Location Project Management Structure and Frame

Kensington Gardens, London, UK Mark Robinson and Julia Peyton- William Hare Ltd., Corus
Construction Period Jones, the Serpentine Gallery Glass Fabrication and Installation
2002.1 ~ 2002.7 Construction Management Saint-Gobain Glass, Seele
Type of structure Sir Robert McAlpine Ltd. Aluminium Panel Fabricators
steel frame Planning SAS International Ltd., Sheetfabs (Nottm) Ltd
Building area City of Westminster Planning Contractors
309.76 Sqm and Transportation Department, Avondale Construction Ltd. (joinery & labor)
Architectural Design Montagu Evans Laing O'Rourke Plc. (Plant & materials)
Toyo Ito and Cecil Balmond Planning Supervisor Siteco Ltd. (lighting systems)
Project Architects Bovis Lend Lease Ltd. South London Timber Co. Ltd. (timber supply)
Takeo Higashi, Hiromi Hosoya T Clarke Plc. (Electrical)
and Takayuki Miyoshi, Toyo Ito & Furniture Design
Associates Ross Lovegrove
Structural Design
Charles Walker and Daniel Bosia, ARUP
THE PROJECT

The pavilion is a white rectangular block 16.5


meters on each side and 4.2 meters of height.
The interior space lacks internal support
elements.
diagonal columns and roof beams 5-10 tons;
ply-wood floor;
made in factory and composed in building site;
joints: screw and weld construction;
There are no doors or windows, but a continuous
surface that functions as structure and as
decoration
the design of the structure was developed, via an
algorithm of a square which expands while
rotating.
THE PROJECT
Patterns

Further analysis of pattern of


geometry with other forms

Toyo Ito and Cecil had


Another form in mind
CONSTRUCTION TECHNOLOGY

STRUCTURE
The support structure is provided by the
intersection of the lines, forming an
irregular Diagrid-single layer grid,
constructed from elements that can be
made of diagonal steel members.
The edges of the squares act as the main
structure, the secondary structure is
made by extending the lines of the
pattern.
CONSTRUCTION TECHNOLOGY
Electrical
CONSTRUCTION cable passed
under slab
The entire pavilion is placed on a double T-shaped
steel mesh with beams.
Above this grill is placed a plywood floor that is
"cut" by the wrapping lines of the box. Ito uses
the floor to also create a "break" effect on the
floor, by replacing plywood with lawn. One can
see the grass appearing through the ground, the
box is beginning to "disappear".
The lines of the plant are transformed into a steel
structure of 550 mm that envelopes the rest of the
pavilion, creating a depth between the exterior
and the interior.
CONSTRUCTION

The perimeter vertical elevation is made of steel


plates 550 millimeters in thickness, welded and
constructed completely in the factory, including
holes for the assembly.
CONSTRUCTION TECHNOLOGY

CONSTRUCTION
380 panels with variable
thicknesses from 12 to
50 mm, completely
made in the workshop,
numbered and
assembled on site.
they are made with a
steel frame formed by
elements of rectangular
section and an
aluminum plate.