06
Installation of I&C for fuel system

51
01 Installation of coal conveying I&C
01
Installation of I&C panel (box, cabinet)

01 Installation of panel (console, panel and cabinet) in rows Table 4.6.2-2

02 Installation of individual panel (console, box and cabinet) Table 4.6.2-3

02 03 Installation of thermostat and protective box Table 4.6.2-4


02
Installation of level and weighing instrument

01 Installation of capacitance level meter Table 4.4.5-5

02 Installation of ultrasonic (radar) level meter Table 4.4.5-6

03 Installation of electronic belt weigher Table 4.4.8-1

03 04 Installation of weigh bridge Table 4.4.8-2


03
Cable laying and wiring Dominant

01 Cable laying Dominant Table 4.7.3-1

02 Laying of wire and compensating wire Dominant Table 4.7.3-2

02 03 Cable head making and wiring Dominant Table 4.7.4


02
Installation of I&C for defrost house
01
Installation of I&C panel (box, cabinet)

01 Installation of panel (console, panel and cabinet) in rows Table 4.6.2-2

52
02 Installation of individual panel (console, box and cabinet) Table 4.6.2-3

02 03 Installation of thermostat and protective box Table 4.6.2-4


02
Installation of sampling element and sensitive element

01 Installation of steam, water, oil pipe temperature measuring elements Table 4.4.2-1

02 Installation of pressure sampling element for steam, water and oil pipe Table 4.4.3-1

03 Installation of annubar flowmeter Table 4.4.4-3

04 Installation of electromagnetic flowmeters Table 4.4.4-10

05 Installation of differential pressure type sampling element for liquid-level Table 4.4.5-1
measurement

06 Installation of electrical contact water level gauge Table 4.4.5-2

07 Installation of float-ball level meter Table 4.4.5-3

08 Installation of float-cylinder level meter Table 4.4.54

03 09 Installation of steam-water analytical sampling device Table 4.4.6-2


03
Installation of measurement and control instrument

01 Installation of local indicating pressure gauges Table 4.5.2-1

02 Installation of indicating pressure gauge with signal contact Table 4.5.2-2

03 Installation of local differential-pressure indicating instrument Table 4.5.2-3

04 Installation of differential-pressure indicating instrument with signal contact Table 4.5.2-4

53
05 Installation of transmitter Table 4.5.2-5

06 Installation of temperature switch Table 4.5.3-1

07 Installation of pressure and differential pressure switches Table 4.5.3-2

08 Installation of flow switch Table 4.5.3-3

09 Installation of level switch Table 4.5.3-4

04 10 Installation of travel switch Table 4.5.3-5


04
Cable laying and wiring Dominant

01 Cable laying Dominant Table 4.7.3-1

02 Laying of wire and compensating wire Dominant Table 4.7.3-2

05 03 Cable head making and wiring Dominant Table 4.7.4


05
Pipe laying Dominant

01 Pipe laying Dominant Table 4.8.2-1

02 Piping in panel and for transmitter Dominant Table 4.8.2-2

03 03 Installation of stop valve and pressure relief valve Dominant Table 4.8.3-1
03
Installation of fuel oil I&C Dominant
01
Installation of I&C panel (box, cabinet)

01 Installation of panel (console, panel and cabinet) in rows Table 4.6.2-2

54
02 Installation of individual panel (console, box and cabinet) Table 4.6.2-3

02 03 Installation of thermostat and protective box Table 4.6.2-4


02
Installation of sampling element and sensitive element

01 Installation of steam, water, oil pipe temperature measuring elements Table 4.4.2-1

02 Installation of pressure sampling element for steam, water and oil pipe Table 4.4.3-1

03 Installation of annubar flowmeter Table 4.4.4-3

04 Installation of electromagnetic flowmeters Table 4.4.4-10

05 Installation of differential pressure type sampling element for liquid-level Table 4.4.5-1
measurement

06 Installation of float-ball level meter Table .4.4.5-3

07 Installation of float-cylinder level meter Table 4.4.54

03 08 Installation of steam-water analytical sampling device Table 4.4.6-2


03
Installation of measurement and control instrument

01 Installation of local indicating pressure gauges Table 4.5.2-1

02 Installation of indicating pressure gauge with signal contact Table 4.5.2-2

03 Installation of local differential-pressure indicating instrument Table 4.5.2-3

04 Installation of differential-pressure indicating instrument with signal contact Table 4.5.2-4

05 Installation of transmitter Table 4.5.2-5

55
06 Installation of temperature switch Table 4.5.3-1

07 Installation of pressure and differential pressure switches Table 4.5.3-2

08 Installation of flow switch Table 4.5.3-3

09 Installation of level switch Table 4.5.34

04 10 Installation of travel switch Table 4.5.3-5


04
Cable laying and wiring Dominant

01 Cable laying Dominant Table 4.7.3-1

02 Laying of wire and compensating wire Dominant Table 4.7.3-2

05 03 Cable head making and wiring Dominant Table 4.7.4


05
Pipe laying Dominant

01 Pipe laying Dominant Table 4.8.2-1

02 Piping in panel and for transmitter Dominant Table 4.8.2-2

03 Installation of stop valve and pressure relief valve Dominant Table 4.8.3-1

04 Installation of blowdown container Table 4.8.3-2

04 05 Installation of separation container Table 4.8.3-3


04
Installation of fuel gas I&C Dominant
01
Installation of I&C panel (box, cabinet)

56
01 Installation of panel (console, panel and cabinet) in rows Table 4.6.2-2

02 Installation of individual panel (console, box and cabinet) Table 4.6.2-3

02 03 Installation of thermostat and protective box Table 4.6.2-4


02
Installation of sampling element and sensitive element

01 Installation of steam, water, oil pipe temperature measuring elements Table 4.4.2-1

02 Installation of pressure sampling element for steam, water and oil pipe Table 4.4.3-1

03 Installation of annubar flowmeter Table 4.4.4-3

04 Installation of electromagnetic flowmeters Table 4.4.4-10

05 Installation of differential pressure type sampling element for liquid-level Table 4.4.5-1
measurement

06 Installation of float-ball level meter Table 4.4.5-3

07 Installation of float-cylinder level meter Table 4.4.5-4

03 08 Installation of steam-water analytical sampling device Table 4.4.6-2


03
Installation of measurement and control instrument

01 Installation of local indicating pressure gauges Table 4.5.2-1

02 Installation of indicating pressure gauge with signal contact Table 4.5.2-2

03 Installation of local differential-pressure indicating instrument Table 4.5.2-3

04 Installation of differential-pressure indicating instrument with signal contact Table 4.5.2-4

57
05 Installation of transmitter Table 4.5.2-5

06 Installation of temperature switch Table 4.5.3-1

07 Installation of pressure and differential pressure switches Table 4.5.3-2

08 Installation of flow switch Table 4.5.3-3

09 Installation of level switch Table 4.5.3-4

04 10 Installation of travel switch Table 4.5.3-5


04
Cable laying and wiring Dominant

01 Cable laying Dominant Table 4.7.3-1

02 Laying of wire and compensating wire Dominant Table 4.7.3-2

05 03 Cable head making and wiring Dominant Table 4.7.4


05
Pipe laying Dominant

01 Pipe laying Dominant Table 4.8.2-1

02 Piping in panel and for transmitter Dominant Table 4.8.2-2

03 Installation of stop valve and pressure relief valve Dominant Table 4.8.3-1
07
Installation of I&C for auxiliary boiler
01
Installation of I&C (panel, console, box)
01
Fabrication and installation of panel base

58
02 01 Fabrication and installation of panel base Table 4.6.2-1
02
Installation of panel (console, panel and cabinet) Dominant

01 Installation of panel (console, panel and cabinet) in rows Dominant Table 4.6.2-2

02 Installation of individual panel (console, box and cabinet) Dominant Table 4.6.2-3

03 03 Installation of thermostat and protective box Dominant Table 4.6.2-4


03
Installation of instruments on panel

01 Installation of instruments on panel Table 4.6.3-1

02 Installation of digital display instrument Table 4.6.3-3

03 Installation of recording instrument Table 4.6.3-4

04 Installation of survey instrument Table 4.6.3-5

05 Installation of flashing-signal alarm devices Table 4.6.3-6

02 06 Installation of control system for PLC Table 4.6.3-7


02
Installation of sampling element and sensitive element
01
Installation of steam-water sampling element and sensitive element Dominant

01 Installation of steam, water, oil pipe temperature measuring elements Dominant Table 4.4.2-1

02 02 Installation of pressure sampling element for steam, water and oil pipe Dominant Table 4.4.3-1
02
Installation of fume, air, coal and powder sampling element and sensitive
element

59
01 Installation of pressure sampling element for fume, air and pulverized pipes Table 4.4.3-2

03 02 Installation of wing speed measurement pipe Table 4.4.4-4


03
Installation of measurement and control instrument
01
Installation of local instrumental equipments

01 Installation of local indicating pressure gauges Table 4.5.2.1

02 Installation of indicating pressure gauge with signal contact Table 4.5.2.2

03 Installation of local differential-pressure indicating instrument Table 4.5.2-3

04 Installation of differential-pressure indicating instrument with signal contact Table 4.5.2-4

04 05 Installation of transmitter Table 4.5.2-5


04
Cable laying and wiring Dominant
01
Connection box protective box

02 01 Connection box protective box Table 4.6.2-4


02
Cable bridge

01 Installation of cable bridge Table 4.7.2-1

02 Installation of independent cable support Table 4.7.2-2

03 Installation of wire slot Table 4.7.2-3

04 Installation of support and hanger Table 4.7.2-4

60
03 05 Wiring pipe, cable conduit and metal hose Table 4.7.2-5
03
Cable laying Dominant

01 Cable laying Dominant Table 4.7.3-1

04 02 Laying of wire and compensating wire Dominant Table 4.7.3-2


04
Cable head making and wiring Dominant

05 01 Cable head making and wiring Dominant Table 4.7.4


05
Pipe laying Dominant
01
Laying of instrumentation pipes Dominant

01 Pipe laying Dominant Table 4.8.2-1

02 Piping in panel and for transmitter Dominant Table 4.8.2-2

02 03 Installation of stop valve and pressure relief valve Dominant Table 4.8.3-1
02
Pipe sealing test Dominant

01 Pipe sealing test Dominant Table 4.8.2-1


08
Installation of I&C for hydrogen generation and supply station
01
Installation of I&C for hydrogen generation and supply station Dominant
01
Installation of I&C panel (box, cabinet) Dominant

01 Installation of panel (console, panel and cabinet) in rows Dominant Table 4.6.2-2

61
02 Installation of individual panel (console, box and cabinet) Dominant Table 4.6.2-3

02 03 Installation of thermostat and protective box Dominant Table 4.6.2-4


02
Installation of sampling element and sensitive element

01 Installation of temperature measuring elements for steam and water pipes Table 4.4.2-1

02 Installation of pressure sampling element for steam and water pipe Table 4.4.3-1

03 Installation of annubar flowmeter Table 4.4.4-3

04 Installation of electromagnetic flowmeters Table 4.4.4-10

05 Installation of differential pressure type sampling element for liquid-level Table 4.4.5-1
measurement

06 Installation of float-ball level meter Table 4.4.5-3

07 Installation of float-cylinder level meter Table 4.4.5-4

03 08 Installation of steam-water analytical sampling device Table 4.4.6-2


03
Installation of measurement and control instrument

01 Installation of local indicating pressure gauges Table 4.5.2-1

02 Installation of indicating pressure gauge with signal contact Table 4.5.2-2

03 Installation of local differential-pressure indicating instrument Table 4.5.2-3

04 Installation of differential-pressure indicating instrument with signal contact Table 4.5.2-4

05 Installation of transmitter Table 4.5.2-5

62
06 Installation of temperature switch Table 4.5.3-1

07 Installation of pressure and differential pressure switches Table 4.5.3-2

08 Installation of flow switch Table 4.5.3-3

09 Installation of level switch Table 4.5.3-4

04 10 Installation of travel switch Table 4.5.3-5


04
Cable laying and wiring Dominant

01 Cable laying Dominant Table 4.7.3-1

02 Laying of wire and compensating wire Dominant Table 4.7.3-2

05 03 Cable head making and wiring Dominant Table 4.7.4


05
Pipe laying Dominant

01 Pipe laying Dominant Table 4.8.2-1

02 Piping in panel and for transmitter Dominant Table 4.8.2-2

03 Installation of stop valve and pressure relief valve Dominant Table 4.8.3-1

04 Pipe sealing test Dominant Table 4.8.2-1


09
Installation of I&C for heat supply system
01
Installation of I&C for temperature and pressure reducing stations
01
Installation of I&C panel (box, cabinet) Dominant

63
01 Installation of panel (console, panel and cabinet) in rows Dominant Table 4.6.2-2

02 Installation of individual panel (console, box and cabinet) Dominant Table 4.6.2-3

02 03 Installation of thermostat and protective box Dominant Table 4.6.2-4


02
Installation of sampling element and sensitive element

01 Installation of steam, water, oil pipe temperature measuring elements Table 4.4.2-1

02 Installation of pressure sampling element for steam, water and oil pipe Table 4.4.3-1

03 Installation of annubar flowmeter Table 4.4.4-3

04 Installation of electromagnetic flowmeters Table 4.4.4-10

05 Installation of differential pressure type sampling element for liquid-level Table 4.4.5-1
measurement

06 Installation of float-ball level meter Table 4.4.5-3

07 Installation of float-cylinder level meter Table 4.4.5-4

03 08 Installation of steam-water analytical sampling device Table 4.4.6-2


03
Installation of measurement and control instrument

01 Installation of local indicating pressure gauges Table 4.5.2-1

02 Installation of indicating pressure gauge with signal contact Table 4.5.2-2

03 Installation of local differential-pressure indicating instrument Table 4.5.2-3

04 Installation of differential-pressure indicating instrument with signal contact Table 4.5.24

64
05 Installation of transmitter Table 4.5.2-5

06 Installation of temperature switch Table 4.5.3-1

07 Installation of pressure and differential pressure switches Table 4.5.3-2

08 Installation of flow switch Table 4.5.3-3

09 Installation of level switch Table 4.5.3-4

04 10 Installation of travel switch Table 4.5.3-5


04
Cable laying and wiring Dominant

01 Cable laying Dominant Table 4.7.3-1

02 Laying of wire and compensating wire Dominant Table 4.7.3-2

05 03 Cable head making and wiring Dominant Table 4.7.4


05
Pipe laying Dominant

01 Pipe laying Dominant Table 4.8.2-1

02 Piping in panel and for transmitter Dominant Table 4.8.2-2

02 03 Installation of stop valve and pressure relief valve Dominant Table 4.8.3-1
02
Installation of I&C for heating network Dominant
01
Installation of I&C panel (box, cabinet)

01 Installation of panel (console, panel and cabinet) in rows Table 4.6.2-2

65
02 Installation of individual panel (console, box and cabinet) Table 4.6.2-3

02 03 Installation of thermostat and protective box Table 4.6.2-4


02
Installation of sampling element and sensitive element

01 Installation of steam, water, oil pipe temperature measuring elements Table 4.4.2-1

02 Installation of pressure sampling element for steam, water and oil pipe Table 4.4.3-1

02 03 Installation of annubar flowmeter Table 4.4.4-3


02
04 Installation of electromagnetic flowmeters Table 4.4.4-10

05 Installation of differential pressure type sampling element for liquid-level Table 4.4.5-1
measurement

06 Installation of float-ball level meter Table 4.4.5-3

07 Installation of float-cylinder level meter Table 4.4.54

03 08 Installation of steam-water analytical sampling device Table 4.4.6-2


03
Installation of measurement and control instrument

01 Installation of local indicating pressure gauges Table 4.5.2-1

02 Installation of local differential-pressure indicating instrument Table 4.5.2-3

03 Installation of differential-pressure indicating instrument with signal contact Table 4.5.2-4

04 Installation of transmitter Table 4.5.2-5

05 Installation of temperature switch Table 4.5.3-1

66
06 Installation of pressure and differential pressure switches Table 4.5.3-2

07 Installation of flow switch Table 4.5.3-3

08 Installation of level switch Table 4.5.3-4

04 09 Installation of travel switch Table 4.5.3-5


04
Cable laying and wiring Dominant

01 Cable laying Dominant Table 4.7.3-1

02 Laying of wire and compensating wire Dominant Table 4.7.3-2

05 03 Cable head making and wiring Dominant Table 4.7.4


05
Pipe laying Dominant

01 Pipe laying Dominant Table 4.8.2-1

02 Piping in panel and for transmitter Dominant Table 4.8.2-2

03 Installation of stop valve and pressure relief valve Dominant Table 4.8.3-1
10
Installation of I&C for ash and slag removal system
01
Installation of panel (console, panel and cabinet)
01
Fabrication and installation of panel base

02 01 Fabrication and installation of panel base Table 4.6.2-1


02
Installation of panel (console, panel and cabinet) Dominant

67
01 Installation of panel (console, panel and cabinet) in rows Table 4.6.2-2

02 Installation of individual panel (console, box and cabinet) Table 4.6.2-3

02 03 Installation of thermostat and protective box Table 4.6.2-4


02
Installation of sampling element and sensitive element
01
Installation of temperature measuring element

02 01 Installation of temperature measuring element Table 4.4.2-1


02
Installation of pressure sampling element

03 01 Installation of pressure sampling element Table 4.4.3-2


03
Installation of flow sampling element and throttling device

04 01 Installation of flow sampling element and throttling device Table 4.4.4-1


04
Installation of liquid level sampling element

01 Installation of capacitance level meter Table 4.4.5-5

03 02 Installation of ultrasonic (radar) level meter Table 4.4.5-6


03
Installation of measurement and control instrument
01
Installation of pressure/differential-pressure indicating instrument and
transmitter

01 Installation of local indicating pressure gauges Table 4.5.2-1

02 Installation of indicating pressure gauge with signal contact Table 4.5.2-2

68
03 Installation of local differential-pressure indicating instrument Table 4.5.2-3

04 Installation of differential-pressure indicating instrument with signal contact Table 4.5.2-4

02 05 Installation of transmitter Table 4.5.2-5


02
Switching value gauge

01 Installation of temperature switch Table 4.5.3-1

02 Installation of pressure and differential pressure switches Table 4.5.3-2

03 Installation of flow switch Table 4.5.3-3

04 Installation of level switch Table 4.5.3-4

03 05 Installation of travel switch Table 4.5.3-5


03
Actuator

01 Installation of motor-driven actuator Table 4.5.5-1

02 Installation of pneumatic actuator Table 4.5.5-2

03 Installation of electric actuator for motor-driven valve Table 4.5.5-3

04 Installation of driving arm Table 4.5.5-4

05 Installation of solenoid valve Table 4.5.5-5

04 06 Installation of control system for pneumatic control valve Table 4.5.5-7


04
Cable laying and wiring Dominant

69
01 Cable laying Dominant

02 01 Cable laying Dominant Table 4.7.3-1


02
Laying of wire and compensating wire Dominant

03 01 Laying of wire and compensating wire Dominant Table 4.7.3-2


03
Cable head making and wiring Dominant

05 01 Cable head making and wiring Dominant Table 4.7.4


05
Pipe laying Dominant
01
Pipe laying Dominant

02 01 Pipe laying Dominant Table 4.8.2-1


02
Piping in panel and for transmitter Dominant

03 01 Piping in panel and for transmitter Dominant Table 4.8.2-2


03
Installation of stop valve and pressure relief valve Dominant

01 Installation of stop valve and pressure relief valve Dominant Table 4.8.3-1
11

Installation of I&C for desulfuration and denitration Dominant


01 Installation of I&C panel (box, cabinet)
01
Fabrication and installation of panel base Dominant

02 01 Fabrication and installation of panel base

70
02 Installation of panel (console, panel and cabinet) Table 4.6.2-1

01 Installation of panel (console, panel and cabinet) in rows Dominant

02 Installation of individual panel (console, box and cabinet) Dominant Table 4.6.2-2

03 03 Installation of thermostat and protective box Dominant Table 4.6.2-3


03
Installation of instruments on panel Dominant Table 4.6.2-4

01 Installation of instruments on panel

02 Installation of equipments in distributed control system Table 4.6.3-1

03 Installation of digital display instrument Table 4.6.3-2

04 Installation of recording instrument Table 4.6.3-3

05 Installation of survey instrument Table 4.6.3-4

06 Installation of flashing-signal alarm devices Table 4.6.3-5

02 07 Installation of control system for PLC Table 4.6.3-6


02
Installation of sampling element and sensitive element Table 4.6.3-7
01
Installation of temperature measuring element Dominant

01 Installation of steam, water, oil pipe temperature measuring elements

02 Installation of armoured thermocouple for non-fixing device for measuring Table 4.4.2-1
metal wall temperature

03 Installation of armoured thermocouple for movable staple sleeve device for Table 4.4.2-2

71
measuring metal wall temperature

04 Installation of special thermal resistance for measuring metal wall Table 4.4.2-3
temperature

02 05 Installation of temperature measuring elements for fume, air, pulverized fuel Table 4.4.2-4
02 pipe and equipment

Installation of pressure sampling element Table 4.4.2-5

01 Installation of pressure sampling element for steam, water and oil pipe

03 02 Installation of pressure sampling element for fume, air and pulverized pipes Table 4.4.3-1
03
Installation of flow sampling element and throttling device Table 4.4.3-2

01 Installation of nozzle and standard orifice plate Dominant

02 Installation of assemble-type major-diameter nozzle Dominant Table 4.4.4-1

03 Installation of annubar flowmeter Dominant Table 4.4.4-2

04 Installation of wing speed measurement pipe Dominant Table 4.4.4-3

05 Installation of rotor flowmeter Dominant Table 4.4.4-4

06 Installation of oval gear flowmeter Dominant Table 4.4.4-5

07 Installation of target type flowmeter Dominant Table 4.4.4-6

08 Installation of turbine flowmeter Dominant Table 4.4.4-7

09 Installation of vortex (vortex street) flowmeter Dominant Table 4.4.4-8

72
10 Installation of electromagnetic flowmeters Dominant Table 4.4.4-9

04 11 Installation of ultrasonic flowmeter Dominant Table 4.4.4-10


04
Installation of level detection device Dominant Table 4.4.4-11

01 Installation of capacitance level meter Dominant

05 02 Installation of ultrasonic (radar) level meter Dominant Table 4.4.5-5


05
Installation of analysis and sampling device Dominant Table 4.4.5-6

01 Installation of zirconia oxygen-content analytical sampling device Dominant

06 02 Installation of gas analytical sampling device Dominant Table 4.4.6-1


06
Installation of special instrument Dominant Table 4.4.6-3

01 Installation of induced displacement measuring device Dominant

02 Installation of electromagnetic vibration measuring device Dominant Table 4.4.7-1

03 Installation of current vortex measuring device Dominant Table 4.4.7-2

04 Installation of magnetoelectric speed sensor Dominant Table 4.4.7-3

07 05 Installation of travel indicator measuring device Dominant Table 4.4.7-4


07
Installation of material weighing sensor Dominant

01 Installation of electronic belt weigher Dominant Table 4.4.8-1

03 02 Installation of weigh bridge Dominant Table 4.4.8-2

73
03 Installation of measurement and control instrument
01
Installation of local pressure and differential-pressure indicating instruments

01 Installation of local indicating pressure gauges Table 4.5.2-1

02 Installation of indicating pressure gauge with signal contact Table 4.5.2-2

03 Installation of local differential-pressure indicating instrument Table 4.5.2-3

04 Installation of differential-pressure indicating instrument with signal contact Table 4.5.2-4

02 05 Installation of transmitter Table 4.5.2-5


02
Installation of switching value instrument

01 Installation of temperature switch Table 4.5.3-1

02 Installation of pressure and differential pressure switches Table 4.5.3-2

03 Installation of flow switch Table 4.5.3-3

04 Installation of level switch Table 4.5.3-4

03 05 Installation of travel switch Table 4.5.3-5


03
Installation of actuator Dominant

01 Installation of motor-driven actuator Dominant Table 4.5.5-1

02 Installation of pneumatic actuator Dominant Table 4.5.5-2

03 Installation of electric actuator for motor-driven valve Dominant Table 4.5.5-3

74
04 Installation of driving arm Dominant Table 4.5.5-4

05 Installation of solenoid valve Dominant Table 4.5.5-5

04 06 Installation of control system for pneumatic control valve Dominant Table 4.5.5-7
04
Cable laying and wiring Dominant
01
Installation of connection box and thermostat

02 01 Installation of connection box and thermostat Table 4.6.2-4


02
Cable bridge (bracing) frame

01 Installation of cable bridge Table 4.7.2-1

02 Installation of independent cable support Table 4.7.2-2

03 Installation of wire slot Table 4.7.2-3

04 Installation of support and hanger Table 4.7.2-4

03 05 Installation of wiring pipe, cable conduit and metal hose Table 4.7.2-5
03
Cable laying Dominant

01 Cable laying Dominant Table 4.7.3-1

04 02 Laying of wire and compensating wire Dominant Table 4.7.3-2


04
Cable head making and wiring Dominant

05 01 Cable head making and wiring Dominant Table 4.7.4

75
05 Pipe laying Dominant
01
Pipe laying Dominant

01 Pipe laying Dominant Table 4.8.2-1

02 Piping in panel and for transmitter Dominant Table 4.8.2-2

03 Installation of stop valve and pressure relief valve Dominant Table 4.8.3-1

04 Installation of blowdown container Table 4.8.3-2

02 05 Installation of separation container Table 4.8.3-3

Pipe sealing test Dominant

01 Pipe sealing test Dominant Table 4.8.2-1


12
Installation of I&C for plant monitoring system
01
Installation of I&C panel (box, cabinet) Dominant
01
Fabrication and installation of panel base

02 01 Fabrication and installation of panel base Table 4.6.2-1


02
Installation of panel (console, panel and cabinet) Dominant

01 Installation of panel (console, panel and cabinet) in rows Dominant Table 4.6.2-2

02 Installation of individual panel (console, box and cabinet) Dominant Table 4.6.2-3

76
03 03 Installation of thermostat and protective box Dominant Table 4.6.2-4
03
Installation of instruments on panel Dominant

02 01 Installation of instruments on panel Dominant Table 4.6.3-1


02
Installation of monitoring devices
01
Installation of monitoring devices

03 01 Installation of monitoring devices Table 4.4.9-4


03
Cable laying and wiring Dominant
01
Installation of bridge (bracing) frame

01 Installation of cable bridge Table 4.7.2-1

02 Installation of independent cable support Table 4.7.2-2

03 Installation of wire slot Table 4.7.2-3

04 Installation of support and hanger Table 4.7.2-4

02 05 Installation of wiring pipe, cable conduit and metal hose Table 4.7.2-5
02
Cable laying Dominant

01 Cable laying Dominant Table 4.7.3-1

03 02 Laying of lead wire Dominant Table 4.7.3-2

77
03 Cable head making and wiring Dominant

01 Cable head making and wiring Dominant Table 4.7.4


13
Installation of I&C for plant access control system
01
Installation of I&C panel (box, cabinet) Dominant
01
Fabrication and installation of panel base

02 01 Fabrication and installation of panel base Table 4.6.2-1


02
Installation of panel (console, panel and cabinet) Dominant

01 Installation of panel (console, panel and cabinet) in rows Dominant Table 4.6.2-2

02 Installation of individual panel (console, box and cabinet) Dominant Table 4.6.2-3

03 03 Installation of thermostat and protective box Dominant Table 4.6.2-4


03
Installation of instruments on panel Dominant

02 01 Installation of instruments on panel Dominant Table 4.6.3-1


02
Installation of local equipments
01
Installation of monitoring devices

03 01 Installation of monitoring devices Table 4.4.9-4


03
Cable laying and wiring Dominant

78
01 Installation of bridge (bracing) frame

01 Installation of cable bridge Table 4.7.2-1

02 Installation of independent cable support Table 4.7.2-2

03 Installation of wire slot Table 4.7.2-3

04 Installation of support and hanger Table 4.7.2-4

02 05 Installation of wiring pipe, cable conduit and metal hose Table 4.7.2-5
02
Cable laying Dominant

01 Cable laying Dominant Table 4.7.3-1

03 02 Laying of lead wire Dominant Table 4.7.3-2


03
Cable head making and wiring Dominant

01 Cable head making and wiring Dominant Table 4.7.4


14
Calibration of plant I&C monomer and adjustment of the circuit
01
Calibration of measuring instrument monomer
01
Calibration of temperature measuring element Dominant

01 General inspection items of debugging for instrument and alarm device Dominant Table 4.3.1

02 Calibration of bimetal thermometer and pressure type thermometer Dominant Table 4.10.2-1

79
03 Calibration (inspection) of thermocouple and sheathed thermocouple Dominant Table 4.10.2-2

02 04 Calibration (inspection) of thermocouple and sheathed thermocouple Dominant Table 4.10.2-3


02
Calibration of local mounted indicating instrument

01 General inspection items of debugging for instrument and alarm device Dominant Table 4.3.1

03 02 Calibration of bourdon tube pressure gauge, vacuum gauge, pressure Dominant Table 4.10.24
03 vacuum gauge and differential-pressure-gauge

Calibration of sensor and transmitter Dominant

01 General inspection items of debugging for instrument and alarm device Dominant Table 4.3.1

02 Calibration of remote pressure and differential pressure gauge (variable Dominant Table 4.10.2-5
resistance and differential transformer)

03 Calibration of capacitance, inductance, piezoelectric and piezoresistance Dominant Table 4.10.2-6


pressure and differential pressure transmitter

04 Calibration of intelligent pressure and differential pressure transmitter Dominant Table 4.10.2-7

04 05 Calibration of temperature transmitter Dominant Table 4.10.2-8


04
Calibration of local flow instrument Dominant

01 General inspection items of debugging for instrument and alarm device Dominant Table 4.3.1

02 Calibration (inspection) of rotameter Dominant Table 4.10.2-9

03 Calibration (detection) of volumetric flowmeter (rotor, gear, elliptic gear, Dominant Table 4.10.2-10
root and scraping type flowmeter)

80
04 Calibration (inspection) of turbine flowmeter (sensor) Dominant Table 4.10.2-11

05 Calibration of vortex shedding flowmeter Dominant Table 4.10.2-12

06 Calibration of electromagnetic flowmeters Dominant Table 4.10.2-13

07 Calibration of ultrasonic flowmeter Dominant Table 4.10.2-14

05 08 Calibration of target type flowmeter Dominant Table 4.10.2-15


05
Calibration of level gauging instrument

01 General inspection items of debugging for instrument and alarm device Table 4.3.1

02 Calibration of electrical contact water meter Table 4.10.2-16

03 Calibration of double-color water gauge Table 4.10.2-17

04 Calibration of float level meter Table 4.10.2-18

05 Calibration of capacitance level meter Table 4.10.2-19

06 Calibration of electric weight level indicator Table 4.10.2-20

06 07 Calibration of supersonic wave and radar level meter Table 4.10.2-21


06
Calibration of composition analysis instrument

01 General inspection items of debugging for instrument and alarm device Table 4.3.1

02 Calibration of zirconia oxygen analyzer Table 4.10.2-22

81
03 Calibration of boiler fly ash carbon-content monitoring system (microwave Table 4.10.2-23
carbon meter)

04 Calibration of thermal conductance hydrogen analyzer Table 4.10.2-24

05 Calibration of industrial electric conduction meter Table 4.10.2-25

06 Calibration of industrial acid and alkali concentration meter Table 4.10.2-26

07 Calibration of industrial acidity (PH value) meter Table 4.10.2-27

08 Calibration of water dissolved oxygen analyzer Table 4.10.2-28

09 Calibration of silicon, phosphate radical analyzer Table 4.10.2-29

10 Calibration of negative and positive ion exchanger failure monitor Table 4.10.2-30

11 Calibration of industrial sodium densimeter Table 4.10.2-31

12 Calibration of hydrazine monitor Table 4.10.2-32

07 13 Calibration of flue gas composition analysis device Table 4.10.2-33


07
Calibration of special instrument Dominant

01 General inspection items of debugging for instrument and alarm device Dominant Table 4.3.1

02 Calibration of inductance and eddy current type axial displacement and Dominant Table 4.10.2-34
relative expansion measuring instruments and protective devices

03 Calibration of steam turbine thermal expansion and strong indicator Dominant Table 4.10.2-35

04 Calibration of steam-turbine crisis breaker electric indicator Dominant Table 4.10.2-36

82
05 Calibration of turbine rotor eccentricity measuring device Dominant Table 4.10.2-37

06 Calibration of electromagnetic and eddy current type steam turbine vibration Dominant Table 4.10.2-38
gauge

08 07 Calibration of tachometer and protective device Dominant Table 4.10.2-39


08
Calibration of material weighing device

01 General inspection items of debugging for instrument and alarm device Table 4.3.1

02 Simulation calibration of electronic belt weigher Table 4.10.2-40

03 Simulation calibration of electronic belt weigher substance detector Table 4.10.2-41

04 Simulation calibration of dynamic electronic weigh bridge Table 4.10.2-42

09 05 Simulation calibration of static electronic track scale (weighing wagon Table 4.10.2-43
09 tipper)

Calibration of indicating instrument on panel Dominant

01 General inspection items of debugging for instrument and alarm device Dominant Table 4.3.1

04 Calibration of digital indicator and display accommodometer Dominant Table 4.10.2-44

05 Calibration of intellectualized balanced type indicating instrument Dominant Table 4.10.2-45

10 06 Calibration of temperature circuit measuring instrument Dominant Table 4.10.2-46


10
Calibration of other instruments

01 General inspection items of debugging for instrument and alarm device Table 4.3.1

83
02 Calibration of flame monitoring devices Table 4.10.2-47

03 Calibration of industrial television Table 4.10.2-48

02 04 Calibration of generator hydrogen leakage monitor Table 4.10.2-49


02
Calibration of control instrument Dominant
01
Calibration of switching value instrument Dominant

01 General inspection items of debugging for instrument and alarm device Dominant Table 4.3.1

02 Calibration of pressure and differential pressure switches Dominant Table 4.10.2-50

03 Calibration of temperature switch Dominant Table 4.10.2-51

04 Calibration of flow switches Dominant Table 4.10.2-52

05 Calibration of liquid level switches Dominant Table 4.10.2-53

06 Calibration of travel switches Dominant Table 4.10.2-54

02 07 Calibration of capacitance level controller Dominant Table 4.10.2-55


02
Calibration of thermal signalling apparatus Dominant

01 General inspection items of debugging for instrument and alarm device Dominant Table 4.3.1

02 Calibration of microcomputer alarm device Dominant Table 4.10.2-56

03 Calibration of circuit alarm instrument and SOE event recorder Dominant Table 4.10.2-57

84
03 04 Calibration of microcomputer alarm device Dominant Table 4.10.2-58
03
Calibration of actuator and its accessories Dominant

01 General inspection items of debugging for instrument and alarm device Dominant Table 4.3.1

02 Calibration of motor-driven actuator Dominant Table 4.10.2-59

03 Calibration of motor-driven actuator servo amplifier Dominant Table 4.10.2-60

04 Calibration of pneumatic actuator Dominant Table 4.10.2-61

05 Calibration of pneumatic diaphragm valve Dominant Table 4.10.2-62

06 Calibration of pneumatic (electric-pneumatic) valve positioner Dominant Table 4.10.2-63

07 Calibration of motor-driven valve Dominant Table 4.10.2-64

08 Calibration of electrical tie bar Dominant Table 4.10.2-65

09 Inspection of solenoid valve Dominant Table 4.10.2-66

10 Calibration of vibration coal feeder Dominant Table 4.10.2-67

04 11 Calibration of speed control device for electromagnetic coupling Dominant Table 4.10.2-68
04 asynchronous motor

Inspection of I&C auxiliary device

01 General inspection items of debugging for instrument and alarm device Table 4.3.1

02 Inspection of thermocouple compensating wire performance Table 4.10.2-69

85
03 Inspection of cold junction compensation box and cold junction thermotank Table 4.10.2-70

04 Inspection of DC stabilized voltage supply unit Table 4.10.2-71

05 Inspection of AC stabilized voltage supply unit Table 4.10.2-72

06 Inspection of middle and time relay Table 4.10.2-73

07 Inspection of self-limit-temperature heating zone Table 4.10.2-74

03 Debugging of thermal measurement circuit Dominant


03
Debugging of I&C power circuit Dominant
01
01 General inspection items of circuit debugging Dominant Table 4.3.2

02 Debugging of I&C power circuit Dominant Table 4.10.3-1

02 03 Uninterrupted power supply (UPS) system test Dominant Table 4.10.3-2


02
Debugging of Temperature, Pressure, Pressure Difference Measurement Dominant
Circuit

01 General inspection items of circuit debugging Dominant Table 4.3.2

02 Debugging of temperature measurement circuit Dominant Table 4.10.3-3

03 03 Debugging of Pressure and Pressure Difference Measurement Circuit Dominant Table 4.10.3-4
03
Debugging of local flow measuring circuit

01 General inspection items of circuit debugging Table 4.3.2

86
02 Debugging of spinner survey circuit Table 4.10.3-5

03 Debugging of volumetric flowmeter measurement circuit Table 4.10.3-6

04 Debugging of turbine flowmeter measurement circuit Table 4.10.3-7

05 Debugging of vortex shedding flow meter measurement circuit Table 4.10.3-8

06 Debugging of electromagnetic flowmeter measurement circuit Table 4.10.3-9

04 07 Debugging of supersonic flowmeter measurement circuit Table 4.10.3-10


04
Debugging of level measurement circuit

01 General inspection items of circuit debugging Table 4.3.2

02 Debugging of electrical contact water meter measurement circuit Table 4.10.3-11

03 Debugging of double-color water gauge measurement circuit Table 4.10.3-12

04 Debugging of float-pipe level meter measurement circuit Table 4.10.3-13

05 Debugging of capacitance level meter measurement circuit Table 4.10.3-14

06 Debugging of electric weight level indicator measurement circuit Table 4.10.3-15

05 07 Debugging of ultrasonic-wave (radar) level meter measurement circuit Table 4.10.3-16


05
Debugging of composition-analysis circuit

01 General inspection items of circuit debugging Table 4.3.2

87
02 Debugging of measurement circuit for analyzing oxygen quantity in Table 4.10.3-17
zirconium oxide

03 Debugging of circuit for measuring carbon content in boiler fly ash Table 4.10.3-18

04 Debugging of thermal-conduction-hydrogen-analyzer measurement circuit Table 4.10.3-19

05 Debugging of industrial electric conduction meter measurement circuit Table 4.10.3-20

06 Debugging of stock acid and soda concentration measurement circuit Table 4.10.3-21

07 Debugging of industrial acidity (pH value) meter measurement circuit Table 4.10.3-22

08 Debugging of in-water dissolved-oxygen analyzer measurement circuit Table 4.10.3-23

09 Debugging of measurement circuit of silicon and phosphate radical analyzer Table 4.10.3-24

10 Debugging of measurement circuit of instrument to monitoring negative and Table 4.10.3-25


positive ion exchanger failure

11 Debugging of industrial sodium densimeter measurement circuit Table 4.10.3-26

12 Debugging of hydrazine monitor measurement circuit Table 4.10.3-27

06 13 Debugging of flue gas composition analysis device circuit Table 4.10.3-28


06
Debugging of mechanical quantity measurement circuit Dominant

01 General inspection items of circuit debugging Dominant Table 4.3.2

02 Debugging of circuit for measuring axial displacement and relative Dominant Table 4.10.3-29
expansion of turbine shaft

03 Debugging of measurement circuit for thermal expansion and strong Dominant Table 4.10.3-30

88
indicator of steam turbine

04 Debugging of measurement circuit for steam turbine emergency-governor Dominant Table 4.10.3-31
electric indicating device

05 Debugging of turbine-rotor eccentricity measurement circuit Dominant Table 4.10.3-32

06 Debugging of turbine vibration measurement circuit Dominant Table 4.10.3-33

07 07 Debugging of rotational speed measurement circuit Dominant Table 4.10.3-34


07
Debugging of material weighing device circuit

01 General inspection items of circuit debugging Table 4.3.2

02 Dynamic debugging of electronic belt weigher Table 4.10.3-35

03 Dynamic debugging of substance detection device (electronic belt weigher) Table 4.10.3-36

04 Dynamic debugging of dynamic electronic weigh bridge Table 4.10.3-37

08 05 Dynamic debugging of static electronic weigh bridge (weighing wagon Table 4.10.3-38
08 tipper)

Debugging of other monitoring circuits

01 General inspection items of circuit debugging Table 4.3.2

02 Debugging of flame monitoring device circuit Table 4.10.3-39

03 Debugging of furnace flame industrial television circuit Table 4.10.3-40

04 04 Calibration of generator hydrogen leakage monitor Table 4.10.3-41

89
04 Debugging of thermal signal circuit Dominant
01
Debugging of thermal signal circuit

01 General inspection items of circuit debugging Table 4.3.2

02 Debugging of thermal signal circuit for flashing alarm instrument Dominant Table 4.10.3-42

03 Debugging of thermal signal circuit for microcomputer warning device Dominant Table 4.10.3-43

Owner (Seal) Supervisor (Seal) Construction contractor (Seal)

Date Date Date

90
4.2.2 The construction management conditions of subsystem shall be inspected during the
construction and acceptance of subsystem and the inspection results shall be filled in Table
4.2.2.
Table 4.2.2: record of inspection for construction management of subsystem ()
Project name Owner

Discipline director of
Designer
designer

Supervision engineer of
Supervisor
subsystem

Construction technology
Construction contractor
director of subsystem

Commissioning date of Completion date of


subsystem subsystem

Results of construction management inspection

No. Inspection item and implementation Inspection result

1 List of implemented technical standards

Preparation and reviewing of construction plan and construction


2
scheme

3 Examination and inspection of working diagram

4 Acceptance and inspection of equipments and materials

5 Implementation condition of compulsory provision

6 Quality management system and implementation

7 Safety management system and implementation

8 Energy saving and emission reduction target and system

9 Environmental protection

10 Certification of special workers

11 Management of measurement tools

12 Qualification management of subcontractor

13 Management situation of engineering materials

Inspection results of quality supervision and problem resolution


14
condition

91
Acceptance conclusion:

Chief supervision engineer: Date:


Discipline director of owner: Date

4.2.3 The information listed in Table 4.2.3 shall be examined for the subsystem acceptance;
the examining results shall be complete and meet the requirements of records management.
Table 4.2.3: check table of quality control documents of subsystem ( )
Unit ________ Project number:
Copies Copies
No. Document name Check condition
expected obtained

Registration forms of design alteration and advice


1
notes of materials substitutes

Registration form of factory test report and quality


2
certificate documents for equipment and material

Equipment defect notice and equipment defect


3
handling report

Registration form of measurement tools used in the


4
subsystem

5 Quality acceptance table of the batch

6 Quality acceptance table of the subitem

7 Quality acceptance table of the subsection

8 Quality acceptance table of the subsystem

9 Certification of concealed project

10 Construction record

11 certification of single machine trial running

Inspection table on the compulsory provision


12
implementations

92
Signature of the acceptance organization

Construction contractor Date:

Supervisor Date:

Owner Date:

4.2.4 The advice notes for engineering design alteration, material substitution and altered
design shall be numbered, registered and attached on the registration form. The registration of
engineering design alteration and material substitution in subsystem shall meet the
requirements specified in Table 4.2.4.
Table 4.2.4: registration form of advice notes for design alteration and materials substitutes of
subsystem ( )
Unit________ Project number:
Original Drawing number related No. of amended contents in the
No. Name of advice note Implementation
number to alteration advice note

93
Construction
contractor Supervisor

Date: Date:

4.2.5 The factory test reports and the quality certificate documents of equipment and
material shall be numbered, registered and attached on the registration form. The registration
of equipment and material factory test report and quality certificate documents of subsystem
shall meet the requirements specified in Table 4.2.5.
Table 4.2.5: Registration form of equipment and material factory test report and quality
certificate document in subsystem ()
Unit________ Project number:
Original number
of report and
Name of equipment and material test Report issuing Total pages of
No. quality Remarks
report and quality certificate document organization the report
certificate
document

94
Prepared by

Date:

4.2.6 Any equipment defect shall be inspected and confirmed by the construction contractor,
supervisor, supplier and owner together and the advice note of equipment defect shall be filled
in. The filling of equipment defect advice note shall meet the requirements specified in Table
4.2.6.
Table 4.2.6: Advice note of equipment defect
Unit________ Project number:
Name of subsystem Name of subitem

Name of batch No.

Equipment name Detecting date

95
Condition of equipment defect:

Construction contractor:
Date:

Construction
Supplier
contractor

Supervisor Owner

Treatment suggestion:

Discipline director of the owner:

Date:

Organization Defect treatment suggestion Signature

Construction
Date:
contractor

Supplier Date:

Supervisor Date:

Owner Date:

4.2.7 After the equipment defect treatment, the defect treatment organization shall submit
the report to the owner, and the owner shall organize the organizations concerned to conduct
inspection and acceptance and sign the equipment defect treatment report. the filling of the
equipment defect reports shall meet the requirements specified in Table 4.2.7.
Table 4.2.7: Equipment defect treatment report
Unit _________ Project number:
Name of subsystem Name of subitem

Name of batch No.

Equipment name Treatment date

96
Treatment condition of defect:

Technical director of the defect treatment organization:


Date:

Defect treatment conclusion:

Supervisor:
Date:

Signature of the acceptance organizations

Construction contractor Date:

Supplier Date:

Supervisor Date:

Owner Date:

4.2.8 The measurement tools used in the construction must be inspected, and used within
the calibration validity period. All measurement tools used in the construction procedure shall
be registered according to the requirements specified in Table 4.2.8. The supervision engineer
shall conduct the inspection and confirmation (approval) for the measurement tools registered
in the table.
Table 4.2.8: Registration form of measurement tools used in subsystem ()
Unit ________ Project number:
Name of measuring Factory Measurement Calibration
No. Type/model Accuracy grade Remarks
equipment (instrument, tool) number limit validity period

97

Construction
Date: Supervisor Date:
contractor

4.2.9 The construction quality of batches shall be inspected and accepted according to the
quality criteria of the inspection items, and the acceptance table for acceptance table of batch
shall be filled. No "Dominant" in column "nature" means "general" according to the
requirements specified in Table 4.2.1. For the items outside of the acceptance range, the
acceptance organization column shall be filled with "/". the construction quality acceptance of
batches shall meet the requirements specified in Table 4.2.9.
Table 4.2.9: construction quality acceptance table of batch ()
Unit________ Project number: Nature: Table:

Name of subitem

Procedure Inspection item Nature Unit Quality standard Inspection result Conclusion

98
Acceptance conclusion:

Supervisor:

Signature of acceptance organization

Construction contractor Date:

Supervisor Date:

Supplier Date:

Designer Date:

Owner Date:

4.2.10 The construction quality of subitem shall be inspected according to those specified in
Table 4.2.10 and the construction quality acceptance table of subitem shall be filled in.
According to construction quality acceptance range division table 4.2.1, no "Dominant" in
"nature" column represents "general" and for the items outside of the acceptance range, the
acceptance organization column shall be filled with "/".
Table 4.2.10: construction quality acceptance table of subitem ( )
Unit________ Nature: Table:

Name of subsection

Acceptance
No. Name of batch Nature Remarks
result

99
Acceptance conclusion:

Supervisor:

Signature of acceptance organization

Construction Date:
contractor

Supervisor Date:

Supplier Date:

Designer Date:

Owner Date:

4.2.11 The construction quality of subsections shall be inspected and accepted according to
the requirements of Table 4.2.11, and the acceptance table for acceptance table of batch shall
be filled. No "Dominant" in column "nature" means "general" according to the requirements
specified in Table 4.2.1. For the items outside of the acceptance range, the acceptance
organization column shall be filled with "/".
Table 4.2.11: construction quality acceptance table of subsection ()
Unit________ Nature: Table:
Name of
subsystem

Acceptance
No. Name of subitem Nature Remarks
result

100
Acceptance conclusion:

Supervisor:

Signature of acceptance organization

Construction Date:
contractor

Supervisor Date:

Supplier Date:

Designer Date:

Owner Date:

4.2.12 The construction quality of subsystems shall be inspected and accepted according to
the requirements of Table 4.2.11, and the acceptance table for acceptance table of batch shall
be filled. No "Dominant" in column "nature" means "general" according to the requirements
specified in Table 4.2.1. For the items outside of the acceptance range, the acceptance
organization column shall be filled with "/".
Table 4.2.12: Construction quality acceptance table of subsystem ()
Unit________ Nature: Table:
Acceptance
No. Name of subsection Nature Remarks
result

101
Acceptance conclusion:

Owner:

Signature of acceptance organization

Construction contractor Date:

Supervisor Date:

Supplier Date:

Designer Date:

Owner Date:

4.2.13 The inspection table for compulsory provision implementations in subsection shall be
inspected according to the inspection items listed in Table 4.2.13.
Table 4.2.13: Check table on the implementation of the compulsory provisions for subsection
Unit ________ Project number:
Name of
Name of subsection
subsystem

Project number Acceptance date

102
Related
No. Inspection item Implementation
information

1 Alloy steel parts and pipe material shall be carried out spectrum
test or other test before and after installing, repairing and
transforming; the type of steel shall be checked to prevent misuage

2 Under one of the following conditions, bourden gauge must not


be used: the pointer of the bourden gauge with limiting nail cannot
return to the limiting nail where no pressure is applied; the distance
from the pointer without pressure to the zero position exceeds the
specified permissible error of the bourden gauge without limiting
nail; the glass is crushed or the meter scale is slur; the sealing
stamp is damaged or the gauge exceeds the verification valid
period; internal leakage or pointer fluctuation; or other defects
effecting the accurate pressure indication

3 Meters and electromagnetic sensor elements for steam turbine unit


protective devices shall be inspected by the I&C engineer before
being installed.

4 As for the electronic protective devices for overspeed monitoring


protection, vibration monitoring protection and axial displacement
monitoring protection, the transmitting element hereof shall be
equipped wall jointly with the I&C engineer, to make the
measurement points located correctly, the test actuation digit accurate
and lead wire arranged outside of the machine

5 The clear distance of cable to heating pipe or equipment, in parallel


way, shall not be less than 1m; in intersection way, it shall not be less
than 0.5m. Otherwise, the heat insulation protection measure shall be
adopted. The cable channel shall be arranged clear away from boiler
observation hole and explosion door in coal pulverizing system;
otherwise, the heat insulation fire precautions like pipe sleeving and
enclosed slot shall be taken. the cable should not be arranged over
thermal equipment and heating pipe

6 The cable must not be arranged over or under the pipe in parallel;
in particular cases, the arrangement shall comply with the following
requirements: although the clear distance from cable to thermal pipe
(trench), oil piping (trench), combustible gas and inflammable liquid
pipe (trench), thermal equipment or other pipe (trench) meets the
requirements, the protection measures shall be arranged 1 m away
from the crosspoint backwards and forwards if the pipe overhaul may
damage the cable; of the crossing clear distance cannot meet the
requirements, the electric cable shall be sleeved by pipes and the
clear distance may be reduced to 0.25 m

103
Inspection result

Construction contractor: (seal) Supervisor: (seal)

Project technical director: Supervision engineer:

Date: Date:

4.3 General criteria


4.3.1 The general inspection items of debugging for instrument and alarm device are
detailed in Table 4.3.1.
Table 4.3.1: General inspection items of debugging for instrument and alarm device
Inspection
Procedure Inspection item Nature Unit Quality criteria methods and
instruments

Appearance Intact, rustles, no scratches Observation

Nameplate and mark Clean and meeting the design Observation

Fixed parts Complete, clean, firm


Mechanical
Movable Observation
parts Dominant Flexible motion
Inside parts

Electrical Plug-in Without loosening


Observation
Inspection parts Parts Without burns

Motor-driven Signal circuit Dominant M 20


Measuring
actuator Power circuit Dominant M 50

Insulation
Motor-driven General area Dominant M 1
resistance Measuring
valve Humid area Dominant M 0.5

Meeting the requirements of


Measuring meters Dominant M Measuring
Annex C

Calibration of potentiometer or screw and Tightened and sealed with


Observation
lock nut varnish paint
Calibration
result Meter function marks Clear Observation

treatment Clear writing, accurate data


Test record Checking
and complete items

104
4.3.2 The general inspection items of circuit debugging are detailed in Table 4.3.2.
Table 4.3.2: General inspection items of circuit debugging
Inspection methods
Procedure Inspection item Nature Unit Quality criteria
and instruments

Re-inspection rate % 95
Wiring Checking
Correct rate Dominant % 100

Meeting the requirements of


Power fuse capacity the design and in the installed Checking
capacity
Inspection Nameplate and function sign of
Clean and meeting the design Checking
equipment

Circuit General area Dominant M 1 Measuring with


insulation 500V insulation
Humid area Dominant M 0.5
resistance resistance meter

Signal cable shielding layer grounding Good Observation

Calibration of screw or retaining nut for Tightened and sealed with


Calibration Observation
potentiometer varnish paint
result
Clear writing, accurate data
treatment Test record Checking
and complete items

4.4 Installation of Sampling element and sensitive element


4.4.1 Quantity for acceptance inspection
1 The sampling elements and sensitive elements exposed to high-temperature,
high-pressure, negative-pressure, combustible, explosive, toxic and harmful media shall be
inspected by 100%.
2 The sampling elements and sensitive elements exposed to middle- and lower pressure,
normal-temperature innoxious media shall be randomly inspected by 30% according to the
type of the sampling element and sensitive element.
3 100 % alloy steel material spectrum shall be re-inspected and recorded.
4.4.2 Installation of temperature measuring element
1 Installation, inspection and acceptance of steam, water, oil pipe temperature
measuring elements are detailed in Table 4.4.2-1.
Table 4.4.2-1 Installation of steam, water, oil pipe temperature measuring elements
Procedure Nature Unit Quality criteria Inspection method
Inspection item
and instrument

Measuring Without violent


Environment Observation
point vibration
positions Meeting the design,
convenient for Check and
Measuring point positions
installation and observation
overhaul

Space Measuring with a


Measuring holes and welded joints Outside of welded ruler
joint or heat affected
105
zone

Two measuring holes mm D, and>200

Gasket material Meeting the design Check

Socket dimension Meeting the design Check


Excavation Measuring with
Measuring hole diameter error 1
of caliper
measuring Measuring with a
Open pore vertical deviation 3
holes and ruler
installation
Measuring with a
of socket Socket installation vertical deviation 1
ruler

Meet the requirements


Welding and heat treatment Checking records
of DL/T 5210.7

Intact
Appearance Observation

Measuring with 500V


Inspection Insulation M >100 insulation resistance
meter

Checking spectral
Gasket material Dominant Meeting Annex B
analysis record

Penetration High-pressure D>250 mm Should be 100

depth of high-temperature
D250 mm Should be 70
thermocouple steam Check
and thermal D>500 mm Should be 300
General liquid
resistance D500 mm Should be 1/2D
Installation Penetration depth of temperature sensing element Immerged in the tested
Dominant Check
of (bimetallic thermometer) media completely
temperature Penetration depth of temperature Dived in the medium
Dominant Observation
measuring sensing bulb completely
element
Measuring with a
Bending radius of capillary vessel mm 50
Pressure type ruler
thermometer Protective measures of capillary Complete, and easy to
Observation
vessel overhaul

Without violent
Ambient temperature Observation
change

Fastening and
Member assembly Dominant Checking record
leak-free

Its contents shall meet


the design, it shall be
Nameplate hanged firmly, and its Check
handwriting shall be
difficult to shed off

Note: DExternal diameter of measured pipe

106
2 Installation inspection and acceptance of sheathed thermocouple for non-fixing
device for measuring metal wall temperature are detailed in Table 4.4.2-2
Table 4.4.2-2 Installation of sheathed thermocouple for non-fixing device for measuring metal wall
temperature
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Type and specification Meeting the design Check

Appearance Intact Observation

Measuring with
Inspection
Insulation resistance Mm >1000 500V insulation
resistance meter

Measuring with
Grounding Meeting the design
ohmmeter

Installation position Meeting the design Check

Surface of Smoothness and cleanness Smooth and burr free Observation


Installation
fixing device
of fixing
and Manual-shaking
device
Welding Tight and firm
measured observation
metal wall

Manual-shaking
Thermocouple penetration Dominant Close and firm
observation

Heat preservation Good


Observation

Checking with
End terminal connection Dominant Correct and firm
Wiring line-checkers

Installation Wire size mark Correct, clear and unfading Observation


of Inner Manual-shaking
Fixed with cylinder wall Firm
thermocouple cylinder of observation
steam
Outgoing line exit sealing Tight and leak-free Observation
turbine

Its contents shall meet the


design, it shall be hanged
Nameplate Check
firmly, and its handwriting
shall be difficult to shed off

3 Installation inspection and acceptance of sheathed thermocouple for staple sleeve


device for measuring metal wall temperature are detailed in Table 4.4.2-3
Table 4.4.2-3 Installation of sheathed thermocouple for staple sleeve device for measuring metal wall
temperature
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Inspection Type and specification Meeting the design Check

Appearance Good Observation

107
Measuring with
Insulation resistance Mm >1000 500V insulation
resistance meter

Measuring with
Grounding Meeting the design
ohmmeter

Position Meeting the design Check

Manual-shaking
Welding Firm
observation

Meet the requirements of


Heat treatment Check
DL/T 5210.7

Installation of Socket material Meeting the design Check


socket
Conduit material Stainless steel Checking the record
Vertical
Measuring with a
installation Conduit bending radian () >130
ruler
on
100 outstretching out of the
superheater
Conduit length mm frame cover of the furnace Observation
pipe wall
top

Manual-shaking
Installation of staple sleeve device Firm
observation

Contacting closely to the Manual-shaking


Thermocouple inserting conduit Dominant
superheater tube wall observation
Installation of
Checking with
sheathed Wiring End terminal connection Correct and firm
line-checkers
thermoelectric
Wire size mark Correct, clear and unfading Observation
couple
Its contents shall meet the
design, it shall be hanged
Nameplate Check
firmly, and its handwriting
shall be difficult to shed off

4 Installation inspection and acceptance of special thermal resistance for measuring


metal wall temperature are detailed in Table 4.4.2-4.
Table 4.4.2-4 Installation of special thermal resistance for measuring metal wall temperature
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Inspection Type and specification Meeting the design Check

of Appearance Undamaged Observation


temperature
Pt M 100 Measuring with 100V
measuring Insulation
insulation resistance
element resistance Cu M 50
meter

Installation Diameter deviation of measuring hole >0.2d Measuring with a ruler


of thrust
Distance from the measuring hole edge to
pad mm 0.5 Measuring with a ruler
the working surface

108
temperature Meeting the specifications
Depth of measuring hole Measuring with a ruler
measuring of supplier
element Material
Oil proof and heat resisting Check
Outgoing line
of Manual-shaking
Welding Firm
temperature observation
measuring Firm, and the allowance
element Fixation shall be reserved for the Observation and check
wire

Its contents shall meet the


design, it shall be hanged
Nameplate Observation and check
firmly, and its handwriting
shall be difficult to shed off

Temperature measuring element and shaft Trial-assembly


Consistent
block screw thread inspection

Installation Depth of penetration Meeting the design Check

of bearing End terminal connection Dominant Correct and firm


Wiring
temperature
Wire size mark Correct, clear and unfading Observation
measuring
Its contents shall meet the
element
design, it shall be hanged
Nameplate Check
firmly, and its handwriting
shall be difficult to shed off

Measuring with
Meeting the specifications
Insulation resistance insulation resistance
Inspection of supplier
meter
of machine
Meeting the specifications
airing Resistance value Check
of supplier
temperature
Its contents shall meet the
measuring
design, it shall be hanged
element Nameplate Check
firmly, and its handwriting
shall be difficult to shed off

Note: dExternal diameter of thermal resistance

5 Installation inspection and acceptance of temperature measuring elements for fume,


air, pulverized coal pipe and equipment are detailed in Table 4.2.2-5.
Table 4.4.2-5 Installation of temperature measuring elements for fume, air, pulverized coal pipe and
equipment
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Measuring Meeting the design,


point Measuring point positions convenient for maintenance Check
position and overhaul
selection
Distance from measuring hole to welded Outside of welded joint or Observation

109
joint heat affected zone

Space of two measuring holes mm >D, and>200 Measuring with a ruler

Roughness of measuring hole edge Smooth and burr free Observation

Excavate of Convex edge facing at the


Installation direction of protection cover Observation
measuring media flow direction
holes and Manual-shaking
Fixing of protection cover Firm
installation observation
of socket Checking the air
Installation of socket Tight
pressure test records

Appearance Intact Observation

Measuring with 500V


Insulation resistance M >100 insulation resistance
Inspection
meter

Gasket material Meeting Annex B Check

Fastening, tight and


Member assembly Dominant Checking record
Installation leak-free
of Penetration depth in fume, air, pulverized
(1/3~1/2)D Measuring with a ruler
temperature coal pipes
measuring Penetrated from the top
Penetration direction
element Pulverized vertically
coal hopper Layering according to the
Depth of penetration Observation
design specification

Its contents shall meet the


design, it shall be hanged
Nameplate Check
firmly, and its handwriting
shall be difficult to shed off

Note: DExternal diameter of measured pipe

4.4.3 Installation of pressure sampling element


1 See Table 4.4.3-1 for installation inspection and acceptance of steam, water and oil
pipe pressure sampling element.
Table 4.4.3-1 Installation of steam, water and oil pipe pressure sampling element
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Measuring Measuring point positions Meeting the design Check


point Space between measuring holes and Outside of welded joint or
Observation
positions welded joints heat affected zone

Along the media flow

Pressure and direction, the pressure

temperature Position Dominant measuring hole is located Observation

measuring before the temperature


a
hole measuring hole

Distance mm >D, and>200 Measuring with a ruler

110
Over the horizontal center
Steam Dominant line or below it within the
Direction of
45 included angle
measuring
Over the horizontal center
hole on aslant Gas Dominant
line
or horizontal
Within the 45 included Observation
pipe
Liquid Dominant angle below the horizontal
center line

Material of pressure sampling stub pipe Meeting the design Check

Deviation of measuring hole diameter and


pressure sampling stub pipe internal nm 0.5~1 Measuring with a ruler
Installation
diameter
of
Smoothness of measuring hole Smooth and burr free Observation
sampling
Vertical deviation of pressure sampling
element mm 2 Measuring with a ruler
stub pipe

Position of pressure sampling stub pipe Not exceeding the pipe


Dominant Observation
inserted into the pipe internal wall

Meet the requirements of


Welding and heat treatment Check
DL/T 5210.7
Installation
Installation position Meeting the design Observation
of
sampling Inlet & outlet directions Correct Observation

element Installation and fixation Upright and firm Observation

Connection with pipes Firm and leak-free Observation

Type and specification Meeting the design Check

Installation Gasket material Meeting Annex B Check


of
Its contents shall meet the
sampling
design, it shall be hanged
valve Nameplate Check
firmly, and its handwriting
shall be difficult to shed off

a- When straight pipe length meets the requirements, positions of pressure and temperature measuring holes are unrestricted.
Note: DExternal diameter of measured pipe

2 Installation inspection and acceptance of pressure sampling element for fume, air and
pulverized coal pipes are detailed in Table 4.4.3-2.
Table 4.4.3-2 Installation of pressure sampling element for fume, air and pulverized coal pipes
Proced Inspection method and
Inspection item Nature Unit Quality criteria
ure instrument

Measur Meeting the design, convenient for


Measuring point positions Check and observation
ing installation and maintenance
point Space between measuring holes and welded Outside of welded joint or heat
Observation
positio joints affected zone
n Space of two measuring holes mm >D, and>200 Measuring with a ruler

111
selectio
Measuring hole position Symmetrical on right and left sides Observation
n

Deviation of measuring hole diameter and


pressure sampling stub pipe internal mm 0.5~1 Measuring with a ruler
diameter

Domin
Smoothness of measuring hole Smooth and burr free Observation
ant

Vertical deviation of separator sampling


mm 0.5 Measuring with a ruler
element

Diving position of pressure sampling pipe in Domin Being flush with the furnace wall
Observation
Installa furnace wall ant internal wall
tion of Inclination of furnace pressure sampling
() 30~45 Measuring with a ruler
samplin pipe
g Domin Angle and direction shall meet
Air pressure plugging prevention device Check
element ant those specified by manufactory

Meet the requirements of DL/T


Welding Check
5210.7

Inspecting the air


Sealing Tight and leak-free
pressure records

Its contents shall meet the design,


it shall be hanged firmly, and its
Nameplate Check
handwriting shall be difficult to
shed off

Note: DExternal diameter of measured pipe

4.4.4 Installation of flow sensing element and instrumentation equipment


1 Installation inspection and acceptance of nozzle and standard orifice plate are
detailed in Table 4.4.4-1.
Table 4.4.4-1 Installation of nozzle and standard orifice plate
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Inspection Type and specification Meeting the design Check


of throttling Appearance Smooth and flat Observation
device Regulating the inlet
side of the orifice plate
Inlet side edge of orifice plate Acute angle being acute at the light source;
observing, without
reflected light

Hole 0.45 0.001d


diameter Measuring with a ruler
>0.45 0.0005d
deviation

Outlet side edge of nozzle Acute angle being acute Regulating the nozzle
outlet at the light
source; observing,
112
without reflected light

Internal diameter of ring casing D~1.02D Measuring with a ruler

Consistent with ring casing


Orifice plate direction Observation
exit

Length of straight pipe section Meeting Annex C Check

Cross section Circular, free from mutating Observation

Inspection Internal wall surface of 10D upstream Clean, and free from filth,
Observation
of straight and 4D downstream pipe sections unevenness and sediments

pipe Installation direction Dominant Correct Observation

sections in Verticality of throttling component end


() 1 Measuring with a ruler
the face and pipe axis

upstream Material Meeting Annex B Check


and Thickness mm 0.1~2 Measuring with a ruler
downstream Gasket The gaskets after being
of throttling Internal diameter compacted must not irrupt Observation
component into the pipe

Fixation Firm Observation

Sealing Leak-free Check

Installation Installation record Correct and complete Observation


of pressure Within the 45 included angle
sampling Tapping Steam over the pipe horizontal
stub pipe, point on center line
condenser horizontal Gas Over the pipe Observation
and valve or tipping Within the 45 included angle
pipes Liquid below pipe horizontal center
line

Valve installation position Convenient for maintenance Observation

Valve inlet and outlet direction Correct Observation

Installation and fixation of valve Upright and firm Observation

Uniform
Installation Space Observation
of valve in
Height difference
rows mm 3 Measuring with a ruler

Connection between valve and pipe Firm and leak-free Check

Gasket material Meeting Annex B Check

Installation height deviation of two


Dominant mm 2 Measuring with a ruler
condensers

Meet the requirements of


Welding Check
DL/T 5210.7

Meet the requirements of


Heat treatment Check
DL/T 5210.7

113
Its contents shall meet the
design, it shall be hanged
Nameplate Check
firmly, and its handwriting
shall be difficult to shed off

Note: dInternal diameter of orifice plate open pore;


DInternal diameter of pipe;

d
Ratio of orifice plate internal diameter and pipe internal diameter
D
2 Installation inspection and acceptance of assemble-type long-neck nozzle are detailed
in Table 4.4.4-2.
Table 4.4.4-2 Installation of assemble-type long-neck nozzle
Inspection
Procedure Inspection item Nature Unit Quality criteria method and
instrument

Type and specification Meeting the design Check

Dimension Meeting the specifications of


Check
Inspection supplier

Straight pipe sections before and after


Meeting Annex C Check
measuring devices

Tapping point Within the 45 included angle over


Steam
on horizontal the pipe horizontal center line
Observation
or tipping Within the 45 included angle below
Liquid
pipes pipe horizontal center line

Valve installation position Convenient for maintenance Observation

Valve inlet and outlet direction Correct Observation

Installation Manual-shaking
Connection between valve and pipe Firm and leak-free
of observation

sampling Gasket material Meeting Annex B Check


condenser
Installation height difference of condenser Dominant mm 2 Measurement
and valve
Meeting the requirements of DL/T
Welding and heat treatment Check
5210.7

Installation record Correct and complete Check

Its contents shall meet the design, it


shall be hanged firmly, and its
Nameplate Check
handwriting shall be difficult to
shed off

3 Installation inspection and acceptance of annubar flowmeter are detailed in Table


4.4.4.3.
Table 4.4.4-3 Installation of annubar flowmeter
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

114
Type and specification Meeting the design Check

Appearance Without damage Observation


Inspection
Installation position Meeting the design Check

Meeting the specifications of


Dimension Check
supplier

Pressure Toward the media flow


Dynamic pressure hole Dominant
sampling direction
Observation
element Against the media flow
Installation Static pressure hole Dominant
direction direction

Perpendicularly intersecting Measuring with a ruler


sampling elements axis
with the pipe axis Observation

Superposing with the pipe


Center line of dynamic pressure hole Observation
center line

Length of straight pipe section before and Meeting the specifications of


Check
after speed regulating pipe supplier

Sealing Leak-free Observation


Installation
Inspection record Complete Observation

Its contents shall meet the


design, it shall be hanged
Nameplate Check
firmly, and its handwriting
shall be difficult to shed off

4 Installation inspection and acceptance of wing speed measurement pipe are detailed
in Table 4.4.4-4.
Table 4.4.4-4 Installation of wing speed measurement pipe
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Type and specification Meeting the design Check

Appearance Without damage Observation

Installation position Meeting the design Check

Inspection Meeting the specifications of


Dimension Check
supplier

Length of Before device 0.6D


Measuring with a
straight pipe
After device 0.2D ruler
section

Superposing with the air duct


Installation Center line of device Dominant Observation
center line

The static pressure hole is


Two or more speed measurement pipes
located in the same cross Observation
for a measuring point
section with the air duct

Parallel with the gas flow


Symmetrical centre line Dominant Observation
direction

115
Its contents shall meet the
design, it shall be hanged
Nameplate Check
firmly, and its handwriting
shall be difficult to shed off

Note: DPipe equivalent diameter

5 Installation inspection and acceptance of rotameter are detailed in Table 4.4.4-5.


Table 4.4.4-5 Installation of rotameter
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Type and specification Meeting the design Check

Appearance Without damage Observation


Inspection
Installation position Meeting the design Check

Length of straight pipe section on the


50D Measuring with a ruler
upstream side

Installation vertical deviation of taper


Dominant mm 1.5 Measuring with a ruler
pipe

Installation Firm, flat and free from Manual-shaking


Fixation
mechanical stress observation

Connection of air pipe Fastening and tight Observation

Checking with
End terminal connection Correct and firm
Wiring line-checkers

Wire size mark Correct, clear and unfading Observation


Installation Its contents shall meet the
design, it shall be hanged
Nameplate Check
firmly, and its handwriting
shall be difficult to shed off

Note: DPipe equivalent diameter

6 Installation inspection and acceptance of oval gear flowmeter are detailed in Table
4.4.4-6.
Table 4.4.4-6 Installation of oval gear flowmeter
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Type and specification Meeting the design Check

Appearance Without damage Observation


Inspection
Installation position Meeting the design Check

Meeting the specifications of


Dimension Check
supplier

Parallel with the pipe center


Installation Dial face Observation
line

Direction of arrow on the shell Dominant Consistent with fluid Observation

116
<20% flowmeter nominal Measuring with a
Deviation of pipe internal diameter
diameter ruler

Must not stretch out the pipe


Installation of gasket Observation
internal wall

Firm and free from mechanical Manual-shaking


Fixation
stress observation

Installation of filter Meeting the design Check

Checking with
End terminal connection Correct and firm
Wiring line-checkers

Wire size mark Correct, clear and unfading Observation

Its contents shall meet the


design, it shall be hanged
Nameplate Check
firmly, and its handwriting
shall be difficult to shed off

7 Installation inspection and acceptance of target type flowmeter are detailed in Table
4.4.4-7.
Table 4.4.4-7 Installation of target type flowmeter
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Type and specification Meeting the design Check

Appearance Without damage Observation


Inspection
Installation position Meeting the design Check

Meeting the specifications


Length of straight pipe section Check
of supplier

Target card Perpendicular to the flow Measuring with a ruler


Dominant
direction Observation

Consistent with flow


Arrow Dominant Observation
Direction direction

Located from the lower to


Installation of vertical pipe
the upper along the fluid Observation
section
direction

Superposing with the pipe


Installation Target card center line Measuring with a ruler
center line

Checking with
End terminal connection Correct and firm
Wiring line-checkers

Wire size mark Correct, clear and unfading Observation

Its contents shall meet the


design, it shall be hanged
Nameplate Check
firmly, and its handwriting
shall be difficult to shed off

8 Installation inspection and acceptance of turbine flowmeter are detailed in Table


4.4.4-8.

117
Table 4.4.4-8 Installation of turbine flowmeter
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Type and specification Meeting the design Check

Appearance Without damage Observation

Installation position Meeting the design Check


Inspection
Length of Upstream side m
straight pipe
Downstream side m Meeting the design Inspecting with a ruler
section

Superposing with the pipe


Turbine center line Dominant Measuring with a ruler
center line

Consistent with medium flow


Arrow direction Dominant Observation
direction

Checking with
End terminal connection Correct and firm
Installation Wiring line-checkers

Wire size mark Correct, clear and unfading Observation

Its contents shall meet the


design, it shall be hanged
Nameplate Check
firmly, and its handwriting
shall be difficult to shed off

9 Installation inspection and acceptance of vortex (vortex street) flowmeter are detailed
in Table 4.4.4-9.
Table 4.4.4-9 Installation of vortex (vortex street) flowmeter
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Type and specification Meeting the design Check

Appearance Without damage Observation

Installation position Meeting the design Check


Inspection
Meeting the specifications
Dimension Check
of supplier

Length of front and back straight pipe Meeting the specifications


Check
section of supplier

Perpendicularly intersecting
Installation Tap axis Observation
with the pipe axis

Penetration depth of vortex generating


To the pipe center Measuring with a ruler
body

Consistent with medium


Arrow direction Dominant Observation
flow direction

Distance from preamplifier to flowmeter m 20 Measuring with a ruler

Checking with
Wiring End terminal connection Correct and firm
line-checkers

118
Wire size mark Correct, clear and unfading Observation

Its contents shall meet the


design, it shall be hanged
Nameplate Check
firmly, and its handwriting
shall be difficult to shed off

10 Installation inspection and acceptance of electromagnetic flowmeter are detailed in


Table 4.4.4-10.
Table 4.4.4-10 Installation of electromagnetic flowmeter
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Type and specification Meeting the design Check

Installation position Meeting the design Check


Inspection
Lining
Without damage Observation

Located from the lower to


On vertical pipe section Dominant the upper along the fluid
direction
Direction Two measuring electrode Observation

On horizontal or tipping shall not be located on


Dominant
pipe section upward side or downward
side

Firm, flat and free from Manual-shaking


Fixation
mechanical stress observation

Installation Fluid, flange and instrument


Measuring and
Grounding Dominant shell shall have same
comparing
potential

Checking with
End terminal connection Correct and firm
Wiring line-checkers

Wire size mark Correct, clear and unfading Observation

Its contents shall meet the


design, it shall be hanged
Nameplate Check
firmly, and its handwriting
shall be difficult to shed off

11 Installation inspection and acceptance of ultrasonic flowmeter are detailed in Table


4.4.4-11.
Table 4.4.4-11 Installation of ultrasonic flowmeter
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Type and specification Meeting the design Check

Appearance Without damage Observation


Inspection
Installation position Meeting the design Check

Internal wall of process pipe Smooth and burr free Observation

119
Straight pipe
Before the flowmeter 10D
section

Measuring with a
Length After the flowmeter 5D
ruler

Probe installation position Dominant Meeting the design Check

Manual-shaking
Fixation Firm
observation
Installation
Checking with
End terminal connection Correct and firm
Wiring line-checkers

Wire size mark Correct and clear Observation

Its contents shall meet the


design, it shall be hanged
Nameplate Check
firmly, and its handwriting
shall be difficult to shed off

Note: DExternal diameter of pipe

4.4.5 Installation of level sensing element and instrumentation equipment


1 Installation inspection and acceptance of differential pressure type sampling element
for liquid-level measurement are detailed in Table 4.4.5-1.
Table 4.4.5-1 Installation of differential pressure type sampling element for liquid-level measurement
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Type and specification Meeting the design Check

Container sealing Leak-free Check

Free from skin lamination,


Inspection Appearance Observation
crack and blister

Material Meeting the design Check

Meeting the specifications


Dimension Check
of supplier

Between the tested


Position equipment and the Observation
balancing container
Installation
Valve body
of Transverse
sampling Direction Observation
Valve rod
valve Horizontal

Meet the requirements of


Welding Check
DL/T 5210.7

Installation Single-chamber Measuring with a


Vertical deviation mm <2
of balancing ruler
balancing container Elevation Dominant Meeting the design Check

120
container Measuring with a
Double-chamber Vertical deviation mm <2
ruler
balancing
Center point position and Measuring with a
container Dominant Superposition
normal liquid level line horizontal U-tube

Measuring with a
Vertical deviation mm <2
ruler

Deviation from design


Measuring with a
zero level to steam drum Dominant mm <2
ruler
zero level line

Heat expansion
Complete Observation
compensating device

Stub pipe connecting to Shall be possessed of


Observation
Compensation steam drum reflux gradient
balancing Meet the requirements of
Welding Check
container DL/T 5210.7

Length to horizontal pipe


Measuring with a
section of differential m >0.4
ruler
pressure gauge

Vertical distance from


Measuring with a
downstream pipe to drain m >10
ruler
pipe

Convenient for operation


Position of drain valve Observation
and maintenance

Upper part of the container


Heat preservation Observation
is exposed

Water compensation facilities for balancing


Complete Observation
container

Its contents shall meet the


design, it shall be hanged
Nameplate firmly, and its handwriting Check
shall be difficult to shed
off

2 Installation inspection and acceptance of electrical contact water level gauge are
detailed in Table 4.4.5-2.
Table 4.4.5-22 Installation of electrical contact water level gauge
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Inspection Type and specification Meeting the design Check

Material Meeting the design Check

Appearance Without damage Observation

Inspecting hydraulic test


Sealing Leak-free
records

121
Measuring with 500V
Insulation resistance of electrode against
M 100 insulation resistance
ground
meter

Smoothness of electrode surface Without crack or spot Observation

Trial assembly
Electrode and drum screw thread Good coordination
observation

Installation Drum vertical deviation mm <2 Measuring with a ruler

of Position of zero level electrode and normal Measuring with a glass


Consistent
measuring water level line level ruler
cylinder Bottom drainage valve Complete Observation

Valve body Transverse


Direction Observation
Valve rod Horizontal

Stub pipe connection Tight Check

Manual-shaking
Installation Fixation Firm
observation
of
sampling Its contents shall meet the

valve design, it shall be hanged


Nameplate Check
firmly, and its handwriting
shall be difficult to shed off

Checking with
End terminal connection Correct and firm
line-checkers

Wiring Wire size mark Correct, clear and unfading Observation

3 Installation inspection and acceptance of float ball level meter are detailed in Table
4.4.5-3.
Table 4.4.5-3 Installation of float ball level meter
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Type and specification Meeting the design Check


Inspection
Appearance Without damage Observation

The float ball can move


Installation Flange hole direction upward and downward free
Flange on same vertical plane
Observation
installation The float ball can move
Dimension of flange and
upward and downward free
container connecting pipe
within the measuring range

Position Meeting the design Check

Consistent with liquid level


Movement direction Dominant Observation
fluctuation
Installation
Manual-shaking
of float ball Movement degree Block-free
observation

Checking the
Sealing Leak-free
hydraulic test records

122
Its contents shall meet the
design, it shall be hanged
Nameplate Check
firmly, and its handwriting
shall be difficult to shed off

4 Installation inspection and acceptance of float-cylinder level meter are detailed in


Table 4.4.5-4.
Table 4.4.5-4 Installation of float-cylinder level meter
Proced Inspection method and
Inspection item Nature Unit Quality criteria
ure instrument

Type and specification Meeting the design Check

Installation position Meeting the design Check


Inspect
Appearance Without damage Observation
ion
Measuring with 500V
Insulation resistance M 10
insulation resistance meter

Installation mode Vertical Observation

Vertica Domin
Per meter mm <2
l ant
Installation of Measuring with a ruler
deviati Domin
guide pipe Full length mm <20
on ant

Manual-shaking
Connection of guide pipe Firm
observation

Meeting the requirements of


Position Observation
measuring range

Installation of Domin
Verticality () <2 Measuring with a ruler
outer ant
Installa
float-cylinder Installation direction Vertical Measuring with a ruler
tion
Manual-shaking
Float-cylinder actuation Block-free
observation

Proof reading the hydraulic


Sealing Leak-free
test records

Checking with
End terminal connection Correct and reliable
Wiring line-checkers

Wire size mark Correct, clear and unfading Observation

Its contents shall meet the


design, it shall be hanged
Nameplate Check
firmly, and its handwriting
shall be difficult to shed off

5 Installation inspection and acceptance of capacitance level meter are detailed in Table
4.4.5-5.
Table 4.4.5-5 Installation of capacitance level meter
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

123
Type and specification Meeting the design Check

Position Meeting the design Check

Electrode Without damage Observation


Inspection
Measuring with 500V
Meeting the specifications of
Insulation resistance M insulation resistance
supplier
meter

Located away from the


Orientation Dominant material dead corner and the Observation
inlet/outlet

Sensor Installation of metal bar


auxiliary electrode in Firm Observation
nonconductor container

Verticality Dominant () 5 Measuring with a ruler


Installation
Checking with
End terminal connection Correct and firm
Wiring line-checkers

Wire size mark Correct, clear and unfading Observation

Its contents shall meet the


design, it shall be hanged
Nameplate Check
firmly, and its handwriting
shall be difficult to shed off

6 Installation inspection and acceptance of ultrasonic (radar) level meter are detailed in
Table 4.4.5-6.
Table 4.4.5-6 Installation of ultrasonic (radar) level meter
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Type and specification Meeting the design Check

Appearance Without damage Observation


Inspection
Meeting the specifications of
Insulation resistance M Check
supplier

Position Meeting the design Check

Without barrier within the


Ambient conditions Dominant Observation
sound velocity range
Installation of
Installation in the The energy transducer shall
detector Observation
powder storehouse be away from the feed inlet

Manual-shaking
Fixation Firm
Installation observation

Checking with
End terminal connection Correct and firm
Wiring line-checkers

Wire size mark Correct, clear and unfading Observation

Its contents shall meet the


Nameplate design, it shall be hanged Check
firmly, and its handwriting

124
shall be difficult to shed off

4.4.6 Installation of analytical sampling device


1 Installation inspection and acceptance of zirconia oxygen-content analytical sampling
device are detailed in Table 4.4.6-1.
Table 4.4.6-1 Installation of zirconia oxygen-content analytical sampling device
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Type and specification Meeting the design Check


Inspection
Probe appearance Without crack or spot Observation

Direction Dominant Correct Observation

Position Meeting the design Check


Installation
Operating environment Meeting the design Check
of probe
Meeting the specifications of
Operating temperature Check
supplier

Checking the
Sealing of probe flange Good
pressure test records

Manual-shaking
Installation Fixation of furnace wall conduit Firm
observation

Wiring orientation of probe junction box Convenient for overhaul Observation

Manual-shaking
Fixation Firm
observation

Its contents shall meet the


design, it shall be hanged
Nameplate Check
firmly, and its handwriting
shall be difficult to shed off

2 Installation inspection and acceptance of steam-water analytical sampling device are


detailed in Table 4.4.6-2.
Table 4.4.6-2 Installation of steam-water analytical sampling device
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Sampling position Dominant Meeting the design Check


Installation
Valve Meeting the design Check

Installation Stub pipe Meeting the design Check

Valve position Convenient for maintenance Observation

Manual-shaking
Fixation Firm
observation

Drainage system Meeting the design Check

1
Penetration depth of sampling pipe Dominant D Measuring with a ruler
3

Welding Meet the requirements of DL/T Check

125
5210.7

Its contents shall meet the


design, it shall be hanged firmly,
Nameplate Check
and its handwriting shall be
difficult to shed off

Note: DExternal diameter of measured pipe

3 Installation inspection and acceptance of gas analytical sampling device are detailed
in Table 4.4.6-3.
Table 4.4.6-3 Installation of gas analytical sampling device
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Sampling position Dominant Meeting the design Proof reading

Valve Meeting the design Check

Stub pipe Meeting the design Check

Convenient for operation


Sampling valve position Observation
and maintenance

Manual-shaking
Installation Fixation Firm
observation

Checking the pressure


Sealing Leak-free
test records

Its contents shall meet the


design, it shall be hanged
Nameplate Check
firmly, and its handwriting
shall be difficult to shed off

4 Installation inspection and acceptance of furnace tube leak probe are detailed in Table
4.4.6-4.
Table 4.4.6-4 Installation of furnace tube leak probe
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Type and specification Meeting the design Check

Appearance Without damage Observation

Auxiliaries Complete and intact Check


Inspection
Measuring with 500V
Insulation resistance M 1 insulation resistance
meter

Meeting the design or the


Installation Position Check
specifications of manufactory

Installation of square tank and sound Meeting the specifications of


Check
conduit supplier

Manual-shaking
Installation of support Firm
observation

126
Fixation angle Dominant Correct Check

Manual-shaking
Installation of probe Dominant Correct and firm
observation

Protective facilities Complete and intact Observation

Meeting the specifications of


Cooling facilities Check
supplier

Checking with
End terminal connection Correct and reliable
line-checkers

Wiring Meeting the specifications of


Grounding Dominant Check
supplier

Wire size mark Correct, clear and unfading Observation

Its contents shall meet the


design, it shall be hanged
Nameplate Check
firmly, and its handwriting shall
be difficult to shed off

5 Installation inspection and acceptance of fly ash carbon content measuring device are
detailed in Table 4.4.6.5.
Table 4.4.6-5 Installation of fly ash carbon content measuring device
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Meeting the specifications


Open pore position Check
of supplier

Installation angle of microwave horn Meeting the specifications


Check
antenna of supplier

Manual-shaking
Installation of support Firm
observation

Manual-shaking
Installation of transmitter and receiver Dominant Correct and firm
observation

Protective facilities Complete and intact Observation


Installation
Checking with
End terminal connection Correct and reliable
line-checkers

Wiring Meeting the specifications


Grounding Dominant Check
of supplier

Wire size mark Correct, clear and unfading Observation

Its contents shall meet the


design, it shall be hanged
Nameplate Check
firmly, and its handwriting
shall be difficult to shed off

4.4.7 Installation of special instrument


1 Installation inspection and acceptance of induced displacement measuring device are
detailed in Table 4.4.7-1.
Table 4.4.7-1 Installation of induced displacement measuring device

127
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Appearance Without damage Observation

Meeting the specifications of


Gap Dominant Check
supplier
Inspection
Measuring with 500V
Insulation resistance M 5 insulation resistance
meter

Checking local dial


Consistent with the "zero"
indicator quantity
Device "zero position" scale division of the
value with indicating
mechanical hand wheel
instrument

Meeting the specifications of


Position Check
supplier

Manual-shaking
Fixation Firm
observation

Installation Gap between device iron core to rotor Meeting the specifications of
Dominant Check
flange supplier

Checking with
End terminal connection Correct and firm
Wiring line-checkers

Wire size mark Correct, clear and unfading Observation

Its contents shall meet the


design, it shall be hanged
Nameplate Check
firmly, and its handwriting
shall be difficult to shed off

2 Installation inspection and acceptance of electromagnetic vibration measuring device


are detailed in Table 4.4.7-2.
Table 4.4.7-2 Installation of electromagnetic vibration measuring device
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Type and specification Meeting the design Check

Appearance Without damage Observation


Inspection
Measuring with 500V
Insulation resistance M 5 insulation resistance
meter

Installation Fixation of vibration pickup Firm and with spring pad Observation

Position Meeting the design Check

Connection with bearing cover Dominant Rigid connection and firm Observation

Before launching, the


Inspection of vibration pickup stopping stopping screw shall be
Observation
screw disassembled and the hole
shall be blocked

128
Measuring with 500V
Insulation resistance of generator (exciter)
M 0.5 insulation resistance
shaft block against the ground
meter

Checking with
End terminal connection Correct and firm
Wiring line-checkers

Wire size mark Correct, clear and unfading Observation

Its contents shall meet the


design, it shall be hanged
Nameplate Check
firmly, and its handwriting
shall be difficult to shed off

3 Installation inspection and acceptance of current vortex measuring device are detailed
in Table 4.4.7-3.
Table 4.4.7-3 Installation of current vortex measuring device
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Type and specification Meeting the design Check

Appearance Without damage Observation


Inspection
Measuring with 500V
Insulation resistance M 5 insulation resistance
meter

Position Meeting the design Check

Meeting the specifications


Gap Dominant Check
of supplier

Manual-shaking
Fixation Firm
observation

End terminal and Checking with


Installation Correct and firm
Wiring connection line-checkers

Wire size mark Correct, clear and unfading Observation

Its contents shall meet the


design, it shall be hanged
Nameplate Check
firmly, and its handwriting
shall be difficult to shed off

4 Installation inspection and acceptance of magnetoelectric speed sensor are detailed in


Table 4.4.7-4.
Table 4.4.7-4 Installation of magnetoelectric speed sensor
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Type and specification Meeting the design Check

Appearance Without damage Observation


Inspection
Measuring with 500V
Insulation resistance M 5
insulation resistance

129
meter

Manual-shaking
Installation of speed measurement frame Firm
observation

Direction Facing against the tooth top Observation


Installation
Gasket Fastened Observation
of speed
Meeting the specifications of
measurement Gap Dominant Check
supplier
probe
Fixation Firm Observation
Installation
Checking with
End terminal connection Correct and firm
Wiring line-checkers

Wire size mark Correct, clear and unfading Observation

Its contents shall meet the


design, it shall be hanged
Nameplate Check
firmly, and its handwriting
shall be difficult to shed off

5 Installation inspection and acceptance of travel indicator measuring device are


detailed in Table 4.4.7-5.
Table 4.4.7-5 Installation of travel indicator measuring device
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Type and specification Meeting the design Check

Appearance Without damage Observation


Inspection
Measuring with 500V
Insulation resistance M 5 insulation resistance
meter

Position Meeting the design Check

Manual-shaking
Fixation Dominant Firm
observation

Checking with
End terminal connection Correct and firm
Wiring line-checkers
Installation
Wire size mark Correct, clear and unfading Observation

Its contents shall meet the


design, it shall be hanged
Nameplate Check
firmly, and its handwriting
shall be difficult to shed off

4.4.8 Installation of material weighing sensor


1 Installation inspection and acceptance of electronic belt weigher are detailed in Table
4.4.8-1.
Table 4.4.8-1 Installation of electronic belt weigher

130
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Type and specification Meeting the design Check

Appearance Without damage Observation


Inspection
Measuring with 500V
Insulation resistance M 5 insulation resistance
meter

Position Meeting the design Check

Contact area of roller wheel and


% 80 Observation
pulley
Installation
Direction of roller wheel center Perpendicular to the pulley
of speed Dominant Observation
line drive direction
measurement
Installation of roller wheel and
sensor Dominant No skidding on belt Observation
feed belt

Manual-shaking
Fixation Firm
observation

The spring leaf is


Connection of balancing frame perpendicular to the conveyer Observation

Installation belt frame, free of twisting

of weighing Meeting the specifications of


Position of hanger Check
sensor supplier
Installation
Manual-shaking
Fixation Firm
observation

Without corrosion, intense


Installation
Installation environment magnetic field and good Observation
of local
ventilation
indicating
Manual-shaking
instrument Fixation Firm
observation

Checking with
End terminal connection Correct and firm
Wiring line-checkers

Wire size mark Correct, clear and unfading Observation

Its contents shall meet the


design, it shall be hanged
Nameplate Check
firmly, and its handwriting
shall be difficult to shed off

2 Installation inspection and acceptance of weigh bridge are detailed in Table 4.4.8-2.
Table 4.4.8-2 Installation of weigh bridge
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Type and specification Meeting the design Check

Inspection Appearance Without damage Observation

Position Meeting the design Proof reading

131
Measuring with 500V
Insulation resistance Dominant M 5 insulation resistance
meter

Installation and fixation Correct and firm Observation

Checking with
End terminal connection Correct and firm
Installation Wiring line-checkers

Wire size mark Correct, clear and unfading Observation

Its contents shall meet the


design, it shall be hanged
Nameplate Check
firmly, and its handwriting
shall be difficult to shed off

4.4.9 Installation of monitoring and sensing element


1 Installation inspection and acceptance of furnace flame camera are detailed in Table
4.4.9-1.
Table 4.4.9-1 Installation of furnace flame camera
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Appearance Without damage Observation

Auxiliaries Complete Observation

Measuring with 500V


Inspection
Insulation resistance M 1 insulation resistance
meter

Type and specification Meeting the design Check

Position Meeting the design Check

Installation platform Meeting the design Check

Overhaul platform Meeting the design Check

Depth of penetration Dominant Meeting the design Check


Installation
Firm and meeting the
of light sense
Fixation Dominant requirements of the thermal Observation
probe
expansion of the main body

Gas source control Reliable Check


Installation
Meeting the specifications of
Quality of coolant Check
supplier

Checking with
End terminal connection Correct and firm
Wiring line-checkers

Wire size mark Correct, clear and unfading Observation

Its contents shall meet the


design, it shall be hanged
Nameplate Check
firmly, and its handwriting
shall be difficult to shed off

2 Installation inspection and acceptance of water level camera are detailed in Table

132
4.4.9-2.
Table 4.4.9-2 Installation of water level camera
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Appearance Without damage Observation

Auxiliaries Complete Observation

Measuring with 500V


Inspection
Insulation resistance M 1 insulation resistance
meter

Type and specification Meeting the design Check

Position Meeting the design Check

TV installation platform Meeting the design Check

Movable distance of probe Meeting the design Check

Installation Firm and meeting the


of light Fixation Dominant requirements of the thermal Observation
sense probe expansion of the main body

Gas source control Reliable Check

Installation Meeting the specifications


Probe protective facilities Check
of supplier

Checking with
End terminal connection Correct and firm
Wiring line-checkers

Wire size mark Correct, clear and unfading Observation

Its contents shall meet the


design, it shall be hanged
Nameplate Check
firmly, and its handwriting
shall be difficult to shed off

3 Installation inspection and acceptance of flame detection and monitoring probe are
detailed in Table 4.4.9-3.
Table 4.4.9-3 Installation of flame detection and monitoring probe
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Type and specification Meeting the design Check

Appearance Without damage Observation

Inspection Auxiliaries Complete and intact Observation

Measuring with 500V


Insulation resistance M 1 insulation resistance
meter

Installation Position Meeting the design Check

Measuring with
Ambient temperature 60
thermometer

133
Manual-shaking
Installation of support Firm
observation

Meet the requirements of Manual-shaking


Fixation angle Dominant
manufacture observation

Consistent with those on the


Serial number of probe Dominant Observation
panel

Protective facilities Complete and intact Check

Meeting the specifications of


Cooling facilities Check
supplier

Checking with
End terminal connection Correct and firm
Wiring line-checkers

Wire size mark Correct, clear and unfading Observation

Its contents shall meet the


design, it shall be hanged
Nameplate Check
firmly, and its handwriting
shall be difficult to shed off

4 Installation inspection and acceptance of camera are detailed in Table 4.4.9-4.


Table 4.4.9-4 Installation of camera
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Appearance Without damage Observation

Auxiliaries Complete Observation

Inspection Measuring with 500V


Insulation resistance M 1 insulation resistance
meter

Type and specification Meeting the design Check

Position Meeting the design Check

Fixation Dominant Firm Observation

Checking with
End terminal connection Correct and firm
Wiring line-checkers
Installation
Wire size mark Correct, clear and unfading Observation

Its contents shall meet the


design, it shall be hanged
Nameplate Check
firmly, and its handwriting
shall be difficult to shed off

4.5 Installation of Local Inspection and Control Instrument


4.5.1 Quantity for acceptance inspection
1 Important instruments and equipments with high temperature, high pressure, negative
pressure, water level, attacking media, flow and being combustible, explosive and toxic shall
be inspected 100%.
2 Those instruments with general parameters shall be randomly inspected 30%

134
according to the systems and functions respectively.
4.5.2 Installation of pressure/differential-pressure indicating instrument and transmitter
1 Installation inspection and acceptance of local indicating pressure gauge are detailed
in Table 4.5.2-1.
Table 4.5.2-1 Installation of local indicating pressure gauge
Proced Inspection method and
Inspection item Nature Unit Quality criteria
ure instrument

Without violent vibration and


Installation environment Observation
corrosive gas

Inspect Convenient for operation and


Installation site Observation
ion maintenance

Pressure-gauge location number Meeting the design Check

Type and specification Meeting the design Check

Height from bourden gauge center to the


m Should be 1.2~1.5 Observation
ground

Bourden Center height difference mm 3


gauges
Measuring with a ruler
installed in Space deviation mm 5
rows

Fixation Upright and firm Observation

Installa Measuring medium


Installation Domina
tion temperature greater than Shall be additionally installed
conditions of nt
60 Observation
U-tube or
Domina
annular tube Pipe length less than 3m Shall be additionally installed
nt

Domina Without leakage or mechanical


Connection between gauge head and pipe Observation
nt stress

Domina
Gasket material Meeting Annex B Check
nt

2 Inspection and acceptance of indicating pressure gauge with signal contact are
detailed in Table 4.5.2-2.
Table 4.5.2-2 Installation of indicating pressure gauge with signal contact
Proce Inspection method and
Inspection item Nature Unit Quality criteria
dure instrument

Small vibration, without


corrosive gas and ambient Observing and measuring
Installation environment
temperature being less than with thermometer
60
Inspec
Convenient for calibration
tion Installation site Observation
and maintenance

Gauge location number Meeting the design


Check
Type and specification Meeting the design

135
Height from pressure gauge center to the ground m Should be 1.2~1.5 Observation

Pressure Center height difference mm 3


gauges
Measuring with a ruler
installed in Space deviation mm 5
rows

Upright, firm and the


Fixation installation in rows shall be Observation
arranged in good order

Domin Checking with


Actuation Flexible and reliable
ant line-checkers
Connection
Measuring with 500V
point Domin
Insulation resistance M 1 insulation resistance
ant
meter

Domin Inspecting with


Install End terminal connection Correct and firm
ant line-checkers
ation Wiring
Domin
Wire size mark Correct, clear and unfading Observation
ant

Inspecting whether the


Domin Without leakage or
Joint connection joint is consistent with
ant mechanical stress
core center

Domin
Gasket material Meeting Annex B Check
ant

Additionally installed for


Buffer unit after valve the tested medium with Observation
great pressure fluctuation

Installation Measuring medium temperature Domin Shall be additionally


conditions of greater than 60 ant installed
U-tube or Domin Shall be additionally
Pipe length less than 3m Observation
annular tube ant installed

3 Installation inspection and acceptance of local differential-pressure indicating


instrument are detailed in Table 4.5.2-3.
Table 4.5.2-3 Installation of local differential-pressure indicating instrument
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Without violent vibration and


Installation environment Observation
corrosive gas

Inspection Convenient for operation and


Installation site Observation
maintenance

Differential-pressure-gauge location number Meeting the design Check

Installation Type and specification Meeting the design Check

Height from differential-pressure-gauge center to the


m Should be 1.2~1.5 Observation
ground

136
Center height difference mm 3
Measuring with a
Differential-pressure-gauges
Space deviation mm 5 ruler
installed in rows

Trial running
Fixation Upright and firm inspection and
observation

Without leakage or
Inspecting by
Joint connection Dominant mechanical stress; with
loosening joints
correct direction

Gasket material Dominant Meeting Annex B Check

Nameplate mark Correct and clear Observation

4 Installation inspection and acceptance of differential-pressure indicating instrument


with signal contact are detailed in Table 4.5.2-4.
Table 4.5.2-4 Installation of differential-pressure indicating instrument with signal contact
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Small vibration, without


Observing and
corrosive gas and ambient
Installation environment measuring with
temperature being less than
thermometer
60

Convenient for calibration


Installation site Observation
and maintenance

Differential-pressure-gauge location
Meeting the design Check
Inspection number

Type and specification Meeting the design Check

Height from differential-pressure-gauge


m Should be 1.2~1.5 Observation
center to the ground

Pressure Center height difference mm 3


gauges
Measuring with a ruler
installed in Space deviation mm 5
rows

Manual-shaking
Installation Fixation Upright and firm
observation

Checking with
Actuation Dominant Flexible and reliable
line-checkers
Connection
Measuring with 500V
point
Insulation resistance Dominant M 1 insulation resistance
meter

Inspecting with
End terminal connection Correct and firm
Wiring line-checkers

Wire size mark Correct, clear and unfading Observation

Joint connection Dominant With correct direction; Observation


without leakage or
137
mechanical stress

Gasket material Dominant Meeting Annex B Check

Nameplate mark Correct and clear Observation

5 Installation inspection and acceptance of transmitter are detailed in Table 4.5.2-5.


Table 4.5.2-5 Installation of transmitter
Proced Inspection method and
Inspection item Nature Unit Quality criteria
ure instrument

Without violent vibration and


Environment Observation
corrosive gas

Measuring with
Ambient temperature 5~55
Inspec thermometer

tion Measuring with


Environment relative humidity % 80
hygrometer

Appearance Intact and undamaged Observation

Type and specification Meeting the design Check

Installation position Meeting the design Observation

Dominan
Waterproof measures of transmitter With layering arrangement Observation
t

Distance s from transmitter installation


m 3<s<45 Measuring with a ruler
site to measuring point

Installation in rows Arranged in order and beautifully Observation

Auxiliaries Complete Observation

Manual-shaking
Fixation Firm
observation
Install
Observing and
ation Dominan
Joint connection Without leakage or mechanical stress inspecting by loosening
t
joints

Dominan Without leakage but with correct


Pipe connection Observation
t connection

Gasket material Meeting Annex B Check

Nameplate mark Correct and clear Observation

Checking with
End terminal connection Correct and firm
Wiring line-checkers

Wire size mark Correct, clear and unfading Observation

4.5.3 Switching value instrument


1 Installation inspection and acceptance of temperature switch are Table 4.5.3-1
Table 4.5.3-1 Installation of temperature switch
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Inspection Type and specification Meeting the design Proof reading

Installation position Meeting the design Proof reading

138
Appearance Intact and undamaged Observation

Installation environment Without violent vibration Observation

Gasket material Meeting Annex B Check

Switching value instrument Upright and firm Observation

Temperature sensing element Leak-free Pressure test inspection

Capillary-pipe protecting facility Dominant Intact and undamaged Observation

Checking with
Actuation Dominant Flexible and reliable
line-checkers
Connection
Installation Measuring with 500V
point
Insulation resistance Dominant M 1 insulation resistance
meter

Checking with
End terminal connection Dominant Correct and firm
line-checkers
Wiring
Correct and clear and
Wire size mark Observation
unfading

Nameplate mark Correct and clear Observation

2 Installation inspection and acceptance of pressure and differential pressure switches


are detailed in Table 4.5.3-2.
Table 4.5.3-2 Installation of pressure and differential pressure switches
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Without violent vibration and


Installation environment Observation
corrosive gas

Type and specification Meeting the design Check


Inspection
Appearance Undamaged Observation

Convenient for calibration and


Installation position Observation
maintenance

Manual-shaking
Installation Fixation Upright and firm
observation

Installation Center height difference mm 3


Measuring with a ruler
in rows Space deviation mm 5

Gasket material Meeting Annex B Check

Installation Measuring medium

conditions of temperature greater than Dominant Shall be additionally installed


Observation
U-tube or 60

annular tube Pipe length less than 3m Dominant Shall be additionally installed

Observing and
Without leakage or mechanical
Joint connection inspecting by
stress
loosening joints

Insulation resistance Dominant M Meeting Annex A Measuring with 500V


insulation resistance

139
meter

Signal contact Flexible and reliable actuation Observation

Checking with
End terminal connection Correct and firm
Wiring line-checkers

Wire size mark Correct, clear and unfading Observation

Nameplate mark Correct and clear Observation

3 Installation inspection and acceptance of flow switch are detailed in Table 4.5.3-3.
Table 4.5.3-3 Installation of flow switch
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Installation environment Without violent vibration Observation

Convenient for operation


Installation position Observation
Inspection and maintenance

Type and specification Meeting the design Check

Appearance Undamaged Observation

Manual-shaking
Fixation Upright and firm
observation

Direction Dominant Correct Observation

Inspection of hydraulic
Without leakage or
Joint connection pressure and trial
mechanical stress
running

Checking with
Actuation Dominant Flexible and reliable
Installation line-checkers
Connection
Measuring with 500V
point
Insulation resistance Dominant M 1 insulation resistance
meter

Checking with
End terminal connection Correct and firm
Wiring line-checkers

Wire size mark Correct, clear and unfading Observation

Nameplate mark Correct and clear Observation

4 Installation inspection and acceptance of level switch are detailed in Table 4.5.3-4.
Table 4.5.3-4 Installation of level switch
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Installation environment Without violent vibration Observation

Installation position Meeting the design Observation


Inspection
Appearance Undamaged Observation

Type and specification Meeting the design Check

Manual-shaking
Installation Fixation Upright and firm
observation

140
Gasket material Meeting Annex B Check

Checking with
Actuation Dominant Flexible and reliable
line-checkers
Connection
Measuring with 500V
point
Insulation resistance Dominant M 1 insulation resistance
meter

Checking with
End terminal connection Correct and firm
Wiring line-checkers

Wire size mark Correct, clear and unfading Observation

Nameplate mark Correct and clear Observation

5 Installation inspection and acceptance of travel switch are detailed in Table 4.5.3.5
Table 4.5.3-5 Installation of travel switch
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Position Meeting the design Check


Inspection
Appearance Undamaged Observation

Checking with
Actuation Dominant Flexible and reliable
line-checkers
Connection
Measuring with 500V
point
Insulation resistance Dominant M 1 insulation resistance
meter

Installation Manual-shaking
Fixation Upright and firm
observation

Checking with
End terminal connection Correct and firm
Wiring line-checkers

Wire size mark Correct, clear and unfading Observation

Nameplate mark Correct and clear Observation

4.5.4 Analysis instrument


1 Installation inspection and acceptance of gas composition analysis instrument are
detailed in Table 4.5.4-1.
Table 4.5.4-1 Installation of gas composition analysis instrument
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Type and specification Meeting the design Check

Location number Meeting the design Check

Appearance inspection Intact and undamaged Observation

Inspection Auxiliaries Complete and intact Check

Meeting the specifications of


Ambient temperature Check
supplier

Meeting the specifications of


Ambient humidity Check
supplier

141
Without violent vibration, harmful
Installation environment gas, intense radiation and Observation
electromagnetic interference

Hazardous rating of gas instrument Dominant Meeting the design Proof reading

Meeting the specifications of


Distance from sampling point Proof reading
supplier

Sender installation position Convenient for maintenance Observation

Manual-shaking
Fixation Upright and firm
observation

Installation Fixation of bolt Complete Observation

Correct, without leakage or


Joint connection Dominant Observation
mechanical stress

DC resistance of the connecting wire of Measuring with


<2.5
temperature compensator electric bridge

Checking with
End terminal connection Correct and firm
Wiring line-checkers

Wire size mark Correct, clear and unfading Observation

Meeting the specifications of


Grounding Check
supplier

2 Installation inspection and acceptance of steam-water analysis instrument are detailed


in Table 4.5.4-2.
Table 4.5.4-2 Installation of steam-water analysis instrument
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Type and specification Meeting the design Check

Location number Meeting the design Check

Appearance inspection Intact and undamaged Observation

Auxiliaries Complete and intact Observation

Meeting the specifications of


Inspection Ambient temperature Check
supplier

Meeting the specifications of


Ambient humidity Check
supplier

Without violent vibration and


Installation environment Observation
harmful gas

Analyzer installation position Convenient for maintenance Check

Manual-shaking
Installation Fixation of analyzer Upright and firm
observation

Fixation of bolt Complete Observation

Correct, free from mechanical stress


Connecting pipe Dominant Observation
and leakage

Source of cooling water Dominant Reliable Observation

142
Clean, without oil dirt, shall not be
Electrode Dominant Observation
inverted

Meeting the specifications of


Grounding Check
supplier

Connected smoothly with discharge


Overflow pipe Observation
main pipe, unimpeded

Meeting the specifications of


Total length of shielded cable Check
supplier

Checking with
End terminal connection Correct and firm
Wiring line-checkers

Wire size mark Correct, clear and unfading Observation

3 Installation inspection and acceptance of steam-water analysis station are detailed in


Table 4.5.4-3.
Table 4.5.4-3 Installation of steam-water analysis station
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Inspection Analysis station environment Meeting the design Check

Installation of equipment Meeting the design Check

Equipment appearance Intact and undamaged Observation

Equipment auxiliaries Complete and intact Observation

Meeting the specifications of


Panel, box and cabinet Dominant Check
4.6

Meeting the specifications of


Cable laying Check
4.7

Meeting the specifications of


Installation Pipe laying Check
4.8

Quality and parameters of cooling water


Meeting the design Check
sources

Drainage pipe Unimpeded Observation

Checking with
End terminal connection Correct and firm
Wiring line-checkers

Wire size mark Correct, clear and unfading Observation

Nameplate mark Correct and clear Observation

4.5.5 Actuator
1 c Installation inspection and acceptance of motor-driven actuator are detailed in Table
4.5.4-3.
Table 4.5.5-1 Installation of motor-driven actuator
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Inspection Type and specification Meeting the design Check

Appearance Intact and undamaged Observation

143
Auxiliaries Complete Observation

Measuring with 500V


Insulation resistance M 1 insulation resistance
meter

Travel switch Flexible and reliable actuation Manual inspection

Manual-shaking
Driving mechanism Flexible transmission
observation

Convenient for operation and


Position Observation
maintenance

Fixation Dominant Firm Manual observation

Distance from handwheel center to the


mm Should be 900 Measuring with a ruler
ground

Close clockwise; open Manual-shaking


Handwheel operation direction
anticlockwise observation

Opening and closing directions of Consistent with regulating


Dominant Check
actuator mechanism

Meeting the specifications of


Installation Oil mass and quality of reduction box Observation
supplier

Reduction box sealing Leak-free Observation

Consistent with thermal


Displacement of regulating mechanism Dominant Observation
expansion direction

Openair protective device Intact Observation

Checking with
End terminal connection Correct and firm
Wiring line-checkers

Wire size mark Correct, clear and unfading Observation

Connecting rod length m Adjustable, and<5 Measuring with a ruler

Manual-shaking
Connecting rod transmission Flexible and stable actuation
observation

Transmission Automatic Dominant % 1


Measuring with a ruler
idle stroke Remote operation Dominant % 1.5
Connecting
Manual-shaking
rod Connecting rod connection Firm and without looseness
observation
preparation
Manual-shaking
Connecting-rod regulating actuation Flexible
observation

Consistent with
Manual-shaking
Actuator travel Dominant regulating-mechanism total
observation
travel

2 Installation inspection and acceptance of pneumatic actuator are detailed in Table


4.5.5-2.
Table 4.5.5-2 Installation of pneumatic actuator
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

144
Type and specification Meeting the design Check

Appearance Intact and undamaged Observation

Auxiliaries Complete Observation

Measuring with 500V


Insulation resistance M 1 insulation resistance
Inspection
meter

Sealing of pneumatic system Meeting Annex D Pressure test

Manual-shaking
Piston action Flexible
observation

Installation position Meeting the design Observation

Manual-shaking
Fixation Firm
observation

Consistent with regulating Manual-shaking


Opening and closing directions of actuator Dominant
mechanism observation

Meeting the specifications of


Air supply quality Check
supplier

Consistent with thermal


Installation Displacement of regulating mechanism Dominant Observation
expansion direction

"three-breaking" protective device (power, Trial running


Reliable
signal, air) inspection

Openair protective device Intact Check

Checking with
End terminal connection Correct and firm
Wiring line-checkers

Wire size mark Correct, clear and unfading Observation

Connecting rod length m Adjustable, and<5 Measuring with a ruler

Manual-shaking
Connecting-rod transmission action Flexible and stable
observation

Automatic Dominant % 1
Connecting-rod
Measuring with a ruler
transmission Remote operation Dominant % 1.5
Connection
idle stroke
rod
Manual-shaking
preparation Connecting rod connection Firm and without looseness
observation

Manual-shaking
Connecting-rod adjusting screw Flexible calibration
observation

Consistent with
Actuator travel Dominant regulating-mechanism total Observation
travel

3 Installation inspection and acceptance of motor-driven valves motor are detailed in


Table 4.5.5-3.
Table 4.5.5-3 Installation of motor-driven valves motor

Procedure Inspection item Nature Unit Quality criteria Inspection method

145
and instrument

Type and specification Meeting the design Check

Appearance Intact and undamaged Observation

Inspection Auxiliaries Complete Observation

Measuring with 500V


Insulation resistance M 1 insulation resistance
meter

Travel switch Dominant Flexible and reliable Manual inspection

Manual-shaking
Mechanical structure Flexible transmission
observation

Trial running
Moment protection Dominant Flexible and reliable actuation
inspection

Openair protective device Intact Observation

Checking with
Installation End terminal connection Dominant Correct and firm
Wiring line-checkers

Wire size mark Correct, clear and unfading Observation

Meeting the specifications of


Oil mass of reduction box Check
supplier

Meeting the specifications of


Oil quality of reduction box Check
supplier

Reduction box sealing Leak-free Observation

4 Installation inspection and acceptance of driving arm are detailed in Table 4.5.5-4.
Table 4.5.5-4 Installation of driving arm
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Type and specification Meeting the design Check

Appearance Intact and undamaged Observation


Inspection
Convenient for operation
Installation position Observation
and maintenance

Manual-shaking
Installation Fixation Dominant Firm
observation

Meeting the specifications of


Oil quality of reduction box Check
supplier

Reduction box sealing Leak-free Observation

Openair protective device Intact Observation

Consistent with regulating


Opening and closing directions of tie bar Dominant Observation
mechanism

Manual-shaking
Transmission Flexible and stable
observation

Contact of protection switch Reliable actuation Checking with

146
line-checkers

Checking with
End terminal connection Dominant Correct and firm
Wiring line-checkers

Wire size mark Correct, clear and unfading Observation

Nameplate mark Correct and clear Observation

5 Installation inspection and acceptance of solenoid valve are detailed in Table 4.5.5-5.
Table 4.5.5-5 Installation of solenoid valve
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Type and specification Meeting the design Check

Appearance Without damage Observation


Inspection Measuring with 500V
Insulation resistance Dominant M 1 insulation resistance
meter

Manual-shaking
Fixation Upright and firm
observation

Inlet & outlet directions Dominant Correct Observation

Installation Space Uniform


Measuring with a ruler
in rows Height difference mm 3

Installation Sealing Dominant Leak-free Observation

Iron core Block-free Trial running

Checking with
End terminal connection Correct and firm
Wiring line-checkers

Wire size mark Correct, clear and unfading Observation

Nameplate mark Correct and clear Observation

6 Installation inspection and acceptance of the control system for vibration coal feeder
are detailed in Table 4.5.5-6.
Table 4.5.5-6 Installation of the control system for vibration coal feeder
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Appearance Intact and undamaged Observation

Auxiliaries Complete Observation

Installation position Meeting the design Check

Meeting the specifications of


Vibration coal Installation angle Check
supplier
Inspection feeder
Without short circuit and Inspecting with a
Coil Dominant
circuit-open multimeter

Measuring with 500V


Insulation resistance Dominant M 1 insulation resistance
meter

Installation
Fixation of control device Upright and firm Manual-shaking

147
observation

Checking with
End terminal connection Dominant Correct and firm
Wiring line-checkers

Wire size mark Correct, clear and unfading Observation

Grounding of casing Good Observation

Nameplate mark Correct and clear Observation

7 Installation inspection and acceptance of the control system for pneumatic control
valve are detailed in Table 4.5.5-7.
Table 4.5.5-7 Installation of the control system for pneumatic control valve
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Appearance Intact and undamaged Observation

Inspection Auxiliaries Complete Observation

Type and specification Meeting the design Check

Valve body arrow shall be consistent


Valve body direction Dominant Observation
with medium flow direction

Meeting valve travel requirements, Manual-shaking


Feedback mechanism
with flexible actuation observation
Installation
End terminal Checking with
Dominant Correct and firm
Wiring connection line-checkers

Wire size mark Correct, clear and unfading Observation

Nameplate mark Correct and clear Observation

4.5.6 Pneumatic local-mounted instrument


1 Installation inspection and acceptance of pneumatic local-mounted instrument are
detailed in Table 4.5.6-1.
Table 4.5.6-1 Installation of pneumatic local-mounted instrument
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Type and specification Meeting the design Check

Location number Meeting the design Check

Appearance Intact and undamaged Observation

Inspection Auxiliaries Complete and intact Check

Without violent vibration and


Installation environment Observation
corrosive gas

Convenient for operation and


Installation position Check
maintenance

Manual-shaking
Installation Fixation Firm
observation

Measurement with level


Instrument direction Vertical
ruler

Temperature measuring element Meeting the specification of 4.4.2 Check

148
Pressure and pressure-difference
Dominant Meeting the specification of 4.4.3 Check
measuring device

Outer wall gap Uniform Measuring with a ruler


Liquid level
At the same horizontal line of tested
float-cylinder Circular mark Dominant Observation
medium control-section center

Checking with
End terminal connection Correct and firm
Wiring line-checkers

Wire size mark Correct, clear and unfading Observation

2 Installation inspection and acceptance of PLC are detailed in Table 4.5.6-2.


Table 4.5.6-2 Installation of PLC
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Specification and type Meeting the design Observation

Appearance Intact and undamaged Observation

Without composition that is


Inspection Atmosphere Observation
Installation corrosive to nonferrous metal
environment Measuring with
Temperature 5~45
thermometer

Fixation Upright and firm Observation

Meeting the specifications of


Grounding Check
supplier
Installation
Checking with
End terminal connection Dominant Correct and firm
Wiring line-checkers

Wire size mark Correct, clear and unfading Observation

4.6 Installation of Control Panel (Console, Box and Cabinet)4.6.1 Quantity for
acceptance inspection
1 Control panel (console, box and cabinet) installed in rows shall be inspected 100%.
2 Control panel (console, box and cabinet) installed separately shall be inspected 30%
randomly.
3 Other installation items shall be inspected 20% randomly.
4.6.2 Installation of control panel
1 Manufacture and installation inspection and acceptance of control panel (console,
box and cabinet) and equipment base are detailed in Table 4.6.2-1.
Table 4.6.2-1 Manufacture and installation of control panel (console, box and cabinet) and equipment base
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Manufacture Type and specification Meeting the design Check

Material Meeting the design Check

Dimension Dominant mm 3 Measuring with a ruler

Deviation of diagonal Dominant mm 3 Measuring with a ruler

Assembly Straight and even Observation

149
Center deviation of fixed holes mm 1.5 Measuring with a ruler

Meet the requirements of DL/T


Welding Check
5210.7

Position Meeting the design Check

Per meter mm <1


Verticality
Full length mm <5 Measuring with a ruler

Per meter mm <1


Levelness
Full length mm <5 Measuring with a ruler

Position error and


Installation Full length mm <5 Measuring with a ruler
non-parallelism

Observation and
Curve layout Meeting the design
measurement

Base top above the ground level mm 10~20 Measuring with a ruler

Manual-shaking
Fixation Firm
observation

Paint Uniform, intact and beautiful Observation

2 Installation inspection and acceptance of control panel (console, box and cabinet) and
in rows are detailed in Table 4.6.2-2.
Table 4.6.2-2 Installation of control panel (console, box and cabinet) in rows
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Type and specification Meeting the design Check

Inspection Appearance Without damage Observation

Fitting equipment Complete and intact Check

Measuring on lateral
face and front face of
Installation Vertical deviation (per meter) Dominant mm <1.5
the panel with a ruler
and a suspension wire

Tops of two adjacent Drawing wire and


Dominant mm <2
panels measuring with a ruler
Horizontal deviation
Tops of panels in or level ruler on the
Dominant mm <5
rows panel top

Sides of two Drawing wire and


Dominant mm <1
adjacent panels measuring with a ruler
Panel surface
on upper, middle and
deviation Surface of panels in
Dominant mm <5 lower positions of the
rows
panel plane

Measuring with a feeler


Seam between panels Dominant mm <2
gauge

Broken line corner of arc panel Consistent Observation

150
Bolt rust-proof layer Intact Observation

Manual-shaking
Fixation Firm
observation

Meeting the requirements of


Grounding Check
4.9.5

Paint Uniform, intact and beautiful Observation

Nameplate mark Dominant Correct, complete and clear Observation

3 Installation inspection and acceptance of individual panel (console, box and cabinet)
are detailed in Table 4.6.2-3.
Table 4.6.2-3 Installation of individual panel (console, box and cabinet)
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Type and specification Meeting the design Check

Inspection Appearance Without damage Observation

Fittings Complete and intact Check

Not influencing passing,


Installation position Dominant convenient for overhaul Observation
and wiring

Measuring with
Ambient temperature 45
thermometer

Measuring on lateral face


and front face of the
Vertical deviation (per meter) Dominant mm 1.5
panel with a ruler and a
suspension wire

Drawing wire and


Horizontal inclination deviation(Per measuring with a ruler or
Installation Dominant mm 1.2
meter) level ruler on the panel
top

Bolt rust-proof layer Intact Observation

Manual-shaking
Fixation Firm
observation

Meeting the requirements


Grounding Check
of 4.9.5

Uniform, intact and


Paint Observation
beautiful

Correct, complete and


Nameplate mark Dominant Observation
clear

4 Installation inspection and acceptance of thermostat, protective box and connection


box are detailed in Table 4.6.2-4.
Table 4.6.2-4 Installation of thermostat, protective box and connection box
Procedure Inspection item Nature Unit Quality criteria Inspection method and

151
instrument

Type and specification Meeting the design Check

Inspection Appearance Without damage Observation

Fittings Complete and intact Check

Not influencing passing,


Installation position Dominant convenient for overhaul and Observation
wiring

Measuring with
Ambient temperature 45
thermometer

Height1.2m Dominant mm 3 Measurement with


Vertical
suspension wire and
deviation Height>1.2m Dominant mm 4
ruler

Arrangement Regular Observation

Installation Manual-shaking
Fixation Firm
observation

Meeting the requirements of


Grounding Check
4.9.5

Insulating layer of thermostat Intact Observation

Connected to the external of


Discharge pipe Observation
the box

Uniform, intact and


Paint Observation
beautiful

Nameplate mark Dominant Correct, complete and clear Observation

4.6.3 Installation of instruments on panel


1 Installation inspection and acceptance of instrument on panel are detailed in Table
4.6.3-1.
Table 4.6.3-1 Installation of instruments on panel
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Without damage and


Inspection Appearance Observation
looseness

Fittings Complete and intact Check

Actuation Dominant Flexible Trial running


Contact Observation and
Contact Dominant Close and reliable
measurement

Nameplate mark Dominant Clear and complete Observation

Drawer of drawer-type Drawer


Flexible and block-free Trial running
switch box actuation

Drawer of Mechanical interlocking


Correct and reliable Trial running and
drawer-type actuation
measurement
switch box
Electrical interlocking Correct and reliable

152
actuation

Contact of power circuit


Dominant Good
inserter
Box drawer Measurement
Contact of secondary
Dominant Good
circuit inserter

Position Correct Check

Instrument Supporter Firm Trial running

Panel surface Dominant Without deformation Observation

Instrument connection Without mechanical stress Inspection


Installation
Disassembly and assembly of instrument Convenient Observation

Checking with
End terminal connection Correct and firm
Wiring line-checkers

Wire size mark Correct, clear and unfading Observation

2 Installation inspection and acceptance of distributed control system are detailed in


Table 4.6.3-2.
Table 4.6.3-2 installation of distributed control system
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Type and specification Meeting the design Check


Inspection
Appearance Intact and undamaged Observation

Auxiliaries Intact and complete Check

Installation environment Meeting the design Check

System hardware Correct and firm Check and inspection

Insulation resistance of assembly Meeting the specifications of


Dominant M Measurement
common point to equipment cabinet supplier

External equipment Correct and firm Check

Network cable connection Dominant Correct and reliable Check


Installation
Grounding mode Meeting the design Check
Grounding Meeting the specifications of
Grounding resistance Measurement
supplier

Checking with
End terminal connection Dominant Correct and firm
Wiring line-checkers

Wire size mark Correct, clear and unfading Observation

Power supply Meeting the design Check

3 Installation inspection and acceptance of digital display instrument are detailed in


Table 4.6.3-3.
Table 4.6.3-3 Installation of digital display instrument
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

153
Type and specification Meeting the design Check
Inspection
Installation position Meeting the design Check

Manual-shaking
Fixation Upright and firm
observation

Appearance Intact and undamaged Observation

Grounding Good Measurement

Measuring with insulation


Insulation resistance Dominant M Meeting Annex A
Installation resistance meter

Checking with
End terminal connection Correct and firm
line-checkers
Wiring
Correct, clear and
Wire size mark Observation
unfading

Nameplate mark Correct and clear Observation

4 Installation inspection and acceptance of recording instrument are detailed in Table


4.6.3-4.
Table 4.6.3-4 Installation of recording instrument
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Type and specification Meeting the design Check


Inspection
Location number Meeting the design Check

Inclination deviation () 2 Measuring with angle rule

Manual-shaking
Fixation Upright and firm
observation

Appearance Intact and undamaged Observation

Grounding Good Measurement


Installation Measuring with insulation
Insulation resistance Dominant M Meeting Annex A
resistance meter

Checking with
End terminal connection Correct and firm
Wiring line-checkers

Wire size mark Correct, clear and unfading Observation

Nameplate mark Correct and clear Observation

5 Inspection and acceptance of survey instrument are detailed in Table 4.6.3-5.


Table 4.6.3-5 Survey instrument
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Type and specification Meeting the design Check


Inspection
Installation position Meeting the design Check

Manual-shaking
Installation Fixation Upright and firm
observation

154
Fittings Complete Observation

Grounding Good Observation

Measuring with
Insulation resistance Dominant M Meeting Annex A insulation resistance
meter

Checking with
End terminal connection Correct and firm
Wiring line-checkers

Wire size mark Correct, clear and unfading Observation

Nameplate mark Correct and clear Observation

6 Installation inspection and acceptance of flashing-signal alarm devices and large


screen display are detailed in Table 4.6.3-6.
Table 4.6.3-6 Installation of flashing-signal alarm devices and large screen display
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Type and specification Meeting the design Check


Inspection
Installation position Meeting the design Check

Manual-shaking
Fixation Upright and firm
observation

Auxiliaries Complete Observation

Grounding Good Observation

Measuring with
Meeting Annex A of this
Installation Insulation resistance Dominant M insulation resistance
Part
meter

Checking with
End terminal connection Dominant Correct and firm
Wiring line-checkers

Wire size mark Correct, clear and unfading Observation

Nameplate mark Correct and clear Observation

7 Installation inspection and acceptance of the control system for PLC are detailed in
Table 4.6.3-7.
Table 4.6.3-7 Installation of the control system for PLC
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Type and specification Meeting the design Check


Inspection
Positions of inserter and plug Meeting the design Check

Installation Fixation Upright and firm Observation

Meeting the specifications


Grounding Measurement
of supplier

Flashboard and inserter Upright and firm Manual inspection

Insulation resistance Dominant M Meeting Annex A Measuring with


insulation resistance

155
meter

Checking with
End terminal connection Dominant Correct and firm
Wiring line-checkers

Wire size mark Correct, clear and unfading Observation

Nameplate mark Correct and clear Observation

4.7 Laying and Wiring of Wire and Cable


4.7.1 Quantity for acceptance inspection
1 Installation of cable main bridge and vertical shaft shall be inspected 100% according
to the inspection batch.
2 Distance between the cable and expansion equipments/heat distribution pipes shall be
inspected 100% according to the inspection batch.
3 Control and electric circuit installed in the areas with potential explosion or fire
hazard shall be inspected 100% according to the inspection batch.
4 Other installation items shall be inspected 30% randomly according to inspection
batch.
4.7.2 Installation of cable bridge (support)
1 See Table 4.7.2-1 for installation inspection and acceptance of cable bridge.
Table 4.7.2-1 Installation of cable bridge
Proced Inspection method and
Inspection item Nature Unit Quality criteria
ure instrument

Type and specification Meeting the design Check


Inspect
Cladding Intact Observation
ion
Appearance Without distortion or deformation Observation

Install Position Meeting the design Check


ation Support height deviation 5 Measuring with a ruler

Horizontal Per meter mm 2


inclination Measuring with a ruler
Total length mm 10
deviation

Vertical Per meter mm 2


Measuring with a ruler
deviation Total length mm 10

Inside bending radius Dominant mm >300 Measuring with a ruler

One every other 30m in the


Steel bridge
straight section and complete
Compensatio Aluminum alloy or glass fiber One every other 15m in the
n devices of plastic bridge straight section and complete
Observation
bridge Expansion joints crossing
Dominant One and complete
buildings

Connection of bridges with different


Gentle transition Observation
heights (widths)

Butt of bridge Without misalignment Observation

Installation of bridge cover plate Dominant Firm and convenient for Observation

156
disassembly

Fastening, nuts are placed outside


Bridge bolted connection Dominant Observation
of the groove

Interlaminar central distance mm 200 Measuring with a ruler

Support post space Meeting the design Measuring with a ruler

Position Meeting the design Check and observation


Install
ation Support vertical space in the vertical shaft Dominant m 1 Measuring with a ruler

of Vertical error % 0.2 height of vertical shaft Measuring with a ruler


vertica
Horizontal deviation of support cross brace % 0.2 width of vertical shaft Measuring with a ruler
l shaft
Fixation of vertical shaft Dominant Firm Observation

Connecting auxiliaries of bridge and


Correct and complete Observation
vertical shaft

Paint Uniform, intact and beautiful Observation


Others
Meet the requirements of DL/T
Welding Check
5210.7

Grounding Meeting the requirements of 4.9.5 Measurement

2 Installation inspection and acceptance of independent cable support are detailed in


Table 4.7.2-2.
Table 4.7.2-2 Installation of independent cable support
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Cable m 0.4~0.8
Horizontal
Wire duct and Measuring with a ruler
Support laying m <2
conduit
space
Vertical Cable m 0.8~1.2
Measuring with a ruler
laying Wire duct and conduit m <2

Top height Per meter mm 2


difference of Measuring with a ruler
Installation Total length(5m) mm 10
supports in rows

Vertical deviation (per meter) mm 2 Measuring with a ruler

Fixation Dominant Firm and beautiful Observation

Uniform, intact and


Paint Observation
beautiful

Meeting the requirements of


Grounding Measurement
Article 4.9.5

3 Installation inspection and acceptance of wire slot are detailed in Table 4.7.2-3.
Table 4.7.2-3 Installation of wire slot
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Installation
Appearance Without distortion or Observation

157
deformation

installation of wire slot Dominant Straight and even Observation

Fastening, nuts are placed


Bolted connection Dominant Observation
outside of the groove

Connection of wire slots with different


Gentle transition Observation
widths

Complete and convenient for


Cover plate of wire slot Observation
disassembly and assembly

Fixation Dominant Firm and beautiful Observation

Open pore Mechanical processing Observation

Paint Uniform, intact and beautiful Observation

Bolt auxiliaries Complete Observation

Meeting the requirements of


Grounding Measurement
4.9.5

4 Installation inspection and acceptance of support and hanger are detailed in Table
4.7.2-4.
Table 4.7.2-4 Installation of support and hanger
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Horizontal Cable conduit m 1~15 Measuring with a


Support
laying Cable m 0.8 ruler
installation
Vertical Cable conduit m 1.5~2 Measuring with a
space
laying Cable m 1 ruler

Measuring with a
Space deviation mm 1
ruler

Measuring with a
Vertical deviation mm 2
ruler
Installation
Measuring with a
Height deviation of cable supports Dominant mm 5
ruler

Support height deviation of cable Measuring with a


Dominant mm 3
conduit ruler

Meet the requirements of DL/T


Welding Check
5210.7

Paint Uniform, intact and beautiful Observation

Manual-shaking
Fixation Firm
observation

5 Installation inspection and acceptance of wiring pipe, cable conduit and metal hose
are detailed in Table 4.7.2-5.
Table 4.7.2-5 Installation of wiring pipe, cable conduit and metal hose
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

158
In the pipe Without sundries and burr Observation

Inspection Out of the pipe Without hollow, damage or corrosion Observation

Bending part Without crack and obvious hollow Observation

Exposed wiring
6D
pipe laying
Bending radius Measuring with a ruler
Meet requirements of cable bend radius
Cable conduit
in a pipe

Difference of elbow diameters Dominant <10%D Measuring with a ruler

Internal diameter of pipe 1.5 Measuring with a ruler

Flexibility () 90 Measuring with a ruler

Quantity of General elbow 3


Observation
conduit elbows Square elbow 2
Siphon

Fixation Adopting U bolt, anchor ear or clip Observation

Pipe opening Dominant Smooth and burr free Observation

Distance from pipe opening to


mm 500 Measuring with a ruler
equipment

Single pipe installation Straight and even Observation

Pipe opening
Consistent Observation
Installation in height

rows Bend radian Consistent Observation

Arrangement Dominant Regular Observation

Height of a pipe over platform m Should >1 Measuring with a ruler

Distance Parallel laying mm 500


from
Measuring with a ruler
insulation Cross laying mm 250
layer

Pipe and pipe Firm


Installation
Connection Mechanical hole opening on the side Observation
of cable Pipe and bridge
surface of bridge, threaded connection
conduit
Length of metal pipe jointing Check and
Dominant >2.2D
sleeve measurement

Sleeve joint or cutting grafting


(1.1~1.8)d Observation
depth of hard plastic pipe

Pipe opening blockage Good Observation

Paint Uniform, intact and beautiful Observation

Appearance Without crack or collapse Observation


Installation
Single pipe Proper reserved length Observation
of metal
In groups Arrangement Regular Observation

159
hose Radian Consistent

Height Consistent

Joint screw thread Proper cooperation Observation

Coupling Dominant Complete Observation

Fixed connection Firm Observation

Not influencing normal operation of


Laying of threading pipe and
Others Dominant locomotive equipment and equipment Observation
metal hose
overhaul

Note: D External diameter of wiring pipe (or cable) conduit;


dInternal diameter of wiring pipe (or cable) conduit:

External diameter of bunched conductor (cable)

4.7.3 Laying and fixing of cable


1 Inspection and acceptance of cable laying are detailed in Table 4.7.3-1.
Table 4.7.3-1 Cable laying
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Type and specification Meeting the design Check

Appearance Without hollow or damage Observation


Inspection Measuring with
Insulation resistance M 1 500V insulation
resistance meter

Freezing-resistance jacket control


Laying Dominant M -20
cable

Rubber insulation PVC jacket


Dominant -15
control cable

Ambient PVC insulation and jacket control Measuring with


Dominant 0
temperature cable thermodetector
C1 Dominant -40~+60

Optical C2 Dominant -30~+60

cable C3 Dominant -20~+60

C4 Dominant -5~+60

Distance Parallel laying mm 500


from cable
Measuring with a
to
ruler
insulating Cross laying mm 250

layer

Interlayer Cable and conduit mm 150~200 Measuring with a


distance Cable and cable mm 150~200 ruler

Cable Measuring with a


Sheathed cable 12
bending ruler

160
radius
Unsheathed cable 6

Shielded flexible cable 6

Fire-resistant cable 8

Fluoroplastic insulation and


10
jacket cable

Static 15
Optical
cable
Dynamic >120

Distance from cable to non-insulated hot Measuring with a


m 1
surface ruler

Regular, less intersection,


Cable arrangement Observation
without twist

Cable layering Meeting the design Check

Laying records Dominant Clear and complete Observation

Correct, complete, clear Check and


Nameplate mark
and difficult of shedding observation

Layering of shielded cable and common


Meeting the design Check
cable

Meeting the design or


Distance from power cable Dominant Observation
Annex E

Cable arrangement Regular Observation

Radian of cable turning the corner Consistent arrangement Observation

Vertical laying On each support

Horizontal laying At both ends Observation

Fixed position of cable At conduit section Before and after conduit


Arrangement clip
Before the panel mm 300~400
and fixation Measuring with a
Before the wiring
mm 150~300 ruler
box

Measuring with a
Before terminal row mm 150~300
Fixed position of cable ruler
clip Cable turning and At turning (branching)
Observation
branching point

Note: Cable diameter

2 Inspection and acceptance of wire and compensating wire laying are detailed in Table
4.7.3-2.
Table 4.7.3-2 Laying of wire and compensating wire

161
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Type and specification Dominant Meeting the design Check

Signal circuit M 2
Measuring with 500V
Compensating wire M10m 5
Insulation resistance insulation resistance
24V wire M 0.1
meter

Installation >24V wire M 1

Straight and even without


Wire laying Observation
twist

End terminal
Dominant Correct and firm
Wiring connection Observation

Wire size mark Correct and clear

4.7.4 Manufacture, installation and wiring of cable head


Inspection and acceptance of manufacture, installation and wiring of cable head are
detailed in Table 4.7-4.
Table 4.7.4 Manufacture, installation and wiring of cable head
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Manual-shaking
Sheathed cable steel hoop Fastening
observation
Manufacture Regular, beautiful and free
Wrapping of cable head Observation
and from leakage
installation
Wrapping length Consistent Observation
of cable
Arrangement Dominant Regular Observation
head

Fixation Firm and beautiful Observation

Without oxidizing layer or


Wiring Core wire surface Observation
scar

Clockwise, and with proper


Core wire bending ring direction Dominant Observation
size

Bolt and washer Complete and fastened Observation

Pressure welding of wiring sheet Fastened Manual trial running

Winding displacement Regular and beautiful Observation

Measurement and
Standby core To the farthest terminal
observation

Checking with
Core wire and terminal Good contact
line-checkers

Wiring Dominant Correct and firm Observation

Wire bending radian Consistent Observation

Wire size Wire size mark Correct, clear and unfading Observation

162
Consistent with letter
Writing direction
orientation

Meeting the requirements of


Shielding layer grounding Dominant Check
Article 4.9.5

4.8 Pipe laying and Connection


4.8.1 Quantity for acceptance inspection
1 Those instrument pipes with high temperature, high pressure, negative pressure,
attacking media, important technological parameters, being combustible, explosive and toxic;
those metering, safety, linkage and warning instrument pipes as well as the attached pipes in
instrument panel (console, box and cabinet) shall be inspected 100 %.
2 Those instrument pipes without harmful medium and with general technological
parameters shall be inspected 30% randomly according to systems.
3 Alloy steel material spectrum shall be re-inspected and recorded 100 %.
4.8.2 Pipe laying
1 Inspection and acceptance of pipe laying are detailed in Table 4.8.2-1.
Table 4.8.2-1 Pipe laying
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Meeting the requirements of the


Type and specification Check
design or Annex F

Inspection Without crack, scar or skin


Appearance Observation
lamination

Internal Dominant Clean and unimpeded Observation

Metal 3D
Bending radius Measuring with a ruler
Plastic 4.5D

Ellipticity Dominant % 10 Measuring with a ruler

Bend radian of pipes in rows Regular and beautiful Observation

Pipe surface Without crack or drop pit Observation

Pipe Pressure
m 150
processing measuring pipe

Micro-pressure and
Length of
vacuum measuring m 100
measuring Measuring with a ruler
pipe
pipe
Water level and
flow measuring m 50
pipe

Pipe Space Cable and pipe mm 200 Measuring with a ruler


laying Oil pipe and hot
surface (during mm 150
cross laying)

Water-level-gauge mm 150
pipe and

163
high-temperature
hot surface

Central distance of
2D
two pipes

Pressure pipe % 1
Measuring with ruler
Gradient Pressure
>1/12 and drawing wire
difference pipe

Meeting the requirements of DL/T


Gradient inclination direction Observation
5190.5-004

Pipes with the


Without staggered joint Observation
same diameter
Contra
Internal diameter
aperture of
difference of pipes
pipe mm 1 Measuring with a ruler
with different
diameters

Meeting the requirements of


Welding Check
D/T5910.5-2004

Fixation of pipe Firm Observation

Fixation of stainless steel pipes Firm and separated from the support Observation

Pipe arrangement Regular and beautiful Observation

Horizontal
m 1.0~1.5, uniform
laying
Measuring with a ruler
Vertical
Pipe Seamless steel pipe m 1.5~2.0, uniform
laying
support
Horizontal
space m 0.5~0.7, uniform
laying
Measuring with a ruler
Copper pipe and Vertical
m 0.7~1.0, uniform
plastic pipe laying

Cable head
Regular and beautiful
Laying of manufacture

nylon Cable core Observation


Correct
cable connection

Laying sealing Straight, without tension

Sealing Dominant Meeting Annex D Check

Appearance Regular and beautiful

Nameplate Contents Correct Observation

Handwriting Intact and clear

Paint Intact Observation

Note: DExternal diameter of pipe

2 Inspection and acceptance of piping in panel and for transmitter are detailed in
Table 4.8.2-2.
Table 4.8.2-2 Piping in panel and for transmitter

164
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Type and specification Meeting the design Check

Without crack, scar or skin


Appearance Observation
Inspection lamination

Internal Clean and unimpeded Observation

Arrangement Dominant Regular and beautiful Observation

Uniform and convenient for


Pipe distance Observation
maintenance

Height of conduit over platform Consistent Observation

Sealing between inlet/outlet pipes of


Tight Observation
thermostat and the cabinet body
piping Arrangement of annular pipes in the
Regular and beautiful Observation
panel

Manual-shaking
Fixation Firm
observation

Correct, without leakage or Observing after the


Connection
mechanical stress joint is demounted

4.8.3 Installation of instrument valve, blowdown and separation containers


1 Installation inspection and acceptance of stop valve and pressure relief valve are
detailed in Table 4.8.3-1.
Table 4.8.3-1 Installation of stop valve and pressure relief valve
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Type and specification Meeting the design Check

Appearance Without damage Observation

Inspection Manual-shaking
Threaded connection Proper
observation

Installation of valve body Upright Observation

Directions of inlet and outlet Dominant Correct Observation

Manual-shaking
Fixation Firm
observation

Space Uniform Observation


Installation in rows
Installation
Height difference mm 3 Measuring with a ruler

Clip and bolt Complete Observation

Sealing Meeting Annex D Check

Nameplate mark Correct and clear Observation

2 Installation inspection and acceptance of blowdown container are detailed in Table


4.8.3-2.
Table 4.8.3-2 Installation of blowdown container

165
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Type and specification Meeting the design Check


Inspection
Outlet and inlet Unimpeded Observation

Installation of container Dominant Straight and even Observation

Gradient of discharge pipe 1/20 Measuring with a ruler

Installation Cover plate of discharging container Open and close flexibly Observation

Sealing of discharging container Leak-free Observation

Fixation Firm Observation

3 Installation inspection and acceptance of separation container are detailed in Table


4.8.3-3.
Table 4.8.3-3 Installation of separation container
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Type and specification Meeting the design Check

Appearance Without damage Observation


Inspection
Manual-shaking
Threaded connection Proper
observation

Main body installation Upright Observation

Sealing Dominant Leak-free Observation

Fixation Firm Observation


Installation
Pipe connection Dominant Correct Observation

Filling with spacer fluid Meeting the design Check

Nameplate mark Correct and clear Observation

4.9 Protection and Grounding


4.9.1 Quantity for acceptance inspection
1 Those protection and grounding projects in places with potential explosion and fire
hazard shall be inspected 100%.
2 Those protection and grounding projects in places without potential explosion and
fire hazard shall be inspected 30% randomly according to systems.
4.9.2 Explosion proof and fire proof
1 Inspection and acceptance of I&C explosion-proof installation project are detailed in
Table 4.9.2-1.
Table 4.9.2-1 I&C device explosion-proof installation project
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Inspection Appearance Type and specification Meeting the design Check


of Nameplate and explosion-proof
Correct and clear Observation
equipment distinctive mark "Ex"

Shell, wiring column and insulation Without crack or damage Observation

166
piece

Explosion-proof surface and


Good sealing and complete Observation
service entrance

Product certificate and explosion-proof


Complete and effective Check
technical verification record

Auxiliaries Complete Check

Installation Ventilation, without corrosive


of Ambient environment gas or gas with dust, convenient
Installation of
equipment for overhaul
explosion-proof
Looseness-proof measures Complete, without looseness Observation
instrument and
of fastening blots and corrosion
auxiliaries
Compact, intact, sealing of
Isolation and sealing
unused eyelet, without omission

Installation of Grounding connection Reliable and intact


explosion-proof
Mark with power (must not Observation
instrument and Clear and obvious
be moved)
auxiliaries

Threaded connection, effective


meshing screw thread 6 screw
thread, locknut shall be locked
Connection inspection tightly, conductive anti-rust
grease shall be coated on the
screw thread, with good Observation
electrical continuity

Rotatable parts Uniform and without friction

Internal and external gaps shall


Installation
Wall-passed conduit Dominant be filled compactly and
connection
completely
between conduits
Welding must be forbidden,
and other pipe Manual-shaking
Fixing of conduit conduit clip fixation shall be
fittings and observation u
firm
equipments
Conduit opening blockage Dominant Tight

Hazardous rating shall meet


relevant requirements,
installation shall be firm and Observation
Installation of wiring box
without looseness, without
corrosion, sealing of entrance
hole shall be intact

Meeting the design Testing with


Static protective grounding
specification multimeter

Explosion-proof Meeting the design


Material Check
sealed pipe specification

167
Filling Dominant Compact and intact Observation

Space with equipments m 0.45 Measuring with a

Metal hose length m 0.45 ruler

Positive draft Air pipe Unimpeded Test and observation


and
Meeting the design
explosion-proof Air pressure Check
specification
device

Wiring connection (pressing Wiring fastening and good Manual-shaking


or bolted joint) contact observation
Wiring in
Testing with
explosion places One point shall be grounded,
Shielding grounding insulation resistance
wiring firm
meter

When its density is greater that


that of the air, cables shall be
laid overhead, perforating or
closed-type cable bridge shall
be adopted
Inflammable gas locations When its density is less than
that of the air, cables shall be
Cable line
laid in the lower place,
perforating or closed-type cable

Cable laying bridge or cable trench shall be Observation


adopted

Shall be laid at the side with


Along general medium pipe less explosion or hazard
possibility

When density of the pipe


Cables laid along pipes
medium is less than that of the
transporting inflammable
air, cables should be laid below
gas or liquid
the process pipes

Fixation of cable Firm

2 Inspection and acceptance of I&C fire-proof inflaming-retarding installation project


are detailed in Table 4.9.2-2.
Table 4.9.2-2 I&C device fire-proof inflaming-retarding installation project
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Type and quality shall meet


Inspecting technical
the relevant requirements of
or product
the design and GB/T 12666;
Material Flame retardant cable identification reports
with quality qualification
compared to the
and product certificate
design drawing
approved by the authority

168
Meeting the design
specification, is applicable to
Inspecting technical
the project environment and
or product
with durability and
Type and material identification reports
reliability. Identification
compared to the
information and product
design drawing
qualification certificate shall
Fireproof
be complete
material
Combustion performance
Close-type fire-proof box and
shall reach the requirements
fire-proof clapboard used for
for Class A or Class B
cables
specified in GB 8624-2006 Check

Cable fire-proof coating Meeting the design

Fire-proof putty and


Meeting the design
fire-retardant package
Inspection Observation
Fire passage Unimpeded
inspection
Cable interlayer
Fire alarm and fire extinguishing Meeting the design, with
Check and test
devices feasible actuation

Arrangement of fire-retardant According to the design Inspection comparing


Dominant
partition wall specification with drawing

Fireproof packages shall be


Crotch of cable channel
filled and without gaps

Soft fireproof putty such as


Fire-retardant fireproof package and
partition wall Cable interlayer of cable channel mineral wool block shall be Observation

entering into the control room infilled and without gaps, inspection

fire retardant separation shall


be carried out

Cable interlayer of unit control Partition wall shall separate


room the interlayer among units
Fire-proof
Meeting the design
facilities Entering into DCS signal cable
specification
and
Standby manually-operated
measures Meeting the design
furnace shutdown and machine
specification
Locations with shutdown lines

flame retardant Oil tanks, oil pipes and heat pipes Fire-retardant separation
cables
According to the design
specification (such as cables
Other areas that are easy to Field inspection
and flame-check cables at
trigger cable fire disaster
the steam turbine regulating
door)

169
Installation of refractory liner Dominant Firm Pulling inspection
Panel, console,
Firm, compact and without Observation
box and cabinet Fireproof putty Dominant
gaps inspection

Fireproof package Compact and without gaps Observation

Fireproof putty Dominant Compact and light proof inspection


Wall-penetration
floor slab Pulling and
Installation of fireproof
Firm and light proof observation
Hole clapboard
inspection
blockage
In the shaft opening that passing Fireproof package or
through channel (tunnel) or floor Dominant fireproof putty shall be
slab infilled
Cable shaft
Fireproof package or
Length of cable shaft larger than Observation
Dominant fireproof putty shall be
7m inspection
infilled every other 7m

Cable pipe opening blocked tightly, and putty Observation


Dominant mm 2~5
bulges inspection

4.9.3 Anti-freezing
1 See Table 4.9.3-1 for inspection and acceptance of steam-tracing anti-freezing
project.
Table 4.9.3-1 Steam-tracing anti-freezing project
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Closely contacted with measuring


Installation Heavy trace pipe
pipe

With a certain distance away from


Light trace pipe
Position measuring pipe Observation

Heating degree of positive and


Pressure-difference pipe
Dominant negative pressure pipes shall be
tracing
consistent

Pumping device Unimpeded Observation

Sealing Leak-free Check

Connection Welded connection, single circuit


shall supply steam and return water,
Connection of tracing pipes Check and observation
each circuit without serial
connection

Shall not be fixed excessively


Fixation of trace pipes tightly and shall be able to stretch Observation
freely

Tracing valves Tracing pipe inlet equipped with Inspection


stop valve, steam trap equipped
with stop valve during return water
mode, valve operation shall be 170
convenient and flexible

Tracing steam parameter Dominant MPa Pressure should be 0.3~1.0 Observation

Measuring pipe and trace pipe shall


be in the same insulation shell
Heat preservation which shall not influence tracing; Observation
medium shall not freeze or vaporize
medium in the measuring pipe

Meeting the anti-freezing


Heating effect Inspection
requirements

2 Inspection and acceptance of electric-tracing anti-freezing project are detailed in


Table 4.9.3-2.
Table 4.9.3-2 Electric-tracing anti-freezing project
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Type and specification Meeting the design Check

Shall be greater than the


Heat-resisting temperature of heating wire temperature transited to the
Dominant Inspection
scarfskin heating wire scarfskin during
measuring pipe washing

Overhaul power supply shall


not be used; voltage and current
Tracing power supply, voltage and current Inspection
shall conform to the technical
requirements of heating wire

Installation Meeting the design


Laying of heating wire Dominant Observation
requirements

In the insulation shell and away


Temperature sensor installation position Observation
from heating wire

Fixation of heating wire Firm Inspection

Measuring with 500V


Insulation resistance M 1 insulation resistance
meter

Meeting the anti-freezing


Heating effect Inspection
requirements

4.9.4 Corrosion-proof
Inspection and acceptance of I&C corrosion-proof construction are detailed in Table
4.9.4.
Table 4.9.4 I&C device corrosion-proof construction
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Painting Positions to be painted Meeting the design requirements Check

171
Meeting the design requirements;
pipes that might contact high
Paint performance and specification Check
temperature shall be painted with
high temperature lacquer

Coating area Meeting the design requirements Check

Without such dirt as rust, welding


Treatment of painting surface Observation
slag, burr, oil and water

Carried out after pressure test of the


Painting time of instrument pipes system, and the ambient temperature Observation
is 5~40

Uniform, firm, without painting skip


and peeling phenomenon; lower track
Coating quality Dominant painting shall be carried out after the Observation
film is completely dry during the
multi-layer painting

Pipes with hazardous media (such as


oil, hydrogen and gas) shall be
Coating color Observation
painted with the finishing paint of the
same color with the main system

Cable and instrument tubes in the


Shall not be installed near trench Observation
chemical water treatment places

Away from acid and alkali hold-up


Cable and instrument tubes in the acid
vessel and acid and alkali Observation
and alkali treatment places
transmission pipe
Other Instruments and electrical equipment
corrosion Electrical equipment and instrument s except sensor shall not be installed Observation
proof in the acid and alkali room

Away from and against to acid and


Control cabinet and instrument wiring
alkali treatment locations, in the Observation
box
upstream of ventilation

Thermal equipments, components and Corrosion-proof measures shall be


Observation
cables in other corrosive places reliable

4.9.5 Grounding
1 Installation inspection and acceptance of I&C special grounding device are detailed
in Table 4.9.5-1.
Table 4.9.5-1 Installation of I&C device special grounding device
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Material Meeting the design Check


Installation
Specification and dimension Meeting the design Check
of
Buried depth Dominant Meeting the design Check
grounding
electrode
Grounding electrode scope Safe grounding and Observation
protective grounding points
172
and ground of high-voltage and
strap high-current equipments
shall not be set within the
scope

Welded joints shall be flat


Appearance Observation
and without cracks

Welding Flat steel 2 times of width


Overlapping
Round Measuring with a ruler
length 6 times of diameter
steel

Attached figure is clear;


Record of concealed project the dimension is marked Inspection
correctly and clearly

Measuring with special


Grounding resistance Dominant Meeting the design grounding resistance
instrument

According to the design


Configuration Checking the design
Protector preventing requirements
Installation
surge Meeting the requirements
Grounding Inspection
of code

2 Installation inspection and acceptance of I&C protection, shielding and signal


grounding wires are detailed in Table 4.9.5-2.
Table 4.9.5-2 Installation of I&C device protection, shielding and signal grounding wires
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Groundwire collecting plate mm 60020020 copper plate Check

Between groundwire collecting plate and Sectional area of grounding wire


mm2 Check
ground screen terrestrial pole shall not be less than 50
Area of
Center grounding point of different
grounding Sectional area of grounding wire
properties in the system to groundwire mm2 Check
conductor shall not be less than 25
collecting plate
in control
Chain-type grounding among the Sectional area of grounding wire
system mm2 Check
equipment cabinet shall not be less than 16

Sectional area of wire connection


Grounding in the equipment cabinet mm2 Check
shall not be less than 4

Inspecting with
Low voltage insulation power cable; spanner for bolted
Connection between groundwire
Grounding after pressure welded with line nose, connection,
collecting plate and ground screen
connection connected or welded by bolts with observation
terrestrial pole
spring pad inspection for
welding

Connection of independent grounding Control device and equipment cabinet Disconnecting


shall not be connected with grounding point and
grounding grid, its shell shall be inspecting with
173
insulated from cabinet foundation multimeter
base

Metal joints, metal damp-blocking


layer and metal reinforcement core of
Connection of optical cable Inspection
optical cable shall be grounded
directly at the user's

Shall be connected to the electrical


Remote control cabinet or I/O cabinet Inspection
grounding grid independently nearby

It shall not be greater than 0.5 when


Measuring with
connected with electrical grounding
special grounding
System grounding resistance Q grid, and not greater than 2 when
measuring
connected to the grounding grid
instruments
independently

Inspecting with
Control panel cabinet
spanner
Type and specification meet the
Inspecting with
design requirements and the relevant
Wiring box spanner or
requirements of CECS 81; firmly and
screwdriver
reliably connected with protective
Wiring pipe grounding grid, without series Inspection

Cable stand grounding conditions Inspection


Protective
grounding Equipment installation base Inspection

Inspecting with
Tandem connection positions Wiring of welded metal span spanner or
screwdriver

Exposed metal components of


electriferous equipments that may
Others Check
contact with human body, protective
grounding shall be intact

Connection with common grounding Firm and close Check

Wiring mode Meeting the design Check


Signal
Meeting the design requirements, one
grounding
point shall be grounded for total Measuring with a
Grounding mode of shielding layer Dominant
shielding layer and pair twist multimeter
shielding layer in general

Signal
cable
shielding Grounding position of shielding layer It shall be grounded at the side of Inspection
grounding computer when signal source floats, it
shall be grounded close to the signal
source when the signal source is
grounded, one end of shielding layer
174
shall be connected with shielding
cover and the other end shall be
connected with common mode
ground when the amplifier floats

Electrical continuity shall be intact in


Grounding wire connection Dominant Inspection
the entire travel

Not directly contact with the shaft


Grounding sensor and pipes Inspection
block of generator and exciter

Connection between groundwire and Welded points shall be free from


Inspection
terrestrial pole cracks, rosin joint and corrosion

Firm, good contact and without


All grounding connection Inspection
looseness at the joint

4.9.6 Water-proof
Inspection and acceptance of I&C water-proof construction are detailed in Table 4.9.6.
Table 4.9.6 I&C device water-proof construction
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

With air conditioning gas outlet on


Without measures that protecting
the panel, screen, cabinet and Inspection
against dropping water
equipment in the room

Instrument cabinet Cabinet shall be closed tightly, all


holes shall be sealed, shall
Wiring box
Installation prevent rain water

Outdoor Rain hood shall be able to


Inspection
inspection Outdoor equipment guarantee the equipments prevent
rain water

Pipe openings are blocked, and


Openair cable conduit
rain water can not enter

4.10 Debugging and Acceptance of Measuring Instruments and Control Devices


4.10.1 Quantity for acceptance inspection
1 As for the bimetallic thermometer and pressure type thermometer, 100% inspection
shall be carried out. Their acceptance random inspection quantity shall be determined
according to the provisions specified in Item 5 of this Article.
2 As for those specified in Annex A of "Technical Supervision Provisions for I&C
devices in Thermal Power Plant", 100% inspection of the main-parameter thermocouples to
measure temperature shall be carried out; for the thermocouples to measure the temperature of
air-flue gas system and other positions, the performance verification shall be carried out as
required and according to batch random inspection; while, for the insulation resistance, 100%
inspection shall be carried out. Quantity of batch random inspection and acceptance random
inspection shall be carried out according to the provisions of Item 5 of in this Article.
3 As for those specified in Annex A of "Technical Supervision Provisions for I&C
devices in Thermal Power Plant", 100% inspection of the main-parameter thermal resistance
to measure temperature shall be carried out; for the thermal resistance to measure the

175
temperature of industrial water system and other positions, the performance verification shall
be carried out as required and according to batch random inspection; while, for the
assembling quality of insulation resistance and temperature sensing element, 100% inspection
shall be carried out. Quantity of batch random inspection and acceptance random inspection
shall be carried out according to the provisions of Item 5 of in this Article.
4 100% verification shall be carried out for the I&C devices listed in this Chapter. The
quantity of acceptance and random inspection shall be determined according to the
requirements specified in Item 5 of this Article.
5 Random quantities of inspection and acceptance are listed below:
1) Instrument is calculated according to the square root of total lot.
2) If one is unqualified during random inspection, twice quality shall be re-inspected
during which if un-qualification is discovered again; 100% instruments in this lot shall be
inspected.
6 All thermal measurements and signal circuits as detailed in this Section shall be
carried out debugging.
7 For the acceptance of single parameter and single measurement signal circuits, 5% of
the total quantity shall be taken to carry out for random inspection.
8 For the acceptance of multi-parameter and compound thermal measurement circuits,
50% of the total quantity shall be taken to carry out random inspection.
4.10.2 Debugging of instrumentation and alarm devices
1 Calibration of temperature measuring element
Calibration of all temperature measuring elements is specified in Table
4.10.2-1~4.10.2-3.
Table 4.10.2-1: calibration of bimetal thermometer and pressure type thermometer
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Not greater than permissible


Reading error at room temperature point Dominant %
fundamental error

Not greater than the absolute


Indication error Dominant value of permissible
Comparison method,
fundamental error
standard thermometer and
Not greater than the absolute
thermostatic bath
Hysterisis error Dominant value of permissible
fundamental error
Calibration
Pointer free from fluctuation
Rising and falling whole route indicating
Dominant or stuck phenomenon, stable Observation
value motion
indicating value

Not greater than the absolute Setting the signal pointer,


Error of signal operation Dominant value of permissible changing bath temperature,
fundamental error proof reading

Inspecting with
Connection point contact Good
line-checkers

Table 4.10.2-2: inspection of thermocouple and sheathed thermocouple

176
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Connection point Firmly welded Observation

Without mechanical damage,


Thermal couple wires cracks, pores, corrosion, Observation
embrittlement metamorphism

Inspection Polarity mark clear and meeting design Observation

Type and function mark clear and meeting design Observation

Thermocouple M 100 Measuring with 500V


Insulation
Sheathed insulation resistance
resistance Mm 1000
thermocouple meter

Platinum-rhodium 10platinum I Dominant Meeting inspection procedure With comparison


Performance (S) requirements method, tubular
II Dominant
inspection of furnace and standard
Platinum-rhodium II Dominant Meeting inspection procedure
thermocouple platinum rhodium -
30platinum-rhodium 6 (B) Dominant requirements platinum thermocouple

I Dominant With comparison


method, tubular
II Dominant Meeting inspection procedure
Copper-constantan (T) furnace and standard
requirements
Dominant platinum rhodium -
platinum thermocouple
Performance
inspection of I Dominant Meeting inspection procedure
Iron-constantan (J) With comparison
thermocouple II Dominant requirements
method, tubular
Nickel-chromiumconstantan (E) I Dominant
furnace and standard
Nickel-chromiumnisiloy (K) II Dominant Meeting inspection procedure
platinum rhodium -
Nickel-chromium-silicon requirements
platinum thermocouple
Dominant
nisiloy (N)

Table 4.10.2-3: inspection of thermal resistance and sheathed thermal resistance


Procedur Inspection method and
Inspection item Nature Unit Quality criteria
e instrument

Pt M 100 Measuring with 100V


Insulation
insulation resistance
Inspectio resistance Cu M 50
meter
n
without short circuit and Inspecting with
Assembly of temperature sensing elements
open circuit multimeter

R0 Grade Pt10(R0=10) Dominan


Platinum Comparison method,
nominal A Pt100(R0=100) t Meeting inspection
thermal sink and second-class
resistance Grade Pt10(R0=10) Dominan procedure requirements
resistance mercury thermometer
error test B Pt100(R0=100) t

Meeting inspection
Copper thermal Cu50(R0=50) Dominan procedure requirements Comparison method,
resistance Cu100(R0=100) t sink and second-class

177
mercury thermometer

Dominan
Grade A Ratio Comparison method,
Platinum thermal t
sink and second-class
resistance Dominan Meeting inspection
R100 Grade B Ratio mercury thermometer
R0
t procedure requirements

Comparison method,
Resistanc Dominan Meeting inspection
Copper thermal resistance Ratio sink and second-class
e ratio t procedure requirements
mercury thermometer

Note 1: Grade A platinum resistance is not applicable to the two wire system connection modes; as for the Grade A platinum
resistance with R0=100, the service temperature scope shall be less than or equal to 650.
Note 2: the inspection of two-wire-system connection thermal resistance shall include the lead resistance in thermal resistance;
during the inspection of multi-branch temperature-sensing two wire system thermal resistance, the internal lead resistance of
thermal resistance shall be provided by the supplier.

2 Calibration of locally-mounted indicating instrumentation


Calibration of locally-mounted indicating instrumentation is specified in Table 4.10.2-4.
Table 4.10.2-4: Calibration of bourdon tube pressure gauge, vacuum gauge, pressure vacuum gauge and
differential-pressure-gauge
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Measurement of special medium


Inspection Clear Observation
instrumentation panel mark

Liquid column correction Correct Observation

Meeting inspection procedure Comparison method,


Indication error Dominant %
requirements pressure

Vacuum calibration
Meeting inspection procedure
Hysterisis error Dominant Pa console and standard
requirements
instrumentation

Meeting inspection procedure


Tapping quantity of change Pa Observation
requirements
Calibration
Meeting inspection procedure
Pointers movement in the full range Observation
requirements

Changing pressure
Meeting inspection procedure
Alarm deviation Dominant Pa and proofing
requirements
Signal actuation value

actuation Actuation of given pointers Flexible Observation

Inspecting with
Connection point contact Good
line-checkers

3 Calibration of sensor and transmitter


Calibration of various sensors and transmitters is specified in Table 4.10.2-5~ Table
4.10.2-8.
Table 4.10.2-5: Calibration of remote pressure and differential pressure gauge (variable resistance and
differential transformer)

178
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Pressure test according


Sealing inspection Without leakage to the requirements of
Inspection supplier

Liquid column correction (with pressure


Correct Inspecting records
transmitter)

Meeting inspection According to the test


Indication error Dominant %
procedure requirements methods specified in the
Calibration
Meeting inspection instruction of the
Hysterisis error Dominant Pa
procedure requirements supplier

Table 4.10.2-6: Calibration of capacitance, inductance, piezoelectric and piezoresistance pressure and
differential pressure transmitter
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Polarity Correct positive and negative polarity


Supply measuring with a
Meeting the load characteristic requirements
voltage Amplitude digital voltmeter
of the supplier
Inspection
Pressure test according
Sealing Without leakage to the requirements of
supplier

Liquid column correction of Inspecting input


Correct
pressure transmitter pressure or pressure

Indication error Dominant % Meeting inspection procedure requirements difference

Hysterisis error Dominant % Meeting inspection procedure requirements Inspecting input


Calibration pressure or pressure
Terminal group consistency % Meeting inspection procedure requirements
difference

Repeatability error % Meeting inspection procedure requirements Inspecting input


pressure or pressure
Dead zone % Meeting inspection procedure requirements
difference

Table 4.10.2-7: Calibration of intelligent pressure and differential pressure transmitter


Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Pressure test according to the


Inspection Sealing Without leakage
requirements of supplier

Correct positive and


Polarity
negative polarity
Supply Meeting the load
Inspecting with a voltmeter
voltage characteristic
Amplitude
requirements of the
supplier

Single point ground resistance 100 Inspecting with a multimeter

179
Meeting the requirements Inspecting configuration with
Initial inspection of software
of measurement for special intelligence
configuration
process flow communicator

Meeting the requirements Carrying out setting and


Software configuration data allocation
of measurement for checking with special
and verification
process flow intelligence communicator

7.1% Dominant % Input pressure or pressure


Flow Output
Meeting inspection difference signal, with SFC
square root allowable 7.1%~50% Dominant %
procedure requirements intelligence communicator,
extractor error
50% Dominant %
reference signal source with
Meeting inspection 0.04 grade accuracy, Grade 3
Indication error Dominant %
procedure requirements voltmeter. Carrying out
Calibration
calibration for the zero point,
measuring range and zero
Meeting inspection point transference of meters
Hysterisis error Dominant %
procedure requirements with SFC keyboard according

to the methods specified in the


product manual.

Table 4.10.2-8: calibration of temperature transmitter


Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Meeting the specifications of According to the


Output current
supplier connection mode and
methods specified by
Protection of broken couple
Inspection Thermocouple the supplier
Meeting inspection
temperature Comparison method,
procedure requirements
transmitter Cold junction compensation second-class mercury
thermometer

Meeting inspection
Zero point transference Inspecting input signal
procedure requirements

Meeting inspection
Calibration Indication error Dominant % inspecting input signal
procedure requirements

Meeting inspection
Hysterisis error Dominant inspecting input signal
procedure requirements

4 Inspection of flow measurement instrumentation


Inspection of various flow measurement instrumentations is specified in Table 4.10.2-9~
Table 4.10.2-15.
Table 4.10.2-9: rotameter inspection
Inspection method and
Procedure Inspection item Nature Unit Quality criteria
instrument

Accurate data and complete


Inspection Delivery inspection report Observation
items

Reading reticle Clear Observation

180
Complete and without
Rotor appearance Observation
damage

Meeting the design


Rotor materials Observation
requirements

Meeting inspection procedure


Indication error Dominant % According to the
requirements
method specified in
Meeting inspection procedure
Repeatability error inspection procedures
requirements
Test
Meeting the specifications of
Cardinal extremity rotor position According to the
supplier
method specified in
Meeting the specifications of
Scale division conversion inspection procedures
supplier

Table 4.10.2-10: inspection of volumetric flowmeter (rotor, gear, elliptic gear, root and scraping type
flowmeter)
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Clear writing, without abrasion,


Dial Observation
scratch or crack

Flexible rotation of drum wheel,


Drum counter high-low consistency, regular Observation
font style and uniform distance

Remote flowmeter printed circuit board


Inspection No Looseness Observation
connector

Carrying out
pressure test
Sealing Without leakage together with
thermodynamic
system

Indication error Dominant % According to the


Meeting inspection procedure method specified in
Rotor type
Sensitivity Dominant requirements inspection
procedures
Test
Indication error Dominant % According to the
Gear, elliptic gear, root Meeting inspection procedure method specified in
and scrapping type Repeatability error Dominant requirements inspection
procedures

Table 4.10.2-11: inspection of turbine flowmeter (sensor)


Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Inspection Fluid direction mark definite and clear Observation

Measuring range of 70~80


Verification of Maximum flow %
transmitter Check
measuring range

Maximum flow The lower limit specified by the

181
supplier

Measuring with a
Sensing coil resistance value 3000
ohmmeter

Lowest frequency Hz 20 According to the


Output voltage of method specified in
transmitter Amplitude mV 10 inspection
procedures

Meeting inspection procedure


Test Indication error Dominant %
requirements According to the

Meeting inspection procedure method specified in


Linearity Dominant %
requirements inspection

Meeting inspection procedure procedures


Repeatability error %
requirements

Note: this article is compiled according to Series LW flowmeters.

Table 4.10.2-12: Calibration of vortex shedding flow meter


Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Fluid direction mark definite and clear Observation

Without unevenness and bruise


Flange sealing surface Observation
phenomenon

Resistance value of sensor silicon stress Inspecting with


k 2~3
sheet multimeter 10k

Insulation resistance M 100 range

Inspection Maximum flow Meeting the upper and lower


Measuring
limit value requirements Check
range Maximum flow
specified in the product manual

Carrying out
pressure test
Sealing Without leakage together with
thermodynamic
system

Calibration Indication error Dominant % Meeting inspection procedure


Sensor According to the
Repeatability error Dominant % requirements
test methods
Allowable Zero point V specified in the
error of Meeting inspection procedure inspection
Midpoint V
Detector analogous requirements procedures and
indicator output Full scale V
instruction of the
Meeting inspection procedure supplier
Integrating constant setting
requirements

Remote Indication Analogous Meeting inspection procedure According to the


Dominant %
indicator error output requirements test methods

182
Integrating specified in the
Dominant %
value inspection
procedures and
Meeting inspection procedure
Integrating speed Word/second instruction of the
requirements
supplier

Note: this article is compiled according to Series LU flowmeter.

Table 4.10.2-13: calibration of electromagnetic flowmeter


Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Delivery inspection report Accurate data and complete items Check

Signal terminal M 20 Measuring with


Inspection Sensor insulation
500V insulation
resistance Power supply terminal M 100
resistance meter

Meeting the requirements of According to the


Parameter setting measurement for design and test methods
process flow specified in the
inspection
Meeting inspection procedure procedures and
Indication error Dominant %
requirements instruction of the
supplier
Calibration
Meeting inspection procedure According to the
Repeatability error Dominant %
requirements test methods

Meeting inspection procedure specified in the


Permissible error of zero point %
requirements inspection
procedures and
Cutting off value of low flow integrating Meeting inspection procedure
% instruction of the
signal requirements
supplier

Table 4.10.2-14: calibration of ultrasonic flowmeter


Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Inspection Delivery inspection report Accurate data and complete items Check

Meeting the requirements of According to the


Parameter setting measurement for design and test methods
process flow specified in the
Calibration Meeting the requirements of the inspection
Functional inspection
supplier procedures and

Indication, record Indication error Dominant % Meeting inspection procedure instruction of the

and integrating Repeatability error Dominant % requirements supplier

Table 4.10.2-15: calibration of target type flowmeter


Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Inspection Sealing Without leakage Pressure test

183
according to the
requirements of
supplier

Indication error Dominant % Inspecting by


adding standard
Meeting inspection procedure weights on the

Hysterisis error Dominant % requirements target surface of


target type
flowmeter
Calibration
Terminal group consistency % Inspecting by
adding standard
Repeatability error %
Meeting inspection procedure weights on the
requirements target surface of
Dead zone % target type
flowmeter

5 Calibration of level gauge


Calibration of various level gauges is specified in Table 4.10.2-16~ Table 4.10.2-21.
Table 4.10.2-16: Calibration of electrical-contact water level gauge
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Meeting the requirements of the Measuring with


Insulation Converter M
Inspection supplier 500V insulation
resistance
Electrical contact M 100 resistance meter

Calibration Digital quantity Dominant Clear, correct Inspecting point by


point water level
Indicating gauge Step type show value
Analog quantity indication,
corresponding to digital display
high-low alarm and
Meeting the requirements
actuation value
specified in the comparison Table
Analog quantity output is 4mA~20mA with 50K
on analog signals and digital
resistance,
displays from the supplier
imitating water
bright and clear light cross and
Light cross indication Dominant conductive
correct indicating value
resistance,
connected to the
High-low alarms Dominant wire connecting
terminal
Actuation value meets the corresponding to
Overrun operating requirements of the the converter. 0.1
actuation value tested vessels, overrun indicating grade analog
High-low protection Dominant lamp flashes quantity output,
inspecting with
4mA~20mA
standard meter

184
Inspecting with
Output contact Good contact
line-checkers

Table 4.10.2-17: Calibration of double-color water level gauge


Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Observing optical
fiber outlet by
lighting the inlet
Inspection Light ray conduction Bright and clear luminous spots with 20W
auto-bulb (or cold
light halogen
lamps)

Inspecting with
multimeter when
Output voltage of reduction transformer V 12
all the light bulbs
are lightened
Calibration Power-on
All bull eye windows of water
No water test Dominant observation of
level gauge are red
light source system

Red-green light changes are Water injection


Water injection test Dominant
corresponding to the water level observation

Table 4.10.2-18: Calibration of float level meter


Procedure Inspection item Nature Unit Quality criteria Inspection
method and
instrument

Inspection Mechanical driven parts of Flexible rotation without Shaking the


converter jamming float-cylinder
with hand

Insulation resistance M 10 Measuring


with 500V
insulation
resistance
meter

Calibration Indication error Dominant % Meeting inspection According to


procedure requirements the method
Hysterisis error Dominant mm
specified in
inspection
procedures

Repeatability error Dominant mm Meeting inspection According to


procedure requirements the method
Dead zone Dominant mm
specified in
Initial point drift Dominant mm
inspection
procedures

Table 4.10.2-19: Calibration of capacitance level meter

185
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Measuring with
Insulation resistance M 50 500V insulation
resistance meter

Holding the
capacitance
electrode with
Upper and lower swaying of hand to observe the
Body capacitance induction
indicating value, normal reaction indicating value
change after the
instrument is
Inspection power-on.

Indicating meter indicating to a Observing the


Indicating value change
certain value indicating value
change on
indicating
Artificial
instrument by
capacitor
connecting
actuation Alarm presetting Alarm lamp with change reaction
simulation
capacitance to Cx
or ground wire
terminal

Inspecting with
Alarm connection point Good contact
line-checkers

Indication error Dominant % According to the


Meeting inspection procedure method specified

Hysterisis error Dominant mm requirements in inspection


Calibration
procedures

Repeatability error mm According to the


Meeting inspection procedure method specified

Alarm actuation value error % requirements in inspection


procedures

Table 4.10.2-20: Calibration of electric weight level indicator


Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Flexible rotation forward and Power-on


Actuator actuation
backward inspection

Power-on
Inspection Braking Reliable
inspection

Power-on
Feedback current of level detection Adjustable
inspection

Driving device of overweight and According to the


Calibration Dominant Reliable actuation
weightless moment test methods

186
Manual Dominant specified in the
Meeting the specifications of
Driver actuation instruction of the
Automatic Dominant supplier
supplier

Inspecting with
level alarm Normal actuation
line-checkers

Inspecting with
Contact Good contact
line-checkers

Table 4.10.2-21: Calibration of ultrasonic wave and radar level meter


Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

According to the
Meeting the operating
Parameter setting and calibration methods specified
requirements of the tested vessel
by the supplier
Inspection External connection CRT terminal device Stable images, clear writing, Power-on
power-on adjustable luminance inspection

Power-on
External-connection printer Complete items and clear writing
inspection

Meeting inspection procedure


Indication error Dominant %
requirements
According to the
Meeting inspection procedure
Discriminability Dominant % methods specified
requirements
by the supplier
Meeting the requirements of the
Measuring blind area
Calibration supplier

According to the
Meeting the operating
Actuation value methods specified
Overrun requirements of the tested vessel
by the supplier
alarm
Inspecting with
Connection point Good contact
line-checkers

6 Calibration of composition analysis instrument


Calibration of various composition analysis instruments is specified in Table 4.10.2-22 ~
Table 4.10.2-33.
Table 4.10.2-22: Calibration of zirconia oxygen analyzer
Procedure Inspection item Nature Unit Quality criteria Inspection method
and instrument

Inspection Internal Probe battery (within the range 80 According to the


resistance of 75050) method specified

Temperature control 2~6 in inspection

thermocouple (at ordinary procedures

temperature)

Heating electric stove wire (at 10~120


ordinary temperature)

Resistance from instrumentation grounding 0.2 Measuring with


terminal to grounding grid electric bridge

187
Stabilized 25V~5V V 0.2 With digital
voltage multimeter
6V~15V V 1
supply
equipment

Calibration Temperature Scope of cold junction 2020 According to the


controller compensation methods specified

Temperature converter, Meeting the requirements of the by the supplier

constant temperature supplier


performance, temperature
indicating gauge

Transmitter Indication error Dominant % Meeting inspection procedure According to the


requirements method specified
Repeatability error Dominant %
in inspection
O2/mA linearity
procedures

Table 4.10.2-23: Calibration of boiler fly ash carbon content monitoring system (microwave carbon meter)
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Shaker Effective shaking Injecting dry fly ash


in the sampling
funnel, power on,
Inspection Clean ash discharge, not stopping
Ash ejector carrying out shaking
up ash
and ash discharge
inspection

Calibration Rectification of Zero point %


Inspecting by
host machine, Meeting inspection procedure
inputting 0~5V DC
remote indication Measurement range % requirements
signals
and record meter

Scope of accumulative
1/V 500~1000
Integrator constant Inspecting by
Zero clearing Normal resetting inputting 0~5V DC

Meeting the requirements of signals


Calibration of alarm actuation value
process flow

Compensation displayed zero point Dominant


According to the
calibration of Meeting the specifications of
methods specified by
background initial Slope indication Dominant supplier
the supplier
voltage

Coefficient (K) calibration of fly ash According to the


specimen carbon content host machine Dominant K=C/U methods specified by
indicating value the supplier

Indicating gauge Dominant


Remote indicating According to the
Consistent with the indicated
value coefficient Record meter Dominant methods specified by
value of the host machine
calibration the supplier
Integrator Dominant

188
Empty bucket voltage
V Meeting the specifications of
(Um)
supplier
Full bucket voltage (UL) V

Ash discharge voltage


of ash discharge door V Ut=UL+0.5
Ash bucket ash According to the
(Ut)
location control methods specified by
Meeting the specifications of
calibration Automatic control the supplier
supplier

Continuous ash
discharge Meeting the specifications of
Stopping ash discharge supplier

Switchover function

Note 1: This article is compiled according to WCT boiler fly ash carbon content monitoring system.
Note 2: In the calculation formula of coefficient K: C- chemical assay quantity; U- voltage equivalent

Table 4.10.2-24: Calibration of thermal conductance hydrogen analyzer


Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Indication error Dominant % Inspecting and


rectifying with
Repeatability error Dominant %
standard hydrogen
Supply voltage change 10% allowable
% Meeting inspection procedure sample according
Calibration error
requirements to the methods
Tested pressure change 3kPa allowable
% specified in
error
inspection
Temperature change 10 allowable error % procedures

Table 4.10.2-25: Calibration of industrial electric conduction meter


Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Rectifying with
standard solution or
Allowable error of
Transmitter 0.01 standard electrode
electrode constant
which constant is
given

Allowable error of full scale Inspecting converter


%
self-checking by using resistance
Calibration Allowable error of box to simulate the

temperature compensation % medium temperature

self-checking Meeting inspection procedure and electrical


Converter
requirements conductivity
Indication error Dominant %
according to the
Hysterisis error Dominant
methods specified in
inspection
Sensitivity %
procedures; carrying

189
out complete
machine indicating
value inspection
rectification with
standard solution

Table 4.10.2-26: calibration of industrial acid, alkali concentration meter


Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Measuring with
Allowable error of electrode constant 0.5
standard solution

Allowable error of 15V Measuring with a


% 0.2
stabilized voltage supply voltmeter

Allowable error of full scale Adjusting


% 5
self-checking converter by using

Allowable tolerance of resistance box to

temperature compensation % 5 simulate the

self-checking medium

Meeting inspection procedure temperature, acid


Calibration Indication error Dominant %
requirements and alkali
Converter
Meeting inspection procedure concentration;
Hysterisis error Dominant
requirements carrying out
complete machine
indicating value
Allowable error of alarm Meeting inspection procedure
% inspection
actuation value requirements
rectification with
standard solution

Inspecting with
Warning contact Good contact
line-checkers

Table 4.10.2-27: Calibration of industrial acidity (PH value) meter


Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Allowable tolerance of 15V stabilized Measuring with a


Inspection % 0.2
voltage supply voltmeter

Rectifying the
Allowable tolerance of neutral pure water
Dominant pH complete machine
(pH: 7) zero point
by using resistance
0.2 box to simulate
medium
Indication error of acid and alkaline water Dominant pH
Calibration temperature and
high-resistance
potentiometer
input signals and
Sensitivity pH 002
to rectify
indicating value or

190
prepare standard
solution according
to the methods
specified in
inspection
procedures and
DL/T 677-1999

Table 4.10.2-28: calibration of water dissolved oxygen analyzer


Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Fully filling the tank room,


Sensor electrolyte Observation
without bubble
Inspection
Complete, undamaged and not
Permeable plastic film Observation
stained with grease

Meeting process flow


Over-temperature actuation of sensor
requirements, reliable solenoid
temperature controller According to the
valve actuation
methods specified
Self-checking of converter 0, 1/4, 1/2 and Meeting the specifications of
% in inspection
full scale supplier
procedures, DL/T
Coarse calibration error of local
% 1 677-1999 and by
atmosphere oxygen content
Calibration supplier
Delicate calibration error of water Meeting the specifications of
%
electrolysis quantitative oxygen supplier

Meeting inspection procedure Rectifying and


Indication error Dominant %
requirements inspecting
according to the
Meeting the specifications of
Sensitivity Dominant methods specified
supplier
by the supplier

Table 4.10.2-29: Calibration of silicon, phosphate radical analyzer


Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Allowable error of stabilized voltage Measuring with a


% 2
supply voltmeter

Inspection Meeting the specifications of According to the


Parameter setting and configuration
supplier methods specified

Auxiliary devices Well running by the supplier

Debugging Cabinet body temperature 5 According to the

Constant temperature methods specified


0.5
deviation in inspection
Temperature
procedures, DL/T
controller
Reaction time s 30 677-1999 and by
supplier

According to the
Superhigh and low Meeting the specifications of

191
temperature alarm supplier methods specified

Meeting the requirements of in inspection


Analysis program period min
analysis process flow procedures, DL/T
Sequencer
677-1999 and by
Sequential steps Correct actuation
supplier

Manual/automatic Meeting the specifications of


self-adjusting zero function supplier According to the
Displayer Error of indication and Meeting inspection procedure methods specified
%
records requirements by the supplier

Repeatability error % 1

Note: This article is compiled according to BF -8061 (Silicon Table) and BF -8063 (Phosphorus Table)

Table 4.10.2-30: Calibration of the instrument to monitoring the negative and positive ion exchanger failure
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Indication error of record meter Dominant % According to the


Meeting inspection procedure
Calibration methods specified
Hysterisis error of record meter Dominant % requirements
by the supplier

Table 4.10.2-31: calibration of industrial sodium densimeter


Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Measuring electrode glass ball bubble Without crack or ageing Observation

Medium in the solution


storage tank of calomel Permeated and free from
Observation
Reference electrode and in the bubbles
electrode ceramic tube

Ceramic sand core Measuring with a


Inspection k 10
resistance ohmmeter

Measuring with
insulation resistance
Insulation resistance of glass measuring
M 106 meter (the voltage
electrode
grade of which meets
supplier's provisions)

Measuring with
voltmeter according
to the methods
Allowable tolerance of 15V stabilized
% 0.1 specified in
voltage supply
inspection

Calibration procedures and DL/T


677-1999

Indication error Dominant % Adjusting, using


Meeting inspection procedure resistance box

Hysterisis error Dominant % requirements simulating medium


temperature,

192
high-resistance
potential difference
meter simulating
sodium densimeter,
or preparing standard
solution

Note: This article is compiled according to DWG -205 industrial sodium densimeter.

Table 4.10.2-32: calibration of hydrazine monitor


Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Immersion cleaning time with 2% NaOH h 1 Check


Inspection
Gelatinous electrolyte in ceramic tube Filling up, no air gap Check

Zero point error Dominant %


Meeting inspection procedure Calibrating with
Indication error Dominant %
requirements standard solution
Repeatability error Dominant %

Response time min 3


Calibration Calibrating with
Meeting the requirements of
Actuation value for overrun warning standard solution
process flow

Inspecting with
Connection point Good contact
line-checkers

Table 4.10.2-33: calibration of flue-gas composition analysis equipment


Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Meeting the requirements of the


Power supply Observation
supplier

Resistance from instrumentation grounding Measuring with


Inspection 2
terminal to grounding grid electric bridge

Pressure meets supplier's


Instrument air Observation
requirements

Measuring range Dominant

Zero point drift According to the


Calibration Total amplitude drift Meeting the design requirements methods specified

Linearity by the supplier

Alarm limit Dominant

7 Calibration of special instrument


Calibration of various special instruments are specified in 4.10.2-34~ Table 4.10.2-39.
Table 4.10.2-34: Calibration of inductance and eddy current type axial displacement and relative expansion
measuring instruments and protective devices
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Meeting the specifications of With DC


Inspection DC resistance of sensing coil
supplier Wheatstone bridge

193
Meeting the specifications of Measuring with a
Performance of voltage stabilizer
supplier digital voltmeter

Moving analog
device, changing
Meeting the axial displacement or the gap between
Instrument indicating direction Dominant
dilatometric change direction the corresponding
sensor and analog
axis

Moving analog
device; changing
Positive-negative Meeting the axial displacement or the gap between
Dominant
actuation dilatometric change direction the corresponding
sensor and analog
axis; and
inspecting
Warning and functions
protection according to

Calibration positive &


Indicator lamp Corresponding lamp lightening
negative
"warming" buttons
and "resetting"
button

Inspecting with
Connection point Good contact
line-checkers

Measuring range 30% Actual value Check

Carrying out
inspection on the
Indication error of system Dominant % 3
axial displacement
calibration console

Carrying out
inspection on the
Linearity Dominant % 1.5
axial displacement
calibration console

Table 4.10.2-35: Calibration of steam turbine thermal expansion and strong indicator
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Meeting the specifications of With DC


Inspection DC resistance of sensing coil
supplier Wheatstone bridge

Measuring range 30% Actual value Carrying out

Indication error of system Dominant % 2 rectifying by using


Calibration dial indicator to

Linearity Dominant % 1.5 measure iron core


displacement

Table 4.10.2-36: Calibration of steam-turbine crisis breaker electric indicator

194
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Meeting the specifications of Inspecting with


Inspection Sender DC resistance
supplier DC bridge

3V~4V Dominant Failure to actuate Test by inputting


Calibration
10V~16V Dominant Giving out action signal analog voltage

Table 4.10.2-37: Calibration of the devices to measure the eddy current type steam turbine rotor eccentricity
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Meeting the specifications of Inspecting with a


Stabilized voltage supply calibration
supplier voltmeter
Inspection
Meeting the specifications of With DC
DC resistance of sensing coil
supplier Wheatstone bridge

Inspecting by
Turning alarm value calibration Meeting the design requirements pressing "turning"
alarm button

Inspecting by
pressing "raising
Calibration Raising speed alarm value calibration Meeting the design requirements
speed" alarm
button

Display "Alarm" lamp lightening


Warning Light memory under Observation
Normal
accidental state

Pressing
"resetting" button
Resetting "Alarm" lamp off
after accident
Warning
extinction
Inspection Inspecting with
Connection point Good contact
line-checkers

Indication error of system Dominant % 10 Inspecting on the


eccentricity
Linearity Dominant % 5
calibration console

Table 4.10.2-38: Calibration of electromagnetic and eddy current type steam turbine vibration gauge
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Seismometer Electromagnetic Meeting the specifications of Test with DC


Inspection
coil resistance Eddy current supplier Wheatstone bridge

Meeting the specifications of Inspecting with a


Calibration Stabilized voltage supply calibration
supplier voltmeter

Inspecting by
Calibration of alarm value Meeting the design requirements pressing
"presetting" button

195
Indication error of instrument Dominant % 5 Inspecting on the
vibration
Indication error of system Dominant % 10
calibration console

Display "Alarm" lamp lightening Inspecting on the

Light memory under vibration


Normal
accidental state calibration console
Warning
Pressing "resetting"
Resetting "Alarm" lamp off button after
accident extinction

Table 4.10.2-39: Calibration of tachometer and protective device


Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Rotation Flexible Observation

Inspecting with DC
DC resistance
bridge
Tachogenerator Relationship Meeting the specifications of Inspecting with

Inspection between the motor supplier rotational speed


speed and output calibration console
voltage and voltmeter

Eddy current Meeting the specifications of Inspecting with DC


Sensor DC resistance
Reluctance supplier bridge

Indicating value static error Dominant % 0.25 Inspecting with


rotational speed
Indicating value dynamic error Dominant % 0.5
calibration console

Dynamic response time Dominant s 0.1 Inspecting with

Meeting the specifications of rotational speed


Calibration Actuation error
supplier calibration console

Overspeed Output connection Inspecting with


Good contact
protection point line-checkers

Light indication
Normal Observation
memory

8 Calibration of material weighing device


Calibration of various material weighing devices is specified in Table 4.10.2-40 ~ Table
4.10.2-43.
Table 4.10.2-40: Simulation calibration of electronic belt weigher
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Inspection Microcomputer belt weigher ground-wire Good grounding Check

Input terminal M 20 Measuring with


Insulation resistance 500V insulation
Power terminal M 50
resistance meter

Belt conveyer Meeting the requirements Measuring with

196
specified in design and by measuring
supplier instruments

Meeting the requirements Measuring with


Metering frames and carrier roller specified in design and by measuring
supplier instruments

Technical
performance Meeting inspection procedure Checking delivery

Comprehensive requirements certificate


%
allowable error

Applying
Load bearing sensor maximum load on
Displacement of
the weighting
elastic application Meeting inspection procedure
platform,
point under the requirements
measuring
maximum load
displacement with
dial indicator

Inspecting
Coarse calibration error of mechanical Meeting inspection procedure according to the
%
weighing original zero point requirements methods specified
by the supplier

Allowable error of Meeting inspection procedure Measuring with


%
rated speed requirements tachometer
No-load running test Meeting inspection procedure Measuring with
Complete turn time s
of belt weigher requirements stopwatch

Not greater than the length Measuring with


Actual belt length
specified by supplier metering band

Delicate adjusting error of initial load According to the


Meeting inspection procedure
(deadweight and pre-compression) zero % methods specified
requirements
point by the supplier
Calibration Indicating value and integrating error Dominant % Inspecting by
adopting chain
Linearity Dominant %
weights,
Discriminability % suspending
Meeting inspection procedure
Repeatability error weights, weight
requirements
blocks in the

Accumulative error of integrator when trolley weights or

belt no-load running complete circuit calibrating


resistance

Meeting inspection procedure


Maximum error of 50% unbalance load Loading inspection
requirements

Without damaged elements, not


120% overload test exceeding allowable error after Loading inspection
unloading

Table 4.10.2-41: Simulation calibration of electronic belt weigher substance detector

197
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Microcomputer device grounding wire Good grounding Check

Meeting the requirements


Charging and discharging belt conveyor specified in design and by Check
supplier

Meeting the requirements


Structure of weighing hopper, feed Check and
specified in design and by
opening and bearing beam observation
supplier

Meeting the requirements


Technical
Dominant specified in design and by Checking delivery
Load bearing sensor performance
supplier certificate

Accuracy Dominant 0.03

Meeting the requirements


Technical
specified in design and by
Weighing display performance Checking delivery
Inspection supplier
controller certificate
Meeting inspection procedure
Permissible variation
requirements

Stable images, clear writing, Power-on


CRT terminal equipment
adjustable luminance inspection

Complete item, accurate data and Power-on


Printer
clear writing inspection

Indication division value (d) kg 0.1d10 Check

Calibration division value (e) kg 5e10 Check

Calibration division value (n) 3000n10 000 Check

Self checking function of hopper scale Power-on


Accurate
accuracy inspection

Lifting weight and procedures of charging Actuation meets measurement Power-on


and feeding process control requirements inspection

Zero point of empty scale Dominant kg Inspecting by


05e
increasing and
Indication <500e Dominant kg
decreasing standard
error >(500~2000)e Dominant kg 10e
weights on the
>(2000~10 000)e Dominant kg 1.5e weighting platform

Observing variation
Calibration
by increasing and
Discriminability kg 1.0e decreasing 1.4
times of division
value (e)

Meeting inspection procedure


Repeatability error of indicating value % Loading inspection
requirements

Table 4.10.2-42: Simulation calibration of dynamic electronic weigh bridge

198
Inspection
Procedure Inspection item Nature Unit Quality criteria method and
instrument

Meeting supplier's provisions, Measuring


guaranteeing up and down weighs with
Tracks in the weighing area
of vehicle to be stable, smooth measuring
transition instruments

Rain protection
Fundamental
Drainage Complete and good equipments Check
pit facilities
Winter protection

Without cracks, sand holes,


Weighing apparatus iron castings, iron and
looseness, continuous pores, Observation
steel structures
internal stress; firm

Switch of weighing area and weighing


Reliable actuation Inspection
platform

Grounding resistance of electrical system 2 Inspection

Meeting the specifications of


Performance of thermostat
supplier
Inspection Checking
Meeting inspection procedure
Sensor Permissible variation Dominant delivery
requirements
certificate
Unbalance load allowable error
Margin of error
of four sensors

Measuring 24V voltage


V 0.005
bridge-circuit deviation According to

pressure the methods

stabilization Output voltage specified by


mV 2.25
integrated scope the supplier

Electrical package

parts Indicating
Meeting the requirements
instrument and According to
Weighing specified in design and by supplier
control system the methods
display
Micro-treatment specified by
controller Complete and perfect software
computer the supplier

Printer Clear writing and complete items

4% Maximum weighing under With 4 grade


Calibration Zero setting function of Zero setting scope Dominant
dynamic state weights or the
empty weigher
Zero point error Dominant 0.5da measurement
standard
Meeting the specifications of
Weighing of platform deadweight Dominant vehicle higher
supplier
than 510-4
Indication error Dominant Permissible error
accuracy

Discrimination capacity of indicating value 0.01% Maximum weighing


change by increasing and decreasing 0.02% under dynamic state

199
maximum load

Minimum load 50da, and 5t

Unbalance load Margin of error

a d is the minimum division value of weighing apparatus.

Table 4.10.2-43: Simulation calibration of static electronic track scale (weighing wagon tipper)
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Measuring with
Meeting inspection procedure
Inspection Tracks in the weighing area measuring
requirements
instruments

Rain protection and


Firm foundation, complete
anti-freezing
Infrastructure facilities, without sinking Observation
Lightning protection and
fracture
drainage

Environment Meet design requirements

Can observe the upper and lower


Weighing Visual angle
balance of the vehicle
room Observation
Speed limit sign on both ends
conditions
of the weighing track Obvious, perfect and all right

Shunting signal

Heavy vehicle
Correct actuation and good Inspecting with
Switch Empty vehicle
contact line-checkers
Position

Microcomputer balance grounding


2 Check
electrode resistance

Meeting inspection procedure


Each technical index
requirements

Zero point allowable error of


Dominant mV 0.5
total balance bridge circuit Checking delivery
Sensor
Zero point allowable error of certificate
Dominant mV 0.5
total weighing bridge circuit

Supply voltage of weighing Meeting the specifications of


bridge circuit supplier

Electrical Load indicators and control Meeting inspection procedure


Inspection
parts circuit requirements

Autognosis of computer (or


PLC), duplicate and copy of According to the
Meeting the specifications of
microcomputer system specified methods
supplier
software and application of supplier

software

200
Placing of microcomputer
parameters (time clock,
Correct and clear item contents
vehicle, coal, mine ticket
number)

Meeting the weighing apparatus


Program inspection of
weighing, wagon tipper
microcomputer application
discharging coal, and vehicle According to the
software
entry and exit flow specified methods

CRT indication inspection of supplier


Complete item, accurate data and
Autognosis and inspection of
clear writing
printing

Automatic balancing and zero point tracing Meeting inspection procedure


Dominant
inspection requirements

Meeting the leave factory records


Deadweight test of weighing platform Dominant
of supplier According to the
Calibration Meeting inspection procedure specified methods
Indication error Dominant %
requirements of supplier

Indicating value change identification


Meeting the specifications of
function by increasing and decreasing 1.4 Dominant
supplier
times of division value weight

9 Calibration of indicating instrument on panel


Calibration of various indicating instrument on panels is specified in Table 4.10.2-44 ~
Table 4.10.2-46.
Table 4.10.2-44: Calibration of digital indicator and display accommodometer
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Meeting inspection procedure


Calibration Indication function
requirements

Meeting inspection procedure


Indication error Dominant %
requirements

Repeatability Ordinary instrument Dominant

error HR instrument Dominant %

Error of dead Ordinary instrument


Meeting inspection procedure
zone HR instrument
requirements
Fluctuation of Ordinary instrument
indicating Inspecting by
HR instrument
value applying electric
Meeting inspection procedure signals
Ambiguity error
requirements

Meeting inspection procedure


Drifting in 1 hour %
requirements

Response time Step-input s Meeting inspection procedure

201
Polarity change s requirements

Overloading recover s

Meeting inspection procedure


Actuation value error %
requirements
Warning
Inspecting with
Signal contact Good contact
line-checkers

Thermocouple cold junction Meeting inspection procedure Power-on


compensation requirements inspection

Table 4.10.2-45: Calibration of intellectualized balanced type indicating instrument


Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Meeting inspection procedure Power-on


Digital display function
requirements inspection

Meeting inspection procedure Power-on


Recording transmission mechanism
Inspection requirements inspection

According to the
Meeting the requirements of
Software parameter setting specified methods
process flow
of supplier

Inspecting by
Meeting inspection procedure
Calibration Indication error Dominant % applying electric
requirements
signals

Repeatability error Dominant

Error of dead zone

Fluctuation of indicating
value

Ambiguity error
Digital display
Drifting in 1 hour % Inspecting by
Meeting inspection procedure
applying electric
Step-input s requirements
signals
Polarity
Response s
change
time
Overloading
s
recover

Thermocouple cold
junction compensation

Inspecting by
Meeting inspection procedure
Damping characteristic records applying electric
requirements
signals

Records Record error Dominant % Meeting inspection procedure Inspecting by


requirements applying electric
Hysterisis error Dominant %
signals
Repeatability error %

Terminal group %

202
consistency error

Function on switching
points and sequence

Inspecting by
Meeting inspection procedure
Actuation value error % applying electric
requirements
Warning signals

Inspecting with
Contact Good contact
line-checkers

Table 4.10.2-46: Calibration of temperature circuit measuring instrument


Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Meeting inspection procedure


Digital display function
requirements

Meeting the requirements of


Display of polarity, unit and symbol
process flow Power-on
Meeting the specifications of inspection
Automatic routing inspection cycle
Inspection supplier

Operation of manual setting point Normal actuation

Point and sequence display Correct and consistent with input

According to the
Meeting the requirements of
Software parameter setting specified methods
process flow
of supplier

Indication error Dominant %

Repeatability error Dominant

Error of dead zone


Inspecting by
Digital Indicating Ordinary Meeting inspection procedure
applying electric
display value instrument requirements
signals
fluctuation HR instrument

Drifting in 1 hour %

Ambiguity error
Calibration
Inspecting by
Meeting inspection procedure
Printer printing error % applying electric
requirements
signals

Inspecting by
Meeting inspection procedure
Actuation value error % applying electric
requirements
Warning signals

Inspecting with
Contact Good contact
line-checkers

Meeting inspection procedure Power-on


Thermocouple cold junction compensation
requirements inspection

10 Calibration of other instruments

203
Calibration of various other instruments is specified in Table 4.10.2-47~ 4.10.2-49.
Table 4.10.2-47: Calibration of flame monitoring device
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Self checking function of flame indication Meeting the specifications of Inspecting by


signal channel supplier using lamplight or
firelight to
Calibration Normal display of analog simulate flame
Flame inspection sensitivity Dominant indication lamp under flame according to the
condition methods specified
by supplier

Table 4.10.2-48: Calibration of industrial televisions


Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Air cooling system


According to the
Meeting the requirements of the
Liquid cooling system methods specified
supplier
by the supplier
CRT luminance and contrast Dominant
Calibration
Distinct, symmetrical,
Graphical display Dominant Observation
undistorted

Free advance and retreat, reliable


Advance and retreat transmission of probe Power-on test
protection actions

Table 4.10.2-49: Calibration of generator hydrogen-leakage monitor


Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Air permeability of sensor


Calibration
hydrogen film

Inspection of the
Hydrogen
performances of heater, According to the
sensing and Meeting the specifications of
thermostatic bath and specified methods
transmission supplier
temperature controller of supplier
type
Error of point sequence
switcher, warning actuation
value and reproducibility

Hydrogen analyzer, point


sequence switcher

Air pump, oily water liquid According to the


Thermal Meeting the specifications of
level switch specified methods
conduction supplier
Air pressure dial gauge, of supplier

external-connection record
meter

Allowable error of zero correction Dominant % Meeting inspection procedure Rectifying with
requirements standard hydrogen
Allowable error of measuring range Dominant %

204
correction sample

Meeting inspection procedure


Repeatability error Dominant %
requirements Rectifying with

Calibration Actuation Dominant % 3.2~3.8 standard hydrogen

of alarm sample
Resetting Dominant % 2.5~2.9
value

11 Calibration of switching value instrument


Calibration of various switching value instruments is specified in Table 4.10.2-50 ~ Table
4.10.2-55.
Table 4.10.2-50: Calibration of pressure and differential pressure switches
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Liquid column correction of pressure


Correct
switch
Inspecting with
Meeting the requirements of
Calibration of actuation value Dominant pressure standard
process flow
Calibration equipments
Meeting inspection procedure
Actuation error Dominant
requirements

Inspecting with
Contact Good contact
line-checkers

Table 4.10.2-51: Calibration of temperature switches


Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Meeting the requirements of Inspecting with


Calibration of actuation value Dominant
process flow temperature

Meeting inspection procedure standard


Calibration Actuation error Dominant
requirements equipments

Inspecting with
Contact Dominant Good contact
line-checkers

Table 4.10.2-52: Calibration of flow switches


Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Meeting the requirements of


Calibration of actuation value Dominant
process flow

Meeting the specifications of Outsourced


Actuation error Dominant
supplier inspection
Calibration
Meeting the specifications of
Allowable error of switching Dominant
supplier

Inspecting with
Contact Good contact
line-checkers

Table 4.10.2-53: Calibration of liquid level switch


Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

205
Meeting the requirements of Injecting water
Calibration of actuation value Dominant
process flow into water level
measuring
cylinder,
Meeting inspection procedure inspecting with
Calibration Actuation error Dominant mm
requirements glass
communicating
pipe

Inspecting with
Contact Good contact
line-checkers

Table 4.10.2-54: Calibration of travel switches


Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Adjusted with the


Meeting the actuation conditions
Travel actuation Dominant travel route of the
of the main body equipment
Calibration major equipments

Inspecting with
Contact Good contact
line-checkers

Table 4.10.2-55: Calibration of capacitance level controller


Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Meeting the requirements of the


Selection of inspection sensitivity
measured level nature

Setting of alarm upper and lower limits Meeting the design requirements
According to the
Calibration of time delay interval Meeting tested level fluctuation
Calibration specified methods
Zero position self-checking of empty Meeting the specifications of of supplier
bucket background capacitance supplier

Meeting the requirements of


Calibration of actuation value Dominant
process flow

12 Calibration of thermal signaling apparatus


Calibration of various thermal signaling apparatuses is specified in Table 4.10.2-56 ~
Table 4.10.2-58.
Table 4.10.2-56: Calibration and control of flashing alarm devices
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Pressing testing
button, shorting
Signal lamp flashing and giving
Calibration Alarm actuation test Dominant the signal input
off sound
terminals point by
point

Constant lighting of signal lamp, According to the


Confirming test Dominant
sound disappear test methods

206
specified in the
Signal lamp extinguishes
Release test Dominant instruction of the
(without external signals)
supplier

Table 4.10.2-57: Calibration of circuit alarm instrument and SOE event recorder
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Automatic tour gauging Dominant

Manual setting point Dominant

Scanning Actuation Dominant

Warning Records Dominant Meeting the specifications of Inputting analog

Disappear Dominant supplier event signal

Working/emergency power
supply switching
Power supply
Calibration Overtime protection for
emergency power supply

Clock, group and point Meeting the specifications of


sequence printing supplier
Printing and Point sequence and memory Meeting the specifications of Inputting analog
display indication supplier event signal

Event actuation
Dominant ms 1
discriminability

Inspecting with
Signal output contact Good contact
line-checkers

Table 4.10.2-58: Calibration of microcomputer alarm device


Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Meeting those specified in


Flat connecting lines in the cabinet Check
supplier's drawings

Calibration test of power device


Inspection According to the
input/output voltages Meeting the specifications of
specified methods
Switching operation of supplier
of supplier
working/emergency power supply

Electrical leakage resistance of DC


Calibration k 50 According to the
grounding detector
specified methods
Configuration of sound, lighting and Meeting the requirements of
Dominant of supplier
working mode process flow

Functions of testing, sound deadening, Meeting the specifications of


confirmation and resetting supplier
According to the
Matrix inspection of tie jumper Meeting the requirements of
Dominant specified methods
configuration process flow
of supplier
Meeting the requirements of
Setting of position switch Dominant
process flow

207
Configuration setting
Multi-point
of position switch (or According to the
same-lamp
jumper) Meeting the design requirements specified methods
re-flashing
Inspection of multi-point of supplier
members
re-flashing functions

13 Calibration of actuator and its accessories


Calibration of various electric actuators, actuator and the auxiliaries is specified in Table
4.10.2-59 ~ Table 4.10.2-68.
Table 4.10.2-59: Calibration of motor-driven actuator
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Flexible actuation without


Inspection Manual/automatic switching hand grip Trial running
jamming

Actuation direction Correct


Power-on
Mechanism actuation Stable and flexible
inspection
Travel time 20% Rated time
Calibration
Travel error Dominant %
Output axis of Meeting inspection procedure Power-on
Hysterisis error Dominant %
actuator requirements inspection
Dead zone Dominant %

Table 4.10.2-60: Calibration of motor-driven actuator servo amplifier


Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Zero point error Dominant mV 1 Inspecting by


Magnetic
Meeting the specifications of applying electric
amplifier Gain error Dominant
supplier signals
Calibration
Positive and Allowable error of dead Inspecting by
Meeting the specifications of
negative travel zone Dominant applying electric
supplier
routes Signal allowable error signals

Table 4.10.2-61: Calibration of pneumatic actuator


Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Manual switching hand grip Carrying out


Flexible switchover and correct switching
Inspection
Manual/automatic switchover actuation operation under
air-free conditions

Rotating manual
Flexible actuation without
Calibration Mechanical transmission parts handwheel, trial
jamming
running inspection

Actuation direction confirmation of Meeting the specifications of Applying analog


actuator supplier electrical signal or
pneumatic signal,
208
inspecting item by
item

Initial end Dominant % Applying analog


electrical signal or
Travel route Middle Dominant % Meeting inspection procedure
pneumatic signal,
allowable error End point Dominant % requirements
inspecting item by
of actuator
Backhaul Dominant % item
output axis
Meeting the specifications of Applying analog
No-load travel time Dominant
supplier electrical signal or
pneumatic signal,
"three-breaking" protection actions Meeting the specifications of
inspecting item by
(power, signal, air) supplier
item

Table 4.10.2-62: Calibration of pneumatic diaphragm valve


Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Inspecting
pneumatic (or
Action direction (positive and reverse) electric-pneumatic)
Meeting the requirements of the
when pneumatic positioner valve and positioner valve
supplier
control valve used jointly nozzle gap and
feedback cam
direction

Starting point Dominant mm Valve stem displacement 0.1~0.2 Checking by


Calibration
applying air
Travel Correct whole travel pressure according
Ending point Dominant
displacement to the supplier's
provisions

Consistent with control valve


Indicator Inspecting by
opening
Operation applying air
Whole travel route
Flexible without fluctuation pressure signals
actuation

Table 4.10.2-63: Calibration of pneumatic (electric-pneumatic) valve positioner


Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Quality of working air supply Meet design requirements Check

Confirmation of positioner positive and


Meeting the design requirements
inverse action direction

Limit of error Dominant % Inspecting by


Calibration
Positioner Meeting inspection procedure applying pneumatic
Hysterisis error Dominant %
output requirements or electric signals
Dead zone Dominant %

Positioning/straight-through switching Normal actuation

209
Table 4.10.2-64: Calibration of motor-driven valves
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Manual/automatic Actuation Flexible without jamming


Manual inspection
switching hand grip Switching force Proper
Inspection
Actuation Flexible without jamming
Manual handwheel Manual inspection
Operating force Proper

Actuation Flexible without jamming Power-on


Electrically operated
On-off directions Correct inspection

Mechanical director Dominant %


Indicating error of Electric Power-on
5.0
valve position transmission Dominant % inspection

indicator

On-off indicating
Calibration Dominant Correct indication direction
lamp Power-on
Valve travel switch
Output connection inspection
Dominant Good contact
point

Valve off actuation


Dominant Meeting the requirements of
value
Rotation moment valve tightening force of process Power-on
Valve on actuation
switch Dominant flow inspection
value

Repeatability error Dominant % 8

Table 4.10.2-65: Calibration of driving arm


Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Flexible expansion and Power-on


Tie bar actuation
contraction without jamming inspection

Meeting the specifications of Power-on


Whole travel route actuation time
supplier inspection

Power-on
Overload protection Reliable actuation
inspection

Calibration Actuation Correct Inspecting with


Travel switch
Contact Good contact line-checkers

Adjusting "zero
point" and "full
Allowable error of travel indication % 2.5 scale"
potentiometer
respectively

Table 4.10.2-66: Inspection of solenoid valve

Procedure Inspection item Nature Unit Quality criteria Inspection method

210
and instrument

Meeting the specifications of Inspecting with DC


Coil DC resistance
supplier bridge

Power-on
Inspection Valve core actuation Dominant Flexible, reliable
inspection

Ventilation
Medium passage Unimpeded
inspection

Table 4.10.2-67: Calibration of vibration coal feeder


Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Power-on
Linearity error of amplitude-control signal Dominant % 5
inspection
Calibration
Power-on
Amplitude of vibration coal feeder Dominant mm 2
inspection

Table 4.10.2-68: Calibration of speed control device for electromagnetic coupling asynchronous motor
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Inspection Manual signal dial Flexible, reliable Manual inspection

Lowest Dominant Meeting the specifications of Power-on


Speed limit
Highest Dominant supplier inspection

Switchover between manual control,


Stable, adjustable and correct Power-on
automatic control and manual/automatic Dominant %
actuation inspection
bump-less
Calibration Manual Dominant

Automatic Dominant Power-on


Signal indication error 2.5
Rotational inspection
Dominant
speed

Power-on
Speed controlling scope Dominant 1:10
inspection

14 Inspection of I&C auxiliary device


Inspection of I&C auxiliary devices is specified in Table 4.10.2.69 ~ Table 4.10.2-74.
Table 4.10.2-69: Inspection of thermocouple compensating wire performance
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Appearance Without avulsion or short circuit Observation


Inspection
Type and polarity mark Clear Observation

Inspection Ordinary Dominant Meeting inspection procedure Checking the


SC type (with S thermocouple)
of Delicate Dominant requirements inspection records
permissible
KC type and KX type (with K Ordinary Dominant
error
thermocouple) Delicate Dominant

EX type (with E thermocouple) Ordinary Dominant

211
Delicate Dominant

Ordinary Dominant
JX type (with J thermocouple)
Delicate Dominant

Ordinary Dominant
TX type (with T thermocouple)
Delicate Dominant

NC type and NX type (with N Ordinary Dominant

thermocouple) Delicate Dominant

Table 4.10.2-70: Inspection of cold junction compensation box and cold junction thermo-tank
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

S scale
Dominant
division No.
Equilibrium K scale
Dominant
point error division No.

E scale
Cold junction Dominant
division No. Meeting the specifications of Checking the
compensation
S scale supplier inspection records
Test box Dominant
division No.
Error in the
K scale
compensation Dominant
division No.
scope
E scale
Dominant
division No.

Constant temperature error of cold junction Meeting the specifications of Power-on


thermo-tank supplier inspection

Table 4.10.2-71: Inspection of DC stabilized voltage supply equipments


Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Meeting the specifications of Inspecting with DC


Output DC voltage Dominant
supplier voltmeter

Measuring with a
Change of input voltage % 10
voltmeter

Measuring with a
Inspection Change of input voltage Dominant % 1
voltmeter

On-load 24h
Rated loading test Dominant % Not heating
inspection

Actuation value of under-voltage, Meeting the specifications of


Checking records
over-voltage and over-current alarm supplier

Table 4.10.2-72: Inspection of AC stabilized voltage supply equipments


Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Meeting the specifications of Inspecting input


Inspection Inspection of voltage stabilizer voltage Dominant
supplier and output voltage

212
Output rated value is constant Changing input
Pressure stabilization value Dominant % when input voltage changes voltage, power-on
within 10 inspection

Table 4.10.2-73: Inspection of intermediate and time relay


Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Meeting the specifications of Inspecting by


Actuation voltage Dominant
supplier adding voltage

Inspecting by
Time relay Return voltage Dominant 5% Rated value
adding voltage

Inspection Inspecting with


Error of actuation time Dominant s 5% Setting value
stopwatch

Sucking
Intermediate Actuation Meeting the requirements of the Inspecting by
combination
relay value supplier adding voltage
Release

Table 4.10.2-74: Inspection of self-limit temperature heating zone


Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Without impacting shriveled


Appearance of external sheath Observation
parts, folds and distortion

Type and function mark Clear Observation

Checking the
actual power when
Leave certificate Clear, accurate data the room
Inspection
temperature is
10

Meeting the characteristic


Power-temperature characteristic test According to the
requirements of the supplier
specified methods
Meeting the requirements of heat
Maximum maintaining temperature Dominant of supplier
tracing

4.10.3 Debugging of instrument pipe and route


1 Debugging of I&C power circuit
Debugging of I&C power circuit is specified in 4.10.3-1 and Table 4.10.3-2.
Table 4.10.3-1: Debugging of I&C device power circuit
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Connection terminal, electric wiring and


Inspection Meeting the design requirements Check
cable cross section in the panel

Inspecting with a
Test Transformer voltage ratio Meeting the design requirements
voltmeter

Meeting the performance Variation range of


Allowable error of AC and DC output
requirements of I&C system input voltage:
voltage
power supply 190~240V

213
Performance of AC and DC stabilized Output change meets the Inspecting output
Dominant
voltage supply specifications of supplier voltage

Inspecting
Working/emergency power supply Reliable operation and meet the
switching
switching requirements of full load
operation

Table 4.10.3-2: Testing of UPS uninterrupted power supply system


Inspection method
Procedure Inspection item Nature Unit /Quality criteria
and instrument

Scope of the voltage


% 10 Inspecting with
fluctuation
voltmeter/oscillograph
Allowable Harmonic content % 10
error of input Inspecting with a
Steady load Dominant % 2
voltage voltmeter

Inspecting with a
50% sudden load change Dominant % 8
Test voltmeter

Inspecting
Switching time of power supply Dominant ms 3 interrupting time with
oscilloscope

Correct actuation, actuation


Overvoltage, undervoltage and
value comply with the Power-on inspection
overcurrent protection
specifications of supplier

2 Debugging of temperature, pressure, pressure-difference measurement circuit


Debugging of temperature, pressure and pressure-difference measurement circuit is
specified in Table 4.10.3-3 and Table 4.10.3-4.
Table 4.10.3-3: Debugging of temperature measurement circuits
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Heating inspection
Thermocouple measurement, circuit
Correct of thermocouple
polarity inspection
working end
Inspection
Inspecting with
Changeover Contact Good
line-checkers
switch
Mark Clear Observation

Debugging Line Thermocouple 0.1 Measuring with


and resistance Wheatstone bridge
Thermal resistance 0.05
putting error of
into moving-coil
Between two wires of thermal
operation indicating 0.01
resistance
gauge

Permitted Input terminal Thermocouple Meeting the specifications of


level of non of digital or supplier
Thermal
essential electronic
resistance
resistance indicating meter

214
Output terminal of display and
regulation instrument

Inspecting by
Composite error of temperature Meeting inspection procedure
Dominant adding simulate
measurement circuit requirements
electric signal

Dot, scribed line, paper feed of recording Meeting the specifications of


Observation
instrument supplier

Damping characteristic and alarm actuation Meeting the requirements of


Observation
value of indicating instrument process flow

Inspecting by
Tour gauging display, warning, memory and
Normal operation adding simulate
self checking functions
electric signal

Table 4.10.3-4: Debugging of pressure and pressure difference measurement circuits


Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Inspection Pulse circuit connection Correct Check

Carrying out
pressure test
Tightness of bearing parts Without leakage together with
thermodynamic
system

Circuit washing Clean Observation

Debugging Corrected value of pressure measurement


Correct Check
and liquid column
putting Pressure difference measurement zero
Correct Check
into point
operation Electric remote
Indicating value
transmission Clear, correct Check
Warning actuation value
meter

Checking the
Composite error of pressure, pressure Meeting inspection procedure indicating values
Dominant %
difference measurement circuits requirements of relevant
instruments

3 Debugging of flow measurement circuit


Debugging of various flow measurement circuits is specified in Table 4.10.3-5 ~ Table
4.10.3-10.
Table 4.10.3-5: Debugging of rotor flowmeter measurement circuit
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Inspection Tested medium parameters Meeting the design requirements Check

Not less than 20 times rotor


Tested medium density Check
density

215
Vertical misalignment of measuring tube
() 1 Check
center line

Carrying out
pressure test
Pipe sealing Without leakage together with
thermodynamic
system

Not greater than the scale mark of


Rotor location Dominant According to the
Zero point of lower limit
specified methods
blank pipe Output error of
Dominant mA 0.1 of supplier
Debugging electrical signal

and Through-flow washing Clean, unblocked According to the


putting specified methods
Liquid filling and exhaust No bubble in pipe
into of supplier
operation Meeting inspection procedure
Indication error Dominant % According to the
requirements
specified methods
Conversion of indicating-value scale Meeting the specifications of
of supplier
division supplier

Table 4.10.3-6: Debugging of volumetric flowmeter measurement circuit


Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Tested medium parameters Meeting the design requirements Observation

Carrying out

Inspection pressure test


Pipe sealing Without leakage together with
thermodynamic
system

According to the
Debugging
Through-flow washing Clean, unblocked specified methods
and
of supplier
putting
Liquid filling and exhaust No bubble in pipe According to the
into
Meeting inspection procedure specified methods
operation Indication error Dominant %
requirements of supplier

Table 4.10.3-7: Debugging of turbine flowmeter measurement circuit


Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Tested medium parameters Meeting the design requirements Check

Meeting the specifications of


Straight pipe segments at outlet and inlet Check
supplier
Inspection
Carrying out
Pipe sealing Without leakage pressure test
together with

216
thermodynamic
system

Debugging Through-flow washing Clean, unblocked Observation


and
According to the
putting Meeting inspection procedure
Indication error Dominant % specified methods
into requirements
of supplier
operation

Table 4.10.3-8: Debugging of vortex-shedding-flowmeter measurement circuit


Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Meeting the specifications of


Straight pipe segments at outlet and inlet Check
supplier

Tested medium parameters Meeting the design requirements Check

Carrying out
pressure test
Inspection
Pipe sealing Without leakage together with
thermodynamic
system

Matching of sensors, detectors and Checking delivery


Shall be matched
indicating instruments certificate

Debugging Indication error Dominant %


and According to the
Integrating error Dominant % Meeting inspection procedure
putting specified methods
requirements
into of supplier
Repeatability error Dominant %
operation

Table 4.10.3-9: Debugging of electromagnetic-flowmeter measurement circuit


Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Meeting the specifications of


Inspection Straight pipe segments at outlet and inlet Check
supplier

Carrying out
pressure test
Pipe sealing Without leakage together with
thermodynamic
system

Meeting the specifications of


Measuring media in the pipe Observation
supplier

Meeting the specifications of


Measuring circuit Observation
supplier

Meeting the specifications of


Grounding mode of cable shielding layer Observation
supplier

Meeting the specifications of


Grounding resistance Measurement
supplier

217
Tested medium parameters Meeting the design requirements Check

Meeting the requirements of


Impedance matching of signal connecting
impedance matching curve Check
cable
specified by supplier

Debugging Liquid filling and exhaust Full packages, no bubble


and According to the
Error of zero point flow Dominant % 0.2
putting specified methods
Meeting inspection procedure
into Indication error Dominant % of supplier
requirements
operation

Table 4.10.3-10: Debugging of ultrasonic-flowmeter measurement circuit


Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Wall thickness, internal diameter and


Meeting the specifications of
material of straight pipe segments at pipe Check
supplier
outlet and inlet

Tested medium parameters Meeting the design requirements Check


Inspection Permissible Length and aiming angle of

error of audio track


Meeting the specifications of
energy Included angle and interval Check
supplier
transducer between audio track and
installation pipe

Meeting the specifications of


Online self-diagnosis function Check
supplier
Debugging Meeting the specifications of
and No ultrasonic echo warning Dominant Check
supplier
putting
Error of zero flow indication Dominant %
into According to the
Error of display, integrating and record Dominant % Meeting inspection procedure
operation specified methods
requirements
Repeatability error of display, integrating of supplier
Dominant %
and record

4 Debugging of level measurement circuit


Debugging of various level measurement circuits is specified in Table 4.10.3-11 ~ Table
4.10.3-16.
Table 4.10.3-11: Debugging of the measurement circuit of electrical-contact water level gauge
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Carrying out
pressure test
Inspection Sealing of measuring tube Without leakage together with
thermodynamic
system

Debugging Water injection Error of digital or light Meeting the specifications of Injecting water in
Dominant
and inspection cross indicating value supplier measurement tube,

218
putting Output error of Meeting the specifications of and comparing
into simulation quantity supplier with glass
operation Meeting the requirements of communicating

Error of signal operation Dominant fixed value of process flow pipe and steel plate

warning ruler

Comparing with
Normal display, correct high-low
Putting into operation Dominant local water level
overrun warning actuation
gauge

Table 4.10.3-12: Debugging of double-color-water-level-gauge measurement circuit


Inspection
Procedure Inspection item Nature Unit Quality criteria method and
instrument

Inspecting with
Meeting the design line-checker and
Inspection Collating circuit and optical fiber connection
requirements incandescent
lamp

Closing water
valve, opening 1
Preheating ring of drainage
min 40~60
time of steam valve and 1/4
ring of steam
valve

Heat-tightened Heat-tightening
and screwed Nm 100 by torque
force moment spanner wrench
Putting double-color-water-level- according to the
gauge into operation specified
Putting into sequence in
operation instruction
Putting into
book,
operation of
Normal heat-tightening
water level
in turn the nuts
gauge
according to 20,
40, 60, 80 and
100 Nm screw
moment

Inspecting by
Putting into operation of remote transmission Bright display, clear interface, comparing with
optical fiber indicator clear colors local water level
gauge

Table 4.10.3-13: Debugging of float-cylinder level gauge measurement circuit


Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

219
Perpendicularity of guide tube of Inspecting by
mm 5
instrument steel wire (or steel strip) suspending line
Inspection No bend or coil buckling, jointed
Driving steel wire to pulley guiding slot, no slack Observation
rope

Meeting the specifications of


Zero point Dominant Check
supplier
Debugging
Meeting the specifications of
and Full range Dominant Check
supplier
putting
Meeting the specifications of
into Indication error Dominant Check
supplier
operation
Meeting the requirements of
Actuation value of high-low warning Dominant Check
process flow

Table 4.10.3-14: Debugging of capacitance level-meter measurement circuit


Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Between sensor and


<15
Connecting wire displayer
Inspecting with
Inspection resistance of each Output signal of
Wheatstone bridge
circuit displayer remote <45
transmission

Calibration of circuit initial distribution


capacitance (allowable error of zero point % 1.0 Check
indicating value)

Allowable error Non explosion-proof


Debugging Dominant % 1.0
of indicating type Check
value Safe spark type Dominant % 1.5

Allowable error of warning actuation


Dominant % 2.5 Check
value

Table 4.10.3-15: Debugging of electric hammer level gauge measurement circuit


Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Turning the
Flexible, free of jam and slack operating handgrip
Wire rope gearing mechanism
Inspection rope and observing the
trial running

Oil level of reduction box Within oil pointer range Observation

Meeting the requirements of Comparing with


Debugging Raising limit
hopper measurement range local manually

Meeting the requirements of mechanical level


Weight loss moment during falling
hopper measurement range meter, or

Error of level feedback indicating value Dominant % 1 measuring the

220
Meeting the specifications of level of hopper by
Manual/automatic operation Dominant
supplier ruler or steel tape

Meeting technological directly


level alarm Dominant
requirements

Table 4.10.3-16: Debugging of ultrasonic-wave (radar) level meter measurement circuit


Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Included angle of sensor transmitted wave Measuring with


measuring
Relative plan radius of level lower limit
instruments during
Blind area of wave beam Meeting the specifications of empty hopper, and
Inspection
supplier calculating
Distance between container centre line according to the
and beam center line specified formulae
of supplier

Indication Digital display Dominant Meeting inspection procedure


Observation, check
Debugging error requirements
Analogous output Dominant
and
CRT terminal display Accurate data and steady image Observation, check
putting
into Printing Clear writing and complete items Observation, check
operation Meeting the requirements of
Overrun alarm limit Observation, check
process flow

5 Debugging of composition-analysis measurement circuit


Debugging of various composition-analysis measurement circuits is specified in Table
4.10.3-17 ~ Table 4.10.3-28.
Table 4.10.3-17: Debugging of measurement circuit for analyzing the oxygen quantity in zirconium oxide
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Signal cable wiring Impending and no grounding Observation

Inspection Thermal couple compensating wire Shielding of metallic shield layer Observation

Sealing of flue gas sampling system Inleakage Observation

Inspecting by
switching
Meeting the specifications of
Accuracy self-checking "Standard "
supplier
position, switching
Debugging
on for 15~30min
and
putting (0.1%~5%)O2 Dominant % 2
Inspecting allowable According to the
into error by switching on (5.1%~10%)O2 Dominant % 3 specified methods
operation standard gas of supplier
Linearity Dominant % 1

Measuring and
Putting into operation Dominant Normal indication
comparing in same

221
position by Orsat
analysis apparatus

Table 4.10.3-18: Debugging of the circuit to measure the carbon content in boiler fly ash
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Carrying out
pressure test
Inspection Sealing of fly ash sampling pipe system Without leakage together with
thermodynamic
system

Online Empty ash bucket Display a negative value According to the


indicating value Display range V -5.00 specified methods
of carbon meter Zero point display V -V0 of supplier

Voltage equivalent of
Online empty hopper Um
Debugging and
According to the
putting into reinspection of Voltage equivalent of full Meeting the specifications of
specified methods
operation ash level bunker UL supplier
of supplier
control Threshold value of ash
control Ut

Root-sum-square error of carbon meter According to the


online sampling test (percentage of Dominant % 2.5 specified methods
measure range) of supplier

Table 4.10.3-19: Debugging of thermal-conduction-hydrogen-analyzer measurement circuit


Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Carrying out
pressure test
Sealing of system Without leakage together with
Inspection thermodynamic
system

Inspecting by
Phase correction Dominant Correct
switching out

According to the
Letting in standard gas Dominant % 5 methods of
Debugging
Allowable supplier
and
error of Analyzing and
putting
indicating comparing by gas
into
value Putting into operation Dominant % 5 analyzer at the
operation
same sampling
point

Table 4.10.3-20: Debugging of the measurement circuit of industrial electric conduction meter
Procedure Inspection item Nature Unit Quality criteria Inspection method

222
and instrument

Pointer close to initial end 0.5


Lead capacitance compensation %
lattice

Accuracy Full scale % 1003


Debugging
self-checking Temperature compensation % 863
and According to the
Online allowable error of temperature
putting 3 methods of
coefficient of tested solution
into supplier
Allowable error within the basic
operation Dominant % 3
measuring range

Allowable error within the reference


Dominant % 5
measurement range

Table 4.10.3-21: Debugging of the circuit to measure industrial acid and alkali concentration
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Type and serial number of transmitter Correct Embossing steel


letter of "A" with
acid densitometer
Inspection and transmitter;
Pipe fittings joints of transmitter Without leakage
embossing steel letter
of "B" with alkali
densitometer

Conducting wire capacitance Pointer close to initial end 0.5 According to the
compensation lattice specified methods of

Debugging Full scale % 1005 supplier


Accuracy
and Temperature
self-checking % 805
putting compensation
into Online allowable error of temperature
% According to the
operation coefficient of tested solution
5 specified methods of
Allowable error of densitometer online
Dominant % supplier
indicating value

Table 4.10.3-22: Debugging of industrial acidity (pH value) meter measurement circuit
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Transmission cable from high-resistance Meeting the specifications of


Observation
transducer to transmitter supplier
Inspection
Meeting the specifications of
System and shielding grounding Observation
supplier

Debugging Adding standard


Dominant pH Verifying with
and solution
Allowable error of laboratory
putting 0.2
indicating value acidometer or
into Putting into operation pH
standard solution
operation

Table 4.10.3-23: Debugging of in-water dissolved-oxygen analyzer measurement circuit

223
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Carrying out
pressure test
Inspection Pipe and pipe fittings of instrument Without leakage together with
thermodynamic
system

Sampling tube
Colorless and clean water
washing
According to the
Debugging before Sampling water
mL/min 30020 specified methods
putting into service quantity
Debugging of supplier
and Sampling water
252
putting temperature

into Rectification self-checking of converter

operation electrical signal According to the


Meeting the specifications of
Delicate adjusting of quantitative specified methods
Dominant supplier
electrolytic oxygen of supplier

Allowable error of putting into service Dominant

Table 4.10.3-24: Debugging of the measurement circuit of silicon and phosphate radical analyzer
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Equipment cabinet and instrument system Meeting the specifications of Check and
grounding supplier observation

Connection and pipe fittings of the pipe


Correct connection, no system Check and
system inside and outside the equipment
Inspection leakage observation
cabinet

Reagent and Loadage Reagent bottle full of solution


Check and
standard silicon Meeting the specifications of
Validity period observation
solution supplier

Zero point of primary color water in the


analyzer
Debugging
Allowable indicated value of analyzer
and Dominant % According to the
when added in standard solution online Meeting the specifications of
putting specified methods
Alarm limit and warning function of supplier
into of supplier
silicon surface temperature controller
operation
Allowable error of putting analyzer into
Dominant
operation

Table 4.10.3-25: Debugging of measurement circuit of the instrument to monitoring the negative and
positive ion exchanger failure
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Inspection Pipe system Without leakage Observation

224
Meeting the specifications of
Resin and white ball charge Observation
supplier

Negative
Dominant % 1 (Full scale ) According to the
Zero correction and baseline drift meter
specified methods
within 2h Positive
Dominant % 2(Full scale) of supplier
Debugging meter

Baseline of normal point Dominant Nearby 0 scale division According to the


specified methods
Fail point 1%~3% Basic scale mark a
of supplier

a % Is percentage ratio = Electric conductivi ty of reference water Electric conductivi ty of measurement water
100%
Electric conductivi ty of reference water

Table 4.10.3-26: Debugging of industrial-sodium-densimeter measurement circuit


Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Length

Insulation resistance
High-insulation
Distributed capacitance Meeting the specifications of
and coaxially Check
supplier
shielded cable Grounding

Wrapper material of
cable head

Glass ball bubble No pollution, crack, aging

New electrode According to the


Measuring
Inspection purification, the time provisions of the
electrode h 24
of immersion cleaning supplier

with distilled water

Medium in the solution storage tank of


Fully filled, no bubbles Observation
calomel electrode and in the ceramic tube

Carrying out
pressure test
Sealing of sampling tube Without leakage together with
thermodynamic
system

Debugging Taking the overflow of spillover


Sampling water flow rate Observation
and tube as limitation
putting According to the
into Allowable error of indicating value Dominant pNa 0.2 specified methods
operation of supplier

Table 4.10.3-27: Debugging of hydrazine-monitor measurement circuit


Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Inspection Electrolyte in the ceramic tube of sensor Fully filled, no air space Check

225
Carrying out
pressure test

Connecting Sealing Without leakage together with

pipe thermodynamic
system

Pipe material PVC plastic pipe Check

Pressure, flow capacity, temperature, PH Meeting the specifications of


Check
value of tested water sample supplier

Water level in groove is slightly


Constant pressure water
higher than spillway According to the
Water quantity
Spilling water starting in specified methods
calibration Overflow water
overflow pipe of supplier

Sampling water mL/min 100


Debugging
Zero point Dominant %
Allowable error According to the
and
of scale Full scale Dominant % 5 specified methods
putting
division of supplier
into Indicating value Dominant %
operation
Repeatability error Dominant % 3

Steady allowable error in 72h Dominant % 2 According to the


specified methods
Response time Dominant min 3
of supplier
Meeting the requirements of
Overrun alarm Dominant
process flow

Table 4.10.3-28: Calibration of flue-gas composition analysis equipment circuit


Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Signal cable wiring Single point grounding Observation


Inspection
Sealing of flue gas sampling system Inleakage Observation

Meeting the specifications of


Response time
Debugging supplier
and According to the
Meeting the specifications of
putting Accuracy self-checking specified methods
supplier
into of supplier
Linearity % 1
operation
Putting into operation Dominant Normal indication

6 Debugging of mechanical quantity measurement circuit


Debugging of various mechanical quantity measurement circuits is specified in Table
4.10.3.29 ~ Table 4.10.3-34.
Table 4.10.3-29: Debugging of the circuit to measure the axial displacement and relative expansion of steam
turbine
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Inspection Assemblage gap of transmitter Meeting the specifications of Inspecting with

226
supplier feeler gauge

Pushing the main


shaft of steam
Original position of the steam turbine Meeting the specifications of turbine to the thrust
Dominant
major axis steam turbine supplier block surface of
initial position by
lifting jack

Direction Dominant Correct Changing


transmitter gap by
using the attached
machine adjusting
Instrument frame, inspecting
display Composite error of circuit Dominant % 3 with feeler gauge (or
dial indicator) and
recording the
corresponding
output voltage

Error % 3 Inspecting by

Negative changing the


Display Correct
direction Connection of output transmitter gap (or
Debugging
Good pressing the given
terminal
inspection buttons,
Error % 3
Warning such as "alarm" and
Display Correct "tripping operation"
Positive
buttons at the
direction Connection of output
positive and
Good
terminal negative direction of
equipment)

Pressing
"Restoration "
button after accident
Memory function of alarm lamp Normal
extinction, alarm
lamp going out and
resetting

Instrument display meeting the


Supporting axis with
gap between two thrust block
Reinspection of axial displacement and jack up and down,
surfaces of steam turbine; error
expansion difference not less than two
meeting the specifications of
cycles
supplier

Table 4.10.3-30: Debugging of the measurement circuit of steam turbine heat expansion and travel indicator
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

227
During zero
positioning, turbine
chamber shall be
Zero value error of equipment Dominant % 2 under normal
temperature or
valve is in closed
position

Mechanical index Measuring the shift


Dominant %
gauge position of iron
Debugging
core by dial
indicator
Indication
(indicating gauge
linearity error and
2 shall point to 0~
circuit composite Electric indicating
Dominant % 100 % when valve
error gauge
is in complete
shutdown or
complete opening
state)

Table 4.10.3-31: Debugging of the measurement circuit of steam-turbine emergency-governor electric


indicating device
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Meeting the specifications of Inspecting with


Inspection Assemblage gap of transmitter Dominant
supplier feeler gauge

Shifting
mechanical lever
by hand to make
Manual simulation operation Correct operation, alarm lamp on
Debugging armature enter into
or approach to
transmitter

Steam turbine overspeed operation Dominant Correct operation, alarm lamp on Observation

Table 4.10.3-32: Debugging of turbine-rotor eccentricity measurement circuit


Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Inspecting with
Meeting the specifications of
Inspection Assemblage gap of probes Dominant feeler gauge or
supplier
delicate multimeter

Turning status % Comparing with


Composite error
10 the indicated value
of circuit Speed raising status %
of locally mounted
Debugging
mechanical dial
Meeting the specifications of
Alarm limit indicator and
supplier
eccentricity

228
indicating gauge

Table 4.10.3-33: Debugging of steam-turbine vibration measurement circuit


Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Meeting the specifications of


Grounding of signal cable shielding layer Check
supplier

Grounding of electromagnetic vibration


Inspection Good Check
pickup casing

Meeting the specifications of Inspecting with


Assemblage gap of current vortex probes Dominant
supplier feeler gauge

Input terminal of
Meeting inspection procedure
Zero point % short circuit
requirements
equipment

Setting the
Inspection
changeover switch
before
on the panel to
electromagnetic
"Calibration"
vibration gauge Meeting inspection procedure
Intermediate point % position, and
starting requirements
restoring it to
"Measure "
Debugging
position after
inspection

Composite error of circuit Dominant % Comparison and


inspection on the
monitor vibration
gauge of steam
10
Allowable error of alarm limit Dominant % turbine during
operation and
additional assumed
steam turbine

Table 4.10.3-34: Debugging of rotational speed measurement circuit


Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Grounding of signal cable shielding layer Meet design requirements Observation


Inspection Meeting the specifications of Inspecting with
Assemblage gap of probes Dominant
supplier feeler gauge

Debugging
Composite error of circuit Dominant % 0.5 Comparison and
inspection on the
steam turbine
during operation
starting and
additional assumed
229

monitor revolution
indicator

Inspecting during
the overspeed trip
Overrun alarm limit Dominant Meeting the design requirements
test of steam
turbine

7 Debugging of material-weighing-device measurement circuit


Debugging of various material-weighing-device measurement circuits is specified in
Table 4.10.3-35 ~ Table 4.10.3-38.
Table 4.10.3-35: Dynamic debugging of electronic belt weigher
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Grounding of micro-machine belt weigher


Inspection Good Check
grounding

Zero value error of weigher without load Dominant % Carrying out


substance
Error of indicating value and integrating Dominant %
inspection with
Meeting inspection procedure
substance
requirements
Repeatability error Dominant % detection device
(electronic belt
weigher)

Debugging Meeting inspection procedure


Error of no-load weigher integrating Dominant % Carrying out
requirements
substance
Meeting inspection procedure
Discriminability % inspection with
requirements
substance
Minimum accumulative
detection device
Material measurement Meeting the specifications of
(electronic belt
weighing Maximum accumulative supplier
weigher)
measurement

Table 4.10.3-36: Dynamic debugging of substance detection device (electronic belt weigher)
Inspection
Procedure Inspection item Nature Unit Quality criteria method and
instrument

Inspection of micro-machine hopper weigher Meeting the specifications of


Check
grounding supplier

Zero error of hopper deadweight Inspecting with


0.5ea
Self-checking resetting standard weights
Inspection
of <500e 0.5ea
suspending Indication Inspecting with
>(500~2000)e 1.0ea
weights error standard weights
a
>(2000~10 000)e 1.5e

Debugging Substance Taking the coal


Zero point error of weigher Dominant 1.0ea

230
without load weighed
accurately to
Indication <500e Dominant 1.0ea
carry out dynamic
error >(500~2000)e Dominant 2.0ea check
weighing Taking the coal
weighed
Indication
a
>(2000~10 000)e 3.0e accurately to
error
carry out dynamic
check

Smooth material feed and clean


Loading and Shaker operation
hopper
unloading Observation
Operating mechanism of Smooth unloading and uniform
materal
unloading door coal flow calibration

a e is inspection division value

Table 4.10.3-37: Dynamic debugging of dynamic electronic weigh bridge


Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Grounding resistance of weighing sensor


Inspection 4 Check
and equipment cabinet

Continuous rolling duration Day 10 Heavy load train


(weighing inspection
The times of starting, braking, shutting
Times 3 train) is pulled (or
down, pushing and towing
pushed) by engine
Meeting the specifications of
Overspeed alarm of trains head to pass through
supplier
the railway track in
Pit fundament No damage, crack
weighing area with
Main beam No damage, crack the speed from slow
Railway
Bearing plate No damage, crack to fast, the highest
track
Reinspection after speed meets
putting into Transitional devices Good track
rolling supplier's provisions.
service,
Inspect according the
rolling and
starting, braking,
reinspection Foundation bolt Without loosening
pushing and towing
within weighing area

Simulating those
Meeting those specified in methods specified
Simulation weighing re-inspection after simulation calibration table on for calibration Table
rolling dynamic electronic weigh according to
bridge dynamic electronic
weigh bridge

Dynamic Allowable error of Truck with or Meeting inspection procedure According to the
Dominant
check weighing without trailer requirements specified methods of

Whole train Dominant supplier

231
Mixed train Dominant

Distinguishing of mixed train passing


Dominant Correct
weighing apparatus

Displaying and printing of CRT and Complete items, clear


Observation
printer parameters writing, accurate data

Table 4.10.3-38: Dynamic debugging of static electronic weigh bridge (weighing wagon tipper)
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Micro-machine weighing apparatus,


Meeting the specifications of
Inspection sensor, equipment cabinet and system Check
supplier
grounding

Rolling with the


heavy vehicle of
80% the
Times rolled by heavy vehicle on
maximum
up-weighing approach rail and weighing Times 3
weighing of
apparatus surface
weighing
apparatus with the
speed of 5~7km/h
Debugging
Automatic balancing and zero point Meeting inspection procedure
Dominant According to the
tracing requirements
specified methods
Meeting the leave factory
Weighing the deadweight of platform Dominant of supplier
records of supplier

Meeting inspection procedure


Indication error Dominant % According to the
requirements
specified methods
Increasing and decreasing the
1ea of supplier
discriminability of 1.4 times scale weight

a e Is inspection division value

8 Debugging of other monitoring circuits


Debugging of other monitoring circuits is specified in Table 4.10.3-39 ~ Table 4.10.3-41.
Table 4.10.3-39: Debugging of flame monitoring device circuit
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Air pressure Pa 1500 Inspecting with


U-shaped
Inspection Cooling air differential
Air temperature 65
pressure gauge and
thermometer

According to the
Self checking function of flame indication Meeting the specifications of
Debugging specified methods
signal supplier
of supplier

232
Inspecting each
probe with
swinging
Normal display of flame
Reinspection of simulation flame signal flashlight;
condition lamp
swinging
frequency is 5~30
times/s

Frequency of probe
Meeting the specifications of
responding to the frequency According to the
supplier
Online of flickering flame specified methods

sensitivity of Flame signal output value Meeting the specifications of of supplier

single burner of probe supplier


flame Meeting the combustion
Display of flame condition
Dominant condition variation of burner in Observation
lamp
the furnace

Correctly distinguish whether the


Distinguishing of the multi-burner flame Dominant burner flame is burning or going Observation
out

Table 4.10.3-40: Debugging of furnace flame industrial television circuit


Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Measuring with
Pressure, temperature, input air of cooling Meeting the specifications of
measuring
air of video probe supplier
instruments

Linking and warning of refrigeration Meeting the specifications of


Joint inspection
Inspection system supplier

Interlocking starting/stopping of standby Meeting the specifications of


Joint inspection
cooling fan supplier

Trial running
Advance and retreat operation of TV probe Dominant Reliable and free operation
inspection

Temporarily turn
on the
incandescent bulbs
at the upper and
lower jet burner of
Screen center superposed with furnace tank, light
Debugging Visual angle calibration of probe Dominant furnace tank center, the image bulb light spot
covers the flame of all jet burners shall be clear
displayed on the
CRT screen, and
adjust the visual
angle of probe as
required

Table 4.10.3-41: Calibration of generator hydrogen leakage monitor

233
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Sealing of sampling pipe Not leakage Observation

Silica gel of dry filter Effective, adequate Observation

Performance of constant temperature Meeting the specifications of

Inspection heater supplier


According to the
Interlocking start/stop of working/standby Meeting the specifications of
specified methods
air pump supplier
of supplier
Meeting the specifications of
Measuring points switching
supplier

Meeting inspection procedure Inspecting by


Zero point error Dominant %
requirements letting in clear air

Inspecting by
letting in
Meeting inspection procedure
Measuring range error Dominant % corresponding
requirements
measurement range
Debugging
standard hydrogen

Meeting the requirements of


Overrun alarm limit Dominant
process flow According to the

Meeting the requirements of specified methods


Hydrogen with oily water and hydrogen
logic function specified by of supplier
overrun protection
supplier

9 Debugging of thermal signal circuit


Debugging of various thermal signal circuits is specified in Table 4.10.3-42 and Table
4.10.3-43.
Table 4.10.3-42: Debugging of thermal signal circuit for flashing alarm instrument
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

Resistance between warning connection


20 Measurement
point to the alarm system

The number of alarm instruments sharing


Inspection
the "testing lamp" and "sound suppression" Meeting the specifications of
Check
buttons, phase conductor of power supply, supplier
and connecting mode of zero conductor

Pressing
Lighting , sounding, sound suppression and Meeting the specifications of
Debugging corresponding
elimination tests supplier
operating buttons

Inspecting at the
Simulation operation, sound suppression initial end by
and elimination test of each warning signal Dominant Correct actuation simulating each
point warning signal
respectively

234
Meeting the operating
Calibration of each signal contact requirements, correct and Check
reliable operation

Light brands of signal Clear writing and correct display Check

Table 4.10.3-43: Debugging of thermal signal circuit for microcomputer warning device
Inspection method
Procedure Inspection item Nature Unit Quality criteria
and instrument

The length, cross section and system


Meeting the specifications of
Inspection grounding of conducting wire from Check
supplier
equipment to signal lamps

Pressing
Lighting , sounding, sound suppression Meeting the specifications of
Dominant corresponding
and elimination test supplier
operation buttons

Supply voltage allowable error 6V Dominant V 6(+0, -2.5)


Measuring with a
under the condition of turning on
24V Dominant V 24(+0, -4) voltmeter
all light brands

Inspecting at the
Simulation operation, sound suppression initial end by
and elimination test of each warning signal Dominant Correct actuation simulating each
point warning signal
respectively
Debugging Using 50K
resistance to
connect with any
Simulation grounding test of external
Grounding alarm lamp on point of external
circuit
circuit to carry out
simulation
grounding

Meeting the operating


Observation and
Calibration of each signal contact requirements, correct and reliable
check
operation

Observation and
Light brands of signal Correct display, clear writing
check

5 Evaluation on the Construction Quality of Individual project


5.1 Basic Requirements
5.1.1 In thermal power generation project, such individual projects as the civil work, boiler
unit, steam turbine generator unit, thermal meter and its control device, pipe and system,
water treatment/hydrogen generation equipment and system, welding work, processing
preparation and electrical device installation shall be evaluated respectively.
5.1.2 In the in thermal power generation project, the individual project evaluation for the
boiler unit, steam turbine generator unit, thermal meter and its control device, pipe and system,
water treatment/hydrogen generation equipment and system, as well as processing preparation

235
shall be evaluated respectively according to this code.
5.1.3 The project owner engaged in applying high quality title shall organize the
participating organizations to formulate quality objective, conduct objective management,
develop quality planning, highlight corresponding responsibilities, strengthen process control
and intensify quality acceptance in each phase before the commencement.
5.1.4 Organizations to evaluate and construct the individual project shall inspect themselves
according to the requirements specified in this Part; the owner shall be responsible for
organizing supervisor or other evaluation organization to evaluate; in addition, the supervisor
or other evaluation organization shall summarize and analyze the evaluation results and then
prepare evaluation report.
5.1.5 During the evaluation of construction quality, the actual project quality and technical
project information shall be comprehensively inspected.
5.1.6 Construction quality of individual project shall be evaluated after all the subsystems
are qualified in the acceptance inspection.
5.1.7 Construction quality of individual project shall be evaluated according to the
following five parts: installation of sampling elements, sensing elements, local detection and
control instruments; installation of control panel (console, box and cabinet); bridge
installation, cable laying and wiring; instrument pipe laying; and debugging of I&C device.
5.1.8 Each project part shall be evaluated according to the on-site quality assurance
condition, performance testing, quality records, size deviation and actual limit measurement,
compulsory provision implementation and appearance quality. Corresponding weighing value
of each evaluation project shall be given according to its work load and importance in this
project part.
5.1.9 Each evaluation item shall consist of several kinds of evaluation which shall specify
the standard score according to their importance priority. During the evaluation of
construction quality, each evaluation is judged as Class I, Class II or Class III which are
corresponding to the standard scores of 100%, 85% and 70% respectively.
5.1.10 During project construction quality evaluation, attention shall be given to promote
scientific management, strengthen project quality control, improve management mechanism
and persist to improve evaluation competence.
5.1.11 Control of project construction quality shall highlight material receiving inspection,
process quality control and function effectiveness test so as to improve management
efficiency and operating skills.
5.1.12 During the evaluation of project construction quality, attention shall be given to
apply the advance of science and technology as well as environmental protection.
5.1.13 The score for the evaluated excellent construction quality of individual project shall
be greater than or equal to 85 scores; those projects with total scores being at last 92 shall be
extremely excellent projects.
5.2 Evaluation Provisions
5.2.1 The evaluated weight value of the part contained in individual project is specified
according to the comprehensiveness of importance, difficulty and work load. The individual
project part of I&C devices shall be evaluated according to those specified in Table 5.2.1.
Table 5.2.1: Distribution of weight value on the project part of I&C devices

236
Weighing score
Weighing score
Project part

Installation of sampling elements, sensing elements, local detection and control


25
instruments

Installation of control panel (console, box and cabinet) 15

Bridge installation, cable laying and wiring 20

Instrument pipe laying 20

Debugging of I&C devices 20

5.2.2 Quality evaluation of each project part shall include the quality assurance in
construction site, performance testing, quality records, quality records, size deviation and
actual limit measurement, compulsory provision implementation and appearance quality.
5.2.3 Weight value of the evaluation item shall meet those specified in Table 5.2.3.
Table 5.2.3: distribution on the weight value of evaluation item in project part
Installation of sampling
Installation of Bridge Instrument
elements, sensing
control panel installation, pipe laying Debugging of
No. Evaluation item elements, local
(console, box cable laying and I&C devices
detection and control
and cabinet) and wiring connection
instruments

Quality assurance on construction


1 15 15 15 15 15
site

2 Performance test 20 10 10 15 25

3 Quality records 15 20 20 15 20

Size deviation and actual limit


4 15 15 15 15 15
measurement

Compulsory provision
5 15 15 15 15 15
implementations

6 Appearance quality 20 25 25 25 10

Note: If there is nonexistent evaluation item in the table, its weight value shall be calculated according to full score.

5.3 Evaluation Content


5.3.1 Construction quality of individual project shall be evaluated item by item according to
the project part and evaluation item content of this Part; the construction quality shall be
statistically analyzed basing on the records of random inspection on construction site as well
as the quality acceptance records of each batch, subitem, subsection and subsystem; in
addition, the construction quality is scored according to project part and the requirements
specified in evaluation item (corresponding table).
5.3.2 Individual project shall not be evaluated to be excellent where there is any of the
following conditions:
1 To use the materials and products which China forbids publicly
2 The obtained score of any project part or evaluation item is less than 85% standard
score.
5.4 Evaluation Methods
5.4.1 Content and methods to evaluate the quality assurance on construction site shall meet

237
the following requirements:
1 If the followings can be practically achieved, the quality assurance on construction site
is Class I and gains 100% standard score: sound quality management, liability system and
project-department organization; effectively-operated quality management system; perfect
technologies, working management system, site acceptance system and sampling inspection
system. If sound quality management and liability systems can be basically achieved, the
quality assurance on construction site is Class II and gains 85% standard score. And if main
quality management and liability systems can be basically achieved, the quality assurance on
construction site is Class III and gains 70% standard score.
2 The quality assurance on construction site with standard quality inspection and
acceptance required by projects, standard construction technologies, complete working
methods, operation specifications and operation manuals which have strong pertinency and
operability are Class I and gain 100% standard score; the quality assurance on construction
site with standard and complete quality inspection and acceptance, standard construction
technologies, basically complete operation specifications and operation manuals which have
relatively strong pertinency and operability are Class II and can gain 85% standard score; and
the quality assurance on construction site with standard and complete quality inspection and
acceptance, standard major construction technologies and complete operation specifications
as well as operation manuals which have general pertinency and operability are Class III and
gain 70% standard score.
3 The quality assurance on construction site with complete processes to develop and
approve construction management plan, construction scheme, construction measures and risk
prevention measures which have strong pertinency and operability, are seriously implemented
and achieve notable effectiveness is Class I and gains 100% standard score; the quality
assurance on construction site with complete development and approval processes, relatively
strong pertinency and operability, being implemented and achieving preferable effectiveness
is Class II and gain 85% standard score; and the quality assurance on construction site with
sound development and approval processes, being generally implemented is Class III and
gains 70% standard score.
4 The quality assurance on construction site with specified quality objective, proper &
effective management system and notable implementation effectiveness is Class I and gains
100% standard score; the quality assurance on construction site with preferable
implementation effectiveness is Class II and gains 85% standard score; and the quality
assurance on construction site with general implementation effectiveness is Class III and
gains 70% standard score.
5.4.2 Content and methods to evaluate the performance inspection shall meet the following
requirements:
1 Inspection and test of construction process as well as subsystem trial running shall
meet the requirements specified in relevant standards; the performance inspection provided
with complete and standard test records and reports is Class I and gains 100% standard score;
2 Inspection and test of construction process as well as subsystem trial running shall
meet the requirements specified in relevant standards; the performance inspection provided
with complete and basically standard test records and reports is Class II and gains 85%
standard score;

238
3 The above test items and test conditions basically meet the requirements specified in
relevant standards; and the performance inspection provided with basically complete test
records and reports is Class III and gains 70% standard score.
4 To check the test records and reports; to measure on site, if necessary
5.4.3 Content and methods to evaluate the quality records shall meet the following
requirements:
1 Those quality records with material & equipment quality certificates (outgoing quality
certificates), material/equipment acceptance record, construction record, construction test
record, data; actual and effective content, standard classification & rearrangement, perfect
reviewing and signing procedures and meeting the requirements specified in design and
standards are Class I and gain 100% standard score. Those quality records with complete
information, relatively complete data, actual and effective content, relatively standard
rearrangement, relatively complete reviewing and signing procedures and meeting the
requirements specified in design and standards are Class II and gain 85% standard score.
Those quality records with basically complete information, date; actual and effective content;
basically standard rearrangement, basically complete reviewing and signing procedures and
basically meeting the requirements specified in design and standards are Class III and gain
70% standard score.
2 To inspect the quantity and content of information
5.4.4 Content and methods to evaluate the size deviation and actually measured limit shall
meet the following requirements:
1 As for those evaluation items, if they are permissible deviation ones; the actual values
measured at each item measuring point reach the ones specified in standard and the actual
values of 80% and more measuring points are less than or equal to 0.8 times the ones
specified in standard, they are Class I and gain 100% standard score. For those evaluation
items, if the actual values of each measuring point reach the ones specified in standard and the
average actual values of greater than 50% (including 50%) but less than 80% measuring
points are less than or equal to 0.8 times the ones specified in standard; they are Class II and
gain 85% standard score. For those evaluation items, if the actual values of each measuring
point reach the ones specified in standard; they are Class III and gain 70% standard score.
2 For those evaluation items, if they are two-way limits items, the actual values measured
at each measuring point meet the ones specified in standard and the actual values of at least
50% measuring points approximate to the medium limit value; they are Class I and gain 100%
standard score; those evaluation items all of whose actual values at each measuring point are
within the limit specified in standard are Class II and gain 85% standard score; those
evaluation items whose measuring points meet the standard specification after treatment are
Class III and gain 70% standard score.
3 For those evaluation items, if they are one-way limit items and all the actual values at
each measuring point meet the ones specified in standard, they are Class I and gain 100%
standard score; those evaluation items whose measuring points meet the standard speciation
after treatment are Class III and gain 70% standard score.
4 If both permissible deviation and limit are available, the decision value is from the
lower Class.
5 Random 10 batches or all lots if they are less than 10 are sampled from the relevant

239
batches or subitems in the category for analyzing and calculating. If necessary, random
measurement on site may be carried out.
5.4.5 Content and methods to evaluate the compulsory provision implementations shall
meet the following requirements:
1 Those compulsory provisions with detailed implementation plan, comprehensive
content, strong operability, strict implementation and complete inspection records are Class I
and gain 100% standard score; those ones with implementation plan, comprehensive content,
preferable operability, preferable implementation and relatively complete inspection records
are Class II and gain 85% standard score; those ones with implementation plan,
comprehensive content, operability, implementation and inspection records are Class III and
gain 70% standard score.
2 To randomly inspect the compulsory provision implementation plan, scheme measure,
operation manual, construction record certification and compulsory provisions inspection
record;
5.4.6 Content and methods to evaluate the appearance quality shall meet the following
requirements:
1 The inspection points of each evaluation item are evaluated according to "good",
"ordinary" and "poor". Those evaluation item whose 90% or more inspection points are
"good" and the other inspection points are "ordinary" are Class I and gain 100% standard
score; those evaluation item whose greater than 70% (including 70%) and less than 90%
inspection points are "good" and the other inspection points are "ordinary" are Class II and
gain 85% standard score; those evaluation item whose greater than 30% (including 30% ) and
less than 70% inspection points are "good" and the other inspection points are "ordinary" are
Class III and gain 70% standard score.
2 To observe (to measure, if necessary); to inspect the quality acceptance records of
subsection and to analyze and calculate.

5.5 Construction quality evaluation on installations of sampling element and sensitive


element, local testing and control instrument
5.5.1 Evaluation methods of quality assurance condition for installing construction site of
sampling element and sensitive element, local testing and control instrument installations
shall meet requirements of Article 5.4.1 of this Part. The evaluation content shall be inspected
and judged comprehensively according to those requirements specified in Table 5.5.1.
Table 5.5.1 Evaluation Table on Quality Assurance Condition for Construction Site
Construction Before carrying out trial running
Project part
stage with 168 h full load

Evaluation
Construction contractor
organization

Serial Evaluation result Obtained


Evaluation content Score Remarks
number 100% 85% 70% score

240
Quality
Organizational structure of project
management
department, quality management
and product
system, operational technology,
1 liability system 30
management, working system
for
Systems for material, equipment site
construction
acceptance and sampling inspection
site

Pertinency and workability of quality inspection and


acceptance standard, construction technology standard,
2 30
working method, operation specifications and operation
instructors

Examination and approval of construction organization


design, construction scheme, construction measure, risk
3 20
aversion measure, etc. With strong effects of
pertinency, workability and implementation

Implement effects of quality objective and management


4 20
system

Weight value 15 scores


Total score:
Inspection Total obtained score:
result Evaluation score of quality assurance condition for construction site=obtained score/score*15=
Evaluation personnel(sign)

5.5.2 Inspection and evaluation methods of performance testing for installing sampling
element and sensitive element, local testing and control instrument shall meet requirements of
Article 5.4.2 of this Part. The evaluation content shall be inspected and judged
comprehensively according to those requirements specified in Table 5.5.2.
Table 5.5.2 Inspection and evaluation table on performance
Before carrying out trial
Installations of sampling element and sensitive element, Construction
Project part running with 168 h full
local testing and control instrument stage
load

Construction
Evaluation organization
contractor

Serial Evaluation content Obtained


Evaluation content Score Remarks
number 100% 85% 70% score

Testing insulation of equipment and


1 20
device

2 Leak test for pipe and sampling valve 30

3 Spectrum analysis of alloy parts 50

241
Weight value 20 scores
Total score:
Total obtained score
Evaluation
Score of inspection and evaluation of performance on installing sampling element and sensitive element, local testing
content
and control instrument=obtained score/score* 20=
Evaluation personnel(sign):
Date

5.5.3 Inspection and evaluation methods of quality records for installing sampling element
and sensitive element, local testing and control instrument shall meet requirements of Article
5.4.3 of this Part. The evaluation content shall be inspected and judged comprehensively
according to those requirements specified in Table 5.5.3
Table 5.5.3 Evaluation table of quality records
Installations of sampling element and sensitive Construction Before carrying out trial
Project part
element, local testing and control instrument stage running with 168 h full load

Evaluation
Construction contractor
organization

Serial Evaluation content Obtained


Evaluation content Score Remarks
number 100% 85% 70% score

Records of product certificate and site acceptance for


1 15
material (equipment, instrument, accessories)

Records of installation and prevention 15

Construction Acceptance record of concealed work 10


2
note
Acceptance record of inspection batch,
30
subitem, subsection and subsystem

Reports of material verification 10

Construction Testing insulation of component and


3 10
test equipment

Leak test for pipe and source valve 10

Weight value 15 scores


Total score:
Total obtained score:
Evaluation
Score of evaluation on quality record for installing sampling element and sensitive element, local testing and control
content
instrument=obtained score/score* 15=
Evaluation personnel(sign):
Date

5.5.4 Evaluation methods of actual measurement of dimension and limit for installing
construction site of sampling element and sensitive element, local testing and control
instrument installations shall meet requirements of Article 5.4.4 of this Part. The evaluation
content shall be inspected and judged comprehensively according to those requirements
specified in Table 5.5.4
Table 5.5.4 Evaluation table of actual measurement of dimensional deviation and limit
Project part Installations of sampling element and sensitive element, local Construction Before carrying out trial

242
testing and control instrument stage running with 168 h full load

Evaluation
Construction contractor
organization

Serial Evaluation content Obtained


Evaluation content Score Remarks
number 100% 85% 70% score

Gauging hole diameter deviation, vertical


1 20
misalignment and distance of tap

2 Installation deviation of tap socket 10

3 Insertion depth of sensor 20

Installation site deviation of mechanical quantity


4 20
pickup probe

Central height difference and distance deviation of


banks of pressure (pressure difference) index
5 10
gauge, pressure (pressure difference) switch,
solenoid valve, etc.

Central distance surface elevation of pressure


6 (pressure difference) index gauge, pressure 10
(pressure difference) switch

Distance of installation site and measuring point


7 10
of transmitter

Weight value 15 scores


Total score:
Total obtained score:
Evaluation
Score of actual measurement and evaluation of dimensional deviation and limit on installing sampling element and
content
sensitive element, local testing and control instrument=obtained score/score* 15=
Evaluation personnel(sign):
Date

5.5.5 Evaluation methods of implementation of compulsory provision management for


installing sampling element and sensitive element, local testing and control instrument shall
meet requirements of Article 5.4.5 of this Part. The evaluation content shall be inspected and
judged comprehensively according to those requirements specified in Table 5.5.5
Table 5.5.5 Evaluation table on implementation of compulsory provision management
Before carrying out trial running
Project part Construction stage
with 168 h full load

Construction
Evaluation organization
contractor

Serial Evaluation content


Evaluation content Score Obtained score Remarks
number 100% 85% 70%

Compilation conditions of
1 implementing compulsory provision 15
plan

2 Workability of implementing 15

243
compulsory provision plan

Compulsory provision of this


3 position(range) has been 30
implemented entirely

Strictness degree of implementing


4 20
compulsory provision of this part

Records of implementing compulsory


provision whether be complete and
5 20
meet requirements of specification or
not

Weight value 15 scores


Total score:
Inspection Total obtained score:
result Evaluation score of implementation on compulsory provision management=obtained score/score*15=
Evaluation personnel(sign):
Date

5.5.6 Inspection and evaluation methods of appearance quality for installing sampling element
and sensitive element, local testing and control instrument shall meet requirements of Article
5.4.6 of this Part. The evaluation content shall be inspected and judged comprehensively
according to those requirements specified in Table 5.5.6.
Table 5.5.6 Evaluation table on appearance quality
Installations of sampling element and sensitive element, local Construction Before carrying out trial
Project part
testing and control instrument stage running with 168 h full load

Construction Evaluation
contractor organization

Serial Evaluation content Obtained


Evaluation content Score Remarks
number 100% 85% 70% score

Installations of gauging hole cutting and sampling


1 20
element

2 Sensor installation 25

Installations in rows of measurement and control


3 15
with one and the same nature

4 Connection of paint and joint 20

5 Nameplate and mark 10

6 Instrument prevention 10

Weight value 20 scores


Total score:
Total obtained score:
Evaluation
Evaluation score of appearance quality on installing sampling element and sensitive element, local testing and
content
control instrument=obtained score/score* 20=
Evaluation personnel(sign):
Date

5.6 Construction quality evaluation of installing control panel (console, box, cabinet)

244
5.6.1 Evaluation method of quality assurance condition of construction site for installing
control panel (console, box, cabinet) shall meet requirements specified in Article 5.4.1 of this
Part. The evaluation content shall be inspected and judged comprehensively according to
those requirements specified in Table 5.5.1
5.6.2 Inspection and evaluation method of performance testing for installing control panel
(console, box, cabinet) shall meet requirements specified in Article 5.4.2 of this Part. The
evaluation content shall be inspected and judged comprehensively according to those
requirements specified in Table 5.6.2
Table 5.6.2 Inspection and evaluation table on performance
Installations of control panel (console, box, Construction Before carrying out trial running with
Project part
cabinet) stage 168 h full load

Construction Evaluation
contractor organization

Serial Evaluation content Obtained


Evaluation content Score Remarks
number 100% 85% 70% score

1 Ground detection of DCS system 70

Grounding resistance testing of other panel


2 30
(console, box, cabinet)

Weight value 10 scores


Total score:
Total obtained score:
Evaluation
Inspection and evaluation score of performance for installing control panel (console, box, cabinet)=obtained
content
score/score*10=
Evaluation personnel(sign):
Date

5.6.3 Inspection and evaluation method of quality records for installing control panel (console,
box, cabinet) shall meet requirements specified in Article 5.4.3 of this Part. The evaluation
content shall be inspected and judged comprehensively according to those requirements
specified in Table 5.6.3.
Table 5.6.3 Evaluation table of quality records
Before carrying out trial
Construction
Project part Installations of control panel (console, box, cabinet) running with 168 h full
stage
load

Evaluation
Construction contractor
organization

Serial Evaluation content Obtained


Evaluation content Score Remarks
number 100% 85% 70% score

Records of product certificate and site acceptance for


1 15
material (equipment, instrument, accessories)

Records of installation and prevention 20


Construction
2 Acceptance record of inspection batch,
note 25
subitem, subsection and subsystem

245
Inspection acceptance record of

Construction grounding for panel, cabinet and 20


3
test console

Ground detection record of DCS system 20

Weight value 20 scores


Total score:

Evaluation Total obtained score:


content Evaluation score of quality record for installing control panel (console, box, cabinet)=obtained score/score*20=
Evaluation personnel(sign):
Date

5.6.4 Inspection and evaluation method of actual measurement of dimensional deviation and
limit for installing control panel (console, box, cabinet) shall meet requirements specified in
Article 5.4.4 of this Part. The evaluation content shall be inspected and judged
comprehensively according to those requirements specified in Table 5.6.4
Table 5.6.4 Evaluation table of actual measurement of dimensional deviation and limit

Construction Before carrying out trial


Project part Installations of control panel (console, box, cabinet)
stage running with 168 h full load

Construction Evaluation
contractor organization

Serial Evaluation content Obtained


Evaluation content Score Remarks
number 100% 85% 70% score

Vertical misalignment of installing banks of panel,


1 30
cabinet and console, and joint of panel

Horizontal deviation of installing banks of panel,


2 25
cabinet and console

Disc surface deviation of installing banks of panel,


3 cabinet and console, and edge deviation of two 25
neighboring panel

Vertical misalignment and horizontal tilt deviation


4 20
of installing single panel, cabinet, console

Weight value 15 scores


Total score:
Total obtained score:
Evaluation
Evaluation score of actual measurement of dimensional deviation and limit for installing control panel (console, box,
content
cabinet) = obtained score/score*15=
Evaluation personnel(sign):
Date

5.6.5 Evaluation method of implementation of compulsory provision management for


installing control panel (console, box, cabinet) shall meet requirements specified in Article
5.4.5 of this Part. The evaluation content shall be inspected and judged comprehensively
according to those requirements specified in Table 5.5.5.
5.6.6 Inspection and evaluation method of appearance quality for installing control panel
(console, box, cabinet) shall meet requirements specified in Article 5.4.6 of this Part. The

246
evaluation content shall be inspected and judged comprehensively according to those
requirements specified in Table 5.6.6
Table 5.6.6 evaluation table on appearance quality
Construction Before carrying out trial
Project part Installations of control panel (console, box, cabinet)
stage running with 168 h full load

Construction Evaluation
contractor organization

Serial Evaluation content Obtained


Evaluation content Score Remarks
number 100% 85% 70% score

1 Installing banks of panel, cabinet, console 30

2 Installing single panel, cabinet, console 15

3 Sign board of panel, cabinet and console 15

4 Paint of panel, cabinet and console 15

5 Protection and grounding 25

Weight value 25 scores


Total score:
Evaluation Total obtained score:
content Evaluation score of appearance quality for installing control panel (console, box, cabinet)=obtained score/score*25=
Evaluation personnel(sign):
Date

5.7 Evaluation on construction quality of installing bridge, wire, cable laying and
connection
5.7.1 Evaluation method of quality assurance condition for construction site of bridge
installation, wire, cable laying and connection shall meet requirements specified in Article
5.4.1 of this Part. The evaluation content shall be inspected and judged comprehensively
according to those requirements specified in Table 5.5.1
5.7.2 Inspection and evaluation method of performance testing for bridge installation, wire,
cable laying and connection shall meet requirements specified in Article 5.4.2 of this Part The
evaluation content shall be inspected and judged comprehensively according to those
requirements specified in Table 5.7.2
Table 5.7.2 Inspection and evaluation table on performance
Construction Before carrying out trial
Project part Bridge installation, wire, cable laying and connection
stage running with 168 h full load

Construction Evaluation
contractor organization

Serial Evaluation content Obtained


Evaluation content Score Remarks
number J00% 85% 70% score

1 Insulation testing 70

2 Testing grounding resistance of bridge 30

247
Weight value 10 scores
Total score:
Total obtained score:
Evaluation
Score of inspection and evaluation on performance of bridge installation, wire, cable laying and connection=obtained
content
score/score*10=
Evaluation personnel(sign):
Date

5.7.3 Inspection and evaluation method of quality record for bridge installation, wire, cable
laying and connection shall meet requirements specified in Article 5.4.3 of this Part The
evaluation content shall be inspected and judged comprehensively according to those
requirements specified in Table 5.7.3
Table 5.7.3 evaluation table of quality record
Bridge installation, wire, cable laying and Construction Before carrying out trial
Project part
connection stage running with 168 h full load

Evaluation
Construction contractor
organization

Serial Evaluation content Obtained


Evaluation content Score Remarks
number 100% 85% 70% score

Records of product certificate and site acceptance


1 15
for material (equipment, instrument, accessories)

Installation record 15

Construction Record of concealed work 10


2
note
Acceptance record of inspection batch,
25
subitem, subsection and subsystem

Construction Insulation testing 15


3
test Protection and grounding 20

Weight value 20 scores


Total score:
Total obtained score:
Evaluation
Score of inspection and evaluation on quality record of bridge installation, wire, cable laying and
content
connection=obtained score/score*20=
Evaluation personnel(sign):
Date

5.7.4 Inspection and evaluation method of actual measurement of dimensional deviation and
limit for bridge installation, wire, cable laying and connection shall meet requirements
specified in Article 5.4.4 of this Part The evaluation content shall be inspected and judged
comprehensively according to those requirements specified in Table 5.7.4
Table 5.7.4 Evaluation table of actual measurement of dimensional deviation and limit
Construction Before carrying out trial running
Project part Bridge installation, wire, cable laying and connection
stage with 168 h full load

Construction Evaluation
contractor organization

248
Serial Evaluation content Obtained
Evaluation content Score Remarks
number 100% 85% 70% score

Distance between layers, distance between cable


1 20
and insulating layer at the time of laying cable

Cable conduit, wiring pipe tortuosity, internal


2 diameter of pipe, and elbow quantity of each 10
conduit

Height deviation, horizontal tilt deviation and


vertical misalignment of installing cable bridge
3 20
(support) bracket, internal diameter, bending
radius and central distance between layers

4 Fixed position of cable clip 10

5 Blockage and fire prevention of cable 10

Resistivity when ground resistance of system


6 15
connects electrical ground grid

7 Sectional area of grounding wire 15

Weight value 15 scores


Total score:
Total obtained score:
Evaluation
Evaluation score of actual measurement of dimensional deviation and limit of bridge installation, wire, cable laying
content
and connection=obtained score/score*15=
Evaluation personnel(sign):
Date

5.7.5 Evaluation method of implementation of compulsory provision management for bridge


installation, wire, cable laying and connection shall meet requirements specified in Article
5.4.5The evaluation content shall be inspected and judged comprehensively according to
those requirements specified in Table 5.5.5.
5.7.6 Inspection and evaluation method of appearance quality for bridge installation, wire,
cable laying and connection shall meet requirements specified in Article 5.4.6 of this Part.
The evaluation content shall be inspected and judged comprehensively according to those
requirements specified in Table 5.7.6.
Table 5.7.6 evaluation table on appearance quality
Construction Before carrying out trial
Project part Bridge installation, wire, cable laying and connection
stage running with 168 h full load

Construction Evaluation
contractor organization

Serial Evaluation content Obtained


Evaluation content Score Remarks
number 100% 85% 70% score

1 Technology of cable (wire) laying 20

2 Technology of cable connection 20

3 Label plate of cable and wire core 10

249
4 Installation technology of bridge (support) 15

5 Technology of cable conduit and wiring pipe 15

Fire retardant coating are brushed at the places


6 where cable are concentrated such as cable 10
interlayer

7 Fire prevention and blockage 10

Weight value 25 scores


Total score:
Total obtained score:
Evaluation
Score of evaluation on appearance quality of bridge installation, wire, cable laying and connection=obtained
content
score/score*25=
Evaluation personnel(sign):
Date

5.8 Evaluation on construction quality of instrument pipe laying and connection


5.8.1 Evaluation method of quality assurance condition of construction site for pipe laying
and connection of instrument shall meet requirements specified in Article 5.4.1 of this Part.
The evaluation content shall be inspected and judged comprehensively according to those
requirements specified in Table 5.5.1.
5.8.2 Inspection and evaluation method of testing performance of Pipe laying and connection
of instrument shall meet requirements specified in Article 5.4.2 of this Part. The evaluation
content shall be inspected and judged comprehensively according to those requirements
specified in Table 5.8.2.
Table 5.8.2 Inspection and evaluation table on performance
Instrument pipe laying and Construction Before carrying out trial running
Project part
connection stage with 168 h full load

Construction Evaluation
contractor organization

Serial Evaluation content Obtained


Evaluation content Score Remarks
number 100% 85% 70% score

1 Leak test of oil chamber 60

2 Spectrum analysis of alloy parts 40

Weight value 15 scores


Total score:
Total obtained score:
Evaluation
Score of inspection and evaluation on performance of pipe laying and connection of instrument =obtained
content
score/score*15=
Evaluation personnel(sign):
Date

5.8.3 Inspection and evaluation method of quality record of pipe laying and connection of
instrument shall meet requirements specified in Article 5.4.3 of this Part. The evaluation
content shall be inspected and judged comprehensively according to those requirements
specified in Table 5.8.3.
Table 5.8.3 Evaluation table of quality record

250
Construction Before carrying out trial
Project part Instrument pipe laying and connection
stage running with 168 h full load

Evaluation
Construction contractor
organization

Serial Evaluation content Obtained


Evaluation content Score Remarks
number 100% 85% 70% score

Records of product certificate and site acceptance


1 15
for material (equipment, instrument, accessories)

Installation record 20

Record of concealed work 10


Construction
2 Acceptance record of inspection
note
batch, subitem, subsection and 20
subsystem

Construction Reports of material verification 15


3
test Pipe leak test 20

Weight value 15 scores


Total score:
Total obtained score:
Evaluation
Score of inspection and evaluation on quality record of Pipe laying and connection of instrument =obtained
content
score/score*15=
Evaluation personnel(sign):
Date

5.8.4 Inspection and evaluation method of actual measurement of dimensional deviation and
limit for Pipe laying and connection of instrument shall meet requirements specified in Article
5.4.4 of this Part. The evaluation content shall be inspected and judged comprehensively
according to those requirements specified in Table 5.8.4
Table 5.8.4 Evaluation table of actual measurement of dimensional deviation and limit
Construction Before carrying out trial running
Project part Instrument Pipe laying and connection
stage with 168 h full load

Construction Evaluation
contractor organization

Serial Evaluation content Obtained


Evaluation content Score Remarks
number 100% 85% 70% score

1 Length of instrument pipe 20

2 Distance of instrument pipe 20

3 Slope of instrument pipe 20

4 Contra aperture of pipe of instrument 20

5 Distance of pipe and support of instrument 20

251
Weight value 15 scores
Total score:
Total obtained score:
Evaluation
Evaluation score of actual measurement of dimensional deviation and limit for Pipe laying and connection of
content
instrument =obtained score/score*15=
Evaluation personnel(sign):
Date:

5.8.5 Evaluation method of implementation of compulsory provision management for pipe


laying and connection of instrument shall meet requirements specified in Article 5.4.5 of this
Part. The evaluation content shall be inspected and judged comprehensively according to
those requirements specified in Table 5.5.5
5.8.6 Inspection and evaluation method of appearance quality for pipe laying and connection
of instrument shall meet requirements specified in Article 5.4.6 of this Part. The evaluation
content shall be inspected and judged comprehensively according to those requirements
specified in Table 5.8.6
Table 5.8.6 evaluation table on appearance quality
Instrument pipe laying and Construction Before carrying out trial running with
Project part
connection stage 168 h full load

Construction Evaluation
contractor organization.

Serial Evaluation content Obtained


Evaluation content Score Remarks
number 100% 85% 70% score

1 Appearance of instrument pipe 20

2 Instrument Pipe laying 20

3 Fixing instrument pipe 20

Distance of pipe and support of


4 10
instrument

5 Sign board of instrument pipe 10

6 Instrument pipe welding 20

Weight value 25 scores


Total score:
Evaluation Total obtained score:
content Score of evaluation on appearance quality for Pipe laying and connection of instrument =obtained score/score*25=
Evaluation personnel(sign):
Date:

5.9 Evaluation on construction quality of I&C device debugging


5.9.1 Evaluation method of quality assurance condition of construction site of I&C device
debugging shall meet requirements specified in Article 5.4.1. The evaluation content shall be
inspected and judged comprehensively according to those requirements specified in Table
5.5.1
5.9.2 Inspection and evaluation method of testing performance for I&C device debugging
shall meet requirements specified in Article 5.4.2. The evaluation content shall be inspected
and judged comprehensively according to those requirements specified in Table 5.9.2

252
Table 5.9.2 Inspection and evaluation table on performance
Debugging and acceptance of measuring Construction Before carrying out trial
Project part
instruments and control devices stage running with 168 h full load

Evaluation
Construction contractor
organization

Evaluation content Obtained


Serial number Evaluation content Score Remarks
100% 85% 70% score

1 Instrument verification 40

2 Circuit debugging of I&C measurement 30

3 I&C debugging control circuit 30

Weight value 25 scores


Total score:
Evaluation Total obtained score:
content Score of inspection and evaluation on performance for I&C device debugging=obtained score/score*25=
Evaluation personnel(sign):
Date:

5.9.3 Inspection and evaluation method of quality records for I&C device debugging shall
meet requirements specified in Article 5.4.3The evaluation content shall be inspected and
judged comprehensively according to those requirements specified in Table 5.9.3.
Table 5.9.3 Evaluation table of quality records
Debugging and acceptance of measuring Construction Before carrying out trial
Project part
instruments and control devices stage running with 168 h full load

Evaluation
Construction contractor
organization

Serial Evaluation content Obtained


Evaluation content Score
number 100% 85% 70% score

Records of product certificate and site acceptance


1 15
for material (equipment, instrument, accessories)

Certificate of verification personal 10

Verification certificate of standard


10
Construction meter
2
record Acceptance record of inspection
batch, subitem, subsection and 20
subsystem

Calibration record of instrument 15

Debugging record of equipment


Construction 20
3 monomer
test
Loop checking record of
10
measurement signal

253
Weight value 20 scores
Total score:
Evaluation Total obtained score:
content Score of evaluation on quality record for I&C device debugging=obtained score/score*20=
Evaluation personnel(sign):
Date:

5.9.4 Inspection and evaluation method of actual measurement for dimensional deviation and
limit for I&C device debugging shall meet requirements specified in Article 5.4.4. The
evaluation content shall be inspected and judged comprehensively according to those
requirements specified in Table 5.9.4
Table 5.9.4 Evaluation table of actual measurement of dimensional deviation and limit
Debugging and acceptance of measuring Construction Before carrying out trial
Project part
instruments and control devices stage running with 168 h full load

Construction Evaluation
contractor organization

Serial Evaluation content Obtained


Evaluation content Score Remarks
number 100% 85% 70% score

1 Precision of standard meter 40

Alignment error of instrument and control


2 60
device

Weight value 15 scores


Total score:
Total obtained score:
Evaluation
Score of evaluation on actual measurement of dimensional deviation and limit for I&C device debugging=obtained
content
score/score*15=
Evaluation personnel(sign):
Date:

5.9.5 Evaluation method of implementation of compulsory provision management of I&C


device debugging shall meet those requirements specified in Articles 5.4.5 in this Part. The
evaluation content shall be inspected and judged comprehensively according to those
requirements specified in Table 5.5.5.
5.9.6 Inspection and evaluation method of appearance quality for I&C device debugging shall
meet requirements specified in Article 5.4.6 in this Part. The evaluation content shall be
inspected and judged comprehensively according to those requirements specified in Table
5.9.6.
Table 5.9.6 Evaluation table on appearance quality
Debugging and acceptance of measuring Construction Before carrying out trial running
Project part
instruments and control devices stage with 168 h full load

Construction Evaluation
contractor organization

Serial Evaluation content Obtained


Evaluation content Score Remarks
number 100% 85% 70% score

254
Name identification of instrument and
1 40
control device

Calibration label of instrument and


2 60
control device

Weight value 10 scores


Total score:
Evaluation Total obtained score:
content Score of evaluation on appearance quality for I&C device debugging=obtained score/score*10=
Evaluation personnel(sign):
Date:

5.10 Evaluation score summarized table of each part of individual project


5.10.1 Quality evaluation score of individual project shall be summarized and evaluated
corresponding to each project part and evaluation project
5.10.2 Quality evaluation score of individual project and evaluation rating shall be
implemented in accordance with requirements specified in Article 5.10.2
Table 5.10.2 Evaluation score summarized table of each part of individual project
Project part

Installations of
sampling Installations
Bridge Debugging and
element and of control Instrument
Serial Evaluation installation, acceptance of
sensitive panel pipe laying Total Remarks
number content wire, cable measuring
element, local (console, and
laying and instruments and
testing and box, connection
connection control devices
control cabinet)
instrument

Quality
assurance
1
condition of
construction site

Performance
2
testing

3 Quality record

Actual
measurement of
4 dimensional
deviation and
limit

Compulsory
5 provision
implementation

Appearance
6
quality

Total

255
Weight value% 25 15 20 20 20

Obtained score

Total score Opinion rating (grade)

Evaluation personnel(sign):
Evaluation organization(seal))
Date:

5.11 Report of individual project quality evaluation


5.11.1 After quality evaluation of individual project, supervision or evaluation organizations
shall carry out evaluation report which shall include the following content:
1 Overview of individual project
2 Quality evaluation situation and result of project part
3 Quality evaluation situation and result of individual project
5.11.2 Report of individual project quality evaluation shall meet the following requirements:
1 Individual project overview: explaining primary device situation, each participating
contractor (design, construction, debugging, supervision, etc), contracting pattern and
construction safety workload (contract amount), major projects characteristics, quality control
in the construction process.
2 Administrative situation of individual project: quality characteristic (technology highlights,
management innovation, technology innovation, "four new "application), machine set trial
running with 168h and targets accomplishment of quality, safety, saving and environmental
protection.
3 Engineering acceptance situation: checking acceptance result of subsystem, subsection,
and subitem.
4 Evaluation of each project part: where there is the item of serious inconformity, it shall be
indicated on stress.
5 Score summary of individual projects quality evaluation, evaluation rating and conclusive
opinion.

6 Quality evaluation of individual unit


6.0.1 Quality evaluation of individual unit shall be carried out on the basis of evaluation
accomplishment of entire individual project construction quality of this unit and development
of support environmental protection engineering and after full-load trial running with 168 h of
this unit. Evaluation of performance test technology index of individual unit shall be brought
into the stage of overall project quality evaluation.
6.0.2 More units shall be evaluated synchronously in accordance with individual unit
respectively, and the support public system of subsequent operation of the unit and operation
unit shall be evaluated synchronously.
6.0.3 Technology index evaluation of unit full-load trial running with 168 h shall be in
accordance with those specified in Table 6.0.3.
Table 6.0.3 Technology index evaluation table of full-load trial running with 168 h of the unit
Serial number of
Project name
plant unit

Test organization Evaluation

256
organization

Examining
Serial Examination
Evaluation content Nature standard/examining Remarks
number result/actual values
value

Conditions ready for 168 h trial


1 Dominant Meeting requirements
running

2 Continuous operating time Dominant 168h

Meeting preselected
3 Continuous steady load
load curve

4 Continuous average load rate 90%

5 Time of continuous full load 96h

6 Utilization rate of I&C protection Dominant 100%

Automatic utilization rate of I&C


(coordinating utilization, and
7 Dominant 95%
controlling quality to come up to
standards)

I&C, electrical measuring


8 99%
point/instrument utilization rate

Accuracy rate of I&C meter


9 indication and meter indication of 98%
electrical measuring point

10 Utilization rate of electric protection Dominant 100%

11 Utilization rate of electromatic device Dominant 100%

Qualification of steam and water


12 Qualified
quality

Approved by
13 Termination of full load trial running Dominant
commander-in-chief

Number of days of first trial running


with 168 h full load from blowing
14 90d
pipe and lighting a fire to
accomplishment

Starting frequency of 168 h trial


15 3times
running

16 Sealing of vacuum system Dominant 0.3kPa/min

Hydrogen leakage rate of electric


17 10Nm3/d
generator

18 Shafting vibration of unit Dominant 76m

19 Load dump test of unit Meeting requirements

Evaluation score:

Evaluation personnel(sign):
Date:

257
Note 1: Class I: If the following conditions are met: each index reaches examination value and the relevant requirements; and test
conditions meet requirements; the test report and certification are complete and standard, it is rated as Class I with the evaluation
score of 92 scores or above ~100 scores
Note 2: Class II: evaluation score 85 (including 85)~92; dominant indexes reaching assessment value and relevant requirements;
test conditions meeting the requirements; test report, certification complete and normative; 85% and above general indexes
reaching assessment value and relevant requirements; test report, certification complete and normative fundamentally.
Note 3: Class III: evaluation score 70 (including 70)~85; dominant indexes reaching assessment value and relevant requirements;
test conditions meeting the requirements; test report, certification complete and normative; 70% and above general indexes
reaching assessment value and relevant requirements; test report, certification complete and normative fundamentally.

6.0.4 Individual unit evaluation score is the sum of obtained score of all weighted individual
project quality evaluation and unit 168-h full load trial running technical index evaluation.
Evaluation score statistics shall be in accordance with those specified in Table 6.0.4.
Table 6.0.4 Individual unit evaluation score statistic table
Project name Unit number

Construction Evaluation
contractor organization

Serial Obtained
Quality evaluation of individual project Scores Weight %
number score

1 Civil engineering 15

2 Boiler unit 16

3 Steam turbine generator unit 15

4 Instrumentation and control 9

5 Pipe and system 5

6 Water treatment/hydrogen generation equipment and system 5

7 Welding 6

8 Processing preparation 3

9 Installation of electrical devices 10

10 Technical index of unit 168-h full load trial running 16

Evaluation score:

Evaluation personnel(sign):
Evaluation organization(seal)
Date:

Note 1: evaluating civil engineering shall refer to requirements specified in GB / T 50375 - 2006
Note 2: Electrical device installation shall be evaluated according to the subsystem fine rate in DL/T 5161-2002; Class I: fine rate
is 100%; Class II: fine rate is 95%~99%; Class III: fine rate is 90%~94%.

7 Overall project quality evaluation


7.0.1 The quality evaluation for overall project shall be conducted after the quality evaluation
for all individual units, grid special test, the performance tests of the units and the engineering
archives management evaluation are completed.
7.0.2 Performance test technical index evaluation of individual unit shall be in accordance

258
with those specified in Table 7.0.2.
Table 7.0.2 Performance test technical index evaluation table of individual unit
Project name Unit number

Evaluation
Test organization
organization

Design Test
Test report
Serial value / Actual conditions
Evaluation content Nature (coincidence Remarks
number guarantee values (coincidence
rate)
value rate)

1 Boiler thermal efficiency Dominant

2 Maximum continuous rating of boiler

3 Boiler rated load

Minimum stable combustion rating of


4
boiler fuel (arc) cut

5 Coal pulverizing system rating

6 Coal mill unit consumption

7 Air preheater air leakage ratio

8 Dust remover efficiency

Maximum rating of steam turbine


9 Dominant
(combustion engine)

Nominal rating of steam turbine


10
(combustion engine)

Heat consumption of steam turbine


11 Dominant
(combustion engine)

12 Coal consumption of unit power supply Dominant

13 Power consumption rate in the unit plant Dominant

14 Unit shafting vibration Dominant

15 Unit RB test

Pollutant emission (NOx, so2, smoke


16 Dominant
and dust, waste water)

17 Noise

18 Heat dissipation

19 Dust

20 Denitration efficiency

21 Denitration efficiency

22 Waste water and sewage treatment Dominant

Power generation water consumption


23 Dominant
rate

Evaluation score:

Evaluation personnel(sign):
Date:

259
Note 1:Class I: evaluation score 92 or above(including 92)~100; each index reaching design value, contract guarantee value and
relevant criteria; test conditions meeting the requirements; test reports and statistical forms complete and normative.
Note 2: Class II: evaluation score 85 or above (including 85)~92; dominant indexes reaching design value, contract guarantee
value and relevant criteria; test conditions meeting the requirements; 85% and above general indexes reaching design value,
contract guarantee value and relevant criteria, test reports and statistical forms complete and normative fundamentally.
Note 3: Class III: evaluation score 70 or above (including 70)~85; dominant indexes reaching design value, contract guarantee
value and relevant criteria; test conditions meeting the requirements; 70% and above general indexes reaching design value,
contract guarantee value and relevant criteria, test reports and statistical forms complete and normative fundamentally.

7.0.3 Engineering archives management evaluation shall be in accordance with those


specified in Table 7.0.3.
Table 7.0.3 Engineering archives management evaluation table
Project name Project scale

Evaluation
Owner
organization

Contents of unmatched Obtained


Evaluation content Score Remarks
items score

Each item archives working system shall be improved;


management system and working procedure shall be
developed. Unified leadership, hierarchical
management and responsibility system of leader shall
5
be adopted for project archives work. Owners shall
supervise and instruct construction participating
organization. Project archives work shall be carried out
Basic synchronously with project construction.
management Filing work shall be brought into the post
of archives responsibilities of relevant department and personnel as
5
work well as contract management, and provided with
assessment measures.

Archives management shall be informationalized and


convenient for shortcut retrieve and utilization.
Facilities, equipments and personnel allocation shall
20
meet the requirements of archives safety, protection
and modernization management. Personnel shall be on
duty with certificates.

Time of Within 45 days after putting into production, all


5
filing archives shall be handed over to owners

Filing documents shall be intact, accurate, systematic


Scope of
and effective. Retention period shall be classified 30
filling
accurately.

Project document collection and arrangement


Archives (classification, volume compilation, arrangement, serial
20
quality number and catalog) shall be normative; hand-over
procedures shall be complete.

260
Completion drawing compilation shall be normative
5
and meet the actual conditions

Durable carrier, legibility, complete signature and seal 10

Engineering archives management evaluation score:


Evaluation
Evaluation personnel(sign):
results
Date:

Note 1: Class I: evaluation score shall be 92 score or above (including 92) ~100 score.
Note 2: Class II: evaluation score shall be 85 score or above (including 85) ~ 92score.
Note 3: Class III: evaluation score shall be 70 score or above (including 70) ~85 score.

7.0.4 Application of advanced technology such as advance of science and technology as well
as energy saving and emission reduction shall be paid attention to in the overall project
quality evaluation. Once obtain awards including scientific and technical achievement at
provincial or department (industry) level, patents, working method, QC achievement, "four
new" application, new record, saving, environmental protection, etc., each item can be added
0.5 score; and each item obtaining national award can be added 1 score. The same class of
awards shall be added marks in accordance with the highest award (only once), and the total
awarded marks shall not exceed 5 scores at the most. Projects that win state, province and
department (industry) level award or certificate shall be awarded marks according to those
specified in Table 7.0.4.
Table 7.0.4 State, province and department (industry) level award statistic table
Project name Project scale

Serial
Awarded project Awarded project name Award department Adding marks
number

1 High quality engineering award

2 Scientific and technological achievement award

3 Patent

4 Working method

5 QC achievement

6 "Four new" application

7 New record

8 Saving

9 Environmental protection

Total score:

Evaluation personnel(sign)
Evaluation organization(seal)
Date:

7.0.5 Overall project quality evaluation score is the sum of mean value of all individual unit
evaluation scores, mean value of all unit performance test evaluation scores, Obtained score
of engineering archives management evaluation and awarded scores. Overall project quality
shall be evaluated according to those specified in Table 7.0.5.
Table 7.0.5 Overall project quality evaluation summary table
Project name Project scale

261
Owner Supervisor

Debugging
Construction organization
contractor Performance test
organization

Serial Obtained
Evaluation item Weight %
number score

1 Mean value of all individual unit evaluation scores 55

2 Mean value of all unit performance test evaluation scores 30

3 Engineering archives management evaluation 15

4 Awarded score

Overall project quality evaluation score:

Evaluation personnel(sign):
Evaluation organization(seal)
Date:

7.0.6 Fine project: overall project quality evaluation score is 85 and above; high-quality fine
project: 92 and above.
7.0.7 Overall project quality evaluation shall be organized and coordinated by owners, and
carried out independently by supervisors or other evaluation organizations. Evaluation content
shall be provided with assessment report.
7.0.8 Overall project quality evaluation shall meet the relevant requirements of current
national and professional project completion acceptance and evaluation.

262
Annex A

(Normative)

Insulation resistance of industrial automation instrument


A.1 For the instruments equipped with protective grounding terminals or points, and the
instruments supplied by low voltage safety power supply (means in the circuit separated from
supply main by security isolation transformer or convertor equipped with individual winding:
for the instruments with electronic components, effective value of ac voltage between each
conductor or between any conductor to the earth shall no greater than 50V; for the electric
measure indicator and recording meter without electronic components, effective value of ac
voltage between each conductor shall no greater than 42V; or in the three phase line, effective
value of ac voltage between conductor and middle line shall no greater than 24V) , when
carry out insulation resistance test under different test conditions, DC test voltage
(megohmmeter voltage) applied respectively to between the insulated grounding terminal and
outer cover (or the ground), or between the mutually isolated terminals shall comply with the
specified value of Table A.1, insulation resistance shall not be less than the specified value of
Table A.1.
Table A.1 Insulation resistance of industrial automation instrument (I)

Insulation resistance M
Rated voltage or nominal circuit
voltage (DC or effective value of DC test voltage V Test condition
sine-wave alternate current) (V) Atmospheric conditions of
Hot and damp conditions
general test

60 100 5 1

>60~130 250 7 2

>130~650 500 10 5

A .2 For the instruments without protective grounding terminal or points, when carry out
insulation resistance test under different test conditions, DCDC test voltage (voltage of
insulation resistance meter) applied to each insulated grounding terminal and outer cover shall
comply with the specified value of A.2, insulation resistance shall not be less than the
specified value of Table A.2; DCDC test voltage applied to the mutually isolated terminals
shall comply with the specified value of Table A.1, insulation resistance shall not be less than
the specified value of Table A.1
Table A.2 Insulation resistance of industrial automation instrument (II)

Insulation resistance M
Rated voltage or nominal circuit
voltage (DC or effective value of DC test voltage V Test condition

sine-wave alternate current) (V) Atmospheric conditions of


Hot and damp conditions
general test

60 100 5 7

>60~130 250 10 5

263
>130~650 500 20 7

A 3 The aforesaid technical requirements of insulation resistance do not applicable to the


system integrated equipment; the technical requirements of insulation resistance of system
integrated equipment shall comply with relevant standards or specifications of supplier.

Annex B

(Normative)

Selection of gasket material


Gasket material selection of I&C device shall be in accordance with those specified in Table
B.1
Table B.1 Selection of gasket material

Gasket Application scope

Pressure
Types Material Temperature , Medium
(0.098MPa)

Paper pad Fish paper <120 Oil, water

Natural rubber 6 -60~100 Water, sea water, air


Rubber gasket
General rubber gasket -40~60 Water, air

Splint reinforced
Fabric reinforced rubber 6 -30~60 Sea water, air
rubber gasket

Dilute acid, acidic solution,


SPVC gasket SPVC plate 16 <60
oxidative steam and gas

Intensified acid, alkali, solvent,


PTFE gasket PTFE plate 30 -180~250
oils, fire-resistant oil

High pressure rubber-asbestos


gasket
60 450
Middle pressure rubber-asbestos Air, compressed air, steam, noble
40 350
Rubber and gasket gas, water, sea water, acid, salt
15 220
asbestos gasket Low pressure rubber-asbestos
gasket

Oil proof rubber-asbestos plate 40 400 Oil, oil gas, solvent, alkali

Spiral wound Metal part: copper,aluminum,08


gasket, flat metal steel,1 Cr 13,1 Cr 18 Ni 9 Ti;
64 600 Steam, hydrogen, air, oil, water
gasket or wave nonmetallic part: asbestos tape and
shape gasket PTEF

Flat metal gasket A3, 10, 20, 1Cr13 200 550 Steam, water

1Cr18Ni9Ti 200 600 Steam

264
100 250 Water
Copper, aluminum
64 425 Steam

The same flat


08 steel, 1Cr13
Metal tooth form metal gasket The same flat metal Fire-resistant oil of the same flat
Alloy steel
gasket 40 gasket660 metal gasket
Soft steel
40

Note: material of selected gasket shall be requested not to have chemical reaction with tested medium

Annex C

(Normative)

The shortest straight pipe segment length shall be required by orifice

plate, nozzle and venturi nozzle


The shortest straight pipe segment length required by orifice plate, nozzle and venturi
nozzle shall be in accordance with those specified in Table C.1.
Table C.1 The shortest straight pipe segment length required by orifice plate, nozzle and venturi nozzle

The shortest
Choked flow mode of throttling components at the upstream side and the shortest straight pipe length
straight pipe
length at the
downstream

Single 90 Reducing All ball of throttling


Two or more Complete
Diameter elbow or tee Two or more pipe (for the Increasing pipe (for valves or component
90 elbows opening
ratio joint T (liquid 90 elbows length of the length of sluice (including all
on different of
just effuse on the same 1.5D~3D, 1D~2D, changed valves throttling
plane spherical
from one plane surface changed from from 0.5D to D) complete components
surfaces valve
branch pipe) 2D to D) opening in the left
column of
this table)

265
0.20 10 (6) 14 (7) 34 (17) 5 16 (8) 18 (9) 12 (6) 4 (2)
0.25 10 (6) 14 (7) 34 (17) 5 16 (8) 18 (9) 12 (6) 4 (2)
0.30 10 (6) 16 (8) 34 (17) 5 16 (8) 18 (9) 12 (6) 5 (2.5)
0.35 12 (6) 16 (8) 36 (18) 5 16 (8) 18 (9) 12 (6) 5 (2.5)
0.40 14 (7) 18 (9) 36 (18) 5 16 (8) 20 (10) 12 (6) 6 (3)
0.45 14 (7) 18 (9) 38 (19) 5 17 (9) 20 (10) 12 (6) 6 (3)
0.50 14 (7) 20 (10) 40 (20) 6 (5) 18 (9) 22 (11) 12 (6) 6 (3)
0.55 16 (8) 22 (11) 44 (22) 8 (5) 20 (10) 24 (12) 14 (7) 6 (3)
0.60 18 (9) 26 (13) 48 (24) 9 (5) 22 (11) 26 (13) 14 (7) 7 (3.5)
0.65 22 (11) 32 (16) 54 (27) 11 (6) 25 (13) 28 (14) 16 (8) 7 (3.5)
0.70 28 (14) 36 (18) 62 (31) 14 (7) 30 (15) 32 (16) 20 (10) 7 (3.5)
0.75 36 (18) 42 (21) 70 (35) 22 (11) 38 (19) 36 (18) 24 (12) 8 (4)
0.80 46 (23) 50 (25) 80 (40) 30 (15) 54 (27) 44 (22) 30 (15) 8 (4)

The shortest length of straight pipe


Choked flow parts
section on the upstream side

Symmetrical sudden contraction tapered pipe: diameter ratio


For the all diameter ratio greater than or equal to 0.5
30 (15)
Thermometer insertion socket and plug seat: diameter less than
5 (3)
or equal to 0.03 D
20 (10)
Thermometer tube and plug seat with diameter between 0.03 D
to 0.13 D

Note 1: List value: the shortest length of straight pipe segment required at the upstream or downstream of throttling component
and the shortest length of straight pipe segment of different kinds of choked flow and throttling component Note2:the values
without parentheses is the values with 0 additional uncertainty
Note 3:the values with parentheses is the values with "0.5% additional uncertainty ".
Note 4:Straight pipe length all expressed the multiples of internal diameter D, they shall be measured from the upstream end
surface of throttling components.

Annex D

(Normative)

Sealing test standard of pipe and valve


Sealing test standard of pipe and valve of instrumentation and control engineering shall be in accordance with those specified in
Table D.1

Table D.1 Sealing test standard of pipe and valve


Serial
Test item Test code
number

Sealing test of valve, steam and water pipe Carry out water pressure test with 1.25 times of working pressure, and
1
of tap check the no-leakage phenomenon within 5 min

Carry out sealing test with 1.5 times of working pressure, pressure
2 Sealing test of pneumatic signal pipe
unloading value within 5 min shall not be greater than 0.5%

266
Try to press with 0.10 MPa ~ 0.15 MPa (gauge pressure) compressed air,
Sealing test of compressed air pipe and
3 if it is no-leakage, then conduct test with 6 kPa, and the pressure reduction
changeover switches
value within 5 min shall not be greater than 50 Pa

Tested with 0.1~0.15MPa (gauge pressure) compressed air, pressure


4 Sealing test of oil pipe and vacuum piping
reduction value within 15 min shall not be greater than 3% of test pressure

Sealing test shall be carried out for instrument pipe and valve along with
5 Sealing test of hydrogen pipe system hydrogen system of electric generator, and the test code shall meet
requirements specified in DL 5011 - 1992 of Annex J

Annex E

(Normative)

The minimum distance between signal cable and power cable


The minimum distance between signal cable and power cable shall be in accordance with
those specified in Table E.1.
Table E.1 Minimum distance between signal cable and power cable
Laying in metallic cable tank with cover plate or laying through the steel plate Laying in
Cable laying way
(mm) the cable

Below 10 m tank with


Length of the cable laying parallel 25m 100m 200m 500m 500
and cover plate
with power cable Below Below Below Below Above
perpendicular (mm)

120V, 10ABelow 10 10 50 100 200 250

250V, 50ABelow 10 50 150 200 250 250


Power 1500
cable 400V, 100ABelow 50 100 200 250 250 250
capacity
500V, 200ABelow 100 200 250 250 250 250

500V, 200AAbove >500 3000

Note: Internal voltage in the Power Cable Capacity column is the maximum voltage of circuit, and current is the sum of
simultaneous current of each circuit

Annex F

(Normative)

Selection of instrument pipe material and pipe diameter


Selection of instrument pipe material and pipe diameter shall be in accordance with those
specified in Table F.1
Table F .1 selection of instrument pipe material and pipe diameter
Tested Tested medium Before sampling valve After sampling valve Remarks

267
medium parameters Pressure Conduit pipe
Conduit pipe
Name sampling stub (external
(external
Material pipe (external Material diameter *
diameter * wall
diameter * wall wall
thickness)mm
thickness)mm thickness)mm

12Cr1MoVOr
p=2.7MPa~14.0MPa; 257
material of main 163 Steel20 142
t=500~540 226
pipe

12Cr1MoVOr
p=16.0MPa~17.5MPa; 257
material of main 163 Steel20 162.5
t=500~540 226
pipe

12Cr1MoVOr
p=17.0MPa~25.4MPa; 257 163.5
material of main Steel20 163
t=500~566 226 184
pipe

p=12.0MPa~18.4MPa; 257
Steel20 162.5 Steel20 162.5
t=200~235 226

p=19.0MPa~28.0MPa; 257
Steel20 163 Steel20 163
t=240~280 226

12Cr1MoVOr
p=28.0MPa~45.0MPa; 257 163.5
material of main Steel20 163.5
t=240~286 226 184
Steam, pipe
water Steel20 Steel20
p=3.9MPa; 257
Or 142 Or 142
t=450 226
Steel10 Steel10

Steel20 Steel20
p=7.6MPa;
Or Note 3 142 Or 142
t175
Steel10 Steel10

After balancing container, discharge


p=4.0MPa~12.5MPa;
pollutions in drain pipe and electrical Boiler
t=249~326 Before balancing container, before
contact water meterSteel20 142 drum
electrical contact water
After balancing container, discharge water
p=15.0MPa~20.0MPa; levelSteel20 284
pollutions in drain pipe and electrical Level
t=340~364
contact water meterSteel20 162.5

Water
Before balancing container, before After balancing container, discharge
p=20.0MPa~27.3MPa; level of
electrical contact water pollutions in drain pipe and electrical
t=364~435 steam
levelSteel20 286 contact water meterSteel20 163
separator

Heavy oils, buck mixture Steel10 202 or 182

Oil, gas, flue gas, gas-powder


Steel10 142
mixture

Composition analysis of steam, 1Cr18Ni9Ti 142(For steam and water


water, flue gas, cooling water of analyzing pipe, it is only need to consider
water cooled generator chemical analysis sampling cooler

268
connection tube)

Note 1: P is working pressure; t is working temperature.


Note 2: pipe specification in Table162.5Unify to163.
Note 3: when sampling valve is welded type valve,257or 226, otherwise163
Note 4: Selection of pipe material and pipe diameter of instrument of Unit with above supercritical pressure shall meet
requirements of design

Annex G

(Informative)

General record table of sampling element and sensitive element

installation engineering
G .1 Record of valve water pressure test should be according to those specified in Table G.1.
Table G .1 valve water pressure test record
_____ Unit Project number:

Project name

Name of subitem Inspection batch

Serial Operating
Valve No. Valve name Type/model Test pressure Remarks
number pressure

Conclusion:

269
Serial number, specification of the using counting device

Signature of acceptance organization

Construction contractor Date:

Supervisor Date:

Owner Date:

G.270 Inspection record of orifice plate should be according to those specified in Table G.2

Table G .2 Inspection record of orifice plate


_____ Subsystem number:

Project name

Name of subitem Inspection batch

Serial Hole diameter Inlet side edge of


Name Design No. value Accessory Remarks
number deviation orifice plate

Conclusion:

Serial number, specification of the counting device used:

270
Signature of acceptance organization

Construction
Date:
contractor

Supervisor Date:

Owner Date:

G.3 Record of special instruments installation should be according to those specified in Table G.3
Table G .3 Record of special instruments installation
_____ Unit Project number:

Project name

Inspection
Name of subitem
batch

Serial Measuring Transformer Insulation Gap between sensors and


Design number Fixing
number point Name type resistance feedback surface

Conclusion:

Serial number, specification of the counting device used

271
Signature of acceptance organization

Construction
Date:
contractor

Supervisor Date:

Owner Date:

G.4 Spectrum re-inspection record of alloy steel parts should be according to those specified in
Table G.4

Table G .4 Spectrum reinspection record of alloy steel parts


_____ Subsystem number:

Project name

Name of subitem Inspection batch

Parts/system Figure No.

Process Inspection rate


Acceptance standard
standard

Determine the nature or Correspond with results


Serial number Work name Specification Design material
semi quantitative analysis whether or not

Conclusion:

272
Serial number, specification of the counting device used

Signature of acceptance organization

Construction
Date:
contractor

Supervisor Date:

Owner Date:

G.5 Certification of concealed work should be according to those specified in Table G.5.
Table G .5 Certification of concealed work
_____ Unit project number:

Project name

Name of subitem Inspection batch

Shelter content:

Conclusion:

Serial number, specification of the counting device used

Signature of acceptance organization

Construction
Date:
contractor

Supervisor Date:

Owner Date:

Annex H

(Informative)

General record table of local testing and control instrument

installation engineering

273
Record of local testing and control instrument installations should be according to those specified
in Table H.1.
Table H .1 Record of local testing and control instrument installations
_____ Unit Project number:

Project name

Name of subitem Inspection batch

Serial Equipment
Equipment name Type/model Installation site Inspection of blockage conformity
number number

Conclusion:

Serial number, specification of the counting device used

Signature of acceptance organization

Construction
Date:
contractor

Supervisor Date:

Owner Date:

Annex I

(Informative)

274
Common record list for installation engineering of control panel

(console, box, cabinet)


Installations record of control panel (console, box, cabinet) should be carried out according to
those specified in Table I.1.
Table I.1 installations record of control panel (console, box, cabinet)
_____ Unit Project number:

Project name

Subentry project
Inspection batch
name

This inspection includes size of control panel (console,


box, cabinet)

Inspection item Data Remarks

The maximum value of vertical misalignment, mm/m

The maximum value of altitude difference of two


neighboring panel top, mm

The maximum altitude difference of banks of panel


tops, mm

The maximum deviation of disc surface of neighboring


panel, mm

Total deviation of disc surface of over 5 panel in rows,


mm

The maximum value of joint gap of panel, mm

Schematic diagram (If any):

Conclusion:

Serial number, specification of the counting device used

Signature of acceptance organization

Construction
Date:
contractor

Supervisor Date:

Owner Date:

Annex J

275
(Informative)

General record list of wire, cable laying and wiring installation


J .1 Record of laying cable and compensating wire should be carried out according to those
specified in Table J.1.
Table J .1 Record of laying cable and compensating wire
______ Unit Project number:

Project name

Name of subitem Batch

Cable
Specification Cable end Cable length Cable coil Surrounding Laying
No. Cable mark starting Remarks
and model point (m) m number temperature date
point (m)

Conclusion:

No. specification of the using counting device

Signature of acceptance organization

Construction
Date:
contractor

Supervisor Date:

276
Owner Date:

J .2 Inspection record of cable insulation should be carried out according to those specified in
Table J.2
Table J .2 Inspection record of cable terminating
_____ Unit Project number:

Project name

Name of subitem Batch

No. Cable mark Specification Cable starting Cable end Insulation resistance Terminating Remarks
and model point point M inspection

Conclusion:

No. specification of the counting device used

Signature of acceptance organization

Construction
Date:
contractor

277
Supervisor Date:

Owner Date:

Annex K

(Informative)

General record table of pipe laying and connection


Record of instrument pipe sealing test should be carried out according to those specified in Table
K .1.
Table K .1 Record of instrument pipe sealing test
______ Unit Project number:

Project name

Name of subitem Batch

Conduct a test with referring to standards of Annex D

No. Pipe No. Pipe name Installation position Operating pressure Test pressure Remarks

Procedure description of pipe sealing test:

Conclusion:

No. specification of the counting device used

Signature of acceptance organization

278
Construction
Date:
contractor

Supervisor Date:

Owner Date:

Annex L

(Informative)

General record table of protection and grounding


L .1 Record of fire prevention and blockage should be carried out according to those specified in
Table L .1.
Table L .1 Record of fire prevention and blockage
_____ Unit Project number:

Project name

Name of subitem Batch

Category of plugging Inspection of blockage


No. Site Marking Remarks
material conformity

Conclusion:

279
No. specification of the counting device used

Signature of acceptance organization

Construction
Date:
contractor

Supervisor Date:

Owner Date:

L.2 Special grounding device of I&C, protection, shielding, inspection acceptance record of signal
grounding installation should be carried out according to those specified in Table L .2.
Table L .2 Check records of installing special grounding device, protection, shielding, signal grounding line
of I&C
_____ Unit Project number:

Project name

Name of subitem Batch

Grounding
No. Site Content Remarks
resistance

280
Conclusion:

No., specification of the using counting device

Signature of acceptance organization

Construction
Date:
contractor

Supervisor Date:

Owner Date:

Annex M

(Informative)

General record table of debugging and acceptance of measuring

instrument and control devices for heating engineering


M.1 TSI calibration record of instrument should be carried out according to those specified in
Table M .1
Table M .1 TSI instrument calibration record
_____ Unit Project number:

Project name

Name of subitem Batch

Sample name

P/N: P/N:
Probe Proximitor
S/N: S/N:

Voltage V
Gap
mm Positive travel Return travel
route route

281
Average calibration coefficient Sensitivity calibration

Appearance inspection:

Conclusion:

Standard instrument
No. Type Accuracy Remarks
Name

Calibrated by Audited by:

Date Date

M.2 Calibration record of transmitter should be carried out according to those specified in Table
M.2.
Table M.2 calibration record of transmitter
_____ Unit Project number:

Project name

Name of subitem Batch

Sample name Type and specification No.

Room temperature
Measuring range Accuracy
calibration

Installation site and


supplier
purpose

Output actual value Basic error


Standard signal
Input parameter mA mA Hysteresis Remarks
mA
Up Down Up Down

282
Appearance inspection: Calibration situation:

Conclusion:

Standard instrument
No. Type Accuracy Remarks
Name

Calibrated
Audited by:
personnel

Date Date

M.3 Pressure switch (flow switch, temperature switch, liquid level switch, etc)calibration record
should be according to those specified in TableM.3
Table M .3 Calibration record of switch
_____ Unit Project number:

Project name

Name of subitem Batch

Sample name Type and specification No.

Measuring Room temperature


Accuracy
range calibration

Installation site and


supplier
purpose

Operating value Contact and


Frequency Given value () Return value () Error () Remarks
() Insulation

First

Second

283
Third

Appearance inspection: Calibration situation:

Conclusion:

Standard instrument
No. Type Accuracy Remarks
Name

Calibrated
Audited by:
personnel

Date Date

M .4 Calibration record of electric contact thermometer should be carried out in accordance with
Table M.4
Table M .4 Calibration record of electric contact thermometer
_____ Unit Project number:

Project name

Name of subitem , Batch

Type and
Sample name No.
specification

Room
Measuring
Accuracy temperature
range
calibration

Installation site
Division value
and purpose

Scale division Import


of tested standard Practical indicated value Basic error Variation Remarks

meter value

Up Down Up Down

284
Connection
Given Operating Return The maximum Contact and Insulation of
point Remarks
value value value error each time Insulation contact to shell
calibration

First

Second

Third

Appearance inspection:

Conclusion:

Standard instrument
No. Type Accuracy Remarks
Name

Calibrated
Audited by:
personnel

Date Date

M.5 Calibration record of thermocouple should be carried out according to those specified in Table M.5

Table M .5 Calibration record of thermocouple


______ Unit Project number:

Project name

Name of subitem Batch

Standard Standard couple Tested thermocouple


Calibration
Temperature , certificate
point No: No: No: No: No:
e

Point 1 1

Reading 2

Average

285
Temperature at reference edge

Difference between calibration points

Actual value

Error

Reading 2

Average

Point 2 Temperature at reference edge

Difference between calibration points

Actual value

Error

Reading 2

Average

Point 3 Temperature at reference edge

Difference between calibration points

Actual value

Error

Appearance inspection:

Conclusion:

Standard instrument Name No. Type Accuracy Remarks

Audited
Calibrated personnel
by:

Date Date

M.6 Calibration record of thermocouple should be carried out according to those specified in TableM.6

Table M .6 calibration record of thermocouple


_____ Unit Project number:

Project name

Name of subitem Batch

No.

Type

Graduation
Tested thermocouple
Accuracy rating

Supplier

Purpose

286
Standard
Standard
Inspection item platinum Tested thermocouple
resistance
resistance

Calibration 2
point 3

4
Reading
5

Average
mV

Actual value

Difference between calibration points

Permissible variation

Qualified acceptance of single point

Calibration 2
point 3

Average
mV

Actual value

Difference between calibration points

Permissible variation

Qualified acceptance of single point

Appearance inspection:

Conclusion:

Standard instrument
No. Type Accuracy Remarks
Name

Calibrated
Audited by:
personnel

Date Date

M.7 Calibration record of thermocouple should be carried out according to those specified in TableM.7

Table M .7 Calibration record of pressure gauge


_____ Unit Project number:

Project name

287
Name of subitem Batch

Sample name Type and specification No.

Room
Measuring
Accuracy temperature
range
calibration

Installation site and Allowable


supplier
purpose tolerance

Standard Indicating value of tested meter Amount of change of pointer of

pressure after being tapped tested meter after being tapped Hysteresis error Remarks
Pa Up Down Up Down

Appearance inspection: Calibration situation:

Conclusion:

Standard instrument
No. Type Accuracy Remarks
Name

Calibrated
Audited by:
personnel

Date Date

288
M .8 Calibration record of motor-driven valve (unadjustable) and solenoid valve should be carried
out according to those specified in Table M .8
Table M .8 unadjustable electric (pneumatic) valve calibration records
_____ Unit Project number:

Project name

Name of subitem Batch

ON- time OFF-time


No. Valve No. Valve name Exfactory SN. Type supplier Remarks
s s

Appearance inspection:

Conclusion:

Standard instrument
No. Type Accuracy Remarks
Name

Calibrated Audited by:

289
personnel

Date Date

M .9 calibration record of operating mechanism should be carried out according to those specified in Table M .9

Table M .9 Calibration record of operating mechanism


_____ Unit Project number:

Project name

Name of subitem Batch

Valve name Type No.

Measurement
Accuracy
range

Installation site and


supplier
purpose

Import standard Basic error


Valve scale Feedback signal mA
value mA Variation Remarks
division%
mA Up Down Up Down

Appearance inspection: Calibration situation:

Conclusion:

Standard instrument
No. Type Accuracy Remarks
Name

290
Calibrated
Audited by:
personnel

Date Date

291