P DL/T 5210.5-2009
Foreword ...................................................................................................................................II
1 Scope ................................................................................................................................... 1
2 Normative References ......................................................................................................... 2
3 General Provisions .............................................................................................................. 3
4 Construction Quality Acceptance ........................................................................................ 4
4.1 Requirements in Construction Quality Acceptance .................................................. 4
4.2 Division of Construction Quality Acceptance Range and General Tables................ 6
4.3 General Criteria....................................................................................................... 47
4.4 Installations of Four Main Pipes ............................................................................. 49
4.5 Installation of Medium- and Low-Pressure Pipes................................................... 78
4.6 Installation of Fuel Oil and Fuel Gas Pipes in Plant ............................................... 89
4.7 Installation of Other Pipes ...................................................................................... 97
5 Evaluation on the Quality of Single Project .................................................................... 103
5.1 Basic Requirements .............................................................................................. 103
5.2 Evaluation Provisions ........................................................................................... 104
5.3 Evaluation Content ............................................................................................... 104
5.4 Evaluation Methods .............................................................................................. 105
5.5 Quality Evaluation on Installation of Four main pipes ......................................... 107
5.6 Quality Evaluation on Installation of Medium and low-pressure pipes.................116
5.7 Quality Evaluation on Installation of Fuel Oil and Fuel Gas Pipes in Plant......... 123
5.8 Summarizing of Evaluation Score of Project Position (Scope) of Single Project 130
5.9 Report of Single Project Quality Evaluation......................................................... 130
6 Quality Evaluation of Single Unit ................................................................................... 132
7 Quality Evaluation of Overall Project ............................................................................. 135
Appendix A (Normative) Confirmation and Signature Table for Acceptance of Unit Project
Appearance Quality ............................................................................................................... 139
I
Foreword
The standard series Code for Construction Quality Acceptance and Evaluation of
Electric Power Construct consists of 8 parts:
DL/T 5210.1 Part 1: civil work
DL/T 5210.2 Part 2: boiler unit
DL/T 5210.3 Part 3: steam turbine generator unit
DL/T 5210.4 Part 4: thermal meter and control device
DL/T 5210.5 Part 5: piping & system
DL/T 5210.6 Part 6: the equipment and the system with the water treatment and
hydrogen generation
DI7T 5210.7 Part 7: welding
DL/T 5210.8 Part 8: processing preparation
This Part is the fifth part of DL/T 5210.
This Part was formualted according to "Announcement of National Development and
Reform Commission on Issuing the Professional Standard Project Planning in 2008"
(Fagaiban Gongye [2008] No. 1242).
During the drafting procedure of this Part, the drafting group refers to the content of
"Standard for Quality Inspection and Evaluation of Thermal Power Construction (Piping
Section)" (2000) (Guodian Dianyuan [2001] No.116) issued by the former State Power
Corporation.
Appendix A in this part is normative.
This Part is proposed by the China Electricity Council.
This Part is under the jurisdiction of and is explained by Committee for Standardization
of Thermal Power Construction in Power Industry.
Chief drafting organization: Hunan Provincial Thermal Power Construction Company
(HTPC)
Participating organizations: TianJin Electric Power Construction Company, Jiangsu
Electric Power Construction No.3 Engineering Company, Chongqing Power Construction
Company and Hunan Electric Power Industry Association.
Chief drafting staffs: Li Weiguo, Chen Jinong, Zhou Wenjiang, Li Pengqing, Zhou Defu,
Yang Jianhua, Yang Fengzhen, Cai Kehong, Zhao Changhe and Xue Zhiqiang.
The "Standard for Quality Inspection and Evaluation of Thermal Power Construction
(Piping Section)" (2000) (Guodian Dianyuan [2001] No. 116) shall be abolished on the
issuing date of this Part.
During the process of implementing this Part, the relevant opinions and advice,
whenever necessary, can be posted or passed on to the Standardization Center of the China
Electricity Council (Address: No. 1, 2nd lane, Baiguang Road, Beijing, 100761, China).
II
1 Scope
This Part of DL/T 5210 specifies the relevant requirements in construction quality
acceptance standard, quality evaluation of single project, quality evalution of single unit, and
quality evaluation of overall project of the pipeline and system in thermal power generation
project.
This Part is applicable to the construction quality acceptance and engineering quality
evaluation of the pipeline and system in the constructed, extended and renovated thermal
power generation projects with unit capacity of 300MW~1000MW.The construction quality
acceptance and engineering quality evaluation of the pipeline and system in the 300MW and
bellow thermal power generation project, conventional island of nuclear power station and
power plant public part (BOP) may comply with this Part by reference.
1
2 Normative References
The following standards contain provisions which, through reference in this part,
constitute provisions of this part. For dated reference, subsequent modification to (excluding
correction to), or revisions of, any of these publications do not apply. For undated references,
the latest edition of the normative document is applicable to this Part.
GB 502351997 Code for Construction and Acceptance of Industrial Metallic Piping
GB 50375 Evaluating Standard for Excellent Quality of Building Engineering
DL 50311994 The Code of Erection and Acceptance for Electric Power Construction
(Piping Section)
DL/T 441-2004 Supervision Code for Creep Strain of Steam Pipe in High Temperature
and High Pressure in Fossil Fuel Power Plant
DL/T 852-2004 Guide for Boiler Start-up Commissioning Test
DL/T 869 The code of Welding for Power Plant
2
3 General Provisions
3
4 Construction Quality Acceptance
4.1.1 The inspection, acceptance and acceptance confirmation and signature for pipeline and
system of thermal power generation project shall be conducted according to the requirements
of this Part.
4.1.2 For the inspection and acceptance for the project construction quality, the construction
organization shall prepare the quality acceptance range division table on the base of the works
scope according to the requirements of Chapter 4 in this Part; the supervision organization
shall conduct the examination and the parties of construction, supervision and construction
organization jointly sign and seal for approval after the construction organization make a
confirmation. For the engineering project with engineering general contract or other project
management mode, the acceptance organization may be added in "acceptance organization"
column of construction quality acceptance range division table by development organization
according to actual situation. The items that the design organization and equipment
manufacture organization shall participate in the quality acceptance specified in "acceptance
organization" column may be adjusted by development organization according to actual
situation.
4.1.3 The part of the inspection items in "Construction Quality Acceptance Range Division
Table" in Chapter 4, incongruent with the ones in the actual project, may be added or canceled.
The items added or canceled may be numbered or lack of number in the project numbering in
the construction quality acceptance range, but the original number shall not be altered.
4.1.4 Engineering construction quality acceptance shall be carried out by the acceptance
organizations stipulated in "construction quality acceptance range division table. The
acceptance for inspection lot, subitem project and subsection project shall be organized by the
supervision organization, if participating in, and the organizations concerned shall participate;
the construction organization shall organize the acceptance for unit project with the
participation of the organizations concerned. The design organization and the manufacturing
organization shall participate in the acceptance of the related items according to the
requirements of "Construction Quality Acceptance Range Division Table. Quality acceptance
personnel shall hold the qualification certificate consistent with the profession which shall be
within the validity period. The acceptance authority of the personnel involved in the quality
acceptance for unit project, subsection project, subitem project and inspection lot shall be
determined by the organizations concerned under the organization of the construction
organization.
4.1.5 In the engineering quality inspection and acceptance, the quality inspection personnel
at all levels shall strictly comply with the requirements of this part as well as the relevant
current national standard, professional standard, contract terms, design document and
manufacturing technical document, and they shall be responsible for the acceptance results.
4.1.6 The quality acceptance must be conducted after the construction project is completed.
The construction organization shall apply the quality acceptance to the project supervision
and the development organization upon the construction organization has done self-checking
4
and prepared complete self checking records.
4.1.7 The construction organization shall notify the supervision organization and the
organizations concerned to conduct witness acceptance before the concealed project being
concealed, and the inspection acceptance record and the confirmation and signature shall be
completed.
4.1.8 The appearance quality of unit projects shall be inspected by the quality inspection
personnel through visual observation, feeling or necessary measurement, and confirmed and
singed according to the overall condition of the inspected project (see Appendix A).
4.1.9 The inspection and acceptance of project construction quality shall comply with the
requirements in Chapter 4 of this Part and be conducted by inspection lot, subitem project,
subsection project and unit project; where a unit project is constructed by multiple
construction organizations in sections, subunit projects may be set up. The subunit project
number is the original unit project number affixed with English letters for distinguishing.
4.1.10 The construction quality acceptance shall meet the following requirements:
The acceptance for subitem projects shall be conducted only upon the acceptance for
inspection lots is qualified; the acceptance for subsection project shall be conducted only
upon the acceptance for subitem projects is qualified; the acceptance for unit project shall be
conducted only upon the acceptance for subsection projects is qualified.
4.1.11 The qualified construction quality acceptance for inspection lot, subitem project,
subsection project and unit project shall meet the following requirements:
1 The complete inspection is conducted for the inspection items according to the
requirements on inspection lots and subitem projects, and the inspection results meet the
quality criteria; the quality acceptance for this inspection lot or subitem project is qualified.
2 All the items for acceptance of the inspection lots contained in a subitem project are
qualified and the data for the subitem project is complete, the quality acceptance for this
subitem project is qualified.
3 The quality acceptance for the subitem projects contained in a subsection project is
qualified and the data for the subsection project is complete, the quality acceptance for this
subsection project is qualified.
4 The quality acceptance for the subsection projects contained in a unit project is
qualified and the data for the unit project is complete and meets the records management
requirements; the quality acceptance for this unit project is qualified.
4.1.12 The nonconformity of construction quality, if existing, shall be registered for record
and treated according to the following requirements:
1 The inspection items for reworked ones, or replaced instrument or equipment, shall
be checked for acceptance again.
2 The inspection items that are able to satisfy the functional requirements of safe
handling through reworking and treatment, may be inspected according to the technology
processing scheme and the negotiated document.
3 As for the inspection items that are unable to be reworked or are unqualified through
repairing, the certifying agency or the organizations concerned shall carry out appraisal and
may make concessional treatment for the project not affecting the inner quality, service life,
use function and safe operation. The items given with quarter may not be inspected again,
but they shall be indicted in column "acceptance result", and the written report shall be
5
attached following the acceptance table.
4.1.13 The construction quality of inspection lot and subitem project under one of the
following conditions shall not be inspected:
1 The inspection results of the dominant inspection items cannot meet the quality
criteria.
2 The design organization or the manufacturer has data requirement in quality criteria
and the measured data are not filled in the inspection result column.
3 The quality acceptance documents do not conform to the records management
regulations.
4.1.14 As for quality problems caused by design or equipment manufacture, the design or
equipment manufacture units shall be responsible for the disposal. After the entrusted on-site
disposal by construction organization, if specific non-dominant items cannot fully meet
standard requirements, upon the written signature by design organization, manufacturing
organization, supervision organization and construction organization, the concessional
treatment can be made. Secondary acceptance will not be carried out to project undergone
concessional treatment, but it shall be indicated in column "acceptance result", and the written
report hereof shall be attached following the acceptance table.
4.1.15 The quality acceptance documents for inspection lot, subitem project, subsection
project and unit project shall be of accurate data, complete document collection, and complete
signature procedure; and the material and handwriting for document preparation shall meet
the requirements of "durability" and the records management specifications.
4.2.1 The construction quality acceptance shall be conducted by inspection lot, subitem
project, subsection project and unit project; the division of quality acceptance range of all
levels of acceptance organizations shall meet those specified in Table 4.2.1.
6
Table 4.2.1 Construction Quality Acceptance Range Division Table
Project number Acceptance organization Number of
Unit Subsection Subitem Inspection Project name Property Construction Supervision Design Manufacturing Development quality
project project project lot organization organization organization organization organization acceptance table
7
Project number Acceptance organization Number of
Unit Subsection Subitem Inspection Project name Property Construction Supervision Design Manufacturing Development quality
project project project lot organization organization organization organization organization acceptance table
8
Project number Acceptance organization Number of
Unit Subsection Subitem Inspection Project name Property Construction Supervision Design Manufacturing Development quality
project project project lot organization organization organization organization organization acceptance table
9
Project number Acceptance organization Number of
Unit Subsection Subitem Inspection Project name Property Construction Supervision Design Manufacturing Development quality
project project project lot organization organization organization organization organization acceptance table
10
Project number Acceptance organization Number of
Unit Subsection Subitem Inspection Project name Property Construction Supervision Design Manufacturing Development quality
project project project lot organization organization organization organization organization acceptance table
11
Project number Acceptance organization Number of
Unit Subsection Subitem Inspection Project name Property Construction Supervision Design Manufacturing Development quality
project project project lot organization organization organization organization organization acceptance table
12
Project number Acceptance organization Number of
Unit Subsection Subitem Inspection Project name Property Construction Supervision Design Manufacturing Development quality
project project project lot organization organization organization organization organization acceptance table
13
Project number Acceptance organization Number of
Unit Subsection Subitem Inspection Project name Property Construction Supervision Design Manufacturing Development quality
project project project lot organization organization organization organization organization acceptance table
04
Installation of pipes in high-pressure heater
14
Project number Acceptance organization Number of
Unit Subsection Subitem Inspection Project name Property Construction Supervision Design Manufacturing Development quality
project project project lot organization organization organization organization organization acceptance table
draining system
15
Project number Acceptance organization Number of
Unit Subsection Subitem Inspection Project name Property Construction Supervision Design Manufacturing Development quality
project project project lot organization organization organization organization organization acceptance table
16
Project number Acceptance organization Number of
Unit Subsection Subitem Inspection Project name Property Construction Supervision Design Manufacturing Development quality
project project project lot organization organization organization organization organization acceptance table
17
Project number Acceptance organization Number of
Unit Subsection Subitem Inspection Project name Property Construction Supervision Design Manufacturing Development quality
project project project lot organization organization organization organization organization acceptance table
18
Project number Acceptance organization Number of
Unit Subsection Subitem Inspection Project name Property Construction Supervision Design Manufacturing Development quality
project project project lot organization organization organization organization organization acceptance table
19
Project number Acceptance organization Number of
Unit Subsection Subitem Inspection Project name Property Construction Supervision Design Manufacturing Development quality
project project project lot organization organization organization organization organization acceptance table
20
Project number Acceptance organization Number of
Unit Subsection Subitem Inspection Project name Property Construction Supervision Design Manufacturing Development quality
project project project lot organization organization organization organization organization acceptance table
21
Project number Acceptance organization Number of
Unit Subsection Subitem Inspection Project name Property Construction Supervision Design Manufacturing Development quality
project project project lot organization organization organization organization organization acceptance table
22
Project number Acceptance organization Number of
Unit Subsection Subitem Inspection Project name Property Construction Supervision Design Manufacturing Development quality
project project project lot organization organization organization organization organization acceptance table
23
Project number Acceptance organization Number of
Unit Subsection Subitem Inspection Project name Property Construction Supervision Design Manufacturing Development quality
project project project lot organization organization organization organization organization acceptance table
24
Project number Acceptance organization Number of
Unit Subsection Subitem Inspection Project name Property Construction Supervision Design Manufacturing Development quality
project project project lot organization organization organization organization organization acceptance table
02
Preparation and installation of supporter and
25
Project number Acceptance organization Number of
Unit Subsection Subitem Inspection Project name Property Construction Supervision Design Manufacturing Development quality
project project project lot organization organization organization organization organization acceptance table
26
Project number Acceptance organization Number of
Unit Subsection Subitem Inspection Project name Property Construction Supervision Design Manufacturing Development quality
project project project lot organization organization organization organization organization acceptance table
27
Project number Acceptance organization Number of
Unit Subsection Subitem Inspection Project name Property Construction Supervision Design Manufacturing Development quality
project project project lot organization organization organization organization organization acceptance table
02
Preparation and installation of supporter and
28
Project number Acceptance organization Number of
Unit Subsection Subitem Inspection Project name Property Construction Supervision Design Manufacturing Development quality
project project project lot organization organization organization organization organization acceptance table
29
Project number Acceptance organization Number of
Unit Subsection Subitem Inspection Project name Property Construction Supervision Design Manufacturing Development quality
project project project lot organization organization organization organization organization acceptance table
30
Project number Acceptance organization Number of
Unit Subsection Subitem Inspection Project name Property Construction Supervision Design Manufacturing Development quality
project project project lot organization organization organization organization organization acceptance table
31
Project number Acceptance organization Number of
Unit Subsection Subitem Inspection Project name Property Construction Supervision Design Manufacturing Development quality
project project project lot organization organization organization organization organization acceptance table
32
Project number Acceptance organization Number of
Unit Subsection Subitem Inspection Project name Property Construction Supervision Design Manufacturing Development quality
project project project lot organization organization organization organization organization acceptance table
33
Project number Acceptance organization Number of
Unit Subsection Subitem Inspection Project name Property Construction Supervision Design Manufacturing Development quality
project project project lot organization organization organization organization organization acceptance table
34
Project number Acceptance organization Number of
Unit Subsection Subitem Inspection Project name Property Construction Supervision Design Manufacturing Development quality
project project project lot organization organization organization organization organization acceptance table
pipe
(Signature) (Signature)
(Signature)
Development
Supervision organization Supervision organization
organization
Date
Date Date
35
4.2.2 The construction management condition of unit project shall be inspected during the
construction and acceptance of unit project and the inspection results shall be filled in Table
4.2.2.
Table 4.2.2 Records of Construction Management and Inspection of Unit Project ( )
Development
Project name
organization
Profession director of
Design organization
design organization
Construction
Construction
technique director of
organization
unit project
9 Environmental protection
Acceptance conclusion:
36
4.2.3 The information listed in Table 4.2.3 shall be checked during the unit project
acceptance; the checking results shall be complete and meet the requirements of records
management.
Table 4.2.3 Check Table of Quality Control Documents of Unit Project ( )
________Unit Project number________
Copies Copies
SN Document name Check condition
expected obtained
10 Construction record
37
4.2.4 The advice notes for engineering design alteration, material substitution and altered
design shall be numbered, registered and attached on the registration form. The registering of
engineering design alteration and material substitution in unit project shall meet the
requirements specified in Table 4.2.4.
Table 4.2.4 Registration Form of Advice Notes for Design Alteration and Material Substitutes of Unit
Project ( )
________Unit Project number________
No. of amended
Original Drawing number
SN Name of advice note contents in the Implementation
number related to alteration
advice note
Construction Supervision
Date: Date:
organization organization
38
4.2.5 The factory test reports and the quality certificate documents of equipments and
materials shall be numbered, registered and attached following the registration form. The
registering of factory test report and quality certificate documents of the equipments and
materials in unit project shall meet the requirements specified in Table 4.2.5.
Table 4.2.5 Registration Form of Factory Test Report and Quality Certificate Documents of Equipments
and Materials in Unit Project ( )
________Unit Project number________
Total Original number of report
Name of equipment and material test report Report issuing
SN pages of and quality certificate Remarks
and quality certificate document organization
the report document
Prepared by Date:
39
4.2.6 The equipment defect, if any discovered, shall be inspected and confirmed by the
construction, supervision, manufacturing and development organizations together and the
letter of notice on equipment defect shall be filled in. The filling of equipment defect advice
note shall meet the requirements specified in Table 4.2.6.
Table 4.2.6 Letter of Notice on Equipment Defects
________Unit Project number________
Project name
Construction organization:
Date:
Treatment suggestion:
Date:
40
4.2.7 After the equipment defect treatment, the defect treatment organization shall submit
the report to the development organization, and the development organization shall organize
the organizations concerned to conduct inspection and acceptance and sign the equipment
defect treatment report with acceptance opinions and signature. The filling of the equipment
defect report shall meet the requirements specified in Table 4.2.7.
Table 4.2.7 Equipment Defect Treatment Report
________Unit Project number________
Project name
Date:
Supervision organization:
Date:
41
4.2.8 The measurement tools used in the construction must be inspected and used within the
calibration validity period. All the measurement tools used in the construction procedure shall
be registered according to the requirements specified in Table 4.2.8. The supervision engineer
shall conduct the inspection and confirmation (approval) for the measurement tools registered
in the table.
Table 4.2.8 Registration Form of Measurement Tools Used in Unit Project ()
________Unit Project number________
Calibration
Name of measuring equipment Factory Measurement Accuracy
SN Type/model validity Remarks
(instrument, tool) number limit grade
period
Construction
Date: Supervision organization Date:
organization
42
4.2.9 The construction quality of inspection lots shall be inspected and accepted according
to the quality criteria of the inspection items, and the Construction Quality Acceptance Table
of inspection lot shall be filled. No "Dominant" in column "property" means "general"
according to the requirements specified in Table 4.2.1. For the items outside of the acceptance
range, the acceptance organization column shall be filled with "/". The construction quality of
inspection lots shall meet the requirements specified in Table 4.2.9.
Table 4.2.9 Construction Quality Acceptance Table of Inspection Lot ( )
________Unit Project number: Property: Table: X.X.X
Name of subitem project
Acceptance conclusion:
Supervision organization:
43
4.2.10 The construction quality of subitem project shall be inspected according to those
specified in Table 4.2.10 and the construction quality acceptance table of subitem project shall
be filled in. According to construction quality acceptance range division table (Table 4.2.1),
no "Dominant" in "property" column represents "general", and for the items outside of the
acceptance range, the acceptance organization column shall be filled with "/".
Table 4.2.10 Construction Quality Acceptance Table of Subitem Project ( )
________Unit Property: Project number________
Name of subsection project
Acceptance conclusion:
Supervision organization
44
4.2.11 The construction quality of subsection projects shall be checked for acceptance
according to the requirements of Table 4.2.11, and the quality acceptance table of subsection
project shall be filled. No "Dominant" in column "property" means "general" according to the
requirements specified in Table 4.2.1. For the items outside of the acceptance range, the
acceptance organization column shall be filled with "/".
Table 4.2.11 Construction Quality Acceptance Table of Subsection Project ( )
________Unit Property: Project number________
Name of unit project
Acceptance conclusion:
Supervision organization
45
4.2.12 The construction quality of unit projects shall be checked for acceptance according to
the requirements of Table 4.2.12, and the construction quality acceptance table for unit project
shall be filled. No "Dominant" in column "property" means "general" according to the
requirements specified in Table 4.2.1. For the items outside of the acceptance range, the
acceptance organization column shall be filled with "/".
Table 4.2.12 Construction Quality Acceptance Table of Unit Project ( )
________Unit Project number________
SN Name of subsection project Property Acceptance result Remarks
Acceptance conclusion:
Supervision organization
46
4.3 General Criteria
4.3.1 Application scope: The general criteria are applicable to the quality acceptance of the
pipe installation projects of thermal power plant, thereinto, the appearance inspection and
cleaning of pipes are detailed in Table 4.3.1-1, the piping fabrication is detailed in Table
4.3.1-2 and the inspection and installation of valves are detailed in Table 4.3.1-3.
4.3.2 Inspection quantity: The items shall be inspected one by one.
4.3.3 Quality criteria: according to those specified in Table 4.3.1-1~Table 4.3.1-3.
Table 4.3.1-1 Appearance Inspection and Cleaning of Pipes
Inspection methods and
Procedure Inspection items Property Unit Quality criteria
instruments
Sealing Both ends of the pipe shall be sealed firmly Appearance inspection
47
and reliably
Ruler-based measurement at
Straightness of
a
DN 100 Dominant mm 1 the position 200mm away from
double jointer
welded junction center
Length of piping Meeting the requirements of piping Checking the relevant technical
components partition map data
Sealing of piping Firmly and reliably sealing both ends Appearance inspection
components of component
Rechecking the
Specification
Dominant Meeting the design specifications technical documents for
and type
production
48
Spot inspection and
Installation Accurate position, being easy to overhaul and operate,
technical document
position type/model of valve being consistent with the design
checking
Operating
Flexible and accurate operating mechanism Appearance inspection
mechanism
a All the imported valves and the valves disallowed being disassembled by the manufacturing organization may not be carried
out with strip inspection, but they must be with the written confirmation documents of the manufacturing organization.
4.4.1 This article is applicable to the quality acceptance of supporter and hanger preparation
and installation for the main steam pipe, the reheated steam hot/cold segment pipe, the main
feed water pipe, and the bypass pipe used in the thermal power plant; the acceptance criteria
are detailed in Table 4.4.1. The preparations and installations of other alloy pipes (including
the steam pipe of steam turbine and the drainage pipe of this system) may refer to this article.
Table 4.4.1 Supporter and Hanger Preparations and Installations of Four Main Pipes
Inspection method and
Procedure Inspection item Property Unit Quality criteria
instrument
Pipe fittings
Specification and material Meeting the design specification Checking the drawing,
49
test report and
re-inspecting the alloy
steel spare parts with
100 % spectrum
Appearance inspection;
Meeting the drawing design
Working size and accuracy Ruler-based
preparation requirements and tolerance
measurement
Guide plate Vertical to the base plate, each pair Appearance inspection
of guide plates shall be in parallel
with each other and the space meets
the design requirements
Anchor ear The support, bearing plate and other Appearance inspection
circular arc sections shall be smooth
and fit without unevenness and the
bending radius shall be correct
Ball bearings and roller The surface shall be processed Appearance inspection
components smooth and clean, flexibly rotated
and the physical dimension shall
meet the design requirements and
Specification and Main Meeting the design requirements and checking delivery
type control with certificate certificate
Surface quality Main Without crack, fold, layering and Appearance inspection
control other defects
50
Material and specification Meeting the design requirements Appearance inspection
Installation position Main Meeting the design requirements Checking the drawing
control without disturbing the position of and inspecting the
pipe with free expansion appearance
Damping supporter and Main Meeting the design requirements or Appearance inspection
hanger control the requirements of manufacturer
Root position and type Meet the design specifications Appearance inspection
Root parts
Structural welding Meeting the relevant requirements Appearance inspection;
installation
of DL/T 869 checking the data
51
Material and specification Shall meet design requirements of Appearance inspection
drawing
Connection type and quantity Connection type shall meet the Checking the drawing
Installation of design specifications and the
jointing elements quantity shall be complete
Supporter and Supporter and hanger Supporter and hanger form, material Checking the drawing
hanger inspection inspection and position shall meet the design and real objects
and adjustment requirements after the pipe is
completed
Spring adjustment Main Meeting the design requirements and Appearance inspection;
control inspecting according to the relevant well recorded
requirements of Article 5.6 of DL
5031- 1994
Supporter and hanger Main Meeting the design requirements and Appearance inspection
adjustment control inspecting according to the
relevant requirements of Article 5.6
of DL 5031-1994
4.4.2 This article is applicable to the quality acceptance of preparation and installation of
main steam pipe, hot segment pipe of reheated steam, bypass pipe and other accessories in
thermal power plant and the acceptance criteria are detailed in Table 4.4.2. The preparations
and installations of other alloy pipes (including steam lead pipe of steam turbine and drainage
pipe of this system) may refer to this article.
Table 4.4.2 Installations of Main Steam Pipe and Hot Segment Pipe of Reheated Steam
Inspection method and
Procedure Inspection item Property Unit Quality criteria
instrument
52
inspection
Main
DN100 mm 1 Measuring with ruler at the
Straightness of control
section 200mm away from
Contra aperture double jointer Main
DN>100 mm 2 welded junction center
and weld joint control
4.4.3 This article is applicable to the quality acceptance of installation of main steam pipe,
hot segment pipe of reheated steam, bypass pipe and other accessories in thermal power plant
and the acceptance criteria are detailed in Table 4.4.3. The other carbon steels and common
low alloy pressure pipe (including drainage pipe of this system) may refer to this article.
Table 4.4.3 Installation of Cold Segment Pipe of Reheated Steam
Inspection method and
Procedure Inspection item Property Unit Quality criteria
instrument
53
smooth and clean without radial
penetrability scratch
Water shall be clean; the air in the system Inspecting the system test
shall be drained up. The ambient
Main temperature shall be above 5; within
General requirements
control the validity period and the at least 2
qualified pressure gages not less than
Level 1.5 in accuracy shall be provided
a All those pipe passing the 100 % nondestructive testing may be free from the water pressure test
4.4.4 This article is applicable to the quality acceptance of installation of main feed water
pipe, bypass pipe and other accessories in thermal power plant; the acceptance criteria are
detailed in Table 4.4.3. The other carbon steels and common low alloy pressure pipe
(including drainage pipe and air release pipe of this system) may refer to this article.
Table 4.4.4 Installation of Main Feed Water Pipe
Inspection method and
Procedure Inspection item Property Unit Quality criteria
instrument
54
pipe
Main The pipe slope direction and slope shall Level meter or theodolite
Pipe slope
control meet the design requirements based measurement
Main
Straightness DN100 mm 1 Measuring with ruler at the
control
Contra of double section 200mm away from
Main
aperture and jointer DN>100 mm 2 welded junction center
control
weld joint
Main Meeting the relevant requirements of Checking the relevant
Weld inspection
control DL/T 869 technical data
Test pressure Main MPa Meeting the design drawing Pressure gage-bases
control requirements. The relevant inspection
55
requirements of GB 50235-1997 shall
be complied with where no design
requirement is provided
a All those pipe passing the 100 % nondestructive testing may be free from the water pressure test
4.4.5 This article is applicable to the inspection and acceptance of displacement indicators
on the four main pipe and bypass pipe in the thermal power plant and the acceptance criteria
are detailed in Table 4.4.5.
Table 4.4.5 Displacement Indicator Installation
Inspection method and
Procedure Inspection item Property Unit Quality criteria
instrument
Parts shall be complete and the quantity shall be Checking the technical
Quantity
Inspection correct document
Meeting the design and the indicated scale value Checking the technical
Indicator dial shall be in accordance with the requirements of document and inspecting
swelling capacity the appearance
4.4.6 This article is applicable to the inspection and acceptance of installations for creeping
supervision segment of high pressure high temperature pipe and creep measurement points in
thermal power plant and the acceptance criteria are detailed in Table 4.4.6.
Table 4.4.6 Installation of Creeping Supervision Segments and Creep Measurement Points
Procedure Inspection item Property Unit Quality criteria Inspection method and
56
instrument
Main mm It shall cut from both end of the Checking the real objects
control supervision segment pipe installation
Transferring
and the length is 300 mm~500 mm
pipe cut
and then transfer it to the power plant
along with the standby pipe
57
point control points of the same specification of document and
distance pipe shall be uniform and the error measuring with outside
shall not be greater than 0.1 mm. micrometer
a The installation and setting of the creeping supervision segment and the creep measurement points shall be strictly carried out
in accordance with the relevant requirements as specified in the creeping supervision code for high pressure high temperature
pipe in thermal power plant.
4.4.7 This article is applicable to the blowing inspection of main steam pipe, cold segment
and hot segment pipes of reheated steam (including bypass) in thermal power plant and the
acceptance criteria are detailed in Table 4.4.7.
Table 4.4.7 Steam Pipe Blowing
Inspection
Procedure Inspection item Property Unit Quality criteria method and
instrument
Temporary pipe The steam exhaust pipe diameter shall be equal to or Appearance
selection greater than the blown pipe inside diameter inspection
Inspection on
supporter and The supporter and hanger shall be firmly and reliably fixed Appearance
hanger of and shall meet the requirements of pipe expansion inspection
temporary pipe
58
inspection "Guide for Boiler Start-up Commissioning Test". inspection
Replacing the target card twice and examining; the
shocking spots on the target card shall not be greater than
0.8 mm and the spots in 0.5mm~0.8mm (including 0.8
mm) shall not be more than 8 spots and the spot in
0.2mn~0.5mm shall be evenly distributed.
4.4.8 This article is applicable to the flushing inspection of main feed water pipe and bypass
pipe in thermal power plant and the acceptance criteria are detailed in Table 4.4.8-System
flushing of water supply system.
59
Table 4.4.8 Pipe Flushing in Water Supply System
Inspection method
Procedure Inspection item Property Unit Quality criteria
and instrument
4.4.9 This article is applicable to the control and inspection during the assembly process of
four main pipes in thermal power plant and shall include the following records. Those which
are not included in the inspection items shall be marked with the symbol of "/"in the
acceptance organization column in the records table.
1 The pipe creep measurement records are detailed in Table 4.4.9-1.
2 The installation records of displacement indicator are detailed in Table 4.4.9-2.
3 The installation records of flow measuring device are detailed in Table 4.4.9-3.
4 The inspection records of pipe and pipe fittings are detailed in Table 4.4.9-4.
5 The (installation) retracing records of pipes and attached piping are detailed in Table
4.4.9-5.
6 The installation and adjustment records of supporters and hangers are detailed in
Table 4.4.9-6.
7 The valve inspection (overhaul) and test inspection acceptance records are detailed in
Table 4.4.9-7.
8 The hot commissioning records of safety valve are detailed in Table 4.4.9-8.
9 The adjustment and inspection acceptance records of electric valve are detailed in
Table 4.4.9-9.
10 The acceptance certification of concealed project is detailed in Table 4.4.9-10.
11 The certification for tightness test acceptance is detailed in Table 4.4.9-11.
12 Certification of key-point/important process inspection is detailed in 4.4.9-12.
13 The pipe records before pressure test are detailed in Table 4.4.9-13.
14 The certification of pipe system blowing (flushing) is detailed in Table 4.4.9-14.
15 The inspection table for implementation performance of compulsory provisions is
detailed in Table 4.4.9-15.
60
Table 4.4.9-1 Pipe Creep Measurement Record
Project name:
Subsection
Unit project name
project name
Measuring point
Subitem project name
name
Measurement
Measuring point location
instrument
Construction
Measuring instruments SN.
team
15
26
Micrometer-based
37
measurement
48
Circumference
of measuring
point 1 pipe
Creep section
measurement Circumference
Measuring with of measuring
steel band tape point 2 pipe
section
Circumference
of measuring
point 3 pipe
section
Length
Supervision
Pipe segment wall thickness A
segment
Pipe segment wall thickness B
Wall thickness
Standby pipe
Length
Note 1: Numbering principle of creep measurement points (supervision segment): from the left to the right of furnace along the
61
medium flow direction
Note 2: The measuring positions of wall thickness A and B of supervision pipe segment shall be respectively 500 mm ~ 800
from the weld bond.
Construction organization
Supervision organization
Design organization
Development organization
Note 1: The scale values on the displacement indicator shall be larger than the corresponding expansion values. Note 2: The
original installation position of the displacement pointer shall be directed at the "0" point.
Construction
organization
Supervision organization
Development
organization
62
4.4.9-3 Installation Record of Flow Measuring Device
Project name:
Acceptance
Acceptance opinions Signature Date
organization
Construction
organization
Supervision
organization
Development
organization
63
Table 4.4.9-4 Inspection Records of Pipes and Pipe Fittings
Project name:
Construction
organization
Supervision organization
Development
organization
64
Table 4.4.9-5 (Installation) Retracing Records of Pipes and Attached Piping
Project name:
Acceptance
Acceptance opinions Signature Date
organization
Construction
organization
Supervision
organization
Development
organization
65
Table 4.4.9-6 Installation and Adjustment Records of Supporters and hangers
Project name:
Acceptance
Acceptance opinions Signature Date
organization
Construction
organization
Supervision
organization
Development
organization
66
Table 4.4.9-7 Records of Valve Inspection (overhaul), Test and Acceptance
Project name:
Acceptanc
e
Acceptance opinions Signature Date
organizati
on
Constructi
on
organizati
on
Supervisio
n
organizati
on
Developm
ent
67
organizati
on
Hot commissioning
Type and Setting Seating Installation Debugging
SN Valve No. Re-seating Accepter Date
specification Medium pressure pressure position personnel
pressure MPa
MPa MPa
Acceptance
Acceptance opinions Signature Date
organization
68
Construction
organization
Supervision
organization
Development
organization
Adjustment project
Accurate and
Without jamming Flexible
Block-free reliable Correct indication Targeting
and flexibly operation and
and go slick protection direction switch
switch reliable switch
actions
69
Acceptance
Acceptance opinions Signature Date
organization
Construction
organization
Supervision
organization
Development
organization
Acceptance conditions
Concealing method
Construction organization
Supervision organization
Development organization
Test scope
test process
Test conclusion
Construction organization
Supervision organization
70
Development organization
Conclusion
Construction organization
Supervision organization
Development organization
Inspection option
SN Inspection item Inspection result Explanation
(N/Y)
15 Nondestructive testing
16 Thermal treatment
20 Others
Note 1: N/Y-N: it refers that this item is not existent in this pipe system. Y: It refers that this item is not existent in this pipe
71
system.
Note 2: The items with qualified inspection results shall be marked with "" and the unqualified with "X".
Construction organization
Supervision organization
Development organization
Conclusion
72
Acceptance organization Acceptance opinions Signature Date
Construction organization
Supervision organization
Development organization
Unit project
Subsection project name
name
Project
Acceptance time
number
Implementation Related
SN Inspection item
performance information
73
the creep measurement section of vertical pipe section.
300 mm~500 mm pipe shall be cut from both ends of this pipe before the
9 supervision pipe segment is installed and then shall be marked and delivered to the
power plant along with the standby pipe of supervision pipe segment.
The pipe installation, the repairing and re-construction, the inspection and the
chemical cleaning organizations shall implement the qualification and license
system according to the relevant national and ministerial requirements; the
10
non-destructive testing personnel engaging in the pipe inspection, welding and
post-weld heat treatment shall be provided with corresponding qualification
certificates.
The metallic material quality for pipe shall be in accordance with the standard and
shall be provided with quality certificate. For the imported materials and items, in
addition to the quality certificate commodity inspection qualification documents
11
shall also be provided. For the missing terms or insufficient data in the quality
certificate, the supplemented inspection shall be carried out according to the
relevant standards.
Alloy steel parts and pipe material shall be carried out spectrum test or other test
12 before and after installing, repairing and transforming; the type of steel shall be
checked to prevent misuse.
Where the overseas steels are adopted for the pipe, the steels meeting those
specified in the overseas standard shall be adopted; the application scope shall be
in accordance with the corresponding criteria; the steels shall be provided with
13 quality certificate as well as technological documents of performance data, welding
process, thermal treatment process and other thermal treatments; for those
unpracticed steels produced domestically, relevant tests and verifications shall be
carried out.
Strict systems for quality acceptance, storage and procurement shall be formulated
for the metal pipe materials of storehouse and site storage use, in addition to the
14
favorable corrosion protection. Quality acceptance shall be re-carried out where
long term storage is required
In addition to the cold drawing weld bonds, the strength contra apertures are not
15 either allowed for welded parts assembling to avoid generating subsidiary stress.
The cold drawing instruments for cold drawing weld bond of installation pipe shall
74
not be demounted till the entire weld bond welding and thermal treatment are
finished.
The pipes, pipe fittings and valve casings used for main steam pipe and
high-temperature reheat pipe with working temperature of not higher than 450
17 must be provided with the qualification certificate of manufacturing organization;
the relevant technical parameters shall be in accordance with the current national or
professional technical standards
Heat treatment and nondestructive testing shall be carried out according to the
18
requirements after the high pressure steel pipe are fabricated.
The transition areas of the forged pipe fittings and pipe accessory surfaces shall be
smoothly transited. The surface film shall be free from any crack and other
19
defects which may influence the intensity and tightness after the mechanical
processing
The high-pressure welded tee joint shall be in accordance with the following
requirements:
(1) The tee joint manufacturing and strengthening forms shall be in accordance
20 with the design drawing requirements; the strengthening materials should be
adopted with the steels in the same designation with the tee joint;
(2) The thermal treatments according to the steel designation shall be qualified in
the inspection
The heating temperature shall be controlled under the lower critical temperature
21 AC 1 of the pipe where alloy-steel pipe shall be carried out with bending alignment
partially.
Distance between center line of pipe butt welding opening and pipe bending start
point shall not be less than external diameter of the pipe and shall not be less than
100mm (excluding typing pipe fittings); distance between the center line and the
22 supporter and hanger edge shall not be less than 50mm. Distance between two
weld bonds of the same pipe generally shall not be less than 150mm; where the
nominal diameter of the pipe is greater than 500mm, it shall not be less than
500mm.
The conduit orifice shall be avoided to be opened on the joints as possible and the
connection pipe welded joints of conduit orifice shall be avoid to be coincide with
the heat affected zone of adjacent welded joints. If hole must be opened on welded
joints or near the welded joints, the following conditions shall be met:
23 (1) The welded joints in the rang of larger than hole diameter and no less than
60mm around conduit orifice shall pass the nondestructive testing.
(2) The hole side is not on the weld defect.
(3) Heat treatment shall be carried out for pipe joint after welding to eliminate
stress.
24 Where the partial interval of weld bond is over large, it shall be trimmed to the
75
given size and it is forbidden to fill in substances
Generally, the welded parts assembly shall ensure flush inner wall (base); it there is
staggered joint, the value of staggered joint shall meet the following requirements:
(1) The value for partial staggered joint of butt-joint single welding shall not
26
exceed 10% of wall thickness and shall be less than or equal to 1mm.
(2) The value for partial staggered joint of butt-joint double welding shall not
exceed 10% thickness of welded parts and shall be less than or equal to 3mm.
Electric arc must not be ignited, current must not be tested or temporary upholder
must not be welded randomly on the surface of welded workpiece; chucking
27
appliance for contra aperture shall not be welded on the high alloy steel material
surface.
Where defects of welding joints exceed the criteria, shooting-in-piece method may
be adopted; however, it shall not exceed 3 times on the same position; the heat
resistant steels shall not exceed 2 times and shall be in accordance with the
following requirements:
28 (1)Made a clean sweep of defect;
(2)Specific repair welding measures shall be made for repair welding and shall be
carried out according to the technological requirements;
(3)The welding joint requiring heat treatment shall be carried out with heat
treatment again after the repairing
The loading instruments for cold drawing port of installation pipe shall not be
29
loaded till the entire contra aperture welding and thermal treatment is finished.
30 No heating and rectification shall be carried out for the welding joints
The end surface of conduit pipe port shall be vertical to the center line of pipe and
the skewness f shall not exceed those specified and see the table for the details
External diameter of pipe (mm) Skewness f (mm)
31 60 0.5
60~159 1
159~219 1.5
>219 2
Medium and low alloy-steel pipe, pipe fittings, pipe auxiliaries and valve shall be
33 carried out with spectrum recheck piece by piece before using, and material quality
shall be marked.
Local defects of scratch, pit and corrosion on pipe surface shall be inspected and
34 verified. The pipe wall thickness after treatment shall record shall be well kept and
the test report shall be submitted
The medium-and- low alloy steel pipe for the high-pressure pipe shall be carried
35
out with thickness surveying inspection for at least 3 sections and shall be well
76
recorded.
The alloy steel bolts with design temperature higher than 430 and with
36 diameter greater than or equal to M 30 shall be numbered by bar and shall be
carried out with hardness inspection and the unqualified ones shall not be applied.
As the valve (isolation function) of closed circuit members, tightness test must be
carried out before installing to inspect the tightness of valve seat, valve core, valve
37
cover and various joint surface of filler room. Tightness test of valves shall be
carried out according to the hydraulic pressure of 1.25 times of nameplate pressure.
The internal parts of alloy steel valves for disassembly shall be re-inspected with
38
spectrum
39 Tightness test shall be carried out after the valves are reassembled
It shall cut holes on the pipes according to design drawing before installing pipes.
40 After cutting holes, it must clean up the inside and there shall be no drill cuttings or
other foreign bodies
Anti-corrosive coating for buried steel pipe shall be painted before installation;
anti-corrosive measures shall not be taken for the weld seams before they are
41 qualified in inspection; the anticorrosive coating shall be painted from damage
during transportation and assembling; and those damaged anticorrosive coatings
shall be repaired.
42 The alloy steel bolts shall not be hot tightened with flame heating on the surface
The supporter and hanger shall be fixed and adjusted in time during the installation
43 of pipe. The position of supporter and hanger shall be correct and the installation
shall be flat and firm; the supporter and hanger shall contact with pipe well
The setting springs shall be installed according to the design requirements; the
44 set-pin shall not be demounted or safekept where the pipe system installation is
finished and the tightness test and thermal insulation are completed
At the time of taking water pressure test of pipe system, maintain 10min where the
pressure reaches to the test pressure, then it drops to the design stress; carry out
45 complete test for all joint and connecting positions There shall not be water
seepage or leakage mark on the overall system except partial places obstruct of
pump or valve padding and no deformation by visual observation.
The pipe system cleaning shall be carried out according to the following
requirements after the system passes the tightness test:
(1) The main steam and reheated steam system must be carried out with steam
46
blowing :
(2) The water supply, condensed water and boiler feedwater systems must be water
flushed or chemically cleaned (according to the boiler water quality requirements)
The corrosion protection on the weld bond parts of the directly-buried fuel pipe
47 shall be carried out after it passes the water pressure test according to the standard
requirements; only after the pipe is accepted, could it be carried out with burying.
77
All the pipes must be carried out with water pressure test and shall be qualified and
49 approved according to the standard requirements after the pipe installation of fuel
oil system is completed
Fresh water flushing or steam blowing shall be carried out after the pipe
50 installation of fuel oil system is completed and shall be approved; the specific
content are detailed in this article of this code
Oil circulation test for the total system shall be carried out after the fuel oil system
is installed; the oil pump by-part trial operation may be accompanied to be carried
51 out; approved technical measures shall be provided during test; and the cycling
time is generally not greater than 8h; the filter shall be cleaned after the oil
circulation is completed and approval shall be transacted.
The fuel oil system shall be completely inspected before it is filled with oil and it
shall not be oil filled till the following conditions are met:
(1) All the civil works and installation works within the oil-filling scope shall be
completed and shall be qualified through acceptance.
(2) The anti-lighting and anti-static facilities shall be installed, tested and
accepted qualified according to the requirements;
52 (3) The illumination and communication facilities in the oil zone have already be
provided with operating conditions;
(4) The fire fighting roads shall be passage clear and the fire fighting system shall
pass the test and stand ready for use;
(5) The fire protection and management system has already been established in the
oil zone and is maintained and administrated by specific personnel;
(6) The oil zone fence shall be integrate and shall be equipped with warning signs
The various valves for hydrogen manufacturing system shall be adopted with gas
53
valve and it shall ensure that there is no leakage.
Inspection
result
Note: All the unit (subdivision) projects may properly add, delete or select the compulsory provisions in this table according to
the actual conditions
4.5.1 This article is applicable to the installation acceptance of the supporters and hangers of
medium- and low-pressure pipes. Acceptance criteria are detailed in Table 4.5.2.
Table 4.5.2 Installation of Supporters and Hangers of Medium- and Low-pressure Pipes
Inspection method and
Procedure Inspection item Property Unit Quality criteria
instrument
78
Meeting the design requirements with Appearance inspection
Type and
well-integrated parts and smooth and clean and ruler-based
working size
appearance measurement
Diameter
Appearance inspection
deviation of
mm 3 and ruler-based
eyelet and
measurement
pull-rod
Spring
The surface shall be free from cracks: fold and Measuring with a ruler
appearance and
sub-layer defects; dimensions shall meet the and checking the product
physical
requirements of the drawing. certificates
dimension
Type and
Root parts Meeting the design requirements
working size
preparation
Weld inspection Meeting the relevant requirements of DL/T 869 Appearance inspection
Fixed supporter Dominant Firmly fixed and well-integrated with pipes Appearance inspection
79
The supporter surfaces and the base plates or
Rolling supporter Appearance inspection
ball bearings (roller) are well contacted.
Damping
Meeting the design or manufacturing
supporter and Dominant Appearance inspection
organization requirements
hanger
Weld inspection Meeting the relevant requirements of DL/T 869 Appearance inspection
80
aperture and Trench mm Within 15 straightedge
weld Grounding mm Within 20
Testing with a
Vertical pipe verticality mm 2/1000L and15 gradienter and a
straightedge
Testing with a
Pipe slope aspect and
Meeting the design requirements gradienter and a
gradient
straightedge
Appearance
Meeting the provisions and design
inspection and the
General requirements requirements of 5.1 and 5.3 of DL
technical document
50311994.
checking
Vernier caliper-based
and straight
Groove cleanliness, type Meeting the provisions specified in 5.1.8 rule-based
and size and 5.1.10 of DL 5031-1994 measurement and
appearance
inspection
81
requirements; they are well-integrated;
paints are used correctly and 2~3 threads are
remained.
Open/close testing
Reduction Operateing flexibly without jams
examination
82
Checking the real
objects and the
Device inspection Meeting the design requirements
documentary
Installation of
evidences
compensation
Ruler-based
devices
Meeting those specified in 6.10 of GB measurement and
Device installation
50235-1997 appearance
inspection
Measurement with a
Elevation of basal surface Dominant mm 20
gradienter
Appearance
inspectionand hidden
Acceptance of
Anti-corrosion of pipe Dominant Meeting the design requirements confirmation and
buired pipes
signature records
checking
Appearance
inspectionand hidden
Meeting the relevant requirements of DL/T
Back-filling Dominant confirmation and
5210.1
signature records
checking
4.5.4 This article is applicable to the installation quality acceptance of steam exhaust system
pipe for air-cooling machine unit. Acceptance criterion are detailed in Table 4.5.4.
Table 4.5.4 Installation of air-cooling steam exhaust pipe
Inspection method and
Procedure Inspection item Property Unit Quality criteria
instrument
83
of component position which forming a
angle of 90; inspecting
with a steel ruler
Heating radiator
Pipe bundles Installing in order; locating correctly and
pipe bundles and Observing
installation guaranteeing smoothly expansion
header installation
Appearance inspection
General Meeting the provisions and design requirements of
and the technical
requirements 5.1and 5.3 of DL 5031191994
document checking
Space of two Space of welds shall not be less than outer diameter
mm Inspecting with a ruler
welds of pipes and shall not be less than 150
Installation Appearance
Expansion joint In the right direction and consistent with flow
position and inspectionand design
installation direction of the medium
direction checking
4.5.5 This article is applicable to the quality acceptance of tightness test for medium and
low-pressure pipes and the acceptance criteria are detailed in Table 4.5.5.
Table 4.5.5 Tightness Test of Medium and Low-pressure Pipes
Inspection
Procedure Property Unit Quality criteria Inspection method and instrument
item
Hydraulic
pressure
General Dominant Water quality shall be clean (the chloride ion System test check
test
requirements content in water in the austenitic stainless steel
pipe must be less than 2510-6), the air in the
85
system shall be exhausted, the surrounding
temperature shall be above 5, at least two
pressure gauges shall be set in the weekly
check period and the precision shall not be less
than Grade 1.5
4.5.6 This section is applicable to quality inspection and evaluation on the cleaning of the
medium and low pressure pipe systems, and the acceptance criteria are detailed in Table 4.5.6.
Table 4.5.6 Cleaning of Medium and Low Pressure Pipe Systems
Inspection method
Procedure Inspection item Property Unit Quality criteria
and instrument
Temporary pipe The welding shall be carried out according to the welding
welding technique of the cleaned pipe
Inspection on
supporter and The supporter and hanger shall be firmly and reliably fixed
hanger of and shall meet the requirements of pipe expansion
temporary pipe
86
The color and transparency of water discharged from water
Visual observation
outlet shall be consist with those of the inlet water (Chloride
Water flushing Dominant by taking water
ion content in the flush water for austenitic stainless steel
sample
pipe must be less than 2510-6)
Inner wall
Post-degreasing Wiping the inner wall of pipe and its auxiliaries with dry
inspection of Result observation
inspection clean white filter paper, without grease trace on the paper
pipe
4.5.7 This article is applicable to the control and inspection during the assembly process of
medium and low pressure pipes in thermal power plant and shall include the following
records. For the items beyond the acceptance range, the "acceptance organization" column in
the record table shall be represented by filling "/".
1 The installation records of compensation devices are detailed in Table 4.5.7.
2 The installation records of flow measuring devices are detailed in Table 4.4.9-3.
3 The inspection records of pipe and pipe fittings are detailed in Table 4.4.9-4.
4 The installation and adjustment records of supporters and hangers are detailed in
Table 4.4.9-6.
5 The inspection (maintenance), test and acceptance records of valves are detailed in
Table 4.4.9-7.
6 The hot commissioning records of safety valve are detailed in Table 4.4.9-8.
87
7 The adjustment, inspection and acceptance records of electrically operated gate are
detailed in Table 4.4.9-9.
8 The acceptance certificate of concealed work is detailed in Table 4.4.9-10.
9 The certification of tightness test is detailed in Table 4.4.9-11.
10 Inspection records of pipe before pressure test are detailed in Table 4.4.9-13.
11 The certification of pipe system blowing (flushing) is detailed in Table 4.4.9-14.
12 The inspection table for implementation performance of compulsory provisions is
detailed in Table 4.4.9-15.
88
Table 4.5.7 Installation Records of Compensation Devices
Project name:
Unit project name Subsection project name
SN Specification and type Installation position Installer Installation date Inspector Inspection date
Construction organization
Supervision organization
Development organization
4.6.1 The installation of fuel oil and fuel gas pipes in plant shall include fuel oil pipe,
natural gas pipe, hydrogen pipe, other combustible (flammable) gas pipe and their fittings
used in the thermal power plant. The quality acceptance of the supporter and hanger
installation stated in this section is detailed in Table 4.5.2.
4.6.2 This article is applicable to the quality acceptance for the installation of fuel oil and fuel
89
gas pipes in plant and the acceptance criteria are detailed in Table 4.6.2.
Table 4.6.2 Installation of Fuel Oil and Fuel Gas Pipes in Plant
Inspection method and
Procedure Inspection item Property Unit Quality criterion
instrument
Overhead <l0
Location Pipe elevation
Trench <l5 Level meter-based and
dimension deviation
Underground <20 ruler-based inspection
Vernier caliper-based
Meeting the provisions specified
Groove cleanliness, type and and ruler-based
dominant in 5.1.8 and 5.1.10 of DL
size inspection as well as
5031-1994
appearance inspection
90
No larger than 1.5/1000 of the Square-based and
Gradient of flange end surface flange outer diameter and not ruler-based
larger than 2mm measurement
Open/close testing
Reduction Block-free and go slick
inspection
Flow device
installation Specification and type Meeting the design requirements Rechecking the real
object and the
91
certification document
Ground resistance value Dominant Meeting the design requirements Electricity test
Level meter-based
Elevation of basal surface Dominant 20
inspection
92
Appearance
inspection, conceal ed
confirmation and
Anti-corrosion of pipe Dominant Meeting the design requirements
signature records
consultation and
instrument test
Appearance inspection
Meeting the relevant and confirmation and
Back-filling Dominant
requirements of DL/T 5210.1 signature records
consultation
4.6.3 This article is applicable to the quality acceptance for tightness test of fuel oil and fuel
gas pipes in plant and the acceptance criteria are detailed in Table 4.6.3
Table 4.6.3 Tightness Test of Fuel Oil and Fuel Gas Pipes in Plant
Inspection method and
Procedure Inspection item Property Unit Quality criterion
instrument
93
After the pressure test is finished, drained
Recovery after test away the inspecting gas. Recovery system Appearance inspection
and fill out the test record.
Airtightness
test General requirements Dominant The combustible gas pipe must have the System test inspection
air-tightness test carried out after the pipe
pressure test is qualified. Air should be
adopted when there is no design 94
requirements for the inspecting medium
4.6.4 This article is applicable to the quality acceptance of fuel oil and fuel gas pipes in plant
system cleaning and the acceptance criteria are detailed in Table 4.6.4
Table 4.6.4 System Cleaning of Fuel Oil and Fuel Gas Pipes in Plant
Inspection method and
Procedure Inspection item Property Unit Quality criterion
instrument
pigging
Dominant The pipe with DN 100mm must have Visible inspection
the pigging and the diameter of the
spherical pig or pipeline cleaner is
generally 1.05 times of the pipes' internal
95
diameter; the maximum pressure of the
apex ball shall not be larger than 1.25
times of the design operating pressure.
The pigging times shall not be less than 2
times and only when there is no impurity,
wastewater, etc. draining away after the
pigging can be determined as qualified.
Visible inspection
96
Inspection Wiping the inner wall of pipe and its
Pipe inwall
after accessory with dry, clean white filter Observation result
inspection
degreasing paper and no grease mark on the paper
4.6.5 This article is applicable to the installation process control and inspection of fuel oil
and fuel gas pipes in plants in thermal power plant and includes the following records. The
acceptance organization column beyond the acceptance scope in the record shall be expressed
with "/".
1 The installation records of flow device are detailed in Table 4.4.9-3.
2 The inspection records for pipe and pipe fittings are detailed in Table 4.4.9-4.
3 The installation and adjustment records of supporter and hangers are detailed in
Table 4.4.9-6.
4 The Acceptance records of valve inspection (overhauling) and test are detailed in
Table 4.4.9-7.
5 The hot commissioning records of safety valve are detailed in Table 4.4.9-8.
6 The acceptance records for adjustment of electrically operated gate are detailed in
Table 4.4.9-9.
7 The acceptance certificate of concealed work is detailed in Table 4.4.9-10.
8 The acceptance certificate of tightness test is detailed in Table 4.4.9-11.
9 The inspection records of pipes before the pressure test are detailed in Table 4.4.9-13.
10 The acceptance certificate of pipe system blowing (flushing) is detailed in Table
4.4.9-14.
11 The inspection table for implementation performance of the compulsory provisions
is detailed in Table 4.4.9-15.
12 The installation records of compensation devices are detailed in Table 4.5.7.
97
Internal inspection of
Clean without sundries Flashlight-based inspection
connection pipe
Weld inspection Dominant Meeting the relevant requirements of DL/T 869 Appearance inspection
System
Pipe cleaning Dominant Without sundries Flashlight-based inspection
cleaning
Acceptance Pipe base and Material, compactness, strength, section size and
Dominant Appearance inspection
of buried cushion layer gradient shall meet the design requirements
98
pipes Elevation of basal Level meter-based
Dominant mm 20
surface measurement
4.73 This article is applicable to the quality acceptance for installation of ash (slag) convey
pipe and the acceptance criteria are detailed in Table 4.7.3.
Table 47.3 Installation of Ash (Slag) Convey Pipe
Inspection method and
Procedure Inspection item Property Unit Quality criterion
instrument
99
Meeting those specified in 6.10 of GB Ruler-based measurement
Device installation
50235-1997 and appearance inspection
4.7.4 This article is applicable to the quality acceptance for installation of nonmetallic
corrosionproof pipe, and the acceptance criterion is detailed in Table 4.7.4.
Table 4.7.4 Installation of Nonmetallic Corrosionproof Pipe
Inspection method
Procedure Inspection item Property Unit Quality criterion
and instrument
Level meter-based
Vertical pipe verticality 2,1000L and 15 and ruler-based
Location inspection
dimension
Bending DN100 1/1000L, and 20
Level meter-based
inspection
degree of
and level ruler-based
horizontal DN>100 1.5/1000L, and 20
inspection
pipe
Level meter-based
Gradient of pipe slope Meeting the design requirements and ruler-based
inspection
Checking drawing
Meeting the technical requirements of design and
Welding and technical
manufacturer
document
Checking drawing
Pipe Meeting the technical requirements of design and
Spigot and socket and technical
connection manufacturer
document
100
and uniform tightening force and be exposed
with 2~3 threads; the screw thread shall be
coated with black lead powder or molybdenum
disulfide, double-layer gasket shall not be used;
the gasket shall meet the design requirements
and the internal diameter shall be larger
2mm~3mm than internal diameter of pipe
Visual observation
System Drainage color and transparency at outlet shall
Pipe flushing Dominant by taking water
washing be consistent with inlet water
sample
4.7.5 This article is applicable to the process control and inspection for installation of other
pipes in thermal power plant and includes the following records. The acceptance organization
column beyond the acceptance scope in the record shall be expressed with "/".
1 The inspection records for pipe and pipe fittings are detailed in Table 4.4.9-4.
2 The installation and adjustment records of supporter and hangers are detailed in
Table 4.4.9-6.
3 The Acceptance records of valve inspection (overhauling) and test are detailed in
Table 4.4.9-7.
4 The hot commissioning records of safety valve are detailed in Table 4.4.9-8.
5 The acceptance records for adjustment of electrically operated gate are detailed in
Table 4.4.9-9.
6 The acceptance certificate of concealed work is detailed in Table 4.4.9-10.
7 The acceptance certificate of tightness test is detailed in Table 4.4.9-11.
101
8 The inspection records of pipe before pressure test are detailed in Table 4.4.9-13.
9 The certification of pipe system blowing (flushing) is detailed in Table 4.4.9-14.
10 The inspection table for implementation performance of compulsory provisions is
detailed in Table 4.4.9-15.
11 The installation records of compensation devices are detailed in Table 4.5.7.
102
5 Evaluation on the Quality of Single Project
5.1.1 Such single project as the civil work, boiler unit, steam turbine generator unit, thermal
meter and its control device, pipe and pipe system, the equipment and the system with the
water treatment and hydrogen generation, welding engineering, processing preparation and
electrical device installation in thermal power generation project shall be evaluated
respectively.
5.1.2 Single project evaluation for the boiler unit, steam turbine generator unit, thermal
meter and its control device, pipe and pipe system, the equipment and the system with the
water treatment and hydrogen generation and processing preparation in thermal power
generation project shall be evaluated respectively according to this code.
5.1.3 Those project construction organizations engaged in creating high quality project shall
organize the participating organizations to formulate quality objective, conduct objective
management, develop quality planning, highlight corresponding responsibilities, strengthen
process control and intensify quality acceptance in each phase before the commencement of
projects.
5.1.4 Organizations to evaluate and construct single project shall inspect themselves
according to the requirements specified in this Part; development organizations shall be
responsible for organizing supervision organizations or other evaluation organizations to
evaluate; in addition, the supervision organizations or other evaluation organizations shall
summarize and analyze the evaluation results and then write evaluation report.
5.1.5 During the evaluation of single project, the actual project quality and technical project
information shall be comprehensively inspected.
5.1.6 Construction quality of single project shall be evaluated after all the acceptance of unit
project is qualified.
5.1.7 Construction quality of single project shall be evaluated respectively according to
three project positions (scopes) as installation of four main pipes, installation of medium and
low-pressure pipes and installation of fuel oil and fuel gas pipes in plant.
5.1.8 Each project position (scope) shall be evaluated according to the quality guarantee in
construction site, performance inspection, quality records, size deviation and actual limit
measurement, implementation performance of compulsory provision and appearance quality.
Corresponding weighing value of each evaluation project shall be given according to its work
load and importance in this project position (scope).
5.1.9 Each evaluation item shall consist of several kinds of evaluation which shall specify
the standard score according to the importance. During the evaluation of construction quality,
each evaluation is judged as Class I, Class II or Class III which are corresponding to the
standard scores of 100%, 85% and 70% respectively.
5.1.10 During project construction quality evaluation, attention shall be given to promote
scientific management, strengthen project quality control, improve management mechanism
and persist to improve evaluation competence.
5.1.11 Control of project construction quality shall highlight raw material, process quality
103
control and function effectiveness test so as to improve management efficiency and operating
skills.
5.1.12 During the evaluation of construction quality, attention shall be given to apply the
advance of science and technology as well as environmental protection.
5.1.13 The score for the evaluated excellent construction quality of single project shall be
greater than or equal to 85 scores; those projects with total score being at last 92 shall be
extremely excellent projects.
5.2.1 The evaluated weight value of position (scope) contained in single project is specified
according to the comprehensiveness of importance, difficulty and work load. Evaluation of
single project position (scope) shall be carried out according to those specified in Table 5.2.1.
Table 5.2.1 Distribution of Weight Value on the Pipe and System Single Project (Scope)
Project position (scope) Weighing score
Note: if the item of "project position (scope)" is lost, the weight value shall be adjusted according to actual situation, but shall be
integer.
5.2.2 Quality evaluation of each project position (scope) shall include the quality guarantee
in construction site, performance inspection, quality records, size deviation and actual limit
measurement, implementation performance of compulsory provisions and appearance quality.
5.2.3 Weight value of the evaluation item shall meet those specified in Table 5.2.3.
Table 5.2.3 Distribution on the Weight Value of Evaluation Item in Project Position (Scope)
Project position (scope)
SN Evaluation item Installation of four Installation of medium Installation of fuel oil and fuel gas
main pipes and low-pressure pipes pipes in plant
2 Performance inspection 30 25 30
3 Quality record 20 20 20
Implementation performance of
5 15 15 15
compulsory provisions
6 Appearance quality 10 15 15
Note: if there is nonexistent evaluation item in the table, its weight value shall be calculated according to full score.
5.3.1 Construction quality of single project shall be evaluated item by item according to the
104
project position (scope) and evaluation item content of this Part; the construction quality shall
be statistically analyzed basing on the records of random inspection on construction site as
well as the quality acceptance records of each inspection lot, subitem project, subsection
project and unit project; in addition, the construction quality is scored according to project
position (scope) and the requirements specified in evaluation item (corresponding table).
5.3.2 Single project shall not be evaluated to be excellent where there is any of the
following conditions:
1 To use the materials and products which China forbids publically.
2 The obtained score of any project position (scope) or evaluation item is less than
85% standard score.
5.4.1 Content and methods to evaluate the quality guarantee on construction site shall meet
the following requirements:
1 If the followings can be practically achieved, the quality guarantee on construction
site is Class I and gains 100% standard score: sound quality management, liability system and
project-department organizations; effectively-operated quality management system; perfect
technologies, working management system, site acceptance system and sampling inspection
system of equipments. If sound quality management and liability systems can be basically
achieved, the quality guarantee on construction site is Class II and gains 85% standard score.
And if main quality management and liability systems can be basically achieved, the quality
guarantee on construction site is Class III and gains 70% standard score.
2 The quality guarantee on construction site with standard quality inspection and
acceptance required by projects, standard construction technologies, complete working
methods, operation specifications and operational guide books which have strong pertinency
and operability are Class I and gain 100% standard score; the quality guarantee on
construction site with standard and complete quality inspection and acceptance, standard
construction technologies, basically complete operation specifications and operation guide
books which have relatively strong pertinency and operability are Class II and can gain 85%
standard score; and the quality guarantee on construction site with standard and complete
quality inspection and acceptance, standard major construction technologies and complete
operation specifications as well as operation guide books which have general pertinency and
operability are Class III and gain 70% standard score.
3 The quality guarantee on construction site with complete processes to develop and
approve construction management plan, construction scheme, construction measures and risk
prevention measures which have strong pertinency and operability, are seriously implemented
and achieve notable effectiveness is Class I and gains 100% standard score; the quality
guarantee on construction site with complete development and approval processes, relatively
strong pertinency and operability, being basically implemented and achieving preferable
effectiveness is Class II and gain 85% standard score; and the quality guarantee on
construction site with sound development and approval processes, being generally
implemented is Class III and gains 70% standard score.
4 The quality guarantee on construction site with specified quality objective, proper &
105
effective management system and notable implementation effectiveness is Class I and gains
100% standard score; the quality guarantee on construction site with preferable
implementation effectiveness is Class II and gains 85% standard score; and the quality
guarantee on construction site with general implementation effectiveness is Class III and
gains 70% standard score.
5.4.2 Content and methods to evaluate the performance inspection shall meet the following
requirements:
1 Inspection and test of construction process as well as by-part trial operation shall
meet the requirements specified in relevant standards; the performance inspection provided
with complete and standard test records and reports is Class I and gains 100% standard score;
2 Inspection and test of construction process as well as by-part trial operation shall
meet the requirements specified in relevant standards; the performance inspection provided
with complete and basically standard test records and reports is Class II and gains 85%
standard score;
3 The above test items and test conditions basically meet the requirements specified in
relevant standards; and the performance inspection provided with basically complete test
records and reports is Class III and gains 70% standard score.
4 To sample test records and reports; to measure on site, if necessary
5.4.3 Content and methods to evaluate the quality records shall meet the following
requirements:
1 Material & equipment quality certificates (outgoing quality certificates), complete
site acceptance record, construction record, construction test record, data; actual and effective
content, standard classification & rearscopement, perfect reviewing and signing procedures
and meeting the requirements specified in design and standards are Class I and gain 100%
standard score. Those quality records with complete information, relatively complete data,
actual and effective content, relatively standard rearscopement, relatively complete reviewing
and signing procedures and meeting the requirements specified in design and standards are
Class II and gain 85% standard score. Those quality records with basically complete
information, date; actual and effective content; basically standard rearscopement, basically
complete reviewing and signing procedures and basically meeting the requirements specified
in design and standards are Class III and gain 70% standard score.
2 To inspect the quantity and content of information
5.4.4 Content and methods to evaluate the size deviation and actual limit measurement shall
meet the following requirements:
1 As for those evaluation items, if they are permissible deviation ones; the actual
values measured at each item measuring point reach the ones specified in standard and the
actual values of 80% and more measuring points are less than or equal to 0.8 times the ones
specified in standard, they are Class I and gain 100% standard score. For those evaluation
items, if the actual values of each measuring point reach the ones specified in standard and the
average actual values of greater than 50% (including 50%) but less than 80% measuring
points are less than or equal to 0.8 times the ones specified in standard; they are Class II and
gain 85% standard score. For those evaluation items, if the actual values of each measuring
point reach the ones specified in standard; they are Class III and gain 70% standard score.
2 For those evaluation items, if they are two-way limits items, the actual values
106
measured at each measuring point meet the ones specified in standard and the actual values of
at least 50% measuring points approximate to the medium limit value; they are Class I and
gain 100% standard score; those evaluation items all of whose actual values at each
measuring point are within the limit specified in standard are Class II and gain 85% standard
score; those evaluation items whose measuring points meet the standard specification after
treatment are Class III and gain 70% standard score.
3 For those evaluation items, if they are one-way limit items and all the actual values at
each measuring point meet the ones specified in standard, they are Class I and gain 100%
standard score; those evaluation items whose measuring points meet the standard speciation
after treatment are Class III and gain 70% standard score.
4 If both permissible deviation and limit are available, the decision value is from the
lower Class.
5 Random 10 inspection lots or all lots if they are less than 10 are sampled from the
relevant inspection lots or subitem projects in the category for analyzing and calculating. If
necessary, random measurement on site may be carried out.
5.4.5 Content and methods to evaluate the implementation performance of compulsory
provisions shall meet the following requirements:
1 Those compulsory provisions with detailed implementation plan, comprehensive
content, strong operability, strict implementation and complete inspection records are Class I
and gain 100% standard score; those ones with implementation plan, comprehensive content,
preferable operability, preferable implementation and relatively complete inspection records
are Class II and gain 85% standard score; those ones with implementation plan,
comprehensive content, operability, implementation and inspection records are Class III and
gain 70% standard score.
2 To randomly inspect the executive plan, scheme measures, operation guide book,
construction record confirmation and signature and inspection records of compulsory
provisions.
5.4.6 Content and methods to evaluate the appearance quality shall meet the following
requirements:
1 The inspection points of each evaluation item are evaluated according to "good",
"ordinary" and "poor". Those evaluation item whose 90% or more inspection points are
"good" and the other inspection points are "ordinary" are Class I and gain 100% standard
score; those evaluation item whose greater than 70% (including 70%) and less than 90%
inspection points are "good" and the other inspection points are "ordinary" are Class II and
gain 85% standard score; those evaluation item whose greater than 30% (including 30% ) and
less than 70% inspection points are "good" and the other inspection points are "ordinary" are
Class III and gain 70% standard score.
2 To observe (to measure, if necessary); to inspect the quality acceptance records of
subsection project and to analyze and calculate.
5.5.1 Content and methods to evaluate the quality guarantee on construction site of
installation of four main pipes shall meet those specified in Article 5.4.1 of this part.
107
5.5.2 Quality assurance on construction site of installation of four main pipes shall inspect
relevant system, measure information, randomly inspect the implementation condition and
comprehensively judge, and the scoring shall be in accordance with those specified in Table
5.5.2.
Table 5.5.2 Scoring Table on Quality Guarantee Condition for Construction Site
Before carrying out trial
Project position (scope) Construction stage
operation with 168h full load
5.5.3 The items to be inspected of performance inspection for installation of four main pipes
shall include:
1 Spectral analysis of alloy steel as pipe materials and pipe fittings as well as hardness
inspection.
2 Valve inspection.
3 Installation of creep supervising section and creep measurement points.
4 Adjustment and inspection of supporter and hanger.
5 Welded junction inspection under supervision.
6 Expansion inspection of pipe system.
108
7 System tightness
8 Flushing inspection of main steam and reheating system.
9 Washing inspection of water supply system.
5.5.4 Inspection and evaluation methods of performance inspection for installation of four
main pipes shall meet the following requirements:
1 Spectral analysis of alloy steel as pipe materials and pipe fittings as well as hardness
inspection.
1) Inspection standard: spectral analysis of alloy steel as pipe materialsa and pipe
fittings as well as hardness inspection result meeting design or specification
requirements with intact, standard and complete records are Class I and gain
100% standard score; those ones with little inspection value not meeting the
design or specification requirements but meeting the requirements after
processing or to be applied with concession through unified agreement of the
parties and intact, standard and complete related records are Class II and gain
85% standard score; those ones with partial inspection value not meeting the
design or specification requirements but meeting the requirements after
processing or to be applied with concession through unified agreement of the
parties and basically intact, standard and complete related records are Class III
and gain 70% standard score.
2) Inspection methods: inspecting the inspection report.
2 Valve inspection.
1) Inspection standard: the valves with qualified inspection and complete record,
and the service performance fully meeting the operating requirement after
operation in system and without leakage on site (including internal leakage) are
Class I and gain 100% standard score; the ones with service performance fully
meeting the operating requirement, and internal (external) leakage phenomenon
for individual valve in drainage system are Class II and gain 85% standard
score; the ones with service performance basically meeting the operating
requirement and internal (external) leakage phenomenon for a small amount of
valves in drainage system are Class III and gain 70% standard score.
2) Inspection method: report inspection and actual measurement on site.
3 Installation of creep supervising section and creep measurement points.
1) Inspection standard: installation of creep supervising section and creep
measurement points meeting design and compulsory provision requirements
and with intact, actual and complete record is Class I and gains 100% standard
score, the one meeting design and compulsory provision requirements and with
basically intact, actual and complete record is Class II and gains 85% standard
score; the one basically meeting design and compulsory provision requirements
and with basically intact, actual and complete record is Class III and gains 70%
standard score.
2) Inspection methods: record inspection and actual measurement on site.
4 Adjustment and inspection of supporter and hanger.
1) Inspection standard: installation of supporter and hanger meeting design and
specification requirements with actual and complete record and running state
109
meeting design and specification requirements is Class I and gains 100%
standard score; the one meeting design and specification requirements with
actual and complete record and the running state basically meeting design and
specification requirements after adjustment or processing is Class II and gains
85% standard score; the one basically meeting design and specification
requirements with basically actual and complete record and the running state
basically meeting design and specification requirements after adjustment or
processing is Class III and gains 70% standard score.
2) Inspection methods: record inspection and actual measurement on site.
5 Welded junction inspection under supervision.
1) Inspection standard: the welded junction under supervision with qualified 100%
non-destructive inspection according to specification and the first qualification
rate reaching 98% and above is Class I and gains 100% standard score; the one
with the first qualification rate reaching 96% and above is Class II and gains
85% standard score; the one with the first qualification rate reaching 96% and
above is Class III and gains 70% standard score.
2) Inspection method: report and record inspection.
6 Expansion inspection of pipe system.
1) Inspection standard: pipe system expansion meeting the design requirements
with correct expansion indication and without expansion obstructing
phenomenon on site and with complete record is Class I and gains 100%
standard score; the one basically meeting the design requirements with
complete record is Class II and gains 85% standard score; the one with
deviation for individual position expansion and design requirement but
basically not influencing the normal operation of system and with basically
complete record is Class III and gains 70% standard score.
2) Inspection method: drawing checking and field inspection.
7 System tightness.
1) Inspection standard: the system tightness test shall be qualified with complete
confirmation and signature, and the main pipe of system during operational
process shall be free from leakage phenomenon. If the system tightness is good
without any leakage point, it is Class I and gains 100% standard score; the
slight leakage points (limited to drainage system) less than 2 during system
operation and not influencing the normal operation of unit is Class II and gains
85% standard score; the slight leakage points (limited to drainage system) less
than 4 during system operation and not influencing the normal operation of unit
is Class III and gains 70% standard score.
2) Inspection methods: report inspection and actual measurement on site.
8 Flushing inspection of main steam and reheating system.
1) Inspection standard: the system flushing with scientific and reasonable scheme,
less flushing times and effect reaching code and standard requirements (impact
spot on last target card 0.8mm, 0.5mm~0.8mm (including 0.8mm) spot no
larger than 8 points and 0.2mm~0.5mm spot with even distribution), complete
record and confirmation and signature and intact target card preservation is
110
Class I and gains 100% standard score; the system flushing with scientific and
reasonable scheme, and flushing effect reaching code and standard
requirements, basically complete record and confirmation and signature and
intact target card preservation is Class II and gains 85% standard score; the
system flushing with scientific and reasonable scheme, and flushing effect
basically reaching code and standard requirements, basically complete record
and confirmation and signature and intact target card preservation is Class III
and gains 70% standard score.
2) Inspection methods: report and record inspection.
9 Washing inspection of water supply system.
1) Inspection standard: the system washing with scientific and environmental
protection scheme and good washing effect as well as complete record and
confirmation and signature gains 100% standard score; the system washing
with comparatively scientific scheme and washing effect reaching code and
standard requirements and basically complete record and confirmation and
signature is Class II and gains 85% standard score; the system washing with
comparatively scientific scheme and washing effect basically reaching code
and standard requirements and basically complete record and confirmation and
signature is Class III and gains 70% standard score.
2) Inspection methods: report and record inspection.
5.5.5 The performance inspection scoring for installation of four main pipes shall be in
accordance with those specified in Table 5.5.5.
Table 5.5.5 Scoring Table of Performance Inspection
Before carrying out trial operation
Project position (scope) Installations of four main pipes Construction stage
with 168h full load
Construction Evaluation
organization organization
2 Valve inspection 5
7 System tightness 15
111
Weight value: 30 scores
Total score:
Evaluation Total obtained score:
result Score of performance inspection for installation of four main pipes=obtained score/score30=
Evaluation personnel (signature):
Date
5.5.6 The items to be inspected of quality record for installation of four main pipes shall
include:
1 Raw material (equipment) inspection and acceptance record.
1) Quality certificate document of raw material (equipment) and warehouse entry
acceptance record.
2) Field spectrum, thickness and hardness inspection record.
2 Construction record.
1) Quality acceptance record.
2) Trace record of pipe piping (installation).
3) Creep monitoring record.
4) Installation record of expansion indicator.
5) Welded junction inspection, heat treatment and detection record.
6) Design alteration and defect treatment record.
7) Confirmation and signature record of concealed items.
3 Construction test (debugging).
1) Acceptance record of tightness test.
2) Acceptance record of blowpipe (washing).
3) Valve debugging record.
5.5.7 Inspection and evaluation methods of quality record for installation of four main pipes
shall meet those specified in Article 5.4.3 of this part.
5.5.8 Inspection and scoring of quality record for installation of four main pipes shall be in
accordance with those specified in Table 5.5.8.
Table 5.5.8 Scoring Table of Quality Record
Construction Before carrying out trial operation with
Project position (scope) Installations of four main pipes
stage 168h full load
Construction Evaluation
organization organization
112
Installation record of expansion indicator 5
5.5.9 The items to be inspected of size deviation and actual limit measurement for
installation of four pipes shall include:
1 Size deviation of pipe positioning.
2 Installation deviation value of supporter and hanger.
3 Adjustment of original position of spring.
4 Flatness and deviation of contra aperture.
5 Spacing of two welds.
6 Distance from weld to supporter and hanger (open pore position or bend beginning
point).
7 Length of connecting bolt exposed from screw thread.
8 Cold drawing value deviation of pipe.
5.5.10 Inspection and evaluation methods for size deviation and actual limit measurement of
installation of four main pipes shall meet those specified in Article 5.4.4. Size deviation and
actual limit measurement item shall be in accordance with those specified in Table 5.5.10.
Table 5.5.10 Item Table of Size Deviation and Actual Limit Measurement for Installation of Four Pipes
SN Inspection item Unit Permissible variation value
2 Installation deviation value of supporter and hanger Meeting the requirements of the design drawing
3 Adjustment of original position of spring Meeting the requirements of the design drawing
5 Spacing of two DN500 mm Larger than external diameter of pipe, and >150
113
welds DN>500 mm Larger than external diameter of pipe, and >500
7 Length of connecting bolt exposed from screw thread Exposing 2~3 threads
5.5.11 Inspection and scoring of size deviation and actual limit measurement for installation
of four main pipes shall be in accordance with those specified in Table 5.5.11.
Table 5.5.11 Scoring Table of Size Deviation and Actual Limit Measurement
Before carrying out trial
Project position (scope) Installations of four main pipes Construction stage
operation with 168h full load
Construction
Evaluation organization
organization
Construction Evaluation
114
organization organization
5.5.14 The items to be inspected of appearance quality for installation of four main pipes
shall include:
1 Overall appearance quality.
2 System tightness.
3 Painting construction.
4 Welding construction.
5 Thermal insulation project.
6 Bolted connection.
7 System mark.
8 Installation of supporter and hanger.
9 Valve installation.
5.5.15 Inspection and evaluation methods for appearance quality of installation of four main
pipes shall meet those specified in Article 5.4.6.
5.5.16 Scoring of appearance quality inspection for installation of four pipes shall be in
accordance with those specified in Table 5.5.16.
Table 5.5.16 Scoring Table of Appearance Quality
Before carrying out trial operation
Project position (scope) Installations of four main pipes Construction stage
with 168h full load
Construction
Evaluation organization
organization
115
1 Overall appearance quality 25
2 System tightness 10
3 Painting construction 10
4 Welding construction 5
6 Bolted connection 5
7 System mark 5
9 Valve installation 10
5.6.1 Content and methods to evaluate the quality guarantee on construction site of
installation of medium and low-pressure pipes shall meet those specified in Article 5.4.1.
5.6.2 As for the evaluation on the quality assurance conditions on the construction site of
installation of medium and low-pressure pipes, the relevant systems and measure information
shall be inspected as well as the implementation conditions shall be inspected randomly to
carry out comprehensive judgment, and the scoring shall be in accordance with those
specified in Table 5.5.2.
5.6.3 The items to be inspected of performance inspection for installation of medium and
low-pressure pipes shall include:
1 Spectral analysis of alloy steel as pipe materials and pipe fittings as well as hardness
inspection.
2 Valve inspection.
3 Adjustment and inspection of supporter and hanger.
4 Welded junction inspection under supervision.
5 Expansion inspection of pipe system.
6 System tightness.
7 Internal cleaning degree of system.
5.6.4 Inspection and evaluation methods of performance inspection for installation of
medium and low-pressure pipes shall meet the following requirements:
1 Spectral analysis of alloy steel as pipe materials and pipe fittings as well as hardness
inspection.
1) Inspection standard: spectral analysis of alloy steel as pipe materials and pipe
fittings as well as hardness inspection result meeting design or specification
requirements with intact, standard and complete records are Class I and gain
116
100% standard score; those ones with little inspection value not meeting the
design or specification requirements but meeting the requirements after
processing or to be applied with concession through unified agreement of the
parties and intact, standard and complete related records are Class II and gain
85% standard score; those ones with partial inspection value not meeting the
design or specification requirements but meeting the requirements after
processing or to be applied with concession through unified agreement of the
parties and basically intact, standard and complete related records are Class III
and gain 70% standard score.
2) Inspection methods: inspecting the inspection report.
2 Valve inspection.
1) Inspection standard: the valves with qualified inspection and installed into
system to operate, and the service performance fully meeting the operating
requirement and without leakage on site (including internal leakage) are Class I
and gain 100% standard score; the ones with service performance fully meeting
the operating requirement, and internal (external) leakage phenomenon for
individual valve in drainage system are Class II and gain 85% standard score;
the ones with service performance basically meeting the operating requirement
and internal (external) leakage phenomenon for a small amount of valves in
drainage system are Class III and gain 70% standard score.
2) Inspection methods: report inspection and actual measurement on site.
3 Adjustment and inspection of supporter and hanger.
1) Inspection standard: installation of supporter and hanger meeting design and
specification requirements with actual and complete record and thermal
running state meeting design and specification requirements is Class I and
gains 100% standard score; the one meeting design and specification
requirements with actual and complete record and may meet design and
specification requirements after adjustment or processing under thermal state is
Class II and gains 85% standard score; the one basically meeting design and
specification requirements with basically actual and complete record and
basically meeting design and specification requirements under running state is
Class III and gains 70% standard score.
2) Inspection methods: record inspection and actual measurement on site.
4 Welded junction inspection under supervision.
1) Inspection standard: the welded junction under supervision with qualified 100%
non-destructive inspection according to specification proportion and the first
qualification rate reaching 98% and above is Class I and gains 100% standard
score; the one with the first qualification rate reaching 96% and above is Class
II and gains 85% standard score; the one with the first qualification rate
reaching 96% and above is Class III and gains 70% standard score.
2) Inspection methods: report and record inspection.
5 Expansion inspection of pipe system.
1) Inspection standard: pipe system expansion meeting the design requirements
with correct expansion indication and without expansion obstructing
117
phenomenon on site and with complete record is Class I and gains 100%
standard score; the one basically meeting the design requirements and without
expansion obstructing phenomenon on site and with complete record is Class II
and gains 85% standard score; the one with deviation for individual position
expansion and design requirement but basically not influencing the normal
operation of system and with basically complete record is Class III and gains
70% standard score.
2) Inspection methods: drawing checking and field inspection.
6 System tightness.
1) Inspection standard: the system tightness with qualified test and without any
leakage point for system operation is Class I and gains 100% standard score;
the system tightness with qualified test and the leakage points less than 5
during system operation and not influencing the normal operation is Class II
and gains 85% standard score; the system tightness with qualified test and the
leakage points less than 8 during system operation and not influencing the
normal operation is Class III and gains 70% standard score.
2) Inspection methods: report inspection and actual measurement on site.
7 Internal cleaning degree of system.
1) Inspection standard: the pipe system with clean internal cleaning (flushing) and
complete record and confirmation and signature as well as good system
operation is Class I and gains 100% standard score; the pipe system with
comparatively clean internal cleaning (flushing) and complete record and
confirmation and signature as well as the slight jam or other poor phenomena
existing for equipment and valves caused by unclean system during operation,
but not influencing the normal operation of system is Class II and gains 85%
standard score; the one with basically complete record and confirmation and
signature the slight jam or other poor phenomena existing for equipment and
valves caused by unclean system during operation, but basically not
influencing the normal operation of system is Class III and gains 70% standard
score.
2) Inspection methods: report and record inspection.
5.6.5 Inspection and scoring of performance inspection for installation of medium and
low-pressure pipes shall be in accordance with those specified in Table 5.6.5.
Table 5.6.5 Scoring Table of Performance Inspection
Installation of medium and low-pressure Before carrying out trial operation
Project position (scope) Construction stage
pipes with 168h full load
Evaluation
Construction organization
organization
Obtained
Evaluation result Remarks
SN Inspection item Score score
2 Valve inspection 15
118
3 Adjustment and inspection of supporter and hanger 15
6 System tightness 25
5.6.6 The items to be inspected of quality record for installation of medium and
low-pressure pipes shall include:
1 Raw material (equipment) inspection and acceptance record.
1) Quality certificate document of raw material (equipment) and warehouse entry
acceptance record.
2) Field spectrum, thickness and hardness inspection record.
2 Construction record.
1) Quality acceptance record.
2) Trace record of pipe piping (installation).
3) Welded junction inspection, heat treatment and detection record.
4) Design alteration and defect treatment record.
5) Confirmation and signature record of concealed items.
3 Construction test (debugging).
1) Acceptance record of tightness test.
2) Acceptance record of blowpipe (washing).
3) Valve debugging record.
5.6.7 Inspection and evaluation methods for quality record of installation of medium and
low-pressure pipes shall meet those specified in Article 5.4.3.
5.6.8 Scoring of quality record inspection for installation of medium and low-pressure pipes
shall be in accordance with those specified in Table 5.6.8.
Table 5.6.8 Scoring Table of Quality Record
Before carrying out trial operation
Project position (scope) Installation of medium and low-pressure pipes Construction stage
with 168h full load
Evaluation
Construction organization
organization
Evaluation result
SN Inspection item Score Obtained
100% 85% 70% Remarks
score
119
acceptance Field spectrum, thickness and hardness
5
record inspection record
5.6.9 The items to be inspected of size deviation and actual limit measurement for
installation of medium and low-pressure pipes shall include:
1 Size deviation of pipe positioning.
2 Installation deviation value of supporter and hanger.
3 Adjustment of original position of spring.
4 Flatness and deviation of contra aperture.
5 Spacing of two welds.
6 Distance from weld to supporter and hanger (open pore position or bend beginning
point).
7 Gradient of flange end surface.
8 Length of connecting bolt exposed from screw thread.
5.6.10 Inspection and evaluation methods of size deviation and actual limit measurement for
installation of medium and low-pressure pipes shall meet those specified in Article 5.4.4. Size
deviation and actual limit measurement item shall be in accordance with those specified in
Table 5.6.10.
Table 5.6.10 Item Table of Size Deviation and Actual Limit Measurement for Installation of Medium and
Low-pressure Pipes
SN Inspection item Unit Permissible variation value
120
2 Installation deviation value of supporter and hanger mm Meeting the requirements of the design drawing
3 Adjustment of original position of spring Meeting the requirements of the design drawing
Spacing of two
5 DN>500 mm Larger than external diameter of pipe, and >500
welds
8 Length of connecting bolt exposed from screw thread Exposing 2~3 threads
5.6.11 Inspection and scoring for size deviation and actual limit measurement of installation
of medium and low-pressure pipes shall be in accordance with those specified in Table 5.6.11.
Table 5.6.11 Scoring Table of Size Deviation and Actual Limit Measurement
Before carrying out trial operation
Project position (scope) Installation of medium and low-pressure pipes Construction stage
with 168h full load
Construction Evaluation
organization organization
Evaluation
Evaluation personnel (signature)
organization
121
Construction
Date
organization
Debugging
Date
organization
Supervision
Date
organization
Design
Date
organization
Manufacturing
Date
organization
Development
Date
organization
Construction Evaluation
organization organization
2 System tightness 10
3 Painting construction 10
122
4 Welding construction 5
6 Bolted connection 10
7 System mark 5
9 Valve installation 10
5.7 Quality Evaluation on Installation of Fuel Oil and Fuel Gas Pipes in Plant
5.7.1 Content and methods to evaluate the quality guarantee on construction site of
installation of fuel oil and fuel gas pipes in plant shall meet those specified in Article 5.4.1.
5.7.2 As for the evaluation on the quality assurance conditions on the construction site of
installation of fuel oil and fuel gas pipes in plant, the relevant systems and measure
information shall be inspected as well as the implementation conditions shall be inspected
randomly to carry out comprehensive judgment, and the scoring shall be in accordance with
those specified in Table 5.5.2.
5.7.3 The items to be inspected of performance inspection for installation of fuel oil and
fuel gas pipes in plant shall include:
1 Spectral analysis of alloy steel as pipe materials and pipe fittings as well as hardness
inspection.
2 Valve inspection.
3 Adjustment and inspection of supporter and hanger.
4 Welded junction inspection under supervision.
5 Expansion inspection of pipe system.
6 System tightness.
7 Internal cleaning degree of system.
8 Earthing inspection of system.
5.7.4 Inspection and evaluation methods of performance inspection for installation of fuel
oil and fuel gas pipes in plant shall meet the following requirements:
1 Spectral analysis of alloy steel as pipe materials and pipe fittings as well as hardness
inspection.
1) Inspection standard: spectral analysis of alloy steel as pipe materials and pipe
fittings as well as hardness inspection result meeting design or specification
requirements with intact, standard and complete records are Class I and gain
100% standard score; those ones with little inspection value not meeting the
design or specification requirements but meeting the requirements after
processing or to be applied with concession through unified agreement of the
123
parties and intact, standard and complete related records are Class II and gain
85% standard score; those ones with partial inspection value not meeting the
design or specification requirements but meeting the requirements after
processing or to be applied with concession through unified agreement of the
parties and basically intact, standard and complete related records are Class III
and gain 70% standard score.
2) Inspection method: inspecting the inspection report.
2 Valve inspection.
1) Inspection standard: the valves with qualified inspection and installed into
system to operate, and the service performance fully meeting the operating
requirement and with intact and complete record are Class I and gain 100%
standard score; the ones with service performance of individual valve fully
basically meeting the operating requirement after processing and with intact
and complete record are Class II and gain 85% standard score; the ones with
service performance of a small amount of valves basically meeting the
operating requirement after processing and with basically intact and complete
record are Class III and gain 70% standard score.
2) Inspection methods: report inspection and actual measurement on site.
3 Adjustment and inspection of supporter and hanger.
1) Inspection standard: installation of supporter and hanger meeting design and
specification requirements with actual and complete record and the thermal
running state meeting design and specification requirements is Class I and
gains 100% standard score; the one meeting design and specification
requirements with actual and complete record and may meet design and
specification requirements after adjustment or processing under thermal state is
Class II and gains 85% standard score; the one basically meeting design and
specification requirements with basically actual and complete record and
basically meeting design and specification requirements after adjustment or
processing under running state is Class III and gains 70% standard score.
2) Inspection methods: record inspection and actual measurement on site.
4 Welded junction inspection under supervision.
1) Inspection standard: the welded junction under supervision with qualified 100%
non-destructive inspection according to specification proportion and the first
qualification rate reaching 98% and above is Class I and gains 100% standard
score; the one with the first qualification rate reaching 96% and above is Class
II and gains 85% standard score; the one with the first qualification rate
reaching 96% and above is Class III and gains 70% standard score.
2) Inspection methods: report and record inspection.
5 Expansion inspection of pipe system.
1) Inspection standard: pipe system expansion meeting the design requirements
with correct expansion indication and without expansion obstructing
phenomenon on site and with complete record is Class I and gains 100%
standard score; the one basically meeting the design requirements and without
expansion obstructing phenomenon on site and with complete record is Class II
124
and gains 85% standard score; the one with deviation for individual position
expansion and design requirement but basically not influencing the normal
operation of system and with basically complete record is Class III and gains
70% standard score.
2) Inspection methods: drawing checking and field inspection.
6 System tightness.
1) Inspection standard: the system tightness with qualified test and without any
leakage point for system operation and with intact and complete record is Class
I and gains 100% standard score; the system tightness with qualified test and
without any leakage point for system operation and with basically intact and
complete record is Class II and gains 85% standard score; the system tightness
with qualified test and few leakage points (non-combustible medium) not
endangering safety or influencing the normal operation and with basically
intact and complete record is Class III and gains 70% standard score.
2) Inspection methods: report inspection and actual measurement on site.
7 Internal cleaning degree of system.
1) Inspection standard: the pipe system with clean internal cleaning (flushing) and
complete record and confirmation and signature as well as good systems
operation is Class I and gains 100% standard score; the pipe system with
comparatively clean internal cleaning (flushing) and complete record and
confirmation and signature as well as the slight jam or other poor phenomena
existing for equipment and valves caused by unclean system during operation,
but not influencing the normal operation of system is Class II and gains 85%
standard score; the one with basically complete record and confirmation and
signature the slight jam or other poor phenomena existing for equipment and
valves caused by unclean system during operation, but basically not
influencing the normal operation of system is Class III and gains 70% standard
score.
2) Inspection methods: report and record inspection.
8 Earthing inspection of system.
1) Inspection standard: the system earthing construction shall meet design and
specification requirements. The one with qualified ground resistance test as
well as complete and standard test record and report is Class I and gains 100%
standard score; the one with system earthing construction meeting design and
specification requirements and with qualified ground resistance test as well as
basically complete and standard test record and report is Class II and gains
85% standard score; the one with system earthing construction basically
meeting design and specification requirements and with qualified ground
resistance test as well as basically complete and standard test record and report
is Class III and gains 70% standard score.
2) Inspection methods: report inspection and actual measurement on site.
5.7.5 Inspection and scoring of performance inspection for installation of fuel oil and fuel
gas pipes in plant shall be in accordance with those specified in Table 5.7.5.
Table 5.7.5 Scoring Table of Performance Inspection
125
Installation of fuel oil and fuel gas pipes in Before carrying out trial operation
Project position (scope) Construction stage
plant with 168h full load
Construction Evaluation
organization organization
2 Valve inspection 15
6 System tightness 25
5.7.6 The items to be inspected of quality record for installation of fuel oil and fuel gas
pipes in plant shall include:
1 Raw material (equipment) inspection and acceptance record.
1) Quality certificate document of raw material (equipment) and warehouse entry
acceptance record.
2) Field spectrum, thickness and hardness inspection record.
2 Construction record.
1) Quality acceptance record.
2) Welded junction inspection and detection record.
3) Design alteration and defect treatment record.
4) Confirmation and signature record of concealed items.
3 Construction test (debugging).
1) Acceptance record of tightness test.
2) Acceptance record of blowpipe (washing).
3) Valve debugging record.
5.7.7 Inspection and evaluation methods of quality record for installation of fuel oil and fuel
gas pipes in plant shall meet those specified in Article 5.4.3.
5.7.8 Scoring of quality record inspection for installation of fuel oil and fuel gas pipes in
plant shall be in accordance with those specified in Table 5.7.8.
126
Table 5.7.8 Scoring Table of Quality Record
Construction Before carrying out trial operation
Project position (scope) Installation of fuel oil and fuel gas pipes in plant
stage with 168h full load
Evaluation
Construction organization
organization
5.7.9 The items to be inspected of size deviation and actual limit measurement for
installation of fuel oil and fuel gas pipes in plant shall include:
1 Size deviation of pipe positioning.
2 Installation deviation value of supporter and hanger.
3 Adjustment of original position of spring.
4 Flatness and deviation of contra aperture.
5 Spacing of two welds.
6 Distance from weld to supporter and hanger (open pore position or bend beginning
point).
7 Gradient of flange end surface.
8 Length of connecting bolt exposed from screw thread.
5.7.10 Inspection and evaluation methods of size deviation and actual limit measurement for
installation of fuel oil and fuel gas pipes in plant shall meet those specified in Article 5.4.4.
Size deviation and actual limit measurement item shall be in accordance with those specified
in Table 5.7.10.
Table 5.7.10 Item Table of Size Deviation and Actual Limit Measurement for Installation of Fuel Oil and
127
Fuel Gas Pipes in Plant
SN Inspection item Unit Permissible variation value
2 Installation deviation value of supporter and hanger Meeting the requirements of the design drawing
3 Adjustment of original position of spring Meeting the requirements of the design drawing
Flatness of DN<100 mm 1
4
contra aperture DN100 mm 2
Spacing of two DN500 mm Larger than external diameter of pipe, and >150
5
welds DN>500 mm Larger than external diameter of pipe, and >500
8 Length of connecting bolt exposed from screw thread Exposing 2~3 threads
5.7.11 Inspection and scoring of size deviation and actual limit measurement for installation
of fuel oil and fuel gas pipes in plant shall be in accordance with those specified in Table
5.7.11.
Table 5.7.11 Scoring Table of Size Deviation and Actual Limit Measurement
Installation of fuel oil and fuel gas pipes in Before carrying out trial operation
Project position (scope) Construction stage
plant with 168h full load
Construction Evaluation
organization organization
Obtained
Evaluation result Remarks
SN Inspection item Score score
128
position or bend beginning point)
Construction Evaluation
organization organization
2 System tightness 10
3 Painting construction 10
129
4 Welding construction 5
6 Bolted connection 10
7 System mark 5
9 Valve installation 10
10 Pipe earthing 5
5.8.1 Quality evaluation score of single project shall be summarized and evaluated
corresponding to each project position (scope) and evaluation item.
5.8.2 Quality evaluation score of single project and evaluation rating shall be implemented
according to those specified in Table 5.82.
Table 5.8.2 Summarized Table of Quality Evaluation Score of Single Project
Name of project position (scope)
SN Inspection item Installations of Installation of medium Installation of fuel oil and Total Remarks
four main pipes and low-pressure pipes fuel gas pipes in plant
2 Performance inspection
3 Quality record
Implementation performance
5
of compulsory provision
6 Appearance quality
Total
Evaluation rating
Total score
(class)
130
5.9.1 After quality evaluation of single project, the evaluation organization shall carry out
evaluation report which shall include the following contents:
1 Overview of single project.
2 Quality evaluation situation and result of project position (scope).
3 Quality evaluation situation and result of single project.
5.9.2 The report of single project quality evaluation shall meet the following requirements:
1 Single project overview: explaining primary device situation, each construction
participating organization (design, construction, debugging, supervision, etc), contracting
pattern and construction safety workload (contract amount), major projects characteristics,
quality control in the construction process.
2 Administrative situation of single project: quality characteristics (technology
lightspot, management innovation, technology innovation and "four new" application), as
well as completion conditions of safety and environmental protection targets.
3 Construction quality acceptance situation: checking acceptance result of unit project,
subsection project and subitem project.
4 Evaluation of each project position (scope): where there is the item of serious
inconformity, it shall be indicated on stress
5 Single project quality evaluation score summary, evaluation grade and conclusive
opinions.
131
6 Quality Evaluation of Single Unit
6.0.1 The quality evaluation for single unit shall be conducted after the construction quality
acceptance for all single projects and the 168h trial operation of the unit with full load are
completed and the environmental protection projects supported are normally put into
operation. The synergic system shall be bought into the evaluation for the first unit.
6.0.2 More units shall be evaluated synchronously in accordance with single unit
respectively, and the support public system of subsequent operation of the unit and operation
unit shall be evaluated synchronously.
6.0.3 Quality evaluation of 168h full-load trial operation for unit shall be in accordance with
those specified in Table 6.0.3.
Table 6.0.3 Quality Evaluation Table of 168h Full-load Trial Operation for Unit
Project name Unit number
Evaluation
Test organization
organization
Examining
Examination
SN Evaluation content Property standard/examining Remarks
result/measured value
value
Meeting the
1 Conditions for entering into 168h trial operation Dominant
requirements
Meeting preselected
3 Continuous steady load
load curve
Approved by
13 Termination of full load trial operation Dominant
commander-in-chief
132
16 Tightness of vacuum system Dominant 0.3kPa/min
Evaluation score:
Note 1: Class I: If the following conditions are met: each index reaches examination value and the relevant requirements; and test
conditions meet requirements; the test report and confirmation and signature are complete and standard, it is rated as Class I with
the evaluation score of 92 scores (including 92 scores) ~100 scores.Note 2: Class II: evaluation score 85 (including 85)~92;
dominant indexes reaching assessment value and relevant requirements; test conditions meeting the requirements; test report,
confirmation and signature complete and normative; 85% and above general indexes reaching assessment value and relevant
requirements; test report, confirmation and signature complete and normative fundamentally.Note 3: Class III: evaluation score
70 (including 70)~85; dominant indexes reaching assessment value and relevant requirements; test conditions meeting the
requirements; test report, confirmation and signature complete and normative; 70% and above general indexes reaching
assessment value and relevant requirements; test report, confirmation and signature complete and normative fundamentally.
6.0.4 Single unit evaluation score is the sum of obtained score of all weighted single project
quality evaluation and unit 168-h full load trial operation technical index evaluation, and the
evaluation score statistics shall be in accordance with those specified in Table 6.0.4.
Table 6.0.4 Statistic Table of Single Unit Evaluation Score
Project name Unit number
Construction Evaluation
organization organization
Obtained
SN Quality evaluation of single project Score Weight (%)
score
1 Civil work 15
2 Boiler unit 16
7 Welding project 6
8 Processing preparation 3
Evaluation score:
133
Evaluation personnel (signature):
Evaluation organization (official seal)
Date
Note 1: Note 1: Evaluating civil work shall refer to requirements specified in GB/T 50375.
Note 2: Electrical device installation shall be evaluated according to the fine rate of unit project in DL/T 5161-2002; Class I: fine
rate is 100%; Class II: fine rate is 95%~99%; Class III: fine rate is 90%~94%.
134
7 Quality Evaluation of Overall Project
7.0.1 The quality evaluation for overall project shall be conducted after the quality
evaluation for all single units, net special test, the performance tests of the units and the
engineering archives management evaluation are completed.
7.0.2 Technical index evaluation of performance test of unit shall be in accordance with
those specified in Table 7.0.2.
Table 7.0.2 Evaluation Table for Technical Index of Unit Performance Test
Project name Unit number
Evaluation
Test organization
organization
15 Unit RB test
17 Noise
18 Heat dissipation
19 Dust
20 Sweetening efficiency
21 Denitration efficiency
135
Evaluation score:
Note 1: Class I: evaluation score 92 (including 92)~100; each index reaching design value, contract guarantee value and relevant
criteria; test conditions meeting the requirements; test reports and statistical forms complete and normative.
Note 2: Class II: evaluation score 85 (including 85)~92; dominant indexes reaching design value, contract guarantee value and
relevant criteria; test conditions meeting the requirements; 85% and above general indexes reaching design value, contract
guarantee value and relevant criteria, test reports and statistical forms complete and normative fundamentally.
Note 3: Class III: evaluation score 70 (including 70)~85; dominant indexes reaching design value, contract guarantee value and
relevant criteria; test conditions meeting the requirements; 70% and above general indexes reaching design value, contract
guarantee value and relevant criteria, test reports and statistical forms complete and normative fundamentally.
7.0.3 The evaluation of project archives management shall be in accordance with those
specified in Table 7.0.3.
Table 7.0.3 Evaluation Table of Project Archives Management
Project name Project scale
Development Evaluation
organization organization
136
complete
Note 1: Class I: evaluation score shall be 92 scores (including 92) ~100 scores.
Note 2: Class II: evaluation score shall be 85 scores (including 85) ~ 92scores.
Note 3: Class III: evaluation score shall be 70 scores (including 70) ~85 scores.
3 Patent
4 Working method
5 QC achievement
7 New record
8 Saving
9 Environmental protection
Total score:
7.0.5 Overall project quality evaluation score is the sum of mean value of all single unit
evaluation scores, mean value of all unit performance test evaluation scores, Obtained score
of engineering archives management evaluation and awarded scores; overall project quality
shall be evaluated according to those specified in Table 7.0.5.
Table 7.0.5 Summarized Table of Overall Project Quality Evaluation
Project name Project scale
Development
Design organization
organization
137
Construction Debugging
organization organization
Obtained
SN Evaluation content Weight %
score
4 Awarded score
7.0.6 Fine project: overall project quality evaluation score is 85 and above; high-quality fine
project: 92 and above.
7.0.7 Overall project quality evaluation shall be organized and coordinated by development
organizations, and carried out independently by supervision organizations or other evaluation
organizations, and the evaluation result shall be provided with evaluation report.
7.0.8 Overall project quality evaluation shall meet the relevant requirements of current
national and professional project completion acceptance and evaluation.
138
Appendix A
(Normative)
Appearance Quality
A.1 The confirmation and signature for acceptance of unit project appearance quality of
installation of four main pipes is detailed in Table A.1.
Table A.1 Confirmation and Signature Table for Acceptance of Unit Project Appearance Quality of
Installation of Four Main Pipes
Project number
Construction
Unit project name
organization
Acceptance result
SN Acceptance item name
Qualified Unqualified
Various marks shall be distinct and the labels shall be unified, complete
and normative
Color and luster shall be consistent, uniform, without flow mark and
3 Painting construction
wrinkle
The weld shall be uniform, without weld beading and residual electrode
4 Welding construction coating
The weld shall be free from deformation; welded junction shall be free
from welding missing
5 Thermal insulation Surface shall be smooth, without damage, shedding or secondary pollution
139
project Rendering coat shall be smooth and without cracks
Supporter and hanger shall be firmly installed, anti-loose and reliable with
Installation of
8 reasonable stress and free expansion, and meet the design; whether the
supporter and hanger
mark of cold and thermal state is obvious
A.2 Confirmation and signature table for acceptance of unit project appearance quality of
installation of medium and low-pressure pipes is detailed in Table A.2.
Table A.2 Confirmation and Signature Table for Acceptance of Unit Project Appearance Quality of
Installation of Medium and Low-pressure Pipes
Project number:
Construction
Unit project name
organization
Acceptance result
SN Acceptance item name
Qualified Unqualified
140
Seepage point
Color and luster shall be consistent, uniform, without flow mark and
Painting
3 wrinkle
construction
Without bubbles, shedding, brushing missing, rust return and
pollution
A.3 Confirmation and signature table for acceptance of unit project appearance quality of
installation of fuel oil and fuel gas pipes is detailed in Table A.3.
Table A.3 Confirmation and Signature Table for Acceptance of Unit Project Appearance Quality of
141
Installation of Fuel Oil and Fuel Gas Pipes
Project number:
Acceptance result
SN Acceptance item name
Qualified Unqualified
Seepage point
142
shell75mm
A.4 Confirmation and signature table for acceptance of unit project appearance quality of
installation of other pipes is detailed in Table A.4.
Table A.4 Confirmation and Signature Table for Acceptance of Unit Project Appearance Quality of
Installation of Other Pipes
Project number: Table ..
Construction
Unit project name
organization
Acceptance result
SN Acceptance item name
Qualified Unqualified
Leakage point
143
Serious leakage point
Color and luster shall be consistent, uniform, without flow mark and
3 Painting construction wrinkle
144