Vous êtes sur la page 1sur 43

Simulation of baja

final chassi
Date: Wednesday, June 22, 2016
Designer: Solidworks
Study name: Static 4
Analysis type: Static

Table of Contents
Description ............................................ 1
Assumptions .......................................... 2
Model Information ................................... 2
Study Properties ................................... 21
Units ................................................. 21
Material Properties ................................ 22
Description Loads and Fixtures................................. 26
No Data Connector Definitions ............................. 26
Contact Information ............................... 26
Mesh information .................................. 27
Sensor Details ...................................... 28
Resultant Forces ................................... 29
Beams ................................................ 30
Study Results ....................................... 41
Conclusion .......................................... 43

Analyzed with SOLIDWORKS Simulation Simulation of baja final chassi 1


Assumptions

Model Information

Model name: baja final chassi


Current Configuration: Default<As Machined>
Beam Bodies:
Document Name and Document Path/Date
Formulation Properties
Reference Modified

Analyzed with SOLIDWORKS Simulation Simulation of baja final chassi 2


Beam-1(Pipe 25 X
2.0(13)[6]) Section Standard-iso/pipe/25
x 2.0
Section Area: 75.3982in^2 C:\Users\tejasmirashi009\
Length:561.857mm Desktop\baja test
Beam Uniform C/S Volume:4.23761e-005m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.332652kg Jun 18 12:20:15 2016
Weight:3.25999N

Beam-2(Pipe 25 X
3.0(22)[2]) Section Standard-iso/pipe/25
x 3.0
Section Area: 110.741in^2 C:\Users\tejasmirashi009\
Length:35.1776mm Desktop\baja test
Beam Uniform C/S Volume:3.89571e-006m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.0305813kg Jun 18 12:20:15 2016
Weight:0.299697N

Beam-3(Pipe 25 X
3.0(22)[37]) Section Standard-iso/pipe/25
x 3.0
Section Area: 110.741in^2 C:\Users\tejasmirashi009\
Length:111.339mm Desktop\baja test
Beam Uniform C/S Volume:1.16875e-005m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.091747kg Jun 18 12:20:15 2016
Weight:0.89912N

Beam-4(Pipe 25 X
2.0(13)[18]) Section Standard-iso/pipe/25
x 2.0
Section Area: 75.3982in^2 C:\Users\tejasmirashi009\
Length:634.56mm Desktop\baja test
Beam Uniform C/S Volume:4.51921e-005m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.354758kg Jun 18 12:20:15 2016
Weight:3.47663N

Analyzed with SOLIDWORKS Simulation Simulation of baja final chassi 3


Beam-5(Pipe 25 X
3.0(22)[34]) Section Standard-iso/pipe/25
x 3.0
Section Area: 110.741in^2 C:\Users\tejasmirashi009\
Length:114.269mm Desktop\baja test
Beam Uniform C/S Volume:1.19576e-005m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.0938668kg Jun 18 12:20:15 2016
Weight:0.919894N

Beam-6(Pipe 25 X
2.0(13)[29]) Section Standard-iso/pipe/25
x 2.0
Section Area: 75.3982in^2 C:\Users\tejasmirashi009\
Length:1250.86mm Desktop\baja test
Beam Uniform C/S Volume:9.43124e-005m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.740353kg Jun 18 12:20:15 2016
Weight:7.25546N

Beam-7(Pipe 25 X
2.0(13)[24]) Section Standard-iso/pipe/25
x 2.0
Section Area: 75.3982in^2 C:\Users\tejasmirashi009\
Length:317.704mm Desktop\baja test
Beam Uniform C/S Volume:2.22032e-005m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.174295kg Jun 18 12:20:15 2016
Weight:1.70809N

Beam-8(Pipe 25 X
3.0(22)[12]) Section Standard-iso/pipe/25
x 3.0
Section Area: 110.741in^2 C:\Users\tejasmirashi009\
Length:1089.21mm Desktop\baja test
Beam Uniform C/S Volume:0.000120621m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.946874kg Jun 18 12:20:15 2016
Weight:9.27936N

Analyzed with SOLIDWORKS Simulation Simulation of baja final chassi 4


Beam-9(Pipe 25 X
3.0(22)[40]) Section Standard-iso/pipe/25
x 3.0
Section Area: 110.741in^2 C:\Users\tejasmirashi009\
Length:892.849mm Desktop\baja test
Beam Uniform C/S Volume:9.63862e-005m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.756632kg Jun 18 12:20:15 2016
Weight:7.41499N

Beam-10(Pipe 25 X
3.0(22)[21]) Section Standard-iso/pipe/25
x 3.0
Section Area: 110.741in^2 C:\Users\tejasmirashi009\
Length:270.542mm Desktop\baja test
Beam Uniform C/S Volume:2.99607e-005m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.235192kg Jun 18 12:20:15 2016
Weight:2.30488N

Beam-11(Pipe 25 X
2.0(13)[10]) Section Standard-iso/pipe/25
x 2.0
Section Area: 75.3982in^2 C:\Users\tejasmirashi009\
Length:512.057mm Desktop\baja test
Beam Uniform C/S Volume:3.86082e-005m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.303074kg Jun 18 12:20:15 2016
Weight:2.97013N

Beam-12(Pipe 25 X
3.0(22)[24]) Section Standard-iso/pipe/25
x 3.0
Section Area: 110.741in^2 C:\Users\tejasmirashi009\
Length:677.815mm Desktop\baja test
Beam Uniform C/S Volume:7.50721e-005m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.589316kg Jun 18 12:20:15 2016
Weight:5.77529N

Analyzed with SOLIDWORKS Simulation Simulation of baja final chassi 5


Beam-13(Pipe 25 X
3.0(22)[30]) Section Standard-iso/pipe/25
x 3.0
Section Area: 110.741in^2 C:\Users\tejasmirashi009\
Length:294.3mm Desktop\baja test
Beam Uniform C/S Volume:3.12605e-005m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.245395kg Jun 18 12:20:15 2016
Weight:2.40487N

Beam-14(Pipe 25 X
3.0(22)[1]) Section Standard-iso/pipe/25
x 3.0
Section Area: 110.741in^2 C:\Users\tejasmirashi009\
Length:516.854mm Desktop\baja test
Beam Uniform C/S Volume:5.72292e-005m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.449249kg Jun 18 12:20:15 2016
Weight:4.40264N

Beam-15(Pipe 25 X
3.0(22)[17]) Section Standard-iso/pipe/25
x 3.0
Section Area: 110.741in^2 C:\Users\tejasmirashi009\
Length:654.665mm Desktop\baja test
Beam Uniform C/S Volume:7.20682e-005m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.565735kg Jun 18 12:20:15 2016
Weight:5.5442N

Beam-16(Pipe 25 X
2.0(13)[23]) Section Standard-iso/pipe/25
x 2.0
Section Area: 75.3982in^2 C:\Users\tejasmirashi009\
Length:522.486mm Desktop\baja test
Beam Uniform C/S Volume:3.93086e-005m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.308572kg Jun 18 12:20:15 2016
Weight:3.02401N

Analyzed with SOLIDWORKS Simulation Simulation of baja final chassi 6


Beam-17(Pipe 25 X
3.0(22)[23]) Section Standard-iso/pipe/25
x 3.0
Section Area: 110.741in^2 C:\Users\tejasmirashi009\
Length:704.966mm Desktop\baja test
Beam Uniform C/S Volume:7.76325e-005m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.609415kg Jun 18 12:20:15 2016
Weight:5.97227N

Beam-18(Pipe 25 X
3.0(22)[28]) Section Standard-iso/pipe/25
x 3.0
Section Area: 110.741in^2 C:\Users\tejasmirashi009\
Length:171.314mm Desktop\baja test
Beam Uniform C/S Volume:1.8982e-005m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.149009kg Jun 18 12:20:15 2016
Weight:1.46028N

Beam-19(Pipe 25 X
2.0(13)[1]) Section Standard-iso/pipe/25
x 2.0
Section Area: 75.3982in^2 C:\Users\tejasmirashi009\
Length:537.706mm Desktop\baja test
Beam Uniform C/S Volume:4.05604e-005m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.318399kg Jun 18 12:20:15 2016
Weight:3.12031N

Beam-20(Pipe 25 X
3.0(22)[38]) Section Standard-iso/pipe/25
x 3.0
Section Area: 110.741in^2 C:\Users\tejasmirashi009\
Length:64.2676mm Desktop\baja test
Beam Uniform C/S Volume:7.11755e-006m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.0558727kg Jun 18 12:20:15 2016
Weight:0.547553N

Analyzed with SOLIDWORKS Simulation Simulation of baja final chassi 7


Beam-21(Pipe 25 X
3.0(22)[35]) Section Standard-iso/pipe/25
x 3.0
Section Area: 110.741in^2 C:\Users\tejasmirashi009\
Length:59.6095mm Desktop\baja test
Beam Uniform C/S Volume:6.6016e-006m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.0518226kg Jun 18 12:20:15 2016
Weight:0.507861N

Beam-22(Pipe 25 X
2.0(13)[16]) Section Standard-iso/pipe/25
x 2.0
Section Area: 75.3982in^2 C:\Users\tejasmirashi009\
Length:700.893mm Desktop\baja test
Beam Uniform C/S Volume:5.27823e-005m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.414341kg Jun 18 12:20:15 2016
Weight:4.06054N

Beam-23(Pipe 25 X
3.0(22)[25]) Section Standard-iso/pipe/25
x 3.0
Section Area: 110.741in^2 C:\Users\tejasmirashi009\
Length:506.716mm Desktop\baja test
Beam Uniform C/S Volume:5.48255e-005m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.43038kg Jun 18 12:20:15 2016
Weight:4.21772N

Beam-24(Pipe 25 X
3.0(22)[9]) Section Standard-iso/pipe/25
x 3.0
Section Area: 110.741in^2 C:\Users\tejasmirashi009\
Length:504.046mm Desktop\baja test
Beam Uniform C/S Volume:5.58187e-005m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.438176kg Jun 18 12:20:15 2016
Weight:4.29413N

Analyzed with SOLIDWORKS Simulation Simulation of baja final chassi 8


Beam-25(Pipe 25 X
3.0(22)[41]) Section Standard-iso/pipe/25
x 3.0
Section Area: 110.741in^2 C:\Users\tejasmirashi009\
Length:446.493mm Desktop\baja test
Beam Uniform C/S Volume:4.74794e-005m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.372713kg Jun 18 12:20:15 2016
Weight:3.65259N

Beam-26(Pipe 25 X
3.0(22)[10]) Section Standard-iso/pipe/25
x 3.0
Section Area: 110.741in^2 C:\Users\tejasmirashi009\
Length:270.549mm Desktop\baja test
Beam Uniform C/S Volume:2.99622e-005m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.235204kg Jun 18 12:20:15 2016
Weight:2.305N

Beam-27(Pipe 25 X
2.0(13)[25]) Section Standard-iso/pipe/25
x 2.0
Section Area: 75.3982in^2 C:\Users\tejasmirashi009\
Length:369.146mm Desktop\baja test
Beam Uniform C/S Volume:2.69044e-005m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.2112kg Jun 18 12:20:15 2016
Weight:2.06976N

Beam-28(Pipe 25 X
3.0(22)[19]) Section Standard-iso/pipe/25
x 3.0
Section Area: 110.741in^2 C:\Users\tejasmirashi009\
Length:1089.21mm Desktop\baja test
Beam Uniform C/S Volume:0.000120621m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.946874kg Jun 18 12:20:15 2016
Weight:9.27936N

Analyzed with SOLIDWORKS Simulation Simulation of baja final chassi 9


Beam-29(Pipe 25 X
2.0(13)[8]) Section Standard-iso/pipe/25
x 2.0
Section Area: 75.3982in^2 C:\Users\tejasmirashi009\
Length:612.669mm Desktop\baja test
Beam Uniform C/S Volume:4.61867e-005m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.362566kg Jun 18 12:20:15 2016
Weight:3.55314N

Beam-30(Pipe 25 X
2.0(13)[12]) Section Standard-iso/pipe/25
x 2.0
Section Area: 75.3982in^2 C:\Users\tejasmirashi009\
Length:612.665mm Desktop\baja test
Beam Uniform C/S Volume:4.6188e-005m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.362576kg Jun 18 12:20:15 2016
Weight:3.55324N

Beam-31(Pipe 25 X
3.0(22)[13]) Section Standard-iso/pipe/25
x 3.0
Section Area: 110.741in^2 C:\Users\tejasmirashi009\
Length:54.6541mm Desktop\baja test
Beam Uniform C/S Volume:6.05298e-006m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.0475159kg Jun 18 12:20:15 2016
Weight:0.465656N

Beam-32(Pipe 25 X
2.0(13)[11]) Section Standard-iso/pipe/25
x 2.0
Section Area: 75.3982in^2 C:\Users\tejasmirashi009\
Length:75.8804mm Desktop\baja test
Beam Uniform C/S Volume:5.7222e-006m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.0449193kg Jun 18 12:20:15 2016
Weight:0.440209N

Analyzed with SOLIDWORKS Simulation Simulation of baja final chassi 10


Beam-33(Pipe 25 X
2.0(13)[13]) Section Standard-iso/pipe/25
x 2.0
Section Area: 75.3982in^2 C:\Users\tejasmirashi009\
Length:892.49mm Desktop\baja test
Beam Uniform C/S Volume:6.71986e-005m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.527509kg Jun 18 12:20:15 2016
Weight:5.16959N

Beam-34(Pipe 25 X
2.0(13)[21]) Section Standard-iso/pipe/25
x 2.0
Section Area: 75.3982in^2 C:\Users\tejasmirashi009\
Length:460mm Desktop\baja test
Beam Uniform C/S Volume:3.46832e-005m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.272263kg Jun 18 12:20:15 2016
Weight:2.66818N

Beam-35(Pipe 25 X
2.0(13)[17]) Section Standard-iso/pipe/25
x 2.0
Section Area: 75.3982in^2 C:\Users\tejasmirashi009\
Length:561.533mm Desktop\baja test
Beam Uniform C/S Volume:4.15701e-005m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.326325kg Jun 18 12:20:15 2016
Weight:3.19798N

Beam-36(Pipe 25 X
3.0(22)[15]) Section Standard-iso/pipe/25
x 3.0
Section Area: 110.741in^2 C:\Users\tejasmirashi009\
Length:677.808mm Desktop\baja test
Beam Uniform C/S Volume:7.50984e-005m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.589522kg Jun 18 12:20:15 2016
Weight:5.77732N

Analyzed with SOLIDWORKS Simulation Simulation of baja final chassi 11


Beam-37(Pipe 25 X
3.0(22)[42]) Section Standard-iso/pipe/25
x 3.0
Section Area: 110.741in^2 C:\Users\tejasmirashi009\
Length:445.743mm Desktop\baja test
Beam Uniform C/S Volume:4.68072e-005m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.367436kg Jun 18 12:20:15 2016
Weight:3.60088N

Beam-38(Pipe 25 X
3.0(22)[20]) Section Standard-iso/pipe/25
x 3.0
Section Area: 110.741in^2 C:\Users\tejasmirashi009\
Length:40.1393mm Desktop\baja test
Beam Uniform C/S Volume:4.44528e-006m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.0348955kg Jun 18 12:20:15 2016
Weight:0.341975N

Beam-39(Pipe 25 X
3.0(22)[5]) Section Standard-iso/pipe/25
x 3.0
Section Area: 110.741in^2 C:\Users\tejasmirashi009\
Length:586.822mm Desktop\baja test
Beam Uniform C/S Volume:6.49853e-005m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.510135kg Jun 18 12:20:15 2016
Weight:4.99932N

Beam-40(Pipe 25 X
2.0(13)[14]) Section Standard-iso/pipe/25
x 2.0
Section Area: 75.3982in^2 C:\Users\tejasmirashi009\
Length:634.56mm Desktop\baja test
Beam Uniform C/S Volume:4.52484e-005m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.3552kg Jun 18 12:20:15 2016
Weight:3.48096N

Analyzed with SOLIDWORKS Simulation Simulation of baja final chassi 12


Beam-41(Pipe 25 X
3.0(22)[3]) Section Standard-iso/pipe/25
x 3.0
Section Area: 110.741in^2 C:\Users\tejasmirashi009\
Length:641.333mm Desktop\baja test
Beam Uniform C/S Volume:7.10219e-005m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.557522kg Jun 18 12:20:15 2016
Weight:5.46372N

Beam-42(Pipe 25 X
3.0(22)[33]) Section Standard-iso/pipe/25
x 3.0
Section Area: 110.741in^2 C:\Users\tejasmirashi009\
Length:907.495mm Desktop\baja test
Beam Uniform C/S Volume:9.93637e-005m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.780005kg Jun 18 12:20:15 2016
Weight:7.64405N

Beam-43(Pipe 25 X
3.0(22)[6]) Section Standard-iso/pipe/25
x 3.0
Section Area: 110.741in^2 C:\Users\tejasmirashi009\
Length:95.1609mm Desktop\baja test
Beam Uniform C/S Volume:1.05403e-005m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.082741kg Jun 18 12:20:15 2016
Weight:0.810862N

Beam-44(Pipe 25 X
3.0(22)[7]) Section Standard-iso/pipe/25
x 3.0
Section Area: 110.741in^2 C:\Users\tejasmirashi009\
Length:641.333mm Desktop\baja test
Beam Uniform C/S Volume:7.10219e-005m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.557522kg Jun 18 12:20:15 2016
Weight:5.46372N

Analyzed with SOLIDWORKS Simulation Simulation of baja final chassi 13


Beam-45(Pipe 25 X
3.0(22)[26]) Section Standard-iso/pipe/25
x 3.0
Section Area: 110.741in^2 C:\Users\tejasmirashi009\
Length:171.307mm Desktop\baja test
Beam Uniform C/S Volume:1.89804e-005m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.148996kg Jun 18 12:20:15 2016
Weight:1.46016N

Beam-46(Pipe 25 X
3.0(22)[31]) Section Standard-iso/pipe/25
x 3.0
Section Area: 110.741in^2 C:\Users\tejasmirashi009\
Length:294.302mm Desktop\baja test
Beam Uniform C/S Volume:3.126e-005m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.245391kg Jun 18 12:20:15 2016
Weight:2.40483N

Beam-47(Pipe 25 X
3.0(22)[16]) Section Standard-iso/pipe/25
x 3.0
Section Area: 110.741in^2 C:\Users\tejasmirashi009\
Length:704.972mm Desktop\baja test
Beam Uniform C/S Volume:7.76283e-005m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.609382kg Jun 18 12:20:15 2016
Weight:5.97194N

Beam-48(Pipe 25 X
3.0(22)[32]) Section Standard-iso/pipe/25
x 3.0
Section Area: 110.741in^2 C:\Users\tejasmirashi009\
Length:913.08mm Desktop\baja test
Beam Uniform C/S Volume:0.000100302m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.787372kg Jun 18 12:20:15 2016
Weight:7.71625N

Analyzed with SOLIDWORKS Simulation Simulation of baja final chassi 14


Beam-49(Pipe 25 X
2.0(13)[27]) Section Standard-iso/pipe/25
x 2.0
Section Area: 75.3982in^2 C:\Users\tejasmirashi009\
Length:373.414mm Desktop\baja test
Beam Uniform C/S Volume:2.80643e-005m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.220305kg Jun 18 12:20:15 2016
Weight:2.15898N

Beam-50(Pipe 25 X
2.0(13)[28]) Section Standard-iso/pipe/25
x 2.0
Section Area: 75.3982in^2 C:\Users\tejasmirashi009\
Length:585.334mm Desktop\baja test
Beam Uniform C/S Volume:4.41331e-005m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.346445kg Jun 18 12:20:15 2016
Weight:3.39516N

Beam-51(Pipe 25 X
2.0(13)[4]) Section Standard-iso/pipe/25
x 2.0
Section Area: 75.3982in^2 C:\Users\tejasmirashi009\
Length:372.365mm Desktop\baja test
Beam Uniform C/S Volume:2.79861e-005m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.219691kg Jun 18 12:20:15 2016
Weight:2.15297N

Beam-52(Pipe 25 X
3.0(22)[11]) Section Standard-iso/pipe/25
x 3.0
Section Area: 110.741in^2 C:\Users\tejasmirashi009\
Length:40.1393mm Desktop\baja test
Beam Uniform C/S Volume:4.44528e-006m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.0348955kg Jun 18 12:20:15 2016
Weight:0.341975N

Analyzed with SOLIDWORKS Simulation Simulation of baja final chassi 15


Beam-53(Pipe 25 X
2.0(13)[9]) Section Standard-iso/pipe/25
x 2.0
Section Area: 75.3982in^2 C:\Users\tejasmirashi009\
Length:75.8804mm Desktop\baja test
Beam Uniform C/S Volume:5.7222e-006m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.0449193kg Jun 18 12:20:15 2016
Weight:0.440209N

Beam-54(Pipe 25 X
2.0(13)[3]) Section Standard-iso/pipe/25
x 2.0
Section Area: 75.3982in^2 C:\Users\tejasmirashi009\
Length:303.158mm Desktop\baja test
Beam Uniform C/S Volume:2.26172e-005m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.177545kg Jun 18 12:20:15 2016
Weight:1.73994N

Beam-55(Pipe 25 X
2.0(13)[19]) Section Standard-iso/pipe/25
x 2.0
Section Area: 75.3982in^2 C:\Users\tejasmirashi009\
Length:522.486mm Desktop\baja test
Beam Uniform C/S Volume:3.93037e-005m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.308534kg Jun 18 12:20:15 2016
Weight:3.02363N

Beam-56(Pipe 25 X
2.0(13)[22]) Section Standard-iso/pipe/25
x 2.0
Section Area: 75.3982in^2 C:\Users\tejasmirashi009\
Length:109.927mm Desktop\baja test
Beam Uniform C/S Volume:8.29047e-006m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.0650802kg Jun 18 12:20:15 2016
Weight:0.637786N

Analyzed with SOLIDWORKS Simulation Simulation of baja final chassi 16


Beam-57(Pipe 25 X
2.0(13)[26]) Section Standard-iso/pipe/25
x 2.0
Section Area: 75.3982in^2 C:\Users\tejasmirashi009\
Length:317.698mm Desktop\baja test
Beam Uniform C/S Volume:2.22212e-005m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.174436kg Jun 18 12:20:15 2016
Weight:1.70947N

Beam-58(Pipe 25 X
3.0(22)[22]) Section Standard-iso/pipe/25
x 3.0
Section Area: 110.741in^2 C:\Users\tejasmirashi009\
Length:372.368mm Desktop\baja test
Beam Uniform C/S Volume:4.10975e-005m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.322616kg Jun 18 12:20:15 2016
Weight:3.16163N

Beam-59(Pipe 25 X
3.0(22)[39]) Section Standard-iso/pipe/25
x 3.0
Section Area: 110.741in^2 C:\Users\tejasmirashi009\
Length:166.966mm Desktop\baja test
Beam Uniform C/S Volume:1.73291e-005m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.136033kg Jun 18 12:20:15 2016
Weight:1.33313N

Beam-60(Pipe 25 X
3.0(22)[36]) Section Standard-iso/pipe/25
x 3.0
Section Area: 110.741in^2 C:\Users\tejasmirashi009\
Length:165.787mm Desktop\baja test
Beam Uniform C/S Volume:1.71542e-005m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.13466kg Jun 18 12:20:15 2016
Weight:1.31967N

Analyzed with SOLIDWORKS Simulation Simulation of baja final chassi 17


Beam-61(Pipe 25 X
3.0(22)[4]) Section Standard-iso/pipe/25
x 3.0
Section Area: 110.741in^2 C:\Users\tejasmirashi009\
Length:95.1609mm Desktop\baja test
Beam Uniform C/S Volume:1.05403e-005m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.082741kg Jun 18 12:20:15 2016
Weight:0.810862N

Beam-62(Pipe 25 X
3.0(22)[29]) Section Standard-iso/pipe/25
x 3.0
Section Area: 110.741in^2 C:\Users\tejasmirashi009\
Length:503.047mm Desktop\baja test
Beam Uniform C/S Volume:5.44287e-005m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.427265kg Jun 18 12:20:15 2016
Weight:4.1872N

Beam-63(Pipe 25 X
3.0(22)[8]) Section Standard-iso/pipe/25
x 3.0
Section Area: 110.741in^2 C:\Users\tejasmirashi009\
Length:35.1776mm Desktop\baja test
Beam Uniform C/S Volume:3.89571e-006m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.0305813kg Jun 18 12:20:15 2016
Weight:0.299697N

Beam-64(Pipe 25 X
3.0(22)[14]) Section Standard-iso/pipe/25
x 3.0
Section Area: 110.741in^2 C:\Users\tejasmirashi009\
Length:654.665mm Desktop\baja test
Beam Uniform C/S Volume:7.20752e-005m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.56579kg Jun 18 12:20:15 2016
Weight:5.54474N

Analyzed with SOLIDWORKS Simulation Simulation of baja final chassi 18


Beam-65(Pipe 25 X
2.0(13)[7]) Section Standard-iso/pipe/25
x 2.0
Section Area: 75.3982in^2 C:\Users\tejasmirashi009\
Length:537.706mm Desktop\baja test
Beam Uniform C/S Volume:4.05604e-005m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.318399kg Jun 18 12:20:15 2016
Weight:3.12031N

Beam-66(Pipe 25 X
3.0(22)[18]) Section Standard-iso/pipe/25
x 3.0
Section Area: 110.741in^2 C:\Users\tejasmirashi009\
Length:54.6541mm Desktop\baja test
Beam Uniform C/S Volume:6.05298e-006m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.0475159kg Jun 18 12:20:15 2016
Weight:0.465656N

Beam-67(Pipe 25 X
2.0(13)[5]) Section Standard-iso/pipe/25
x 2.0
Section Area: 75.3982in^2 C:\Users\tejasmirashi009\
Length:303.172mm Desktop\baja test
Beam Uniform C/S Volume:2.2619e-005m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.177559kg Jun 18 12:20:15 2016
Weight:1.74008N

Beam-68(Pipe 25 X
2.0(13)[2]) Section Standard-iso/pipe/25
x 2.0
Section Area: 75.3982in^2 C:\Users\tejasmirashi009\
Length:561.855mm Desktop\baja test
Beam Uniform C/S Volume:4.23999e-005m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.332839kg Jun 18 12:20:15 2016
Weight:3.26182N

Analyzed with SOLIDWORKS Simulation Simulation of baja final chassi 19


Beam-69(Pipe 25 X
2.0(13)[20]) Section Standard-iso/pipe/25
x 2.0
Section Area: 75.3982in^2 C:\Users\tejasmirashi009\
Length:109.927mm Desktop\baja test
Beam Uniform C/S Volume:8.29047e-006m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.0650802kg Jun 18 12:20:15 2016
Weight:0.637786N

Beam-70(Pipe 25 X
2.0(13)[15]) Section Standard-iso/pipe/25
x 2.0
Section Area: 75.3982in^2 C:\Users\tejasmirashi009\
Length:561.525mm Desktop\baja test
Beam Uniform C/S Volume:4.15137e-005m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.325882kg Jun 18 12:20:15 2016
Weight:3.19365N

Beam-71(Pipe 25 X
3.0(22)[27]) Section Standard-iso/pipe/25
x 3.0
Section Area: 110.741in^2 C:\Users\tejasmirashi009\
Length:372.858mm Desktop\baja test
Beam Uniform C/S Volume:4.11516e-005m^3 chassi\baja final
Mass Density:7850kg/m^3 chassi.SLDPRT
Mass:0.32304kg Jun 18 12:20:15 2016
Weight:3.16579N

Analyzed with SOLIDWORKS Simulation Simulation of baja final chassi 20


Study Properties
Study name Static 4
Analysis type Static
Mesh type Beam Mesh
Solver type Direct sparse solver
Inplane Effect: Off
Soft Spring: Off
Inertial Relief: Off
Incompatible bonding options Automatic
Large displacement Off
Compute free body forces On
Result folder SOLIDWORKS document
(C:\Users\tejasmirashi009\Desktop\baja test chassi)

Units
Unit system: SI (MKS)
Length/Displacement mm
Temperature Kelvin
Angular velocity Rad/sec
Pressure/Stress N/m^2

Analyzed with SOLIDWORKS Simulation Simulation of baja final chassi 21


Material Properties
Model Reference Properties Components
Name: AISI 4130 Steel, SolidBody 1(Pipe 25 X
annealed at 865C 2.0(13)[6])(baja final chassi),
Model type: Linear Elastic Isotropic SolidBody 2(Pipe 25 X
Default failure Max von Mises Stress 3.0(22)[2])(baja final chassi),
criterion: SolidBody 3(Pipe 25 X
Yield strength: 4.6e+008 N/m^2 3.0(22)[37])(baja final
Tensile strength: 5.6e+008 N/m^2 chassi),
Elastic modulus: 2.05e+011 N/m^2 SolidBody 4(Pipe 25 X
Poisson's ratio: 0.285 2.0(13)[18])(baja final
Mass density: 7850 kg/m^3 chassi),
Shear modulus: 8e+010 N/m^2 SolidBody 5(Pipe 25 X
3.0(22)[34])(baja final
chassi),
SolidBody 6(Pipe 25 X
2.0(13)[29])(baja final
chassi),
SolidBody 7(Pipe 25 X
2.0(13)[24])(baja final
chassi),
SolidBody 8(Pipe 25 X
3.0(22)[12])(baja final
chassi),
SolidBody 9(Pipe 25 X
3.0(22)[40])(baja final
chassi),
SolidBody 10(Pipe 25 X
3.0(22)[21])(baja final
chassi),
SolidBody 11(Pipe 25 X
2.0(13)[10])(baja final
chassi),
SolidBody 12(Pipe 25 X
3.0(22)[24])(baja final
chassi),
SolidBody 13(Pipe 25 X
3.0(22)[30])(baja final
chassi),
SolidBody 14(Pipe 25 X
3.0(22)[1])(baja final chassi),
SolidBody 15(Pipe 25 X
3.0(22)[17])(baja final
chassi),
SolidBody 16(Pipe 25 X
2.0(13)[23])(baja final
chassi),
SolidBody 17(Pipe 25 X
3.0(22)[23])(baja final
chassi),
SolidBody 18(Pipe 25 X
3.0(22)[28])(baja final

Analyzed with SOLIDWORKS Simulation Simulation of baja final chassi 22


chassi),
SolidBody 19(Pipe 25 X
2.0(13)[1])(baja final chassi),
SolidBody 20(Pipe 25 X
3.0(22)[38])(baja final
chassi),
SolidBody 21(Pipe 25 X
3.0(22)[35])(baja final
chassi),
SolidBody 22(Pipe 25 X
2.0(13)[16])(baja final
chassi),
SolidBody 23(Pipe 25 X
3.0(22)[25])(baja final
chassi),
SolidBody 24(Pipe 25 X
3.0(22)[9])(baja final chassi),
SolidBody 25(Pipe 25 X
3.0(22)[41])(baja final
chassi),
SolidBody 26(Pipe 25 X
3.0(22)[10])(baja final
chassi),
SolidBody 27(Pipe 25 X
2.0(13)[25])(baja final
chassi),
SolidBody 28(Pipe 25 X
3.0(22)[19])(baja final
chassi),
SolidBody 29(Pipe 25 X
2.0(13)[8])(baja final chassi),
SolidBody 30(Pipe 25 X
2.0(13)[12])(baja final
chassi),
SolidBody 31(Pipe 25 X
3.0(22)[13])(baja final
chassi),
SolidBody 32(Pipe 25 X
2.0(13)[11])(baja final
chassi),
SolidBody 33(Pipe 25 X
2.0(13)[13])(baja final
chassi),
SolidBody 34(Pipe 25 X
2.0(13)[21])(baja final
chassi),
SolidBody 35(Pipe 25 X
2.0(13)[17])(baja final
chassi),
SolidBody 36(Pipe 25 X
3.0(22)[15])(baja final
chassi),
SolidBody 37(Pipe 25 X
3.0(22)[42])(baja final
chassi),

Analyzed with SOLIDWORKS Simulation Simulation of baja final chassi 23


SolidBody 38(Pipe 25 X
3.0(22)[20])(baja final
chassi),
SolidBody 39(Pipe 25 X
3.0(22)[5])(baja final chassi),
SolidBody 40(Pipe 25 X
2.0(13)[14])(baja final
chassi),
SolidBody 41(Pipe 25 X
3.0(22)[3])(baja final chassi),
SolidBody 42(Pipe 25 X
3.0(22)[33])(baja final
chassi),
SolidBody 43(Pipe 25 X
3.0(22)[6])(baja final chassi),
SolidBody 44(Pipe 25 X
3.0(22)[7])(baja final chassi),
SolidBody 45(Pipe 25 X
3.0(22)[26])(baja final
chassi),
SolidBody 46(Pipe 25 X
3.0(22)[31])(baja final
chassi),
SolidBody 47(Pipe 25 X
3.0(22)[16])(baja final
chassi),
SolidBody 48(Pipe 25 X
3.0(22)[32])(baja final
chassi),
SolidBody 49(Pipe 25 X
2.0(13)[27])(baja final
chassi),
SolidBody 50(Pipe 25 X
2.0(13)[28])(baja final
chassi),
SolidBody 51(Pipe 25 X
2.0(13)[4])(baja final chassi),
SolidBody 52(Pipe 25 X
3.0(22)[11])(baja final
chassi),
SolidBody 53(Pipe 25 X
2.0(13)[9])(baja final chassi),
SolidBody 54(Pipe 25 X
2.0(13)[3])(baja final chassi),
SolidBody 55(Pipe 25 X
2.0(13)[19])(baja final
chassi),
SolidBody 56(Pipe 25 X
2.0(13)[22])(baja final
chassi),
SolidBody 57(Pipe 25 X
2.0(13)[26])(baja final
chassi),
SolidBody 58(Pipe 25 X
3.0(22)[22])(baja final

Analyzed with SOLIDWORKS Simulation Simulation of baja final chassi 24


chassi),
SolidBody 59(Pipe 25 X
3.0(22)[39])(baja final
chassi),
SolidBody 60(Pipe 25 X
3.0(22)[36])(baja final
chassi),
SolidBody 61(Pipe 25 X
3.0(22)[4])(baja final chassi),
SolidBody 62(Pipe 25 X
3.0(22)[29])(baja final
chassi),
SolidBody 63(Pipe 25 X
3.0(22)[8])(baja final chassi),
SolidBody 64(Pipe 25 X
3.0(22)[14])(baja final
chassi),
SolidBody 65(Pipe 25 X
2.0(13)[7])(baja final chassi),
SolidBody 66(Pipe 25 X
3.0(22)[18])(baja final
chassi),
SolidBody 67(Pipe 25 X
2.0(13)[5])(baja final chassi),
SolidBody 68(Pipe 25 X
2.0(13)[2])(baja final chassi),
SolidBody 69(Pipe 25 X
2.0(13)[20])(baja final
chassi),
SolidBody 70(Pipe 25 X
2.0(13)[15])(baja final
chassi),
SolidBody 71(Pipe 25 X
3.0(22)[27])(baja final
chassi)
Curve Data:N/A

Analyzed with SOLIDWORKS Simulation Simulation of baja final chassi 25


Loads and Fixtures
Fixture name Fixture Image Fixture Details
Entities: 8 Joint(s)
Type: Fixed Geometry

Fixed-1

Load name Load Image Load Details


Entities: 4 Joint(s)
Type: Apply force
Values: ---, ---, -7000 N
Moments: ---, ---, --- N.m

Force-3

Connector Definitions
No Data

Contact Information
No Data

Analyzed with SOLIDWORKS Simulation Simulation of baja final chassi 26


Mesh information
Mesh type Beam Mesh

Mesh information - Details


Total Nodes 1676
Total Elements 1411
Time to complete mesh(hh;mm;ss): 00:00:14
Computer name: TEJAS

Mesh Control Information:


Mesh Control Name Mesh Control Image Mesh Control Details

Analyzed with SOLIDWORKS Simulation Simulation of baja final chassi 27


Entities: 71 Beam (s)
Number of 13
Elements:

Control-1

Entities: 71 Beam (s)


Number of 16
Elements:

Control-2

Entities: 71 Beam (s)


Number of 20
Elements:

Control-3

Sensor Details
No Data

Analyzed with SOLIDWORKS Simulation Simulation of baja final chassi 28


Resultant Forces
Reaction forces
Selection set Units Sum X Sum Y Sum Z Resultant
Entire Model N -28000 -1.52588e-005 -22.8092 28000

Reaction Moments
Selection set Units Sum X Sum Y Sum Z Resultant
Entire Model N.m -1.05884 1.46004 771.921 771.923

Analyzed with SOLIDWORKS Simulation Simulation of baja final chassi 29


Beams
Beam Forces
Beam Joint Moment1(N.m Moment2(N.m Torque(N.m
Axial(N) Shear1(N) Shear2(N)
Name s ) ) )
Beam- 1 3472.79 -148.518 -5.7901 4.57251 -40.5952 10.1675
1(Pipe 25 X
2 -3472.79 148.516 5.79357 -1.31766 -42.8507 -10.1675
2.0(13)[6])
0.0040891 - 5.68834e-
1 4.9968e-007 2.46823e-006 3.08855e-008
Beam- 8 0.00056925 005
2(Pipe 25 X - -
-5.6872e- -3.14105e-
3.0(22)[2]) 2 0.0041128 0.00036058 4.99682e-007 -5.46976e-007
005 008
3 5
Beam- 1 -335.604 171.985 -6.21033 0.433705 -16.4629 0.2453
3(Pipe 25 X
3.0(22)[37] 2 335.603 -171.988 6.20768 -1.15406 -3.49049 -0.245259
)
Beam- 1 3381.42 -34.0917 -81.5719 -21.0787 9.94304 -6.40252
4(Pipe 25 X
2.0(13)[18] 2 -3381.43 33.4269 81.3939 -30.6119 11.317 6.39964
)
Beam- 1 347.397 -160.584 -5.91765 1.16429 -3.5295 0.215222
5(Pipe 25 X
3.0(22)[34] 2 -347.396 160.586 5.9171 -0.461744 -15.5375 -0.215243
)
Beam- 1 -1.60964 -0.820598 0.741803 2.0664 0.690595 -0.274537
6(Pipe 25 X
2.0(13)[29] 2 1.60964 0.820596 -0.741807 -2.99429 -1.71704 0.274538
)
Beam- 1 1016.48 -104.853 29.5973 -9.06026 -30.5929 1.74317
7(Pipe 25 X
2.0(13)[24] 2 -1016.27 103.524 -39.8304 -2.54292 -2.8502 -1.93469
)
Beam- 1 -168.315 36.0766 -3.56286 0.356465 -1.32156 0.0865621
8(Pipe 25 X 2 -364.891 -93.6513 0.553485 -0.710978 20.3265 -1.48741
3.0(22)[12] 3 168.315 -36.0767 3.56287 0.289712 7.86466 -0.0865641
) 4 -187.042 106.046 -1.80874 0.608148 -23.895 0.391333
Beam- 1 -164.392 -4.81221 10.4836 6.8348 1.37358 -3.79527
9(Pipe 25 X 2 170.186 0.615565 -9.20608 -1.63513 0.155589 -0.601102
3.0(22)[40]
) 3 -170.186 -0.615309 9.20565 5.79138 0.122155 0.601101
Beam- 1 124.603 30.1054 -1063.49 4.09852 -2.33819 0.167114
10(Pipe 25 2 -508.841 -7.34011 -2094.78 202.516 -0.73984 1.94395
X
3.0(22)[21] 3 508.841 7.33898 2094.78 159.967 -0.530204 -1.94399
)
Beam- 1 -23.1326 0.122231 -0.0832529 -5.03784 1.12589 0.0111524
11(Pipe 25
X
2 23.1326 -0.122231 0.0832529 5.08047 -1.0633 -0.0111524
2.0(13)[10]
)
Beam- 1 -204.438 12.7889 1.97942 -1.36168 -3.77141 -1.82193

Analyzed with SOLIDWORKS Simulation Simulation of baja final chassi 30


12(Pipe 25
X
2 204.438 -12.7891 -1.97931 2.70365 -4.89922 1.82193
3.0(22)[24]
)
Beam- 1 0 0 0 0 0 0
13(Pipe 25
X
2 0 0 0 0 0 0
3.0(22)[30]
)
Beam- 1 -158.873 -10.122 -38.3049 10.3613 2.39712 5.19118
14(Pipe 25
X 2 158.873 10.1221 38.3048 8.94613 -7.49905 -5.19119
3.0(22)[1])
Beam- 1 249.862 21.0151 115.388 6.34497 -0.380502 -1.06299
15(Pipe 25 2 -249.862 -21.0151 -115.388 4.23549 -1.54648 1.06299
X 3 -75.9151 -6.62666 -72.6359 -12.7745 1.58509 -2.19394
3.0(22)[17]
) 4 -249.862 -21.0151 -115.388 4.23549 -1.54648 1.06299
Beam- 1 0 0 0 0 0 0
16(Pipe 25
X
2 0 0 0 0 0 0
2.0(13)[23]
)
Beam- 1 -224.942 17.3803 0.869931 -2.45345 -10.4582 0.558892
17(Pipe 25
X
2 224.942 -17.3803 -0.870055 3.07121 -1.88497 -0.558897
3.0(22)[23]
)
Beam- 1 -1382.62 721.381 -1806.8 -162.988 -70.401 -8.2741
18(Pipe 25
X
2 1623.68 139.819 1743.75 -123.18 15.1352 7.32622
3.0(22)[28]
)
Beam- 1 267.292 48.6072 -150.512 -31.3069 -12.9657 -7.09223
19(Pipe 25
X 2 -267.292 -48.6071 150.511 -48.4925 -12.8053 7.09221
2.0(13)[1])
Beam- 1 -338.985 165.265 4.94559 0.930196 3.55794 0.226613
20(Pipe 25
X
2 359.183 114.938 -4.9464 -0.541531 -5.25446 0.364045
3.0(22)[38]
)
Beam- 1 -350.323 154.125 -5.11567 -0.92326 3.60105 -0.198124
21(Pipe 25
X
2 366.366 110.709 5.11203 0.550903 -4.94859 -0.34666
3.0(22)[35]
)
Beam- 1 175.729 152.729 -424.354 -12.7385 -13.697 12.4511
22(Pipe 25 2 172.5 -161.357 424.973 -33.7428 -20.8938 -12.0178
X 3 -172.5 161.357 -424.973 12.3027 12.7533 12.0178
2.0(13)[16] 4 0 0 0 0 0 0
) 5 -175.729 -152.729 424.354 33.9562 21.3334 -12.4511
Beam- 1 -266.989 -1.7193 45.7178 -24.853 -1.40863 2.36873

Analyzed with SOLIDWORKS Simulation Simulation of baja final chassi 31


23(Pipe 25
X
2 266.638 4.91712 -47.4974 0.598664 0.12169 -2.44248
3.0(22)[25]
)
Beam- 1 155.502 -8.01939 -40.2328 4.60879 -5.80895 5.68789
24(Pipe 25 2 155.502 -8.01947 -40.2327 -10.465 -2.80435 5.68789
X
3.0(22)[9]) 3 -157.153 6.08652 41.1603 -8.49808 7.25323 -4.01436
Beam- 1 164.512 -5.39449 -9.91525 -2.31302 -0.933414 -3.73501
25(Pipe 25
X
2 -164.512 5.38749 9.91506 6.77841 -1.49294 3.7349
3.0(22)[41]
)
Beam- 1 490.944 0.978679 -2126.78 -204.054 -0.175611 2.08646
26(Pipe 25 2 129.048 -30.4074 1053.51 107.74 0.767644 -0.399134
X
3.0(22)[10] 3 -129.048 30.4071 -1053.51 -3.28727 2.24717 0.39925
)
Beam- 1 -1258.08 -1.63825 -0.564153 1.90459 6.45144 0.0649957
27(Pipe 25
X
2 1258.07 1.77273 -5.09226 -1.8554 -5.89035 -0.0915971
2.0(13)[25]
)
Beam- 1 -374.904 -91.4626 0.461755 0.874847 18.7154 1.49438
28(Pipe 25 2 374.904 91.4623 -0.461793 -0.680685 19.7426 -1.49438
X 3 -192.457 108.748 -1.73094 -1.40335 -23.1174 -0.382212
3.0(22)[19]
) 4 157.339 -32.1793 3.71736 0.400353 -1.81731 0.102154
1.13902e- -1.96978e- 1.11738e-
Beam- 1 1.05409e-011 -3.12618e-011 3.20162e-012
010 011 012
29(Pipe 25
-1.13902e- 1.96978e- -1.11738e- -3.20162e-
X 2 -1.05054e-011 3.14774e-011
010 011 012 012
2.0(13)[8])
3 -178.648 -27.8914 -21.6953 4.59934 -0.258224 -0.586851
-
Beam- - 8.81708e- -4.81642e-
1 0.00084808 3.27804e-006 3.40799e-007
30(Pipe 25 0.0122483 005 016
9
X
2 179.626 -29.2755 -22.7461 -4.72448 0.376712 -0.606094
2.0(13)[12]
) -8.81708e- 0.00084808
3 0.0122483 3.27804e-006 3.40799e-007 4.81642e-016
005 9
1 169.178 -31.9718 0.894966 -0.454899 1.29171 -0.0750756
Beam-
-
31(Pipe 25 0.0026454 -1.1724e- -2.62017e-
2 0.00049376 -2.03856e-007 2.07741e-006
X 6 005 008
7
3.0(22)[13]
) - 2.7696e-
3 -0.0011658 -3.22778e-007 -6.7593e-006 3.07073e-008
0.0052545 005
Beam- 1 35.3039 -178.198 -25.2751 -2.52133 9.03585 -5.66631
32(Pipe 25
X
2 -178.414 34.1992 25.2738 4.71158 0.0476795 0.792903
2.0(13)[11]
)
Beam- 1 0 0 0 0 0 0
33(Pipe 25
X
2 0 0 0 0 0 0
2.0(13)[13]
)

Analyzed with SOLIDWORKS Simulation Simulation of baja final chassi 32


Beam- 1 10.2763 0.0371982 -0.188723 2.45109 -0.256001 -0.00348081
34(Pipe 25
X
2 -10.2763 -0.0372515 0.188723 -2.36428 0.273124 0.00349329
2.0(13)[21]
)
Beam- 1 940.621 -16.0697 -71.7708 15.869 -1.36398 -5.00805
35(Pipe 25
X
2 -940.598 15.2604 72.2551 24.7626 -7.28933 5.01701
2.0(13)[17]
)
Beam- 1 203.234 -12.6176 -2.3197 -1.22354 -3.69395 -1.8185
36(Pipe 25
X
2 -203.234 12.6178 2.3197 2.79628 -4.86046 1.81851
3.0(22)[15]
)
Beam- 1 -167.764 -0.80469 10.9733 6.08091 0.0163403 -0.589267
37(Pipe 25
X
2 167.764 0.797946 -10.9739 -1.12106 0.344401 0.589029
3.0(22)[42]
)
Beam- 1 -384.557 -30.0691 -11.4412 2.2784 20.2842 0.860834
38(Pipe 25 2 -106.973 1057.58 -132.332 2.93791 3.69427 -0.118099
X
3.0(22)[20] 3 -376.367 84.4755 -11.4433 1.71992 19.6815 1.46585
)
Beam- 1 -187.623 1.13025 0.807198 -4.78711 0.226352 0.0465273
39(Pipe 25
X 2 187.623 -1.12987 -0.807198 4.31342 0.436791 -0.0465366
3.0(22)[5])
Beam- 1 3374.12 23.468 -122.908 -30.3321 12.1314 7.0334
40(Pipe 25
X
2 -3375.27 29.8871 83.6863 -21.1246 9.69808 -6.32495
2.0(13)[14]
)
Beam- 1 0 0 0 0 0 0
41(Pipe 25 2 269.512 4.51256 -19.5336 -14.0416 1.78049 4.31934
X 3 271.131 3.76017 -18.742 -4.72121 5.81796 2.12637
3.0(22)[3]) 4 -271.131 -3.76017 18.742 3.86506 -5.98973 -2.12637
Beam- 1 -573.389 -8.69937 6.70452 -2.1791 -2.62816 1.55517
42(Pipe 25
X
2 573.389 8.69928 -6.70452 -3.95455 -5.3305 -1.55517
3.0(22)[33]
)
Beam- 1 72.0115 -257.451 -17.0595 3.19585 9.10345 0.698686
43(Pipe 25
X 2 -267.26 6.23733 17.0607 -2.80743 5.33567 3.74647
3.0(22)[6])
Beam- 1 -267.284 5.68314 -16.8804 13.6472 -1.60014 3.86231
44(Pipe 25 2 -267.284 5.68314 -16.8804 13.6472 -1.60014 3.86231
X
3.0(22)[7]) 3 267.284 -5.68311 16.8803 -2.82127 5.245 -3.86231
Beam- 1 -1606.31 271.318 1772.68 122.634 -25.5134 5.71437

Analyzed with SOLIDWORKS Simulation Simulation of baja final chassi 33


45(Pipe 25
X
2 1641.6 -146.053 -1755.02 177.002 -9.53303 -7.3175
3.0(22)[26]
)
Beam- 1 0 0 0 0 0 0
46(Pipe 25
X
2 0 0 0 0 0 0
3.0(22)[31]
)
Beam- 1 -222.995 17.0437 0.222353 2.72829 -1.80307 -0.517456
47(Pipe 25
X
2 222.995 -17.0438 -0.222343 -2.57038 -10.3011 0.517455
3.0(22)[16]
)
Beam- 1 -559.575 10.7634 6.52944 -2.12386 2.65315 -1.55053
48(Pipe 25
X
2 559.68 -6.40554 -0.704905 -4.05431 4.70068 1.49987
3.0(22)[32]
)
Beam- 1 44.7457 0.532847 1.07104 1.34184 -0.398874 0.0291264
49(Pipe 25
X
2 -44.7457 -0.532866 -1.07104 -1.74123 0.597532 -0.0291246
2.0(13)[27]
)
Beam- 1 112.827 0.109049 -0.0610024 -0.828815 0.312454 -0.00437875
50(Pipe 25
X
2 -112.827 -0.108954 0.0605502 0.793308 -0.376235 0.00438076
2.0(13)[28]
)
Beam- 1 89.1324 0.949371 1.38469 1.435 0.185545 0.0850391
51(Pipe 25
X 2 -89.132 -0.95786 -1.40706 -1.95697 0.174308 -0.0849277
2.0(13)[4])
Beam- 1 366.391 86.8042 -11.7971 -1.75984 -20.2648 1.4582
52(Pipe 25 2 111.58 1047.84 -130.513 -2.72821 -2.90638 -0.35377
X
3.0(22)[11] 3 -178.566 16.9291 57.505 0.706259 10.1947 2.48122
)
Beam- 1 -36.1814 -176.843 -24.1048 2.4248 -8.81448 -5.48616
53(Pipe 25
X 2 177.487 32.8769 24.1036 -4.57721 -0.154537 0.768332
2.0(13)[9])
Beam- 1 -3823.35 48.1388 341.466 56.3574 -11.9615 1.04232
54(Pipe 25
X 2 3820.34 -97.2756 -363.873 52.6721 -4.40427 -0.480453
2.0(13)[3])
Beam- 1 0 0 0 0 0 0
55(Pipe 25
X
2 0 0 0 0 0 0
2.0(13)[19]
)
Beam- 1 -5.98254 36.021 -201.333 -5.11059 -2.05123 -4.60363

Analyzed with SOLIDWORKS Simulation Simulation of baja final chassi 34


56(Pipe 25
X
2 36.4054 2.82033 201.333 -9.66314 -0.177715 8.77527
2.0(13)[22]
)
Beam- 1 -1016.93 90.5438 -44.1955 -9.28071 -30.1129 2.25709
57(Pipe 25
X
2 1014.21 -90.3648 86.7106 -3.58485 -2.3727 -1.89603
2.0(13)[26]
)
Beam- 1 0 0 0 0 0 0
58(Pipe 25
X
2 0 0 0 0 0 0
3.0(22)[22]
)
Beam- 1 -356.811 -120.679 19.2407 1.14696 5.1555 -0.374779
59(Pipe 25
X
2 356.809 120.684 -19.2407 2.12417 15.3618 0.374779
3.0(22)[39]
)
Beam- 1 364.239 116.117 18.8079 -2.05466 14.7414 -0.356872
60(Pipe 25
X
2 -364.239 -116.117 -18.8094 -1.11883 4.85109 0.356856
3.0(22)[36]
)
Beam- 1 -71.0564 -261.673 -18.8564 -1.64384 -8.67317 2.026
61(Pipe 25
X 2 271.02 8.38269 18.8575 3.75127 -6.11463 1.96884
3.0(22)[4])
Beam- 1 -262.955 4.76867 -48.4424 -0.30638 -0.112301 -2.45739
62(Pipe 25
X
2 262.956 -4.68421 48.4424 24.8186 2.52328 2.44977
3.0(22)[29]
)
-1.50868e- -3.46777e- 3.01615e-
Beam- 1 -2.93458e-010 -1.44993e-010 3.25672e-010
007 008 008
63(Pipe 25
-
X 0.0049735 - -3.10142e-
2 0.00056267 -4.91809e-006 2.01257e-007
3.0(22)[8]) 3 0.00038277 007
4
Beam- 1 260.682 -22.5467 -121.152 6.56244 -0.37979 1.04516
64(Pipe 25 2 69.4408 -5.69719 -70.4927 12.1491 -1.18345 -2.17592
X 3 0 0 0 0 0 0
3.0(22)[14]
) 4 260.682 -22.5467 -121.152 -4.5465 1.68761 1.04516
Beam- 1 266.098 47.794 -149.664 -48.73 -12.7081 7.09243
65(Pipe 25
X 2 -266.1 -48.433 149.454 -31.7141 -13.0951 -7.07002
2.0(13)[7])
Beam- 1 79.0661 -14.1184 -0.668172 -0.282393 0.890642 -0.0541737
66(Pipe 25 -
0.0033322 1.64518e-
X 2 0.00083693 2.27227e-007 5.47778e-006 2.61041e-008
4 005
3.0(22)[18] 6
) 3 -158.107 -28.3752 1.33631 0.535553 -1.78288 -0.0886296
Beam- 1 3841.03 -380.139 18.9513 -11.3071 -57.0483 0.577667

Analyzed with SOLIDWORKS Simulation Simulation of baja final chassi 35


67(Pipe 25
X 2 -3842.84 359.838 -38.7113 -6.1133 -52.0059 -1.46312
2.0(13)[5])
Beam- 1 3465 147.261 -1.7106 0.75916 42.4506 -9.94907
68(Pipe 25
X 2 -3465.19 -142.711 -5.60981 -4.56253 40.2355 10.06
2.0(13)[2])
Beam- 1 6.35829 35.7713 -200.549 5.11494 2.03991 -4.5718
69(Pipe 25
X
2 -36.1893 3.21641 200.549 9.63721 0.145674 8.71569
2.0(13)[20]
)
Beam- 1 -938.155 13.1579 72.1775 15.6765 -1.28306 -4.94324
70(Pipe 25
X
2 939.178 -21.1824 -54.8912 23.3198 -9.72844 5.01625
2.0(13)[15]
)
Beam- 1 0 0 0 0 0 0
71(Pipe 25 2 0 0 0 0 0 0
X
3.0(22)[27] 3 0 0 0 0 0 0
)

Beam Stresses
Bending Bending Torsional Worst
Beam Name Joints Axial(N/m^2)
Dir1(N/m^2) Dir2(N/m^2) (N/m^2) Case(N/m^2)
Beam-1(Pipe 25 1 -4.60593e+007 -1.05104e+007 -9.3312e+007 1.16855e+007 1.39961e+008
X 2.0(13)[6]) 2 -4.60593e+007 -3.02878e+006 9.84966e+007 -1.16855e+007 1.44602e+008
Beam-2(Pipe 25 1 36.9255 0.813732 -4.01952 0.0251486 41.0266
X 3.0(22)[2]) 2 37.1392 -0.813736 -0.890753 -0.0255761 38.3456
Beam-3(Pipe 25 1 -3.03053e+006 706291 2.68099e+007 199736 2.98497e+007
X 3.0(22)[37]) 2 -3.03052e+006 1.8794e+006 -5.68429e+006 -199703 9.01744e+006
Beam-4(Pipe 25 1 4.48475e+007 -4.84514e+007 -2.28551e+007 -7.35841e+006 9.84188e+007
X 2.0(13)[18]) 2 4.48476e+007 7.03645e+007 2.60133e+007 7.3551e+006 1.19867e+008
Beam-5(Pipe 25 1 -3.13702e+006 -1.89605e+006 -5.74781e+006 175245 9.18948e+006
X 3.0(22)[34]) 2 -3.13701e+006 -751953 2.53029e+007 -175262 2.84511e+007
Beam-6(Pipe 25 1 21348.5 -4.74982e+006 1.5874e+006 -315525 5.02941e+006
X 2.0(13)[29]) 2 21348.5 -6.88268e+006 3.94677e+006 315526 7.95535e+006
Beam-7(Pipe 25 1 -1.34815e+007 2.08259e+007 -7.03207e+007 2.00343e+006 8.68212e+007
X 2.0(13)[24]) 2 -1.34786e+007 -5.84515e+006 6.55146e+006 -2.22354e+006 2.22586e+007
1 1.5199e+006 -580506 -2.15217e+006 70483.5 3.74899e+006
Beam-8(Pipe 25 2 -3.29499e+006 -1.15783e+006 -3.31019e+007 -1.21113e+006 3.64171e+007
X 3.0(22)[12]) 3 1.5199e+006 471798 -1.28077e+007 -70485.1 1.43362e+007
4 -1.68901e+006 990373 3.89131e+007 318644 4.06147e+007
1 -1.48447e+006 1.11305e+007 -2.23688e+006 -3.09031e+006 1.28375e+007
Beam-9(Pipe 25
2 -1.53679e+006 2.66282e+006 253378 -489449 4.21164e+006
X 3.0(22)[40])
3 -1.53679e+006 9.4313e+006 -198930 489449 1.09702e+007
Beam-10(Pipe 1 1.12518e+006 6.67446e+006 3.80776e+006 136073 8.80941e+006
25 X 2 4.59487e+006 -3.29799e+008 -1.20483e+006 1.58286e+006 3.34396e+008
3.0(22)[21]) 3 4.59487e+006 2.60507e+008 863441 -1.5829e+006 2.65103e+008
Beam-11(Pipe 1 306806 1.158e+007 2.58796e+006 12817.5 1.21724e+007
25 X
2 306806 1.1678e+007 2.44409e+006 -12817.5 1.22378e+007
2.0(13)[10])

Analyzed with SOLIDWORKS Simulation Simulation of baja final chassi 36


Beam-12(Pipe 1 -1.84609e+006 -2.2175e+006 6.14177e+006 -1.48351e+006 8.37591e+006
25 X
2 -1.84609e+006 -4.40291e+006 -7.97842e+006 1.48351e+006 1.09588e+007
3.0(22)[24])
Beam-13(Pipe 1 0 0 0 0 0
25 X
2 0 0 0 0 0
3.0(22)[30])
Beam-14(Pipe 1 1.43463e+006 -1.68734e+007 3.90372e+006 4.22694e+006 1.87537e+007
25 X 3.0(22)[1]) 2 1.43463e+006 1.45688e+007 1.22123e+007 -4.22695e+006 2.04449e+007
1 2.25627e+006 1.03328e+007 619651 -865546 1.26077e+007
Beam-15(Pipe
2 2.25627e+006 -6.89753e+006 -2.51845e+006 865546 9.59919e+006
25 X
3 -685518 -2.08034e+007 -2.58133e+006 -1.78642e+006 2.16484e+007
3.0(22)[17])
4 2.25627e+006 -6.89753e+006 -2.51845e+006 865546 9.59919e+006
Beam-16(Pipe 1 0 0 0 0 0
25 X
2 0 0 0 0 0
2.0(13)[23])
Beam-17(Pipe 1 -2.03124e+006 -3.99546e+006 1.70312e+007 455079 1.95248e+007
25 X
2 -2.03124e+006 -5.00148e+006 -3.06969e+006 -455084 7.89961e+006
3.0(22)[23])
Beam-18(Pipe 1 -1.24851e+007 -2.65426e+008 1.14649e+008 -6.73721e+006 3.01614e+008
25 X
2 -1.46619e+007 2.006e+008 2.46478e+007 5.9654e+006 2.1677e+008
3.0(22)[28])
Beam-19(Pipe 1 3.54507e+006 -7.1962e+007 2.98029e+007 -8.15109e+006 8.14343e+007
25 X 2.0(13)[1]) 2 3.54507e+006 1.11465e+008 -2.94342e+007 8.15107e+006 1.18831e+008
Beam-20(Pipe 1 -3.06105e+006 1.51483e+006 -5.79412e+006 184520 9.04992e+006
25 X
2 -3.24345e+006 881887 -8.55692e+006 296425 1.18457e+007
3.0(22)[38])
Beam-21(Pipe 1 -3.16344e+006 -1.50354e+006 -5.86434e+006 -161323 9.21745e+006
25 X
2 -3.30831e+006 -897149 -8.0588e+006 -282269 1.14169e+007
3.0(22)[35])
1 -2.33068e+006 2.92808e+007 -3.14839e+007 1.431e+007 4.5326e+007
Beam-22(Pipe 2 -2.28785e+006 7.75612e+007 -4.80264e+007 -1.38121e+007 9.35144e+007
25 X 3 -2.28785e+006 2.82791e+007 -2.93147e+007 1.38121e+007 4.30194e+007
2.0(13)[16]) 4 0 0 0 0 0
5 -2.33068e+006 7.80517e+007 -4.9037e+007 -1.431e+007 9.45082e+007
Beam-23(Pipe 1 2.41093e+006 4.04733e+007 -2.29396e+006 1.92875e+006 4.29491e+007
25 X
2 2.40776e+006 974929 -198172 -1.9888e+006 3.40263e+006
3.0(22)[25])
1 1.40419e+006 7.50544e+006 9.45992e+006 4.63138e+006 1.34799e+007
Beam-24(Pipe
2 1.40419e+006 -1.70424e+007 4.5669e+006 4.63138e+006 1.90479e+007
25 X 3.0(22)[9])
3 1.4191e+006 1.38392e+007 1.18119e+007 -3.26871e+006 1.96137e+007
Beam-25(Pipe 1 -1.48556e+006 3.76676e+006 -1.52007e+006 -3.04124e+006 5.54747e+006
25 X
2 -1.48556e+006 1.10387e+007 2.43127e+006 3.04116e+006 1.27888e+007
3.0(22)[41])
Beam-26(Pipe 1 4.43325e+006 -3.32303e+008 285983 1.69891e+006 3.36737e+008
25 X 2 1.16531e+006 1.75456e+008 -1.25011e+006 -324996 1.76626e+008
3.0(22)[10]) 3 1.16531e+006 5.35334e+006 3.65953e+006 325091 7.64994e+006
Beam-27(Pipe 1 -1.66858e+007 4.3779e+006 -1.48293e+007 74699.5 3.21478e+007
25 X
2 -1.66857e+007 4.26482e+006 -1.35395e+007 -105272 3.08811e+007
2.0(13)[25])
1 -3.38541e+006 1.42469e+006 -3.04781e+007 1.21681e+006 3.38968e+007
Beam-28(Pipe
2 -3.38541e+006 1.1085e+006 3.2151e+007 -1.21681e+006 3.55555e+007
25 X
3 -1.7379e+006 -2.28536e+006 3.76469e+007 -311218 3.94541e+007
3.0(22)[19])
4 1.42078e+006 651977 2.95951e+006 83179 4.45125e+006

Analyzed with SOLIDWORKS Simulation Simulation of baja final chassi 37


1 1.51067e-006 2.42294e-005 7.18583e-005 3.67962e-006 7.73439e-005
Beam-29(Pipe
2 1.51067e-006 2.41478e-005 7.23539e-005 -3.67962e-006 7.77879e-005
25 X 2.0(13)[8])
3 2.36939e+006 -1.0572e+007 -593553 -674468 1.29581e+007
Beam-30(Pipe 1 162.448 -7.5349 0.783359 -5.5355e-010 170.023
25 X 2 2.38236e+006 -1.08597e+007 -865909 -696584 1.32765e+007
2.0(13)[12]) 3 162.448 7.5349 -0.783359 5.5355e-010 170.023
Beam-31(Pipe 1 1.52769e+006 -740807 -2.10356e+006 -61130.5 3.75788e+006
25 X 2 23.8887 -0.33198 -3.38307 -0.0213348 27.288
3.0(22)[13]) 3 47.4485 0.525647 -11.0076 0.0250035 58.4686
Beam-32(Pipe 1 468232 -5.79552e+006 -2.07698e+007 -6.51228e+006 2.20314e+007
25 X
2 2.36629e+006 -1.083e+007 109596 911282 1.31969e+007
2.0(13)[11])
Beam-33(Pipe 1 0 0 0 0 0
25 X
2 0 0 0 0 0
2.0(13)[13])
Beam-34(Pipe 1 -136293 -5.63407e+006 -588443 -4000.49 5.80101e+006
25 X
2 -136293 -5.43452e+006 -627803 4014.83 5.60696e+006
2.0(13)[21])
Beam-35(Pipe 1 -1.24754e+007 -3.64765e+007 -3.13525e+006 -5.75575e+006 4.90864e+007
25 X
2 -1.24751e+007 5.69192e+007 1.67552e+007 5.76605e+006 7.18092e+007
2.0(13)[17])
Beam-36(Pipe 1 -1.83522e+006 1.99255e+006 -6.01562e+006 -1.48072e+006 8.17225e+006
25 X
2 -1.83522e+006 4.55376e+006 7.91529e+006 1.48073e+006 1.09669e+007
3.0(22)[15])
Beam-37(Pipe 1 -1.51492e+006 9.9028e+006 -26610.3 -479813 1.14178e+007
25 X
2 -1.51492e+006 1.82565e+006 560859 479619 3.42477e+006
3.0(22)[42])
Beam-38(Pipe 1 -3.47257e+006 3.7104e+006 -3.3033e+007 700937 3.67133e+007
25 X 2 965970 -4.78441e+006 6.01614e+006 -96162.7 8.65262e+006
3.0(22)[20]) 3 -3.39862e+006 2.8009e+006 -3.20515e+007 1.19357e+006 3.55722e+007
Beam-39(Pipe 1 1.69425e+006 7.79583e+006 368616 37885 9.49879e+006
25 X 3.0(22)[5]) 2 1.69425e+006 7.02444e+006 -711316 -37892.5 8.75461e+006
Beam-40(Pipe 1 4.47507e+007 -6.97213e+007 -2.78852e+007 8.08348e+006 1.19842e+008
25 X
2 4.47659e+007 4.85571e+007 2.2292e+007 -7.26926e+006 9.81955e+007
2.0(13)[14])
1 0 0 0 0 0
Beam-41(Pipe 2 2.43371e+006 -2.28668e+007 -2.89955e+006 3.51704e+006 2.54836e+007
25 X 3.0(22)[3]) 3 2.44833e+006 -7.68853e+006 -9.47459e+006 1.7314e+006 1.465e+007
4 2.44833e+006 -6.29427e+006 -9.75432e+006 -1.7314e+006 1.40571e+007
Beam-42(Pipe 1 5.17775e+006 3.54867e+006 -4.27998e+006 1.2663e+006 1.07375e+007
25 X
2 5.17775e+006 -6.44e+006 8.68075e+006 -1.2663e+006 1.59865e+007
3.0(22)[33])
Beam-43(Pipe 1 650268 5.20446e+006 -1.4825e+007 568908 1.63623e+007
25 X 3.0(22)[6]) 2 2.41338e+006 4.57192e+006 8.68917e+006 3.05058e+006 1.22319e+007
1 2.41359e+006 -2.22246e+007 -2.60584e+006 3.1449e+006 2.47904e+007
Beam-44(Pipe
2 2.41359e+006 -2.22246e+007 -2.60584e+006 3.1449e+006 2.47904e+007
25 X 3.0(22)[7])
3 2.41359e+006 -4.59445e+006 -8.54152e+006 -3.1449e+006 1.21124e+007
Beam-45(Pipe 1 -1.45051e+007 1.99711e+008 4.15487e+007 4.65294e+006 2.18492e+008
25 X
2 -1.48237e+007 -2.8825e+008 -1.55246e+007 -5.9583e+006 3.03491e+008
3.0(22)[26])
Beam-46(Pipe 1 0 0 0 0 0
25 X
2 0 0 0 0 0
3.0(22)[31])

Analyzed with SOLIDWORKS Simulation Simulation of baja final chassi 38


Beam-47(Pipe 1 -2.01366e+006 4.44304e+006 2.93631e+006 -421340 7.33931e+006
25 X
2 -2.01366e+006 4.18588e+006 -1.67755e+007 421340 1.93035e+007
3.0(22)[16])
Beam-48(Pipe 1 5.053e+006 3.45872e+006 4.32067e+006 -1.26253e+006 1.05875e+007
25 X
2 5.05395e+006 -6.60248e+006 -7.65509e+006 1.22128e+006 1.5163e+007
3.0(22)[32])
Beam-49(Pipe 1 -593459 -3.08435e+006 -916850 33474.9 3.81119e+006
25 X
2 -593459 -4.00239e+006 -1.37349e+006 -33472.8 4.82496e+006
2.0(13)[27])
Beam-50(Pipe 1 1.49642e+006 -1.90511e+006 -718206 -5032.49 3.53241e+006
25 X
2 1.49642e+006 -1.8235e+006 -864813 5034.81 3.51459e+006
2.0(13)[28])
Beam-51(Pipe 1 -1.18216e+006 -3.29849e+006 426494 97735.4 4.50811e+006
25 X 2.0(13)[4]) 2 -1.18215e+006 -4.49829e+006 -400665 -97607.4 5.69825e+006
Beam-52(Pipe 1 -3.30853e+006 2.8659e+006 -3.30013e+007 1.18735e+006 3.64341e+007
25 X 2 1.00758e+006 -4.44291e+006 4.73305e+006 -288058 7.4992e+006
3.0(22)[11]) 3 -1.61246e+006 1.15015e+006 -1.66022e+007 2.02034e+006 1.82544e+007
Beam-53(Pipe 1 479871 -5.57364e+006 -2.02609e+007 -6.30524e+006 2.14935e+007
25 X 2.0(13)[9]) 2 2.354e+006 -1.05212e+007 355219 883044 1.28812e+007
Beam-54(Pipe 1 -5.07087e+007 1.29543e+008 2.74947e+007 1.19793e+006 1.83137e+008
25 X 2.0(13)[3]) 2 -5.06689e+007 -1.21072e+008 -1.01236e+007 -552185 1.72163e+008
Beam-55(Pipe 1 0 0 0 0 0
25 X
2 0 0 0 0 0
2.0(13)[19])
Beam-56(Pipe 1 -79345.9 -1.17472e+007 4.71495e+006 -5.29095e+006 1.27374e+007
25 X
2 -482841 2.22117e+007 -408496 1.00854e+007 2.26983e+007
2.0(13)[22])
Beam-57(Pipe 1 -1.34875e+007 -2.13326e+007 6.92175e+007 2.59407e+006 8.59177e+007
25 X
2 -1.34513e+007 8.24013e+006 -5.45389e+006 -2.1791e+006 2.33329e+007
2.0(13)[26])
Beam-58(Pipe 1 0 0 0 0 0
25 X
2 0 0 0 0 0
3.0(22)[22])
Beam-59(Pipe 1 -3.22203e+006 1.86782e+006 -8.39576e+006 -305165 1.18231e+007
25 X
2 -3.22201e+006 -3.45922e+006 2.50168e+007 305165 2.84768e+007
3.0(22)[39])
Beam-60(Pipe 1 -3.2891e+006 3.34602e+006 2.40065e+007 -290584 2.75276e+007
25 X
2 -3.2891e+006 -1.82203e+006 -7.90002e+006 290572 1.13965e+007
3.0(22)[36])
Beam-61(Pipe 1 641644 2.677e+006 -1.41243e+007 1.64968e+006 1.50174e+007
25 X 3.0(22)[4]) 2 2.44733e+006 6.10896e+006 9.95771e+006 1.60313e+006 1.41296e+007
Beam-62(Pipe 1 2.3745e+006 498941 -182882 -2.00094e+006 2.9059e+006
25 X
2 2.37451e+006 4.04173e+007 -4.10918e+006 1.99473e+006 4.30002e+007
3.0(22)[29])
Beam-63(Pipe 1 0.00136235 0.000477898 -0.000236122 0.00026518 0.0018954
25 X 3.0(22)[8]) 2 44.9114 -8.00914 -0.327748 -0.252534 52.9272
1 2.35398e+006 1.0687e+007 618491 851021 1.30588e+007
Beam-64(Pipe
2 -627055 -1.97849e+007 -1.92726e+006 -1.77175e+006 2.05056e+007
25 X
3 0 0 0 0 0
3.0(22)[14])
4 2.35398e+006 -7.404e+006 -2.74828e+006 851021 1.02516e+007
Beam-65(Pipe 1 3.52923e+006 -1.12011e+008 2.92109e+007 8.15133e+006 1.19286e+008
25 X 2.0(13)[7]) 2 3.52927e+006 7.2898e+007 -3.01004e+007 -8.12557e+006 8.23973e+007
Beam-66(Pipe 1 713973 -459879 -1.45042e+006 -44111.1 2.23555e+006

Analyzed with SOLIDWORKS Simulation Simulation of baja final chassi 39


25 X 2 30.0903 0.370041 -8.9206 0.0212553 39.0186
3.0(22)[18]) 3 1.42772e+006 -872151 -2.90344e+006 -72166.9 4.45932e+006
Beam-67(Pipe 1 -5.09433e+007 2.59904e+007 -1.31131e+008 663912 1.84625e+008
25 X 2.0(13)[5]) 2 -5.09673e+007 -1.4052e+007 1.19541e+008 -1.68156e+006 1.71331e+008
Beam-68(Pipe 1 -4.5956e+007 -1.745e+006 9.75769e+007 -1.14345e+007 1.43549e+008
25 X 2.0(13)[2]) 2 -4.59585e+007 -1.04874e+007 -9.24853e+007 1.15619e+007 1.39037e+008
Beam-69(Pipe 1 -84329.5 -1.17572e+007 4.68894e+006 -5.25436e+006 1.2742e+007
25 X
2 -479976 2.21521e+007 -334846 1.00169e+007 2.26346e+007
2.0(13)[20])
Beam-70(Pipe 1 -1.24427e+007 3.6034e+007 2.94924e+006 -5.68127e+006 4.85972e+007
25 X
2 -1.24562e+007 -5.36028e+007 -2.23618e+007 5.76517e+006 7.05364e+007
2.0(13)[15])
Beam-71(Pipe 1 0 0 0 0 0
25 X 2 0 0 0 0 0
3.0(22)[27]) 3 0 0 0 0 0

Analyzed with SOLIDWORKS Simulation Simulation of baja final chassi 40


Study Results

Name Type Min Max


Stress1 TXY: Shear in Y Dir. on YZ 0 N/m^2 3.36737e+008 N/m^2
Plane Element: 233 Element: 512

baja final chassi-Static 4-Stress-Stress1

Name Type Min Max


Displacement1 URES: Resultant Displacement 0 mm 2.56151 mm
Node: 55 Node: 1

Analyzed with SOLIDWORKS Simulation Simulation of baja final chassi 41


baja final chassi-Static 4-Displacement-Displacement1

Name Type
Displacement1{1} Deformed shape

Analyzed with SOLIDWORKS Simulation Simulation of baja final chassi 42


baja final chassi-Static 4-Displacement-Displacement1{1}

Conclusion

Analyzed with SOLIDWORKS Simulation Simulation of baja final chassi 43

Vous aimerez peut-être aussi